TII Projects by Municipality

Size: px
Start display at page:

Download "TII Projects by Municipality"

Transcription

1 TII Projects by Municipality TII # PROJECT PROJECT TYPE Atglen PTC 1 SEPTA PAOLI/THORNDALE LINE EXTENSION EXTEND TO C'VILLE, P'BURG, ATGLEN PTS 6 ATGLEN TRAIN STATION CONSTRUCT NEW STATION BP 27 ENOLA LOW GRADE EXTENSION TRAIL BP 41 OCTORARO TRAIL: ATGLEN TO WOLFS HOLLOW MULTI-USE TRAIL SB 5 PA 372 OVER OFFICERS RUN REPLACEMENT INT 65 PA PA 372 SIGNAL UPGRADE Avondale MCN 2 PA 41: DELAWARE TO PA 926 SAFETY IMPROVEMENTS BP 18 PENNSY. AVE: CHURCH ST TO 6TH ST SIDEWALKS, CURBS, CROSSWALKS BP 20 STATE RD BIKEWAY: PA 41 TO PA 841 BIKEWAY BP 64 INDIAN RUN RD: W STATE ST TO BORO LINE DRAINAGE AND PEDESTRIAN SB 12 PA 41 OVER WHITE CLAY CK REPLACE OR REHAB CB 28 STATE ST OVER INDIAN RUN REPLACE OR REHAB OP 2 PA 41 (LONDON GROVE & AVONDALE) SIGNALS/TIMING/COORDINATION PR 3 AVONDALE AREA PARK & RIDE LOT RW 39 ELLICOTT AVE (AVONDALE BOROUGH) DRAINAGE AND SITE DISTANCE RW 78 6TH ST (AVONDALE BOROUGH) DRAINAGE IMPROVEMENT RW 79 MORRIS ALY (AVONDALE BOROUGH) DRAINAGE AND PAVEMENT INT 3 PA STATE RD CAPACITY & PED IMPROVEMENTS Birmingham MCN 1 US 202: MATLACK ST TO DELAWARE (SECTION 100) CAPACITY & SAFETY IMPRVOMENTS BP 25 BRANDYWINE TRAIL: US 1 TO PA 52 MULTI-USE TRAIL SB 39 BIRMINGHAM ROAD OVER RADLEY RUN REPLACE OR REHAB Page 1 of 23

2 Caln MCF 1 US 30 BYPASS: REECEVILLE RD TO EXTON BYPASS RECONSTRUCT, WIDENING, RAMPS MCF 2 US 30 BYPASS: PA 10 TO REECEVILLE RD RECONSTRUCTION, RAMPS PTC 1 SEPTA PAOLI/THORNDALE LINE EXTENSION EXTEND TO C'VILLE, P'BURG, ATGLEN CB 13 LLOYD RD OVER BEAVER CREEK REPLACE OR REHAB MB 6 G.O. CARLSON BLVD OVER BEAVER RUN NEW BRIDGE MB 22 FISHERVILLE RD OVER BEAVER RUN TRIBUTARY REPLACE OR REHAB NC 3 G.O. CARLSON BLVD EXTENSION NEW COLLECTOR ROAD RW 20 REECEVILLE ROAD: US 30 BP TO E REECEVILLE RD RECONSTRUCTION/TURNING LANES INT 5 PA BUSINESS US 30 INTERSECTION IMPROVEMENTS INT 56 PA REECEVILLE RD INTERSECTION IMPROVEMENTS INT 63 LINCOLN NORTH CALN RD/OLIVE ST. REALIGN/TURN LANES/SIGNALIZATION Charlestown TPK 1 PA TURNPIKE: VALLEY FORGE TO PA 29 WIDEN TO SIX LANES TPK 2 PA TURNPIKE: PA 29 TO DOWNINGTOWN WIDEN TO SIX LANES BP 15 DEVAULT RAIL TRAIL: PA 29 TO FRENCH CREEK RAIL TRAIL SB 66 PICKERING DAM ROAD OVER BRANCH PICKERING CK REPLACE OR REHAB RW 36 CHARLESTOWN RD: PA 29 TO COLDSTREAM RD SHOULDER WIDENING/SAFETY RW 44 COLDSTREAM RD: MARIAN TO MARYHILL SAFETY IMPROVEMENTS/S-CURVE RW 72 PIKELAND RD NEAR CHURCH RD REALIGNMENT/SHOULDERS INT 51 PIKELAND CHARLESTOWN RD REALIGNMENT INT 57 PHOENIXVILLE YELLOW SPRINGS RD TURN LANE INT 62 HOLLOW CHARLESTOWN RD SHOULDER WORK INT 74 PA VALLEY HILL RD TURN LANE Coatesville MCF 1 US 30 BYPASS: REECEVILLE RD TO EXTON BYPASS RECONSTRUCT, WIDENING, RAMPS MCF 2 US 30 BYPASS: PA 10 TO REECEVILLE RD RECONSTRUCTION, RAMPS PTC 1 SEPTA PAOLI/THORNDALE LINE EXTENSION EXTEND TO C'VILLE, P'BURG, ATGLEN PTS 2 COATESVILLE TRAIN STATION REHABILITATION, PARKING, & ACCESS BP 53 HARMONY ST: 1ST AVE TO 3RD AVE STREETSCAPES RW 42 COATESVILLE: WOODLAN AV, WALNUT, THOMPSON ST RECONSTRUCTION/DRAINAGE/SIDEWALKS INT 11 US 30 PA 82 CAPACITY & SAFETY INT 37 PA PA 340 CAPACITY & SAFETY Page 2 of 23

3 Downingtown MCF 1 US 30 BYPASS: REECEVILLE RD TO EXTON BYPASS RECONSTRUCT, WIDENING, RAMPS MCN 8 PA 113: US 30 BYPASS TO PECK ROAD CAPACITY ADDING PTS 4 DOWNINGTOWN TRAIN STATION RAIL STATION, PARKING, PED ACCESS BP 3 CHESTER VALLEY TRAIL: EXTON TO DOWNINGTOWN MULTI-USE TRAIL BP 9 BRANDYWINE TRAIL EXT: BRADFORD AV TO BOOT RD MULTI-USE TRAIL BP 28 BUSINESS 30: LLOYD AVE TO TRAIN STATION STREETSCAPES SB 4 LANCASTER AV (322/30) O/ E BR. BRANDYWINE CK REPLACE OR REHAB SB 8 LANCASTER AVENUE OVER PAPER MILL RUN REPLACE OR REHAB SB 28 US 322 (BRANDYWINE AV) AMTRAK UNDERPASS PARTIAL REMOVAL/PED IMPROV MB 1 CHESTNUT ST BRIDGE OVER N-S/AMTRAK REPLACEMENT RW 6 BOOT RD: CHESTNUT ST TO QUARRY RD WIDEN TO FOUR-FIVE LANES East Bradford BP 22 BRANDYWINE TRAIL AT US 322 BRIDGE TRAILHEAD BP 29 BRANDYWINE TRAIL (US 322 TO PA 926) PEDESTRIAN TRAIL BP 38 PA BRADFORD AVE. UPDATE CROSSWALK & PED SIGNAL BP 45 US BRADFORD PLAZA CROSSWALK/PED SIGNALIZATION BP 49 US 322: BROOKWORTH PLAZA TO W CHESTER BIKE LANES/MULTI-USE TRAIL BP 55 PA PRICE ST & SCONNELLTOWN ROAD CROSSWALK/PED SIGNALIZATION BP 56 PA CREEK RD / COPES BRIDGE CROSSWALK/PED SIGNALIZATION SB 17 US 322 OVER VALLEY CK REPLACE OR REHAB CB 27 ALLERTON RD OVER E BR BRANDYWINE REHABILITATION CB 43 HARMONY HILL RD OVER LITTLE VALLEY CK REPLACE OR REHAB CB 49 HIGHLAND RD OVER TAYLORS RUN REPLACE OR REHAB NC 11 WCU ACCESS RD: NEW ST TO HIGH ST ROAD RECONSTRUCTION RW 82 RAVINE ROAD (EAST BRADFORD) SAFETY INT 35 US CREEK/FRANK RDS SAFETY IMPROVEMENTS INT 40 US VALLEY CREEK RD SAFETY IMPROVEMENTS INT 75 PA ROSEDALE AVE SIGNALIZATION INT 105 PA CREEK RD SAFETY IMPROVEMENTS Page 3 of 23

4 East Brandywine BP 6 STRUBLE TRAIL EXTENSION MULTI-USE TRAIL BP 58 EAST/WEST PED TRAIL: STRUBLE TO GUTHRIESV'LE PEDESTRIAN TRAIL SB 18 LITTLE WASHINGTON RD OVER CULBERTSON RUN REPLACEMENT SB 23 PA 282 (NR REED RD) O/ TRIB BRANDYWINE CK REPLACE OR REHAB SB 30 PA 282 (NR DOWLIN FG RD) O/BR BRANDYWINE CK REPLACE OR REHAB CB 5 REEDS RD OVER E BRANDYWINE REPLACE OR REHAB CB 21 HADFIELD RD OVER BEAVER CREEK REPLACE OR REHAB MB 10 LYNDELL ROAD OVER EAST BR BRANDYWINE CREEK REPLACE OR REHAB NC 1 US 322: REECEVILLE RD EXT NEW COLLECTOR ROAD OP 6 US 322 CLOSED LOOP SYSTEM CLOSED LOOP SYSTEM PR 7 EAST BRANDYWINE AREA PARK & RIDE LOT RW 65 DORLANS MILL RD: PA 282 TO LONGFIELDS WAY SHOULDER WIDENING East Caln MCF 1 US 30 BYPASS: REECEVILLE RD TO EXTON BYPASS RECONSTRUCT, WIDENING, RAMPS MCN 8 PA 113: US 30 BYPASS TO PECK ROAD CAPACITY ADDING PTS 4 DOWNINGTOWN TRAIN STATION RAIL STATION, PARKING, PED ACCESS BP 3 CHESTER VALLEY TRAIL: EXTON TO DOWNINGTOWN MULTI-USE TRAIL BP 9 BRANDYWINE TRAIL EXT: BRADFORD AV TO BOOT RD MULTI-USE TRAIL SB 3 BOOT RD OVER AMTRAK REHABILITATION SB 14 LANCASTER AV OVER BR OF E BR BRANDYWINE CK REPLACE OR REHAB MB 1 CHESTNUT ST BRIDGE OVER N-S/AMTRAK REPLACEMENT MB 30 SKELP LEVEL ROAD BRIDGE REPLACEMENT RW 6 BOOT RD: CHESTNUT ST TO QUARRY RD WIDEN TO FOUR-FIVE LANES RW 18 PA 113: US 30 BP TO WOODMONT DR CAPACITY INT 42 BUSINESS WB 30 BYPASS OFF RAMP ADD LANE TO WB OFF RAMP INT 54 BOOT QUARRY RD ADD LANE / SAFETY Page 4 of 23

5 East Coventry BP 1 SCHUYLKILL RIVER TRAIL: LINFIELD TO POTTSTOWN MULTI-USE TRAIL BP 71 EAST COVENTRY MULTIMODAL CONNECTIONS SIDEWALK/TRAIL CB 18 OLD SCHUYLKILL RD OVER PIGEON CK REPLACE OR REHAB CB 22 HALTEMAN RD OVER PIGEON CREEK REPLACE OR REHAB CB 50 BAPTIST CHURCH RD OVER PIGEON CREEK REPLACE OR REHAB MB 13 BEALER RD OVER PIGEON CREEK REPLACEMENT MB 19 FULMER RD OVER PIGEON CREEK REPLACE OR REHAB MB 20 KULP RD OVER PIGEON CREEK REPLACE OR REHAB MB 25 SCHOOLHOUSE RD OVER TRIB OF PIGEON CREEK REPLACE OR REHAB MB 27 ZIEBER RD OVER PIGEON CREEK REPLACE OR REHAB MB 32 SAWMILL RD OVER BICKETS RUN REPLACE OR REHAB MB 33 SCHOOLHOUSE RD OVER BICKELS RUN REPLACE OR REHAB MB 34 SCHOOLHOUSE RD OVER TRIB OF BICKELS RUN REPLACE OR REHAB MB 38 HARLEY RD OVER BICKELS RUN REPLACE OR REHAB MB 39 SPIECE RD OVER BICKELS RUN REPLACE OR REHAB RW 8 PA 724: LINFIELD RD TO VAUGHN RD ADD TURN LANES/SIGNALIZATION RW 38 SANATOGA RD: CEDARVILLE TO OLD SCHUYLKILL RECONSTRUCTION RW 52 BETHEL CHURCH RD: PA 724 TO PA 23 SAFETY IMPROVEMENTS RW 71 STONY RUN RD: BETHEL CHURCH TO PA 724 ALIGNMENT & CAPACITY INT 43 PA 724 / BETHEL CHURCH RD / LINFIELD RD SIGNAL / CAPACITY INT 81 PA WELLS RD SIGNALIZATION / WIDENING East Fallowfield FRR 2 WILMINGTON & NORTHERN LINE REHABILITATION TRACK & TIE REPLACEMENT SB 22 FROG HOLLOW RD (SPEAKMANS #1) OVER BUCK RUN REHABILITATION SB 26 STRASBURG ROAD OVER TRIB OF W.BR.OF B. CK REPLACE OR REHAB SB 37 PA 82 (DOE RUN ROAD) OVER BUCK RUN REPLACE OR REHAB RW 76 MORTONVILLE ROAD EMBANKMENT STABILIZATION RESTORATION Page 5 of 23

6 East Goshen MCN 6 US 202: US 30 TO MATLACK (SECTION 200) OPERATIONAL IMPROVEMENTS PTC 3 PA 3 - BETTER BUS IMPROVEMENTS IMPROVE CRITICAL/EXPRESS STOPS BP 13 PAOLI PIKE TRAIL: AIRPORT RD TO LINE RD MULTI-USE TRAIL BP 59 TOWN CENTER (OR GOSHENVILLE) STREETSCAPE SIDEWALK AND STREETSCAPE BP 65 BOOT ROAD PATH SIDEPATH BP 68 RESERVOIR ROAD SHARED LANE SHARED LANE BP 69 RESERVOIR ROAD PATH SIDEPATH BP 70 BOW TREE CONNECTION MULTI-USE TRAIL CB 4 DUTTON MILL RD OVER RIDLEY CK REPLACE OR REHAB RW 2 PA 3: US 202 TO PA 352 SAFETY / BIKE / PED RW 14 PAOLI PIKE TRAFFIC CALMING TRAFFIC CALMING AND SAFETY RW 16 PAOLI PIKE: BOOT RD TO FIVE POINTS RD CAPACITY/SAFETY IMPROVEMENTS RW 17 BOOT ROAD: WILSON DR TO GREENHILL RD SAFETY/OPERATIONAL IMPROV INT 26 PA KING RD ADD TURN LANES/SAFETY East Marlborough MCF 6 US 1: MARYLAND LINE TO SCHOOL HOUSE RD RECONSTRUCTION/INTERCHANGES SB 55 PA 926 OVER BR WEST BR.RED CLAY CK REPLACE OR REHAB CB 39 MILL RD OVER W RED CLAY REPLACE OR REHAB MB 24 E LOCUST RD OVER E BR RED CLAY CK REPLACE OR REHAB RW 84 POPLAR TREE ROAD CULVERT REPLACEMENTS REPLACEMENT East Nantmeal MCF 5 PA 100: FONT RD TO S HANOVER ST SAFETY IMPROVEMENTS SB 63 FAIRVIEW ROAD OVER MARSH CK REPLACE OR REHAB CB 6 WARWICK FURN RD OVER S BR FRENCH REHABILITATION East Nottingham MCF 6 US 1: MARYLAND LINE TO SCHOOL HOUSE RD RECONSTRUCTION/INTERCHANGES SB 51 5TH ST BR OVER LITTLE ELK CK REPLACE OR REHAB CB 44 LITTLE ELK CK RD OVER ELK CREEK REPLACE OR REHAB RW 4 BALTIMORE PIKE: PA 272 TO LINCOLN U. CORRIDOR IMPROVEMENTS RW 11 PA 272: LANCASTER CO TO MARYLAND LINE REDUCE SPEED, SHOULDERS, & SAFETY INT 101 PA BARNSLEY-CHROME RD SAFETY IMPROVEMENTS Page 6 of 23

7 East Pikeland BP 62 PA 724: PA 23 TO TOWNSHIP LINE ROAD SIDEWALKS AND BUS STOP CB 25 SPRING CITY RD OVER STONY RUN REPLACE OR REHAB CB 47 ART SCHOOL RD OVER PICKERING REPLACE OR REHAB NC 2 NORTHERN RELIEF RT/FILMORE ST EXT NEW COLLECTOR ROAD RW 9 PA 724: PA 23 TO BRIDGE ST (SPRING CITY) COMPLETE STREET IMPROVEMENTS INT 12 PA TOWNSHIP LINE RD INTERSECTION REALIGNMENT INT 44 PA COLDSTREAM RD ADD TURN LANES INT 87 PA RAPPS DAM RD ADD TURN LANES / SIGNAL UPGRADE INT 91 PA 113 AT TOWNSHIP LINE ROAD INSTALL LEFT-TURN LANES ON PA 113 East Vincent BP 32 FRENCH CREEK TRAIL MULTI-USE TRAIL CB 1 SEVEN STARS RD OVER FRENCH CK REPLACE OR REHAB CB 10 FRENCH CREEK RD OVER FRENCH CK REPLACE OR REHAB CB 24 BERTOLET SCHOOL OVER FRENCH CK REPLACE OR REHAB CB 42 PIKELAND RD OVER STONEY RUN REPLACE OR REHAB RW 9 PA 724: PA 23 TO BRIDGE ST (SPRING CITY) COMPLETE STREET IMPROVEMENTS RW 71 STONY RUN RD: BETHEL CHURCH TO PA 724 ALIGNMENT & CAPACITY INT 25 PA NEW ST SAFETY IMPROVEMENTS Page 7 of 23

8 East Whiteland MCF 1 US 30 BYPASS: REECEVILLE RD TO EXTON BYPASS RECONSTRUCT, WIDENING, RAMPS MCN 5 US 30: US 202 TO MALIN RD WIDEN TO FIVE LANES MCN 6 US 202: US 30 TO MATLACK (SECTION 200) OPERATIONAL IMPROVEMENTS TPK 1 PA TURNPIKE: VALLEY FORGE TO PA 29 WIDEN TO SIX LANES BP 7 PATRIOT'S PATH: MALVERN TO VF PARK MULTI-USE TRAIL (MUNICIPAL SPURS) BP 12 PA 29 MULTIMODAL IMPROVEMENTS BICYCLE/PEDESTRIAN/TRANSIT BP 36 E WHITELAND TRAIL: GVHS TO CVT MULTI-USE TRAIL SB 1 US 202 OVER AMTRAK/US 30 EB (FRAZER) MAJOR MAINTENANCE SB 48 SWEDESFORD ROAD OVER BRANCH VALLEY CK REPLACE OR REHAB MB 31 RAVINE RD UNDER FRAZER RR REMOVAL MB 41 FRAME AVE OVER VALLEY CREEK TRIB REPLACE OR REHAB NC 5 MALIN RD EXTENSION: MALIN RD TO PA AVE NEW COLLECTOR ROAD NC 7 THREE TUN RD EXTENSION: PA 352 TO MALIN RD NEW COLLECTOR ROAD INT 20 US PA 352 CAPACITY IMPROVEMENTS INT 26 PA KING RD ADD TURN LANES/SAFETY INT 28 US PLANEBROOK RD CAPACITY IMPROVEMENTS INT 45 PA SWEDSFORD RD (WESTERN INT) REALIGNMENT/ADD TURN LANES INT 46 SWEDESFORD MILL LAND SAFETY IMPROVEMENTS INT 57 PHOENIXVILLE YELLOW SPRINGS RD TURN LANE INT 61 PA SPRING VALLEY RD ALIGNMENT/SIGHT DISTANCE INT 77 PA BACTON HILL RD ADD TURN LANES/SIGNALIZATION Easttown PTS 7 DEVON TRAIN STATION REHABILITATION & ACCESS SB 62 WATERLOO ROAD OVER DARBY CK REPLACE OR REHAB INT 29 US WATERLOO RD TURNING LANES & SIGNAL IMPROV INT 70 SUGARTOWN WATERLOO RD SAFETY IMPROVEMENTS Elk SB 19 STATE ROAD BRIDGE OVER LITTLE ELK CK REPLACE OR REHAB CB 20 BONSUL RD OVER BIG ELK CK REHABILITATION CB 33 HICKORY HILL RD OVER LITTLE ELK REPLACE OR REHAB CB 35 REISLERS RD OVER JORDON RUN REPLACE OR REHAB RW 27 STATE RD SOUTH OF OLD FORGE RD SHOULDER WIDENING RW 45 PA 472: E NOTT TWP TO LEWISVILLE (ELK TWP) RECONSTRUCTION / DRAINAGE RW 77 PA PEACEDALE COURT IMPROVE SIGHT DISTANCE/REMOVE HUMP RW 88 KINGS ROW RD RECONSTRUCTION INT 86 PA KINGS ROW RD SAFETY IMPROVEMENTS Page 8 of 23

9 Elverson RW 19 PA 23: ELVERSON BOROUGH STORMWATER INT 116 MAIN STREET STREETSCAPES TRAFFIC SIGNAL ON MAIN STREET Franklin MCF 7 PA 896: HESS MILL RD TO CHAMBERS ROCK RD SAFETY IMPROVEMENTS SB 38 PA 841 OVER BR W BR WHITE CLAY CK REPLACE OR REHAB MB 11 HESS MILL RD OVER WHITE CLAY CREEK REPLACE OR REHAB MB 12 WALKER RD OVER TRIB BIG ELK CREEK REPLACE OR REHAB INT 66 PA DEN RD SAFETY IMPROVEMENTS INT 79 PA GOOD HOPE RD SAFETY/MINOR CAPACITY INT 80 PA SCHOOL HOUSE RD SAFETY IMPROVEMENTS INT 98 PA FLINT HILL RD SAFETY IMPROVEMENTS INT 108 PA CARRIAGE RUN RD SAFETY IMPROVEMENTS INT 109 PA N CREEK RD SAFETY IMPROVEMENTS INT 113 PA GYPSY HILL RD SAFETY IMPROVEMENTS Highland MCN 3 PA 10: FRIENDSHIP CHURCH RD TO PA 896 SAFETY IMPROVEMENTS Honey Brook Borough MCN 4 PA 10: HONEY BROOK TWP TO SADSBURY TWP SAFETY IMPROVEMENTS PR 2 HONEY BROOK AREA PARK & RIDE LOT RW 5 PA 10: HONEY BROOK TWP WIDEN SHOULDERS/BUGGY LANES Honey Brook Township MCN 4 PA 10: HONEY BROOK TWP TO SADSBURY TWP SAFETY IMPROVEMENTS BP 6 STRUBLE TRAIL EXTENSION MULTI-USE TRAIL SB 11 PA 10 OVER W BR BRANDYWINE CK REPLACE OR REHAB RW 5 PA 10: HONEY BROOK TWP WIDEN SHOULDERS/BUGGY LANES RW 7 PA 322: CONSTRUCT CARRIAGE LANES ROAD WIDENING INT 27 US CHESTNUT TREE RD ADD TURN LANES INT 93 PA POPLAR RD SHOULDER WIDENING FOR TRUCKS INT 99 PA TODD RD SHOULDER WIDENING INT 100 PA KING RD IMPROVE SIGHT DISTANCE INT 117 VARIOUS INTERSECTIONS - HONEY BROOK TOWNSHIP SAFETY Page 9 of 23

10 Kennett Square PTC 6 SOUTHERN CHESCO TO NEW CASTLE NEW TRANSIT SERVICE BP 37 STATE ST: WALNUT ST TO MILL ST STREETSCAPE BP 50 RED CLAY GREENWAY: CREAM ST TO RAILROAD MULTI-USE TRAIL SB 36 SOUTH WALNUT ST OVER RED CLAY CK REPLACEMENT PR 1 KENNETT PARK & RIDE: CYPRESS PARK & RIDE LOT RW 66 BIRCH STREET: BROAD ST TO KENNETT TWP RECONSTRUCTION INT 41 SOUTH UNION ST IMPROVE TURNING RADII / RECONSTRUCT Kennett Township MCF 6 US 1: MARYLAND LINE TO SCHOOL HOUSE RD RECONSTRUCTION/INTERCHANGES MCN 2 PA 41: DELAWARE TO PA 926 SAFETY IMPROVEMENTS PTC 6 SOUTHERN CHESCO TO NEW CASTLE NEW TRANSIT SERVICE SB 20 PA 82 OVER EAST BRANCH OF RED CLAY CK REPLACE OR REHAB SB 43 BURNT HILL ROAD OVER BRANCH RED CLAY CK REPLACE OR REHAB CB 7 HILLENDALE RD OVER W BR RED CLAY CK REPLACE OR REHAB MB 16 CHANDLER MILL RD OVER W BR RED CLAY PEDESTRIAN IMPROVEMENTS MB 36 HILLENDALE RD UNDER OCTORARA RR REPLACE OR REHAB NC 6 WAYS LANE EXTENSION NEW COLLECTOR ROAD London Britain MCF 7 PA 896: HESS MILL RD TO CHAMBERS ROCK RD SAFETY IMPROVEMENTS SB 47 LONDON TRACT RD (GLEN RD) OVER TRIB W CLAY CK REPLACE OR REHAB CB 48 SHARPLESS RD OVER WHITE CLAY REPLACE OR REHAB CB 54 FLINT HILL RD OVER WEST BR WHITE CLAY CK REPLACE OR REHAB RW 85 FLINT HILL RD: GOOD HOPE RD TO MERCER MILL RD RECONSTRUCTION / DRAINAGE Page 10 of 23

11 London Grove MCF 6 US 1: MARYLAND LINE TO SCHOOL HOUSE RD RECONSTRUCTION/INTERCHANGES MCN 2 PA 41: DELAWARE TO PA 926 SAFETY IMPROVEMENTS BP 20 STATE RD BIKEWAY: PA 41 TO PA 841 BIKEWAY BP 21 PA 41: US 1 TO GLEN WILLOW RD STREETSCAPES & ACCESS IMPROVEMENTS BP 24 BALTIMORE PIKE: WEST GROVE TO AVONDALE IMPROVE EXISTING BIKE LANES BP 42 PA 41: BALT PIKE/41 INT. TO AVONDALE SIDEWALKS & TRAFFIC CALMING BP 44 BALTIMORE PK: WEST GROVE TO PA 41 SIDEWALKS BP 46 BALTIMORE PK AT PA 41 BUS SHELTER BP 60 W. LONDON GROVE RD: CHATHAM SIDEWALK BP 67 S GUERNSEY RD SIDEWALK SB 65 EWING ROAD OVER MIDDLE BR WHITE CLAY CK REPLACE OR REHAB SB 67 PA 926 OVER BR.WHITE CLAY CK REPLACE OR REHAB CB 26 VALLEY RD OVER MID BR WHITE CLAY REPLACE OR REHAB CB 56 BAKER STATION RD OVER EAST WHITE CLAY REPLACE OR REHAB OP 2 PA 41 (LONDON GROVE & AVONDALE) SIGNALS/TIMING/COORDINATION PR 3 AVONDALE AREA PARK & RIDE LOT RW 86 N GUERNSEY ROAD: PA 41 TO US 1 WIDEN FROM 17' TO 24' INT 19 PA BALTIMORE PIKE SAFETY/PED IMPROVEMENTS INT 32 PA PA 841 (CHATHAM) SAFETY/CALMING INT 88 PA N GUERNSEY RD ADD TURN LANES INT 110 STATE SCHOOLHOUSE RD ROUNDABOUT INT 112 N GUERNSEY W WOODVIEW RD SAFETY IMPROVEMENTS INT 118 PA HOWELL MOORE RD SAFETY IMPROVEMENTS INT 119 STATE S GUERNSEY RD SAFETY / ROUNDABOUT INT 120 SCHOOLHOUSE REMINGTON WAY ADD TURNING LANE/REALIGNMENT Londonderry MCN 2 PA 41: DELAWARE TO PA 926 SAFETY IMPROVEMENTS CB 40 ST. MALACHI RD OVER DOE RUN REPLACE OR REHAB INT 13 PA PA 926 SAFETY/ROUNDABOUT INT 34 PA PA 796 ROUNDABOUT INT 39 PA PA 796 ADD TURN LANES INT 55 PA WHITEHORSE RD SIGNAL INT 60 PA HOOD RD INTERSECTION IMPROVEMENTS INT 84 PA FERNWOOD RD ROUNDABOUT INT 102 PA HOOD RD SAFETY IMPROVEMENTS Page 11 of 23

12 Lower Oxford MCF 6 US 1: MARYLAND LINE TO SCHOOL HOUSE RD RECONSTRUCTION/INTERCHANGES MCN 3 PA 10: FRIENDSHIP CHURCH RD TO PA 896 SAFETY IMPROVEMENTS CB 2 TOWNSHIP ROAD OVER W. BR BIG ELK CREEK REPLACE OR REHAB CB 3 ELK VIEW RD OVER BIG ELK REHABILITATION CB 45 HAYESVILLE RD OVER WEST BR BIG ELK CK REPLACE OR REHAB RW 3 PA 10: OXFORD TO US 1 ADD TURN LANES & SAFETY IMPROV RW 4 BALTIMORE PIKE: PA 272 TO LINCOLN U. CORRIDOR IMPROVEMENTS INT 9 US 1 / PA 10 INTERCHANGE ADD TURN LANES INT 52 ELKDALE BALTIMORE PK REALIGN INTERSECTION Malvern BP 7 PATRIOT'S PATH: MALVERN TO VF PARK MULTI-USE TRAIL (MUNICIPAL SPURS) NC 5 MALIN RD EXTENSION: MALIN RD TO PA AVE NEW COLLECTOR ROAD RW 87 MONUMENT AVE. TRAFFIC CALMING PROJECT TRAFFIC CALMING INT 21 PAOLI WARREN AVE CAPACITY IMPROVEMENTS INT 71 PENNSYLVANIA WARREN AVE PEDESTRIAN IMPROVEMENTS / DRAINAGE New Garden MCF 6 US 1: MARYLAND LINE TO SCHOOL HOUSE RD RECONSTRUCTION/INTERCHANGES MCN 2 PA 41: DELAWARE TO PA 926 SAFETY IMPROVEMENTS PTC 6 SOUTHERN CHESCO TO NEW CASTLE NEW TRANSIT SERVICE BP 5 BALT PIKE: NEWARK RD TO MILL RD PEDESTRIAN TRAIL SB 7 BALTIMORE PIKE OVER BRANCH RED CLAY CK REPLACE OR REHAB CB 41 WATSON MILL RD OVER BROAD RUN REPLACE OR REHAB INT 1 BALTIMORE NEWARK RD ADD TURN LANES/SAFETY INT 6 NEWARK HILLENDALE RD SAFETY IMPROVEMENTS INT 10 PA NEWARK RD ADD TURN LANES / SIGNAL UPGRADE New London MCF 7 PA 896: HESS MILL RD TO CHAMBERS ROCK RD SAFETY IMPROVEMENTS SB 27 PENNOCKS BRIDGE RD OVER WB WHITE CLAY CK REPLACE OR REHAB CB 20 BONSUL RD OVER BIG ELK CK REHABILITATION MB 9 AVONDALE RD OVER MID BR WHITE CLAY CREEK REPLACE OR REHAB RW 88 KINGS ROW RD RECONSTRUCTION INT 95 PA OXFORD RD ADD TURN LANES INT 96 PA W AVONDALE RD ADD TURN LANES Page 12 of 23

13 Newlin FRR 2 WILMINGTON & NORTHERN LINE REHABILITATION TRACK & TIE REPLACEMENT CB 11 HARVEY'S BRIDGE OVER W BR BRANDYWINE REPLACE OR REHAB RW 13 LAUREL ROAD (S OF STRASBURG RD) ROADWAY REPAIR RW 22 PA 162: W BRADFORD TO E MARLBOROUGH RECONSTRUCT/WIDEN/REALIGN RW 48 GREEN VALLEY RD ROAD / CULVERT REPLACEMENT RW 49 BRANDWYINE CREEK RD RECONSTRUCTION RW 50 BRANDYWINE DRIVE RECONSTRUCTION RW 83 STARGAZERS RD RECONSTRUCT/WIDEN/REALIGN North Coventry MCF 3 US 422: BERKS CO. TO SCHUYLKILL RIVER BR (W) SAFETY, RECON, BRIDGES, INTERCHANGE MCF 4 US 422: POTTSTOWN BYP RECON (M1B, M2B, M03) SAFETY, RECON, BRIDGES, INTERCHANGE MCF 5 PA 100: FONT RD TO S HANOVER ST SAFETY IMPROVEMENTS BP 1 SCHUYLKILL RIVER TRAIL: LINFIELD TO POTTSTOWN MULTI-USE TRAIL BP 4 S HANOVER ST: BRIDGE & ROAD DIET PEDESTRIAN/STREETSCAPES BP 47 RIVER RD TRAIL PEDESTRIAN TRAIL BP 48 RIVER PARK BRIDGE CONVERT RR BR TO PED BR BP 52 N COVENTRY PEDESTRIAN PROJECT PEDESTRIAN FACILITIES SB 29 HARMONYVILLE ROAD OVER ROCK RUN REPLACE OR REHAB CB 17 KEIM ST OVER SCHUYLKILL RIVER (MONTCO PROJ) REPLACEMENT CB 34 CEDARVILLE RD OVER ECKERS RUN REPLACE OR REHAB MB 13 BEALER RD OVER PIGEON CREEK REPLACEMENT OP 1 POTTSTOWN CLOSED LOOP SYSTEM CLOSED LOOP SYSTEM PR 4 NORTH COVENTRY AREA PARK & RIDE LOT RW 10 PA 100: HOFFECKER RD TO S HANOVER ST REVERSE FRONTAGE ROAD / TURN LANES RW 31 HARMONYVILLE RD S-CURVE REALIGNMENT/DRAINAGE RW 59 SHENKEL ROAD BRIDGES REPAIR / REPLACE RW 60 TEMPLE ROAD BRIDGE REPAIR / REPLACE RW 61 COVENTRYVILLE ROAD BRIDGE REPAIR / REPLACE RW 62 CHESTNUT HILL ROAD BRIDGE REPAIR / REPLACE RW 63 KEIM STREET BRIDGE OVER BICKEL'S RUN REPAIR / REPLACE INT 49 PA LAURELWOOD RD ADD TURN LANES / REALIGN APPROACHES Page 13 of 23

14 Oxford MCF 6 US 1: MARYLAND LINE TO SCHOOL HOUSE RD RECONSTRUCTION/INTERCHANGES BP 26 S 3RD ST: HODGSON ST TO SOUTH ST STREETSCAPE BP 35 MARKET ST: S 4TH ST TO 5TH ST & RAILROAD ALY STREETSCAPE PR 5 OXFORD BOROUGH PARKING GARAGE RW 3 PA 10: OXFORD TO US 1 ADD TURN LANES & SAFETY IMPROV RW 4 BALTIMORE PIKE: PA 272 TO LINCOLN U. CORRIDOR IMPROVEMENTS RW 55 BROAD ST: S FOURTH ST TO S. EIGHTH ST RECONSTRUCTION RW 56 N 2ND ST: MT VERNON ST TO PA 472 RECONSTRUCTION RW 67 WHEELER BLVD: LINCOLN ST TO N.THIRD ST STORMWATER/DRAINAGE RW 68 MT VERNON ST: N THIRD ST TO PA 472 STREET/ STORMWATER RW 69 PARK ST: N. THIRD ST TO LINCOLN ST RECONSTRUCTION RW 70 NIBLOCK ALY: BROAD ST TO MARKET ST RECONSTRUCTION RW 74 HODGSON ST: LOCUST ST TO S FIFTH ST RECONSTRUCTION RW 75 S 4TH ST: HODGSON ST TO GRANT ST RECONSTRUCTION RW 80 BRICK ST: 110 BRICK ST TO MARKET ST RECONSTRUCTION RW 81 RAILROAD AVE: NEW ST TO N FIFTH ST RECONSTRUCTION Parkesburg MCN 3 PA 10: FRIENDSHIP CHURCH RD TO PA 896 SAFETY IMPROVEMENTS PTC 1 SEPTA PAOLI/THORNDALE LINE EXTENSION EXTEND TO C'VILLE, P'BURG, ATGLEN PTS 5 PARKESBURG TRAIN STATION REHABILITATION & PARKING BP 11 FIRST AV & MAIN ST STREETSCAPES, CALMING, GATEWAYS MB 2 WEST BRIDGE ST OVER AMTRAK REPLACEMENT MB 7 E BRIDGE STREET OVER AMTRAK REPLACEMENT Page 14 of 23

15 Penn MCF 6 US 1: MARYLAND LINE TO SCHOOL HOUSE RD RECONSTRUCTION/INTERCHANGES MCF 7 PA 896: HESS MILL RD TO CHAMBERS ROCK RD SAFETY IMPROVEMENTS BP 40 JENNERSVILLE VILLAGE MULTI-MODAL IMP. WALKWAYS, BIKE LANES, TRAFFIC CALM SB 34 NEWARK ROAD OVER BRANCH BIG ELK CK REPLACE OR REHAB SB 64 EWING ROAD OVER BRANCH WHITE CLAY CK REPLACE OR REHAB CB 3 ELK VIEW RD OVER BIG ELK REHABILITATION CB 38 PUSEY MILL ROAD OVER BIG ELK CREEK REPLACE OR REHAB RW 12 PA 796: OLD BALTIMORE PIKE TO CORBY RD WIDENING/ADD TURN LANES INT 7 OLD BALTIMORE PA 796 RECONFIGURE INTERSECTION INT 59 PA CORBY RD SAFETY IMPROVEMENTS INT 64 BALTIMORE PASCHAL MILL RD TRAFFIC SIGNAL INT 73 PA PENNOCKS BRIDGE RD INSTALL TRAFFIC SIGNAL Pennsbury FRR 2 WILMINGTON & NORTHERN LINE REHABILITATION TRACK & TIE REPLACEMENT FRR 3 HILLENDALE ROAD GRADE CROSSING GRADE CROSSING SIGNAL IMPROVEMENT BP 8 PA 52 BIKEWAY (PENNSBURY) BIKEWAY BP 25 BRANDYWINE TRAIL: US 1 TO PA 52 MULTI-USE TRAIL SB 9 S CREEK RD OVER BRANDYWINE CK (TWIN BR) REPLACEMENT Phoenixville PTC 4 SEPTA NORRISTOWN/MANAYUNK LINE EXTENSION NEW PASSENGER RAIL SERVICE BP 15 DEVAULT RAIL TRAIL: PA 29 TO FRENCH CREEK RAIL TRAIL BP 23 PA 23: WHITE HORSE RD TO VALLEY RD SIDEWALKS BP 34 FRENCH CREEK TRAIL: NORTH SIDE MULTI-USE TRAIL SB 33 N/S DEVAULT LINE OVER MAIN STREET RAISE OVERHEAD CLEARANCE OR REMOVE NC 2 NORTHERN RELIEF RT/FILMORE ST EXT NEW COLLECTOR ROAD OP 5 PHOENIXVILLE CLOSED LOOP SYSTEM EXPANSION OF CLOSED LOOP SYSTEM PR 6 PHOENIXVILLE PARKING GARAGE PARKING GARAGE INT 4 PA PA 113 (BRIDGE ST) SAFETY IMPROVEMENTS INT 12 PA TOWNSHIP LINE RD INTERSECTION REALIGNMENT INT 14 BRIDGE STARR ST REALIGNMENT & SIGNALIZATION INT 38 NUTT MASON STREET SIGNALIZE INTERSECTION Page 15 of 23

16 Pocopson FRR 2 WILMINGTON & NORTHERN LINE REHABILITATION TRACK & TIE REPLACEMENT BP 29 BRANDYWINE TRAIL (US 322 TO PA 926) PEDESTRIAN TRAIL INT 90 PA LOCUST GROVE ADD LEFT TURN LANE INT 94 PA POCOPSON RD ADD TURN LANES Sadsbury MCF 2 US 30 BYPASS: PA 10 TO REECEVILLE RD RECONSTRUCTION, RAMPS MCN 4 PA 10: HONEY BROOK TWP TO SADSBURY TWP SAFETY IMPROVEMENTS PTC 1 SEPTA PAOLI/THORNDALE LINE EXTENSION EXTEND TO C'VILLE, P'BURG, ATGLEN BP 33 BUS 30: SADSBURYVILLE TO BELLAIRE BUS PARK SIDEWALKS SB 50 OLD WILMINGTON RD UNDER AMTRAK IMPROVE HEIGHT RESTRICTION MB 8 OCTORARA RD OVER BUCK RUN REPLACE OR REHAB MB 14 COMPASS RD BRIDGE OVER BUCK RUN REPLACE OR REHAB Schuylkill PTC 4 SEPTA NORRISTOWN/MANAYUNK LINE EXTENSION NEW PASSENGER RAIL SERVICE BP 14 PED BRIDGE OVER PICKERING CK PEDESTRIAN BRIDGE BP 15 DEVAULT RAIL TRAIL: PA 29 TO FRENCH CREEK RAIL TRAIL BP 17 VALLEY FORGE RD: PAWLINGS RD TO WHITEHORSE RD SIDEWALKS BP 19 VALLEY FORGE RD: VALLEY PARK RD TO PAWLINGS R SIDEWALKS BP 23 PA 23: WHITE HORSE RD TO VALLEY RD SIDEWALKS BP 57 COUNTRY CLUB RD: PA 23 TO VALLEY PARK RD SIDEWALK BP 61 PAWLINGS RD: VALLEY FORGE RD TO TWP LINE SIDEWALK BP 66 WHITEHORSE RD: VALLEY FORGE RD TO POTHOUSE RD SIDEWALK CB 31 CREEK RD OVER PICKERING CREEK REPLACE OR REHAB MB 28 WHITEHORSE RD (AT PENNYPACKER AV) CULVERT REPLACEMENT MB 29 WHITEHORSE RD (NEAR LORAMAR LN) CULVERT REPLACEMENT RW 32 WHITEHORSE RD (SCHUYLKILL TWP) STORMWATER/DRAINAGE RW 33 COUNTRY CLUB RD (SCHUYLKILL TWP) STORMWATER/DRAINAGE RW 58 VALLEY PARK RD (SCHUYLKILL TWP) STORMWATER/DRAINAGE INT 31 POTHOUSE BRIDGE ST ADD TURN LANES/SIGNALIZATION INT 47 PA WHITEHORSE RD WIDEN/CHANNELIZE/SIGNALIZE INT 53 MOREHALL DORCHESTER WY NEW TRAFFIC SIGNAL INT 68 VALLEY PARK CLOTHIER SPRINGS RD SAFETY IMPROVEMENTS South Coatesville BP 72 SOUTH COATESVILLE STREET LIGHTS NEW STREET LIGHTS INT 58 S 1ST MODENA RD SAFETY IMPROVEMENTS Page 16 of 23

17 South Coventry MCF 5 PA 100: FONT RD TO S HANOVER ST SAFETY IMPROVEMENTS CB 9 PORTERS MILL RD OVER PIGEON CREEK REPLACE OR REHAB CB 16 COVENTRYVILLE RD OVER FRENCH CK REPLACE OR REHAB MB 13 BEALER RD OVER PIGEON CREEK REPLACEMENT MB 15 PIGEON CREEK RD OVER PIGEON CREEK REPLACE OR REHAB RW 26 HARMONYVILLE RD (S. COVENTRY) STORMWATER/DRAINAGE RW 31 HARMONYVILLE RD S-CURVE REALIGNMENT/DRAINAGE RW 47 DAISY POINT RD: PA 23 TO PA 100 STORMWATER/DRAINAGE Spring City PTC 4 SEPTA NORRISTOWN/MANAYUNK LINE EXTENSION NEW PASSENGER RAIL SERVICE INT 30 MAIN BRIDGE ST UPGRADE SIGNALIZATION INT 76 NEW MAIN ST SIGNALIZATION Thornbury MCN 1 US 202: MATLACK ST TO DELAWARE (SECTION 100) CAPACITY & SAFETY IMPRVOMENTS PTC 2 MEDIA/ELWYN LINE EXT TO WEST CHESTER EXTEND TO W.C. INT 2 US PA 926 SAFETY & SIGNAL UPGRADE INT 69 PA S CONCORD RD LEFT TURN LANES Tredyffrin TPK 1 PA TURNPIKE: VALLEY FORGE TO PA 29 WIDEN TO SIX LANES PTS 1 PAOLI TRANSPORTATION CENTER (PHASE III) INTERMODAL STATION/PARKING BP 7 PATRIOT'S PATH: MALVERN TO VF PARK MULTI-USE TRAIL (MUNICIPAL SPURS) BP 10 CEDAR HOLLOW SPUR TRAIL ("WARNER SPUR") MULTI-USE TRAIL SB 2 DARBY RD EXT OVER AMTRAK REPLACEMENT SB 32 HOWELLVILLE RD OVER AMTRAK (BERWYN) BRIDGE IMPROVEMENTS SB 35 PA 252 UNDERPASS OF AMTRAK REPLACEMENT SB 41 OLD LANCASTER RD UNDER AMTRAK (DAYLESFORD) REPLACE UNDERPASS CB 12 THOMAS RD OVER TROUT RUN REPLACE OR REHAB CB 30 MILL RD OVER VALLEY CREEK REPLACE OR REHAB CB 46 WILSON DR OVER VALLEY CREEK REPLACE OR REHAB CB 52 MILL RD OVER VALLEY CREEK REPLACE OR REHAB MB 4 HOWELVILLE RD BRIDGE OVER N-S REPLACE OR REHAB MB 17 CONTENTION LA BRIDGE OVER CHESTER V TRAIL REPLACE OR REHAB RW 1 PAOLI TRANS. CENTER: RD IMPROVEMENTS (P II) TRAFFIC IMPROVEMENTS RW 25 N VALLEY RD: US 202 TO CENTRAL AVE DRAINAGE IMPROVEMENTS RW 40 PA 252: US 30 TO HILLTOP RD WIDEN TO 5 LANES RW 41 SWEDESFORD RD: CATALPA TO WISTERIA RD DRAINAGE IMPROVEMENTS INT 22 E/W N VALLEY RD INTERSECTION IMPROVEMENT INT 23 LANCASTER PAOLI PK INTERSECTION IMPROVEMENTS Page 17 of 23

18 Upper Oxford MCF 6 US 1: MARYLAND LINE TO SCHOOL HOUSE RD RECONSTRUCTION/INTERCHANGES MCF 7 PA 896: HESS MILL RD TO CHAMBERS ROCK RD SAFETY IMPROVEMENTS MCN 3 PA 10: FRIENDSHIP CHURCH RD TO PA 896 SAFETY IMPROVEMENTS SB 31 PA 896 OVER MUDDY RUN REPLACE OR REHAB SB 42 EDENTON RD OVER RATTLESNAKE RUN REPLACE OR REHAB CB 15 FOREST MANOR RD OVER BIG ELK REPLACE OR REHAB CB 23 WATERMARK RD OVER MUDDY RUN REPLACE OR REHAB CB 38 PUSEY MILL ROAD OVER BIG ELK CREEK REPLACE OR REHAB INT 24 PA BALTIMORE PIKE INTERSECTION IMPROVEMENT Upper Uwchlan MCF 5 PA 100: FONT RD TO S HANOVER ST SAFETY IMPROVEMENTS MCN 7 PA 100: FELLOWSHIP RD TO W VINCENT TWP WIDEN TO FIVE LANES BP 30 EAGLE VILLAGE: POTTSTOWN/PARK/L. CSTOGA/BYERS CALMING / BIKE / PED CB 5 REEDS RD OVER E BRANDYWINE REPLACE OR REHAB MB 10 LYNDELL ROAD OVER EAST BR BRANDYWINE CREEK REPLACE OR REHAB NC 8 EAST/WEST LINK: LITTLE CONESTOGA TO PA 100 NEW COLLECTOR ROAD NC 9 MILFORD ROAD EXTSION: FONT ROAD TO PA 100 NEW COLLECTOR ROAD RW 43 L CONESTOGA RD NEAR CHRISTINE DRIVE SAFETY IMPROVEMENTS RW 54 EAGLE LOOP ROAD - PA 100 DESIGNATION WIDENING / ADD TURN LANES RW 65 DORLANS MILL RD: PA 282 TO LONGFIELDS WAY SHOULDER WIDENING INT 89 L CONESTOGA MILFORD RD ADD TURN LANES/SAFETY Uwchlan MCN 8 PA 113: US 30 BYPASS TO PECK ROAD CAPACITY ADDING TPK 2 PA TURNPIKE: PA 29 TO DOWNINGTOWN WIDEN TO SIX LANES TPK 3 PA TURNPIKE SLIP RAMP AT PA 113 CONSTRUCT SLIP RAMP RW 18 PA 113: US 30 BP TO WOODMONT DR CAPACITY RW 30 WHITFORD RD IN UWCHLAN TWP TURN LANES/SAFETY/RECONSTRUCT INT 92 WHITFORD DEVON DR SIGNALIZATION INT 97 NEWCOMEN SHIP RD ADD TURN LANES/SIGNALIZATION Valley MCF 2 US 30 BYPASS: PA 10 TO REECEVILLE RD RECONSTRUCTION, RAMPS PTC 1 SEPTA PAOLI/THORNDALE LINE EXTENSION EXTEND TO C'VILLE, P'BURG, ATGLEN SB 44 WAGONTOWN ROAD OVER CONRAIL,WILMINGTON BR. REPLACE OR REHAB CB 53 GLENCREST RD OVER WEST BRANDYWINE REPLACE OR REHAB MB 23 KIRBY ST OVER SUCKER RUN REPLACE OR REHAB MB 35 MOUNT AIRY RD OVER ROCK RUN REPLACE OR REHAB RW 15 WAGONTOWN ROAD MANOR RD TO EAST GLENCREST RD REPAIR AND RECONSTRUCTION Page 18 of 23

19 Wallace BP 6 STRUBLE TRAIL EXTENSION MULTI-USE TRAIL BP 63 ROAD WIDENING/BIKE LANE - PA ROUTE 282 ROAD WIDENING / BIKE LANE SB 13 PA 282 OVER INDIAN RUN CK REPLACE OR REHAB SB 21 INDIAN RUN DRIVE OVER INDIAN RUN REPLACE OR REHAB SB 53 CREEK ROAD OVER E BRANDYWINE CK REPLACE OR REHAB SB 59 PA 282 OVER BR.EAST BR.BRANDYWINE CK REPLACE OR REHAB SB 60 SPRINGTON ROAD OVER INDIAN RUN CK REPLACE OR REHAB CB 8 DEVEREUX ROAD OVER E BR BRANDYWINE CK REPLACE OR REHAB INT 114 HIGHSPIRE SPRINGTON ROAD REALIGNMENT Warwick CB 6 WARWICK FURN RD OVER S BR FRENCH REHABILITATION CB 29 PARK RD OVER FRENCH CREEK REPLACE OR REHAB West Bradford BP 9 BRANDYWINE TRAIL EXT: BRADFORD AV TO BOOT RD MULTI-USE TRAIL BP 43 MARSHALLTON TRAFFIC CALMING: PHASE 1B TRAFFIC ISLAND (E OF VILLAGE) SB 6 DOWNINGTOWN PK OVER E BRANCH BRANDYWINE CK REPLACE OR REHAB MB 40 WARPATH RD OVER BROAD RUN REPLACE OR REHAB NC 10 SHADYGLEN DR EXTENSION NEW COLLECTOR ROAD RW 83 STARGAZERS RD RECONSTRUCT/WIDEN/REALIGN INT 72 STRASBURG TELEGRAPH RD APPROACH REALIGNMENT West Brandywine BP 58 EAST/WEST PED TRAIL: STRUBLE TO GUTHRIESV'LE PEDESTRIAN TRAIL SB 61 CULBERSTON RUN RD. OVER CULBERTSON RUN REPLACE OR REHAB CB 19 LAFAYETTE RD OVER W BRANDYWINE REPLACE OR REHAB CB 37 GERMANY HOLLOW RD OVER INDIAN RUN REPLACE OR REHAB MB 5 ICEDALE RD OVER W BR BRANDYWINE CREEK REPLACE OR REHAB OP 6 US 322 CLOSED LOOP SYSTEM CLOSED LOOP SYSTEM RW 20 REECEVILLE ROAD: US 30 BP TO E REECEVILLE RD RECONSTRUCTION/TURNING LANES RW 51 PA 82 S-CURVES NEAR MONACY RD SHOULDER WIDENING INT 15 PA EAST REECEVILLE RD SAFETY IMPROVEMENTS INT 111 HIBERNIA WAGONTOWN RD REALIGNMENT INT 114 HIGHSPIRE SPRINGTON ROAD REALIGNMENT West Caln MCF 2 US 30 BYPASS: PA 10 TO REECEVILLE RD RECONSTRUCTION, RAMPS MCN 4 PA 10: HONEY BROOK TWP TO SADSBURY TWP SAFETY IMPROVEMENTS CB 36 LION'S HEAD ROAD OVER BIRCH RUN CREEK REPLACE OR REHAB INT 67 PA PA 10 (SIGNALIZED INT) WIDENING & DRAINAGE Page 19 of 23

20 West Chester PTC 2 MEDIA/ELWYN LINE EXT TO WEST CHESTER EXTEND TO W.C. PTC 3 PA 3 - BETTER BUS IMPROVEMENTS IMPROVE CRITICAL/EXPRESS STOPS BP 16 ROSEDALE AVE: HIGH ST TO COLLEGE AVE PEDESTRIAN & TRAFFIC IMPROVEMENTS OP 3 W. CHESTER BOROUGH SIGNAL SYSTEM UPGRADE SIGNAL SYSTEM UPGRADE RW 28 MULTIMODAL IMPROVEMENTS STREETSCAPE/ROAD DIET/INFRASTRUCTUR RW 34 W. CHESTER BORO GATEWAYS GATEWAY TREATMENTS INT 50 POTTSTOWN US 322 ADD RAMPS West Fallowfield MCN 3 PA 10: FRIENDSHIP CHURCH RD TO PA 896 SAFETY IMPROVEMENTS BP 41 OCTORARO TRAIL: ATGLEN TO WOLFS HOLLOW MULTI-USE TRAIL SB 49 ROSS FORDING ROAD OVER OCTORARO CK REPLACE OR REHAB MB 21 BRYSON RD OVER KNIGHTS RUN REPLACE OR REHAB MB 37 STEELVILLE RD OVER KNIGHTS RUN REPLACE OR REHAB MB 44 HIGH POINT RD OVER MUDDY RUN REPLACE OR REHAB West Goshen MCN 1 US 202: MATLACK ST TO DELAWARE (SECTION 100) CAPACITY & SAFETY IMPRVOMENTS MCN 6 US 202: US 30 TO MATLACK (SECTION 200) OPERATIONAL IMPROVEMENTS MCN 9 US 202/US 322 INTCHG (AIRPORT RD ACCESS) INTERCHANGE RAMPS PTC 2 MEDIA/ELWYN LINE EXT TO WEST CHESTER EXTEND TO W.C. PTC 3 PA 3 - BETTER BUS IMPROVEMENTS IMPROVE CRITICAL/EXPRESS STOPS BP 16 ROSEDALE AVE: HIGH ST TO COLLEGE AVE PEDESTRIAN & TRAFFIC IMPROVEMENTS NC 11 WCU ACCESS RD: NEW ST TO HIGH ST ROAD RECONSTRUCTION RW 2 PA 3: US 202 TO PA 352 SAFETY / BIKE / PED RW 16 PAOLI PIKE: BOOT RD TO FIVE POINTS RD CAPACITY/SAFETY IMPROVEMENTS RW 17 BOOT ROAD: WILSON DR TO GREENHILL RD SAFETY/OPERATIONAL IMPROV RW 53 WESTTOWN RD: US 202 TO NIELDS ST CAPACITY IMPROVEMENTS INT 8 PA FIVE POINTS RD ADD TURN LANES INT 50 POTTSTOWN US 322 ADD RAMPS INT 83 WESTTOWN UNION ST CUL-DE-SAC West Grove MCF 6 US 1: MARYLAND LINE TO SCHOOL HOUSE RD RECONSTRUCTION/INTERCHANGES BP 20 STATE RD BIKEWAY: PA 41 TO PA 841 BIKEWAY RW 86 N GUERNSEY ROAD: PA 41 TO US 1 WIDEN FROM 17' TO 24' INT 16 EVERGREEN OAKLAND AVE ADD TURN LANES INT 18 EVERGREEN CHATHAM RD (PA 841) ROUNDABOUT / SIGNAL Page 20 of 23

21 West Marlborough SB 16 PA 82 OVER BRANCH DOE RUN REPLACE OR REHAB SB 22 FROG HOLLOW RD (SPEAKMANS #1) OVER BUCK RUN REHABILITATION SB 54 PA 926 OVER BR OF WHITE CLAY CK REPLACE OR REHAB CB 32 THOURON RD OVER DOE RUN REPLACE OR REHAB RW 73 NEWARK RD: LINE RD TO PA 82 SAFETY/SHOULDER WIDENING INT 118 PA HOWELL MOORE RD SAFETY IMPROVEMENTS West Nantmeal BP 6 STRUBLE TRAIL EXTENSION MULTI-USE TRAIL SB 46 LEWIS MILL RD OVER E BRANCH OF BRANDYWINE REPLACE OR REHAB SB 56 PA 282 OVER BR.E.BR.BRANDYWINE CK REPLACE OR REHAB SB 57 PA 82 OVER EAST BR BRANDYWINE CK REPLACE OR REHAB CB 14 WYEBROOK RD OVER E BRANDYWINE REPLACE OR REHAB RW 23 PA 82: PA 282 TO PA 345 SAFETY IMPROVEMENTS RW 37 PA 82: CHESTNUT TREE RD TO GOOD FELLOW RD DRAINAGE IMPROVEMENT RW 57 CHESTNUT TREE RD: PA 82 TO US 322 RECONSTRUCTION / DRAINAGE West Nottingham MCF 6 US 1: MARYLAND LINE TO SCHOOL HOUSE RD RECONSTRUCTION/INTERCHANGES RW 4 BALTIMORE PIKE: PA 272 TO LINCOLN U. CORRIDOR IMPROVEMENTS RW 11 PA 272: LANCASTER CO TO MARYLAND LINE REDUCE SPEED, SHOULDERS, & SAFETY INT 36 PA BALTIMORE PIKE ADD TURN LANES/SIGNALIZATION INT 85 US RIDGE AV (T-546) SAFETY IMPROVEMENTS West Pikeland TPK 2 PA TURNPIKE: PA 29 TO DOWNINGTOWN WIDEN TO SIX LANES SB 24 PA 401 OVER BRANCH PICKERING CK REPLACE OR REHAB SB 52 ART SCHOOL RD OVER BRANCH PICKERING CK REPLACE OR REHAB CB 51 PIKELAND RD OVER PICKERING REPLACE OR REHAB RW 21 PA 401: BYERS RD TO UPPER PINE CREEK RD ADD TURN LANES/SAFETY RW 24 PA 113: DAVIS RD TO PIKELAND RD ADD TURN LANES/SAFETY RW 64 BYERS RD NEAR PICKERING CK SHOULDER WIDENING INT 48 PA YELLOW SPRINGS RD LEFT TURN LANES INT 82 PA MESSNER RD REALIGN INTERSECTION Page 21 of 23

22 West Sadsbury MCF 2 US 30 BYPASS: PA 10 TO REECEVILLE RD RECONSTRUCTION, RAMPS MCN 4 PA 10: HONEY BROOK TWP TO SADSBURY TWP SAFETY IMPROVEMENTS PTC 1 SEPTA PAOLI/THORNDALE LINE EXTENSION EXTEND TO C'VILLE, P'BURG, ATGLEN BP 41 OCTORARO TRAIL: ATGLEN TO WOLFS HOLLOW MULTI-USE TRAIL SB 68 SWAN ROAD BRIDGE REPAIR/REPLACEMENT SAFETY IMPROVEMENTS AND REHAB RW 35 US 30: COUNTY LINE RD TO PA 10 WIDEN TO FIVE-LANE CROSS SECTION INT 115 RT 30/SWAN ROAD/COUNTY LINE ROAD REALIGMENT SAFETY IMPROVEMENTS West Vincent MCF 5 PA 100: FONT RD TO S HANOVER ST SAFETY IMPROVEMENTS BP 32 FRENCH CREEK TRAIL MULTI-USE TRAIL SB 45 PA ST MATTHEWS RD OVER BR PICK CK REPLACEMENT & INTERSECTION SB 58 BIRCHRUN RD OVER BIRCH RUN REPLACE OR REHAB CB 10 FRENCH CREEK RD OVER FRENCH CK REPLACE OR REHAB CB 24 BERTOLET SCHOOL OVER FRENCH CK REPLACE OR REHAB CB 47 ART SCHOOL RD OVER PICKERING REPLACE OR REHAB CB 55 HORSESHOE TRAIL OVER BIRCH RUN REPLACE OR REHAB MB 18 BUTTONWOOD LN OVER BIRCH RUN CK REPLACE OR REHAB MB 26 OLD KIMBERTON RD OVER PICKERING TRIB (ARCH) REPLACE OR REHAB MB 42 OLD KIMBERTON RD OVER PICKERING TRIB (MIDDLE) REPLACE OR REHAB MB 43 FELLOWSHIP RD OVER BIRCH RUN REPLACE OR REHAB NC 4 LUDWIGS CORNER LOOP ROAD NEW COLLECTOR ROAD INT 104 PA CHESTER SPRINGS RD SAFETY IMPROVEMENTS Page 22 of 23

23 West Whiteland MCF 1 US 30 BYPASS: REECEVILLE RD TO EXTON BYPASS RECONSTRUCT, WIDENING, RAMPS PTS 3 EXTON TRAIN STATION (GARAGE + BUS LOOP) GARAGE + BUS LOOP BP 2 PA 100: EXTON TRAIN STATION TO CVT PEDESTRIAN FACILITIES/CROSSWALKS BP 3 CHESTER VALLEY TRAIL: EXTON TO DOWNINGTOWN MULTI-USE TRAIL BP 31 CVT SPUR: BUSINESS 30 TO COMMERCE DR. TRAIL CONNECTION BP 39 BOOT ROAD: POTTSTOWN PK TO SONNET LANE PEDESTRIAN TRAIL BP 51 WHITFORD RD PATH NORTH BICYCLE/PEDESTRIAN PATH BP 54 WHITFORD RD PATH SOUTH BICYCLE/PEDESTRIAN PATH SB 1 US 202 OVER AMTRAK/US 30 EB (FRAZER) MAJOR MAINTENANCE SB 10 LANCASTER AVENUE OVER BRANCH VALLEY CK REPLACE OR REHAB SB 15 SHIP ROAD OVER VALLEY CK REPLACE OR REHAB SB 25 LINCOLN HWY OVER BRANCH OF VALLEY CK REPLACEMENT SB 40 WHITFORD RD UNDER AMTRAK REPLACE UNDERPASS OP 4 POTTSTOWN PIKE CLOSED LOOP SYSTEM TRAFFIC SIGNAL UPGRADE RW 29 WHITFORD RD: CLOVER MILL TO WATERLOO RECONFIGURATION AND WIDENING RW 46 PA 100 NEAR EXTON RAIL STATION RECONFIGURE FOR 3 NB THRU LANES INT 33 BOOT SHIP RD SAFETY IMPROVEMENTS INT 78 SHIP RD AND BUSINESS 30 INTERSECTION IMPROVEMENTS INT 106 SPRINGDALE RD AND BUSINESS 30 RECONFIGURATION AND WIDENING Westtown MCN 1 US 202: MATLACK ST TO DELAWARE (SECTION 100) CAPACITY & SAFETY IMPRVOMENTS MCN 6 US 202: US 30 TO MATLACK (SECTION 200) OPERATIONAL IMPROVEMENTS PTC 2 MEDIA/ELWYN LINE EXT TO WEST CHESTER EXTEND TO W.C. PTC 3 PA 3 - BETTER BUS IMPROVEMENTS IMPROVE CRITICAL/EXPRESS STOPS MB 3 OAKBOURNE RD OVER GOOSE CREEK REPLACEMENT REPLACEMENT OP 7 PA RT. 3 / PA RT. 352 TRAFFIC SIGNAL UPGRADES SAFETY AND MOBILITY IMPROVEMENTS RW 2 PA 3: US 202 TO PA 352 SAFETY / BIKE / PED INT 2 US PA 926 SAFETY & SIGNAL UPGRADE INT 69 PA S CONCORD RD LEFT TURN LANES INT 103 PA RT. 352 PA RT. 926 IMPROVEMENTS SAFETY AND MOBILITY IMPROVEMENTS Willistown PTC 3 PA 3 - BETTER BUS IMPROVEMENTS IMPROVE CRITICAL/EXPRESS STOPS PTS 1 PAOLI TRANSPORTATION CENTER (PHASE III) INTERMODAL STATION/PARKING RW 1 PAOLI TRANS. CENTER: RD IMPROVEMENTS (P II) TRAFFIC IMPROVEMENTS INT 17 PAOLI SUGARTOWN RD ADD TURN LANES INT 21 PAOLI WARREN AVE CAPACITY IMPROVEMENTS INT 107 GOSHEN DELCHESTER RD CAPACITY & SAFETY Page 23 of 23

2017 Chester County. Transportation Improvement Inventory

2017 Chester County. Transportation Improvement Inventory 2017 Chester County Transportation Improvement Inventory Transportation Improvement Inventory 2017 Overview: The Transportation Improvement Inventory (TII) is a comprehensive record of documented transportation

More information

Status April Transportation Priority Projects in Chester County

Status April Transportation Priority Projects in Chester County Transportation Priority Projects in Chester County April 2017 Highway & Trail Projects # Project Scope Current /Phase 1 US 202 over Amtrak Major bridge rehabilitation 17.567 began 03/17 2017 2 US 202 at

More information

Status February Transportation Priority Projects in Chester County

Status February Transportation Priority Projects in Chester County Transportation Priority Projects in Chester County February 2018 Highway & Trail Projects # Project Scope Current /Phase 1 US 202 over Amtrak Major bridge rehabilitation 17.6 2017-2019 2 US 202 at PA 926

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

DELAWARE COUNTY START PERIOD

DELAWARE COUNTY START PERIOD BASE Add Lane US 322: US 1 to Interstate 95 BASE Bridge Replacement Darby Paoli over Lower Darby Creek BASE Bridge Replacement Folcroft Avenue over AMTRAK BASE Bridge Replacement Station Road Bridge BASE

More information

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1) Appendix B Neighborhood Connections Summaries This Appendix is a supplement to the information presented in Chapter 3 Connect People. The Appendix includes a summary or profile for each of the proposed

More information

WALKWAY & BIKE LANES SURVEY

WALKWAY & BIKE LANES SURVEY TREDYFFRIN TOWNSHIP WALKWAY & BIKE LANES SURVEY Tredyffrin Township is currently in the process of determining where to plan for walkways and bike lanes. Before any decisions are made, the Sidewalks Subcommittee

More information

Rail Sta ons. Transporta on Centers. Chapter 3 Design Elements PUBLIC TRANSPORTATION

Rail Sta ons. Transporta on Centers. Chapter 3 Design Elements PUBLIC TRANSPORTATION Rail Sta ons & Transporta on Centers Rail sta ons and transporta on centers serve as the intermodal hubs of the public transporta on system in Chester County. They are the primary loca ons for where Chester

More information

Executive Summary Route 30 Corridor Master Plan

Executive Summary Route 30 Corridor Master Plan Route Corridor Master Plan Project Overview The Route Corridor Master Plan is a coordinated multimodal transportation and land use plan for the entire stretch of Route through East Whiteland Township,

More information

PUBLIC JUDICIAL TAX SALE OF PROPERTIES BY CHESTER COUNTY TAX CLAIM BUREAU

PUBLIC JUDICIAL TAX SALE OF PROPERTIES BY CHESTER COUNTY TAX CLAIM BUREAU PUBLIC JUDICIAL TAX SALE OF PROPERTIES BY CHESTER COUNTY TAX CLAIM BUREAU NOTICE Notice is hereby given that the following described properties will be sold at Judicial Sale free and cleared of all tax

More information

AVON GROVE CHARTER KIMBLESVILLE SITE BUS # 44 AM & PM

AVON GROVE CHARTER KIMBLESVILLE SITE BUS # 44 AM & PM AVON GROVE CHARTER KIMBLESVILLE SITE BUS # 44 AM & PM 7:00 AM 110 CALVARY RD 7:05 AM WEDGEWOOD & WINSTON 7:06 AM WEDGEWOOD & DEVONSHIRE 7:09 AM 1122 SHADYSIDE RD 7:13 AM E CHRISTINE & OLD FORGE 7:17 AM

More information

North Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary

North Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary Division One Highway Infrastructure Program Summary 1 Hyde NC 12 Northern Ferry Dock Ocracoke Village R-5149 Resurface and Widening to Accommodate Bicycling 13.3 $3,310,000 $0 $3,310,000 Jul-09 1 Dare

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

Paoli Road Improvement Feasibility Study

Paoli Road Improvement Feasibility Study Paoli Road Improvement Feasibility Study & Public Participation Project March 24, 2015 Prepared for: Tredyffrin Township Prepared by: McMahon Associates, Inc. with Town Planning Partnership, LLC Glackin

More information

Applications for Funding

Applications for Funding Coordinated Call for Projects Second Cycle of OBAG, TLC and PBTF Funding Applications for Funding As of The following table lists the applications for funding available through the Coordinated Call for

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

Baltimore Pike for Everyone

Baltimore Pike for Everyone Complete Street Strategies for Baltimore Pike Chester County, Pennsylvania Prepared by the Chester County Planning Commission, 2015 Baltimore Pike Complete Street Plan 1 Acknowledgments Plan advisory committee

More information

ATTACHMENT A Transportation Improvement Program TCC-Recommended TIP Amendments March 5, 2009

ATTACHMENT A Transportation Improvement Program TCC-Recommended TIP Amendments March 5, 2009 Road Projects Project Project Description TIP # Location NC 51 SC state line to Downs Circle U-3447 Pineville NC 218 I-485 to US 74 R-5114 Meck/Union/Anson Little Rock Road Intersection improvement U-5116

More information

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7

More information

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. 28 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. PROJECT

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

Directions to Saint-Gobain 20 Moores Road, Malvern, PA from Center City Philadelphia

Directions to Saint-Gobain 20 Moores Road, Malvern, PA from Center City Philadelphia from Center City Philadelphia Take I-76 west towards Valley Forge. Stay on I-76 for about 18 miles. NOTE: I-76 is also known as the Schuylkill Expressway, though not on any signs. You will, however, hear

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

Roadway Project Recommendations:

Roadway Project Recommendations: Northwest RTPO Regional Transportation Improvement Program Recommendations (RTIPR) for NMDOT District 6 (Cibola, McKinley) & District 5 (San Juan) 2018-2023 for 5 Year STIP (FY 2018 through FY 2023) way

More information

San Jose Transportation Policy

San Jose Transportation Policy San Jose Transportation Policy Protected Intersections in LOS Policies to Support Smart Growth Presented by: Manuel Pineda City of San Jose Department of Transportation Bay Area Map San Francisco Oakland

More information

West Whiteland Township Bicycle and Pedestrian Plan

West Whiteland Township Bicycle and Pedestrian Plan West Whiteland Township Bicycle and Pedestrian Plan Executive Summary The West Whiteland Township Bicycle and Pedestrian Plan is an update to a compilation of several related adopted plans completed by

More information

2040 Long Range Plan Projects Draft October 2011

2040 Long Range Plan Projects Draft October 2011 Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72

More information

CITY OF PORTSMOUTH PLANNING DEPARTMENT

CITY OF PORTSMOUTH PLANNING DEPARTMENT CITY OF PORTSMOUTH PLANNING DEPARTMENT MEMORANDUM TO: JOHN P. BOHENKO, CITY MANAGER FROM: JULIET T.H. WALKER, PLANNING DIRECTOR SUBJECT: BICYCLE / PEDESTRIAN PLAN PROGRESS UPDATE DATE: 3/13/2018 Background

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

Montco 2040 Implementation Grant Program Award Summary

Montco 2040 Implementation Grant Program Award Summary Municipality Montco 2040 Implementation Grant Program - 2017 Award Summary Support Downtowns Walk/Bike Montco Name of Project Business Parks Total Project Cost Grant Award Schwenksville Main Street Pedestrian

More information

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...

More information

Transportation Corridor Studies: Summary of Recommendations

Transportation Corridor Studies: Summary of Recommendations Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field

More information

Southwestern RPO Prioritization Local Input Points for Division Needs Funding

Southwestern RPO Prioritization Local Input Points for Division Needs Funding H172327 US 19 Business paved shoulders; include bicycle lanes and sidewalks. Location: extends 0.9 miles from Junaluska Road in Andrews to US 19/74. $ 6,100,000 9.20 H090251-AC R-3622AC NC 294 (southern

More information

COMPLETE STREETS PLANNER S PORTFOLIO

COMPLETE STREETS PLANNER S PORTFOLIO COMPLETE STREETS PLANNER S PORTFOLIO ISSUE 3 APRIL 2016 PLANNER S PORTFOLIO COMPLETE STREETS 1 2 6 10 14 OVERVIEW MATURE NEIGHBORHOODS GROWING SUBURBS CENTRAL PLACES ACTIVITY CORRIDORS Planner s Portfolio

More information

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016 All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan

More information

TRASBURG RANSPORTATION

TRASBURG RANSPORTATION TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION

More information

Planned Improvements from Sector & Area Plans that have been added to the MTP

Planned Improvements from Sector & Area Plans that have been added to the MTP Appendix P Bikeway Projects in Currently Approved Plans Planned Improvements from Sector & Area Plans that have been added to the MTP Airport Viaduct Trail Connection to National Airport Implement a pedestrian/bicycle

More information

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors. Lincoln Highway Streetscape Plan Stakeholder Workshop #2 Handout Contents Introduction and Project Vision Planning Principles Specific Recommendations including a Proposed Typical Roadway Section Renderings

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

Project Fact Sheet. August 1,

Project Fact Sheet. August 1, Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation

More information

STATION #3 INITIAL ALTERNATIVES

STATION #3 INITIAL ALTERNATIVES www.dot.il.gov www.eisenhowerexpressway.com STATIO #3 IHB RR Heavy Rail Transit (HRT) High capacity transit mode serving urban areas:» Steel wheeled, high performance electric powered rail vehicles» Right-of-way

More information

Transportation Improvement Program (TIP) for Fiscal Years Presentation to Chittenden County Regional Planning Commission July 18, 2018

Transportation Improvement Program (TIP) for Fiscal Years Presentation to Chittenden County Regional Planning Commission July 18, 2018 Transportation Improvement Program (TIP) for Fiscal Years 2019-2022 Presentation to Chittenden County Regional Planning Commission July 18, 2018 Transportation Planning and Project Implementation Metropolitan

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the

More information

APPENDIX E GRADE CROSSING LOCATIONS

APPENDIX E GRADE CROSSING LOCATIONS APPENDIX E GRADE CROSSING LOCATIONS 1 2 3 Citrus Avenue Riverside County and City Palmyrita Avenue Columbia Avenue MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3 027303M 1. Existing

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Camden County Bus Purchase Project ID Numbers: D0601 / 068082 In the DVRPC region, a combination of fixed route, subscription, and demand responsive transit services are provided in Camden County by Senior

More information

ROAD PROJECTS. Primary and Interstate Roads LRTP; Southern- Western Neighborhoods MP

ROAD PROJECTS. Primary and Interstate Roads LRTP; Southern- Western Neighborhoods MP Desktop > Trans Priorities 0 >TRANPSORTATION PRIORITIES > new priority list format.doc ALBEMARLE COUNTY TRANSPORTATION PRIORITIES (DRAFT) April, 0: The following are the counties strategies priorities

More information

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE

More information

KEVIN CONAHAN, PE, PTOE Senior Traffic Engineer

KEVIN CONAHAN, PE, PTOE Senior Traffic Engineer KEVIN CONAHAN, PE, PTOE Senior Traffic Engineer Professional Background Education M.S., Civil Engineering Villanova University Villanova, PA; 2006 B.S., Civil Engineering Drexel University Philadelphia,

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

Traffic and Flood Control Improvements in the Transit Oriented Development District Project Updates Tuesday, November 29, 2016 Meriden Public Library

Traffic and Flood Control Improvements in the Transit Oriented Development District Project Updates Tuesday, November 29, 2016 Meriden Public Library Traffic and Flood Control Improvements in the Transit Oriented Development District Project Updates Tuesday, November 29, 2016 Meriden Public Library Presentation Format Project Goals and Overview Sidewalk

More information

GREAT VALLEY / ROUTE 29 MULTIMODAL STUDY

GREAT VALLEY / ROUTE 29 MULTIMODAL STUDY GREAT VALLEY / ROUTE 29 MULTIMODAL STUDY in cooperation with Delaware Valley Regional Planning Commission Chester County Planning Commission East Whiteland Township Southeastern Pennsylvania Transportation

More information

PA 10 - Road Safety Audit Report December i - TABLE OF CONTENTS

PA 10 - Road Safety Audit Report December i - TABLE OF CONTENTS PA 10 - Road Safety Audit Report December 2008 TABLE OF CONTENTS 1.0 BACKGROUND 1 1.1 The Audit 2 2.0 PA 10 NORTH SECTION 3 2.1 Overview of the Study Area 3 2.2 Crash Data 4 3.0 PA 10 NORTH FINDINGS AND

More information

David G. Roberts, AICP/PP, LLA, RLA Maser Consulting, PA 1

David G. Roberts, AICP/PP, LLA, RLA Maser Consulting, PA 1 David G. Roberts, AICP/PP, LLA, RLA Maser Consulting, PA 1 In March of 2009, the North Jersey Transportation Planning Authority (NJTPA) awarded Ocean County a $120,000 grant through its Subregional Study

More information

Project Name Project Description Authorized Amount

Project Name Project Description Authorized Amount 1, 13 Branchville-Lewisburg Road (CR 628) Lewisburg-Creamery Road (CR 565) 2,3 Asbury-Bloomsbury Road/Asbury- Anderson Road (CR 632) Skid-resistant surface treatment, enhanced signage, pavement markings

More information

Lincoln Highway Streetscape Plan Concept Plan

Lincoln Highway Streetscape Plan Concept Plan Lincoln Highway Streetscape Plan Concept Plan November 14, 2014 Introduction This report provides a summary of conceptual transportation, land use, and design recommendations in the Lincoln Highway Streetscape

More information

Chesterbrook and King of Prussia to 13th-Market

Chesterbrook and King of Prussia to 13th-Market 124 SEPTA Effective September 1, 2013 and to 13th-Market Serving Customer Service 610-279-8400 TDD/TTY 215-580-7853 www.septa.org Corporate Morris Dr Duportail Rd Bearhill Rd Blvd Cassatt Rd Casino Rd

More information

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) US 20 Feasibility Study Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) Village Board Meeting Bartlett Village Hall February 16, 2016 1 Background 1991 IDOT Study Recommendations

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving

More information

section 4 Existing Conditions, Issues, and Options

section 4 Existing Conditions, Issues, and Options section 4 Existing Conditions, Issues, and Options 4.0 Existing Conditions, Issues, and Options This section analyzes each segment of the corridor on a street to street basis. Each segment is discussed

More information

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway

More information

Pedestrian Facili es. Sidewalks. Chapter 3 Design Elements BICYCLE/PEDESTRIAN

Pedestrian Facili es. Sidewalks. Chapter 3 Design Elements BICYCLE/PEDESTRIAN Pedestrian Facili es Pedestrian facili es serve as the very founda on of the mul modal transporta on system. The AASHTO Guide for the Planning, Design, and Opera on of Pedestrian Facili es states that

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present

More information

FY Regional Transportation Improvement Program

FY Regional Transportation Improvement Program FY2014-2018 Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell

More information

PRIORITIES RESULTS YOUR PRIORITIES FOR BRIDGEPORT 5% 4% 13% RESIDENTIAL CHOICES TRAILS & PARKS

PRIORITIES RESULTS YOUR PRIORITIES FOR BRIDGEPORT 5% 4% 13% RESIDENTIAL CHOICES TRAILS & PARKS Community Visioning Open House The Community Visioning Open House was held on January, 31st 2018 at Harrisburg Area Community College (HACC), Lancaster Campus. Approximately 80 people attended this Open

More information

Table 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line

Table 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line Grade Crossing Enhancements CPUC 1 2 3 4 5 Citrus Avenue, Riverside County Palmyrita Ave., Columbia Avenue, Marlborough Ave., Spruce St., MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3

More information

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013 Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013 2005 Master Plan GOAL: Provide for safe and convenient bicycle and pedestrian circulation throughout the City. Develop a city

More information

Enhancing the Transit Environment. Bus Stop Improvement Case Studies for Chester County

Enhancing the Transit Environment. Bus Stop Improvement Case Studies for Chester County Enhancing the Transit Environment 2016 Bus Stop Improvement Case Studies for Chester County Acknowledgments Stakeholder Advisors John Calnan, SEPTA Mark Cassel, AICP, SEPTA Michael Co er, West Chester

More information

Implementation Plan. 5.1 Improvement Program

Implementation Plan. 5.1 Improvement Program 5 Implementation Plan Section 4 presented detailed recommendations for transportation improvements and land use strategies in the Route 6 Hop River corridor. This section outlines how the transportation

More information

I-40 Maumelle New Interchange and new 2-lane facility 48 $10.4 $29.8 Highest. Full ITS Implementation 55 $63.3 $144.5 Highest

I-40 Maumelle New Interchange and new 2-lane facility 48 $10.4 $29.8 Highest. Full ITS Implementation 55 $63.3 $144.5 Highest PROJECT PRIORITIES: FREEWAYS 92 Freeway System ITS 60 $2.3 $2.3 Highest 94 Freeway System ITS 60 $7.9 $10.2 Highest 65 North Cabot Interchange - Hwy 38 State Hwy 367 and State Hwy 38 US Hwy 67 / 167 New

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

OKI Awards More Than $41 Million to Transportation Projects Across the Region

OKI Awards More Than $41 Million to Transportation Projects Across the Region FOR IMMEDIATE RELEASE October 11, 2018 Contact: Ashley Patrick apatrick@oki.org (330) 573-4932 m. OKI Awards More Than $41 Million to Transportation Projects Across the Region Cincinnati, Ohio Ohio-Kentucky-Indiana

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

VISTA 2025 Goal 1: Maintain and enhance quality of place as a key component of economic health. Goal 1 Team Meeting. April 20, 2017.

VISTA 2025 Goal 1: Maintain and enhance quality of place as a key component of economic health. Goal 1 Team Meeting. April 20, 2017. VISTA 2025 Goal 1: Maintain and enhance quality of place as a key component of economic health Goal 1 Team Meeting April 20, 2017 Meeting Notes Team Members Attending: W. Boulton Alexander, Nancy Corson,

More information

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS RT 81 Corridor Study CLINTON ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS View north on High Street, with potential improvements to the streetscape Draft Recommendations November 8 th, 2018 TOWN OF CLINTON

More information

Complete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis)

Complete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis) Mobility MassDOT Program Project Prioritization Plan (Revised 3/31/16) Municipality Winchendon 7/25/2017 Location Needs Request Schedule 1 Development of roundabout at the intersection of Front Street

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,

More information

Eayrestown Road. East Eay restown Road E EAYRESTOWN RD EAYRESTOWN RD (0.25) County Road (1.79) CULVERT. Road Overpass

Eayrestown Road. East Eay restown Road E EAYRESTOWN RD EAYRESTOWN RD (0.25) County Road (1.79) CULVERT. Road Overpass Mile Posts: 0.000 -.000 New Freedom Roa d Beaver Dam East Eay restown 685 Eayrestown Allentown Red Lion Disabled Americ an V eterans Hig h w ay 06 300104 of Lanes 87 685 BEAVER DAM RD (1.1) E EAYRESTOWN

More information

ODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR ODOT DISTRICT 9 2019 CONSTRUCTION PROGRAM SERVING ADAMS, BROWN, HIGHLAND, JACKSON, LAWRENCE, PIKE, ROSS AND SCIOTO COUNTIES MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT

More information

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

Phone: Fax: Project Reference No. (to be filled out by MassHighway): Massachusetts Highway Department District 3 Project Need Form (PNF) This form is intended to provide preliminary information about the proposed project. It is not expected that all information that is

More information

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ % Fee Program Project List - 2004 General Plan Cost Estimate 2004 Alternative Route Study West Valley Condition 27 Alternative connection between, Feasibility study. Included in /White Rock Connector. south

More information

TRANSPORTATION & ACCESS

TRANSPORTATION & ACCESS STATE OF CENTER CITY PHILADELPHIA TRANSPORTATION & ACCESS Matt Stanley Center City is well-positioned at the center of an extensive, multi-modal transportation system. It is located just seven miles from

More information

Short and Long Term Needs

Short and Long Term Needs Short and Long Term Needs The short- and long-term programs of proposed projects listed below have been designed to address the mobility issues in South Montgomery County. These improvements to the transportation

More information

DEKALB COUNTY. 22. Priority Projects for DeKalb County

DEKALB COUNTY. 22. Priority Projects for DeKalb County DEKALB COUNTY 2 0 1 4 T R A N S P O R T A T I O N P L A N 22. Priority s for DeKalb County Following the completion of the project prioritization metrics, each project was able to be compared to other

More information

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Northern Virginia

More information

US Route 30 Master Plan Optimal Corridor Conceptual Plan

US Route 30 Master Plan Optimal Corridor Conceptual Plan Prepared for: Smart Growth Partnership of Westmoreland County Renaissance Planning Group Prepared by: Michael Baker Jr., Inc. Moon Township, PA March 13, 2007 Table of Contents Introduction... 1 Corridor

More information

CAPACITY EXPANDING LONG RANGE PLAN OPTIONS FOR ALTERNATIVES ANALYSIS

CAPACITY EXPANDING LONG RANGE PLAN OPTIONS FOR ALTERNATIVES ANALYSIS CAPACITY EXPANDING LONG RANGE PLAN OPTIONS FOR ALTERNATIVES ANALYSIS Based on Applications Submitted to TCRPC and Presented to Town Hall Forums in December, 2008 and Additional Updates and LRP Task Force

More information

Freeway System Considerations

Freeway System Considerations Session 11 Jack Broz, PE, HR Green May 5-7, 2010 Freeway System Considerations Mainline Transit: Shoulder Operations, BRT, Stations HOV, HOT, UPA Interchanges Exit Ramps Entrance Ramps Bridges Local Crossings

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Airport Circle Elimination, CR 563, 646 S9820 Intersection, operational, and safety improvements at the intersection of Tilton Road (CR 563) and Delilah Road (CR 646) will include elimination of the circle,

More information

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014 Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014 Project Overview Coordinate roadway improvements with other major projects HUB Flood Control

More information

NJTPA DRAFT Transportation Improvement Program Fiscal Years

NJTPA DRAFT Transportation Improvement Program Fiscal Years County Route 6 Bridge (MA-14) Mileposts: 0.46 DBNUM: NS9811 The Amboy Avenue bridge (MA-14) over Matawan Creek in the Boroughs of Keyport and Aberdeen is structurally deficient and functionally obsolete.

More information

Project Status Update

Project Status Update Project Status Update : Novato Boulevard, 4th & 3rd Streets, Sir Francis Drake Boulevard (3), and Miller Avenue Major roads projects target the most heavily traveled roads in Marin County for repairs,

More information

2007 UNSCHEDULED PROJECTS LIST PRIORITIES / RANKINGS / 6YP SEPTEMBER 2007 PURCHASE

2007 UNSCHEDULED PROJECTS LIST PRIORITIES / RANKINGS / 6YP SEPTEMBER 2007 PURCHASE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 MAJOR WIDENING TO 4 LANES FROM 1.0 MI E OF DENIS JONES RD TO BETHEL CHURCH RD. B0060 1.10 BALLARD US 60 3.700 INCLUDES KEVIL BYPASS.

More information

ALLEGHENY COUNTY. Allegheny County Active Transportation Profile 2017 REGIONAL ACTIVE TRANSPORTATION PLAN FOR SOUTHWESTERN PENNSYLVANIA

ALLEGHENY COUNTY. Allegheny County Active Transportation Profile 2017 REGIONAL ACTIVE TRANSPORTATION PLAN FOR SOUTHWESTERN PENNSYLVANIA REGIONAL ACTIVE TRANSPORTATION PLAN FOR SOUTHWESTERN PENNSYLVANIA 1 2 ACTIVE TRANSPORTATION AT A GLANCE Trails + Bike Routes 123miles 132 miles 281 miles 75 miles 3 FACILITIES Facility Metrics (not including

More information

II. Identification of Opportunities and Solutions. A. Short-term action plan (Summary of Recommendations)

II. Identification of Opportunities and Solutions. A. Short-term action plan (Summary of Recommendations) II. Identification of Opportunities and Solutions Upon completion of the planning process for this report, a wide range of recommendations were developed throughout the City. The list of proposed recommendations

More information