A24 HOP OAST ROUNDABOUT
|
|
- Arthur French
- 5 years ago
- Views:
Transcription
1 A24 HOP OAST ROUNDABOUT SOUTHWATER, WEST SUSSEX COMPLETED S278 HIGHWAY WORKS Road Safety Audit Stage 3 - Completion of Construction November 2018 Report reference 1862
2 CONTENTS page 1. Introduction 3 2. Items raised at Previous Road Safety Audits 5 3. Items raised at this Stage 3 Road Safety Audit 6 4. Audit Team Statement 13 Appendix A List of Drawings & Documents Examined 14 Appendix B Key Plan 15 TED SMITH Traffic Safety Consultant Tele Mob C:/BerkeleyHomes(S)/Glanville/Southwater/A24HopOastRoundaboutImprovements/RSA3Report 05/11/2018 Page 2 of 15
3 1 INTRODUCTION 1.1 This report describes the results of a Stage 3 Completion of Construction Road Safety Audit, carried out on the recently constructed S278 Adoptable Highway Improvement Works at the existing A24 Hop Oast Roundabout, located at the junction of the A24 London to Worthing Road with the B2237 Horsham to Worthing Road, Southwater, West Sussex, in connection with Residential Development of Land at the West Side of Worthing Road, Southwater. The Safety Audit was carried out at the request of the Design Organisation, Glanville Consultants Limited, Cornerstone House, 62 Foxhall Road, Didcot, Oxfordshire, OX11 7AD, on behalf of the Client Organisation, Berkeley Homes (Southern) Limited, Berkeley House, Bay Tree Avenue, Leatherhead, Surrey, KT22 7UE. 1.2 The Adoptable Highway Works consist of widening of the Southern Arm of the B2237 Worthing Road at the northbound approach to the existing roundabout, in order to create space for a dedicated northbound left-turn lane at the junction with the A24 northbound dual carriageway, combined with an increase to three lanes of the existing two lane A24 southbound dual carriageway approaching the roundabout. In addition, modifications were carried out to the existing Northern Arm of the B2237 Worthing Road to widen the carriageway northbound and also to increase southbound capacity approaching the roundabout, whilst some localised widening works at the A24 northbound entry point at the south side of the roundabout are also undertaken. 1.3 The Road Safety Audit Team membership comprised as follows: Ted Smith, CoC Martin Brownsey, BSc, DipEM, MCIHT, CoC Director, MB Projects Ltd Traffic Safety Consultant Highways Consultancy Each member specialises in Highway Safety and Traffic Engineering and have operated independently of the design team responsible for the scheme and have had no involvement with the design of the proposals. 1.4 This Audit was carried out in the offices of the Team Members during September and November 2018, comprising of an examination of the drawings and documents listed in Appendix A, in accordance with various s from Berkeley Homes (Southern) and Glanville Consultants. An inspection of the substantially completed site works was undertaken together during daylight conditions on the early afternoon of Thursday 13 th September 2018, during which time it was clear and dry. Whereas traffic flows were light to moderate, no pedestrians or cyclists were seen in the nearby vicinity. C:/BerkeleyHomes(S)/Glanville/Southwater/A24HopOastRoundaboutImprovements/RSA3Report 05/11/2018 Page 3 of 15
4 1.5 During that daylight site inspection the Audit Team were also accompanied by Ian Jeffery, representing Sussex Police as an Accredited Senior Investigating Officer for Investigating Road Deaths, together with David Lambert and Sean Banaghan, representing West Sussex County Council Highways and Graeme Turner and Alan Bowman representing Granville Consultants. 1.6 A further site inspection of previously outstanding works and conditions was undertaken during darkness on the late evening of Thursday 1 st November 2018, during which time it was cold, damp and misty, whilst traffic was light no pedestrians or cyclists were seen in the near vicinity. Various road safety related identified items identified at that later inspection are included in Section 3 below. 1.7 The terms of reference of the Road Safety Audit are as described in HD 19/15 (DMRB Volume 5: Section 2, Part 2) and the incorporated categories of checklists, as appropriate. The Road Safety Audit Team has examined and reported only on the road safety implications of the scheme as constructed and presented in the drawings listed in the Appendix to this report, and has not examined or verified compliance of the design with any other criteria or standard. 1.8 The object of this Audit is to identify any road existing safety related problems that may be exacerbated or any new problems that may be introduced by the proposed highway works. A previous Combined Stage 1 and Stage 1 Road Safety Audit Report and Designer s Response Report, together with subsequent Interim Stage 3 Inspection Report of substantially completed works were available for reference as part of this current Stage 3 Audit. 1.9 The Designer for this scheme reported at the previous Combined Stage 1 and Stage 2 Detailed Design that five Departures from Standard that primarily appear related to the existing roundabout design and described as such conditions will not be worsened due to the works and those have apparently been approved by West Sussex County Council Highways Authority, with associated comments relating to provision of visibility screening at specific locations as currently indicated on the design drawings All problems and recommendations identified in this report are considered to be of sufficient importance to warrant attention and each are individually referenced and indicated on the Key Plan at Appendix B. ** ** ** ** ** ** ** C:/BerkeleyHomes(S)/Glanville/Southwater/A24HopOastRoundaboutImprovements/RSA3Report 05/11/2018 Page 4 of 15
5 2 ITEMS RAISED AT PREVIOUS ROAD SAFETY AUDITS 2.1 The road safety aspects of the Previous Combined Stage 1 and Stage 2 Detailed Design Road Safety Audit Report number 1629, dated 29 th June 2016 for S278 Highway Works for the Roundabout Improvements and the subsequent Designer s Response Report dated July 2016 were available for reference in this current Stage 3 Audit Report. Whereas most items identified at that time appeared resolved in the subsequent construction, as some features were found to be incomplete during the initial daylight inspection, the required darkness inspection was deferred until those works would be completed. 2.2 Following recent notification of completion of outstanding items consisting of some road markings, installation of road studs and the Lighting Column 19, the subsequent inspection during darkness conditions identified a number of items which combined with items identified at the previous daylight inspection and listed within the previous Interim Stage 3 Inspection Report, now form the basis of this finalised Stage 3 Road Safety Audit Report. ** ** ** ** ** ** ** C:/BerkeleyHomes(S)/Glanville/Southwater/A24HopOastRoundaboutImprovements/RSA3Report 05/11/2018 Page 5 of 15
6 3 ITEMS RAISED AT THIS STAGE 3 ROAD SAFETY AUDIT 3.1 GENERAL PROBLEM (Drawing Ref: /6400 Rev A9) Location: (A) A24 Northbound Left Slip Lane. Summary: Risk of loose gravel entering the carriageway. Immediately behind the recently constructed kerbline the nearside verge area has been surfaced with loose gravel. Consequently, any vehicles attempting to stop partially on the verge area in emergencies, may when subsequently returning drag loose gravel onto the carriageway surface, whereby risk of flying stones may become a serious hazard to other road users. The current area of loose gravel should be removed or sufficiently raked back from the kerbline and the area replaced with soil and grass seeding to form a standard grass verge area PROBLEM (Drawing Ref: /6400 Rev A9) Location: (B) Drainage ditch at west side of A24 Northbound Left Turn Lane Merge Summary: Risk of potential collision with weir structure. At the nearside edge of the lane a lengthy surface water drainage ditch is interrupted by the base of a weir arrangement to restrict flow of water beyond. Since that structure is formed of concrete abutments, concern was raised, especially by the Police representative, that owing to the possibilities of being weather sensitive, any vehicle losing control at the merge, especially during any adverse weather/environmental conditions may errantly enter the ditch and may collide with that structure. Following completion of the feature, it was inspected again during the latest darkness inspection and the resultant formation of mitigating earth works appeared to have suitably modified conditions and thus as situated below the carriageway/verge level, now appeared to be no worse than headwalls within ditches that can be found elsewhere alongside roads in the rural area. The proposed weir arrangement may need to be monitored during the forthcoming maintenance period to determine if any difficulties arise in that period. C:/BerkeleyHomes(S)/Glanville/Southwater/A24HopOastRoundaboutImprovements/RSA3Report 05/11/2018 Page 6 of 15
7 3.2 LOCAL ALIGNMENT PROBLEM (Drawing Ref: /6400 Rev A9) Location: (C) B2237 Worthing Road (Southern Arm). Summary: Risk of errant vehicle passage to rear of safety barrier. Whereas a safety barrier has been erected around the outer radius of the realigned bend, its starting point is located at the far side of an existing low kerb height/hard surfaced crossover to an existing field access, whilst also coinciding with the start of steep down gradient embankment. Since it is so wide open behind the barrier, there appears risk of vehicles passing behind the barrier and down the embankment. The view of the Sussex Police representative, as an Accredited Senior Investigating Officer for Investigating Road Deaths, emphasised his opinion that in the event of icy weather and any subsequent salting works being diluted by following rainfall, any subsequent re-icing may give rise to vehicles possibly skidding, over-correcting and losing control and leaving the carriageway on the nearside. Possible consequences may result in collision with the collapsible end of the safety barrier or a worse scenario of passing to the rear of the terminal point and travelling down the embankment to the fence line below, whereby serious occupant injuries may result. The current arrangements of the low level hard surfaced field access and the wide open approach to the steep embankment behind the current safety barrier should be revisited, possibly in consultation with the Adopting Highway Authority, to investigate/determine a safer manner of preventing vehicles errantly passing to the area behind the safety barrier and subsequently down the embankment PROBLEM (Drawing Ref: /6400 Rev A9) Location: (D) B2237 Worthing Road (Southern Arm). Summary: Risk of serious injuries to motor cycle riders/passengers. The safety barrier as provided around the outer radius kerbline of the bend is currently devoid of any infill panel protection for errant motor cyclists, who may unfortunately lose control on this high risk curvature and in adverse weather conditions may leave the carriageway and collide with the posts supporting the top rail of the barrier. Consequently, concern arises that serious life changing injuries to such users may result. This safety related problem for motorcyclists was previously identified at paragraph of the Combined Stage 1 & Stage 2 RSA Report and recommendation given to infill the space beneath the top rail of the proposed safety barrier, but not carried out. The current situation of exposed posts beneath the safety barrier should be revisited in consultation with Adopting Highway Authority to investigate/determine addition of appropriate protection system to minimise risk of serious injuries to motorcyclists. C:/BerkeleyHomes(S)/Glanville/Southwater/A24HopOastRoundaboutImprovements/RSA3Report 05/11/2018 Page 7 of 15
8 3.3 JUNCTIONS PROBLEM (Drawing Ref: /6409 Rev A8) Location: (E) B2237 Worthing Road (Southern Arm), at the junction with A24 Circulatory Area. Summary: Risk of two-lane entry within wide single lane. The current single lane entry at/approaching the Give Way line is very wide and whilst not marked as two lanes, some drivers were seen forming two separate lanes at the entry to the roundabout, to potential detriment of adjoining driver s visibility of approaching circulatory traffic, whereby collisions with such traffic may result. The current wide lane and driver behaviour at the entry point may need to be monitored during the forthcoming maintenance period to determine whether any mitigation measures may be needed. 3.4 NON MOTOR VEHICLE PROVISIONS PROBLEM (Drawing Ref: /6409 Rev A8) Location: (F) A24 Northbound Exit from the Roundabout. Summary: Risk of Pedal Cyclists failure to perceive access to northbound route. Northbound pedal cyclist s view of the nearside kerbline of the physical splitter island is partially hidden in the low point of crossfall and thus may not give clear guidance to the access gap leading into the left-slip lane for northbound cycle route. Low height delineation posts should be provided on the island to more clearly identify the feature and better guide cyclists to the gap to pass through into the left-slip lane and avoid the northbound A24 traffic merge ahead. 3.5 SIGNS, ROAD MARKINGS AND STREET LIGHTING PROBLEM (Drawing Ref: /6409 Rev A8) Location: (G) A24 Southbound Dual Carriageway, approaching the roundabout. Summary: Risk of inadequate lane information. The advance lane information sign, reference 11 is currently situated to the left of the slip road leading into the Service Station and thus far to the left of southbound driver s forward visibility and partially hidden by the overgrown hedgerow. Consequently, the sign may not be clearly seen by southbound drivers and/or be misunderstood and errantly interpreted to indicate the left turn arrow as directing drivers into the lane leading to those premises, instead of the new left turn lane ahead at the roundabout. C:/BerkeleyHomes(S)/Glanville/Southwater/A24HopOastRoundaboutImprovements/RSA3Report 05/11/2018 Page 8 of 15
9 The current sign ref 11 should be removed and be interchanged with the current position of the temporary sign reference 12, directly in front (north side) of the lighting column numbered 30, (directly in southbound driver s forward visibility). In addition, the existing overgrown hedgerow should be cut back to provide clearer visibility alongside the slip road, whilst the 100 yard countdown sign previously provided on the nearside verge should also be re-erected PROBLEM (Drawing Ref: /6409 Rev A8) Location: (H) A24 Dual carriageway, at the southbound approach to the roundabout. Summary: Risk of insufficient guidance approaching the roundabout. At page 3 of the Designer s Response to Problem (Location G) relating to southbound road markings, a bifurcation arrow to provide better lane guidance was shown to be provided at the separation of the nearside left turn lane and the central ahead lane. That arrow has not been provided as proposed and the current wide open space may be misleading. During the site inspection it was noted that some southbound drivers appeared to be straddling those two lanes and then shifting direction into the central lane, seemingly as if uncertain as to actual position required to travel straight ahead at the roundabout. The proposed bifurcation arrow to TSRGD Diagram 1039 should be implemented in the open carriageway space identified above and possibly the actions of drivers approaching the roundabout may need to be monitored for the forthcoming Maintenance Period PROBLEM (Drawing Ref: /6409 Rev A8) Location: (I) B2237 Worthing Road (North-Eastern Arm) Summary: Risk of unsuitable sign location. The existing Park & Ride sign is in poor position relative to the modified lane layout beyond. In addition, the left turn arrow is missing from the left turn lane adjacent to the right turn bifurcation arrow. One driver was seen to drive straight ahead northbound from within the left turn lane. A left turn arrow to TSRGD Diagram 1038 should be applied adjacent to the northern most bifurcation arrow as shown on the Sign drawing, whilst an additional pair of ahead and left turn arrows to Diagram 1038 should be applied approximately midway between the two current bifurcation arrows to more clearly give guidance approaching the signals ahead. In addition, the existing Park and Ride sign should be relocated further northwards, possibly to the tangent point of the nearside radius kerbline. C:/BerkeleyHomes(S)/Glanville/Southwater/A24HopOastRoundaboutImprovements/RSA3Report 05/11/2018 Page 9 of 15
10 3.5.4 PROBLEM (Drawing Ref: /6409 Rev A8) Location: (J) B2237 Worthing Road (Northern Arm). Summary: Risk of signs not illuminated during darkness. The current two warning signs indicating two-way traffic and traffic signals ahead, (reference number 28W ) includes overhead illumination units that were not working during the darkness inspection, whereby driver information may be missing from the street scene. The illumination of the warning signs should be checked and any defects be rectified PROBLEM (Drawing Ref: /6409 Rev A8) Location: (K) A24 Dual Carriageway, at the northbound approach to the roundabout. Summary: Risk of inadequate driver guidance approaching the junction. The proposed edge line and studs are missing from the offside of resurfaced section of modified carriageway alignment, whilst the existing edge line and studs alongside the nearside lane are badly worn or hidden by detritus. The offside edge line should be provided whilst the existing nearside line should be cleared and refurbished to give clearer driver guidance approaching the roundabout PROBLEM (Drawing Ref: /6409 Rev A8) Location: (L) A24 Dual Carriageway, at the northbound approach to the roundabout. Summary: Risk of inadequate driver guidance approaching the roundabout. The existing chevron sign on the central island facing northbound drivers is damaged and thus suffers loss of clear delineation of the required directional change. The condition of the chevron should be checked and should be replaced or refurbished as found to be required PROBLEM (Drawing Ref: /6409 Rev A8) Location: (M) A24 Dual carriageway and the roundabout circulatory area. Summary: Street lights not illuminated during darkness. The darkness inspection identified several street lights not illuminated, whereby areas of dark shadow resulted. Identified column numbers were 22 and 25 at the east and north sides of the roundabout circulatory area; 28, 30 and 32 at the east side of the A24 Southbound Dual Carriageway alongside the Fuel Filling Station and number 9 on the A24 Northbound dual carriageway just south of the roundabout. C:/BerkeleyHomes(S)/Glanville/Southwater/A24HopOastRoundaboutImprovements/RSA3Report 05/11/2018 Page 10 of 15
11 Each of the identified street lights should be checked and faults rectified as soon as possible PROBLEM (Drawing Ref: /6409 Rev A8) Location: (N) B2237 Worthing Road (Southern Arm). Summary: Risk of inadequate illumination of signs. The current speed limit terminal signs are within the street lit zone, but are currently without illumination units. The current back to back terminal signs should be provided with appropriate illumination PROBLEM (Drawing Ref: /6409 Rev A8) Location: (O) B2237 Worthing Road (Southern Arm). Summary: Risk of large area of carriageway surface without clear markings. Large area of carriageway space is currently devoid of any guidance markings approaching the lane separation on this carriageway curvature, whilst during the darkness inspection no road studs were installed within the marking between lanes approaching the separation. Two additional longitudinal centre line markings between lanes to match existing should be applied in space between the current bifurcation arrow and the start of existing lane markings to give better driver guidance of lane separation PROBLEM (Drawing Ref: /6409 Rev A8) Location: (P) B2237 Worthing Road (Southern Arm). Summary: Risk of inadequate road stud guidance on carriageway curvature. Whereas appropriate coloured road studs have been provided within the central double white line system and also at the hatched area associated with the southbound exit route from the roundabout, whilst studs are also provided within the segregated left turn slip lane starting at the roundabout, suitably coloured studs have not been installed within the lane line separating the northbound ahead lane from the left turn slip lane or the edge of carriageway. Similarly none are provided within the tapered hatched markings approaching the splitter island, whereby overall continuity of suitable guidance is missing. The continuity of guidance by road studs should be revisited and the missing features should be installed to compliment the remainder of the overall junction markings. C:/BerkeleyHomes(S)/Glanville/Southwater/A24HopOastRoundaboutImprovements/RSA3Report 05/11/2018 Page 11 of 15
12 PROBLEM (Drawing Ref: /6409 Rev A8) Location: (Q) B2237 Worthing Road (Southern Arm). Summary: Risk of signs not illuminated. The current warning signs indicating two-way traffic and bend ahead, together with Ending of Clearway, (reference numbers 65W and 67W respectively), both include overhead illumination units that were not working during the darkness inspection, whereby driver information may be missing from the street scene. The illumination of the warning signs should be checked and any defects be rectified PROBLEM (Drawing Ref: /6409 Rev A8) Location: (R) A24 Northbound carriageway, prior to the merge arrangements. Summary: Risk of insufficient warning of traffic merge ahead. During the site inspection discussions of potential safety related problems that may arise at the new merge conditions on the existing A24 northbound carriageway. It was noted that currently there is no indication given to warn northbound drivers that traffic will be merging from the left ahead. Consequently, it was felt that warning may need to be provided now instead of waiting to determine results of any future monitoring during the forthcoming maintenance period. Appropriate warning signs to TSRGD Diagram should in consultation with the Adopting Highway Authority be provided to warn drivers of the merge ahead, possibly in similar circumstances to the recently constructed arrangement at Broadbridge Heath, as shown on photograph below. If actual merge difficulties arise over the maintenance period, then appropriate green faced informatory signs may also need to be later incorporated. ** ** No further road safety related items are identified at this Stage 3. ** ** C:/BerkeleyHomes(S)/Glanville/Southwater/A24HopOastRoundaboutImprovements/RSA3Report 05/11/2018 Page 12 of 15
13 4 AUDIT TEAM STATEMENT 4.1 We certify that this Road Safety Audit has been carried out in accordance with HD 19/15. ROAD SAFETY AUDIT TEAM LEADER Ted Smith CoC Traffic Safety Consultant Signed Date 5 th November 2018 Tele Mob ROAD SAFETY AUDIT TEAM MEMBER Martin Brownsey BSc, DipEM, MCIHT, CoC Director MB Projects Ltd Signed Highways Consultancy Date 5 th November 2018 Tele Mob C:/BerkeleyHomes(S)/Glanville/Southwater/A24HopOastRoundaboutImprovements/RSA3Report 05/11/2018 Page 13 of 15
14 APPENDIX A LIST OF DRAWINGS & DOCUMENTS EXAMINED Drawing No/Document Date Scale Description /6200 Rev A3 11/07//2016 A1 Vehicle Swept Paths /6400 Rev A9 09/12/2016 A1 General Arrangement /6404 Rev A8 21/09/2016 A1 Surface Finishes /6407 Rev A2 17/06/2016 As shown Construction Details /6408 Rev A8 02/05/2018 As shown Surface Water Drainage /6409 Rev A8 14/02/2016 A1 Traffic Signs /6410 Rev A7 17/06/2016 A1 Road Markings /6411 Rev A3 17/06/2016 A1 Proposed Levels & Contours /6412 Rev A3 17/06/2016 As shown Long Sections SSE AC-001 Rev A 07/03/ Street Lighting Report SSE AC-002 Rev A 07/03/ Street Lighting Report SSE LD-001 Rev C 07/03/2016 A1-- Street Lighting Layout Drawing Sheet 1 of 2 Report July Report of Surface Treatment Superflex 72 Report /07/ Combined Stage 1 & Stage 2 Road Safety Audit Report (Ted Smith) Report TR /GT/024 July Designer s Response Report to above Combined Stage 1 & Stage Audit Report (Glanville) Report 16/09/ Listing of Initial Problems Identified at the Interim Stage 3 Daylight Site Inspection (Ted Smith) s Various dates -- Audit Brief and Instructions (Berkeley Homes (Southern) & Glanville Consultants APPENDIX B KEY PLAN Copy of drawing numbered /6409 Rev A8 C:/BerkeleyHomes(S)/Glanville/Southwater/A24HopOastRoundaboutImprovements/RSA3Report 05/11/2018 Page 14 of 15
15 C:/BerkeleyHomes(S)/Glanville/Southwater/A24HopOastRoundaboutImprovements/RSA3Report 05/11/2018 Page 15 of 15
SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane
SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane Exception Report Client Officer Rudo Beremauro Date 20 January 2015 RSA /Project Sponsor s Contents Section 3 Project Sponsor's
More informationCHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT
CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT 2.1 General topics 2.1.1 Changes since previous audit Do the conditions for which the scheme was originally designed still apply? (for example, no changes to
More informationRhebogue Neighbourhood Greenway. Road Safety Audit Stage 2
Rhebogue Neighbourhood Greenway Road Safety Audit Stage 2 Report Number: 12/007/00/00057 July 2014 Mid West National Road Design Office Lissanalta House, Dooradoyle County Limerick Tel: 061 496 800 Fax:
More informationPART 5 TD 51/03 SEGREGATED LEFT TURN LANES AND SUBSIDIARY DEFLECTION ISLANDS AT ROUNDABOUTS SUMMARY
DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 6 SECTION 3 ROAD GEOMETRY HIGHWAY FEATURES PART 5 TD 51/03 SEGREGATED LEFT TURN LANES AND SUBSIDIARY DEFLECTION ISLANDS AT ROUNDABOUTS SUMMARY This document sets
More informationPART 5 TD 51/17 SUMMARY
DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 6 SECTION 3 ROAD GEOMETRY HIGHWAY FEATURES PART 5 TD 51/17 SEGREGATED LEFT TURN LANES AND SUBSIDIARY DEFLECTION ISLANDS AT ROUNDABOUTS SUMMARY This document sets
More informationDesign and Installation of Low Level Cycle Signals
Transport for London Surface Transport Management System Document Guidance Note Design and Installation of Low Level Cycle Signals Document reference: SQA-0651 - Issue: Draft out of date information. 1
More informationA105 Green Lanes junction with Bourne Hill / Hedge Lane
Cycle Enfield - Section 5 A105 Green Lanes junction with Bourne Hill / Hedge Lane Stage 2 Road Safety Audit Ref: 2759.03.05/032/A105/BOR/2016 Prepared for: London Borough of Enfield By: Road Safety Audit,
More informationCHECKLIST 5: ROADWORK TRAFFIC SCHEME AUDIT
CHECKLIST 5: ROADWORK TRAFFIC SCHEME AUDIT 5.1 General items 5.1.1 Alignment Are the roadworks located safely with respect to horizontal and vertical alignment? If not, does works signing cater for this?
More informationRAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings
RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings Location: Crossing No. Date of On-Site Inspection: (Day) / / (Night) / / Weather: CHECKLIST 5. - GENERAL TOPICS Level of control
More informationCHECKLIST 6: EXISTING ROADS: ROAD SAFETY AUDIT
CHECKLIST 6: EXISTING ROADS: ROAD SAFETY AUDIT 6.1 Road alignment and cross-section 6.1.1 Visibility; sight distance Is sight distance adequate for the speed of traffic using the route? Is adequate sight
More informationA465 Heads of the Valleys Dualling Sections 5 and 6 Dowlais Top to Hirwaun SUMMARY PROOF OF EVIDENCE. Highways Engineering Document WG 1.3.
A465 Heads of the Valleys Dualling Sections 5 and 6 Dowlais Top to Hirwaun SUMMARY PROOF OF EVIDENCE Highways Engineering Document WG 1.3.2 by Jonathan Thirkettle MARCH 2018 1. Introduction 1.1 I am Jonathan
More informationM9/A90/M90 Edinburgh to Fraserburgh Trunk Road. A90 Tealing. Moving Cursor Programme Junction Study
A90 Tealing Moving Cursor Programme Junction Study This is an unpublished report prepared for the Transport Scotland, Trunk Road and Bus Operations Division (TRBO) and must not be referred to in any publication
More informationEvaluation of Road Safety Audit Reports
Evaluation of Road Safety Audit Reports Peter Monahan 5 th April 2016 Task Overview Review sample of RSA Reports in TII Database and: 1. Identify the most commonly recurring Problems or category of Problems
More informationUlster Canal Greenway Phase 1 Stage 2 Road Safety Audit
Monaghan County Council July 2013 Ulster Canal Greenway Phase 1 Stage 2 Road Safety Audit Prepared by:... Checked by:... Johanne Browne Brian McMahan Senior Consultant Senior Engineer Approved by:... Joe
More informationAppendix F CAPITA Technical Audit
Appendix F CAPITA Technical Audit West Hendon - Major Review of Technical Audit Responses 14 June 2016 Quality Management Quality Management Job No Project Location Title CS/086106 West Hendon - Major
More informationINTERIM ADVICE NOTE 150/12. Guidance for Alternative Temporary Traffic Management Techniques for Relaxation Schemes on Dual Carriageways.
INTERIM ADVICE NOTE 150/12 Guidance for Alternative Temporary Traffic Management Techniques for Relaxation Schemes on Dual Carriageways Summary Guidance for temporary traffic management (TTM), on the approach
More information11 CHECKLISTS Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT
11 CHECKLISTS 11.1 Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT 1.1 General topics 1. Scope of project; function; traffic mix 2. Type and degree of access to property and developments
More informationAppendix A Type of Traffic Calming Measures Engineering Solutions
Appendix A Type of Traffic Calming Measures Engineering Solutions PHYSICAL MEASURES Central Hatching The major consideration of this feature is that, these markings can only be laid down the centre of
More informationRaised Rib Markings. Traffic Advisory Leaflet 2/95 March Introduction
Traffic Advisory Leaflet 2/95 March 1995 Raised Rib Markings Introduction Raised rib markings consist of a continuous line marking with ribs across the line at regular intervals. They were first specially
More informationTemporary Vehicle Restraint System Policy
Temporary Vehicle Restraint System Policy Prepared By; J Wilkinson H&S Manager, Civils Prepared for: Installation of TVRS on all triio highways projects including JV s. Page 1 of 8 Contents 1.0 Introduction
More informationCycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design
Cycle traffic and the Strategic Road Network Sandra Brown, Team Leader, Safer Roads- Design Highways England A Government owned Strategic Highways Company Department for Transport Road Investment Strategy
More informationSCHEME DESIGN AND ENGINEERING
THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK CLASSIFIED ROAD) SIDE ROADS ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK) COMPULSORY PURCHASE ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL
More informationReview of Guidelines for Cycleway Safety Fencing
Review of Guidelines for Cycleway 1.0 PURPOSE 1.1 This document is meant to provide a review of available reference documents for determining appropriate fencing requirements for cycleway paths and shared
More informationAccess to Brownswood Quarry, Enniscorthy, Co. Wexford ROAD SAFETY AUDIT STAGE 1/2. March Consent of copyright owner required for any other use.
11012 Access to Brownswood Quarry, Enniscorthy, Co. Wexford ROAD SAFETY AUDIT STAGE 1/2 March 2011 7, Ormonde Road Kilkenny Tel: 056 7795800 Fax: 056 7702999 Access to Brownswood Quarry, Enniscorthy, Co.
More informationINTERIM ADVICE NOTE 93/07 DRIVER LOCATION SIGNS INTERIM PERFORMANCE SPECIFICATION
INTERIM ADVICE NOTE 93/07 DRIVER LOCATION SIGNS INTERIM PERFORMANCE SPECIFICATION IAN 93/07 Page 1 of 10 Apr 2007 . for. Interim Advice Note 93/07 The following requirements shall apply until further notice.
More informationThe existing site constraints which may be encountered for the A428 scheme proposals are divided into sections as follows.
Project: A428 Study To: Cambridgeshire County Council Subject: Tidal Bus lane Review From: Atkins Date: 24 May 2016 cc: Introduction As part of the A428 Corridor Study to improve the bus journey time between
More informationIntroduction Methodology Study area and data collection Results and recommendation Conclusion References
Introduction Methodology Study area and data collection Results and recommendation Conclusion References It is formal procedure for assessing accident potential and safety performance in the provision
More informationAiming for Zero Road Worker Safety. Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012
Aiming for Zero Road Worker Safety Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012 1. Road Worker Safety Strategy. RWS Strategic Target No. 1: achieve a substantial
More informationA105 South of Ecclesbourne Gardens to Oakthorpe Road
Cycle Enfield - Section 1 A105 South of Ecclesbourne Gardens to Oakthorpe Road Stage 2 Road Safety Audit Ref: 2759.03.01/032/A105/BOR/2016 Prepared for: London Borough of Enfield By: Road Safety Audit,
More informationAppendix D Stage 1 Road Safety Audit
N2 Monaghan Town to Emyvale Road Improvements Part 8 Application Description of Proposed Development Appendi D N2 Monaghan Town to Emyvale, County Monaghan Proposed Pavement and Minor Improvement Scheme
More informationThe Ins and Outs of Roundabouts
The Ins and Outs of Roundabouts Safety Auditors Perspective April 2000 TABLE OF CONTENTS PAGE Preface 3 Introduction 4 Road Safety Audits 5 List of Common Road Safety Problems at Roundabouts 6 Commonly
More informationPolicy Statement. Objective. Context. References and Supporting Documentation
Policy Statement Subject Placement of Distribution Poles Along Roads With Speed Limits Not Exceeding 70km/h Approved by Robert Rogerson Signature & Date Distribution Standards and Policy Manager Authorised
More informationLocal Highway Panels Members Guide. 5 Crossing Facilities
Local Highway Panels Members Guide 5 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction On the Network where there are sufficient crossing opportunities most individuals are able to cross
More informationRoad Safety Audit training course. Motorways - safety issues of the motorway design
Road Safety Audit training course Motorways - safety issues of the motorway design Jesper Mertner, Road safety auditor, COWI A/S 1 ROAD SAFETY AUDITING COURSE Content 1. Safety 2. Cross sections 3. Horizontal
More informationCHECKLIST 4: PRE-OPENING STAGE AUDIT
CHECKLIST 4: PRE-OPENING STAGE AUDIT 4.1 General topics 4.1.1 Changes since previous audit; translation of design into practice General check: have any matters that have changed since a previous audit
More informationImproving Cyclist Safety at the Dundas Street West and Sterling Road Intersection
STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee
More information6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT
6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT General Manager responsible: Officer responsible: Author: Jane Parfitt General Manager City Environment DDI 941 8656 Michael Aitken
More informationIssues at T junctions:
TheSlade_PublicConsulationPlans_March2017.pdf These comments relate to junction designs in this phase of the project on The Slade. Comments begin with the northernmost junction: Girdlestone Rd and continue
More informationGuidance on Minor Improvements to National Roads (Including Erratum No. 1)
Volume 6 Section 1 Part 1 NRA TA 85/11 Guidance on Minor Improvements to National Roads November 2011 (Including Erratum No. 1, February 2012) St. Martin s House, Waterloo Road, Dublin 4. Tel:+353 1 660
More informationChapter 8 (2009) - Summary of key changes
Chapter 8 (2009) - Summary of key changes (Some sections and paragraphs in the revised edition have been renumbered to take account of new sections and paragraphs; section numbers below refer to the revised
More informationDESIGN CODE. Enterprise West Harlow London Road North Design Code 21
DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.
More informationDRAFT INTERIM ADVICE NOTE 150/17
DRAFT INTERIM ADVICE NOTE 150/17 Guidance on Alternative Temporary Traffic Management Techniques for Relaxation Works on Dual Carriageways Summary Guidance for temporary traffic management (TTM), on the
More informationRoad Safety Audits of Traffic Signal Schemes
Road Safety Audits of Traffic Signal Schemes David Prior Waterman Infrastructure & Environment Abstract This paper examines the following elements of Road Safety Audits (RSAs) of traffic signal schemes:
More informationMILTON ROAD LLF PROJECT UPDATE
Greater Cambridge City Deal MILTON ROAD LLF PROJECT UPDATE 9 th May 2017 Project objectives Comprehensive priority for buses in both directions wherever practicable; Additional capacity for sustainable
More informationCollision Site Investigation - Bodenham By-Pass Background
Collision Site Investigation - Bodenham By-Pass Background The junction of the C12 and A338 was the subject of a Local Safety Scheme (LSS) in 2011. Analysation of the collisions at the time revealed the
More informationCONTROL AND COMMUNICATIONS PROVISION PART 1 TD 46/05 MOTORWAY SIGNALLING SUMMARY
DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 9 SECTION 1 NETWORK - TRAFFIC CONTROL AND COMMUNICATIONS STANDARDS OF PROVISION PART 1 TD 46/05 MOTORWAY SIGNALLING SUMMARY This issue of TD 46 incorporates Interim
More informationAudit No. RSA Stage 1 Road Safety Audit Bermuda Park, Nuneaton Getting West Nuneaton Moving: Bermuda Connection
Audit No. RSA 2199 Stage 1 Road Safety Audit Bermuda Park, Nuneaton Getting West Nuneaton Moving: Bermuda Connection 1 1.0 INTRODUCTION 1.1 This report results from a Stage 1 Road Safety Audit for a highways
More informationTraffic Assets Section Proposed Removal of Street Lighting Road Safety Review Report No 48
Street Lighting Section Unique Reference: o. 48 Traffic Assets Section Report o 48 Reviewer: Ellie Briggs, BEng (Hons) CEng MICE Highway Classification / umber Road / Street ame: District / Settlement:
More informationPROPOSED RESIDENTIAL SUBDIVISION
PROPOSED RESIDENTIAL SUBDIVISION PART OF TARNEIT ROAD & 1121 DOHERTYS ROAD, TARNEIT Prepared For: TCG (RM) Developments Pty Ltd MARCH 2014 OUR REF: 16740R#1 PROPOSED RESIDENTIAL SUBDIVISION PART OF TARNEIT
More informationINTERIM ADVICE NOTE 188/16
INTERIM ADVICE NOTE 188/16 Guidance on Omission of Warning Lights (Road Danger Lamps) for Relaxation Works on Dual Carriageways Summary Guidance for omission of warning lights (road danger lamps) in temporary
More informationChicane Schemes. Traffic Advisory Leaflet 12/97 December Introduction
Traffic Advisory Leaflet 12/97 December 1997 Chicane Schemes Introduction Traffic Advisory Leaflet 9/94 "Horizontal Deflections" reported on the results of track trials carried out by the Transport Research
More information72 Crossrail Amendment of Provisions
72 Crossrail Amendment of Provisions Manhattan Shaft Worksite 5.4.36 This new worksite is adjacent to the Tumbling Bay worksite and will occupy an area of land between the Manhattan Building and the Great
More informationINTERIM ADVICE NOTE 144/16 DIRECTIONAL SIGNS ON MOTORWAY AND ALL-PURPOSE TRUNK ROADS GRADE SEPARATED JUNCTIONS
INTERIM ADVICE NOTE 144/16 DIRECTIONAL SIGNS ON MOTORWAY AND ALL-PURPOSE TRUNK ROADS GRADE SEPARATED JUNCTIONS Summary This document sets out guidance for the use of directional signs at motorway and allpurpose
More informationSH1, Karo Drive Wellington Crash Reduction Study
SH1, Karo Drive Wellington Crash Reduction Study A REPORT PREPARED FOR New Zealand Transport Agency Reference: 12334 January 2013 Hawke s Bay office: PO Box 28 208, Havelock North 4157 Tel: (06) 877 8040
More informationMACKA S SAND PTY LTD
MACKA S SAND PTY LTD ROAD SAFETY AUDIT STAGE 2 PRELIMINARY DESIGN OF CHANNELISED INTERSECTION OF ACCESS ROAD TO TO PROPOSED SAND MINING DEVELOPMENT AT LOT 218, D.P. 1044608, WILLIAMTOWN AND NELSON BAY
More informationINTERIM ADVICE NOTE 150/11. Temporary Traffic Management Signing: Simplification of lane change zone signing for relaxation schemes.
INTERIM ADVICE NOTE 150/11 Temporary Traffic Management Signing: Simplification of lane change zone signing for relaxation schemes Summary Guidance to those planning traffic management on omission of certain
More information1 This technical note considers the issues associated with the use of tidal flow bus lanes on key public transport corridors in Cambridge.
TECHNICAL NOTE: TIDAL FLOW BUS LANE OPTION ASSESSMENT Purpose 1 This technical note considers the issues associated with the use of tidal flow bus lanes on key public transport corridors in Cambridge.
More informationProcess for managing parking on verges, footways and footpaths
Process for managing parking on verges, footways and footpaths Author: MG/NR Highways and Transport Environment Department Date: 28 July 2015 Version: 2.0 PARKING ON VERGES, FOOTWAYS AND FOOTPATHS Introduction
More informationSandyford Cycle Route (Kilgobbin / Drummartin Link Road)
Sandyford Cycle Route (Kilgobbin / Drummartin Link Road) Public Consultation Report on Submissions Client: Dun Laoghaire-Rathdown County Council Date: May 2018 Job Number: 15_116B Clifton Scannell Emerson
More information1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02
1 VicRoads Access Management Policies May 2006 Ver 1.02 VicRoads Access Management Policies May 2006 Version 1.02 2 VicRoads Access Management Policies May 2006 Ver 1.02 FOREWORD FOR ACCESS MANAGEMENT
More information8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN
8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN The Transportation Services Committee recommends the adoption of the recommendation contained in the following report
More informationA6 Manchester Airport Relief Road
A6 Manchester Airport Relief Road Status Date Author Approved for Issue (AECOM) Approved for Issue (Grontmij) P0 18 July 2014 Adam Richardson Martin Houghton Martin Williamson P1 06 August 2014 Tony Hickman
More informationStrategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment
Chipping Barnet Area Committee 9 July 2018 Title Report of Wards Status Urgent Key Cromer Road Request for 20mph Zone Strategic Director for Environment High Barnet Public No No Enclosures Appendix A -
More informationChapter 4 - Links Within the Highway. Suitability of Routes
Chapter 4 - Links Within the Highway Suitability of Routes Most cycling takes place on existing urban roads; this will also be the case with the National Cycle Network. As well as following lightly trafficked
More informationTHE OXFORDSHIRE COUNTY COUNCIL (CITY OF OXFORD AND NORTH HINKSEY) (BUS LANES, CYCLE LANES AND TRAFFIC MANAGEMENT) (VARIATION NO.
THE OXFORDSHIRE COUNTY COUNCIL (CITY OF OXFORD AND NORTH HINKSEY) (BUS LANES, CYCLE LANES AND TRAFFIC MANAGEMENT) (VARIATION NO.10*) ORDER 20** The Oxfordshire County Council ( the Council ), in exercise
More informationENGINEERING DESIGN STANDARDS TO ENSURE ROAD SAFETY: EXPERIENCES FROM INDIA
ENGINEERING DESIGN STANDARDS TO ENSURE ROAD SAFETY: EXPERIENCES FROM INDIA Atul Kumar 1 ABSTRACT The primary goal of designing roads with adequate standards is to achieve a safer transport facility for
More informationA465 Heads of the Valleys Sections 5 and 6: Dowlais Top to Hirwaun
A465 Blaenau r Cymoedd A465 Heads of the Valleys Adrannau 5 + 6: Dowlais Top - Hirwaun Sections 5 + 6: Dowlais Top - Hirwaun www.cymru.gov.uk A465 Heads of the Valleys Sections 5 and 6: Dowlais Top to
More informationTONBRIDGE & MALLING BOROUGH COUNCIL JOINT TRANSPORTATION BOARD 14 JUNE Report of the Head of Countywide Improvements
TONBRIDGE & MALLING BOROUGH COUNCIL JOINT TRANSPORTATION BOARD 14 JUNE 2010 Report of the Head of Countywide Improvements 1. OPERATIONAL AND SAFETY REVIEW OF THE A228 LEYBOURNE AND WEST MALLING BYPASS
More informationTRAFFIC SIGNALS AND SIGNALISED ROUNDABOUTS
TRAFFIC SIGNALS AND SIGNALISED ROUNDABOUTS Ian Routledge - OBJECTIVE OF PRESENTATION I have 32 years experience of traffic signal and systems design, implementation, operation and maintenance There are
More informationSECTION 12 ROAD MARKINGS AND DELINEATION
SECTION 12 20 June 2009 Part 3: Motorways and Expressways CONTENTS Reference Page Page Number Date SECTION 12: MARKINGS AND DELINEATION 12.1 GENERAL... 12-1 June 2009 12.1.1 INTRODUCTION... 12-1 June 2009
More informationNRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways
NRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways DN-GEO-03059 December 2007 DN Design Technical TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland
More informationCabinet Member for Highways & Streetscene. Highway Infrastructure Manager
LONDON BOROUGH OF RICHMOND UPON THAMES DATE: AUGUST 2015 DECISION MAKER: LEAD OFFICER: SUBJECT: WARDS: Cabinet Member for Highways & Streetscene Highway Infrastructure Manager PROPOSED CYCLING IMPROVEMENTS
More informationSummary: Mercer County Princeton Avenue & Spruce Street Study January 2009
Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street
More informationLocal Highway Panels Members Guide. 2 Speed and Traffic Management
Local Highway Panels Members Guide 2 Speed and Traffic Management 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction Following the publication of the DfT guidance on setting local speed
More informationINTERIM ADVICE NOTE 150/14 Revision 02. Guidance on Alternative Temporary Traffic Management Techniques for Relaxation Works on Dual Carriageways
INTERIM ADVICE NOTE 150/14 Revision 02 Guidance on Alternative Temporary Traffic Management Techniques for Relaxation Works on Dual Carriageways Summary Guidance for temporary traffic management (TTM),
More informationCHECKLIST 3: DETAILED DESIGN STAGE AUDIT
CHECKLIST 3: DETAILED DESIGN STAGE AUDIT 3.1 General topics 3.1.1 Changes since previous audit Do the conditions for which the scheme was originally designed still apply? (i.e. no significant changes to
More informationWelcome. Knutsford to Bowdon Improvement. Start of works exhibition November An executive agency of the Department for Transport
Start of works exhibition November 2014 Welcome Scheme plan A56 Bowdon A56 M56 Booth Bank Junction 8 M56 Millington Lane Cherry Tree Lane Junction 7 Millington Hall Lane Rostherne Mere Rostherne Lane N140519
More informationWest Midlands Cycle Design Guidance Cycling and the Midland Metro
Transport for the West Midlands Cycling and the Midland Metro September 2017 Project Code: 02821 Phil Jones Associates Ltd Seven House High Street Longbridge Birmingham B31 2UQ philjonesassociates.co.uk
More informationSECTION 12 ROAD MARKINGS AND DELINEATION
SECTION 12 ROAD MARKINGS AND DELINEATION (Blank Page) MANUAL OF TRAFFIC SIGNS AND MARKINGS - Part III: Motorways and Expressways 12-1 12.1 GENERAL 12.1.1 INTRODUCTION The markings and delineation details
More informationHighway Code for Cyclists Operation Close-Pass
Highway Code for Cyclists Operation Close-Pass 1 2 Operation Close-Pass For the 2 million people who cycle every day, close passes are an almost daily occurrence. Close passes are really intimidating and
More informationThe Location and Layout of Lay-bys and Location Markers
The Location and Layout of Lay-bys and Location Markers DN-GEO-03046 December 2010 DN Design Standards TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII)
More informationBLYTHEWOOD PARK, BROMLEY
BLYTHEWOOD PARK, BROMLEY Proposed Access Junction to Serve a Single Residential Dwelling On behalf of Robert Pooke CONTENTS Introduction...1 Appeal Site and Planning History...2 Relevant Transport Policy...4
More informationTo position power poles a safe distance from the road to minimise the likelihood of being accidentally hit by vehicles.
Policy Statement Subject Placement of Rigid Distribution Poles Along Roads With Speed Limits Exceeding 70KM/H Approved by Robert Rogerson Signature & Date Distribution Standards and Policy Manager Authorised
More informationSpeed Limit Policy Isle of Wight Council
APPENDIX B Speed Limit Policy Isle of Wight Council 2009 Contents Section 1 Introduction 1.1 Links with the Local Transport Plan Section 2 Speed Limits on Urban Roads and Residential Areas 2.1 20mph Limits
More information18.1 Introduction Maintaining pedestrian-related Problems arising in the long term. infrastructure
18 Maintaining the pedestrian network Maintaining the pedestrian network Maintenance in the short and long term Planning for pedestrians during maintenance works 18.1 Introduction Both pedestrian-related
More informationA105 Oaktree Avenue to Carpenters Gardens
Cycle Enfield - Section 6 A105 Oaktree Avenue to Carpenters Gardens Stage 2 Road Safety Audit Ref: 2759.03.06/032/A105/BOR/2016 Prepared for: London Borough of Enfield By: Road Safety Audit, TfL Asset
More informationFrascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation
Frascati Road and Temple Hill Route Improvements Outline Design Report to Accompany Public consultation September 2013 Background: Dún Laoghaire-Rathdown is committed to providing high quality pedestrian
More informationINTERIM ADVICE NOTE 98/07 GUIDANCE FOR HA SERVICE PROVIDERS ON IMPLEMENTING THE SKID RESISTANCE POLICY (HD28/04)
INTERIM ADVICE NOTE 98/07 GUIDANCE FOR HA SERVICE PROVIDERS ON IMPLEMENTING THE SKID RESISTANCE POLICY (HD28/04) Summary This interim advice note provides guidance to facilitate the effective application
More informationSwamp Road Residents Study
Swamp Road Residents Study SRRG Meeting with PennDot and Elected Officials Newtown and Wrightstown, PA April 25, 2008 Newtown Township Section of Swamp Road Limited Public Funds No reconstruction of a
More informationSPEED CONTROL AT ROUNDABOUTS USE OF MAXIMUM ENTRY PATH RADII
23 rd ARRB Conference Research Partnering with Practitioners, Adelaide Australia, 2008 SPEED CONTROL AT ROUNDABOUTS USE OF MAXIMUM ENTRY PATH RADII Dr Owen Arndt, Queensland Department of Main Roads, Australia
More informationStage 2 Road Safety Audit
Consulting Stage 2 Road Safety Audit Stretford Public Realm Improvements Phase 1 CO00201045 June 2017 ISSUED Document Control Sheet Project Name: Stretford Public Realm Improvements Phase 1 Project Number:
More informationPAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT
Chairperson and Committee Members ENVIRONMENT AND COMMUNITY DEVELOPMENT COMMITTEE 6 DECEMBER 2011 Meeting Status: Public Purpose of Report: For Decision PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION
More informationDraft letter to Designers and Managing Agents INTERIM ADVICE NOTE 43/02: CANTILEVER AND PORTAL GANTRY VMS
Draft letter to Designers and Managing Agents INTERIM ADVICE NOTE 43/02: CANTILEVER AND PORTAL GANTRY VMS This Interim Advice Note announces amendments to a series of guidelines related to cantilever and
More informationDerby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN. Date: 20 th November, 2018.
Your Ref: Derby City Council Air Quality - Preferred Option Nov 2018 Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN Date: 20 th November, 2018. 1. Introduction: 1.1. Derby Cycling
More informationREPORT. Engineering and Construction Department
REPORT COMMUNITY SERVICES COMMITTEE MEETING DATE: JUNE 11, 2013 FROM: Engineering and Construction Department DATE: May 24, 2013 SUBJECT: Great Lakes Boulevard Mini Roundabout LOCATION: Great Lakes Boulevard
More informationStreets for All : 9 Use of white lines
Streets for All : 9 Use of white lines On 1st April 2015 the Historic Buildings and Monuments Commission for England changed its common name from English Heritage to Historic England. We are now re-branding
More informationTGSI Tactile Ground Surface Indicators
TGSI Tactile Ground Surface Indicators Introduction: This Design Note, No 11, provides guidelines and requirements for the use and installation of Tactile Ground Surface Indicators (TGSI s). References
More informationTraffic signs used, including signs giving orders, warning signs, direction signs, information signs and road works signs.
Traffic signs Traffic signs used, including signs giving orders, warning signs, direction signs, information signs and road works signs. Although The Highway Code shows many of the signs commonly in use,
More informationCambridge Cycling Campaign P.O. Box 204 Cambridge CB4 3FN (01223)
Policy on paths shared between cycles and pedestrians Cambridge Cycling Campaign P.O. Box 204 Cambridge CB4 3FN (01223) 504095 camcycle@pobox.co.uk November 1997 1. Summary 1.1. Pavements alongside roads
More informationQ&A for Safety Code. Prepared by the HAUC-UK Safety Code working group
Q&A for Safety Code Prepared by the HAUC-UK Safety Code working group Q1 What is the latest version of the Safety Code? The last time any amendments were made to the Safety Code was in June 2014. This
More information