- DRAFT - PAVEMENT MANAGEMENT REPORT FOR MERCED COUNTY 2009

Size: px
Start display at page:

Download "- DRAFT - PAVEMENT MANAGEMENT REPORT FOR MERCED COUNTY 2009"

Transcription

1 - DRAFT - PAVEMENT MANAGEMENT REPORT FOR MERCED COUNTY 2009

2 TABLE OF CONTENTS What is the Pavement Management? 1 Pavement Data Collection 1 Inventorying Pavement Conditions 1 Maintained Paved Mileages for Jurisdictions 1 What Data was Collected 2 Determining Treatments for Pavement Conditions 2 Understanding the Life of Pavement: Creation of Potholes 2 Decision Making Process for Treatment Selection 4 Why do Pavement Management? 5 Preventative Preservation First 6 Cost and Coverage Comparisons 6 Standard Pavement Deterioration Curve 8 Extension of Pavement Life with Timely and Appropriate Treatments 9 Benefits to Motorists 10 Goal 10 Sources of Funding 11 Annually Expected Fundings For Street & Road Maintenance 11 Special Funding 11 Economic Climate 13 Housing Foreclosures: Decline In Property Taxes 13 Less Driving: Reduced Revenues From Federal & State Gas Taxes 13 Economic Recession: Less Sales Tax Revenue 13 State Budget Deficit: Uncertainty Of Monies 13 National Deficit: Devaluation Of Dollar 14 Recession Climate Bids 14 Results from Pavement Management Program (PMP) 15 Overall Pavement Conditions 15 Suggested PMP Treatments & Costs 17 Conclusion: Revenue versus Need 18 Appendix: Maps of Pavement Conditions

3 What is the Pavement Management? Pavement Management (PM) is a structured program that is set up for rating the pavement conditions, based on inspected and surveyed pavement conditions, of jurisdictional paved-road networks. This program also recommends more-immediate maintenance treatments and performs short- and long-term effectiveness of financing strategies. PM brings more science to the process of determining pavement treatments. It includes: A system to regularly collect pavement condition data A database to store and sort collected data An analysis program to evaluate treatment strategies and suggest cost-effective treatments PAVEMENT DATA COLLECTION: WINDSHIELD INSPECTION Hiring a consultant to collect laser readings, format those for robust front-end software, and train jurisdictional staff how to interpret data, perform analyses and generate reports are very timeconsuming and costly. Furthermore, this level of detail and extensive commitment of resources are not necessarily needed by knowledgeable and experienced jurisdictional public works staff, who could assess the conditions and to determine appropriate treatments for their respective streets by quicker visual inspections. For all of the jurisdictions, this windshield type inspection was the approach undertaken to update the pavement conditions data from the 1998/1999 consultant-gathered laser collections. INVENTORYING PAVEMENT CONDITIONS Maintained Paved Mileages for Jurisdictions Cities and Counties are responsible for the maintenance of more than 80 percent of the state s road system that is currently rated at risk (California Statewide Local Streets and Roads Needs Assessment). For Merced County, the mileages maintained by jurisdictions are estimated and shown in Table 1. Table 1: Estimated Maintained Miles by Jurisdiction Jurisdiction Miles Atwater Dos Palos Note (*): Gustine The figure for the County of Merced is the official number Livingston used by the State in their apportionment distribution of Los Banos Proposition 42 monies. Merced The municipalities figures were estimated from the G.I.S. County of Merced* 1, ,

4 What Data was Collected Determination for what types of data to be collected through windshield inspections came as the result of researching other public agencies successful pavement management programs (i.e. Metropolitan Transportation Commission s (MTC) StreetSaver). Standardization of inputs for pavement conditions data came from reviewing MTC s freely-accessible, online asphalt condition and distress identification guidebook and also from individual instructional sitdowns with jurisdictional staff. Pavement distresses, including their types (weathering, linear, block, alligator, rutting), respective severities (low, moderate, severe) and extents (how much of the segment s pavement surface), were collected. Drainage and ride observations were also collected. These pavement conditions were for every segment (typically from intersection to intersection) of every paved roadway for the entire county. Table 2 shows the windshield inspection pavement conditions collected. Table 2: Pavement Condition: Windshield Inspection Conditions Pavement Condition Severity Extent Weathering (drying) Linear Cracking (long./transverse) Block Cracking (paneling) Alligator Cracking (scaling) Rutting Ride Drainage Low, Moderate, Severe Good, Fair, Poor Low (25-50%) Medium (50-75%) High (75-100%) Low, Medium, High Due to constraints on available resources, as shown in Table 3, the Cities of Merced and Los Banos have assessed their paved roadway conditions using more generalized overall assessment categories of either Overall Condition Index (OCI: numeric value between 0 and 100, with 100 being a new roadway) or overall qualitative conditions (Very good, good, fair, poor, very poor). Table 3: Pavement Condition: Overall Condition Indices (OCI) and Qualitative Conditions OCI Qualitative Condition Description Very Good Good surface Good Minor-moderate cracking Fair Moderate-severe cracking Poor Severe cracking 0-20 Very Poor Extreme structural damage; Failed DETERMINING TREATMENTS FOR PAVEMENT CONDITIONS Understanding the Life of Pavement: Creation of Potholes A paved roadway is made up of sections: sub-grade soil, crushed rock capping layer, granular (gravel and sand) sub-base, and asphalt pavement surface. 2

5 Potholes on road surfaces develop as the result of stress deterioration of traffic-impacted, untreated roadways and by penetration of water into the sub-grade of the structure. Figure 1 and the following discussion describes the life cycle of pavement. A new paved roadway starts out as a black, crack-free surface. With weathering (oxidation that results in the hardening and aging of the asphalt binder) and traffic, the surface dries, turns grayish and shows signs of loose aggregates (exposed rocks). Left untreated, this dried pavement surface begins to crack linearly (longitudinal and transverse) under traffic loadings. These cracks form paneled or block cracks. As shown in Figure 2, cracking to the pavement surface allows water to penetrate into the roadway structure, which results in frost action (repeated expansion, caused by freezing, and thawing of water), pavement upheaval and cavity collapse (pothole). Figure 1: Life Cycle of Pavement. 3

6 Figure 2: Frost Heave of Pavement by Repeated Freezing and Thawing of Penetrated Water. Source: Michigan Department of Transportation Over time, these cracks become more widespread and severe (wider, deeper and closer together) in nature. Visibly, these blocks become smaller so that they resemble scales of an alligator, and that s how this type of fatigue distress got its alias, alligator cracking. As traffic traverses the failed roadway with severe alligator cracking, some of the broken pavement gets dislodged leaving potholes. Decision Making Process for Treatment Selection Now that it s clearer how untreated pavement deteriorates to failure over time due to distress loadings and water penetration, the following discussion will describe the treatment selection for various pavement conditions (stages in the life of pavement). Fog Seal ($0.07/sq.ft.): When pavement surface appears gray and dried, spraying fog seal will prevent dry cracking under traffic loadings. Rejuvenating Seal ($0.12/sq.ft.): When pavement surface appears dried with visibly nearloose aggregate and maybe signs of minor linear pavement cracking, using this sealant mixture will prevent further cracking as well as further reinforce the bonds to improve structural integrity. 4

7 Slurry or Sand Seal ($ /sq.ft.): When minor pavement cracking appears, treating the surface with special composite material (slurry) and/or fine sand with emulsion will fill in the surface cracks. Scrub Seal ($0.40/sq.ft.): With minor to moderate levels of pavement cracking (when manual crack fillings are infeasible), broom-scrubbing mixed-size aggregates into these cracks following the application of a layer of emulsion will enhance surface-volume-contact bondings, which act to strengthen the failing pavement surface, seal against water penetration and prevent further rapid deterioration. Cape Seal: Scrub Seal and Microsurfacing ($0.95/sq.ft.): With inconsistent moderate, more extensive pavement cracking on more-traveled roadways, performing scrub seal followed by microsurfacing (for quicker set and faster open-to-traffic turnarounds) will fill the various cracks and provide an aesthetic, sealed surface. Thin Overlay: Partial-Depth Grinding, Sheet Asphalt, Scrub Seal and 2 AC ($2.80/sq.ft.): With moderate to severe pavement cracking in low-moderate traffic areas, partially grinding the surface, scrub sealing the cracks and placing a thin asphalt overlay will restore the condition and performance of the roadway. Please note that scrub sealing, prior to the thin overlay, will act to retard any reflective cracking. Thick Overlay: Full-Depth Grinding, Sheet Asphalt, Scrub Seal and >2 AC ($4.30/sq.ft.): With more severe pavement cracking in moderate-high traffic areas, if the foundation layers have not been comprised, full-depth grinding the surface, scrub sealing the cracks and placing a thick asphalt overlay will restore the condition and performance of the roadway. Please note that scrub sealing, prior to the thin overlay, will act to retard any reflective cracking. Full Reconstruction with 4 AC ($6.06/sq.ft.): When the roadway has completely failed with crumbling surface pavement and compromised structure, full reconstruction will be suggested. Please note that the above-mentioned (2005/2006) unit costs include equipment, hauling/applying materials and labor. These unit costs do not include other cost factors such as engineering, inspection, force account labor, traffic control, signage, notification to residents, AC grinding, striping/stenciling, etc. Public works road crew also performs other pavement maintenance beyond those listed above such as patching, crack filling, pothole repair, etc. Why do Pavement Management? Public roads allow for moving people and freight. Due to their value and importance to the national economic vitality, preserving their condition and performance should be a priority. Pavement Management is used to maximize financial investment in those assets and to save motorist money spent annually on rough road impacts. 5

8 PREVENTATIVE PRESERVATION FIRST In the past, many jurisdictions haven chosen the typical approach to pavement maintenance and repair such as Fix the worst first. Unfortunately, in the long run this is actually the least costeffective strategy. Especially with the instability of funding, it is even more important to implement the most efficient, cost-effective ( biggest bang for the buck ) and timely maintenance strategies. Preservation treatments are highly recommended, because of their more reasonable costs, their larger coverage areas and their ability to extend the life of pavement. Cost and Coverage Comparisons Costs per lane mile for reconstruction after 25 years can be more than 3x the costs of periodic preservation treatments over the same 25-year period (AASHTO, 2009). Table 4 estimates the costs of preservation treatments and compares this total to the cost of reconstruction. Table 4: Comparison of Periodic Preventative Costs to Reconstruction Over 25 Years Table 4 assumes a new paved road at year 1. In years 3-25, preventative treatments would be performed to preserve and extend the life of the pavement surface. Figures 3 illustrates the cost comparison for treatments of various pavement conditions. Figure 3: Cost Comparison for Treatments Preventative Maintenance via Preservation Treatments 6

9 Figures 4 illustrates the coverage comparison for treatments of various pavement conditions. Figure 4: Coverage Comparison for Treatments Preventative Maintenance via Preservation Treatments The cost to reconstruct one mile of roadway is equivalent to: Major Rehabilitation. = 1.5 miles of thick 4 asphalt overlay = 2 miles of thin 2 asphalt overlay Preventative Maintenance. = 6 miles of cape (scrub seal plus microsurfacing) seal = 15 miles of scrub seal = 51 miles of rejuvenating seal = 87 miles of fog seal 7

10 Standard Pavement Deterioration Curve As depicted in Figure 5, the national standard pavement deterioration curve, it would cost $1 (on average) to keep a road in good shape for every $7 you would have to spend on reconstruction. Figure 5: National Standard Deterioration Curve for Pavement. Please recall the life of an untreated roadway and the selection of treatments as described in the previous sections. New pavement will hold its strength for 75% of its life. However, if left untreated, the drying pavement will crack and these cracks will propagate out and become more severe with continued traffic loadings. Along with this, cracks will allow water to penetrate the surface and progressively upheave the pavement surface via the frost heave process. As shown in the standard pavement deterioration curve diagram, these above-mentioned conditions are depicted by the steepening of deterioration. 8

11 Extension of Pavement Life with Timely and Appropriate Treatments Preservation strategy implies spending smart by making investments needed to keep a road in good repair, rather than paying more later to address greater deterioration. As shown in Figure 6, by performing appropriate treatments in a timely manner, the life of pavement could be extended (retaining serviceability and performance), thereby, delaying the need for costly rehabilitation and reconstruction. Figure 6: Extend Life with Preventative (Preservation) Maintenance Appropriate treatment means performing the needed maintenance for observed pavement condition. As an example, referring back to the treatment selection section, it would not be very effective to perform fog/rejuvenating seals on pavement that suffers from moderate level of cracking on much of the surface. It would be more appropriate to select a treatment that will fill and seal the cracks to restore structural integrity so that further deterioration was retarded. Timely treatment means performing appropriate maintenance before pavement deteriorates further and faster. 9

12 BENEFITS TO MOTORISTS In a flash, potholes can dislodge a hubcap, shred a tire, or even cause a driver to lose control of a car. PM will help decision makers extend the life of good roads while strategizing the catch-up on deferred maintenance. Poor-quality pavement increases operating costs to motorists. Rough roads add an average of $335* to the annual cost of owning a car due to damaged tires, suspensions, reduced fuel efficiency and accelerated vehicle depreciation ( Rough Roads Ahead, AASHTO/TRIP, 2009). Keeping pavement in good repair will save motorists from additional operating costs. Table 5 shows the average annual costs to motorists of reported nearby cities. Table 5: Average Annual Costs to Motorists in Nearby Cities City (as cited in Rough Roads Ahead report) Cost (2007) Fresno $461 Modesto $538 (* Model developed that estimates operating cost to driver based on average number of miles driven and AAA s 2008 vehicle operating cost data. Texas Transportation Institute (TTI) estimated impact of road conditions on fuel consumption) (In 2007, AAA reports that the average cost for a motorist traveling 15,000 miles per year is $8,100, although costs vary depending on the vehicle and location.) Goal The ultimate goal of a Pavement Management (PM) system is to effectively strategize short- & long-term usages of current and future limited monies to restore and maintain pavement at Fair to Better conditions for the ENTIRE road pavement network. Good-condition road networks will ensure the economic vitality of the Nation and will benefit motorists with safety assurances and minimized additional costs. 10

13 Sources of Funding Table 6 shows the various funding sources and their respective amounts allocated to the jurisdictions, which would be used for street and road pavement maintenance. The first column set depicts expected annual revenue amounts. Whereas, the second column set depicts two special (one-time) funding sources. Table 6: Revenue Sources of Maintenance Funding for Jurisdictions ANNUALLY EXPECTED FUNDINGS FOR STREET & ROAD MAINTENANCE Currently, fundings from the following sources are expectedly allocated annually to the jurisdictions for street and road maintenance. Local General Funds and Tax Measures Federal Regional Surface Transportation Program (RSTP): Federal allocation exchanged for state dollars State Local Transportation Funds (LTF): Derived from state general sales tax; Priority given to transit State Proposition 42: Derived from state sales tax on gas State Proposition 111 (Highway Users Tax): Derived from state fuel tax SPECIAL FUNDING Proposition 1B Local Street and Roads (LS&R) With the passing of the State Bond Measure 1B in November 2006, $2 billion will be available to the counties ($1 billion) and cities ($1 billion) for improvements to transportation facilities that will assist in reducing local traffic congestion and further deterioration, improving traffic flows, or increasing traffic safety that may include, but not be limited to, street and highway pavement maintenance, rehabilitation, installation, construction and reconstruction of necessary associated facilities such as drainage and traffic control devices, or the maintenance, rehabilitation, installation, construction and reconstruction of facilities that expand rider ship on transit systems, safety projects to reduce fatalities, or as a local match to obtain state or federal transportation funds for similar purposes. Allocation of funds are by formula, as specified in Proposition 1B: 75% of funds apportioned to counties are based on the number of vehicles registered in the county, relative to all counties in the State, and 25% are based on number of county maintained road miles, relative to all county 11

14 maintained road miles in the State; Funds apportioned to cities are based on total population of the city in relation to all cities in the State (with the minimum $400,000 to each city). Table 7 shows how the jurisdictions will utilize Proposition 1 B: Local Streets and Roads fundings. Table 7: Jurisdictional Use of Proposition 1 B (Local Streets and Roads) Funds Jurisdiction Description Prop 1B Funding Atwater Atwater Blvd streetscape: downtown sub-area & entry gateway $ 444,217 Dos Palos Maintenance $ 400,000 Gustine Maintenance $ 400,000 Livingston Maintenance $ 415,490 Los Banos Maintenance $ 1,089,803 Merced Overlay & Reconstruction of Olive Ave: Hwy 59-G; Parsons Ave Extension; Maintenance $ 2,467,231 County of Merced Major Maintenance; Reconstructions; Major Roadway Improvements $ 6,278,962 American Recovery and Reinvestment Act (ARRA) On February 17, 2009, H.R.1, The American Reinvestment and Recovery Act (ARRA) was signed into law. The ARRA provided billions for transportation infrastructure as a means of stimulating the nation s severe economic decline. Under H.R.1, California must sub-allocate 30% ($771M) of the ARRA fund total ($2.57B) to the regions for programming. Caltrans used the existing Regional Surface Transportation Program (RSTP) formula to distribute ARRA-RSTP funds to the regions. MCAG s total regional portion of to program was $9.9 million in ARRA-RSTP funds and $300,000 in Transportation Enhancement funds. Table 8 shows how the jurisdictions plan to use ARRA fundings. Table 8: Jurisdictional Use of ARRA Funds Jurisdiction Description ARRA Funding Overlay & Partial Reconstruction: Shaffer Rd, Winton Wy Atwater Overlay & Partial Reconstruction: $ 1,100,849 Juniper Ave: Shaffer Bridgewater Dos Palos Construction & Reconstruction of Sidewalks $ 200,597 Gustine Construction & Reconstruction of Sidewalks and Construction of New Curb Cut Ramps in Downtown $ 207,585 Livingston Rehabilitation: Peach Ave: 7 th Dwight; 7 th St: Peach Park; Walnut Ave: Almond Glen E. City Limit Rehabilitation: 1 st St: Peach J; 1 st St: F B; $ 550,804 7 th St: F C; C St: Main 7 th Los Banos Asphalt Overlays/Rehabilitation of Various Roads $ 1,439,476 Overlay: 16 th St: G - V Merced Reconstruction & Repaving Central Merced: Various Streets: G, M, 18 th $ 3,218,498 County of Merced Avenue Two Bridge over Canal Creek Scrub Seals for County Roads $ 3,473,757 12

15 Economic Climate The following economic turmoil decreases the revenue sources current and future fundings for streets and roads. HOUSING FORECLOSURES: DECLINE IN PROPERTY TAXES The collapse of the housing market has resulted in the decline of property tax revenues for State and local governments. This decline of property tax revenues resulted from large numbers of foreclosures and the decrease in property value. LESS DRIVING: REDUCED REVENUES FROM FEDERAL & STATE GAS TAXES Initially, less driving was the result of skyrocketed fuel prices. Even with lower gas prices, people are still driving less due to the Recession. High unemployment rates mean less traveling. Others are saving as the cautionary measure during this unstable, economic time. Reduced gas tax revenues resulted. ECONOMIC RECESSION: LESS SALES TAX REVENUE With ever deepening Economic Recession, unemployment has been rising for the Nation and especially for California. The Nation s unemployment rate rose to 9.4% in May, while California s unemployment rate reached 11.5%, and is 17.3% in June for Merced County. Those unemployed have less money to spend, and others are saving (instead of spending, especially on big ticket items) to safeguard themselves during the Recession. Less spending translates to less sales tax revenue generated. STATE BUDGET DEFICIT: UNCERTAINTY OF MONIES The State of California must put together the FY State Budget that will close an estimated $26 billion deficit. Cash flow (while working on budget to deal with large deficit) Bond sales (declining credit rating) Debt repayments (payback borrowed monies plus interests will deplete State s general fund) Deteriorating revenues (high unemployment=less income taxes; home foreclosures=less property taxes; business collapses=less taxes; less driving=less gas taxes) Increasing expenses (high unemployment=more need for state net) If the Budget Conference Committee s approved budgetary fix proposals are enacted, they will seriously cripple local government s ability to maintain streets and roads. Such proposed state budgetary proposals include seizing Highway User s Tax Account (HUTA: gas tax) monies and once again borrowing of Proposition 42 (sales tax on gas) funds. 13

16 NATIONAL DEFICIT: DEVALUATION OF DOLLAR With the national deficit on the rise with continued spending to push the economy out of its current recession, it is likely that devaluation of the U.S. Dollar and thus inflation are in our future. With prospective inflated costs, the number of unmaintained paved roadways will rise resulting in a greater backlog of deferred rehabilitation and replacement projects. RECESSION CLIMATE BIDS A bright side to this Recession period is the drop in bids on projects. Due to the slowdown of construction and lessening of available funding for projects, contractors have competitively placed very low (near no profit) bids to win jobs in order to just survive. With such low bids, monies could be stretched farther on street and road projects. 14

17 Results from Pavement Management Program (PMP) OVERALL PAVEMENT CONDITIONS The following tables, Table 9 A-G, (with charts) summarize the overall pavement conditions for each jurisdiction. Table 9 A: Pavement Conditions for Atwater Atwater Fair to Better 78 % Poor and Worse 22 % Table 9 B: Pavement Conditions for Dos Palos Dos Palos Fair to Better 41 % Poor and Worse 59 % Table 9 C: Pavement Conditions for Gustine Gustine Fair to Better 54 % Poor and Worse 46 % 15

18 Table 9 D: Pavement Conditions for Livingston Livingston Fair to Better 86 % Poor and Worse 14 % Table 9 E: Pavement Conditions for Los Banos Los Banos Fair to Better 78 % Poor and Worse 22 % Table 9 F: Pavement Conditions for Merced Merced Fair to Better 77 % Poor and Worse 23 % Table 9 G: Pavement Conditions for County of Merced County of Merced Fair to Better 75 % Poor and Worse 25 % 16

19 Pavement conditions for each jurisdiction are illustrated on the maps, which are in the appendix section of this report. SUGGESTED PMP TREATMENTS & COSTS The following tables, Table 10 A-G, show the costs of Preventative Maintenance and Rehabilitation/Reconstruction for each jurisdiction. Table 10 A: Restoration Costs for Atwater Fair to Better 78 % Preventative $ 2.5 M Atwater Poor and Worse 22 % Rehab./Reconstruct. $ 12.8 M Table 10 B: Restoration Costs for Dos Palos Fair to Better 41 % Preventative $ 0.7 M Dos Palos Poor and Worse 59 % Rehab./Reconstruct. $ 9.1 M Table 10 C: Restoration Costs for Gustine Fair to Better 54 % Preventative $ 0.2 M Gustine Poor and Worse 46 % Rehab./Reconstruct. $ 7.0 M Table 10 D: Restoration Costs for Livingston Fair to Better 86 % Preventative $ 1.1 M Livingston Poor and Worse 14 % Rehab./Reconstruct. $ 4.7 M Table 10 E: Restoration Costs for Los Banos Fair to Better 78 % Preventative $ 3.1 M Los Banos Poor and Worse 22 % Rehab./Reconstruct. $ 17.7 M Table 10 F: Restoration Costs for Merced Fair to Better 77 % Preventative $ 4.0 M Merced Poor and Worse 23 % Rehab./Reconstruct. $ 23.3 M Table 10 G: Restoration Costs for County of Merced Fair to Better 75 % Preventative $ 10.9 M County of Merced Poor and Worse 25 % Rehab./Reconstruct. $ 89.0 M 17

20 Conclusion: Revenue versus Need The summary of revenues and pavement restoration needs is shown in Table 11. Table 11: Revenues versus Restoration Needs by Jurisdiction Annual Preventative Rehab./ Total Jurisdiction Revenue Maintenance Reconstruct. Need Atwater $ 1.1 M $ 2.5 M $ 12.8 M $ 15.3 M Dos Palos $ 0.2 M $ 0.7 M $ 9.1 M $ 9.8 M Gustine $ 0.2 M $ 0.2 M $ 7.0 M $ 7.2 M Livingston $ 0.6 M $ 1.1 M $ 4.7 M $ 5.8 M Los Banos $ 1.3 M $ 3.1 M $ 17.7 M $ 20.8 M Merced $ 2.8 M $ 4.0 M $ 23.3 M $ 27.3 M County of Merced $ 7.7 M $ 10.9 M $ 89.0 M $ 99.9 M What becomes clear is that the total needs are many times the amounts of annual revenues. Inadequate and inconsistent levels of maintenance funding have resulted in an immense backlog of deferred maintenance (rehabilitation and reconstruction) projects. Since the deterioration of pavement is more gradual while in its preventative maintenance stage, it would be possible to keep the streets and roads at Fair to Better conditions by the timely budgeting of sufficient preventative treatment funds over three to five years. If more (beyond the preventative costs) was budgeted, then jurisdictions could bring streets and roads up from Poor or Worse conditions by catching up on the deferred rehabilitation and reconstruction projects. 18

21 Appendix Maps of Pavement Conditions

22

23

24

25

26

27

28

29

30

31

32

33

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015 Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT February 12, 2015 What is Pavement Management? At a Network Level: Pavement management refers to a systematic

More information

City of Davis Pavement Management Program

City of Davis Pavement Management Program City of Davis Pavement Management Program Davis Street and Bike Path System 163 centerline miles of streets (33 million square feet) 34.6 miles of arterials 21% 22.8 miles of collectors 14% 103.9 miles

More information

C ITY OF B EDFORD H EIGHTS

C ITY OF B EDFORD H EIGHTS C ITY OF B EDFORD H EIGHTS T ABLE OF C ONTENTS 1. Executive Summary... 2 2. Background... 3 3. PART I: 2016 Pavement Condition... 8 4. PART II: 2018 Current Backlog... 13 5. PART III: Maintenance &

More information

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force 1 Tacoma Streets 101 2 Streets Maintenance Overview Type and amount of streets Condition and types of construction Maintenance and repair methods and costs Sample Project Philosophy/Selection Criteria

More information

2018 ROAD MAINTENANCE PROGRAM

2018 ROAD MAINTENANCE PROGRAM 2018 ROAD MAINTENANCE PROGRAM John Tiger Anastasi Town of Bethlehem Superintendent of Highways June 27, 2018 AGENDA Why do we maintain our roads? How is the Road Maintenance Plan developed? The process

More information

Smoothing Out the Bumpy Road Ahead

Smoothing Out the Bumpy Road Ahead Julie Hannah, P.E. Technical Services and Asset Management May 11, 2017 Smoothing Out the Bumpy Road Ahead Nationwide D = Poor, At Risk Conditions & Capacity Pavement Condition & Congestion Nationwide

More information

Kentucky s Surface Transportation System

Kentucky s Surface Transportation System Kentucky s Surface Transportation System ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit

More information

Executive Summary. Introduction

Executive Summary. Introduction Executive Summary Introduction The future of our local economy is uncertain, but one thing we know we must manage our infrastructure smarter. State and local agencies are facing challenging times. There

More information

Pavement Management Program

Pavement Management Program Pavement Management Program Public Works Department January 5, 2016 Chad Butzow, P.E. Deputy Director Field Operation Services Public Works Department Brian Martineau Pavement Manager Public Works Department

More information

Pavement Management Report. City Council Meeting of May 21, 2013

Pavement Management Report. City Council Meeting of May 21, 2013 Pavement Management Report City Council Meeting of May 21, 2013 Previous Meetings Summary In February, we presented the 2012 pavement survey and our consultant presented general pavement management strategies

More information

Hold the Wheel Steady: America s Roughest Rides and Strategies to Make our Roads Smoother

Hold the Wheel Steady: America s Roughest Rides and Strategies to Make our Roads Smoother Hold the Wheel Steady: America s Roughest Rides and Strategies to Make our Roads Smoother September 2010 TRIP 1726 M Street, NW, Suite 401 Washington, DC 20036 Phone: (202) 466-6706 Fax: (202) 785-4722

More information

Why We do Preventive Maintenance

Why We do Preventive Maintenance Why We do Preventive Maintenance James S. Moulthrop, P.E. Executive Director FP 2 Inc. North Dakota Asphalt Conference March 28-29, 2017 Bismarck, ND Presentation Outline What is FP 2 Inc.? Mission Preventive

More information

Paving for Progress Municipal Streets Seminar

Paving for Progress Municipal Streets Seminar Paving for Progress Municipal Streets Seminar November 15, 2017 Doug Wilson, PE City of Cedar Rapids Paving for Progress Program Manager State and National Rankings $10,996,122 Prior Funding: General Obligation

More information

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 City Street and County Road Maintenance Program The preservation and keeping of public street and road rights-of-way

More information

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco Capital Needs In 2006, the Mayor and Board of Supervisors approved San

More information

Merced County Association of Governments: Voter Survey

Merced County Association of Governments: Voter Survey Merced County Association of Governments: Voter Survey Page 1 Overview and Research Objectives Merced County Association of Governments commissioned Godbe Research to conduct a survey of local voters with

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie

More information

Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota. Transportation Research

Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota. Transportation Research 2007-18 Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota Take the steps... Research...Knowledge...Innovative Solutions! Transportation Research

More information

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM City of West Des Moines PAVEMENT MANAGEMENT SYSTEM 12/11/2018 Municipal Street Seminar (11-14-2018) JEFF NASH 1 City Background Information: - West Des Moines current census Population is around 66,000

More information

Keeping good roads good

Keeping good roads good Pavement Preservation (PP) in the State of California- Protecting Their Road and Street Investment R. Gary Hicks PhD, PE CP2 Center, Chico CA Prepared for the 3 rd International Pavement Maintenance Technology

More information

Township of Springwater

Township of Springwater Township of Springwater Approved: November 2008 Effective: Date of Passing Next Review: TBD Department: Public Works Subject: Sidewalks Policy Number: A09 SI A. Authority This policy shall be approved

More information

Driving Indiana s Economic Growth

Driving Indiana s Economic Growth Driving Indiana s Economic Growth IRI/PCR/RUT Field Verification Kumar P. Dave Manager, Road & Pavement Asset Management & Programming, INDOT 03-06-2012 Organization Chart Pavement Division, INDOT David

More information

Non-State Federal Aid Highways. Pavement Condition Ratings. H e r k i m e r a n d O n e i d a C o u n t i e s

Non-State Federal Aid Highways. Pavement Condition Ratings. H e r k i m e r a n d O n e i d a C o u n t i e s Non-State Federal Aid Highways Pavement Condition Ratings 2010 H e r k i m e r a n d O n e i d a C o u n t i e s 2010 PAVEMENT CONDITION RATINGS for the Non-State Federal Aid Highway System in Herkimer

More information

Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes

Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes The Pothole Solution... p.2 Specifications... p.3 Using Perma-Patch in Severe Weather... p.4 www.permapatch.com Frequently

More information

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need Chapter 2 Purpose and Need 2.1 Introduction The El Camino Real Bus Rapid Transit (BRT) Project (Project) would make transit and other transportation improvements along a 17.6-mile segment of the El Camino

More information

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. N o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. 84 Transportation CHAPTER 11 INTRODUCTION Transportation

More information

FUTURE MOBILITY IN TEXAS: The Cost of Meeting the State s Need for Safe and Efficient Mobility

FUTURE MOBILITY IN TEXAS: The Cost of Meeting the State s Need for Safe and Efficient Mobility FUTURE MOBILITY IN TEXAS: The Cost of Meeting the State s Need for Safe and Efficient Mobility OCTOBER 2012 202-466-6706 www.tripnet.org Founded in 1971, TRIP, of Washington, DC is a nonprofit organization

More information

POTHOLES IN EDMONTON. Updated: April 4, 2013

POTHOLES IN EDMONTON. Updated: April 4, 2013 Updated: April 4, 2013 Abstract Every year the City of Edmonton spends a few million dollars to fill a few hundred thousand potholes. Are potholes just a fact of life, or can we do something about them?

More information

TOWN OF SHUTESBURY PAVEMENT MANAGEMENT STUDY SCENARIO 2

TOWN OF SHUTESBURY PAVEMENT MANAGEMENT STUDY SCENARIO 2 TOWN OF SHUTESBURY PAVEMENT MANAGEMENT STUDY SCENARIO 2 FRANKLIN REGIONAL COUNCIL OF GOVERNMENTS 425 Main Street, Greenfield, MA 01301 413-774-3167 June 2004 TOWN OF SHUTESBURY PAVEMENT MANAGEMENT STUDY

More information

FUTURE MOBILITY IN RHODE ISLAND:

FUTURE MOBILITY IN RHODE ISLAND: FUTURE MOBILITY IN RHODE ISLAND: Meeting the State s Need for Safe and Efficient Mobility October 2010 Prepared by: TRIP 1726 M Street, NW, Suite 401 Washington, D.C. 20036 202-466-6706 (voice) 202-785-4722

More information

DEVELOPMENT OF A PAVEMENT REHABILITATION STRATEGY FOR NATIONAL ROADS IN QUEENSLAND

DEVELOPMENT OF A PAVEMENT REHABILITATION STRATEGY FOR NATIONAL ROADS IN QUEENSLAND DEVELOPMENT OF A PAVEMENT REHABILITATION STRATEGY FOR NATIONAL ROADS IN QUEENSLAND Presenter: Tyrone Toole, ARRB Group Scope Background Objectives Road network data and analysis Current and potential investment

More information

SUMMARY OF TRANSPORTATION INVESTMENTS

SUMMARY OF TRANSPORTATION INVESTMENTS Santa Cruz County 2016 Measure D: Transportation Improvement Expenditure Plan - Approved by over 2/3 of Santa Cruz County voters on November 8, 2016 - Overview Measure D, the 2016 Transportation Improvement

More information

IMPLEMENTATION STRATEGIES

IMPLEMENTATION STRATEGIES GEORGETOWN SIDEWALK MASTER PLAN 34% of funding is dedicated to Downtown Overlay District sidewalks 28% of funding is recommended within 1/4 mile of Southwestern University 26% of funding is recommended

More information

Incorporating Sidewalks into Transportation Asset Management. Presentation by Alan S. Kercher, P.E. Kercher Engineering, Inc.

Incorporating Sidewalks into Transportation Asset Management. Presentation by Alan S. Kercher, P.E. Kercher Engineering, Inc. Incorporating Sidewalks into Transportation Asset Management Presentation by Alan S. Kercher, P.E. Kercher Engineering, Inc. Integrated Management of Infrastructure Example: Urban Environment Pavements

More information

SECTION 5: PEER CITY REVIEW

SECTION 5: PEER CITY REVIEW SECTION 5: PEER CITY REVIEW 5.1 Introduction It is evident that the City of Lincoln continually strives to improve its operations and practices. To that end, a list of peer cities was developed to compare

More information

APPENDIX C. Systems Performance Report C-1

APPENDIX C. Systems Performance Report C-1 APPENDIX C Systems Performance Report C-1 System Performance Report & Requirements According to the FAST Act, a long range transportation plan needs to include a system performance report and subsequent

More information

Chapter 4: Funding and Implementation

Chapter 4: Funding and Implementation Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,

More information

Asphalt Recycling and Pavement Preservation in Hillsborough County, Florida

Asphalt Recycling and Pavement Preservation in Hillsborough County, Florida Asphalt Recycling and Pavement Preservation in Hillsborough County, Florida Roger Cox, P.E. Manager coxw@hillsboroughcounty.org 813.272.5912 Public Works Department Systems Planning Discussion Points Hillsborough

More information

FLORIDA DEPARTMENT OF TRANSPORTATION

FLORIDA DEPARTMENT OF TRANSPORTATION FLORIDA DEPARTMENT OF TRANSPORTATION FLEXIBLE PAVEMENT CONDITION SURVEY HANDBOOK March 2012 STATE MATERIALS OFFICE Table of Contents Title Page List of Tables... i List of Figures... ii Executive Summary...

More information

VDOT s Pavement Management Program. Presented by: Tanveer Chowdhury Maintenance Division, VDOT March 05, 2010

VDOT s Pavement Management Program. Presented by: Tanveer Chowdhury Maintenance Division, VDOT March 05, 2010 VDOT s Pavement Management Program Presented by: Tanveer Chowdhury Maintenance Division, VDOT March 05, 2010 Outline Pavement Management network and project level Pavement Data Collection and QA/QC Data

More information

Request for Authorization to Open Public Comment Period

Request for Authorization to Open Public Comment Period Request for Authorization to Open Public Comment Period May 12, 2015 LRP, TIPs, and Conformity Reasons for Requested Action: LRP and TIP Amendment to Connections 2040 LRP, and Draft FY 2016 TIP for New

More information

Gerald P. Oliveto, P.E. George Franz NJDOT

Gerald P. Oliveto, P.E. George Franz NJDOT Gerald P. Oliveto, P.E. George Franz NJDOT Bridge preservation is defined as actions or strategies that prevent, delay or reduce deterioration of bridges or bridge elements, restore the function of existing

More information

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input WELCOME Purpose of the Open House The Town of Smiths Falls has initiated the Beckwith Street Redevelopment Plan that includes the preparation of a streetscape functional design for the renewal of Beckwith

More information

Findings. TSTC went line-by-line through the STIP and categorized projects into 15 categories:

Findings. TSTC went line-by-line through the STIP and categorized projects into 15 categories: Tracking the Dollars 2012-2015: A Review of Planned Transportation Investments in Connecticut and what it says about Connecticut s transportation priorities The Connecticut Department of Transportation

More information

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return Summary: Local return is an important revenue source for cities to maintain their local transportation infrastructure. Most cities use their local return to operate small bus systems and repave streets,

More information

Transportation in Washoe County. Lee Gibson, Executive Director February 15, 2011

Transportation in Washoe County. Lee Gibson, Executive Director February 15, 2011 Transportation in Washoe County Lee Gibson, Executive Director February 15, 2011 RTC OF WASHOE COUNTY Metropolitan Planning Organization Meet long term needs Deliver federal funding Program projects in

More information

2017 Pavement Management Services Pavement Condition Report Salt Lake City, UT

2017 Pavement Management Services Pavement Condition Report Salt Lake City, UT 2017 Pavement Management Services Pavement Condition Report Salt Lake City, UT Prepared by: Data Transfer Solutions, LLC 3680 Avalon Park East Blvd., Suite 200 Orlando, FL 32828 www.dtsgis.com Table of

More information

APPENDIX I-A Kings County Regional Transportation Plan. Appendix A Page A-1 STATE ROUTES

APPENDIX I-A Kings County Regional Transportation Plan. Appendix A Page A-1 STATE ROUTES APPENDIX I-A STATE ROUTES Interstate 5 SR 33 SR 41 SR 43 SR 137 SR 198 SR 269 (See under City of Avenal) (See Figure 4-2 and 4-3 for Rural and Urban Functional Classifications) Appendix A Page A-1 INTERSTATE

More information

Secondary Road Program

Secondary Road Program Secondary Road Program Joint Legislative Transportation Oversight Committee October 5, 2012 1 Secondary Roads Program The Big Picture The Secondary Road System Needs and Project Types Paved and Unpaved

More information

Bicycle Master Plan Goals, Strategies, and Policies

Bicycle Master Plan Goals, Strategies, and Policies Bicycle Master Plan Goals, Strategies, and Policies Mobilizing 5 This chapter outlines the overarching goals, action statements, and action items Long Beach will take in order to achieve its vision of

More information

PEDESTRIAN ACTION PLAN

PEDESTRIAN ACTION PLAN ATTACHMENT 2 CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN This page intentionally left blank EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY Setting the Stage

More information

Use of Performance Metrics on The Pennsylvania Turnpike. Pamela Hatalowich, Penn Turnpike Commission Paul Wilke, Applied Research Associates, Inc.

Use of Performance Metrics on The Pennsylvania Turnpike. Pamela Hatalowich, Penn Turnpike Commission Paul Wilke, Applied Research Associates, Inc. Use of Performance Metrics on The Pennsylvania Turnpike Pamela Hatalowich, Penn Turnpike Commission Paul Wilke, Applied Research Associates, Inc. Presentation Outline Background- Turnpike Construction

More information

FUNDING SOURCES CHAPTER 6

FUNDING SOURCES CHAPTER 6 CHAPTER 6 6.1 BICYCLE 6.1.1 Local 6.1.2 Regional 6.1.3 State 6.1.4 Federal 6.1.5 Public Facilities 6.1.6 Bicycle Registration and Licensing Fees 6.1.7 Summary Table 6.1 of Bicycle Funding Sources 6 2 6.2

More information

Lake Waterford Community Association Meeting. November 15, 2016

Lake Waterford Community Association Meeting. November 15, 2016 Lake Waterford Community Association Meeting November 15, 2016 Introduction Staff Introduction Project Overviews - Completed Projects - Pavement Management Program - Pasadena Road Sidewalk Improvements

More information

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10 Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel

More information

Otter Tail County 2040 Transportation Plan. Asset Management Peer Exchange

Otter Tail County 2040 Transportation Plan. Asset Management Peer Exchange Otter Tail County 2040 Transportation Plan Asset Management Peer Exchange Study Purpose and Goals 1. Leverage existing tools 2. Analyze existing road conditions 3. Comparison of funding versus road conditions

More information

NCHRP Project Synthesis Topic Tack Coat Specifications, Materials, and Construction Practices

NCHRP Project Synthesis Topic Tack Coat Specifications, Materials, and Construction Practices NCHRP Project 20-05 Synthesis Topic 48-02 Tack Coat Specifications, Materials, and Construction Practices Danny Gierhart, P.E. Dave Johnson, P.E. Principal Investigators What Exactly Is a Synthesis? A

More information

Capital Beltway HOT Lanes - Frequently Asked Questions

Capital Beltway HOT Lanes - Frequently Asked Questions Capital Beltway HOT Lanes - Frequently Asked Questions December 20, 2007 1. What is the cost of the project? The fixed-price design-build cost is approximately $1.4 billion. 2. Why have the project costs

More information

Pedestrian Crosswalk Audit

Pedestrian Crosswalk Audit 1200, Scotia Place, Tower 1 10060 Jasper Avenue Edmonton, Alberta T5J 3R8 edmonton.ca/auditor Pedestrian Crosswalk Audit June 19, 2017 The conducted this project in accordance with the International Standards

More information

Safe Routes to School Action Plan Aberdeen, Idaho

Safe Routes to School Action Plan Aberdeen, Idaho Background Aberdeen, Idaho is a largely agricultural community of nearly 2,000 people and is located in the southeast portion of the state on the western edge of American Falls Reservoir. The community

More information

New Mexico Transportation Funding Challenges

New Mexico Transportation Funding Challenges New Mexico Transportation Funding Challenges Rocky Mountain Pavement Preservation Partnership Meeting October 29-31, 2008 Ernest Archuleta, P.E. Field Operations Division Director 1 NMDOT DISTRICT OFFICES

More information

Pavement Evaluation of the Nairobi Eastern By-Pass Road

Pavement Evaluation of the Nairobi Eastern By-Pass Road International Journal of Scientific and Research Publications, Volume 8, Issue 11, November 2018 547 Pavement Evaluation of the Nairobi Eastern By-Pass Road T. M. Nyang au, S. K. Mwea & P.K. Matheri Department

More information

CHAPTER 7.0 IMPLEMENTATION

CHAPTER 7.0 IMPLEMENTATION CHAPTER 7.0 IMPLEMENTATION Achieving the vision of the Better Streets Plan will rely on the ability to effectively fund, build and maintain improvements, and to sustain improvements over time. CHAPTER

More information

land transport road assets

land transport road assets land transport road assets land transport road assets Otago Region Information as at June 2007 land transport road assets 2 Purpose of this publication Land Transport New Zealand annually publishes comparative

More information

Introduction to Full Depth Asphalt Repairs. Setting Work Processes for a Quality Job Start in time to finish prior to Winter!

Introduction to Full Depth Asphalt Repairs. Setting Work Processes for a Quality Job Start in time to finish prior to Winter! Introduction to Full Depth Asphalt Repairs Setting Work Processes for a Quality Job Start in time to finish prior to Winter! Asphalt Pothole and Patching Repairs Smaller Repairs! Where do Potholes come

More information

City of Coquitlam. Pavement Management Technology. Profile/GPS/Videolog Vehicle. Pavement Management System. SUBSURFACE PROFILING - Road Radar

City of Coquitlam. Pavement Management Technology. Profile/GPS/Videolog Vehicle. Pavement Management System. SUBSURFACE PROFILING - Road Radar City of Coquitlam System Road Condition Analysis Parameters % Cracking Structural (Deflection) Rideability (Roughness) Rutting Traffic Volumes % Trucks Different Policy Models Min Cost - based on a minimum

More information

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE PAVED SHOULDERS ON PRIMARY HIGHWAYS IN IOWA: AN ANALYSIS OF SHOULDER SURFACING CRITERIA, COSTS, AND BENEFITS EXECUTIVE SUMMARY Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation

More information

GOVERNMENT OF SASKATCHEWAN SUBMISSION TO THE RAILWAY SAFETY ACT REVIEW PANEL

GOVERNMENT OF SASKATCHEWAN SUBMISSION TO THE RAILWAY SAFETY ACT REVIEW PANEL GOVERNMENT OF SASKATCHEWAN SUBMISSION TO THE RAILWAY SAFETY ACT REVIEW PANEL Saskatchewan Highways & Transportation May 29, 2007 I Introduction Government of Saskatchewan Submission To the Railway Safety

More information

Environment and Public Works Committee Presentation

Environment and Public Works Committee Presentation Mixed Use Centers Complete Streets Guidelines Project Environment and Public Works Committee Presentation December 10, 2008 Project Objectives: Conduct an inter-departmental and agency process to study

More information

land transport road assets

land transport road assets land transport road assets land transport road assets Westland District West Coast Region Information as at June 2006 land transport road assets 2 Purpose of this publication Land Transport New Zealand

More information

Basalt Creek Transportation Refinement Plan Recommendations

Basalt Creek Transportation Refinement Plan Recommendations Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for

More information

2016 FACT SHEET ENGINEERING STREET OPERATIONS. Engineering Street Operations net 2016 budget is $5,199,900 WHAT IS ENGINEERING STREET OPERATIONS?

2016 FACT SHEET ENGINEERING STREET OPERATIONS. Engineering Street Operations net 2016 budget is $5,199,900 WHAT IS ENGINEERING STREET OPERATIONS? WHAT IS STREET OPERATIONS? This section maintains approximately 570 km of major, collector and residential roads throughout Saanich. Some of the major programs include road surface treatments (pothole

More information

Improving Mobility Without Building More Lanes

Improving Mobility Without Building More Lanes Improving Mobility Without Building More Lanes By Mike Salisbury and Will Toor July 2017 Copyright 2017 by Southwest Energy Efficiency Project. All rights reserved. Photo: Courtesy of the Denver Post Anyone

More information

Southeaster Pavement Preservation Partnership 2010 Update Welcome to Tennessee. Michael J. Doran, P.E. Maintenance Division

Southeaster Pavement Preservation Partnership 2010 Update Welcome to Tennessee. Michael J. Doran, P.E. Maintenance Division Southeaster Pavement Preservation Partnership 2010 Update Welcome to Tennessee Michael J. Doran, P.E. Maintenance Division Why are we here today? The Solution Background Information Geographic Locations

More information

The Region s Most Expensive Commutes:

The Region s Most Expensive Commutes: The Region s Most Expensive Commutes: Congested Corridors in the Lehigh Valley-Reading Area and Steps Needed to Relieve Traffic Congestion June 2013 Washington, DC Phone: (202) 466-6706 www.tripnet.org

More information

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 Prepared by Planning and Research Division Arkansas State

More information

STATE TRANSPORTATION COMMISSION HEARING

STATE TRANSPORTATION COMMISSION HEARING STATE TRANSPORTATION COMMISSION HEARING Twelve Year Program Update Tom Zilla: Centre County MPO Jim Saylor: SEDA-COG RPO Amy Kessler: North Central RPO PennDOT District 2-0 State College, PA October 8,

More information

Bicycle and Pedestrian Plans and Improvements

Bicycle and Pedestrian Plans and Improvements Bicycle and Pedestrian Plans and Improvements Presented to the City Council By Randle Harwood, Planning and Development, and Richard Zavala, Parks and Community Services September 24, 2013 Purpose Review

More information

SIDEWALK ASSESSMENT PHASE TWO

SIDEWALK ASSESSMENT PHASE TWO 2013 SIDEWALK ASSESSMENT PHASE TWO Table of Contents Lake of the Ozarks Council of Local Governments Sidewalk Assessment Phase TWO Criteria... 1 Communities Included In Sidewalk Assessment Phase TWO...

More information

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program Attachment One Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program Introduction Begun as part of the Moving Ahead for Progress in the

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

TEXAS DEPARTMENT OF TRANSPORTATION. Condition of Texas Pavements

TEXAS DEPARTMENT OF TRANSPORTATION. Condition of Texas Pavements TEXAS DEPARTMENT OF TRANSPORTATION Condition of Texas Pavements PMIS Annual Report FY 2007-2010 Condition of Texas Pavements Pavement Management Information System (PMIS) Annual Report FY 2007-2010 Prepared

More information

Rigby / Jefferson County Transportation Plan

Rigby / Jefferson County Transportation Plan Rigby / Jefferson County Transportation Plan 105085/07-863 Chapter 1 - Introduction... 1 Chapter 2 - Rigby / Jefferson County Highway System... 5 Chapter 3 Condition of the Existing Roadway System...

More information

Tour de Chip Seal. Tour de Chip Seal Follow- up Report and Conclusions May 16, 2013

Tour de Chip Seal. Tour de Chip Seal Follow- up Report and Conclusions May 16, 2013 Tour de Chip Seal Follow- up Report and Conclusions May 16, 2013 Old Jackson Highway, Victor Idaho Tour de Chip Seal Teton County Idaho and Teton County Wyoming May 16, 2013 1. Old Jackson Highway, North

More information

Fairfax County Transportation Funding and Roadway Service Delivery Study. Study Update Transportation Advisory Commission

Fairfax County Transportation Funding and Roadway Service Delivery Study. Study Update Transportation Advisory Commission Fairfax County Transportation Funding and Roadway Service Delivery Study Study Update Transportation Advisory Commission May 4, 2010 Past Studies Aug. 1965 The Financial Effects of the Incorporation of

More information

Pavement Preservation Best Practices. Mike Bryant, South Central U.S. Territory Sales Manager

Pavement Preservation Best Practices. Mike Bryant, South Central U.S. Territory Sales Manager Pavement Preservation Best Practices Mike Bryant, South Central U.S. Territory Sales Manager Crafco Is The World s Largest Producer Of Crack Sealing Material & Equipment At Crafco, we are passionate about

More information

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting

More information

Project Update May 2018

Project Update May 2018 Project Update May 2018 Dakota County, in cooperation with the City of Lakeville, is planning to reconstruct 202 nd Street West (County Road 50) from Holyoke Avenue to Cedar Avenue (County Road 23). 202

More information

TRANSPORTATION TRAINING TOPICS. April 6, 2010

TRANSPORTATION TRAINING TOPICS. April 6, 2010 TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA

More information

Typical Rush Hour Commute. PennyforTransportation.com

Typical Rush Hour Commute. PennyforTransportation.com Typical Rush Hour Commute In the News Overview of the Plan Collaborative plan with projects in every community Prioritizing connectivity and congestion relief Dedicated transportation-specific funding;

More information

County of Spartanburg South Carolina

County of Spartanburg South Carolina County of Spartanburg South Carolina Traffic Calming Program June 2012 (Revised/Program on Hold) PURPOSE The potential negative impacts from vehicular traffic on residential roads have been a longstanding

More information

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

CITY OF BLOOMINGTON COMPLETE STREETS POLICY CITY OF BLOOMINGTON COMPLETE STREETS POLICY POLICY OBJECTIVE: The City of Bloomington will enhance safety, mobility, accessibility and convenience for transportation network users of all ages and abilities,

More information

Looking Ahead and Looking Back: An Examination of NJDOT s and NJT s 2014 Capital Program

Looking Ahead and Looking Back: An Examination of NJDOT s and NJT s 2014 Capital Program Looking Ahead and Looking Back: An Examination of NJDOT s and NJT s 2014 Capital Program The New Jersey Department of Transportation s (NJDOT) and New Jersey TRANSIT s (NJT) Transportation Capital Program

More information

MOBILITY RESULTS AREA. Budgeting For Outcomes Council Presentation January 12, 2007

MOBILITY RESULTS AREA. Budgeting For Outcomes Council Presentation January 12, 2007 MOBILITY RESULTS AREA Budgeting For Outcomes Council Presentation January 12, 2007 Mobility Results Team Members 2 Hammond Perot, OED, Co-Team Leader Bonnie Meeder, DEV (returning), Co-Team Leader Peer

More information

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Complia Report Reporting Fiscal Year 20162017 AGENCY CONTACT INFORMATION Agency Name: City of Piedmont Date: 12/4/2017 Primary Point of Contact Name: Chester Nakahara

More information

I-105 Corridor Sustainability Study (CSS)

I-105 Corridor Sustainability Study (CSS) I-105 Corridor Sustainability Study (CSS) Metro Streets and Freeways Subcommittee March 21, 2019 Gary Hamrick Cambridge Systematics, Inc. I-105 CSS Project History & Background Funded by Caltrans Sustainable

More information

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE NASHVILLE, TENNESSEE EXECUTIVE SUMMARY Executive Summary A world-class multi-modal transportation system is essential to a vibrant city and better quality of life. -Mayor Barry The WalknBike plan aims

More information

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX ADOT Statewide Bicycle and Pedestrian Program Summary of Activities APPENDIX B PEDESTRIAN DEMAND INDEX May 24, 2009 Pedestrian Demand Index for State Highway Facilities Revised: May 29, 2007 Introduction

More information

Building Great Neighbourhoods BONNIE DOON

Building Great Neighbourhoods BONNIE DOON Building Great Neighbourhoods BONNIE DOON We Are Here Today To Explain the Neighbourhood Renewal Process Show you the Westwood Preliminary Design Ask for local knowledge Highlight the Local Improvement

More information