Theodore Roosevelt Expressway (TRE) study was completed in Conducted Public meetings Analyzed traffic Provided good information

Size: px
Start display at page:

Download "Theodore Roosevelt Expressway (TRE) study was completed in Conducted Public meetings Analyzed traffic Provided good information"

Transcription

1

2 Theodore Roosevelt Expressway (TRE) study was completed in Conducted Public meetings Analyzed traffic Provided good information 2

3 All routes in oil producing counties have increased traffic. 3

4 Super 2 Highway Concept NDDOT moving forward on Super 2 Highway Concept on U.S. Highway 85. Construction work includes additional turning lanes and passing lanes. The ultimate goal is to reshape the roadway into an undivided four-lane highway. 4

5 Conducting $47.3 million of construction work on roadway and $17.3 million of projects Projects on US 85: Belfield to Gorham Junction Overlay = $3.16 million North of Amidon Overlay = $816,000 North of Grassy Butte Microsurfacing & pavement = $2.59 million ND Highway 85 Grading of North Unit Badlands = $8.6 million Long X Bridge repair = $1.9 million Near Long X Bridge Microsurfacing = $1.05 million Junction ND 200 N to Grassy Butte Turn lanes = $536,000 Various locations Turn lanes & widening = $8.66 million Gorham Junction N to Grassy Butte Pavement = $6.34 million 5

6 2011 Projects on US 85: Junction US 85 & McKenzie CO 30 Turn lanes & pavement = $1.3 million Watford City W & N to Alexander Widening, pavement, passing/ climbing lanes = $17 million Alexander to Junction of US Highway 2 - Widening, pavement, passing/ climbing lanes = $15.84 million 1 mile north of Long X Bridge Slide Repair = $7.2 million (ER Funding) US 85 & ND 23 intersections 3 Interim traffic signals = $550, Projects on US 85: More than 18 projects planned = Approximately $17.3 million 6

7 NDDOT is currently conducting a study on the feasibility of constructing traffic bypass routes at: Williston Alexander Dickinson Also discussing possibility of traffic bypass routes at: Watford City New Town 7

8 Plan to have signals operational by end of this year, weather permitting 8

9 North Dakota DOT in cooperation with the Oil and Gas Division, is monitoring oil development in western part of state including the advancement of the Tyler formation in southwest N.D. NDDOT s plan includes: Complete Regional Traffic Model The DOT recently entered into a contract with the Upper Great Plains Transportation Institute (UGPTI) to develop a traffic forecasting model. The model will account for the evolving trends in: energy agricultural manufacturing sectors in western North Dakota. 9

10 The traffic forecasting model which will be operational by next summer will be used to: produce traffic forecasts for highway segments during specified time periods. serve as a forecasting tool to support transportation investment strategies in the state s 17 oil producing counties. 10

11 Additional steps in the future plan include: Enhancing Corridor safety and pavement. Continue working with stakeholders. 11

12 Transportation Projects: The NDDOT had a record construction season in one of the largest seasons in state history. In 2010 completed approximately $442 million in transportation projects will be another record construction year for N.D. $592 million bid through August. 12

13 13

14 The Department is designing and working on projects on the following roadways: ND 22 Dickinson north to Hwy 23 ND 23 from New Town east and west ND 8 north and south of Stanley ND 1806 north of Watford City Other overlays on various highways will be completed. 14

15 Due to challenging weather and wet conditions throughout the state, the Department is working on a large number of Emergency Repair projects. Total = $380 million* $264.3 million on state highways $116.2 million on county roadways * (As of August 26, 2011) 15

16 Western North Dakota 16

17 Eastern North Dakota 17

18 Landslide on US Highway 85 18

19 Dickinson District Engineer Larry Gangl stands in landslide area on ND Highway 22 north of Killdeer July

20 Map of landslide areas 20

21 Water on roadways ND Highway 46 by Gackle Lamoure County roadway 21

22 Federal Funding Uncertainty of future federal funding: o N.D. very dependent on federal highway funding o Current federal highway bill expired Sept. 30, o Have been operating under a series of continuing resolutions based on 2009 funding levels. Difficult to do long range planning Current extension expires in September, 2011 o Continue working with our Congressional delegation and Five-State Coalition. 22

23 Summary Transportation infrastructure investment results in many benefits: Creates jobs and strengthens the economy. Improves safety. Improves mobility for our citizens and businesses. With these and other benefits in view, NDDOT is working hard to provide a transportation system that safely moves people and goods. 23

Theodore Roosevelt Expressway (TRE) Annual Meeting. Jane E. Berger PE, Programming Engineer North Dakota Department of Transportation Nov.

Theodore Roosevelt Expressway (TRE) Annual Meeting. Jane E. Berger PE, Programming Engineer North Dakota Department of Transportation Nov. Theodore Roosevelt Expressway (TRE) Annual Meeting Jane E. Berger PE, Programming Engineer North Dakota Department of Transportation Nov. 14, 2012 Williston Minot Dickinson Bismarck Increase in oil production

More information

January 22, Steve Salwei, NDDOT

January 22, Steve Salwei, NDDOT 1 January 22, 2015 Steve Salwei, NDDOT The number of miles driven on State highways have increased. From 2010-2012 North Dakota saw a 22% increase in traffic statewide and a 53% increase in traffic in

More information

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 Prepared by Planning and Research Division Arkansas State

More information

Basalt Creek Transportation Refinement Plan Recommendations

Basalt Creek Transportation Refinement Plan Recommendations Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for

More information

MN 5 Corridor Performance. Current Corridor Characteristics Highway: MN AADT: 2,400 73,000

MN 5 Corridor Performance. Current Corridor Characteristics Highway: MN AADT: 2,400 73,000 Corridor Context The corridor runs from Norwood Young America to the connection with US 212 in Eden Prairie. The corridor serves the communities of Chanhassen, Eden Prairie, Norwood Young America, Victoria,

More information

US 69 RELIEF ROUTE STUDY

US 69 RELIEF ROUTE STUDY US 69 RELIEF ROUTE STUDY Jacksonville, Texas PUBLIC MEETING #2 May 29 th, 2018 Welcome to the public meeting for the US 69 Relief Route Study in Jacksonville. This is the second public meeting for this

More information

HIGHWAY 11 CORRIDOR STUDY

HIGHWAY 11 CORRIDOR STUDY HIGHWAY 11 CORRIDOR STUDY Executive Summary August 2016 Roseau County?æA@?çA@ Warroad Lake of the Woods Roseau Roosevelt Badger?ÄA@ Greenbush Legend N Hwy 11 Study Area Figure 1: Corridor Study Limits

More information

4-County Big Oil Oil Impacts Analysis Dunn, McKenzie, Mountrail, & Williams Counties in association with:

4-County Big Oil Oil Impacts Analysis Dunn, McKenzie, Mountrail, & Williams Counties in association with: 4-County Big Oil Oil Impacts Analysis Dunn, McKenzie, Mountrail, & Williams Counties in association with: In association with: Interim Energy Development and Transmission Legislative Committee March 8,

More information

I-90 Corridor Performance Corridor Result

I-90 Corridor Performance Corridor Result I-90 Corridor Performance Corridor Result Statewide Result 87.1% 86.9% 0% 3.2% Ride Quality Good--% of miles 65.4% 70.2% Ride Quality Poor--% of miles 0% 3.7% 73 MPH N/A Measure Corridor Context The corridor

More information

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017 1 Congress Avenue Palm Beach MPO Subcommittee Meetings December 2017 2 Agenda Study Purpose Study Process Multimodal Alternatives Development Next Steps *ACTION ITEM: CONFIRM ALTERNATIVES TO MOVE INTO

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

Project Update May 2018

Project Update May 2018 Project Update May 2018 Dakota County, in cooperation with the City of Lakeville, is planning to reconstruct 202 nd Street West (County Road 50) from Holyoke Avenue to Cedar Avenue (County Road 23). 202

More information

I-10 Bypass Project Banning to Cabazon

I-10 Bypass Project Banning to Cabazon I-10 Bypass Project Banning to Cabazon Presentation to City of Banning Town Hall Meeting April 11, 2018 June 17 th, 2005 Emergency Action Plan Conceptual Project Purpose Summary Construct a new roadway

More information

City of Homewood Transportation Plan

City of Homewood Transportation Plan City of Homewood Transportation Plan Prepared for: City of Homewood, Alabama Prepared by: Skipper Consulting, Inc. May 2007 TABLE OF CONTENTS INTRODUCTION... 1 BACKGROUND INFORMATION... 1 EXISTING TRANSPORTATION

More information

Welcome. Public Meeting. Heading 1. Heading 2. DeMers Ave. Columbia Rd. Washington St. 42nd St. 32nd Ave. Heading 3 HEADING

Welcome. Public Meeting. Heading 1. Heading 2. DeMers Ave. Columbia Rd. Washington St. 42nd St. 32nd Ave. Heading 3 HEADING Heading 1 Heading 2 Heading 3 HADING Welcome 4 Heading 5 Normal Normal Less Spacing Public Meeting Normal No Spacing Strong mphasis Intense mphasis To Do List ullet List ullet Last List ullet 2 CÞ List

More information

TABLE OF CONTENTS. Executive Summary

TABLE OF CONTENTS. Executive Summary Executive Summary Background... ES-1 Pedestrian Network... ES-2 Bikeway Network... ES-2 Collision History... ES-2 Public Input... ES-4 Conclusions and Recommendations... ES-4 1. Introduction and Setting

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

Gandy Connector: Travel Demand. Policy Committee August 2013

Gandy Connector: Travel Demand. Policy Committee August 2013 Gandy Connector: Travel Demand Policy Committee August 2013 What options to the Gandy Elevated Lanes exist? What are the current conditions? Who s using Gandy Blvd? What s currently planned? What s been

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017

MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017 MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017 RECOMMENDED ACTION: Update on the NDDOT US Business 2 Project Programmed for 2019 Matter of the NDDOT US Business

More information

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017 DES MOINES AREA MPO Presentation to Iowa Commercial Real Estate Association April 6, 2017 Presentation Outline MPO Overview Trends We re Watching Plans, Projects, Initiatives, Regional Transportation Priorities

More information

Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA

Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA PENN STATE TESC SESSION 8B MOVING PENNDOT AND PTC FORWARD DECEMBER 8, 2017 Agenda Define Active Traffic Management and describe

More information

Town of Bethlehem. Planning Assessment. Bethlehem Town Board

Town of Bethlehem. Planning Assessment. Bethlehem Town Board Town of Bethlehem US 9W Corridor Transportation Planning Assessment Presented e to: Bethlehem Town Board June 2009 Overview Study Background Route 9W Corridor Conditions and Improvements Selkirk Bypass

More information

CTH M HIGHWAY PROJECT CTH Q to STH 113

CTH M HIGHWAY PROJECT CTH Q to STH 113 CTH M HIGHWAY PROJECT CTH Q to STH 113 PUBLIC INFORMATIONAL MEETING #3 Wednesday, May 25, 2005 Town of Westport Administration Building 5387 Mary Lake Road 6:00 p.m. to 8:00 p.m. PUBLIC INFORMATIONAL MEETING

More information

Interstate 66 Tier 1 Environmental Impact Statement (EIS)

Interstate 66 Tier 1 Environmental Impact Statement (EIS) WELCOME Welcome to the second Citizen Information Meeting for the Tier 1 Environmental Impact Statement (EIS). As an integral part in the environmental study process, the study team is seeking your comments

More information

STUDY ADVISORY COMMITTEE. October 8, 2015

STUDY ADVISORY COMMITTEE. October 8, 2015 STUDY ADVISORY COMMITTEE October 8, 2015 Study Purpose evaluate the long-term transportation strategies and investments needed to sustain the county s economic health and quality of life in the coming

More information

February 2018 HIGHWAY 316 IMPROVEMENTS PROJECT

February 2018 HIGHWAY 316 IMPROVEMENTS PROJECT February 2018 HIGHWAY 316 IMPROVEMENTS PROJECT Agenda 1 2 3 4 5 A Message from the City Project Area Traffic Conditions Pedestrian/Bicycle Comfort & Safety Next Steps Q&A City of Hastings Supports a study

More information

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,

More information

Transportation in Washoe County. Lee Gibson, Executive Director February 15, 2011

Transportation in Washoe County. Lee Gibson, Executive Director February 15, 2011 Transportation in Washoe County Lee Gibson, Executive Director February 15, 2011 RTC OF WASHOE COUNTY Metropolitan Planning Organization Meet long term needs Deliver federal funding Program projects in

More information

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for: DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,

More information

Safety Corridors a Synthesis. Charlie Nemmers / Derek Vap University of Missouri

Safety Corridors a Synthesis. Charlie Nemmers / Derek Vap University of Missouri Safety Corridors a Synthesis Charlie Nemmers / Derek Vap University of Missouri 1 Background: Safety Corridors Study Need grew from a four State Safety Summit Funding from Iowa, Kansas, Missouri DOTs and

More information

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP DRAFT NOT FINAL (Note: document was not finalized due to an eastbound stopping site distance design issue that requires more detailed bridge and roadway design considerations. This discussion starts on

More information

APPENDIXB. Traffic Operations Technical Memorandum

APPENDIXB. Traffic Operations Technical Memorandum APPENDIXB Traffic Operations Technical Memorandum Environmental Assessment - Lincoln County, SD 85 th Street: Sundowner Avenue to Louise Avenue November 2017 MEMORANDUM Transportation Jim Kollbaum, PE

More information

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design I-20 ODESSA-MIDLAND CORRIDOR STUDY Public Meeting for Schematic Design The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being,

More information

Page 1 of KA

Page 1 of KA Page 1 of 11 75-16 KA 5188-01 KA 5188-01 Page 2 of 11 (0+00-28+69) 14,664 SQYDS ROCK EDGE WEDGE 0+00-26+30 D = 0.083333' W = 2.0' 26+30-338+65 D = 0.25' W = 3.0' KA 5188-01 Page 3 of 11 28+69-338+65 (103,553

More information

ICBC invests $1.175 million to help make Surrey, Delta and White Rock s roads safer in 2013

ICBC invests $1.175 million to help make Surrey, Delta and White Rock s roads safer in 2013 Date: March 18, 2014 Page: 1 of 8 Media contacts: Michelle Hargrave, 250-979-4642 Lindsay Olsen, 604-982-4759 ICBC invests $1.175 million to help make Surrey, Delta and White Rock s roads safer in 2013

More information

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

Goodlettsville Bicycle and Pedestrian Plan Executive Summary Goodlettsville Bicycle and Pedestrian Plan July 2010 In Cooperation with the Nashville Area Metropolitan Planning Executive Organization Summary Introduction Progressive and forward thinking communities

More information

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E.

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E. RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project 0-6840) June 7, 2016 Presented by: Karen Dixon, Ph.D., P.E., TTI Team: Kay Fitzpatrick, Raul Avelar, & Subasish Das Project

More information

Providing an Efficient and Multi-modal Transportation System

Providing an Efficient and Multi-modal Transportation System Providing an Efficient and Multi-modal Transportation System Welcome and Introductions The Plan Process Transportation Overview Workshop Discussions Report Out and Next Steps AGENDA Comprehensive Plan

More information

Alberta Highway 881. Corridor Management Plan. Session Forum 1 - Highways. Tri-Party Transportation Conference Moving Alberta Into the Future

Alberta Highway 881. Corridor Management Plan. Session Forum 1 - Highways. Tri-Party Transportation Conference Moving Alberta Into the Future Tri-Party Transportation Conference Moving Alberta Into the Future Alberta Highway 881 Corridor Management Plan Lac La Biche to Anzac Session Forum 1 - Highways March 2017 INTRODUCTION + 241 km long, 2

More information

Project Kickoff Meeting February 15, 2018

Project Kickoff Meeting February 15, 2018 Project Kickoff Meeting February 15, 2018 Scope of Work: Study Area Project Goals Develop traffic calming alternatives to the Vine Street local right of way, to mitigate speeding. Develop concept plans

More information

CHAPTER 7 CIRCULATION

CHAPTER 7 CIRCULATION CHAPTER 7 CIRCULATION A township s transportation network links its population with the surrounding communities. Transportation networks, including public and private, provide the means by which township

More information

Proposed Project I 35 from Denton to Cooke County Line

Proposed Project I 35 from Denton to Cooke County Line Proposed Project I 35 from Denton to Cooke County Line The existing I 35 facility is four lanes from I 35E/I 35W to Farm to Market Road (FM) 3002. The purpose of the proposed project is to increase capacity

More information

STATE TRANSPORTATION COMMISSION HEARING

STATE TRANSPORTATION COMMISSION HEARING STATE TRANSPORTATION COMMISSION HEARING Twelve Year Program Update Tom Zilla: Centre County MPO Jim Saylor: SEDA-COG RPO Amy Kessler: North Central RPO PennDOT District 2-0 State College, PA October 8,

More information

Table 1: Recommended Interim Improvement and Long Term Improvement/ROW Preservation Proposed Improvements. Recommended Interim Improvement

Table 1: Recommended Interim Improvement and Long Term Improvement/ROW Preservation Proposed Improvements. Recommended Interim Improvement Rebecca W. Arnold, President Sara M. Baker, Vice President John S. Franden, Commissioner Carol A. McKee, Commissioner Mitchell Jaurena, Commissioner June 19, 2012 Planning & Programming Department TO:

More information

ENERGY SECTOR COORDINATION

ENERGY SECTOR COORDINATION ENERGY SECTOR COORDINATION Darin Kosmak, Deputy Director TxDOT Rail Division November 4, 2013 Energy Sector Considerations Existing FM roads not built to handle truck traffic resulting from: Oil & natural

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,

More information

Route 29 Corridor Assessment Update. Development of Possible Solutions

Route 29 Corridor Assessment Update. Development of Possible Solutions Route 29 Corridor Assessment Update Development of Possible Solutions Public Workshop #3 October 27, 2016 Purpose of Developing Possible Solutions Recap of where we ve been and timeline for moving forward

More information

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer Colerain Avenue Roadway Improvements Sponsored by Hamilton County Engineer Participants Lead Agency: Hamilton County Engineer Review and Approval: Ohio Department of Transportation Design Engineer: Edwards

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four

More information

Safe Routes to School Action Plan Aberdeen, Idaho

Safe Routes to School Action Plan Aberdeen, Idaho Background Aberdeen, Idaho is a largely agricultural community of nearly 2,000 people and is located in the southeast portion of the state on the western edge of American Falls Reservoir. The community

More information

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES INNER LOOP EAST TRANSFORMATION PROJECT AIA Rochester Annual Meeting November 13, 2013 Bret Garwood, NBD Erik Frisch, DES Why? We are building a city that encourages walking, biking and enjoying the outdoor

More information

2015 Florida Main Street Annual Conference. Complete Streets Equal Stronger Main Streets

2015 Florida Main Street Annual Conference. Complete Streets Equal Stronger Main Streets WHAT ARE COMPLETE STREETS? CASE STUDIES COMPLETING YOUR MAIN STREET 2015 Florida Main Street Annual Conference St. Petersburg, Florida August 19, 2015 WHAT ARE COMPLETE STREETS? CASE STUDIES COMPLETING

More information

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Open House Public Meeting S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Municipality of Bethel Park, Allegheny County Bethel Park Municipal Building 5001 West Library

More information

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose

More information

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

Weymouth - Abington Route 18 Widening and Reconstruction Project File No Weymouth - Abington Route 18 Widening and Reconstruction Project File No. 601630 PROJECT LOCATION Project Limit Previously Completed Signalized Intersections (Typical) Route 18 Widening Bridge No. W-32-013

More information

CITY OF SPOKANE VALLEY Request for Council Action

CITY OF SPOKANE VALLEY Request for Council Action CITY OF SPOKANE VALLEY Request for Council Action Meeting Date: December 16, 2014 Department Director Approval: Check all that apply: consent old business new business public hearing information admin.

More information

Planned Improvements from Sector & Area Plans that have been added to the MTP

Planned Improvements from Sector & Area Plans that have been added to the MTP Appendix P Bikeway Projects in Currently Approved Plans Planned Improvements from Sector & Area Plans that have been added to the MTP Airport Viaduct Trail Connection to National Airport Implement a pedestrian/bicycle

More information

Highway 12 Safety Coalition

Highway 12 Safety Coalition Highway 12 Safety Coalition City of Wayzata, City of Long Lake, City of Orono, City of Medina, City of Maple Plain, City of Independence, City of Delano, City of Montrose, City of Waverly, City of Howard

More information

ALTERNATIVE WORKSHOP JULY

ALTERNATIVE WORKSHOP JULY WELCOME - ALTERNATIVE WORKSHOP JULY 27, 2017 MEETING GOALS ITD is committed to working collaboratively with stakeholders to ensure safe and efficient mobility through Island Park and Targhee Pass. TONIGHT

More information

Where Did the Road Go? The Straight and Narrow about Curves

Where Did the Road Go? The Straight and Narrow about Curves Where Did the Road Go? The Straight and Narrow about Curves Renae Kuehl, SRF Consulting Group October 23, 2018 What is a County Roadway Safety Plan or CRSP?" CRSP Identifies priority location-specific

More information

New Mexico Transportation Funding Challenges

New Mexico Transportation Funding Challenges New Mexico Transportation Funding Challenges Rocky Mountain Pavement Preservation Partnership Meeting October 29-31, 2008 Ernest Archuleta, P.E. Field Operations Division Director 1 NMDOT DISTRICT OFFICES

More information

State Route 160 (Blue Diamond Highway)

State Route 160 (Blue Diamond Highway) State Route 160 (Blue Diamond Highway) ~ Multi-Year Expansion Program ~ Highway Improvement Projects in Clark and Nye Counties EXHIBIT G Treasures Document consists of 16 slides. Entire exhibit provided.

More information

Lincoln Avenue Road Diet Trial

Lincoln Avenue Road Diet Trial Lincoln Avenue Road Diet Trial Data Collection Report June 1, 2015 Department of Transportation Table of Contents I. Introduction...... 3 II. Data Collection Methodology & Results...... 5 A. Traffic Volume

More information

Addressing Impacts in Western Communities. Geoff Simon Williston Basin Petroleum Conference Bismarck, ND May 22, 2018

Addressing Impacts in Western Communities. Geoff Simon Williston Basin Petroleum Conference Bismarck, ND May 22, 2018 Addressing Impacts in Western Communities Geoff Simon Williston Basin Petroleum Conference Bismarck, ND May 22, 2018 2 The First Boom Happened Quickly Within two months of the 1951 Iverson oil strike,

More information

General Notes. Project No /15/2018 Page 1 of 1

General Notes. Project No /15/2018 Page 1 of 1 5025 Page 1 of 10 General Notes 5/15/2018 Page 1 of 1 Project No. 82 18-18- 82 KA D 5025-01 0307-19 1 2 Note The contractor is responsible for establishing and maintaining centerline of the traveled way

More information

Project Description Form 8EE

Project Description Form 8EE Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:

More information

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question

More information

Orange County Rail-Highway Grade Crossing Safety Enhancement Program. City of San Juan Capistrano April 17, 2012

Orange County Rail-Highway Grade Crossing Safety Enhancement Program. City of San Juan Capistrano April 17, 2012 Orange County Rail-Highway Grade Crossing Safety Enhancement Program City of San Juan Capistrano April 17, 2012 Orange County Rail-Highway Grade Crossing Safety Enhancement Program (OCX) 52 crossings 8

More information

CITY OF PORTSMOUTH PLANNING DEPARTMENT

CITY OF PORTSMOUTH PLANNING DEPARTMENT CITY OF PORTSMOUTH PLANNING DEPARTMENT MEMORANDUM TO: JOHN P. BOHENKO, CITY MANAGER FROM: JULIET T.H. WALKER, PLANNING DIRECTOR SUBJECT: BICYCLE / PEDESTRIAN PLAN PROGRESS UPDATE DATE: 3/13/2018 Background

More information

Building Great Neighbourhoods QUEEN ALEXANDRA

Building Great Neighbourhoods QUEEN ALEXANDRA Building Great Neighbourhoods QUEEN ALEXANDRA We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.

More information

SC 41/Joe Rouse Intersection Improvements

SC 41/Joe Rouse Intersection Improvements SC 41/Joe Rouse Intersection Improvements Scope: Add dual left-turn lanes from Joe Rouse Road onto southbound SC 41 to reduce re-occurring peak hour congestion, particularly the AM peak. Construction Cost

More information

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,

More information

DRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA

DRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA DRAFT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA August 8, 2006 DRAFT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA Prepared for: City of Highland 27215 Baseline Highland, California 92346

More information

Project Description Form 6V

Project Description Form 6V Project Description Form 6V Basic Project Information Submitting Jurisdiction/Agency: Prince William County Project Title: Route 15 Widening: Route 55 to south of RR tracks & Construct RR Overpass Project

More information

Shore Drive Safety Task Force. Report to the SDAC

Shore Drive Safety Task Force. Report to the SDAC Shore Drive Safety Task Force Report to the SDAC April 20, 2006 Table of Contents Introduction... 3 Section I Safety Recommendations... 5 Section II Communication/Public Involvement Plan... 14 Section

More information

Task Force Meeting #5, August 3, Prepared by DKS Associates

Task Force Meeting #5, August 3, Prepared by DKS Associates Task Force Meeting #5, August 3, 2018 Prepared by DKS Associates Agenda 1. Agenda Review and Meeting #4 Recap 2. Review Project Goal, Data, and Project Ideas 3. Recommendations and Reporting a) Recommended

More information

ACHD COMMISSION DECISION

ACHD COMMISSION DECISION DRAFT ACHD COMMISSION DECISION On January 22, 2014, the ACHD Commission voted to delay the decision on the adoption of this study until January 2015. The decision to the delay the adoption was a result

More information

When trying to gauge where future roadway extensions and/or lane widening projects will be needed, it is necessary to first anticipate and analyze

When trying to gauge where future roadway extensions and/or lane widening projects will be needed, it is necessary to first anticipate and analyze Future Needs: Roadways 26 Anticipated Development Trends When trying to gauge where future roadway extensions and/or lane widening projects will be needed, it is necessary to first anticipate and analyze

More information

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M. WELCOME - PTH 1 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, 11 4:00 P.M. - 8:00 P.M. PROJECT STUDY AREA 1 Wenzel Street PR 2 Pritchard Farm Farm Road Road McGregor Farm

More information

Iowa Corridor Management Pilot Project Overview. Recommendations For A Corridor Management Program August 2004

Iowa Corridor Management Pilot Project Overview. Recommendations For A Corridor Management Program August 2004 Iowa Corridor Management Pilot Project Overview Recommendations For A Corridor Management Program August 2004 Presentation Overview Project goals Pilot project selection process Analysis results Segment

More information

INTERSTATE 540 IMPROVEMENT STUDY

INTERSTATE 540 IMPROVEMENT STUDY INTERSTATE 540 IMPROVEMENT STUDY WASHINGTON COUNTY AND BENTON COUNTY APRIL, 2006 INTERSTATE 540 IMPROVEMENT STUDY WASHINGTON COUNTY AND BENTON COUNTY April, 2006 Prepared by Parsons Transportation Group

More information

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek,

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek, INDIANA PROJECTS 1558 Bridge 51 1601823 1601971 I 64 Blackiston Mill Road Phase II Charlestown Rd. Clark State Forest Road Maintenance E. Main Street Improvements to Blackiston Mill Road from just north

More information

North Dakota Department of Transportation. Certification Renewal Program Flexible Pavement Smoothness Tolerance

North Dakota Department of Transportation. Certification Renewal Program Flexible Pavement Smoothness Tolerance North Dakota Department of Transportation Certification Renewal Program 2010-2011 Flexible Pavement Smoothness Tolerance Special Provision Status Flexible Pavement Surface Tolerance In Addition to Standard

More information

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10 Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel

More information

Intersection Traffic Control Feasibility Study

Intersection Traffic Control Feasibility Study Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,

More information

Transportation Improvement Study

Transportation Improvement Study Transportation Improvement Study City of Searcy White County November 2008 Transportation Improvement Study City of Searcy White County November 2008 Prepared by: Planning and Research Division Arkansas

More information

Kentucky s Surface Transportation System

Kentucky s Surface Transportation System Kentucky s Surface Transportation System ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit

More information

ICBC invests $738,000 to make Surrey, White Rock and Delta roads safer

ICBC invests $738,000 to make Surrey, White Rock and Delta roads safer For release: Immediately Page: 1 of 5 Date: April 2, 2012 Ref #: 2012-11 Media contacts: Karon Trenaman, 604-527-8766 ICBC invests $738,000 to make Surrey, White Rock and Delta roads safer You ve likely

More information

Regional Bicycle Barriers Study

Regional Bicycle Barriers Study Regional Bicycle Barriers Study Executive Summary Background and Purpose The 2040 Transportation Policy Plan (TPP) sets policies for planning and investment direction in the transportation system in the

More information

Making the Right Call in Sisseton. Mark Malone, PE SD DOT

Making the Right Call in Sisseton. Mark Malone, PE SD DOT Making the Right Call in Sisseton Mark Malone, PE SD DOT Why are we here again? Review past meetings Discuss Comments SDDOT received How has SDDOT addressed the public s concerns Options to move forward

More information

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE April, 2012 1 INTRODUCTION The need for transit service improvements in the Routes 42/55/676 corridor was identified during the Southern

More information

TRANSPORTATION & MOBILITY

TRANSPORTATION & MOBILITY TRANSPORTATION & MOBILITY ROADWAY SYSTEM There are approximately 40 miles of roadways in Manitou Springs. For planning purposes, roadways are typically assigned a functional classification which defines

More information

Golden s Plan. For the Highway 6 & 93 Corridor

Golden s Plan. For the Highway 6 & 93 Corridor Golden s Plan For the Highway 6 & 93 Corridor Purpose of the Study Accommodate regional traffic needs on Highways 6 and 93, as defined by the Northwest Quadrant Feasibility Study. Find a solution that

More information

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016 Managed Lanes Steve Schilke, P.E. Major Projects Unit Head District 1 Illinois Traffic Engineering and Safety Conference October 2016 Agenda Managed Lanes Projects I-55 (Stevenson Expressway) Express Toll

More information

Update of the Master Transportation Plan s (MTP) Bicycle Element

Update of the Master Transportation Plan s (MTP) Bicycle Element Update of the Master Transportation Plan s (MTP) Bicycle Element April 23, 2019 Background & Context Arlington has an established reputation for advanced bicycle infrastructure and planning Bicycling addresses

More information

Operational Comparison of Transit Signal Priority Strategies

Operational Comparison of Transit Signal Priority Strategies Operational Comparison of Transit Signal Priority Strategies Revision Submitted on: November, 0 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 0 South Orange Avenue, Suite 00 Orlando,

More information

2012 Capital Budget Capital Improvement Program

2012 Capital Budget Capital Improvement Program 2012 Capital Budget Capital Improvement Program Agency Name: Eng. - Bicycle and Pedestrian Agency Number: 53L Capital Budget Future Year Estimates Project Name 2012 2013 2014 2015 2016 2017 1 Bikeways

More information

Pavement Management Report. City Council Meeting of May 21, 2013

Pavement Management Report. City Council Meeting of May 21, 2013 Pavement Management Report City Council Meeting of May 21, 2013 Previous Meetings Summary In February, we presented the 2012 pavement survey and our consultant presented general pavement management strategies

More information