Kind Attention: Shri. R.R.Kumar, Addl. General Manager (M.M), PDIL PRE-BID QUERIES. Sl.No Bidder s Query Reference Client / Consultant Reply 1

Size: px
Start display at page:

Download "Kind Attention: Shri. R.R.Kumar, Addl. General Manager (M.M), PDIL PRE-BID QUERIES. Sl.No Bidder s Query Reference Client / Consultant Reply 1"

Transcription

1 CLIENT M/s GREEN GAS LIMITED, Lucknow CONSULTANT M/s PROJECTS & DEVELOPMENT INDIA LIMITED, Noida TENDER CITY GAS DISTRIBUTION PROJECT AT LUCKNOW GA for GREEN GAS LIMITED TENDER NO. PNMM/EM089/E/111/NCB : DRS TENDER VENDOR M/s CPL ENERGY INDIA PVT. LTD. PRE-BID VENUE PDIL, Noida (1100Hrs on ) Kind Attention: Shri. R.R.Kumar, Addl. General Manager (M.M), PDIL PRE-BID QUERIES Sl.No Bidder s Query Reference Client / Consultant Reply 1 Cabinet : MOC shall be MS Sheet with 1.6 TS for DRS mm Thickness Pg 6/26 MS shall be acceptable. 2 Pressure Regulating Configuration shall be TS for DRS Integral SSV is Active + Monitor with Int. SSV. Pg 6/26 acceptable. 3 Time Schedule : Kindly amend the TS for DRS Delivery Time Schedule upto 16 Weeks Pg 12/26 4 Kindly confirm QOEC Closures are not TS for DRS required for filters. Pg 16/ Kindly provide us the Approved Vendor List for Solar Photovoltaic Module Kindly confirm all valves shall be of 150# Pressure Rating Class Kindly confirm there is no requirement for Flow Computer Kindly extend the Bid Submission Date upto 5 th December 2014 TS for DRS Pg 24/26 General Piping Spec. Valve Datasheet - - Point closed. Refer the sub vender list point No.1 RPD with Totalizer & EVC No flow computer is required. Extended till 3 rd December 2014.

2 CLIENT TENDER NO. PROJECT EMERSON NGSE NO. : M/s GREEN GAS LTD. : PNMM/ EM089/E/111/NCB : CITY GAS DISTRIBUTION PROJECT AT LUCKNOW GA FOR GREEN GAS LIMITED, LUCKNOW DESIGN, ENGINEERING, MANUFACTURING, TESTING, SUPPLY, TRANSPORTATION TO GGL SITE INSTALLATION & COMMISSIONING OF DISTRICT REGULATING STATION : SR. NO. TENDER SECTION DESCRIPTION EMRSON's QUERRY Customer Replies TESTING AND INSPECTION: Page No. 8 of 26 TENDER DOCUMENT NO.: PNMM/ EM089/E/111/NCB 5.8 The Vendor must submit a certificate EN stating the relevant quality of the Supplied DRS. As per our understanding 3.1 certification as EN is acceptable for this low pressure PRS skid Kindly confirm our understanding is correct. It is Acceptable TIME SCHEDULE Page No. 12 of 26 Time schedule for Design, Manufacturing, testing, inspection, loading at Vendor s work, Transportation, Unloading, Installation & Commissioning of DRS at Project site, shall be 10 weeks from the date of LOI. Major Instruments like PSV, CRV are taking 12 to 14 weeks for the delivery & after that we require 01 to 02 week for the integration & testing, FAT & dispatch & recivial at site of the whole skid. Considering whole. 3 Qty. As per our understanding we need to provide these system for each site. Total 06 site. Please confirm our understanding is correct. Total No. of DRS shall be STANDALONE SOLAR LIGHTING SYSTEM TECHNICAL SPECIFICATION Page No. 24 to 26 The scope shall be inclusive of but not limited to solar photovoltaic (SPV) As per our understanding we only need to provide these equipments loose. Also module, storage battery, battery box control electronics, inter connecting we need to provide only assistance during insulation of this system. We need to wires/cables, luminaries, supporting pole/structure including hardware, commission this system once fully installed by M/s PDIL OR M/s GGL. Kindly for equipment/devices etc. confirm our understanding is correct. General General 7 General Kindly confirm How much back ups is required to select the Invertors. Scope of work includes design,engineering,manufacture,testing at works,packing,loading,dispatch in well packed condition,unloading at site,storage at site,testing & commissioning of stand alone SPV outdoor lighting system. Kindly confirm that Batteries & Invertors & other safe area mountable devices are All elctrical equipments are to be installed on pole/structure in field need to installed in the control room only. If yes then please provide distance only,nearby DRS skid. Also, these shall copmly with the requirement between control room to field. specified in ITB. Kindly confirm that any civil or required for this system is excluded from our Erection is not included in bidder scope. scope of supply. Battery rating shall be decided on Autonomy as indicated in ITB but minimum 12 V, 75Ah (at C/10 discharge rate). The invertor rating shal be decided on battery and the lighting load connected. 8 LIGHTING FIXTURE Kindly confirm qty required per site. In order to maintain minimum illumination level of 50 lux, the quantity per site shall be decided (minimum 1per site). The successful bidder shall submit lighting calculation to GGL/consultant for review/approval. However GGL/consultant comments, if any, shall be binding. 9 Datasheet PSV Datasheet PSV Kindly provide PSV & CRV datasheet along with set points. Set point of PSV shall be 5.5 to 6 Kg/cm2g 10 EVC Datasheet EVC Datasheet As per our understanding RS 232 is more then sufficient for the functionality as per technical specs. EVC inbuilt RS 232 can be used through serial link and separate optical port is available for configuration. RS 232 port is available by default in EVC (for all make), however, RS 485 is optional and is of high cost. Apart from this No EVC Manufacturer is haveing inbuilt RS 485 port. Inbuilt RS232 port can be converted using additional RS 232 to Rs 485 convertor. However for that 230 VAC OR 24 VDC external power supply will be required at skid. So considering all condition, We can provide RS 232 port. Kindly confirm our RS232/485 All Major Item approved vendors is taking 10 to 12 weeks for the fabrication & 11 Delivery period 10 weeks from date of LOI delivery. After the same one week we require for Integration in our system &. internal testing & one week for the FAT & delivery at site. Considering these time period request you to please extend delivery terms up to 16 weeks. 12 Skid Cabinet Skid Cabinet Please provide details specs for the skid Cabinet. Details avilable in ITB

3 CLIENT : GREEN GAS TENDER NO. EM089 PNPR TS 111 PROJECT : CITY GAS DISTRIBUTION PROJECT FOR LUCKNOW GA FOR DISTRICT REGULATING STATION 5000SCMH REF. No. : NIQ/G140528GGL/R00 6 Date : Sr. No. Clause/Page No Query Description Nirmal Remark / Clarification sought form MGL CLIENT'S/PDIL REPLY TECHNICAL QUERIES 1 Pg 5 of 26 of Tech Specs Scope of supply Pg 7 of 26 of Tech Specs & Filter Datasheet 4.0 Annex 3 VOL II of II, Filter Datasheet Pg 6 of 26 of Tech Specs, Clause 3.2.iv INLET PRESSURE KG/CM2G OUTLET PRESSURE 4 KG/CM2G& "FILTER SHOULD BE FITTED WITH SUITABLE PRESSURE SAFETY AND VENT VALVES. FLANGE RATING SHOULD BE 600 #." SUITABLE DAVIT ARRANGEMENT IS TO BE PROVIDED FOR THE HEAD Two turbine meters are required The site scope of supply should be limited to supervision of installation and commissioning. Please confirm The design Pressure being 25 barg we understand that all flanges shall be 300# before Pressure Regulation & 150# after Pressure Regulation.Please confirm We understand that QOC is not required for filter Turbine meters need larger space due to requirement of 10D upstream and 5D downstream straight run. We request you to opt for RPD meters as they do not require any strainght run. RPD meters also have a better As Per ITB Confirmed RPD with Flow Totalizer & EVC 5 Pg 3 of 26 of Tech Specs Annex 5 Vendor List Vendor List not avaible. Please provide Annex 5 Approved Vendor List vendor list is already provided in the ITB Pg 8 of 26 of Tech Specs, Clause 3.3 Pg 8 of 26 of Tech Specs, Clause 5.8 Pg 8 of 26 of Tech Specs, Clause 5.8 Pg 8 of 26 of Tech Specs, Clause 13 Pg 20 of 26 of Tech Specs, Turbine meter Pg 21 of 26 of Tech Specs, RTD Pg 23 of 26 of Tech Specs, Pressure regulators and SSV Commissioning of a standalone solar photovoltaic outdoor lighting system for DRS. The Vendor must submit a certificate EN stating the relevant quality of the Supplied DRS. Leak test of complete skid with air/n2 1.4 times of design pressure. Time schedule for Design, Manufacturing, testing, inspection, loading at Vendor s work,transportation, Unloading, Installation & Commissioning of DRS at Project site, shall be 10 weeks from the date of LOI. The Turbine flow meters shall be flow calibrated with natural gas at operating pressure The RTD shall be Class A type4 wire PT100. Limit switch to Slam shut off valve Please note that lightning systems are expertise of site contractor. Please remove from bidder scope. Please accept 3.1 certification for pressure parts which ensures quality assuarance by ISO certified companies. The 3.1 certification is accepted for DRS supplied to major gas companies like, GAIL, MGL, SGL, GSPC, CUGL, IGL etc. Please note that the 3.2 certification involves more time. The pneumatic leak test is done at 7 barg as a general practice. This phylosophy is used in all DRS supplied to gas companies like, GAIL, MGL, SGL, GSPC, CUGL, IGL etc. Please accept this philosophy. The delivery period is very less. Please allow 16weeks exworks. Please note that 'flow calibration' involves transportation of meter to a european thirtd party lab which is a time consuming activity. Please allow air calibration at atmospheric pressure in manufacturer's lab traceable to international standards. Air calibration is accepted in all DRS supplied to gas companies like, GAIL, MGL, SGL, GSPC, CUGL, IGL etc. Please accept this philosophy. Please note that RTDs are built in to EVC. Thus specifications of RTD must be as per manufacturer's standard. Please accept. Different manufacturers use pt100 or pt1000 RTD. Please note that the SSV is not connected to any control system as per specifications. Thus requirement of limit switch can be eleminated. Please confirm... Flow meter will have to be calibrated with air at atmospheric condition. The calibration will have to be done by any NABL accredited agency authorized to carry out calibration of flow related to gas / air. Electronic Volume Corrector with PT and RTD inbuilt (4 wire pt 100 /1000) ok. Limit switch to be provided.

4 CLIENT : GREEN GAS TENDER NO. EM089 PNPR TS 111 PROJECT : CITY GAS DISTRIBUTION PROJECT FOR LUCKNOW GA FOR DISTRICT REGULATING STATION 5000SCMH REF. No. : NIQ/G140528GGL/R00 6 Date : Sr. No. Clause/Page No Query Description Nirmal Remark / Clarification sought form MGL CLIENT'S/PDIL REPLY 13 Annexure 4 to volume II of II turbine meter datasheet pulsar HF(DUAL) Generally EVC uses the low frequency pulsar. Thus only low frequency pulsar is required. Please confirm. Input/Output LF/HF pulses will be sent to Electronic Volume Correcting Device complying with EN for measurement of corrected volume of gas supplied. Gas flow meter should be compatible with such EVC Devices.

5 CLIENT : GREEN GAS TENDER NO. EM089 PNPR TS 111 PROJECT : CITY GAS DISTRIBUTION PROJECT FOR LUCKNOW GA FOR DISTRICT REGULATING STATION 5000SCMH REF. No. : NIQ/G140528GGL/R00 6 Date : Sr. No. Clause/Page No Query Description Nirmal Remark / Clarification sought form MGL CLIENT'S/PDIL REPLY COMMERCIAL QUERIES 1 ITB Clause 17.4 EMD exemption for NSIC registered Firms Please confirm EMD exemption for NSIC registered Firms NSIC registered firms are exempted from furnishing EMD/Bid Security as per clause 17.9 of Instruction to Bidders

6 Bidder : ROCKWIN FLOWMETER INDIA PVT. LTD. Tender no : IGL/ND/C&P/13219 FOR RPD METERS : DRS TENDER, GGL, LUCKNOW PRE-BID QUERIES, Commercial: 1. We wish to inform that EMD is exempted for bidders registered under NSIC. Relevant extracts of NSIC document is herewith attached for your information. Shall appreciate if the EMD is waived for NSIC registered bidders PDIL Reply: NSIC registered firms are exempted from furnishing EMD/Bid Security as per clause 17.9 of Instruction to Bidders Technical: 1. Please clarify whether EN Certification is applicable for all bought out items or 3.1 certification is acceptable. In case of 3.2 certification, delivery for DRSs is requested to be 6 months from date of FOI / PO. With 3.1 certification also 10 weeks delivery at site is too short and request to change this as 14 weeks at least. PDIL Reply :- 2. As the turbine meters are to be provided with EVC, please delete requirement of HF pulser on Turbine meter. It may also please consider that, Battery powered, EVCs are used with LF pulse. For using EVCs with HF pulse, EVC need to be externally powered by external power supply or through external battery, battery charger & solar panel. PDIL Reply:- Input/Output LF/HF pulses will be sent to Electronic Volume Correcting Device complying with EN for measurement of corrected volume of gas supplied. Gas flow meter should be compatible with such EVC Devices. 3. Turbine meter & EVC shall have a continuous monitoring feature for detecting missing blades or bearing problems and to give alarm in such situation. This

7 feature is not possible with EVC. Flow computer would be required for the same. Hence, please delete this feature requirement. PDIL Reply:- RPD with Flow Totalizer & EVC 4. For turbine meter calibration at operating pressure on Natural gas (wet calibration) delivery will be too long and DRS delivery needs to be revised to 6 to 7 months. Hence, please confirm acceptance of six point calibration for turbine meter at atmospheric pressure with air at NABL accredited calibration laboratory. PDIL Reply:- Flow meter will have to be calibrated with air at atmospheric condition. The calibration will have to be done by any NABL accredited agency authorized to carry out calibration of flow related to gas / air. 5. Please confirm acceptability of supply of one no. communication cable for each DRS. PDIL Reply:-. 6. Please confirm acceptability of optical port connection on EVC for connecting portable PC/Laptop and RS232 port for connecting modem. PDIL Reply:- RS232 / 485 acceptable. 7. All the IO cards/ barriers/relays/terminals for EVC shall be installed 25% in excess than the required for future use. This feature is of Flow Computer and is not possible in EVC. Hence, please delete. PDIL Reply:- OK 8. RTD can be either 2 wire or 4 wire. Please confirm. PDIL Reply :- Electronic Volume Corrector with PT and RTD inbuilt (4 wire PT 100 /1000) ok. 9. Please delete requirement of Limit Switch for SSV as same cannot be hooked-up with EVC. PDIL Reply :-.

8 10. Please exclude scope of supply of a standalone solar photovoltaic outdoor lighting system for DRS from DRS supply vendor. PDIL Reply : Please confirm acceptance of SS410 ball material for 2 & above sizes. PDIL Reply: SS410 ball material in place of CS+.003ENP is acceptable 12. For EVC, please confirm following. a) Compliance standard shall be EN & MID and approved by NMI / equivalent for legal metrology.- confirm b) Temperature sensor shall be PT wire PT 100 /1000 c) Communication for portable PC / Laptop shall be optical port and for Modem RS232 port. RS232 / 485 acceptable. 13. Please provide more vendors for SS Tube, tube fittings and SS manifold valves. PDIL Reply : - point closed. Refer the point No. 1 of sub vendor list. 14. Please include M/s Pietro Fiorentini in approved vendor list for EVC. These are supplied & working satisfactory in many CGDs including Gail gas Ltd, GGCL, MGL etc. and these EVC have all certifications in place as per international standard. PDIL Reply : - point closed. Refer the point No. 1 of sub vendor list. 14. Please allow us at least 10 days, from date of your reply to bidder s queries and extend the due date for offer submission accordingly. PDIL Reply:- Bid due date extended till

9 Client : Tender No: Subject: Green Gas Limited PNMM/ EM089/E/111/NCB DESIGN, ENGINEERING,MANUFACTURING, TESTING, SUPPLY, TRANSPORTATION TO GGL SITEINSTALLATION & COMMISSIONING OF DISTRICT REGULATING STATION Date: Sr. no. Clause No. / Document Page No. Query Description IGCPL Remark / Clarification sought form GGL Remarks / Reply by GGL/PDIL 1 1.2/SECTION VII /VOL I of II 4 of 16 C Form 2 1.3/SECTION VII /VOL I of II 4 of 16 Octroi and other levies etc. COMMERCIAL QUERIES Please confirm that the C form will be Issue by GGL. Please confirm applicable octroi and other taxes paid by GGL, Lucknow. Form C shall be issued by GGL Please note that all applicable taxes and duties including octroi and other taxes shall be included in the quoted price and shall be to bidders account /SECTION VII /VOL I of II 13 of 16 TPI or Inspection Intimation /SECTION VII /VOL I of II 14 of 16 FOT site delivery 5 SOR TPI Agency Please confirm intimation is accepted one week advance inplace of 30 days advance. Please extend and confirm the FOT site delivery period to 20 weeks inplace of 10 weeks as 3.2 certificationis asked for. Pl. confirm TPIA can be selected from approved list of PNGRB Shall be as per ITB. Shall be as per ITB. TPI from PNGRB is not mandatory.llyods/bv/tuv are the some TPI Agency. TECHNICAL QUERIES 1 3.2/VOL II of II 6 of 26 Cabinet size The specified size 2mtr X 1.5mtr is too small for DRS with turbine metering skid. Please accept minimum 6mtr X 2mtr size. With RPD meters 3X2mts Please accept RPD meter inplace of turbine 2 3.2/VOL II of II 6 of 26 Turbine metering skid meter for larger turn down ratio and compact size. RPD with Flow Totalizer & EVC / VOL II of II 8 of 26 Testing and Inspection Certification Please confirm testing and inspection of DRS and all other components are as per EN certificate. Please extend and confirm A per ITB delivery of DRS and all other components 20 weeks with EN certification. 4 Filter Technical Specification / VOL II of II 16 of 26 Horizontal filter inplace of vertical filter Please accept horizontal filter for easy maintance and compactness of the skid. Please accept devit and QOC not required. 5 Filter Datasheet/ VOL II of II Filter data sheet Gas Quality Pl. confirm the gas quality. Is it dry gas filtration Dry Gas or Wet gas? Pl. confirm

10 Client : Tender No: Subject: Green Gas Limited PNMM/ EM089/E/111/NCB DESIGN, ENGINEERING,MANUFACTURING, TESTING, SUPPLY, TRANSPORTATION TO GGL SITEINSTALLATION & COMMISSIONING OF DISTRICT REGULATING STATION Date: Sr. no. Clause No. / Document Page No. Query Description IGCPL Remark / Clarification sought form GGL Remarks / Reply by GGL/PDIL Please accept and confirm RPD meter with EVC. Also please accept LF output as EVC can not take HF input. 6 3 / Technical Specification of Instruments / Turbine flow meter / VOL II of II 19 of 26 RPD meter with EVC and HF Output Input/Output LF/HF pulses will be sent to Electronic Volume Correcting Device complying with EN for measurement of corrected volume of gas supplied. Gas flow meter should be compatible with such EVC Devices. 7 3 / Technical Specification of Instruments / Turbine flow meter / VOL II of II 20 of 26 Turbine flow meter calibration Please accept dry calibration ( on air at atmospheric pressure) of the turbine flow meter at NABL accredited laboratory or traceble country of origin. Flow meter will have to be calibrated with air at atmospheric condition. The calibration will have to be done by any NABL accredited agency authorized to carry out calibration of flow related to gas / air. 8 3 / Technical Specification of Instruments/ Turbine flow meter / VOL II of II 21 of 26 RS 232 inplace of RS 485 Please accept RS 232 port for communication inplace of RS 485. EVC gas pressure ranges are RS232 / RS485 fixed and not configurable. Please accept also the overall accuracy will be +/ 0.5%. 9 3 / Technical Specification of Instruments/ Self Actuated PCV and SDV valves/ VOL II of II 23 of 26 Velocity at downstream of SSV Velocity at downstream of SSV will be less then Velocity at downstream of SSV shall be less than 20 40m/s as per tender requirement in place of 20 M/sec M/s as specified. Pl. confirm 10 Ball Valve Datasheet / VOL II of II Ball Valve ratings Please confirm class 150# rating for ball valve as maximum inlet pressure specified is 19 Barg AS per ITB in tender. 11 PCV/ SSV/ Filter Datasheet / VOL II of II Design Pressure 19 Barg / 25 Barg Please confirm class 300# rating upto be consider and design pressure of 25kg/cm2g for AS per ITB sizing and selection. Pl. confirm the battery limit of 300 class and 150 class in P & ID 12 Electronic Volume Corrector Datasheet/ VOL II of II EVC Pressure sensor range 4 to 20 bara Please accept and confirm EVC pressure sensor range between 2.5 to 13 Bara. It covers the AS per ITB outlet pressure range requirements. 13 Electronic Volume Corrector Please accept RS232 Canon connector for local EVC Communication Interface RS 232 / RS485 Datasheet/ VOL II of II and remote communication. 14 Turbine Flow Meter Datasheet/ Please accept aluminium body inplace of Meter Body Material VOL II of II carbon steel material. AS per ITB Please confirm nozzle size will be as per 15 Filter Datasheet/ VOL II of II Nozzle Size velocity requirement at minimum pressure and maximum flow.

11 Client : Tender No: Subject: Green Gas Limited PNMM/ EM089/E/111/NCB DESIGN, ENGINEERING,MANUFACTURING, TESTING, SUPPLY, TRANSPORTATION TO GGL SITEINSTALLATION & COMMISSIONING OF DISTRICT REGULATING STATION Date: Sr. no. Clause No. / Document Page No. Query Description IGCPL Remark / Clarification sought form GGL Remarks / Reply by GGL/PDIL

MAHARASHTRA NATURAL GAS LIMITED

MAHARASHTRA NATURAL GAS LIMITED Replies to Queries of the Bidders Date: 01.12.2018 SUB: Replies to queries of the bidders for Tender for annual rate contract for procurement of SRM for CGD Network of MNGL, Pune REF: Bid Document No.

More information

Reply to bidder's queries are enclosed herewith as Annexure-I.

Reply to bidder's queries are enclosed herewith as Annexure-I. CORRIGENDUM #1 for Date:22.05.2018 Owner : GNGPL Sl. No. Description Volume Page No. Clause / Para / Section Amendment / Addition / Modification / Deletion 1 Last date and time for submission of bid I

More information

Ratnagiri Gas & Power Pvt. Ltd. C&M Department. Ref.: RGPPL/C&M/CS-2335/Pre-Bid queries Date: 24/09/2016. Clarifications to bidder

Ratnagiri Gas & Power Pvt. Ltd. C&M Department. Ref.: RGPPL/C&M/CS-2335/Pre-Bid queries Date: 24/09/2016. Clarifications to bidder Ratnagiri Gas & Power Pvt. Ltd. C&M Department Ref.: RGPPL/C&M/CS-2335/Pre-Bid queries Date: 24/09/2016 Clarifications to bidder Sr. No. 1 Clause No. of tender document Pg.12 (section- B) Prequalification

More information

DEPARTMENT OF CHEMICAL ENGINEERING INDIAN INSTITUTE OF TECHNOLOGY MADRAS CHENNAI , INDIA

DEPARTMENT OF CHEMICAL ENGINEERING INDIAN INSTITUTE OF TECHNOLOGY MADRAS CHENNAI , INDIA DEPARTMENT OF CHEMICAL ENGINEERING INDIAN INSTITUTE OF TECHNOLOGY MADRAS CHENNAI 600036, INDIA Ref. No. CHE/17-18/CHE/006/GAIM/RAJN Date: 25 APRIL, 2018 Due date: 9 MAY, 2018 Item: High Pressure Gas Hydrate

More information

Compiled by: B Beard. Approved by: SH Carstens. Description of requirements and procedures for compact provers to be used as verification standards.

Compiled by: B Beard. Approved by: SH Carstens. Description of requirements and procedures for compact provers to be used as verification standards. 1. Scope Description of requirements and procedures for compact provers to be used as verification standards. 2. Reference documents Trade Metrology Act SANS1698 3. Policy A. BASIC REQUIREMENTS Compact

More information

PRE BID QUERIES FOR CNG & CITY GAS DISTRIBUTION FOR HYDERABAD. Clause No. Description in tender documents Clarifications / Request for change

PRE BID QUERIES FOR CNG & CITY GAS DISTRIBUTION FOR HYDERABAD. Clause No. Description in tender documents Clarifications / Request for change Tender : Bid Document : BGL/100/2010-11 PRE BID QUERIES FOR CNG & CITY GAS DISTRIBUTION FOR HYDERABAD Sl. Clause Description in tender documents Clarifications / 1. ARTICLE 19 :Price If the contractor

More information

Mass Flow Controller (MFC) for Gases

Mass Flow Controller (MFC) for Gases Mass Flow Controller (MFC) for Gases Bypass MFC with capillary technology for nominal flow rates from 5 ml N /min to 15 l N /min Applicable for aggressive gases Compact design and digital communication

More information

METERING PROFILE GAS WATER & ASSOCIATED CONTROLS

METERING PROFILE GAS WATER & ASSOCIATED CONTROLS ABN 17 100 208 964 METERING PROFILE GAS WATER & ASSOCIATED CONTROLS Accutherm International is a specialist company supplying high quality gas control products, engineering services and support to all

More information

BHAGYANAGAR GAS LIMITED (A JOINT VENTURE OF HPCL & GAIL)

BHAGYANAGAR GAS LIMITED (A JOINT VENTURE OF HPCL & GAIL) (A JOINT VENTURE OF HPCL & GAIL) BID DOCUMENT FOR PROCUREMENT OF METERS AND REGULATORS FOR SUPPLY OF PNG IN HYDERABAD UNDER DOMESTIC COMPETITIVE BIDDING Bid Document No.: BGL/093/2010-11 -II of II BHAGYANAGAR

More information

Mass Flow Controller (MFC) for Gases

Mass Flow Controller (MFC) for Gases Mass Flow Controller (MFC) for Gases Type 8713 can be combined with... Direct flow measurement by MEMS- Technology for nominal flow rates from 1 ml N /min to 8 l N /min (N 2 ) High accuracy and repeatability

More information

Mass Flow Meter (MFM) for Gases

Mass Flow Meter (MFM) for Gases 873 Mass Flow Meter (MFM) for Gases Direct flow measurement by MEMS- Technology for nominal flow rates from 1 ml N /min to 8 l N /min (N 2 ) High accuracy Short response time Compact design and digital

More information

Electronic Volume Correctors

Electronic Volume Correctors Electronic Volume Correctors Ben Manson Landis+Gyr October 14, 2016 PUBLIC Agenda Customer Types and suitable equipment Volume corrector standards / regulations Basics of volume correction Gauge v Absolute

More information

ADDENDUM NO. 1 Tender for Procurement of Catalyst Testing Pilot Plant for Corporate R & D Centre, Greater Noida

ADDENDUM NO. 1 Tender for Procurement of Catalyst Testing Pilot Plant for Corporate R & D Centre, Greater Noida ADDENDUM NO. 1 Tender for Procurement of Catalyst Testing Pilot Plant for Corporate R & D Centre, Greater Noida CRFQ Number 1000298594 E-Tender System ID: 34790 1.0 SCOPE OF THIS ADDENDUM 1.1 This Addendum

More information

GAIL (India) Limited

GAIL (India) Limited GAIL (India) Limited (A Govt. of India Undertaking) CHAINSA-JHAJJAR-BAMNOULI PIPELINE PROJECT BID DOCUMENT FOR USM AND METERING SKID CORRIGENDUM 1 (BID DOCUMENT NO.: 11/0230/JPK/GAIL/07-R0) LIMITED INTERNATIONAL

More information

For Multi-Parameter Meters see mvx

For Multi-Parameter Meters see mvx Design Features VORTEX IN-LINE FLOW METERS For Multi-Parameter Meters see m Principles of Operation n No moving parts to wear or fail. n Electronics can be remotely mounted up to 30.5 m (0 ft). n No fluid

More information

NIT LIMITED NO. NC-105-P-SCS-NOCB CYLINDERS & REGULATORS

NIT LIMITED NO. NC-105-P-SCS-NOCB CYLINDERS & REGULATORS NIT LIMITED NO. CYLINDERS & REGULATORS NATIONAL INSTITUTE OF SCIENCE EDUCATION & RESEARCH JATNI CAMPUS, P.O.: JATNI, Khurdha-752050 Tender Notice No. NIT Limited NO. Sealed Tenders are invited on behalf

More information

HYPOXIC AIR FIRE PREVENTION SYSTEM TECHNICAL SPECIFICATION

HYPOXIC AIR FIRE PREVENTION SYSTEM TECHNICAL SPECIFICATION HYPOXIC AIR FIRE PREVENTION SYSTEM TECHNICAL SPECIFICATION Introduction: Hypoxic Air Fire Prevention System is a revolutionary fire prevention technology. It has the unique ability to create a breathable

More information

FIO > Five In One The SMART regulator

FIO > Five In One The SMART regulator FIO > Five In One The SMART regulator Indirect Flow Measurement Outlet Pressure Control Flow Limitation Remote Monitoring End-User Management www.mvandc.com Integrated remote controlled regulator FIO >

More information

SUPPLY OF ISOLATION AND APPLIANCE VALVES PTS - APPLIANCE BALL VALVE

SUPPLY OF ISOLATION AND APPLIANCE VALVES PTS - APPLIANCE BALL VALVE PTS - APPLIANCE BALL VALVE 2 30.06.17 Issued for Tender AS ADE GS 1 12.04.17 Issued for Tender AS AD GS 0 06.03.17 Issued for Client s Comments AS AD GS Rev. Date Subject of revision Author Checked Approved

More information

Pro-V Multivariable Flowmeter Model M22 In-line Vortex

Pro-V Multivariable Flowmeter Model M22 In-line Vortex Pro-V Multivariable Flowmeter Model M22 In-line Vortex Pro-V TM Advantage: Volumetric or mass flow monitoring of most liquids, gases, and steam Multivariable meter delivers mass flow, temperature, pressure,

More information

COMPAFLOW. Compressed Air. Volumetric flow. Gas. Mass flow. Steam. Net volumetric flow. Liquid

COMPAFLOW. Compressed Air. Volumetric flow. Gas. Mass flow. Steam. Net volumetric flow. Liquid Volumetric flow Compressed Air Mass flow Gas Net volumetric flow Steam Liquid Universal compact orifice flow meter combines a compact orifice flow sensor and sotiphicated converter One-piece flow sensor,

More information

Metering Code Gas TSO, measurement by connected party Effective from to the present

Metering Code Gas TSO, measurement by connected party Effective from to the present Please note that although Gasunie Transport Services B.V. translated the Dutch network codes with utmost care, Gasunie Transport Services B.V. would like to point out that only the decisions of the Dutch

More information

GFM. Typical Aluminum GFM Mass Flow Meter NIST MASS FLOW METERS. Principles of Operation. Design Features

GFM. Typical Aluminum GFM Mass Flow Meter NIST MASS FLOW METERS. Principles of Operation. Design Features Design Features Rigid metallic construction. Maximum pressure of 1000 psig (70 bars). Leak integrity 1 x 10-7 of helium. NIST traceable certification. Built-in tiltable LCD readout. 0-5 Vdc and 4-20 ma

More information

For Multi-Parameter Meters see mvx

For Multi-Parameter Meters see mvx VORTEX IN-LINE FLOW METERS Design Features For Multi-Parameter Meters see mvx Principles of Operation VX No moving parts to wear or fail. Electronics can be remotely mounted up to 30.5 m (0 ft). No fluid

More information

BHEL/Trichy-14 CCDP SYSTEM DESCRIPTION FOR DOME VALVE:

BHEL/Trichy-14 CCDP SYSTEM DESCRIPTION FOR DOME VALVE: BHEL/Trichy-14 CCDP SYSTEM DESCRIPTION FOR DOME VALVE: The Dome Valve is a pressure tight, power operated Valve for application in Material Inlet / Vessel Discharge / Line Change over etc. The Valves should

More information

G REQUIREMENTS FOR THE INSTALLATION OF GAS BOOSTERS, MICROTURBINES AND ASSOCIATED SYSTEM PROTECTIVE DEVICES

G REQUIREMENTS FOR THE INSTALLATION OF GAS BOOSTERS, MICROTURBINES AND ASSOCIATED SYSTEM PROTECTIVE DEVICES LAST REVIEW DATE: REVIEW CYCLE: 6/22/11 5 Years SPECIFICATION: TITLE: VOLUME: G-2040-9 REQUIREMENTS FOR THE INSTALLATION OF GAS BOOSTERS, MICROTURBINES AND ASSOCIATED 4 and Gas Blue Book REVISIONS: (See

More information

SonoMeter 30 Energy Meters

SonoMeter 30 Energy Meters Data Sheet SonoMeter 30 Energy Meters Description The Danfoss SonoMeter 30 is a range of ultrasonic, compact energy meters intended for measuring energy consumption in heating and cooling applications

More information

TH-1800-T TRX-700-CNG Converter

TH-1800-T TRX-700-CNG Converter TH-1800-T TRX-700-CNG Converter low detector The CNG fuel gas flowmeter is so accurate as to meet a demand of measuring the CNG directly by making the most use of our well-established mini-thermal flowmeter

More information

SECTION-IV TECHNICAL SPECIFICATIONS OF METERING SKID FOR SHRIKRUPA FOOD INDUSTRIES, AHMEDABAD.

SECTION-IV TECHNICAL SPECIFICATIONS OF METERING SKID FOR SHRIKRUPA FOOD INDUSTRIES, AHMEDABAD. SECTION-IV TECHNICAL SPECIFICATIONS OF METERING SKID FOR SHRIKRUPA FOOD INDUSTRIES, AHMEDABAD. INDEX SL. DESCRIPTION PAGE NO. NO. 1 Technical Specifications (Common and 3 Instrumentation items) for Metering

More information

Electronic Turbine Meter TERZ 94

Electronic Turbine Meter TERZ 94 Electronic Turbine Meter TERZ 9 PRODUT INFORMTION Reliable Measurements of Gas EETRONI TURINE METER TERZ 9 Methode of operation, construction 2 Methode of operation The TERZ 9 electronic turbine meter

More information

Flowatch Multiphase Flow Meter

Flowatch Multiphase Flow Meter Multiphase Flow Meter Multiphase Flow Meter Key Components Pietro Fiorentini's FLOWATCH is a non-intrusive, non radioactive, in-line multiphase meter for measuring flow rates of oil, water and gas from

More information

Mass Flowmeters. Mass Flowmeters for Gases

Mass Flowmeters. Mass Flowmeters for Gases Mass Flowmeters Mass Flowmeters for Gases Fast, Accurate, Low Pressure Drop for critical measurement applications! Flow (Std l/min) Response to a step change in flowrate 300 200 100 4 Milliseconds 63%

More information

RMG Meßtechnik GmbH. Publication No E

RMG Meßtechnik GmbH. Publication No E Electronic Turbine Meter TERZ 94 RMG Meßtechnik GmbH Publication No. 3.174-E P.O.ox 280 35502 utzbach (Germany) Tel.: +49 (0)6033 897-0 Fax: +49 (0)6033 897-130 E-mail: messtechnik@rmg.de Internet: http://www.rmg.de

More information

OIL INDIA LIMITED (A Government of India Enterprises) 4, India Exchange Place Kolkata -1 INVITATION TO E-BID UNDER COMPOSITE BID SYSTEM

OIL INDIA LIMITED (A Government of India Enterprises) 4, India Exchange Place Kolkata -1 INVITATION TO E-BID UNDER COMPOSITE BID SYSTEM OIL INDIA LIMITED (A Government of India Enterprises) 4, India Exchange Place Kolkata -1 TELEPHONE NO. (033) 222301657 FAX NO: (033) 22302596 Email: oilcalmn@dataone.in;oilcalmn@oilindia.in TENDER NO.

More information

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM ASSE STANDARD #1048 - REVISED: 2009 Double Check Detector Fire Protection Backflow Prevention Assemblies Separate, complete laboratory

More information

Pressure Calibrators. Series PC..., PM...

Pressure Calibrators. Series PC..., PM... Pressure Calibrators Series PC..., PM... SIKA-Precision Pressure Calibrators, Series PC..., PM... We help you, if you are under pressure! Pneumatic pressure calibrators PM 25 A, PM 25 D, PM 110 PIC pressure

More information

Filter Integrity Testers for the Pharmaceutical Industry

Filter Integrity Testers for the Pharmaceutical Industry Inline Filter Integrity Tests on Filters on huge Vessels, Freeze Dryers, Autoclaves, Filling -and Pressure Lines 1 The portable Filter Integrity Tester "it-01" The Filter Integrity Tester " it-01" can

More information

ASSE International Product (Seal) Listing Program

ASSE International Product (Seal) Listing Program ASSE International Product (Seal) Listing Program ASSE 1070-2015 / ASME A112.1070-2015 / CSA B125.70-15 Performance Requirements for Water Temperature Limiting Devices Manufacturer: Contact Person: E-mail:

More information

ASX 176 Axial Pressure regulator

ASX 176 Axial Pressure regulator ASX 176 Axial Pressure regulator ASX 176 Classification and Area of Application ASX 176 is a downstream pressure regulator, pilot controlled, for medium and high pressure applications. It is particularly

More information

Turbine Flowmeters for Gas Applications (Metric)

Turbine Flowmeters for Gas Applications (Metric) Turbine Flowmeters for Gas pplications (Metric) Description Flow Technology s FT Series turbine flowmeters utilize a proven flow measurement technology to provide exceptionally reliable digital outputs.

More information

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB)

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB) NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB) Aryabhata Block, C.R. Rao Advanced Institute of Mathematics, Statistics and Computer Science (AIMSCS), UoH Campus, Gachibowli, Hyderabad-500 046 TENDER

More information

NIT LIMITED NO. RD-NC-40-SPS-PH

NIT LIMITED NO. RD-NC-40-SPS-PH NIT LIMITED NO. RD-NC-40-SPS-PH1302-14-15 ARGON GAS & CO2 with CYLINDER NATIONAL INSTITUTE OF SCIENCE EDUCATION & RESEARCH INSTITUTE OF PHYSICS CAMPUS, P.O.: SAINIK SCHOOL, BHUBANESWAR-751 005 Tender Notice

More information

ASME and PED Requirements for Drum Level Instrumentation. Presented by: Amir Hedayatnia Clark-Reliance Corp.

ASME and PED Requirements for Drum Level Instrumentation. Presented by: Amir Hedayatnia Clark-Reliance Corp. ASME and PED Requirements for Drum Level Instrumentation 2017 Presented by: Amir Hedayatnia Clark-Reliance Corp. Topics Gage Glasses and Remote Reading Instruments ASME Code Section I Requirements for

More information

Pro-V Multivariable Flowmeter Model M22 In-line Vortex

Pro-V Multivariable Flowmeter Model M22 In-line Vortex Pro-V Multivariable Flowmeter Model M22 In-line Vortex Pro-V TM Advantage: Volumetric or mass flow monitoring of most liquids, Multivariable meter delivers mass flow, temperature, pressure, and density

More information

ARAI/TA(4G)/HORIBA/MEXA 584L/ Dated 19 th Jun 2008 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES

ARAI/TA(4G)/HORIBA/MEXA 584L/ Dated 19 th Jun 2008 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES M/s Horiba India Pvt. Ltd. Room 1521, 15 th Floor, Eros Corporate Tower Nehru Place New Delhi 110 019 Cert Annex Drg Tot al 1 6 0 7 pgs Exhaust

More information

Process Solutions. Electronic Turbine Meter TERZ 94 PROVEN TECHNOLOGY. SUPERIOR PERFORMANCE.

Process Solutions. Electronic Turbine Meter TERZ 94 PROVEN TECHNOLOGY. SUPERIOR PERFORMANCE. Process Solutions Electronic Turbine Meter TERZ 9 PROVEN TEHNOOGY. SUPERIOR PERFORMNE. Electronic Turbine Meter TERZ 9 Method of Operation The TERZ 9 electronic turbine meter is a flow meter which directly

More information

TRZ 03-K Volumeter. Proven Technology. Superior Performance. TRZ 03-K Volumeter is a Turbine Gas Flowmeter for Secondary Gas Metering.

TRZ 03-K Volumeter. Proven Technology. Superior Performance. TRZ 03-K Volumeter is a Turbine Gas Flowmeter for Secondary Gas Metering. TRZ 0-K Volumeter TRZ 0-K Volumeter is a Turbine Gas Flowmeter for Secondary Gas Metering. TRZ 0-K Turbine Gas Flowmeter continues the tradition of Honeywell s field-proven turbine meter technology, delivering

More information

Fio 2.2 Smart add-on for gas pressure Regulators

Fio 2.2 Smart add-on for gas pressure Regulators Fio 2.2 Smart add-on for gas pressure Regulators Fio 2.2 Classification and Field of Application Fio 2.2 is a modular system that allows to remotely control a pressure reduction station of a natural gas

More information

GUIDELINES. Systems. Pressure. Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service

GUIDELINES. Systems. Pressure. Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service GUIDELINES Pressure Systems Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service Document Reference: PSG 16 Issue 04 Dated 13/09/16 The Safety Assessment Federation

More information

NIT LIMITED NO. NC-185-SCS-P-NOCB ARGON & NITROGEN CYLINDER WITH REGULATOR

NIT LIMITED NO. NC-185-SCS-P-NOCB ARGON & NITROGEN CYLINDER WITH REGULATOR NIT LIMITED NO. NC-185-SCS-P-NOCB-15-16 ARGON & NITROGEN CYLINDER WITH REGULATOR NATIONAL INSTITUTE OF SCIENCE EDUCATION & RESEARCH JATNI CAMPUS, P.O.: BHIMPUR-PADANPUR, VIA:-JATNI Khurdha-752050 Tender

More information

SUPPLY OF ISOLATION AND APPLIANCE VALVES PTS - ISOLATION BALL VALVE

SUPPLY OF ISOLATION AND APPLIANCE VALVES PTS - ISOLATION BALL VALVE PTS - ISOLATION BALL VALVE 2 30.06.17 Issued for Corrigendum#1 AS ADE GS 1 12.04.17 Issued for Tender AS AD GS 0 06.03.17 Issued for Client s Comments AS AD GS Rev. Date Subject of revision Author Checked

More information

SCIENCE LAB UTILITY CONTROLS

SCIENCE LAB UTILITY CONTROLS SCIENCE LAB UTILITY CONTROLS INCORPORATING GAS PRESSURE PROVING GAS PRESSURE PROVING EQUIPMENT - ENGINEERED TO DELIVER EXCEPTIONAL LEVELS OF SAFETY THE MERLIN RANGE DESIGNED FOR EDUCATIONAL LABORATORIES

More information

Highest Quality. Gas Chlorination Systems

Highest Quality. Gas Chlorination Systems Highest Quality Gas Chlorination Systems Application: Gas chlorination systems are used for water disinfection and other purposes in a variety of applications. Compared to other disinfection methods, chlorine

More information

PM105 PRESSURE METER USER S MANUAL

PM105 PRESSURE METER USER S MANUAL PM105 PRESSURE METER USER S MANUAL Manual revision: 15 March, 2001 SCSMANP015 Copyrighted 2001 Thank you for purchasing a Tek Know pressure meter. The Tek Know products are manufactured by Scan-Sense AS

More information

Mass Flow Meter (MFM) for gases

Mass Flow Meter (MFM) for gases Mass Flow Meter (MFM) for gases Type can be combined with Inline MFM for nominal flow rates from 25 l N /min to 1,500 l N /min; 1/4 to 3/4 High accuracy Fast settling time Fieldbus option Special version

More information

DF-550E PROCESS ANALYSERS APPLICATIONS FEATURES

DF-550E PROCESS ANALYSERS APPLICATIONS FEATURES PROCESS ANALYSERS DF-550E The DF-550E Nano Trace oxygen analyser is a Coulometric sensor based analyser designed to measure oxygen as a contaminant at ultra trace levels in ultra high purity electronic

More information

Turbine Flowmeters for Gas Applications

Turbine Flowmeters for Gas Applications Turbine Flowmeters for Gas Applications Description Flow Technology s FT Series turbine flowmeters utilize a proven flow measurement technology to provide exceptionally reliable digital outputs. Because

More information

Certificate of Approval. No 5/6B/211

Certificate of Approval. No 5/6B/211 Certificate of Approval No 5/6B/211 Issued by the Chief Metrologist under Regulation 60 of the National Measurement Regulations 1999 This is to certify that an approval for use for trade has been granted

More information

AutoChanger Installation & User Guide Issue 2

AutoChanger Installation & User Guide Issue 2 1 INDEX Page 1. Introduction... 3 2. AutoChanger Components Guide 4 3. Installation. 5-11 a) Installation Guidelines.. 5 b) Installation Retrofit... 6-11 c) Installation New... 11 4. AutoChanger User Guide

More information

UNDERSTANDING, ACCELERATED

UNDERSTANDING, ACCELERATED UNDERSTANDING, ACCELERATED MEASURE FLOW, PRESSURE, AND TEMPERATURE ALL IN ONE INSTRUMENT! Designed for Performance TSI thermal mass flowmeters incorporate a proprietary platinum film sensor design for

More information

Features. Description

Features. Description Features Fast response flow meter ideal for inert gas and liquid mass flow measurement applications Smart electronics permit field adjustment of critical flow meter settings Field validation of flow meter

More information

Pressure Automated Calibration Equipment

Pressure Automated Calibration Equipment GE Measurement & control Pressure Automated Calibration Equipment Safety Instructions and User Guide - K0447 PACE5000 PACE6000 K0447 Issue No. 9 1 10 1 PACE5000 1 2 3 4 5 PACE6000 2 6 7 8 3 4 5 6 7 8 9

More information

GP1 & GP2. Electropneumatic Regulators FOR PRESSURE CONTROL TO 1,000 PSI

GP1 & GP2. Electropneumatic Regulators FOR PRESSURE CONTROL TO 1,000 PSI GP1 & GP2 Electropneumatic Regulators FOR PRESSURE CONTROL TO 1, PSI GP1 & GP2 Functional Description The GP series control valve is an electronic pressure regulator designed to precisely control the pressure

More information

Model PDT Dewpoint Transmitter

Model PDT Dewpoint Transmitter Model PDT Dewpoint Transmitter Instruction Manual Alpha Moisture Systems Alpha House 96 City Road Bradford BD8 8ES England Tel: +44 1274 733100 Fax: +44 1274 733200 email: mail@amsytems.co.uk web: www.amsystems.co.uk

More information

LPG DRIVER ATTENDED TRANSPORT LOADING

LPG DRIVER ATTENDED TRANSPORT LOADING November 1993 Prepared By: Ken A. Steward. P.E. Linco-Electromatic, Inc. 4580 West Wall Street Midland, Texas 78703 LPG DRIVER ATTENDED TRANSPORT LOADING INTRODUCTION The safest and most accurate method

More information

GAIL GAS LTD (A wholly owned subsidiary of GAIL (India) Limited)

GAIL GAS LTD (A wholly owned subsidiary of GAIL (India) Limited) GAIL GAS LTD (A wholly owned subsidiary of GAIL (India) Limited) CNG AND CITY GAS DISTRIBUTION PROJECT BID DOCUMENT FOR ODORISING UNIT VOLUME II OF II (TECHNICAL) (BID DOCUMENT NO: 110290/WGI/GAIL GAS/12-R1)

More information

Fiji Electricity Authority Transmission Unit 2 Marlow Street, Suva

Fiji Electricity Authority Transmission Unit 2 Marlow Street, Suva TENDER DOCUMENT AND SPECIFICATION MR 333/2017 Preferred Supplier for Double Tail Shock Absorbing Elasticated Webbing Lanyard The Fiji Electricity Authority (FEA) invites bids from reputable suppliers for

More information

TENDER SPECIFICATION No: 12/ of SUPERINTENDING ENGINEER (CTI & ENQUIRIES), Dt

TENDER SPECIFICATION No: 12/ of SUPERINTENDING ENGINEER (CTI & ENQUIRIES), Dt 1 TENDER SPECIFICATION No: 12/2018-19 of SUPERINTENDING ENGINEER (CTI & ENQUIRIES), Dt. 08.01.2019 Specification for Supply of Standard Calibration Gas Mixture in the ranges of 5PPM and 100PPM filled in

More information

Distribution Connection Forms

Distribution Connection Forms Distribution Connection Forms Form No. DR01 DR02 DR03 DR04 DR05 DR06 DR07 DR08 DR09 DR10 DR11 GDP101 GDP102 GDP105 GDP106 GDP107 GDP108 GDP111 KG-D01 KG-D02 KG-D03 KG-D04 Description Application For Gas

More information

THE MAHARASHTRA STATE CO-OPERATIVE BANK LTD

THE MAHARASHTRA STATE CO-OPERATIVE BANK LTD THE MAHARASHTRA STATE CO-OPERATIVE BANK LTD ( Incorporating The Vidarbha Co-operative Bank Ltd.) Scheduled Bank P.O. Box No. 654, Plot No.10, Town Center, CIDCO Aurangabad - 431003 TENDER NOTICE Sealed

More information

Pro-V Multivariable Flowmeter

Pro-V Multivariable Flowmeter Pro-V Multivariable Flowmeter Model M23 Insertion Meter M23-V flowmeter provides cost-effective volumetric flow monitoring solution for most liquids M23-VT incorporates temperature sensing to provide a

More information

CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG)

CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG) Page 1 of 10 CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG) 1. SCOPE 1.1 To provide definitive requirements for HIGH PRESSURE PNEUMATIC testing of piping systems according to ASME B31.3. This

More information

NATIONAL CENTER FOR COMBUSTION RESEARCH AND DEVELOPMENT (NCCRD) INDIAN INSTITUTE OF TECHNOLOGY MADRAS CHENNAI , INDIA

NATIONAL CENTER FOR COMBUSTION RESEARCH AND DEVELOPMENT (NCCRD) INDIAN INSTITUTE OF TECHNOLOGY MADRAS CHENNAI , INDIA NATIONAL CENTER FOR COMBUSTION RESEARCH AND DEVELOPMENT (NCCRD) INDIAN INSTITUTE OF TECHNOLOGY MADRAS CHENNAI 600036, INDIA Ref. No. ICS/11-12/013/DSTX/TSUN Date: 14 July 2016 Due date: 4 Aug. 2016 Item

More information

THERMAL MASS FLOW MEASUREMENT FOR GASES

THERMAL MASS FLOW MEASUREMENT FOR GASES THERMAL MASS MEASUREMENT FOR GASES Make the Wise Choice. Choose Sage Flow Meters. A Commitment to Higher Performance SAGE METERING is a manufacturer of high performance Thermal Mass Flow Meters which measure

More information

Petrofac Client Doc. No JI-DTS-5002 Page 2 of 8 Rev. TABLE OF CONTENTS

Petrofac Client Doc. No JI-DTS-5002 Page 2 of 8 Rev. TABLE OF CONTENTS M681IDS0003 Petrofac Client Doc.. 100813361JIDTS500 Page of 8 Rev. ALL TABLE OF CONTENTS DESCRIPTION PAGE 1. COVER PAGE 1. TABLE OF CONTENTS 3. 61FCV8006 3 4. 61FCV800 4 5. 61FCV8008 5 6. 61FCV801 6. GENERAL

More information

2005 CERTIFICATE OF ACCEPTANCE (Part 1 of 3) MECH-1-A

2005 CERTIFICATE OF ACCEPTANCE (Part 1 of 3) MECH-1-A 2005 CERTIFICATE OF ACCEPTANCE (Part 1 of 3) MECH-1-A PROJECT ADDRESS TESTING AUTHORITY TELEPHONE Checked by/date Enforcement Agency Use GENERAL INFORMATION OF BLDG. PERMIT PERMIT # BLDG. CONDITIONED FLOOR

More information

INSTRUCTION MANUAL. FLOW CONTROL DRAWERS MANUAL / PLC CONTROL SERIES Model Version Perma Pure LLC Tel:

INSTRUCTION MANUAL. FLOW CONTROL DRAWERS MANUAL / PLC CONTROL SERIES Model Version Perma Pure LLC Tel: PERMA PURE INSTRUCTION MANUAL FLOW CONTROL DRAWERS MANUAL / PLC CONTROL SERIES Model 3300 Version 4.06 Perma Pure LLC Tel: 732-244-0010 P.O. Box 2105, 8 Executive Drive Tel: 800-337-3762 (toll free US)

More information

Design Features. General Description

Design Features. General Description Model thermal Mass Flow Controllers are designed to indicate and control set flow rates of gases. The combines the characteristics and accuracy of conventional mass flow devices into a unique compact design

More information

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems. Page 1 of 7 CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD 1. SCOPE 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems. 1.2 The piping system as used herein is

More information

EXPERIMENT 1 AIR PRESSURE CONTROL SYSTEM

EXPERIMENT 1 AIR PRESSURE CONTROL SYSTEM EXPERIMENT 1 AIR PRESSURE CONTROL SYSTEM 1.0 OBJECTIVE To study the response of gas pressure control using PID controller. 2.0 INTRODUCTION TO THE APPARATUS a) The process plant consists of two air vessels

More information

PRICED BID -PACKAGE II Page 1 of 19 Vendor Seal and Signature. Set 103. Set 23 pulse transmitter and Non return valve for 1.5" ethanol line.

PRICED BID -PACKAGE II Page 1 of 19 Vendor Seal and Signature. Set 103. Set 23 pulse transmitter and Non return valve for 1.5 ethanol line. 1 2 3 Supply of flowmeters 3" line: Supply of Positive displacement type flowmeters, Strainer with DPG, air eliminator, with pulse transmitter for 3" line Erection of Positive displacement type flowmeters,

More information

Vehicle- or rack-mounted liquefied gas meters, pump supplied

Vehicle- or rack-mounted liquefied gas meters, pump supplied Purpose This inspection procedure outline (IPO) defines the minimum tests which must be performed to ensure that basic volumetric measuring devices comply with the legislation. Application Rack/fixed metering

More information

Operating Instructions DB41

Operating Instructions DB41 PKP Process Instruments Inc. 10 Brent Drive Hudson, MA 01749 Tel: +1-978-212-0006 Fax: +1-978-568-0060 PKP Prozessmesstechnik GmbH Borsigstrasse 24 D-65205 Wiesbaden-Nordenstadt Tel: 06122 / 7055-0 Fax:

More information

South-Tek Systems - Nitrogen Generation Corrosion Inhibiting System. Designed for: Dry or Preaction Fire Protection Systems (FPS)

South-Tek Systems - Nitrogen Generation Corrosion Inhibiting System. Designed for: Dry or Preaction Fire Protection Systems (FPS) South-Tek Systems - Nitrogen Generation Corrosion Inhibiting System Designed for: Dry or Preaction Fire Protection Systems (FPS) 1.0 Description of Work 1.1 The Fire Sprinkler Contractor shall provide

More information

780S Ultra High Purity Series

780S Ultra High Purity Series Smart Ultra High Purity Thermal Gas Mass Flow Meter Features Measures mass flow directly, no seperate temperature or pressure inputs required Field adjustment of critical flow meter settings via on-board

More information

5 Channel Calibrator

5 Channel Calibrator 212 N. Woodwork Lane Palatine, IL 60067 800-223-3977 5 Channel Calibrator Part # 0724 User Manual Questions? Contact us at 800-223-3977 or online at http://www.cleanair.com/equipment/express/main.html

More information

Appendix D: SOP of INNOVA 1412 Photoacoustic Multi-Gas Monitor. Description and Principle of Operation

Appendix D: SOP of INNOVA 1412 Photoacoustic Multi-Gas Monitor. Description and Principle of Operation Page 1 of 19 : SOP of INNOVA 1412 Photoacoustic Multi-Gas Monitor Description and Principle of Operation The photoacoustic multi-gas monitor (INNOVA 1412, Innova AirTech Instruments, Denmark) is a highly

More information

Electronic gas volume corrector model DGVC-04

Electronic gas volume corrector model DGVC-04 Electronic gas volume corrector model DGVC-04 1. Introduction The following user s manual gives information about the installation, configuration, usage and storage of the electronic gas volume corrector

More information

TENDER FOR THE SUPPLY OF MEDICAL OXYGEN AND NITROUS OXIDE GASES CYLINDERS FOR ONE YEAR.

TENDER FOR THE SUPPLY OF MEDICAL OXYGEN AND NITROUS OXIDE GASES CYLINDERS FOR ONE YEAR. L E S 1 Government of Karnataka BELGAUM INSTITUTE OF MEDICAL SCIENCES, BELGAUM AUTONOMOUS INSTITUTE (Registered Under Societies Registration Act) Dr. B. R. Ambedkar Road, Belgaum 590 001. Phone No: 0831-2420320,

More information

Natural Gas Conditioning Skids & Equipments

Natural Gas Conditioning Skids & Equipments Natural Gas Conditioning Skids & Equipments NATURAL GAS CONDITIONING SKIDS NIRMAL has rich experience of supplying complete package of Natural Gas conditioning skids consisting of emergency shut down,

More information

Flow metering in gases Introduction to COMBIMASS family

Flow metering in gases Introduction to COMBIMASS family Flow metering in gases Introduction to COMBIMASS family - physical principle, basic information - different types of instruments, pricing & delivery time Sales Training Germany October 17 th to 19 th,

More information

Turbine Flowmeters for Gas Applications

Turbine Flowmeters for Gas Applications Turbine Flowmeters for Gas Applications Description Flow Technology s FT Series turbine flowmeters utilize a proven flow measurement technology to provide exceptionally reliable digital outputs. Because

More information

Additel 761 Automated Pressure Calibrators

Additel 761 Automated Pressure Calibrators Automated Calibrators UPDATED Fully automated pressure calibrator with built-in pressure generator / controller to as high as 600 psi (40 bar) or as low as 0.01 Pa (0.00004 inh 2 O) accuracy Dual pressure

More information

Mass Flow Controller (MFC) for Gases

Mass Flow Controller (MFC) for Gases Mass Flow Controller (MFC) for Gases Direct flow measurement with CMOSens technology for nominal flow rates from 0 ml N to 0 l N High accuracy and reproducibility Ingress protection IP Type can be combined

More information

Unique solutions for Oxygen and Nitrogen supply

Unique solutions for Oxygen and Nitrogen supply Unique solutions for Oxygen and Nitrogen supply SHAPING THE FUTURE Index Competence and Trust 3 Modular PSA 4 Superior PSA generator Technology 5 NOXERIOR Competence and Trust NOXERIOR focuses on all aspects

More information

TR Electronic Pressure Regulator. User s Manual

TR Electronic Pressure Regulator. User s Manual TR Electronic Pressure Regulator Page 2 of 13 Table of Contents Warnings, Cautions & Notices... 3 Factory Default Setting... 4 Quick Start Procedure... 5 Configuration Tab... 8 Setup Tab... 9 Internal

More information

THE BP-301 SERIES. Operating and Service Manual. Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv)

THE BP-301 SERIES. Operating and Service Manual. Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv) THE BP-301 SERIES Operating and Service Manual Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv) Issue B October 2015 1 TABLE OF CONTENTS 1. Description... 3 2. Installation... 3 3. Operation...

More information

Network Regulator Maintenance Operatives LS (Non-Accredited)

Network Regulator Maintenance Operatives LS (Non-Accredited) Background Network Regulator Maintenance Operatives LS (Non-Accredited) Network Maintenance Operative (NMO) would be trained to perform work on pressure reducing equipment upstream of the ECV on pressures

More information

SideTrak 830/840. Process Gas Mass Flow Meters and Controllers. FEATURES DESCRIPTION

SideTrak 830/840. Process Gas Mass Flow Meters and Controllers.   FEATURES DESCRIPTION Process Gas Mass Flow Meters and Controllers FETURES n Direct monitoring of mass flow eliminates need for ancillary pressure and temperature sensing n Patented straight sensor tube with access ports permits

More information

AFC. SDPROC and AFC Analog Mass Flow Controller ANALOG MASS FLOW CONTROLLERS. Principles of Operation. Design Features

AFC. SDPROC and AFC Analog Mass Flow Controller ANALOG MASS FLOW CONTROLLERS. Principles of Operation. Design Features ANALOG MASS FLOW CONTROLLERS Model AF mass fl ow controllers are designed to indicate fl ow rates and control set fl ow rates of gases. Each of these units incorporates an advanced straight tube sensor

More information