Traffic Engineering and Operations for BRT in Los Angeles
|
|
- Scott Darcy Stone
- 5 years ago
- Views:
Transcription
1 Traffic Engineering and Operations for BRT in Los Angeles NACTO BRT Running Way Workshop #2 June 29, 2010 By: Kang Hu, PE, PTOE Chun Wong, PE
2 LADOT s s Involvement in BRT LADOT has partnered with LA Metro in National BRT Demonstration Program since 1997 Strong commitment from the Mayors to improve transit services in LA Focusing on improving bus speeds Successfully implemented Transit priority System for 25 Metro Rapid Bus corridors and the Metro Orange Line Responsible for the traffic safety improvements of the Metro Orange Line Developing new bus lane projects 1
3
4 LADOT s s Transit Priority System (TPS) A centralized signal priority system Fully integrated with the City s Adaptive Traffic Control System (ATCS) Reduce bus delays at signalized intersections with minimal impacts on cross streets smart priority Provide real-time bus arrival information Measure bus performance throughout the system Page 3
5 LADOT S S ATSAC Control Center Page 4
6 TPS Central System Diagram Comm. Network TPS Server (Transit Priority Manager) TPS Workstation Sensor Input Sensor Input Sensor Input 2070 Controller 2070 Controller 2070 Controller Database LAN/WAN Web Server Page 5
7 Bus Detection Selected loop-transponder based on field tests of 3 different technologies Inductive loops placed in the roadway serve as antennas to receive bus transponder identification code Advance (check-in) detector just past upstream bus stop Release (check-out) detector just prior to limit line or within the intersection Page 6
8 Bus Loop and Transponder Transponder Page 7
9 Sensor Card and 2070 Controller Page 8
10 Bus Priority Operation EARLY GREEN - Phase is started earlier than normal to minimize delays to stopped or approaching buses GREEN EXTENSION - Phase continues past normal endpoint to help buses pass through critical intersections PHASE HOLD - Phase held in green until bus arrives, typically used for left turns. Page 9
11 Cycle Time Changes 20% 20% 45% Main Street Cross Street 45% Main Street Cross Street Left Turns Left Turns 35% 35% 15% 15% 55% Main Street Cross Street Left Turns 30% 55% Main Street Cross Street Left Turns 30% Page 10
12 MTA S S Bus Dispatch Center Monitor bus performance Radio communication with bus operators Real time bus data provided by LADOT ATSAC video & camera control access Page 11
13 TPS Map Client Software Page 12
14 TPS Performance Benefits The Metro Rapid Buses achieved a 25% reduction in total travel time Transit Priority System alone contributed to 30% of the total travel time saving Bus delays at signalized intersections were reduced by 33-39% Average of 1 second per vehicle per cycle increase in delay to the cross traffic Page 13
15 Passenger Information System Developed by LADOT Based on bus detection Uses actual travel times Also on the web Page 14
16 Typical Station Locations Metro Rapid Local Bus Local Bus Metro Rapid 15
17 Metro Orange Line Busway Page 16
18 Type of Crossings Median Alignment Diagonal Crossings Side Aligned Intersections (right-turn pocket intersections) Isolated intersections Mid-block Pedestrian Crossings 17
19 18
20 19
21 20
22 21
23 22
24 23
25 Traffic Safety Features Traffic Signals All Busway crossings are signalized Protected Left Turn and Right Turns across the Busway Extended All-Red time Pavement Markings Double yellow Busway centerlines Bus Only, Keep Clear and Wait Here markings Signage Illuminated Bus Coming signs NO TURN and DO NOT ENTER signs Illuminated pedestrian/bus signs Bus Xing and Look Both Ways warning signs 24
26 Protected Turn Pockets 25
27 Signs and Markings 26
28 Busway Signs 27
29 New Crosswalk and Pedestrian Signs 28
30 Photo Cameras 29
31 In-Pavement Lights In-Pavement Lights Page 30
32 San Fernando Valley North-South Transit Corridors Valley N-S Study Corridor Metro Orange Line Canoga Transit Corridor Chatsworth Metrolink Station Metro Red Line North Hollywood Station CANOGA CORRIDOR METRO ORANGE LINE RESEDA CORRIDOR SEPULVEDA CORRIDOR VAN NUYS CORRIDOR LANKERSHIM/SF CORRIDOR
33
East San Fernando Valley Transit Corridor. Draft EIS/EIR Public Hearing (September 1 thru October 16, 2017
East San Fernando Valley Transit Corridor Draft EIS/EIR Public Hearing (September 1 thru October 16, 2017 1 Public Comments Release of Draft EIS/EIR September 1, 2017 through October 16, 2017 45-day Public
More informationMOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014
MOBILITY WORKSHOP Joint City Council and Transportation Commission May 5, 2014 Review of General Plan M-1 Develop world-class transit system M-3 Maintain/enhance pedestrian-oriented City M-4 Create comprehensive
More informationOrange County Rail-Highway Grade Crossing Safety Enhancement Program. City of San Juan Capistrano April 17, 2012
Orange County Rail-Highway Grade Crossing Safety Enhancement Program City of San Juan Capistrano April 17, 2012 Orange County Rail-Highway Grade Crossing Safety Enhancement Program (OCX) 52 crossings 8
More informationChapter 3 BUS IMPROVEMENT CONCEPTS
Chapter 3 BUS IMPROVEMENT CONCEPTS The purpose of this chapter is to describe potential bus improvement strategies and potential impacts or implications associated with BRT implementation within the existing
More informationADVANCED TRANSIT OPERATIONS AND MODELING
SOUTHERN DISTRICT OF INSTITUTE OF TRANSPORTATION ENGINEERS (SDITE) 2017 ADVANCED TRANSIT OPERATIONS AND MODELING SURESH KARRE, PE, PTOE ROBERT DUBNICKA, PE, TE, PTOE AGENDA Background Transit operations
More informationOperational Comparison of Transit Signal Priority Strategies
Operational Comparison of Transit Signal Priority Strategies Revision Submitted on: November, 0 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 0 South Orange Avenue, Suite 00 Orlando,
More informationBRT Standard 2016 Edition. Jacob Mason Transport Research and Evaluation Manager July 26, 2016
BRT Standard 2016 Edition Jacob Mason Transport Research and Evaluation Manager July 26, 2016 Overview 1. Context 2. What is Bus Rapid Transit (BRT)? 3. What is the BRT Standard? 4. Why Was It Created?
More informationIn station areas, new pedestrian links can increase network connectivity and provide direct access to stations.
The Last Mile Planning for Pedestrians Planning around stations will put pedestrians first. Making walking to stations safe and easy is important; walking will be a part of every rapid transit Accessible
More informationMineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st
Mineral Avenue Corridor Assessment ITE 2017 Western District Annual Meeting San Diego, CA June 21 st Biography - Aaron Heumann, PE, PTOE Currently City of Littleton Transportation Engineering Manager 24
More informationPublic Comment Meeting Geary BRT Project Draft Environmental Impact Statement/Report
Public Comment Meeting Geary BRT Project Draft Environmental Impact Statement/Report Open House and Opportunity to Provide Comments Public comments can be submitted to the court reporter stationed in the
More informationPURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5
SUMMARY PURPOSE AND NEED Chapel Hill Transit ridership has increased Buses operate every 4 minutes and have standing room only Exceeding seated capacity by 12% Corridor Need 1 by more than 20 percent between
More information95 th Street Corridor Transportation Plan. Steering Committee Meeting #2
95 th Street Corridor Transportation Plan Steering Committee Meeting #2 February 18, 2015 PURPOSE OF THE MEETING Update Steering Committee Present Community/Stakeholder Survey Results Present Transportation
More informationEMPHASIS AREA 1: PEDESTRIANS
EMPHASIS AREA 1: PEDESTRIANS A pedestrian is seriously injured or killed every 3 days on Toronto s roads. Pedestrian collisions involve any person that is not riding in a vehicle or on a bicycle. 26% OF
More informationM14A/D Select Bus Service
M14A/D Select Bus Service Manhattan Community Board 6: April 1, 2019 New York City Transit 2 Background M14 Select Bus Service M14 was identified as a critical future SBS corridor in past BRT studies as
More information7 June 2018 OUR REF:
7 June 2018 OUR REF: 476729-01000 Mirtillo Estates Inc. 1681 Langstaff Road, Unit 1 Vaughan, Ontario, L4K 5T3 Attention: Joran Weiner Vice-President Dear Mr. Weiner: Re: Mirtillo Estates Sales Office Transportation
More informationMaking Signals Work for Bicyclists and Pedestrians
Making Signals Work for Bicyclists and Pedestrians Peter Koonce, PE Portland, OR October 18, 2017 PBIC Webinar pedbikeinfo.org @pedbikeinfo Housekeeping Problems with audio? Dial into the phone line instead
More informationArterial Transitway Corridors Study. Ave
Arterial Transitway Corridors Study Ave January 2012 Arterial Transitway Corridors Study Overview Corridor Features and Demographics 11 study corridors, 95 route miles 86,000 daily rides and half of existing
More informationRoadways. Roadways III.
Introduction 97 Roadway Design Principles 98 Safe Speeds 99 Optimizing of Street Space 00 Minimum Lane Widths in the City of Boston 02 Design Features that Reduce Operating Speeds 05 Travel Lanes Transit
More informationCycle Track Design Best Practices Cycle Track Sections
Design Best Practices Sections It is along street segments where the separation and protection methods of cycle tracks offer more comfort than conventional bicycle lanes, and are more attractive to a wide
More informationCITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE
CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE Date: May 9, 2017 To: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee From:
More informationEliminate on-street parking where it will allow for a dedicated bus only lane %
Traffic Dashboard Priorities Survey Responses Introduction 1) Are you familiar with bus rapid transit (BRT)? a. No, BRT is new to me. 597 23.5% b. I ve heard of BRT, but I don t know much about it. 1,136
More informationComplete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA
Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,
More informationWestside Transportation Access Needs Assessment - Short and Long Term Improvements
ABSTRACT The Los Angeles County Metropolitan Transportation Authority (MTA) adopted the 2001 Long Range Transportation Plan (LRTP), which sets out the County s transportation investments for the next 20-25
More informationDesigning Streets for Transit. Presentation to NACTO Designing Cities Kevin O Malley Managing Deputy Commissioner 10/24/2014
Designing Streets for Transit Presentation to NACTO Designing Cities Kevin O Malley Managing Deputy Commissioner 10/24/2014 Chicago -- Streets for Transit TODAY Jeffery Jump Transit Signal Priority Central
More informationWilshire Boulevard Bus Rapid Transit Project
Los Angeles County Metropolitan Transportation Authority Wilshire Boulevard Bus Rapid Transit Project COMMUNITY MEETINGS November 2008 Agenda Introduction Proposed Project Overview Participating Agencies
More informationPedestrian Safety Guide for Transit Agencies
Pedestrian Safety Guide for Transit Agencies FDOT/FTPA/CUTR Professional Development Workshop June 15, 2010 1 Purpose Presentation Overview Bus Stop Location and Design Process/Partnership 2 Purpose Every
More informationTraditional Public Transport Priority. Priority/Traffic Management? What is Integrated Public Transport Priority/Traffic management? Why? How?
Integrated Public Transport Priority & Traffic Management Sam Zimmerman What is Integrated Public Transport Priority/Traffic management? Why? How? Integrated Public Transport Priority/Traffic Management?
More informationImproving the Bus Network through Traffic Signalling. Henry Axon Transport for London
Improving the Bus Network through Traffic Signalling Henry Axon Transport for London Improving the Bus Network through Traffic Signalling Introduction Transport for London (TfL) operates the most frequent
More informationSpring Lake Park Mounds View North Oaks. Arden Hills. Shoreview. Roseville. Little Canada. Falcon Heights SNELLING. Lilydale. West Saint Paul 35E
Coon Rapids Blaine Spring Lake Park Mounds View rth Oaks In 2011, Metro Transit embarked on the Arterial 494 Minnetonka Maple Grove Plymouth Hopkins Brooklyn Park New Hope Golden Valley Louis Park Edina
More informationALTERNATIVES ANALYSIS EXECUTIVE SUMMARY
West Valley Connector Corridor ALTERNATIVES ANALYSIS EXECUTIVE SUMMARY FINAL September 2014 Ontario International Airport Ontario Mills Rancho Cucamonga Metrolink Station Kaiser Permanente PARSONS EXECUTIVE
More informationBalancing Operation & Safety for Motorized and Non-Motorized Traffic
Balancing Operation & Safety for Motorized and Non-Motorized Traffic Brian Willham, PE, PTOE Iowa Director - MOVITE June 30, 2014 Learning Objectives: When & Why should we measure the performance of complete
More informationEmergency Vehicle Preemption
Emergency Vehicle Preemption Brian Willham, PE, PTOE Traffic Engineer November 18, 2014 Emergency Vehicle Preemption is a type of system that allows the normal operation of traffic signals to be preempted
More informationThe Who and What: Bus Rapid Transit Riders and Systems in the U.S.
The Who and What: Bus Rapid Transit Riders and Systems in the U.S. Cheryl Thole December 12, 2013 Webinar Center for Urban Transportation Research University of South Florida Pre presentation How familiar
More informationHow familiar are you with BRT?
The Who and What: Bus Rapid Transit Riders and Systems in the U.S. Cheryl Thole December 12, 2013 Webinar Center for Urban Transportation Research University of South Florida Pre presentation How familiar
More informationMultimodal Approach to Planning & Implementation of Transit Signal Priority within Montgomery County Maryland
Multimodal Approach to Planning & Implementation of Transit Signal Priority within Montgomery County Maryland A Path to Successful Implementation James Allday Bunch - Sabra, Wang & Associates, Inc. ITS
More informationTransit Signal Preemption and Priority Treatments
Transit Signal Preemption and Priority Treatments Peter Koonce, PE Portland, OR Today s Message Transit signal priority presents an opportunity to partner with an agency that isn t always recognized as
More information1.0 INTRODUCTION 1.1 PURPOSE OF THIS REPORT
1.0 INTRODUCTION This chapter provides an overview of the purpose, authorization and focus of this Recirculated Draft Environmental Impact Report (EIR), an identification of the Lead Agency, an outline
More informationEE16B Designing Information Devices and Systems II
EE6B Designing Information Devices and Systems II Lecture A k-means Clustering - - - - k-means Given: ~x, ~x,, ~x m R n Partition them into k
More informationBaseline Road Rapid Transit: Bayshore Station to Prince of Wales Drive
Baseline Road Rapid Transit: Bayshore Station to Prince of Wales Drive Planning and Environmental Assessment Study Consultation Group Meetings May 2014 Presentation Agenda Study Overview Study Progress
More informationEl Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018
El Camino Real Specific Plan TAC/CAC Meeting #2 Aug 1, 2018 Land Use Alternatives Goals and Tradeoffs Parks & open space Housing Retail & services Civic spaces Parking Community gathering spaces 3 Alternatives
More informationAPPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016
APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of
More informationMINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY
MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY INTRODUCTION City Personnel Sign-in Sheet Comment Forms Please Write Down Any Feedback INTRODUCTION List of Topics for Presentation Study
More informationActive Transportation Facility Glossary
Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike
More informationTonight is for you. Learn everything you can. Share all your ideas.
Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.
More informationNY 5 BRT Conceptual Design Study: Study Advisory Committee Meeting 1. with Creighton Manning Engineering, LLP Logitrans Herb Levinson
NY 5 BRT Conceptual Design Study: Study Advisory Committee Meeting 1 with Creighton Manning Engineering, LLP Logitrans Herb Levinson September 22, 2003 Overview Introduction to the consultant team Goals
More informationScottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012
Scottsdale Road/Rural Road Alternatives Analysis (AA) Study Arizona ITE/IMSA Spring Conference March 7, 2012 Study Location and Duration Primary Study Corridor (major focus of effort) Rural Road and Scottsdale
More informationBus Rapid Transit on Silicon Valley s El Camino Real: Working Together to Create a Grand Boulevard Steven Fisher
Bus Rapid Transit on Silicon Valley s El Camino Real: Working Together to Create a Grand Boulevard Steven Fisher Senior Transportation Planner Santa Clara Valley Transportation Authority San Jose, CA How
More informationTHE NACTO MANUALS AND DESIGNING FOR VISION ZERO ZAKI MUSTAFA SHIRLEY ZAMORA
THE NACTO MANUALS AND DESIGNING FOR VISION ZERO ZAKI MUSTAFA SHIRLEY ZAMORA NACTO Design Guides 2 City of Los Angeles Vision Zero 3 Vision Zero Roscoe Boulevard Corridor SHIRLEY ZAMORA TRANSPORTATION ENGINEERING
More informationSANTA MONICA BOULEVARD CORRIDOR
CIRCULATION ELEMENT WHITE PAPER NO. 3 SANTA MONICA BOULEVARD CORRIDOR INTRODUCTION From the 1930s to the beginning of Los Angeles freeway era, Santa Monica Boulevard, (previously Route 66, the Beverly
More informationYork Region Rapid Transit Corporation
York Region Rapid Transit Corporation 0 Highway 7 East (H3) BRT Dedicated Lanes Municipal Engineers Association (MEA) York Region 2015 November 19, 2015 key points of the presentation Geography / York
More informationMetro Bike/Bus Interface Study
Metro Bike/Bus Interface Study Agenda 1. Background & Process 2. Corridors & Metrics 3. General Findings 4. Training Recommendations 5. Design Guidelines 6. Questions L.A. County Bus Service LA Metro 1,433
More informationBOSTON REGION METROPOLITAN PLANNING ORGANIZATION
PLANNING ORGANIZATIO BOSTON REGION MPO NMETROPOLITAN BOSTON REGION METROPOLITAN PLANNING ORGANIZATION Stephanie Pollack, MassDOT Secretary and CEO and MPO Chair Karl H. Quackenbush, Executive Director,
More informationORANGE LINE BUS RAPID TRANSIT SUSTAINABLE CORRIDOR IMPLEMENTATION PLAN
FINAL PLAN ORANGE LINE BUS RAPID TRANSIT SUSTAINABLE CORRIDOR IMPLEMENTATION PLAN JUNE 29, 2012 ORANGE LINE BUS RAPID TRANSIT SUSTAINABLE CORRIDOR IMPLEMENTATION PLAN Final Plan June 29, 2012 This is
More informationCITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY
RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study
More informationWHAT IS BRT? Jack M. Gonsalves, PE, Parsons Brinckerhoff, Inc. February 22, 2012
WHAT IS BRT? Jack M. Gonsalves, PE, Parsons Brinckerhoff, Inc. February 22, 2012 What is Bus Rapid Transit (BRT)? A flexible, high performance rapid transit mode that combines a variety of physical, operating,
More informationNorth Hollywood to Pasadena BRT Corridor Technical Study. Eco-Rapid Transit/Orange Line Development Authority March 8, 2017
North Hollywood to Pasadena BRT Corridor Technical Study Eco-Rapid Transit/Orange Line Development Authority March 8, 2017 Agenda 1. Background 2. Corridor Review 3. Key Challenge 4. Preliminary BRT Alignments
More informationQueensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011
: Summary of Recommendations Presentation to Manhattan Community Board 8 May 4, 2011 1 Overview Study Goal: Identify cost-effective ways to improve bus speed and reliability for local and express buses
More informationNew York s Revolutionary Transit Signal Priority Program
New York s Revolutionary Transit Signal Priority Program Research Showcase October 28, 2015 Mark Yedlin Greenman-Pedersen, Inc. Agenda Background Why revolutionary Universal Issues Implementation Current
More informationBicycle Facilities Planning
Bicycle Facilities Planning Overview Types of Cyclists Purpose for Riding Types of Facilities Bike Lanes Bicycle Boulevards Cycle Tracks Intersections Signals Signing and Marking Discussion Types of Bicyclists
More informationEXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives
Contents EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW... 1-1 1.1 Study Scope... 1-1 1.2 Study Area... 1-1 1.3 Study Objectives... 1-3 2 EXISTING CONDITIONS... 2-1 2.1 Existing Freeway Conditions... 2-4 2.1.1
More informationAlternatives Public Workshop
US 1 Express Lanes Project Development & Environment (PD&E) Study Alternatives Public Workshop August 2013 1 Today s Agenda Project Background and Overview Tier 1 Alternatives Development Tier 2 Decision-Making
More informationArterial Transitway Corridors Study
Arterial Transitway Corridors Study February 2012 Arterial Transitway Corridors Study Overview Corridor Features and Demographics 11 study corridors, 95 route miles Routes: 86,000 daily rides and half
More informationAcknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division
Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division Acknowledgements Mr. David Nicol Director, FHWA Office of Safety FHWA Office of Safety http://safety.fhwa.dot.gov/provencountermeasures/
More informationBus Rapid Transit Plans
Twin Cities Region Bus Rapid Transit Plans ULI Minnesota Workshop Connecting Bus Rapid Transit to the Community December 15, 2009 John Levin Director of Service Development Metro Transit Metropolitan Area
More informationABOUT MUNI FORWARD. Muni Forward is the SFMTA s initiative to make transit safer and more reliable.
TOPICS Service Planning Overview April 25 Service Increases Muni Forward General Update Haight Street Rapid Project McAllister Street Rapid Project New System Map and Related Bus Stop Changes 2 ABOUT MUNI
More informationATTACHMENT NO. 11. RRLRT No. 2. Railroad / Light Rail Transit Technical Committee TECHNICAL COMMITTEE: Busway Grade Crossings STATUS/DATE OF ACTION
ATTACHMENT NO. 11 RRLRT No. 2 TECHNICAL COMMITTEE: TOPIC: Railroad / Light Rail Transit Technical Committee Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014
More informationBICYCLE FACILITIES INVENTORY: SUMMARY REPORT
BICYCLE FACILITIES INVENTORY: SUMMARY REPORT Southern New Jersey September 2008 2002 D Lincoln Drive West Marlton, NJ 08053 (856) 596-8228 www.driveless.com BICYCLE FACILITIES INVENTORY SUMMARY REPORT
More informationPresentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN
Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN Public Outreach Fall 2011: Two community meetings/open houses Fall 2012: Three community meetings/open houses
More informationTitle Option One. Operations and Safety of Separated Bicycle Facilities at Single Lane Roundabouts
Title Option One Operations and Safety of Separated Bicycle Facilities at Single Lane Roundabouts David Stanek, PE Institute of Transportation Engineers Western District Annual Meeting San Diego, CA June
More informationScope of the Transit Priority Project
Transit Planning Committee #1 March 19, 2015 Scope of the Transit Priority Project Review of the 2010 plan Analysis of Transit Priority Measures Preliminary plans for rapid transit Recommendations for
More informationSFMTA SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
SFMTA SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY VAN NESS BUS RAPID TRANSIT PROJECT UPDATE PRESENTATION TO SFMTA BOARD OF DIRECTORS RELEASE OF DRAFT ENVIRONMENTAL IMPACT STATEMENT / REPORT 10 18 2011
More informationProject Development & Environment (PD&E) Study Public Hearing January 12 th, 2006
Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006 Public Hearing Regulations Chapter 23 of United States Code 128 Title 40 of the Code of Federal Regulations Parts 1500
More informationDecision on North Waterloo Routing
Next Steps Decision on North Waterloo Routing Two route variations remain in north Waterloo. The final preferred route will include only one of the two variations. Please consider these two variations
More informationECONOMY PEOPLE ENVIRONMENT
Report Back on Local Transit Improvements May 29, 2013 ECONOMY PEOPLE ENVIRONMENT Intro Council Requested Report Back Topics Progress on Planning for Broadway Subway False Creek Bridges Local Transit Improvements
More informationMARK MESSIER TRAIL LONG-RANGE PLANNING STUDY WELCOME. Mark Messier Trail Planning Study 137 Avenue to Anthony Henday Drive.
WELCOME Mark Messier Trail Planning Study 137 Avenue to Anthony Henday Drive December 5, 2013 MEETING PURPOSE To gather your thoughts and ideas for Mark Messier Trail concept plans between 137 Avenue and
More informationMission-Geneva Transportation Study Community Workshop 2 July 8, 2006
Community Workshop 2 July 8, 2006 Small Group Workbook 1 Basic Improvements on Mission Street Streetscape. Pedestrian-scale lighting; landscaping; community art on utility boxes; more (possibly unique)
More informationRoad Diets: Reconfiguring Streets for Multi-Modal Travel
Road Diets: Reconfiguring Streets for Multi-Modal Travel Tom Grant, P.E., PTOE What is a Road Diet? Reconfiguration of travel lanes to benefit all roadway users (i.e., Complete Street) Reclaiming the space
More informationTransportation Planning Division
Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meeting Stakeholder Interviews Data Collection Design Principles Tool Box Recommendations Schedule Moving Forward North
More informationFigure 1: Vicinity Map of the Study Area
ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove
More informationEL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT
Agenda Item #4.2 EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT VTA BOARD WORKSHOP MAY 1, 2015 ABOUT THIS PRESENTATION CONTEXT Existing conditions and planning for growth WHAT IS THE PROJECT? Project alternatives
More informationMEMORANDUM. TO: Transportation Planning and Programming Committee December 4, 2008 of the Boston Region Metropolitan Planning Organization
MEMORANDUM TO: Transportation Planning and Programming Committee December 4, 2008 of the Boston Region Metropolitan Planning Organization FROM: Mark S. Abbott, PE Efi Pagitsas RE: MBTA Transit Signal Priority
More informationMETRO RTA TRANSIT MASTER PLAN. May 25-26, 2011
METRO RTA TRANSIT MASTER PLAN May 25-26, 2011 WHAT IS THE TRANSIT MASTER PLAN? A twenty-year plan for METRO RTA What will METRO look like in 2031? 1 TRANSIT TECHNOLOGIES 2 TRANSIT TECHNOLOGIES Transit
More informationSpeaker: Brian Dranzik, Fiscal & Policy Administrator Milwaukee County
Milwaukee County Speaker: Brian Dranzik, Fiscal & Policy Administrator Milwaukee County Department of Transportation and Public Works Project coordinated by Milwaukee County Transit System and Southeastern
More informationSouthwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.
Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW
More informationNorth Shore Transportation Improvement Strategy
North Shore Transportation Improvement Strategy Preliminary, Near-term Recommendation 2016 April Transportation Improvement Strategy (TIS) Comprehensive and Analytical A multi-modal transportation strategy
More informationTransit Choices December 8, 2016
Transit Choices December 8, 2016 Agenda 1. Network Redesign Status 2. Public Hearings & Bus Stops 3. Public Education Plan 4. Capital Projects Update 1 st Draft Winter Outreach October 2015 February 2016
More informationEL CAMINO REAL BUS RAPID TRANSIT PROJECT
EL CAMINO REAL BUS RAPID TRANSIT PROJECT Would upgrade the current 522 Rapid Bus to BRT status by making changes to El Camino Real and The Alameda that make transit FAST, FREQUENT AND RELIABLE and make
More informationFrom Disarray to Complete Street:
From Disarray to Complete Street: Utilizing BRT to improve bus service, pedestrian safety, and traffic organization in the South Bronx BRT, TOD and Complete Streets TRB BRT Conference June 19, 2018 We
More informationDDI s Can Move More Than Cars! 2016 Western ITE Conference Albuquerque, NM July 12, 2016 Alex Ariniello, P.E. Public Works Director, Town of Superior
DDI s Can Move More Than Cars! 2016 Western ITE Conference Albuquerque, NM July 12, 2016 Alex Ariniello, P.E. Public Works Director, Town of Superior Overview How did we get to the DDI concept? What s
More informationBrooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017
Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn
More informationFlorida Department of Transportation District Six Project FM # Public Information Meeting Tuesday, July 24, 2018
Florida Department of Transportation District Six Project FM #432687-1-52-01 Public Information Meeting Tuesday, July 24, 2018 South Florida Express Lanes Network The I-75/SR 826 Palmetto Express Lanes
More informationON STREET TRANSIT PRIORITY MEASURES PUTTING BUSES FIRST IN WINNIPEG
ON STREET TRANSIT PRIORITY MEASURES PUTTING BUSES FIRST IN WINNIPEG David Wiebe, P.Eng. Associate, Dillon Consulting Limited (presenter) Dave Krahn, P.Eng. Partner, Dillon Consulting Limited 200-895 Waverley
More informationPedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011
Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan January 18, 2011 Tonight s Agenda Receive update on project Provide feedback on two policy issues Complete Streets Policy Project Prioritization
More informationCity of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE
Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway
More informationWELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary
WELCOME! Thank you for attending our open house. There will be no formal presentation today so please take the time to read the boards. If you have any questions, please do not hesitate to approach one
More informationROADSOADS CONGESTION HAMPTON SYSTEMYSTEM MANAGEMENT. Part II Roadway Congestion Analysis Mitigation Strategies and Evaluation
HAMPTON ROADSOADS CONGESTION MANAGEMENT SYSTEMYSTEM Part II Roadway Congestion Analysis Mitigation Strategies and Evaluation Presented by: Dwight Farmer, PE Deputy Executive Director, Transportation April
More informationUnderstanding Our Options, Lessons and Potential of Bus Rapid Transit (BRT) Graham Carey P.E., AICP November 2, 2011
Understanding Our Options, Lessons and Potential of Bus Rapid Transit (BRT) Graham Carey P.E., AICP November 2, 2011 Average Speed (mph) What is BRT? 50 Commuter Rail Heavy Rail Interurban (DMU) Light
More informationVision Zero & ITE. April 11, Toole Design Group. Jason DeGray, P.E., PTOE. Vision Zero & ITE
Jason DeGray, P.E., PTOE Toole Design Group April 11, 2017 What is Vision Zero? Traffic deaths and serious injuries are preventable and unacceptable Human life takes priority over mobility Human error
More informationTransforming Traffic Signals to Support Sustainability: Applications, Ideas, & Research
Transforming Traffic Signals to Support Sustainability: Applications, Ideas, & Research MARCH 4, 2011 Presented by: Peter Koonce, PE Division Manager, City of Portland Signals, Street Lighting, & ITS Overview
More informationGeary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee
Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee Project Update SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY August 6, 2015 Project Overview
More information