1 Appendix C3 Cost Engineering November 2016

2 Costs generated in this appendix include the likely initial project cost to place dredged material from the source area (Lower Reach E Miah Maull and Brandywine Ranges) on the 8 placement locations (Pickering Beach, Kitts Hummock, Bowers Beach, South Bowers Beach, Big Stone Beach, Slaughter Beach, Prime Hook Beach and Lewes Beach). In addition, the Federal Standard cost was calculated for different timeframes in the 50-year project lifecycle. For the first 10 years of the proposed project life, the Federal Standard cost was based on disposal of dredged material at Buoy 10 via a hopper dredge and bottom dumping at Buoy 10. For years 11 through 50, the Federal Standard calculation was based on the placement of dredged material at the Artificial Island CDF due to capacity limitations at Buoy Cost to place dredged material (from Lower Reach E Miah Maull and Brandywine Ranges) at the 8 placement locations. Based on the with-project assumption that project implementation would consist of a continuous dredging operation with one primary mobilization, the dredge mobilization costs and all associated equipment required for each placement site were used to calculate the initial construction costs. In addition, continuous incremental preparatory costs to nourish the sites in the system were added into the initial construction costs. Initial fill costs are based on the assumption that one generic medium size hopper dredge to be used for placement of beach fill. Approximately a total of 930,000 cubic yards of available material for beach fill from Lower Reach E Miah Maull and Brandywine Ranges (Station thru Station ) was assumed to be available as a borrow source. The average travel distance was determined for each beach mooring barge location for dredge to travel. The average pumping distance for the initial beach fill was determined from mooring barge to landing on beach and the average beach length. Quantities were provided by the PDT. Utilizing Corps of Engineers Dredging Estimating Program (CEDEP), estimated cost were incorporated into MCACES, 2 nd Generation (MII), then summarized in tables. Beach Travel Pipe Shore Volume (Miles) (Feet) (Feet) (Cubic Yards) Pickering Beach ,661 3,168 63,771 Kitts Hummock ,125 5,808 91,723 Bowers Beach ,667 3,696 53,797 South Bowers Beach ,395 3,696 52,935 Big Stone Beach ,207 1,690 42,278 Slaughter Beach ,980 14, ,206 Prime Hook Beach ,985 7, ,341 Lewes Beach ,151 4, ,000

3 2. Cost to place dredged material in accordance with the Federal Standard at Buoy 10, via bottom dumping with the McFarland Costs are based on the assumption that one generic medium size hopper dredge to be used for excavating material from Lower Reach E Miah Maull and Brandywine Ranges (Station thru Station ) and deposited at Buoy 10. The average travel distance 12 miles was determined. Utilizing Corps of Engineers Dredging Estimating Program (CEDEP), estimated cost were incorporated into MCACES, 2 nd Generation (MII), then summarized in tables. 3. Cost to place dredged material in accordance with the Federal Standard at the Artificial Island CDF Costs are based on the assumption that one generic medium size hopper dredge to be used for excavating material from Lower Reach E Miah Maull and Brandywine Ranges (Station thru Station ) and deposited at the Artificial Island CDF. The average travel distance 40 miles was determined. Utilizing Corps of Engineers Dredging Estimating Program (CEDEP), estimated cost were incorporated into MCACES, 2 nd Generation (MII), then summarized in tables.

4 DREDGED MATERIAL UTILIZATION - Initial Construction ROUGH ORDER ESTIMATE FOR BEACHFILL MATERIAL FROM Delaware River Reach E Number Product Description Quantity UOM Unit Price Estimated Contingency Estimated Amount 30% Amount 01 LANDS AND DAMAGES 1 JOB LS $4,539,825 $1,361,948 $5,901,773 Total 02 RELOCATIONS 1 JOB LS $0 $0 $0 17 BEACH REPLENISHMENT 1 JOB LS $45,398,253 $13,619, Mobilization, Demobilization, and Preparatory Work 1 JOB LS $11,465,574 $3,439,672 $14,905, Site Work Dredging and Beachfill - Pickering Beach 63,771 CY $40.97 $2,612,698 $783,809 $3,396, Dredging and Beachfill - Kitts Hummock Beach 158,321 CY $38.67 $6,122,273 $1,836,682 $7,958, Dredging and Beachfill - Bowers Beach 117,149 CY $36.95 $4,328,656 $1,298,597 $5,627, Dredging and Beachfill - South Bowers Beach 52,935 CY $39.24 $2,077,169 $623,151 $2,700, Dredging and Beachfill - Big Stone Beach 42,278 CY $39.96 $1,689,429 $506,829 $2,196, Dredging and Beachfill - Slaughter Beach 246,564 CY $37.29 $9,194,372 $2,758,311 $11,952, Dredging and Beachfill - Prime Hook Beach 114,341 CY $35.08 $4,011,082 $1,203,325 $5,214, Dredging and Beachfill - Lewes Beach 100,000 CY $38.97 $3,897,000 $1,169,100 $5,066, PLANNING, ENGINEERING, AND DESIGN 1 JOB LS $2,042,921 $612, $2,655, CONSTRUCTION MANAGEMENT (S&I) 1 JOB LS $2,161,400 $1,634,337 $3,795,737 TOTAL ESTIMATED AMOUNT = $71,371,035

5 DREDGED MATERIAL UTILIZATION - Initial Construction ROUGH ORDER ESTIMATE FOR Slaugher 01 Beach REMOVAL AND DISPOSAL OF MATERIAL AT BOUY 10 Number Product Description Quantity UOM Unit Price Estimated Contingency Estimated Amount 30% Amount 01 LANDS AND DAMAGES 1 JOB LS $0 $0 $0 Total 02 RELOCATIONS 1 JOB LS $0 $0 $0 09 CHANNELS AND CANALS 1 JOB LS $3,514,424 $1,054, Associated General Items Site Work Mobilization, Demobilization, and Preparatory Work 1 JOB LS $1,150,036 $345,011 $1,495, Dredging and Disposal 172,206 CY $13.73 $2,364,388 $709,317 $3,073, PLANNING, ENGINEERING, AND DESIGN 1 JOB LS $340,674 $102, $442, CONSTRUCTION MANAGEMENT (S&I) 1 JOB LS $341,980 $102,594 $444,574 TOTAL ESTIMATED AMOUNT = $5,456,202

6 DREDGED MATERIAL UTILIZATION - Initial Construction ROUGH ORDER ESTIMATE REMOVAL AND DISPOSAL OF MATERIAL AT Artificial Island Number Product Description Quantity UOM Unit Price Estimated Contingency Estimated Amount 30% Amount 01 LANDS AND DAMAGES 1 JOB LS $0 $0 $0 Total 02 RELOCATIONS 1 JOB LS $0 $0 $0 09 CHANNELS AND CANALS 1 JOB LS $27,611,884 $8,283, Associated General Items Site Work Mobilization, Demobilization, and Preparatory Work 1 JOB LS $1,579,884 $473,965 $2,053, Dredging and Disposal 800,000 CY $32.54 $26,032,000 $7,809,600 $33,841, PLANNING, ENGINEERING, AND DESIGN 1 JOB LS $1,104,475 $331, $1,435, CONSTRUCTION MANAGEMENT (S&I) 1 JOB LS $1,844,390 $553,317 $2,397,707 TOTAL ESTIMATED AMOUNT = $39,728,974

ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY. Contract #2 Construction Scope. April 18th-19th 2018

ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY. Contract #2 Construction Scope. April 18th-19th 2018 ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY Contract #2 Construction Scope April 18th-19th 2018 New York District PLAN COMPONENTS Length of Beachfill 35,000

More information

Navarre Beach & Dune Restoration Project Status Report to be regularly updated June 17, 2016 Report

Navarre Beach & Dune Restoration Project Status Report to be regularly updated June 17, 2016 Report Navarre Beach & Dune Restoration Project Status Report to be regularly updated June 17, 2016 Report Work Completed (June 11 to June 17) Weeks Marine Inc. (Contractor): o continued filling Segment 4 including

More information

Delaware Chapter Surfrider Foundation - Indian River Inlet Monitoring

Delaware Chapter Surfrider Foundation - Indian River Inlet Monitoring Delaware Chapter Surfrider Foundation - Indian River Inlet Monitoring In 2012, the Delaware Surfrider Foundation Chapter formed the Surf Quality and Access Committee to focus on issues such as surf spot

More information

MOREHEAD CITY HARBOR, NC. Dredged Material Management Plan (DMMP)

MOREHEAD CITY HARBOR, NC. Dredged Material Management Plan (DMMP) MOREHEAD CITY HARBOR, NC Dredged Material Management Plan (DMMP) Public Meeting/Info Session 15 January 2014 US Army Corps of Engineers Morehead City Harbor DMMP Presentation Topics Morehead City Harbor

More information

Shoalwater Bay Shorline Erosion Dredging

Shoalwater Bay Shorline Erosion Dredging Shoalwater Bay Shorline Erosion Dredging ROSS ISLAND SAND & GRAVEL CO. Saving the Tokeland Penninsula Willapa Bay & Tokeland Penninsula Southwestern Washington Coast Shoalwater Bay Historic View Settlements

More information

The 2017 Panama City Beaches Beach Interim Renourishment Project. Answers to Common Questions

The 2017 Panama City Beaches Beach Interim Renourishment Project. Answers to Common Questions The 2017 Panama City Beaches Beach Interim Renourishment Project The fourth renourishment of the Panama City Beaches will be under construction during March and April 2017, with a planned completion by

More information

Grays Harbor Federal Project

Grays Harbor Federal Project Grays Harbor Federal Project Elizabeth Chien Coastal Navigation Program Manager Seattle District 27 October 2016 US Army Corps of Engineers Grays Harbor Navigation Channel Inner Harbor Dredging Summer

More information

Grays Harbor O&M and Deepening Dredging

Grays Harbor O&M and Deepening Dredging Grays Harbor O&M and Deepening Dredging Elizabeth Chien Project Manager Seattle District 28 January 2016 US Army Corps of Engineers Grays Harbor Navigation Channel Inner Harbor O&M Dredging Summer 2015:

More information

TOWN OF DENNIS 10 YR COMPREHENSIVE DREDGE PERMIT SEPTEMBER 10, 2013

TOWN OF DENNIS 10 YR COMPREHENSIVE DREDGE PERMIT SEPTEMBER 10, 2013 TOWN OF DENNIS 10 YR COMPREHENSIVE DREDGE PERMIT SEPTEMBER 10, 2013 WHAT IS IT? ALL NECESSARY PERMITS FOR DREDGING FOR PORTIONS OF BASS RIVER, SWAN POND RIVER, SESUIT HARBOR AND CHASE GARDEN CREEK ONE

More information

Recycling of Surplus Sand to Extend the Time Between Beach Fill Episodes

Recycling of Surplus Sand to Extend the Time Between Beach Fill Episodes Recycling of Surplus Sand to Extend the Time Between Beach Fill Episodes Cape May County, New Jersey Dr. Stewart Farrell Coastal Research Center 1795 Franklin Map Shows Inlets Inlet Morphology has Remained

More information

Saco River Maintenance Dredge PROJECT PLAN AND TIMELINE JUNE 15, 2017

Saco River Maintenance Dredge PROJECT PLAN AND TIMELINE JUNE 15, 2017 Saco River Maintenance Dredge 2017-2018 PROJECT PLAN AND TIMELINE JUNE 15, 2017 Overview Last dredged in 1994 Removing ~150,000 cy of sand and silt from the upper and lower reaches Disposal sites: In-River

More information

North Shore of Long Island, Feasibility Study

North Shore of Long Island, Feasibility Study North Shore of Long Island, Asharoken New York Asharoken, Feasibility Study Asharoken, NY Public Meeting June 30, 2015 US Army Corps of Engineers US Army Corps of Engineers New York BUILDING STRONG BUILDING

More information

Sediment Transport Analysis Village of Asharoken, New York

Sediment Transport Analysis Village of Asharoken, New York Sediment Transport Analysis Village of Asharoken, New York NORTH SHORE OF LONG ISLAND, NEW YORK COMBINED EROSION CONTROL AND STORM DAMAGE PROTECTION FEASIBILITY STUDY FINAL REPORT August 2004 Cell 0 Asharoken

More information

Ocean Structures and Material Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras

Ocean Structures and Material Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Ocean Structures and Material Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Module - 2 Lecture - 5 Dredging II In the fifth lecture we discussed

More information

DREDGING. with particular emphasis on Oil and Gas activities in Canada

DREDGING. with particular emphasis on Oil and Gas activities in Canada DREDGING with particular emphasis on Oil and Gas activities in Canada Dredging is an excavation activity or operation usually carried out at least partly underwater, in shallow seas or fresh water areas

More information

Ocean Structures and Materials Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras

Ocean Structures and Materials Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Ocean Structures and Materials Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Module - 2 Lecture - 4 Dredging I (Refer Slide Time: 00:22) The

More information

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012 NOME HARBOR 1-32 NOME HARBOR, ALASKA (CWIS NOS. 72742, 87755, 12270, & 10422) Condition of Improvement 30 September 2012 AUTHORIZATION: (1) Rivers and Harbors Act, 8 August 1917 (House Doc. 1932, 64th

More information

Louisiana CPRA SJB Group, Baton Rouge Coastal Engineering Consultants U.S. Army Corps of Engineers Federal and State PDT Members

Louisiana CPRA SJB Group, Baton Rouge Coastal Engineering Consultants U.S. Army Corps of Engineers Federal and State PDT Members Louisiana CPRA SJB Group, Baton Rouge Coastal Engineering Consultants U.S. Army Corps of Engineers Federal and State PDT Members Project Setting and Background Island Restoration Plans Pre-Screening Analysis

More information

APPENDIX M DREDGED MATERIAL MANAGEMENT PLAN (DMMP) FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT

APPENDIX M DREDGED MATERIAL MANAGEMENT PLAN (DMMP) FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT APPENDIX M DREDGED MATERIAL MANAGEMENT PLAN (DMMP) Brazos Island Harbor, Texas Channel Improvement Study FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT This page is intentionally left

More information

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE Closure Plan for Existing CCR Rev. 0 Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION AND PURPOSE... 1 2. CLOSURE PLAN NARRATIVE DESCRIPTION... 2 3. FINAL COVER SYSTEM DESCRIPTION... 3

More information

Closure Plan for CCR Surface Impoundments

Closure Plan for CCR Surface Impoundments Closure Plan for CCR Surface Impoundments B.L. England Generating Station Beesley s Point, New Jersey April 17, 2018 Prepared For RC Cape May Holdings, LLC 900 North Shore Road Beesley s Point, New Jersey

More information

An Example of a Unique Partnership for Contaminated Sediment Management The Port Hueneme Experience

An Example of a Unique Partnership for Contaminated Sediment Management The Port Hueneme Experience An Example of a Unique Partnership for Contaminated Sediment Management The Port Hueneme Experience AAPA/USACE Quality Partnership Initiative 4 th Annual Project Managers Workshop Port of Ponce, Puerto

More information

Assateague Island National Seashore North End Restoration Project Timeline

Assateague Island National Seashore North End Restoration Project Timeline Assateague Island National Seashore North End Restoration Project Timeline Date Event Some information provided in the Project Introduction document. Detailed events are available in a timeline compiled

More information

Beaches of the Delaware Estuary

Beaches of the Delaware Estuary Beaches of the Delaware Estuary Woodland Beach Bombay Hook Fortescue Bivalve Thompsons Beach Moores Beach Reeds Beach Port Mahon Pickering Kitts Hummock Bowers Beach Big Stone Beach Town Bank Slaughter

More information

Atlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY Construction Update

Atlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY Construction Update Atlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY Construction Update June 2016 US Army Corps of Engineers Project Purpose Three specific damage mechanisms of coastal

More information

Absecon Island Shore Protection The planning behind the project

Absecon Island Shore Protection The planning behind the project Absecon Island Shore Protection The planning behind the project Most residents of Atlantic City, Ventnor, Margate and Longport are now aware of upcoming plans to protect their common coastline with a beachfill

More information

Public Notice U.S. Army Corps In Reply to Application Number CENAB-OP-RMS (NATIONAL HARBOR (FORMERLY PORT Baltimore District AMERICA])

Public Notice U.S. Army Corps In Reply to Application Number CENAB-OP-RMS (NATIONAL HARBOR (FORMERLY PORT Baltimore District AMERICA]) Public Notice U.S. Army Corps In Reply to Application Number of Engineers CENAB-OP-RMS (NATIONAL HARBOR (FORMERLY PORT Baltimore District AMERICA]) 88-01361 PN 14-05 Comment Period: January 16, 2014 to

More information

NAVIGATION STUDY FOR LAKE WORTH INLET, FLORIDA DRAFT INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL IMPACT STATEMENT APPENDIX A ENGINEERING

NAVIGATION STUDY FOR LAKE WORTH INLET, FLORIDA DRAFT INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL IMPACT STATEMENT APPENDIX A ENGINEERING NAVIGATION STUDY FOR LAKE WORTH INLET, FLORIDA DRAFT INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL IMPACT STATEMENT APPENDIX A ENGINEERING NAVIGATION STUDY FOR LAKE WORTH INLET, FLORIDA DRAFT INTEGRATED

More information

Trusted Partners Delivering Value, Today and Tomorrow BUILDING STRONG

Trusted Partners Delivering Value, Today and Tomorrow BUILDING STRONG Miami-Dade County Renourishment Project U.S. Army Corps of Engineers Jacksonville District January 5, 2017 US Army Corps of Engineers Project Purpose coastal storm risk management beach erosion control

More information

Tanya M. Beck. Kelly Legault. Research Physical Scientist Coastal & Hydraulics Lab, ERDC Vicksburg, MS

Tanya M. Beck. Kelly Legault. Research Physical Scientist Coastal & Hydraulics Lab, ERDC Vicksburg, MS Inlet And Adjacent Shoreline Processes at Cascading Time Scales Using the Coastal Modeling System and GenCade Tanya M. Beck Research Physical Scientist Coastal & Hydraulics Lab, ERDC Vicksburg, MS Kelly

More information

US Beach Nourishment Experience:

US Beach Nourishment Experience: Beach Nourishment: Introduction of new sand to the beach by truck or dredge Large beach >1 million cubic yards (100,000 dump truck loads) Funding is a combination of federal, state, local & private Also

More information

3.9 Marine Transportation

3.9 Marine Transportation 3.9 Marine Transportation 3. Affected Environment and Environmental Analysis 3.9 Marine Transportation 3.9.1 Introduction This section describes existing marine vessel transportation within the Port, the

More information

2018 Beach Preservation Project Information

2018 Beach Preservation Project Information QUICK FACTS Beach Renourishment to begin late April 2018 o U.S. Army Corps of Engineers project o Project Area: 8 th St. E. to end of E. Ashley Ave. o Project Length: 2 miles o Cost: $10,900,000 o Funding:

More information

Nome Harbor Page 2 of 12

Nome Harbor Page 2 of 12 Nome Harbor Nome Harbor Page 2 of 12 Condition of Improvements 30 December 2015 Nome Harbor, Alaska (CWIS No. 010422, 012270, 072742, 087755) Authorization (1) Rivers and Harbors Act, 8 August 1917 (House

More information

Dare County Nourishment Project Town of Duck

Dare County Nourishment Project Town of Duck Dare County Nourishment Project Town of Duck Julien Devisse, P.E. and Ken Willson CB&I / Coastal Planning & Engineering of North Carolina, Inc. February 15, 2017 A World of Solutions Outline Background

More information

Maltester Channel Dredging. Shoreline Marina Committee. November 18, 2008

Maltester Channel Dredging. Shoreline Marina Committee. November 18, 2008 Maltester Channel Dredging Shoreline Marina Committee November 18, 2008 Shoaling Study Summary Report Completed in October 2008 Analyzed siltation rates at Marina Rate of siltation is dynamic ranging from

More information

Dauphin Island East End Beach and Barrier Island Restoration Project. Beau Buhring South Coast Engineers

Dauphin Island East End Beach and Barrier Island Restoration Project. Beau Buhring South Coast Engineers Dauphin Island East End Beach and Barrier Island Restoration Project Beau Buhring South Coast Engineers Funding Funded with qualified outer continental shelf oil and gas revenues by the Coastal Impact

More information

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE 8-FOOT CHANNEL OF THE FEDERAL NAVIGATION PROJECT IN KENNEBUNK RIVER KENNEBUNK & KENNEBUNKPORT, ME

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE 8-FOOT CHANNEL OF THE FEDERAL NAVIGATION PROJECT IN KENNEBUNK RIVER KENNEBUNK & KENNEBUNKPORT, ME fr.iiif.i ~ US Anny Corps of Engineers New England District 696 Virginia Road Concord, MA 01742-2751 Public Notice In Reply Refer to: Mr. Jack Karalius nae-pn-nav@usace.army.mil Programs/Project Management

More information

FINAL ENVIRONMENTAL IMPACT STATEMENT ON BROWARD COUNTY SHORE PROTECTION PROJECT SEGMENTS II AND III BROWARD COUNTY, FLORIDA

FINAL ENVIRONMENTAL IMPACT STATEMENT ON BROWARD COUNTY SHORE PROTECTION PROJECT SEGMENTS II AND III BROWARD COUNTY, FLORIDA FINAL ENVIRONMENTAL IMPACT STATEMENT ON BROWARD COUNTY SHORE PROTECTION PROJECT SEGMENTS II AND III BROWARD COUNTY, FLORIDA 1. PROJECT PURPOSE AND NEED 1.1. PROJECT AUTHORITY. 1.1.1. INITIAL AUTHORIZATION.

More information

CLARIFICATION PAPER DREDGED MATERIAL VOLUME ESTIMATES

CLARIFICATION PAPER DREDGED MATERIAL VOLUME ESTIMATES CLARIFICATION PAPER DREDGED MATERIAL VOLUME ESTIMATES Prepared by Hiram Arden (Corps of Engineers), David Fox (Corps of Engineers) and Ted Benson (DNR) for the PSDDA agencies. INTRODUCTION In a PSDDA sediment

More information

14 NOISE AND VIBRATION

14 NOISE AND VIBRATION 14 NOISE AND VIBRATION 14.1 EXISTING ENVIRONMENT 14.1.1 The noise environment within Poole Harbour is generally characterised by low to medium noise levels depending on location. For example, certain areas

More information

Colorado Avenue Dam Proposed Paddle Trail Improvements Preliminary Design Report Deschutes River, Bend, Oregon

Colorado Avenue Dam Proposed Paddle Trail Improvements Preliminary Design Report Deschutes River, Bend, Oregon Colorado Avenue Dam Proposed Paddle Trail Improvements Preliminary Design Report Deschutes River, Bend, Oregon Prepared For: Bend Metro Park and Recreation District 799 SW Colombia Street Bend, Oregon

More information

BEACH FILL CONSTRUCTION USING SEABED REHANDLING AREAS. Kevin R. Bodge, Ph.D., P.E. 1

BEACH FILL CONSTRUCTION USING SEABED REHANDLING AREAS. Kevin R. Bodge, Ph.D., P.E. 1 Proceedings, 28 th International Conference on Coastal Engineering. 2002. World Scientific Publishing Co. Pte. Ltd. Volume 3 - ISBN 981-238-984-9. pp. 3736-3747 BEACH FILL CONSTRUCTION USING SEABED REHANDLING

More information

La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle

La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas Mark Coyle Corpus Christi Navigation Channel PCCA La Quinta Expansion Project History Corpus Christi Ship Channel Improvement Projects

More information

Pacific Ocean Division. Navigation Program Overview. Association of Pacific Ports 2016 Winter Conference Waikaloa, Hawaii.

Pacific Ocean Division. Navigation Program Overview. Association of Pacific Ports 2016 Winter Conference Waikaloa, Hawaii. Pacific Ocean Division Navigation Program Overview Association of Pacific Ports 2016 Winter Conference Waikaloa, Hawaii David Lau Pacific Ocean Division Chief, Civil Works Integration Division January

More information

Juneau Douglas Harbor

Juneau Douglas Harbor Juneau Douglas Harbor Douglas Harbor Page 2 of 8 Condition of Improvements 31 December 2015 Douglas Harbor, Alaska (CWIS No. 072789, 180942) Authorization Rivers and Harbors Act, 3 July 1958 (House Doc.

More information

SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT

SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT Department of the Army New England District, Corps of Engineers 696 Virginia Road

More information

DRAFT. October 17, 2014 File No Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA.

DRAFT. October 17, 2014 File No Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA. GZA GeoEnvironmental, Inc. Engineers and Scientists October 17, 2014 File No. 18.0171857.00 Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA. 01929 DRAFT Re: Essex River

More information

Oceanside Carlsbad. Solana Beach

Oceanside Carlsbad. Solana Beach Oceanside Carlsbad Solana Beach BACKGROUND AND PURPOSE OF THE PROGRAM Many beaches in Southern California are actively eroding; A deficit of natural sand delivery to the beaches exists due to flood control

More information

Figure 262. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 279

Figure 262. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 279 278 Figure 262. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 279 ATLANTIC COUNTY SUMMARY The Atlantic County coastline consists of three barrier islands. The island of Little Beach

More information

New Jersey Beach Profile Network Atlantic County Profile Site Locations

New Jersey Beach Profile Network Atlantic County Profile Site Locations 215 RICHARD STOCKTON COLLEGE OF NEW JERSEY New Jersey Beach Profile Network Atlantic County Profile Site Locations COASTAL RESEARCH CENTER Figure 128 There are nine NJBPN survey sites on the Atlantic County

More information

ST. LUCIE COUNTY, FLORIDA

ST. LUCIE COUNTY, FLORIDA ST. LUCIE COUNTY, FLORIDA COASTAL STORM RISK MANAGEMENT STUDY Draft Feasibility Study & Integrated Environmental Assessment Public Meeting Presented by U.S. Army Corps of Engineers Jacksonville District

More information

Deep-water orbital waves

Deep-water orbital waves What happens when waves approach shore? Deep-water orbital waves Fig. 9.16, p. 211 Wave motion is influenced by water depth and shape of the shoreline wave buildup zone surf zone beach Wave base deepwater

More information

Town of Duck, North Carolina

Town of Duck, North Carolina Tracking No. 00.00.2010 Erosion Mitigation And Shoreline Management Feasibility Study Town of Duck, North Carolina Coastal Planning & Engineering of North Carolina February 28, 2013 Ken Willson 1 Tracking

More information

APPENDIX D REAL ESTATE PLAN

APPENDIX D REAL ESTATE PLAN NAVIGATION IMPROVEMENTS SITKA HARBOR, ALASKA CHANNEL ROCK BREAKWATERS DRAFT DEFICIENCY CORRECTION EVALUATION REPORT APPENDIX D REAL ESTATE PLAN JANUARY 2011 REAL ESTATE PLAN FOR SITKA HARBOR, ALASKA CHANNEL

More information

Figure79. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 155

Figure79. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 155 154 Figure79. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 155 ATLANTIC COUNTY SPRING 2009 to FALL 2010 The Atlantic County coastline consists of three barrier islands. Between Little

More information

3.0 PROJECT ALTERNATIVES

3.0 PROJECT ALTERNATIVES 3.0 PROJECT ALTERNATIVES The National Environmental Policy Act and the CEQ regulations for implementing the NEPA (40 CFR 1500 et. seq.) require the identification and evaluation of reasonable alternatives

More information

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, & 10422) Condition of Improvement 30 September 2009

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, & 10422) Condition of Improvement 30 September 2009 NOME HARBOR 1-32 NOME HARBOR, ALASKA (CWIS NOS. 72742, 87755, & 10422) Condition of Improvement 30 September 2009 AUTHORIZATION: (1) Rivers and Harbors Act, 8 August 1917 (House Doc. 1932, 64th Congress,

More information

Town of Duck, North Carolina

Town of Duck, North Carolina Tracking No. 00.00.2010 Erosion Mitigation And Shoreline Management Feasibility Study Town of Duck, North Carolina Coastal Planning & Engineering of North Carolina August 15, 2012 Tom Jarrett Robert Neal

More information

FINDING OF NO SIGNIFICANT IMPACT

FINDING OF NO SIGNIFICANT IMPACT DEPARTMENT OF THE ARMY CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A HAGOOD AVENUE CHARLESTON, SOUTH CAROLINA 29403-5107 FINDING OF NO SIGNIFICANT IMPACT EDISTO BEACH COASTAL STORM DAMAGE REDUCTION GENERAL

More information

2013 ANNUAL REPORT - TO THE CITY OF NORTH WILDWOOD ON THE CONDITION OF THE CITY BEACHES

2013 ANNUAL REPORT - TO THE CITY OF NORTH WILDWOOD ON THE CONDITION OF THE CITY BEACHES 2013 ANNUAL REPORT - TO THE CITY OF NORTH WILDWOOD ON THE CONDITION OF THE CITY BEACHES View on June 18, 2013 from the 2 nd Avenue jetty looking south while the 2013 beach nourishment project was under

More information

MAC Transit Advisories as of April 30, 2018

MAC Transit Advisories as of April 30, 2018 MAC Transit Advisories as of April 30, 2018 The Mariners Advisory Committee for the Bay and River Delaware was established in October 1964. Its members and associate members are mainly comprised of master

More information

UPPER BEACH REPLENISHMENT PROJECT RELATED

UPPER BEACH REPLENISHMENT PROJECT RELATED ASSESSMENT OF SAND VOLUME LOSS at the TOWNSHIP of UPPER BEACH REPLENISHMENT PROJECT RELATED to the LANDFALL OF HURRICANE SANDY - PURSUANT TO NJ-DR 4086 This assessment is in response to Hurricane Sandy

More information

Page 1 of 6 WINTER 2007

Page 1 of 6 WINTER 2007 Page 1 of 6 WINTER 2007 LETTER FROM THE PRESIDENT - Al Rae There is certainly a lot going on in South Bethany this winter; of course the biggest event is the beach replenishment which is now well underway.

More information

Nearshore Dredged Material Placement Pilot Study at Noyo Harbor, CA

Nearshore Dredged Material Placement Pilot Study at Noyo Harbor, CA 1 Nearshore Dredged Material Placement Pilot Study at Noyo Harbor, CA Noyo Cove N 2011 National Conference on Beach Preservation Technology 9-11, February 2011 Lihwa Lin, Honghai Li, Mitchell Brown US

More information

The purpose and needs of the Figure Eight Island Inlet and Shoreline Management Project are as follows:

The purpose and needs of the Figure Eight Island Inlet and Shoreline Management Project are as follows: Chapter 2 PURPOSE AND NEEDS 1. What are the purpose and needs of this project? The main concern of residents and owners at Figure Eight Island are economic losses resulting from damages to structures and

More information

Ennore Coal Port Project: Port Basin and Entrance Channel

Ennore Coal Port Project: Port Basin and Entrance Channel Ennore Coal Port Project: Port Basin and Entrance Channel André Luypaert Ennore Coal Port Project: Port Basin and Entrance Channel Abstract The Chennai Port on the eastern coast of India is the main port

More information

Regular Workshop October 20, 2014 Agenda Item: Dr. Albert E. Browder, PE; Olsen Associates, Inc.

Regular Workshop October 20, 2014 Agenda Item: Dr. Albert E. Browder, PE; Olsen Associates, Inc. Regular Workshop October 20, 2014 Agenda Item 8 Agenda Item: Presenter: Summary: Beach Update Town Manager; Dr. Albert E. Browder, PE; Olsen Associates, Inc. At the January 21, 2014 Regular Workshop Meeting,

More information

COTTER MILL SITE SUMMARY - RML

COTTER MILL SITE SUMMARY - RML COTTER MILL SITE SUMMARY - RML NRC Code Totals Estimated Cost Reference/ Index Table No. in table N/A GRAND TOTAL RML SURETY RML TOTAL $20,401,841 N/A N/A N/A GRAND TOTAL RAP SURETY RAP TOTAL $2,891,319

More information

Dredging Keeping Our Underwater Highways Open

Dredging Keeping Our Underwater Highways Open Dredging Keeping Our Underwater Highways Open Sedimentation Material that falls to the bottom of a liquid is called sediment. If enough sediment deposits to build a shallow spot on the river or ocean bottom,

More information

FEASIBILITY OF SAND BYPASSING SYSTEMS

FEASIBILITY OF SAND BYPASSING SYSTEMS MISCELLANEOUS PAPER HL-88-9 FEASIBILITY OF SAND BYPASSING SYSTEMS Of " EngFOR REDUCING MAINTENANCE DREDGING IN THE ST. MARYS RIVER ENTRANCE CHANNEL by David R. Richards ji NHydraulics tand Laboratory James

More information

AD-A II~lllII I I 7

AD-A II~lllII I I 7 AD-A284 157 II~lllII CONSTRUCTION OF BREAK WATERS AND BEACEFILL AT THE NAVAL AIR STATION, PATUXENT RIVER, MARYLAND C D.W.Yang, J.McWilliams 2, S.Ming 2 ABSTRACT Construction of the breakwaters and beach

More information

Dredged Material Management Plan Atlantic Intracoastal Waterway Port Royal Sound, South Carolina to Cumberland Sound, Georgia November 2015

Dredged Material Management Plan Atlantic Intracoastal Waterway Port Royal Sound, South Carolina to Cumberland Sound, Georgia November 2015 Dredged Material Management Plan Atlantic Intracoastal Waterway Port Royal Sound, South Carolina to Cumberland Sound, Georgia November 2015 Appendix B: Biological Assessment of Threatened and Endangered

More information

Utilities Technical Report Oregon Department of Transportation. Appendix E. Figure Descriptions

Utilities Technical Report Oregon Department of Transportation. Appendix E. Figure Descriptions Appendix E. Descriptions Appendix E. Descriptions This appendix includes written descriptions of all figures included in this Technical Report. If needed, additional figure interpretation is available

More information

Ninilchik Harbor Page 2 of 11

Ninilchik Harbor Page 2 of 11 Ninilchik Harbor Ninilchik Harbor Page 2 of 11 Condition of Improvements 31 December 2017 Ninilchik Harbor, Alaska (CWIS No. 012640, 087345) Authorization Rivers and Harbors Act, 3 July 1958 (P.L. 85-500

More information

Certified Professionals in Hydrographic Solutions

Certified Professionals in Hydrographic Solutions Certified Professionals in Hydrographic Solutions Client Satisfaction is our Deliverable Port of Brisbane Pty Ltd Port Surveys Certified Professionals in Hydrographic Surveying Tel +61 (0) 7 3258 4820

More information

SANDBANKS COAST PROTECTION

SANDBANKS COAST PROTECTION SANDBANKS COAST PROTECTION David Robson, Senior Engineer, Coastal & Drainage Team Borough of Poole Leisure Services (T) 01202 265265 (E) d.robson@poole.gov.uk May 2003 SANDBANKS COAST PROTECTION Introduction

More information

Beach Nourishment Impact on Beach Safety and Surfing in the North Reach of Brevard County, Florida

Beach Nourishment Impact on Beach Safety and Surfing in the North Reach of Brevard County, Florida Beach Nourishment Impact on Beach Safety and Surfing in the North Reach of Brevard County, Florida Prepared by John Hearin, Ph.D. Coastal Engineering Vice Chairman Cocoa Beach Chapter Port Canaveral Patrick

More information

Rule 3 - General definitions

Rule 3 - General definitions Vessel Rule 3 (a) Every water craft including: Non-displacement craft WIG craft Seaplanes Used or capable of being used as a means of transportation on water www.synfo.com 1 Types of Vessels Every description

More information

3.10 TRAFFIC AND CIRCULATION

3.10 TRAFFIC AND CIRCULATION 3.10 TRAFFIC AND CIRCULATION Implementation of the Enhancement Project would require use of the local circulation system for construction activities and operations. This traffic analysis considers the

More information

BEACH NOURISHMENT BY RAINBOWING FOR THE VISAKHAPATNAM PORT TRUST BY DCI. Capt. MVR MURTHY ABSTRACT

BEACH NOURISHMENT BY RAINBOWING FOR THE VISAKHAPATNAM PORT TRUST BY DCI. Capt. MVR MURTHY ABSTRACT BEACH NOURISHMENT BY RAINBOWING FOR THE VISAKHAPATNAM PORT TRUST BY DCI Capt. MVR MURTHY ABSTRACT The coastal city of Visakhapatnam had a long wide beach. Over past three decades, this beach has progressively

More information

3.9 Marine Transportation

3.9 Marine Transportation 3.9 Marine Transportation 3. Affected Environment and Environmental Analysis 3.9 Marine Transportation 3.9.1 Introduction This section describes existing marine vessel transportation within the Port, the

More information

Regional Sediment Management Opportunities within Intracoastal Waterway (IWW) Dredging Program in the State of Florida

Regional Sediment Management Opportunities within Intracoastal Waterway (IWW) Dredging Program in the State of Florida Regional Sediment Management Opportunities within Intracoastal Waterway (IWW) Dredging Program in the State of Florida INTRODUCTION: The topic of this Regional Sediment Management (RSM) Technical Note

More information

EVALUATION OF BEACH EROSION UP-DRIFT OF TIDAL INLETS IN SOUTHWEST AND CENTRAL FLORIDA, USA. Mohamed A. Dabees 1 and Brett D.

EVALUATION OF BEACH EROSION UP-DRIFT OF TIDAL INLETS IN SOUTHWEST AND CENTRAL FLORIDA, USA. Mohamed A. Dabees 1 and Brett D. EVALUATION OF BEACH EROSION UP-DRIFT OF TIDAL INLETS IN SOUTHWEST AND CENTRAL FLORIDA, USA Mohamed A. Dabees 1 and Brett D. Moore 1 The paper discusses the analysis of up-drift beach erosion near selected

More information

CHAPTER 281 INFLUENCE OF NEARSHORE HARDBOTTOM ON REGIONAL SEDIMENT TRANSPORT

CHAPTER 281 INFLUENCE OF NEARSHORE HARDBOTTOM ON REGIONAL SEDIMENT TRANSPORT CHAPTER 281 INFLUENCE OF NEARSHORE HARDBOTTOM ON REGIONAL SEDIMENT TRANSPORT Paul C.-P. Lin, Ph.D., P.E. 1 and R. Harvey Sasso, P.E. 2 ABSTRACT The influence of nearshore hardbottom on longshore and cross-shore

More information

3.3 OCEANOGRAPHY/COASTAL PROCESSES

3.3 OCEANOGRAPHY/COASTAL PROCESSES 3.3 OCEANOGRAPHY/COASTAL PROCESSES Beaches are dynamic and conditions vary based on the onshore/offshore movement of sand both seasonally and annually. Sand also moves alongshore within a generally defined

More information

Building Coastal Resiliency at Plymouth Long Beach

Building Coastal Resiliency at Plymouth Long Beach Building Coastal Resiliency at Plymouth Long Beach Department of Marine and Environmental Affairs March 30, 2017 Introducing Green Infrastructure for Coastal Resiliency Plymouth Long Beach & Warren s Cove

More information

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1 TABLE OF CONTENTS 1.0 INTRODUCTION 1 2.0 PLAN CERTIFICATION 257.102(B)(4) 1 3.0 WRITTEN CLOSURE PLAN 2 3.1 Narrative 2 3.2 CCR Removal 2 3.3 CCR Left in Place 3 3.4 Maximum CCR Inventory 3 3.5 Maximum

More information

BEACH NOURISHMENT PROJECTS IN CARBONATE MATERIAL BEACH

BEACH NOURISHMENT PROJECTS IN CARBONATE MATERIAL BEACH Submitted February, 2006 BEACH NOURISHMENT PROJECTS IN CARBONATE MATERIAL BEACH Ryuichiro Nishi 1, Robert G. Dean 2 and Mario P. de Leon 1 1 Department of Ocean Civil Engineering, Kagoshima University,

More information

R. Randall Center for Dredging Studies Texas A&M University

R. Randall Center for Dredging Studies Texas A&M University R. Randall Center for Dredging Studies Texas A&M University i Glory (Caisson) holes for subsea installations Pipeline trenches Deep ocean mining LNG ports & ship channels Summary WEDA 33 & TAMU 44 2 WEDA

More information

APPENDIX G DREDGING STUDIES. G.1: Fish Related Dredgi g I pacts a d Mitigatio

APPENDIX G DREDGING STUDIES. G.1: Fish Related Dredgi g I pacts a d Mitigatio APPENDIX G DREDGING STUDIES G.1: Fish Related Dredgi g I pacts a d Mitigatio A acis Isla d WWTP Ne Outfall Syste Va cou er Fraser Port Authority Project a d E iro e tal Re ie Applicatio This page intentionally

More information

Planning Considerations for Nearshore Placement of Mixed Dredged Sediments

Planning Considerations for Nearshore Placement of Mixed Dredged Sediments Planning Considerations for Nearshore Placement of Mixed Dredged Sediments PURPOSE: Dredging planning and management decisions are based on a combination of engineering and economic factors tempered by

More information

PNWA Conference Update

PNWA Conference Update PNWA Conference Update COLONEL Jose Aguilar District Commander Portland District 2 October, 2014 US Army Corps of Engineers Projects Mouth of the Columbia (MCR) Jetties Columbia River Status Coastal Dredging

More information

BIG RIVER COALITION RED RIVER VALLEY ASSOCIATION Sean M. Duffy, Sr. Executive Director

BIG RIVER COALITION RED RIVER VALLEY ASSOCIATION Sean M. Duffy, Sr. Executive Director BIG RIVER COALITION RED RIVER VALLEY ASSOCIATION 22119 Sean M. Duffy, Sr. Executive Director sean.duffy@bigrivercoaltiion.org MARITIME NATION ENGINEER S WEEK 22217 MARITIME STATE MISSISSIPPI RIVER SHIP

More information

2017 Annual Inspection Report

2017 Annual Inspection Report 2017 Annual Inspection Report for Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Comanche Station 2005 Lime Road Pueblo, Colorado 81006 January 18, 2018 Table of Contents Certification...

More information

RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416]

RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416] October 25, 2016 Iris Hill Town Administrator Town of Edisto Beach 2414 Murray St Edisto Beach SC 29438 RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416] Dear Iris, Hurricane

More information

BALD HEAD ISLAND, NC SAND SHARING SYSTEM OVERVIEW AND ASSESSMENT. Erik J. Olsen, P.E. olsen associates, inc.

BALD HEAD ISLAND, NC SAND SHARING SYSTEM OVERVIEW AND ASSESSMENT. Erik J. Olsen, P.E. olsen associates, inc. BALD HEAD ISLAND, NC SAND SHARING SYSTEM OVERVIEW AND ASSESSMENT Erik J. Olsen, P.E. Olsen Associates, Inc. BACKGROUND Both the Village of Bald Head Island (VBHI) and the Bald Head Island Limited, LLC.

More information

DREDGING AT INLETS ON SANDY COASTS

DREDGING AT INLETS ON SANDY COASTS CHAPTER 18 DREDGING AT INLETS ON SANDY COASTS Berkeley Blackman Chief, Civil Works Branch South Atlantic Division, Corps of Engineers Department of the Army Atlanta, Georgia Dredging in navigation channels

More information

MILE POINT TRAINING WALL JACKSONVILLE, FL. Geotextile Tube Installation

MILE POINT TRAINING WALL JACKSONVILLE, FL. Geotextile Tube Installation MILE POINT TRAINING WALL JACKSONVILLE, FL Geotextile Tube Installation PROJECT DESIGN Remove portion of existing training wall Construct new eastern and western training walls Deepen new flow improvement

More information

ST. JOSEPH PENINSULA, GULF COUNTY, FLORIDA Beach Re-Nourishment and Environmental Enhancement Project RECOMMENDATIONS

ST. JOSEPH PENINSULA, GULF COUNTY, FLORIDA Beach Re-Nourishment and Environmental Enhancement Project RECOMMENDATIONS ST. JOSEPH PENINSULA, GULF COUNTY, FLORIDA Beach Re-Nourishment and Environmental Enhancement Project RECOMMENDATIONS January 23, 2018 543 Harbor Boulevard, Suite 204 Destin, Florida 32541 850.654.1555

More information