City of Coquitlam. Pavement Management Technology. Profile/GPS/Videolog Vehicle. Pavement Management System. SUBSURFACE PROFILING - Road Radar

Size: px
Start display at page:

Download "City of Coquitlam. Pavement Management Technology. Profile/GPS/Videolog Vehicle. Pavement Management System. SUBSURFACE PROFILING - Road Radar"

Transcription

1 City of Coquitlam System Road Condition Analysis Parameters % Cracking Structural (Deflection) Rideability (Roughness) Rutting Traffic Volumes % Trucks Different Policy Models Min Cost - based on a minimum performance criteria; This method ignores user costs Minimize Total Transportation Cost (TTC) (Road User Cost Savings) (Project Life Cycle Cost); this maximizes the return on investment to the traveling public Worst First - it assumes sufficient funds are available to reactively rehabilitate roads once they have become in obviously poor condition. Technology A Pavement Inventory Measuring Pavement Condition Location Referencing, Analysis tools Predicting the Future A framework to identify needs Set priorities for Pavement Treatment Profile/GPS/Videolog Vehicle Profile/Rutting/Cracking - Condition data SUBSURFACE PROFILING - Road Radar

2 63% 13% 14% 4% 6% 23% 45% 22% 3% 7% DYNAMIC STRENGTH Dynatest Model 8E Falling Weight Deflectometers Community Corridor Roads (included in this assessment) Pavement Condition Data Network Pavement Condition 1992 vs To Predict PCN - $Existing Program PCN in 3 = 78 Condition Distribution PCN 92 (ave. = 85) PCN 98 (ave. = 82) % -85 % % 79-14% 39- % 59-4% 69-6% % 79-19% 39-1% 59-5% 69-7% V. Poor Poor Fair Good Excellent PCN 92 (ave.= 85) PCN (ave.= 81) PCN (ave.= 81) PCN 92 (ave.= 85)

3 31% 8% 9% MUNDY ST MARINER WAY L JOHNSON ST 1 L NELSON ST OZADA AV 31% 8% 9% 2 Network Condition = 79 fair PCN 2 (ave.= 79) 2 Network Condition = 79 PCN 2 (ave.= 79) PCN 2 (ave.= 79) PCN 2 (ave.= 79) V. Poor Poor Fair Good Excellent V. Poor Poor Fair Good Excellent 2 PCI = 79 Cracking = 12% $25/m 2 Mill, Deep Patch and Inlay Blue Mountain Street Preventative Maintenance Crack Seal In 1992 PCI = 85 Cracking = 1% $2/m 2 In 1998 PCI = 82 Cracking = 5% $12/m 2 Replace surface 7 PCI = 72 Cracking = % $45/m 2 Loss of Strength begins Mill and Inlay CHAPMAN AV CLARKE RD L SMITH AV FALCON DRV AUSTIN AV R LINTON ST ROBINSON ST Crack % BLUE MOUNTAIN S EDGAR AV ALDERSON AV PORTER STR MARMONT ST BRUNETTE AV COMO LAKE AV R FOSTER AVENUE WINSLOW AV LOUGHEED 1 L AUSTIN AV RAUSTIN AV L DAVID AV 2 THERMAL DR PANORAMA DR LANSDOWNE DR BARNET HW Y L COMO LAKE AV L HICKEY DR DURANT DR PARKWAY BLVD GUILDFORD WAY L DEWDNEY TRUNK CHILKO DR INLET ST DELAHAYE DR VICTORIA-N.HALF SPURAWAY AV DAVID AV 1 DUNKIRK AV LOUGHEED 2 L PIPELINE RD 2 GLEN DR POIRIER ST WESTWOOD ST R ROBSON DR INLET ST HILLCREST ST SEGUIN DR SHAUGHNESSY ST COAST MERIDIAN VICTORIA-N.HALF VICTORIA DR AADT Traffic Volumes GLEN DR UNITED BLVD 1 R UNITED BLVD 3 R

4 2 Network Condition Neighborhood Road Program (not included in this assessment) Arterial & Collector Road Restoration Collector Roads 132 lane km Arterial Roads 211 lane km In 1998 Coquitlam used the dtims life-cycle cost and budget planning tools Specialized database tools provide location referencing

5 Asset Management of Municipal Infrastructure Emergency Maintenance Treatment Emergency situation (shoulder washout, repair a severe pothole) Holding Maintenance Treatment Temporary (delay of more permanent or substantial rehab due to lack of funds) Rehab. Treatment restore initial pavement serviceability (overlay, recycle) Bridges Pavements System Pavement Condition & Inventory Modified to accommodate a timely identification of preventive maintenance treatments (if required) Other Assets Pavement Preservation Treatments Corrective Maintenance Treatment Encompass all types of For safety maintenance & rehab. treatments ( filling potholes, etc) Preventive Maintenance Treatment (Routing & Sealing Thin O/L) Reconstruction Preventive Maintenance Performance Prediction Identification of Candidate Treatments Other Maintenance Rehabilitation/ Reconstruction Priorization of Treatments Monitoring and Assessment Without Preventive Maintenance With Preventive Maintenance Assume: 1Km long section, Costs are : sealing $1, resealing $1, Rehabilitation (resurfacing) $,

Pavement Management Program

Pavement Management Program Pavement Management Program Public Works Department January 5, 2016 Chad Butzow, P.E. Deputy Director Field Operation Services Public Works Department Brian Martineau Pavement Manager Public Works Department

More information

The City of Port Moody 2013 Paved Road Network Condition Assessment

The City of Port Moody 2013 Paved Road Network Condition Assessment The City of Port Moody 2013 Paved Road Network Condition Assessment February 2014 Contents Objectives Data Collection Road Network Present Conditions in 2013 Road Network Assessment and Comparison to other

More information

DEVELOPMENT OF A PAVEMENT REHABILITATION STRATEGY FOR NATIONAL ROADS IN QUEENSLAND

DEVELOPMENT OF A PAVEMENT REHABILITATION STRATEGY FOR NATIONAL ROADS IN QUEENSLAND DEVELOPMENT OF A PAVEMENT REHABILITATION STRATEGY FOR NATIONAL ROADS IN QUEENSLAND Presenter: Tyrone Toole, ARRB Group Scope Background Objectives Road network data and analysis Current and potential investment

More information

AQUATIC SERVICES & INFRASTRUCTURE STRATEGY ( )

AQUATIC SERVICES & INFRASTRUCTURE STRATEGY ( ) AQUATIC SERVICES & INFRASTRUCTURE STRATEGY (2015 2040) CONTENTS Introduction 3 Background 3 Executive Summary 5 Framework for Planning Aquatic Services 7 Existing Aquatic Infrastructure and Use 11 Goals

More information

Bus Timetable. Coquitlam Port Coquitlam Port Moody Pitt Meadows Maple Ridge West Coast Express. Compass is your Key. Load. Tap. Ride.

Bus Timetable. Coquitlam Port Coquitlam Port Moody Pitt Meadows Maple Ridge West Coast Express. Compass is your Key. Load. Tap. Ride. Compass Cards and Fare Information Compass Cards can be loaded with the fare product of your choice, or you can add Stored Value (replaces FareSavers, and is perfect for single trip use and pay-as you-go

More information

City of Davis Pavement Management Program

City of Davis Pavement Management Program City of Davis Pavement Management Program Davis Street and Bike Path System 163 centerline miles of streets (33 million square feet) 34.6 miles of arterials 21% 22.8 miles of collectors 14% 103.9 miles

More information

Smoothing Out the Bumpy Road Ahead

Smoothing Out the Bumpy Road Ahead Julie Hannah, P.E. Technical Services and Asset Management May 11, 2017 Smoothing Out the Bumpy Road Ahead Nationwide D = Poor, At Risk Conditions & Capacity Pavement Condition & Congestion Nationwide

More information

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM City of West Des Moines PAVEMENT MANAGEMENT SYSTEM 12/11/2018 Municipal Street Seminar (11-14-2018) JEFF NASH 1 City Background Information: - West Des Moines current census Population is around 66,000

More information

Paving for Progress Municipal Streets Seminar

Paving for Progress Municipal Streets Seminar Paving for Progress Municipal Streets Seminar November 15, 2017 Doug Wilson, PE City of Cedar Rapids Paving for Progress Program Manager State and National Rankings $10,996,122 Prior Funding: General Obligation

More information

Date: February 18, 2015 Page: 1 of 5. ICBC invests $391,000 to improve Tri-Cities roads

Date: February 18, 2015 Page: 1 of 5. ICBC invests $391,000 to improve Tri-Cities roads News release Date: February 18, 2015 Page: 1 of 5 Media contacts: Lindsay Olsen, 604-982-4759 ICBC invests $391,000 to improve Tri-Cities roads You may have noticed the new sidewalks, pedestrian signals

More information

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015 Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT February 12, 2015 What is Pavement Management? At a Network Level: Pavement management refers to a systematic

More information

Streets Presentation. Public Works Department. Jill Mercurio, P.E. City Engineer November 19, 2013

Streets Presentation. Public Works Department. Jill Mercurio, P.E. City Engineer November 19, 2013 Streets Presentation Public Works Department Jill Mercurio, P.E. City Engineer November 19, 2013 Street Repairs A Guide to Potholes & Pavement Failure Pavement Condition Index (PCI) Different Types of

More information

Alta Planning + Design

Alta Planning + Design Alta Planning + Design Gavin Davidson, MCIP, RPP Principal, Senior Planner Vancouver Kate Whitfield, P.Eng., MCIP, RPP Senior Associate Engineer/Planner Ottawa Ottawa, Ontario, Canada Ottawa Toronto Syracuse

More information

land transport road assets

land transport road assets land transport road assets land transport road assets Otago Region Information as at June 2007 land transport road assets 2 Purpose of this publication Land Transport New Zealand annually publishes comparative

More information

Keeping good roads good

Keeping good roads good Pavement Preservation (PP) in the State of California- Protecting Their Road and Street Investment R. Gary Hicks PhD, PE CP2 Center, Chico CA Prepared for the 3 rd International Pavement Maintenance Technology

More information

land transport road assets

land transport road assets land transport road assets land transport road assets Westland District West Coast Region Information as at June 2006 land transport road assets 2 Purpose of this publication Land Transport New Zealand

More information

Utah Department of Transportation Division of Asset Management taking care of what we have

Utah Department of Transportation Division of Asset Management taking care of what we have Utah Department of Transportation Division of Asset Management taking care of what we have Utah Department of Transportation State of Utah Update Rocky Mountain Pavement Preservation Partnership October

More information

Asphalt Recycling and Pavement Preservation in Hillsborough County, Florida

Asphalt Recycling and Pavement Preservation in Hillsborough County, Florida Asphalt Recycling and Pavement Preservation in Hillsborough County, Florida Roger Cox, P.E. Manager coxw@hillsboroughcounty.org 813.272.5912 Public Works Department Systems Planning Discussion Points Hillsborough

More information

Executive Summary. Introduction

Executive Summary. Introduction Executive Summary Introduction The future of our local economy is uncertain, but one thing we know we must manage our infrastructure smarter. State and local agencies are facing challenging times. There

More information

POTHOLES IN EDMONTON. Updated: April 4, 2013

POTHOLES IN EDMONTON. Updated: April 4, 2013 Updated: April 4, 2013 Abstract Every year the City of Edmonton spends a few million dollars to fill a few hundred thousand potholes. Are potholes just a fact of life, or can we do something about them?

More information

I-90 Corridor Performance Corridor Result

I-90 Corridor Performance Corridor Result I-90 Corridor Performance Corridor Result Statewide Result 87.1% 86.9% 0% 3.2% Ride Quality Good--% of miles 65.4% 70.2% Ride Quality Poor--% of miles 0% 3.7% 73 MPH N/A Measure Corridor Context The corridor

More information

Guidelines for Integrating Safety and Cost-Effectiveness into Resurfacing, Restoration, and Rehabilitation Projects

Guidelines for Integrating Safety and Cost-Effectiveness into Resurfacing, Restoration, and Rehabilitation Projects Guidelines for Integrating Safety and Cost-Effectiveness into Resurfacing, Restoration, and Rehabilitation Projects NCHRP Project 15-50 July 2017 1 Research Objective Develop guidelines for safe and cost-effective

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.

More information

Why We do Preventive Maintenance

Why We do Preventive Maintenance Why We do Preventive Maintenance James S. Moulthrop, P.E. Executive Director FP 2 Inc. North Dakota Asphalt Conference March 28-29, 2017 Bismarck, ND Presentation Outline What is FP 2 Inc.? Mission Preventive

More information

Township of Springwater

Township of Springwater Township of Springwater Approved: November 2008 Effective: Date of Passing Next Review: TBD Department: Public Works Subject: Sidewalks Policy Number: A09 SI A. Authority This policy shall be approved

More information

Lake Waterford Community Association Meeting. November 15, 2016

Lake Waterford Community Association Meeting. November 15, 2016 Lake Waterford Community Association Meeting November 15, 2016 Introduction Staff Introduction Project Overviews - Completed Projects - Pavement Management Program - Pasadena Road Sidewalk Improvements

More information

Incorporating Sidewalks into Transportation Asset Management. Presentation by Alan S. Kercher, P.E. Kercher Engineering, Inc.

Incorporating Sidewalks into Transportation Asset Management. Presentation by Alan S. Kercher, P.E. Kercher Engineering, Inc. Incorporating Sidewalks into Transportation Asset Management Presentation by Alan S. Kercher, P.E. Kercher Engineering, Inc. Integrated Management of Infrastructure Example: Urban Environment Pavements

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

2018 ROAD MAINTENANCE PROGRAM

2018 ROAD MAINTENANCE PROGRAM 2018 ROAD MAINTENANCE PROGRAM John Tiger Anastasi Town of Bethlehem Superintendent of Highways June 27, 2018 AGENDA Why do we maintain our roads? How is the Road Maintenance Plan developed? The process

More information

Pavement Management Report. City Council Meeting of May 21, 2013

Pavement Management Report. City Council Meeting of May 21, 2013 Pavement Management Report City Council Meeting of May 21, 2013 Previous Meetings Summary In February, we presented the 2012 pavement survey and our consultant presented general pavement management strategies

More information

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force 1 Tacoma Streets 101 2 Streets Maintenance Overview Type and amount of streets Condition and types of construction Maintenance and repair methods and costs Sample Project Philosophy/Selection Criteria

More information

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000

More information

City of Lakewood. Public Works Transportation. Transportation Division Current and Future Projects Division Manager: Weston Ott, P.E.

City of Lakewood. Public Works Transportation. Transportation Division Current and Future Projects Division Manager: Weston Ott, P.E. City of Lakewood Public Works Transportation Transportation Division Current and Future Projects Division Manager: Weston Ott, P.E. June 15, 2017 Transportation Photos S. Tacoma Way: looking north between

More information

C ITY OF B EDFORD H EIGHTS

C ITY OF B EDFORD H EIGHTS C ITY OF B EDFORD H EIGHTS T ABLE OF C ONTENTS 1. Executive Summary... 2 2. Background... 3 3. PART I: 2016 Pavement Condition... 8 4. PART II: 2018 Current Backlog... 13 5. PART III: Maintenance &

More information

Living Streets Policy

Living Streets Policy Living Streets Policy Introduction Living streets balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, enhance community identity, create

More information

Overview Background and Current Issues ARRA Key 2009 Accomplishments Going Forward

Overview Background and Current Issues ARRA Key 2009 Accomplishments Going Forward Maryland State Report: Pavement Preservation Activities 2009 November 3, 2009 Overview Background and Current Issues ARRA Key 2009 Accomplishments Going Forward Beginning of 2009 Essentially no preservation

More information

REAL WORLD PAVEMENT PRESERVATION SOLUTIONS

REAL WORLD PAVEMENT PRESERVATION SOLUTIONS Cycle INTRODUCTION Page 1 Cycle Page 2 INTRODUCTION Introduction Do the Right Thing... Definitions Preventive Maintenance vs. Reactive Maintenance Cycle Page 3 INTRODUCTION Do the Right Thing The right

More information

Driving Indiana s Economic Growth

Driving Indiana s Economic Growth Driving Indiana s Economic Growth IRI/PCR/RUT Field Verification Kumar P. Dave Manager, Road & Pavement Asset Management & Programming, INDOT 03-06-2012 Organization Chart Pavement Division, INDOT David

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco Capital Needs In 2006, the Mayor and Board of Supervisors approved San

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

HIR on Oklahoma Turnpikes

HIR on Oklahoma Turnpikes HIR on Oklahoma Turnpikes Tammy Robinson, P.E., Division Engineer EST, Inc. Stephen A. Cross, PhD, PE Professor, Oklahoma State Executive Director Pavement Recycling & Reclaiming Center HIR on Oklahoma

More information

LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54)

LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54) LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54) INTRODUCTIONS * Pipeline 1041 Application Coordinator Todd Blomstrom Public Works Director Mark Peterson County Engineer Terry Gilbert Community Development

More information

Non-State Federal Aid Highways. Pavement Condition Ratings. H e r k i m e r a n d O n e i d a C o u n t i e s

Non-State Federal Aid Highways. Pavement Condition Ratings. H e r k i m e r a n d O n e i d a C o u n t i e s Non-State Federal Aid Highways Pavement Condition Ratings 2010 H e r k i m e r a n d O n e i d a C o u n t i e s 2010 PAVEMENT CONDITION RATINGS for the Non-State Federal Aid Highway System in Herkimer

More information

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails Chapter 7 Transportation Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails 7.1 TRANSPORTATION BACKGROUND The District of Maple Ridge faces a number of unique

More information

MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017

MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017 MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017 RECOMMENDED ACTION: Update on the NDDOT US Business 2 Project Programmed for 2019 Matter of the NDDOT US Business

More information

Building Great Neighbourhoods BONNIE DOON

Building Great Neighbourhoods BONNIE DOON Building Great Neighbourhoods BONNIE DOON We Are Here Today To Explain the Neighbourhood Renewal Process Show you the Westwood Preliminary Design Ask for local knowledge Highlight the Local Improvement

More information

New Mexico Transportation Funding Challenges

New Mexico Transportation Funding Challenges New Mexico Transportation Funding Challenges Rocky Mountain Pavement Preservation Partnership Meeting October 29-31, 2008 Ernest Archuleta, P.E. Field Operations Division Director 1 NMDOT DISTRICT OFFICES

More information

VDOT s Pavement Management Program. Presented by: Tanveer Chowdhury Maintenance Division, VDOT March 05, 2010

VDOT s Pavement Management Program. Presented by: Tanveer Chowdhury Maintenance Division, VDOT March 05, 2010 VDOT s Pavement Management Program Presented by: Tanveer Chowdhury Maintenance Division, VDOT March 05, 2010 Outline Pavement Management network and project level Pavement Data Collection and QA/QC Data

More information

Secondary Road Program

Secondary Road Program Secondary Road Program Joint Legislative Transportation Oversight Committee October 5, 2012 1 Secondary Roads Program The Big Picture The Secondary Road System Needs and Project Types Paved and Unpaved

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie

More information

Available online at ScienceDirect. Transportation Research Procedia 14 (2016 )

Available online at   ScienceDirect. Transportation Research Procedia 14 (2016 ) Available online at www.sciencedirect.com ScienceDirect Transportation Research Procedia 14 (2016 ) 3021 3030 6th Transport Research Arena April 18-21, 2016 Application of the HDM-4 model on local road

More information

Building Great Neighbourhoods QUEEN ALEXANDRA

Building Great Neighbourhoods QUEEN ALEXANDRA Building Great Neighbourhoods QUEEN ALEXANDRA We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.

More information

Pavement Evaluation of the Nairobi Eastern By-Pass Road

Pavement Evaluation of the Nairobi Eastern By-Pass Road International Journal of Scientific and Research Publications, Volume 8, Issue 11, November 2018 547 Pavement Evaluation of the Nairobi Eastern By-Pass Road T. M. Nyang au, S. K. Mwea & P.K. Matheri Department

More information

Low Traffic Volume LR 159 Low Traffic Preservation

Low Traffic Volume LR 159 Low Traffic Preservation Pavement Preservation Group Study Findings Adriana Vargas, Ph.D. PG Study State DOTs must preserve existing infrastructure with limited resources Preservation treatments can extend life of pavement Insufficient

More information

County Road 2 Long Sault Improvements EA Study Schedule C Municipal Class Environmental Assessment. Environmental Study Report

County Road 2 Long Sault Improvements EA Study Schedule C Municipal Class Environmental Assessment. Environmental Study Report Study Schedule C Municipal Class Environmental Assessment Prepared By: BT Engineering 100 Craig Henry Drive, Suite 201 Ottawa, ON K2G 5W3 (613) 228-4813 (855) 228-4813 Toll free Executive Summary Executive

More information

Project Update May 2018

Project Update May 2018 Project Update May 2018 Dakota County, in cooperation with the City of Lakeville, is planning to reconstruct 202 nd Street West (County Road 50) from Holyoke Avenue to Cedar Avenue (County Road 23). 202

More information

Population Trends. MN 73 Corridor Performance

Population Trends. MN 73 Corridor Performance Context The corridor runs just over 100 miles from outside of Moose Lake to south of Orr. It passes through Sturgeon River Forest. Current Characteristics Highway: MN 2009 AADT: 580 7,000 2009 HCADT: 20

More information

Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota. Transportation Research

Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota. Transportation Research 2007-18 Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota Take the steps... Research...Knowledge...Innovative Solutions! Transportation Research

More information

GDOT Fiscal 2015 Year 2017 GDOT PowerPoint. Title Page

GDOT Fiscal 2015 Year 2017 GDOT PowerPoint. Title Page GDOT Fiscal 2015 Year 2017 GDOT PowerPoint Savannah Post SAME Title Page Annual Programs Review Sub Titles K. Joe Carpenter, Jr., P.E. Body Text Director Division of P3/Program Delivery June 15, 2016 Transportation

More information

Connecting cyclists to work. Syracuse Metropolitan Transportation Council

Connecting cyclists to work. Syracuse Metropolitan Transportation Council Connecting cyclists to work Syracuse Metropolitan Transportation Council Overview Prepared at request: NYS Department of Transportation (NYSDOT) Project Achievements Target group Purpose Process Recommendations

More information

NEVADA DEPARTMENT OF TRANSPORTATION STATE HIGHWAY PRESERVATION REPORT

NEVADA DEPARTMENT OF TRANSPORTATION STATE HIGHWAY PRESERVATION REPORT NEVADA DEPARTMENT OF TRANSPORTATION STATE HIGHWAY PRESERVATION REPORT February 2015 State of Nevada Department of Transportation State Highway Preservation Report Report to the 2015 Legislature As Required

More information

MN 5 Corridor Performance. Current Corridor Characteristics Highway: MN AADT: 2,400 73,000

MN 5 Corridor Performance. Current Corridor Characteristics Highway: MN AADT: 2,400 73,000 Corridor Context The corridor runs from Norwood Young America to the connection with US 212 in Eden Prairie. The corridor serves the communities of Chanhassen, Eden Prairie, Norwood Young America, Victoria,

More information

Kentucky s Surface Transportation System

Kentucky s Surface Transportation System Kentucky s Surface Transportation System ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit

More information

2017 Pavement Management Services Pavement Condition Report Salt Lake City, UT

2017 Pavement Management Services Pavement Condition Report Salt Lake City, UT 2017 Pavement Management Services Pavement Condition Report Salt Lake City, UT Prepared by: Data Transfer Solutions, LLC 3680 Avalon Park East Blvd., Suite 200 Orlando, FL 32828 www.dtsgis.com Table of

More information

Parewanui Road (RP ) 1960 Prog. Mar-18 Prog. May-18

Parewanui Road (RP ) 1960 Prog. Mar-18 Prog. May-18 RDC ROADING REPORT: FEBRUARY 2018 1. MAINTENANCE, OPERATIONS AND RENEWALS This year s resealing programme of 61 km has been completed. Pre-reseal repairs for the 2018/19 year have been programmed. Installing

More information

Road Condition Statistics: Notes and definitions

Road Condition Statistics: Notes and definitions Road Condition Statistics: Notes and definitions This note provides definitions used for road condition statistics. It also includes useful information on the source of the data 1. Source The statistics

More information

Bicycle Friendly Streets

Bicycle Friendly Streets Bicycle Friendly Streets 4.1 Guiding Principle and Objectives Bicycles are recognized as vehicles under the Highway Traffic Act, and as such, should be afforded the same consideration as motor vehicles

More information

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District No Turn on Red Regulations STAFF REPORT ACTION REQUIRED Date: June 1, 2010 To: From: Toronto and East York Community Council Director, Transportation Services, Toronto and East York District Wards: Trinity

More information

2016 FACT SHEET ENGINEERING STREET OPERATIONS. Engineering Street Operations net 2016 budget is $5,199,900 WHAT IS ENGINEERING STREET OPERATIONS?

2016 FACT SHEET ENGINEERING STREET OPERATIONS. Engineering Street Operations net 2016 budget is $5,199,900 WHAT IS ENGINEERING STREET OPERATIONS? WHAT IS STREET OPERATIONS? This section maintains approximately 570 km of major, collector and residential roads throughout Saanich. Some of the major programs include road surface treatments (pothole

More information

Optimising Gravel Road Maintenance Strategies. Presenter: Gerrie van Zyl

Optimising Gravel Road Maintenance Strategies. Presenter: Gerrie van Zyl Optimising Gravel Road Maintenance Strategies Presenter: Gerrie van Zyl Scope Introduction Road management systems Utilising information to improve maintenance strategies Blading optimisation process Conclusion

More information

Building Great Neighbourhoods LANSDOWNE

Building Great Neighbourhoods LANSDOWNE Building Great Neighbourhoods LANSDOWNE We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.

More information

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017 DES MOINES AREA MPO Presentation to Iowa Commercial Real Estate Association April 6, 2017 Presentation Outline MPO Overview Trends We re Watching Plans, Projects, Initiatives, Regional Transportation Priorities

More information

HIGHWAY 11 CORRIDOR STUDY

HIGHWAY 11 CORRIDOR STUDY HIGHWAY 11 CORRIDOR STUDY Executive Summary August 2016 Roseau County?æA@?çA@ Warroad Lake of the Woods Roseau Roosevelt Badger?ÄA@ Greenbush Legend N Hwy 11 Study Area Figure 1: Corridor Study Limits

More information

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,

More information

Shenango Valley MPO. State Transportation Commission 2015 Twelve Year Program Development

Shenango Valley MPO. State Transportation Commission 2015 Twelve Year Program Development State Transportation Commission 2015 Twelve Year Program Development Regional results of the survey and public feedback from August thru November 2013 Shenango Valley MPO Version 01-2014 Mobility Concerns

More information

February 2018 HIGHWAY 316 IMPROVEMENTS PROJECT

February 2018 HIGHWAY 316 IMPROVEMENTS PROJECT February 2018 HIGHWAY 316 IMPROVEMENTS PROJECT Agenda 1 2 3 4 5 A Message from the City Project Area Traffic Conditions Pedestrian/Bicycle Comfort & Safety Next Steps Q&A City of Hastings Supports a study

More information

Complete Streets: Policy Framework Complete Streets: Implementation Plans A more Complete Street: Laurier Bike Lane Pilot Project

Complete Streets: Policy Framework Complete Streets: Implementation Plans A more Complete Street: Laurier Bike Lane Pilot Project Complete Streets Initiatives City of Ottawa Complete Streets: Policy Framework Complete Streets: Implementation Plans A more Complete Street: Laurier Bike Lane Pilot Project Zlatko.Krstulic@Ottawa.ca May

More information

Request for Authorization to Open Public Comment Period

Request for Authorization to Open Public Comment Period Request for Authorization to Open Public Comment Period May 12, 2015 LRP, TIPs, and Conformity Reasons for Requested Action: LRP and TIP Amendment to Connections 2040 LRP, and Draft FY 2016 TIP for New

More information

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM. City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018 5:00 8:00 PM Region of Waterloo City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018

More information

CITY OF NEW ORLEANS. City-Wide Pavement Condition Assessment Results August 30, 2016

CITY OF NEW ORLEANS. City-Wide Pavement Condition Assessment Results August 30, 2016 CITY OF NEW ORLEANS City-Wide Pavement Condition Assessment Results August 30, 2016 Background - The Roadway System 2 Over 1,500 miles of City-owned roads - Approx. 70% of the City s roads are asphalt-topped

More information

SECTION 5: PEER CITY REVIEW

SECTION 5: PEER CITY REVIEW SECTION 5: PEER CITY REVIEW 5.1 Introduction It is evident that the City of Lincoln continually strives to improve its operations and practices. To that end, a list of peer cities was developed to compare

More information

GDOT GDOT PowerPoint. Title Page

GDOT GDOT PowerPoint. Title Page GDOT 20152017 GDOT PowerPoint Savannah Post SAME Title Page Annual Programs Review Sub Titles Matt Bennett Body Text Program Manager June 14, 2017 Transportation Funding Act of 2015 (HB170) 2015 GDOT Your

More information

SIGNALIZED T-INTERSECTION SAFETY REVIEW

SIGNALIZED T-INTERSECTION SAFETY REVIEW SIGNALIZED T-INTERSECTION SAFETY REVIEW Mark Halpin, Transportation Planner, City of Port Moody Sean O Sullivan, Traffic Operations Engineer, City of Coquitlam Matthew Chan, Traffic Engineer, Parsons Project

More information

Anniedale - Tynehead NCP. Transportation Highway 15 & Golden Ears Way Analysis

Anniedale - Tynehead NCP. Transportation Highway 15 & Golden Ears Way Analysis Highway 15 & Golden Ears Way Analysis Stage 1 Conclusions Analysis indicated capacity constraints at Highway 15 & Golden Ears Way Grade Separation required for safe and efficient traffic movement Supports

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Manual Notice Archive by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2009-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road West Dimond Blvd Jodhpur St to Sand Lake CSS Transportation Project Summary Municipality of Anchorage Project # 05 005 Project Manager: John Smith, P.E. (MOA PM&E) Project Administrator: Julie Makela,

More information

Gerald P. Oliveto, P.E. George Franz NJDOT

Gerald P. Oliveto, P.E. George Franz NJDOT Gerald P. Oliveto, P.E. George Franz NJDOT Bridge preservation is defined as actions or strategies that prevent, delay or reduce deterioration of bridges or bridge elements, restore the function of existing

More information

THE EFFECTS OF UTILITY CUT PATCHING ON PAVEMENT LIFE SPAN AND REHABILITATION COSTS

THE EFFECTS OF UTILITY CUT PATCHING ON PAVEMENT LIFE SPAN AND REHABILITATION COSTS THE EFFECTS OF UTILITY CUT PATCHING ON PAVEMENT LIFE SPAN AND REHABILITATION COSTS Prepared for City of Santa Ana Draft Report January 1999 Prepared by M. Y. Shahin, Ph.D., P.E. Consulting Engineer RJN

More information

Value-Based Pavement Prioritization Tool. 11th National Conference on Transportation Asset Management Tim Skeel July 11, 2016

Value-Based Pavement Prioritization Tool. 11th National Conference on Transportation Asset Management Tim Skeel July 11, 2016 Value-Based Pavement Prioritization Tool 11th National Conference on Transportation Asset Management Tim Skeel July 11, 2016 Acknowledgments Pavement Group Sue Byers Ben Hansen Nataliya Dernbach Asset

More information

US287 Asset Inventory Loveland. Figure 6-1 Loveland Bridges and Traffic Signals

US287 Asset Inventory Loveland. Figure 6-1 Loveland Bridges and Traffic Signals Chapter 6: City of Loveland US287 extends for approximately 13.1 miles through the City of Loveland. Between the northern City boundary and 29 th Street, the road is labeled Garfield Avenue, before transitioning

More information

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

Goodlettsville Bicycle and Pedestrian Plan Executive Summary Goodlettsville Bicycle and Pedestrian Plan July 2010 In Cooperation with the Nashville Area Metropolitan Planning Executive Organization Summary Introduction Progressive and forward thinking communities

More information

Strategies for Maintaining & Renewing Innovative Street Projects. Elyse Parker, Director of Policy & Innovation, City of Toronto NACTO, LA, 2018

Strategies for Maintaining & Renewing Innovative Street Projects. Elyse Parker, Director of Policy & Innovation, City of Toronto NACTO, LA, 2018 Strategies for Maintaining & Renewing Innovative Street Projects Elyse Parker, Director of Policy & Innovation, City of Toronto NACTO, LA, 2018 1 OUR ASSETS $12B in Assets $20B Replacement Cost $372M Capital

More information

Improving intersections for people that walk in Minneapolis

Improving intersections for people that walk in Minneapolis Matthew Dyrdahl, AICP, LCI Bicycle and Pedestrian Coordinator Minneapolis Public Works CITY OF MINNEAPOLIS Improving intersections for people that walk in Minneapolis Transportation Bonanza February 8,

More information

Otter Tail County 2040 Transportation Plan. Asset Management Peer Exchange

Otter Tail County 2040 Transportation Plan. Asset Management Peer Exchange Otter Tail County 2040 Transportation Plan Asset Management Peer Exchange Study Purpose and Goals 1. Leverage existing tools 2. Analyze existing road conditions 3. Comparison of funding versus road conditions

More information

Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths

Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths Road Asset Technical Accord - RATA The Centre of Excellence for Road Asset Planning in the Waikato Region Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths

More information

ECONOMY PEOPLE ENVIRONMENT

ECONOMY PEOPLE ENVIRONMENT Report Back on Local Transit Improvements May 29, 2013 ECONOMY PEOPLE ENVIRONMENT Intro Council Requested Report Back Topics Progress on Planning for Broadway Subway False Creek Bridges Local Transit Improvements

More information

York Region Population and Employment Growth

York Region Population and Employment Growth March 1, 2016 1 York Region Population and Employment Growth York Region needs to comply with The Provincial Growth Plan and new forecasts introduced to 2036 and 2041 2 Regional Official Plan Review York

More information

Culpeper District. Albemarle County Monthly Report October, 2011

Culpeper District. Albemarle County Monthly Report October, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information