SIGN PLACEMENT-ELEVATION VIEW: FREEWAY (FORESLOPE) ROADSIDE SIGN LOCATIONS & SUPPORT SPACING MICHIGAN DEPARTMENT OF TRANSPORTATION (MIN.
|
|
- Sara McDaniel
- 5 years ago
- Views:
Transcription
1 3' HINGE POINT EACH POST (TYP) (MIN.) (SAW CUT OR FUSE PLATE) EDGE OF FORESLOPE 4" STEEL COLUMN 6" WOOD POST THRU TRAVELED 7'MIN. SHOULDER LATERAL OFFSET (FORESLOPE) (VARIABLE) BREAKA POSTS THE LATERAL OFFSET SHALL BE 30' (MIN.), FOR MAINTENANCE PURPOSES. PLACEMENT-ELEVATION VIEW: FREE (FORESLOPE) DEPARTMENT DIRECTOR Kirk T. Steudle FOR Michigan Department of Transportation PREPARED BY DE DIVISION APPROVED BY: DIRECTOR, BUREAU OF FIELD SERVICES ROADSIDE LOCATIONS & SUPPORT SPACING DRAWN BY: CHECKED BY: DHD AJU APPROVED BY: DIRECTOR, BUREAU OF HIGH DEVELOPMENT -120-E 1 OF 9
2 HINGE POINT EACH POST (TYP) (SAW CUT OR FUSE PLATE) 4" (STEEL COLUMN) 6" (WOOD POST) 4' MIN. (BACKSLOPE) 3' MIN. THRU TRAVELED SHOULDER 5' TOE OF BACKSLOPE. BREAKA POSTS * IN DEPRESSED SECTIONS WITH 3:1 OR STEEPER BACKSLOPE, IF THE FRONT (TRAFFIC SIDE) POST CANNOT BE LOCATED AT 7' ABOVE SHOULDER ELEVATION, THEN A 3' MINIMUM OFFSET FROM THE TOE OF SLOPE SHALL BE MAINTAINED AND THE PROTECTED WITH AN APPROVED BARRIER. SEE GENERAL NOTE 5. PLACEMENT-ELEVATION VIEW: FREE (BACKSLOPE) -120-E 2 OF 9 NOTE: THE ORIGINAL ED COPY IS KEPT ON FILE AT THE.
3 3' HINGE POINT EACH POST (TYP) (SAW CUT OR FUSE PLATE) (MIN.) EDGE OF FORESLOPE 4" STEEL COLUMN 6" WOOD POST THRU TRAVELED 7' MIN SHOULDER LATERAL OFFSET (FORESLOPE) (VARIABLE) THE OFFSET SHALL BE 17' (DESIRABLE) AND 3' (MIN.). BREAKA POSTS PLACEMENT-ELEVATION VIEW: NON-FREE (FORESLOPE) -120-E 3 OF 9 NOTE: THE ORIGINAL ED COPY IS KEPT ON FILE AT THE.
4 HINGE POINT EACH POST (TYP) (SAW CUT OR FUSE PLATE) 4" (STEEL COLUMN) 6" (WOOD POST) 3' MIN. 5' MIN. 4' MIN. (BACKSLOPE) THRU TRAVELED SHOULDER 5' TOE OF BACKSLOPE. BREAKA POSTS * IN DEPRESSED SECTIONS WITH 3:1 OR STEEPER BACKSLOPE, IF THE FRONT (TRAFFIC SIDE) POST CANNOT BE LOCATED AT 5' ABOVE SHOULDER ELEVATION, THEN A 3' MINIMUM OFFSET FROM THE TOE OF SLOPE SHALL BE MAINTAINED AND THE PROTECTED WITH AN APPROVED BARRIER. SEE GENERAL NOTE 5. PLACEMENT-ELEVATION VIEW: NON-FREE (BACKSLOPE) -120-E 4 OF 9 NOTE: THE ORIGINAL ED COPY IS KEPT ON FILE AT THE.
5 2' (MIN.) (3' DESIRABLE) SPEED LIMIT 50 1' (MIN.) (3' DESIRABLE) * SPEED LIMIT 50 1' DESIRABLE NOT LESS THAN 7' NOT LESS THAN 7' FACE OF VERTICAL CURB FACE OF VERTICAL CURB SIDEWALK WITHOUT SIDEWALK WITH SIDEWALK * WHEN DIRECTED BY THE ENGINEER, 1' IS PERMITTED IN AREAS WHERE SIDEWALK OR UTILITY POLES ARE CLOSE TO CURB PER MMUTCD. NOTE: SLOPING CURBS SHOULD BE TREATED AS FLAT. PLACEMENT ALONG VERTICAL CURB ELEVATION VIEW DIRECTION OF TRAVEL EDGE OF THROUGH TRAVELED 9O 3 ORIENTATION -120-E 5 OF 9 NOTE: THE ORIGINAL ED COPY IS KEPT ON FILE AT THE.
6 L 1/6L 1/6L 2/3L " - 1" + - 1" 2 POST SUPPORT SPACING -120-E 6 OF 9 NOTE: THE ORIGINAL ED COPY IS KEPT ON FILE AT THE.
7 BOTTOM HEIGHTS CONVENTIONAL ROADS 7'- RURAL AREAS 7'- URBAN AREAS 7'- ALL CONDITIONS WHERE SIDEWALKS EXISTS NOTES: 1. PARKING S MOUNTED BELOW A PARENT MAY HAVE A BOTTOM HEIGHT 1' OR 1.5' (DEPENDING ON SIZE) LESS THAN BOTTOM HEIGHTS LISTED FOR PARENT S. RAMPS/CROSSROADS 7'- RAMP AND CROSSROAD ING (WITHOUT VERTICAL CURB) 7'- RAMP AND CROSSROAD ING (WITH VERTICAL CURB) 7'- ALL CONDITIONS WHERE SIDEWALK EXISTS 4'- AND S (FOR FREE RAMPS) FREES/EXPRESSS 7'- ROUTE MARKERS, WARNING AND REGULATORY S 2. BOTTOM HEIGHT OF ALL S ARE 7' EXCEPT THE FOLLOWING: OBJECT MARKERS- 4' MILE POST MARKERS- 4' / (FRWY RAMPS)- 4' 3. CONVENTIONAL ROAD-A STREET OR HIGH OTHER THAN A FREE OR EXPRESS. 4. EXPRESS-A DIVIDED HIGH WITH PARTIAL CONTROL OF ACCESS. 5. FREE-A DIVIDED HIGH WITH FULL CONTROL OF ACCESS. 7'- ALL OTHER FREE/EXPRESS S -120-E 7 OF 9 NOTE: THE ORIGINAL ED COPY IS KEPT ON FILE AT THE.
8 W4-1 AS CALLED FOR ON PLANS FREE 17' EDGE OF PAVED SHOULDER(S) R3-2 (24") AS CALLED FOR ON PLANS. 15' OFFSET FROM EDGE OF RAMP 6' FOR EXIT GORE S, THE SAME OFFSETS AS SHOWN FOR MERGE SHALL BE USED RAMP PAVEMENT (NOT EDGE OF PAVED SHOULDER). 60' PLACEMENT OF MERGE & NO LEFT TURN S AT ENTRANCE RAMP POSSIBLE VEHICLE PATH POSSIBLE VEHICLE PATH CROSSROAD ONE R6-1(L) R6-1(R) ONE ONE R6-1(R) R6-1(L) ONE a STOP R1-1 EXIT RAMP R1-1 STOP a TYPICAL LOCATION OF & a ON EXIT RAMPS. THESE S SHOULD BE TURNED APPROXIMATELY 20 DEGREES FROM THE CROSSROAD TO FACE THE PATHS OF POSSIBLE VEHICLE MOVEMENTS. PLACEMENT OF S AT EXIT RAMP TERMINALS FREE EXIT 44 E5-1a (Existing) 17' EDGE OF PAVED SHOULDER(S) RAMP VAR' 3' a (36" X 24") 6 Sft Sign, Type IIIA 28 Ft 2-Post, Steel, 3 lb ERECT AT 7' BOTTOM HEIGHT 2- Reflective Panel for Permanent Sign Support, 6 Foot PLACEMENT OF EXIT GORE & S AT EXIT RAMP -120-E 8 OF 9 NOTE: THE ORIGINAL ED COPY IS KEPT ON FILE AT THE.
9 EXIT 44 E5-1a a a (36" X 24") 6 Sft Sign, Type IIIA 28 Ft 2-Post, Steel, 3 lb ERECT AT 7' BOTTOM HEIGHT 2- Reflective Panel for Permanent Sign Support, 6 Foot a a a PLACEMENT OF EXIT GORE & S AT EXIT RAMP GENERAL NOTES: 1. LATERAL OFFSET CLEARANCE OF ALL S SHALL BE AS INDICATED UNLESS OTHERWISE SHOWN ON CONTRACT PLAN S OR IN THE PROPOSAL. 2. THE TERM "" AS USED ON THIS PLAN MEANS A SINGLE PANEL OR GROUP OF PANELS COMBINED TO FORM ONE INSTALLATION. 3. BOTTOM HEIGHT (BH) SHALL BE AS INDICATED ON 7 UNLESS OTHERWISE SHOWN ON THE ELEVATION PLAN OR IN THE PROPOSAL. BOTTOM HEIGHT IS THE DIFFERENCE IN ELEVATION OF THE NEAREST EDGE OF THE TRAVELED LANE AND BOTTOM OF THE. 4. LOCATIONS SHALL BE AS SHOWN UNLESS OTHERWISE SPECIFIED ON CONTRACT PLAN S OR IN THE PROPOSAL. 5. WHEN S ARE TO BE INSTALLED BEHIND CONCRETE BARRIER OR GUARDRAIL, THE NEAR EDGE OF SHOULD BE SET BACK A MINIMUM OF 3' MEASURED FROM THE BACK OF BARRIER OR GUARDRAIL POSTS. BREAK POSTS ARE NOT REQUIRED AT THESE LOCATIONS. 6. FOR PLACEMENT OF STOP S AT CROSSROADS SEE MMUTCD. 7. AND SUPPORTS FOR FREE RAMPS SHALL HAVE RED REFLECTIVE STRIP(S) INSTALLED ON THE SUPPORTS E 9 OF 9 NOTE: THE ORIGINAL ED COPY IS KEPT ON FILE AT THE.
NO PARKING ZONE, YELLOW CURB (OPTIONAL) Z 8 20 MIN. 8 Z (SEE SHEET 2) 4" WHITE "X" (TYP.),(OPTIONAL) TYPE I NO PARKING ZONE, YELLOW CURB (OPTIONAL) Z 8 20 20 ALL SPACES 22 MIN., 26 MAX. EACH Z TYPE II
More informationFREEWAY AND SERVICE ROAD CONNECTIONS
EDGE LINE WHITE STOP BAR SERVICE ROAD EDGE LINE DOTTED LINE (5 MARK, 20 GAP) EDGE LINE 4" WHITE BROKEN LINE 12" WHITE DOTTED LINE (5 MARK, 20 GAP) LINE LINE EDGE LINE 300 SERVICE ROAD 1/2 X (500 MAX) CHANNELIZING
More informationINTERSECTION WITH RIGHT TURN TAPER
(TYP.) TAPER 4" BROKEN INTERSECTION WITH RIGHT TURN TAPER 4" SOLID WHITE 4" BROKEN ARROW & LEGEND MARKINGS (SEE NOTE 2) INTERSECTION WITH RIGHT TURN LANE Notes: 1. Paint intersection tapers greater than
More informationFigure 3B-1. Examples of Two-Lane, Two-Way Marking Applications
Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones
More informationFOR LOOP RAMPS-TAPERED DECELERATION LANE
6" WHITE DOTTED LINE: 5 MARK, 20 SKIP 6" WHITE CRYSTAL MONO-DIRECTIONAL MAIN LINE END (EVERY 50 FEET) 50 FEET BEYOND LAST CRYSTAL PAVEMENT MARKER 5 AMBER MONO-DIRECTIONAL 50 FEET BEFORE LAST CRYSTAL PAVEMENT
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION 6" X 8" (NOMINAL POST) 3-1/2" DIA. 2 HOLES TAPERED HARD WOOD WEDGES (HARDWOOD WEDGE
X (NOMINAL POST) 1-1/ DIA. 2 HOLES X 8" (NOMINAL POST) 3-1/ DIA. 2 HOLES TAPERED HARD WOOD WEDGES (HARDWOOD WEDGE TO BE OAK, MAPLE OR OTHER APPROVED DENSE HARDWOODS) TO HOLD POST IN A STABLE POSITION AFTER
More informationGeometric Design Tables
Design Manual Chapter 5 - Roadway Design 5C - Geometric Design Criteria 5C-1 Geometric Design Tables A. General The following sections present two sets of design criteria tables - Preferred Roadway Elements
More informationDriveway Design Criteria
Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved
More informationADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT
ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT APS and ADA APS is not currently an ADA Standard and is provided at the discretion of the Title II entity APS is recognized in the MnMUTCD, but
More informationAlberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999
Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,
More informationCHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems
CHAPTER 8 STAKING STAKING Correct staking of traffic control signal or lighting systems is critical to the appropriate placement of system components. 8.1 Traffic Control Signal Systems Locating the components
More informationPLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION
Page 1 of 6 RECOMMENDED PRACTICES PART SECTION SUB-SECTION HIGHWAY SIGNS GENERAL General Proper positioning of signs is an important element in the overall control of traffic within a roadway network.
More informationSTAKING TRAFFIC CONTROL SIGNAL SYSTEMS
Locating the components of a traffic control signal is not an exact science; many factors influence the location of the components. These factors include: lane widths, radii, pedestrian curb ramp requirements,
More informationFREEWAY, WEAVING LANE, AND SERVICE ROAD CONNECTIONS
EDGE LINE WHITE STOP LINE SERVICE ROAD EDGE LINE 6" X 5 WHITE DOTTED LINE WITH 20 GAPS EDGE LINE 4" WHITE BROKEN LINE EDGE LINE 1/3 Y v SERVICE ROAD Y 900 X ( 5 0 12" SOLID WHITE CHANNELIZING LINE X EDGE
More informationADA Operations Contact Info
Intro ADA Operations Contact Info Todd Grugel ph: 651-366-3531 email: todd.grugel@state.mn.us Joe Zilka ph: 651-366-3311 email: joseph.zilka@state.mn.us Harvey Unruh ph: 651-216-2912 email: harvey.unruh@state.mn.us
More informationDesign Criteria. Design Criteria
F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road
More informationINDEX. Geometric Design Guide for Canadian Roads INDEX
Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines
More informationPERFORMANCE ACTIVITY 405 LIMB MANAGEMENT
PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT 405 LIMB MANAGEMENT ACTIVITY DESCRIPTION Cut and/or remove and/or grind tree limbs from the right-of-way. TRAFFIC CONTROL Utilize intermittent mobile operations
More informationClear Zone Conflicts in AASHTO Publications
Clear Zone Conflicts in AASHTO Publications Dick Albin Washington State Department of Transportation Presented at the AASHTO Sub Committee on Design Meeting June 2007 Burlington, Vermont Clear Zone is
More informationTo position power poles a safe distance from the road to minimise the likelihood of being accidentally hit by vehicles.
Policy Statement Subject Placement of Rigid Distribution Poles Along Roads With Speed Limits Exceeding 70KM/H Approved by Robert Rogerson Signature & Date Distribution Standards and Policy Manager Authorised
More informationCW20-1D 48" X 48" (Flags- See note 1) G " X 24" (See note 2)
CK: DW: CK: x for mph or less mph devices may be omitted if the work area is a minimum of from the nearest traveled way. (See notes 4 & 5) x for mph or less Work Space mph x for mph or less mph (See notes
More information2004 Traffic and Safety Notes. Cross Reference between the Old Note Number and the New Note Number
Michigan Department of Transportation 2004 Traffic and Safety Notes Cross Reference between the Old Note Number and the New Note Number OLD NEW Number Number Title (Prior to 2004) 1.1.1 101-Series General
More informationSign Designs and Markings Manual (TEM 295-2) Page 8-3
Sign Designs and Markings Manual (TEM 295-2) Page 8-3 TEMPORARY TRAFFIC CONTROL SIGNS INDEX Regulatory Signs R1-1 STOP R1-2 YIELD R1-2a TO ONCOMING TRAFFIC R2-1 SPEED LIMIT R2-H2a VEHICLES OVER 4 TONS
More informationTRAFFIC CONTROL DEVICES
TRAFFIC CONTROL DEVICES SIGNS Temporary traffic control work zone signs include regulatory, warning and guide signs utilized to provide regulations, warnings and guidance information to road users impacted
More informationRoad Safety Audit training course. Motorways - safety issues of the motorway design
Road Safety Audit training course Motorways - safety issues of the motorway design Jesper Mertner, Road safety auditor, COWI A/S 1 ROAD SAFETY AUDITING COURSE Content 1. Safety 2. Cross sections 3. Horizontal
More informationGEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION
TABLE 1A CG-6 CURB AND GUTTER SECTION HORIZONTAL AND VERTICAL CONTROLS CURB AND GUTTER ROADWAYS MAXIMUM 3:1 CUT OR FILL SLOPE CURVE DATA MIN. SIGHT DISTANCE PROJECTED TRAFFIC VOLUME (ADT) MIN. DESIGN SPEED
More informationCHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS
2011 Edition - Revision 2 Page 275 Section 2G.01 Scope CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS 01 Preferential lanes are lanes designated for special traffic uses such as high-occupancy vehicles
More informationShared Use Path Design
12B-2 Design Manual Chapter 12 - Sidewalks and Bicycle Facilities 12B - Bicycle Facilities Shared Use Path Design A. Accessible Shared Use Path Design 1. General: Applicable portions from the following
More informationPage 2D-10 Added the following language at the end of the paragraph under REFINING HORIZONTAL ALIGNMENT ; See Chapter 2A, Section 2A-6.
ROAD DESIGN MANUAL REVISIONS January, 2017 CHAPTER 1B Page 1B-12 Added the following language (Definition); NORMAL CROWN - Undivided travel ways on tangents shall have a crown or high point in the middle
More informationAppendix Work Zone Traffic Control
ppendix Work Zone Traffic Control The purpose of this appendix is to present basic guidelines for work zone traffic control and to supplement the Highway Work Zone Safety Checklist. This appendix presents
More informationGDOT Cross Section Elements. Course ID: GDOT PDH Credits
GDOT Cross Section Elements Course ID: GDOT-01 2 PDH Credits Civil Engineer Educators LLC 1026 Timberwolf Lane Juneau, AK 99801 Email: support@civilpdh.com Chapter 6 Contents 6. CROSS SECTION ELEMENTS
More informationOctober 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)
October 2004 REVISIONS (2) Chapter 11 HORIZONTAL ALIGNMENT SUPERELEVATION DEVELOPMENT 11.3(2) Chapter 12 VERTICAL ALIGNMENT VERTICAL CURVES PASSING SIGHT DISTANCE 12.5(2) VERTICAL CURVES STOPPING SIGHT
More informationRURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E.
RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project 0-6840) June 7, 2016 Presented by: Karen Dixon, Ph.D., P.E., TTI Team: Kay Fitzpatrick, Raul Avelar, & Subasish Das Project
More informationBARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S
ACCEPTABLE (TCB) TYPES AND ANCHORING DETAILS BASED ON UNDERLYING SURFACE TYPE AND BARRIER OFFSET FROM DROP-OFF BARRIER OFFSET UNDERLYING SURFACE 0" A 6" 6" A 12" 12" A 26" A 26" TCB TYPE DETAIL TCB TYPE
More informationRoute 47 (North Main Street) Reconstruction
TOWN OF SUNDERLAND Route 47 (North Main Street) Reconstruction Presented by Lou Rabito, P.E. Presented to Town of Sunderland June 11, 2018 Project Overview MassDOT Project No. 607245 Resurfacing and Related
More informationTraffic Control Inspection Checklist Segment:
Traffic Control Inspection Checklist Segment: Simon Contractors Simon Contractors Originator: Description Reviewed by: Initials Date Distribution: Traffic Quality Manager, Site Assistant Traffic Manager
More informationCHAPTER 6H. TYPICAL APPLICATIONS
Section 6H.01 Typical Applications Support: CHAPTER 6H. TYPICAL APPLICATIONS Chapter 6G contains discussions of typical temporary traffic control activities. Chapter 6H presents typical applications for
More informationRC-67M has been updated to include more details to be consistent with both ADAAG and PROWAG. The following slides discusses the general notes found
RC-67M has been updated to include more details to be consistent with both ADAAG and PROWAG. The following slides discusses the general notes found on Sheet 1. RC-67M note Construct curb ramps with a minimum
More informationSign Design Manual (TEM 295-2)
TEMPORARY TRAFFIC CONTROL SIGNS INDEX Regulatory Signs R1-1 R-1 STOP R1-2 R-2 YIELD R1-2a R-2A TO ONCOMING TRAFFIC R4-1 R-33 DO NOT PASS R4-2 R-34 PASS WITH CARE R4-3 R-35 SLOWER TRAFFIC KEEP RIGHT R4-9
More informationDesign Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope
Design Overview Section 4 Standard Plans for Design Fall, 2017 Ann Johnson, PE Services Brady Rutman, SRF Consulting Group Overview Design Basics Recommendations: The Zone System Driveway Crossings Pedestrian
More informationADA Training Standard Plans
ADA Training Standard Plans SCREEN READABLE VERSION IS IN THE MAKING AND WILL BE MADE AVAILABLE SOON 2018 MnDOT 2 Standard Plans 2017 Overview Overview PROWAG and Curb Ramp Basics Curb Ramp Types ADA Curb
More informationPaul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)
To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,
More informationSECTION 14: LANDSCAPING AND BEAUTIFICATION
SECTION 14: LANDSCAPING AND BEAUTIFICATION RULE 14.1 GENERAL PROVISIONS 14.1.1 The rules and guidelines contained in this section have been established to provide proper guidelines for the beautification
More informationFigure 1: Graphical definitions of superelevation in terms for a two lane roadway.
Iowa Department of Transportation Office of Design Superelevation 2A-2 Design Manual Chapter 2 Alignments Originally Issued: 12-31-97 Revised: 12-10-10 Superelevation is the banking of the roadway along
More informationCity of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS
SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable
More informationSECTION 3 STREET DESIGN
3.01 GENERAL SECTION 3 STREET DESIGN For purposes of geometric and structural design, streets shall be classified according to the following table. The City Engineer will determine the class of all proposed
More informationHow Might Connected Vehicles and Autonomous Vehicles Influence Geometric Design? October 10, 2017
How Might Connected Vehicles and Autonomous Vehicles Influence Geometric Design? October 10, 2017 Overview Design Vehicle Design Driver Potential Geometric Impacts of Autonomous Vehicles Connected Vehicles
More informationPresented By: Jim Roth, P.E. Signing Engineer Office of Traffic Engineering Ohio Department of Transportation 1980 West Broad Street Columbus, Ohio
1 Presented By: Jim Roth, P.E. Signing Engineer Office of Traffic Engineering Ohio Department of Transportation 1980 West Broad Street Columbus, Ohio 43223 (614) 752-0438 Fax: (614) 644-8199 jim.roth@dot.state.oh.us
More informationDISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (13-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual
DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.
More informationDETECTABLE WARNING SURFACES SHALL BE PROVIDED AT THE FOLLOWING LOCATIONS ON PEDESTRIAN ACCESS ROUTES:
GENERAL NOTES: CURB NOTES: 5'-0" MIN 5'-0" 5'-0" MIN 1. 2. THESE SHEETS ARE IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT (ADA), AND THE REQUIREMENTS OF THE 2011 PROPOSED ACCESSIBILITY GUIDELINES
More informationDeveloped by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA
Addendum Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 800-272-8772 This material is based upon work supported by
More information"Emul Asph (SS-1HP) Tack".
Page 1 of 25 Application of Emulsified Asphalt, (fog seal 2-lane section). Using a distributor, uniformly apply fog seal to the rumble strip with two passes of the distributor, one in each direction of
More informationCity of Margate, Florida. Neighborhood Traffic Management Manual
City of Margate, Florida Neighborhood Traffic Management Manual Table of Contents Page No. I. INTRODUCTION... 1 II. TRAFFIC CALMING REQUEST AND PROCESSING PROCEDURES... 2 1. COMPLETE AND SUBMIT PROJECT
More informationWYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)
WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION
More informationNOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG
NOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG NOT TO SCALE PUBLIC WORKS STANDARD DETAILS SIDEWALK RAMPS DATE: MARCH 2013 FILE NAME: SIDEWALK RAMPS.DWG NOT
More informationWalking Along the Road. Module 2
Walking Along the Road Module 2 Learning Outcomes: 2-2 At the end of this module, you will be able to: Describe the operational and safety benefits of shoulders and sidewalks Select the appropriate design
More informationWYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways
WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to
More informationPolicy Statement. Objective. Context. References and Supporting Documentation
Policy Statement Subject Placement of Distribution Poles Along Roads With Speed Limits Not Exceeding 70km/h Approved by Robert Rogerson Signature & Date Distribution Standards and Policy Manager Authorised
More informationSPECIAL SPECIFICATION 7581 Performance Based Vegetation Management
2004 Specifications CSJ 6216-60-001 SPECIAL SPECIFICATION 7581 Performance Based Vegetation Management 1. Description. This item will govern for complete vegetation management of highway rightof-way, including
More informationAccess Management Standards
Access Management Standards Section 1: Application of Access Standards This chapter describes the Department's access management standards for access connections on the county roadway system. The standards
More informationH8 Signs, Supports and Poles
Alberta Infrastructure and Transportation Roadside Design Guide November 2007 H8 Signs, Supports and Poles H8.1 Introduction This section identifies the appropriate roadside safety treatment for signs,
More information2C-3 Placement of Warning Signs
C. WARNING SIGNS 2C-1 Application of Warning Signs Warning signs are used when it is deemed necessary to warn traffic of existing or potentially hazardous conditions on or adjacent to a highway or street.
More informationSECTION 12 ROAD MARKINGS AND DELINEATION
SECTION 12 ROAD MARKINGS AND DELINEATION (Blank Page) MANUAL OF TRAFFIC SIGNS AND MARKINGS - Part III: Motorways and Expressways 12-1 12.1 GENERAL 12.1.1 INTRODUCTION The markings and delineation details
More informationWork Zone Traffic Safety
Work Zone Traffic Safety Summary The Hazard: death or serious injury from being struck by vehicles or equipment in work zones. Who is at risk: streets/highways, utilities and other public works department
More informationRoadway Design Manual
Roadway Design Manual Revised December 2013 2013 by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2013-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective
More informationReferences General Definitions
Chapter 700 700.01 General 700.02 References 700.03 Definitions 700.04 Clear Zone 700.05 Hazards to Be Considered for Mitigation 700.06 Median Considerations 700.07 Other Features 700.08 Documentation
More information2017 Changes to the 2011 MMUTCD January 2017
2017 Changes to the 2011 MMUTCD January 2017 The design for the Weight Limit symbol sign (R12-5) has been modified to show a threeunit vehicle as the third line of the regulatory weight limit sign. This
More informationCHAPTER 3 SIGNS, SIGNALS AND PAVEMENT MARKINGS. Responsible Driving (Red book) NOTES & STUDY GUIDE
CHAPTER 3 SIGNS, SIGNALS AND PAVEMENT MARKINGS Responsible Driving (Red book) NOTES & STUDY GUIDE Regulatory Signs Warning Signs International Signs Guide Signs Types of Road Signs Sub category (construction
More informationDesigning Complete Streets: What you need to know
Designing Complete Streets: What you need to know Getting from this to this. Continuous sidewalk Buffer w/trees Bicycle lane Raised median Buildings close to the street Flexibility in design Design and
More informationSECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN
SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN Table of Contents Page No 1A.1 GENERAL...1 1A.1.1 DESIGN CONTROLS...1 1A.2 MAINLINE ROADWAYS...4 1A.2.1 ROADWAY DESIGNATION...4 1A.2.2 DESIGN SPEED...4 1A.2.3
More information(This page left intentionally blank)
(This page left intentionally blank) 2011 Edition - Revision 2 Page 27 CHAPTER 2A. GENERAL Section 2A.01 Function and Purpose of Signs 01 This Manual contains Standards, Guidance, and Options for the signing
More informationADA on Construction. Guidance for Section C Plan Preparers
ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize
More informationSafety Barrier System Acceptance Conditions SMART Steel Crash Cushion
Safety Barrier System Acceptance Conditions SMART Steel Crash Cushion The SMART Steel Crash Cushion is accepted for use on the New South Wales classified road network. The acceptance is based on the determination
More informationScenarios. The following slides will show existing pictures that deny access, followed by a retrofitted picture that provides access.
Scenarios. The following slides will show existing pictures that deny access, followed by a retrofitted picture that provides access. For the following slides assume an overlay project and provide pedestrian
More informationAccommodating Pedestrians in the Work Zone
Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,
More informationCOMPLETE STREETS DURING CONSTRUCTION
COMPLETE STREETS DURING CONSTRUCTION MAINTAINING ACCESSIBILITY FOR ALL Presented by Robbie Burgess, P.E., PTOE Associate Principal Construction Services Manager Howard Stein Hudson rburgess@hshassoc.com
More informationRoadway Design Manual
Roadway Design Manual Manual Notice Archive by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2009-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective
More informationFOR HISTORICAL REFERENCE ONLY
To: From: Subject: Electronic Distribution Recipients MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No. 12-14-B-03 December 18, 2012 Jon M. Chiglo, P.E. Division
More informationPERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3
PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 1 WORK DESCRIPTION 2 WORK DESCRIPTION 3 Install Remove Repair 613 IMPACT ATTENUATOR ACTIVITY DESCRIPTION Repair, install, remove and maintain
More informationIntroduction to Roadway Design
Chapter Introduction to Roadway Design 1 This chapter lays the foundation for the Roadway Design course. You examine the roadway design workflow and the completed drawing files and review the project scope,
More informationITEMIZED LIST FOR TRAFFIC CONTROL TOTAL UNITS S
STATE OF SOUTH DAKOTA PROJECT SHEET TOTAL SHEETS ( ) 029S-288 10 2 7 MAINTENANCE OF TRAFFIC Removing, relocating, covering, salvaging and resetting of permanent traffic control devices, including delineation,
More informationPERMANENT PAVEMENT MARKING PLAN
TITLE: CROSSWALK BLOCK WHITEPOLY PREFORM GENERAL INFORMATION: PERMANENT PAVEMENT MARKING PLAN NOTES & GUIDELINES POLY PREFORM INLAY APPLICATION: PERMANENT PAVEMENT MARKING PLAN INDEX THE ENGINEER S INVOLVEMENT
More informationSMART STEEL CRASH CUSHION
APRIL 2015 DETAIL SHEET SMART STEEL CRASH CUSHION VicRoads Requirements Refer to Austroads - Safety Barrier System Acceptance Conditions for the SMART Steel Crash Cushion. All requirements listed by Austroads
More informationDEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space
DEFINITIONS Activity Area - that part of a TTC zone activity area where the work actually takes place. It consists of the work space, traffic space and one or more buffer spaces. Advance Warning Area -
More informationB741 - TEMPORARY CONCRETE BARRIERS - OPSS 741
B741 - - OPSS 741 741.1 GENERAL Temporary concrete barrier (TCB) is a portable barrier system consisting of freestanding precast concrete segments that are positively connected together to form a continuous
More informationguide signs or groups of signs. General provisions are given in Sections 2A.07, 2A.08, and 2A.10. Standard:
Page 186 2011 Edition CHAPTER 2D. GUIDE SIGNS CONVENTIONAL ROADS Section 2D.01 Scope of Conventional Road Guide Sign Standards 01 The provisions of this Chapter shall apply to any road or street other
More informationRhebogue Neighbourhood Greenway. Road Safety Audit Stage 2
Rhebogue Neighbourhood Greenway Road Safety Audit Stage 2 Report Number: 12/007/00/00057 July 2014 Mid West National Road Design Office Lissanalta House, Dooradoyle County Limerick Tel: 061 496 800 Fax:
More informationGeneral Notes. Project No /15/2018 Page 1 of 1
5081 Page 1 of 13 General Notes 5/15/2018 Page 1 of 1 Project No. 82 183-82 KA D 5081-01 0309-19 1 2 Note The contractor is responsible for establishing and maintaining centerline of the traveled way for
More informationBI-DIRECTIONALS FREE-ACCESS
BI-DIRECTIONALS FREE-ACCESS Dimensions may vary depending on design vehicle and turning movements. See GEO-650-Series for addtional details. SPECIAL Special situations, i.e., See Notes 4 & 5 wide streets,
More informationAppendix A-6. Signing and Marking Guidelines. Number Name Pages. 2B.06 Signing at T Intersections 1. 2B.12 Pedestrians in Crosswalk 1
MARYLAND STATE HIGHWAY ADMINISTRATION Office of Traffic and Safety Traffic Engineering Design Division Traffic Control Devices Design Manual Appendix A-6 Signing and Marking Guidelines Number Name Pages
More informationRailroad Inspection Procedure Manual
Railroad Inspection Procedure Manual Railroad Inspection Procedure Manual Table of Contents Introduction... 1 Inspection Report t For orm... 3 Instructions for Completing Inspection Report t For orms...
More informationCHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS
CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...
More informationProvides an extension of a road to the subdivision boundary or parcel to facilitate the continuity of possible adjacent development.
SECTION 2 - ROADWAYS 2-1 Continuity of the Public Road System The continuity of a publicly maintained system is a prerequisite to the addition of any street into the County road system. A road or street
More informationENGINEERING STANDARD FOR GEOMETRIC DESIGN OF ROADS AND STREETS ORIGINAL EDITION MAR. 1996
ENGINEERING STANDARD FOR GEOMETRIC DESIGN OF ROADS AND STREETS ORIGINAL EDITION MAR. 1996 This standard specification is reviewed and updated by the relevant technical committee on Dec. 2000(1) and July.
More informationROADWAY AND PARKING DETAILS TYPICAL STREET SECTIONS PRINCIPAL ARTERIAL NOT TO SCALE
NOTES: O:\Division Information\Engineering\Documents\Engineering and Construction\COMMERCE CITY\CAD files\2016 Updated Files\307-01 thru 307-09 (Roadway & Parking Typical Sections).dwg 6' SIDEWALK MAY
More informationSECTION 12 ROAD MARKINGS AND DELINEATION
SECTION 12 20 June 2009 Part 3: Motorways and Expressways CONTENTS Reference Page Page Number Date SECTION 12: MARKINGS AND DELINEATION 12.1 GENERAL... 12-1 June 2009 12.1.1 INTRODUCTION... 12-1 June 2009
More informationLegislative Update Williamsburg Residency
Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:
More information(This page left intentionally blank)
(This page left intentionally blank) 2011 Edition - Revision 1 Page 553 Section 5A.01 Function CHAPTER 5A. GENERAL 01 A low-volume road shall be defined for this Part of the Manual as follows: A. A low-volume
More informationPlan prepared for: Brennan Paving and Construction. Plan prepared by: Direct Traffic Management
Traffic Control Plan Hwy 401 - Bridgeland Avenue / Site 37-283 Grading, Drainage, Garnular Base, Hot Mix Paving, Electrical, Structural and Plan prepared for: Plan prepared by: General Notes WB 401 Collector
More informationModule 5: Navigating Roadways
Module 5: Navigating Roadways Topic 1: Intersections 1. One out of FATAL crashes occur at intersections. 2. Label the intersection warning signs: 3. When possible, begin searching seconds ahead of the