1 ROUTE 22A CORRIDOR STUDY Final Report Appendices Appendix D Crash Analysis May 2012
2 Rutland Regional Planning Commission, Vermont Orwell, Benson, West Haven & Fair Haven, Vermont Broadreach Planning & Design/Stantec
3 Note Single Vehicle crashes at driveways and angle type crashes at Route 73 intersection. Looking south from Route 73 at undefined access to store on northwest corner and dip in Route 22A roadway which influences sight distance. Looking south from Cook Road to top of hill approximately 300 feet away which severely limits sight distance. Note Single Vehicle crashes at driveways, Rear End crashes at driveway at bottom of hill and Angle crash at intersection. Where Rear End crashes occurred there is limited sight distance due to hill.
4 Note Single Vehicle and Head On crashes at driveways and note the Single Vehicle crashes on horizontal / vertical curve. Looking north toward curve and warning sign too close to curve to allow reduction in speed from 50 MPH speed limit to 35 MPH advisory speed. Looking south along east edge of roadway within curve. Looking south where Route 22 A curves to left and driveway to right. Looking south toward curve.
5 Note Single Vehicle Crashes and one Head On crash. Roadway conditions may have contributed to these crashes. Note Single Vehicle crashes near intersections and driveways and Rear End crash in vicinity of public wildlife management area. Note also pavement affected by adjacent wetland area. Looking south at Coates Hill Road. Note no street sign.
6 Note crashes in vicinity of store on northeast corner of Route 144 intersection including Rear End type which may have resulted from lack of definite access points and speed. Looking north from Route 144 beyond undefined access to store. Looking south from Route 144 to crest near Hullet Hill Road. Looking north from crest of hill toward Route 144 intersection. Looking south from Hullet Hill Road. Note Single Vehicle crashes at driveways likely due to higher speeds and longer travel distance during reaction time.
7 Note Single Vehicle and Rear End crashes at access to fields and Angle, Rear End, and Single Vehicle crashes at Lake Road intersection. Speed on downgrade likely contributes to crashes. Figure 1 Sight line from Lake Road looking north uphill to crest. Looking south from Lake Road. Note Rear end crashes near driveways and head on crash within roadway curve where passing is allowed northbound. Looking north within the curve. Southbound advisory speed limit of 40 MPH is posted (50 MPH speed limit) in advance of curve. Note limited sight distance southbound. Looking south within curve and northbound passing zone.
8 Note Single Vehicle crashes near driveway likely due to higher speeds and longer travel during reaction times and possibly due to driveway hidden by vertical curve. Note single vehicle crash near driveway and multiple single vehicle crashes within reverse curve at stream crossing. See photos below of curves and crossing. Looking north at stream crossing where guide rail appears to narrow the travel way. Looking north along right edge of pavement where vehicles track outside the paved shoulder. Looking south back to beginning of curve. No warning signs are posted in advance of this curve.
9 Note Single Vehicle crashes at driveways likely due to higher vehicle speeds and longer travel distances during reaction time. Note the wider shoulder on Route 22 A at Main Road intersection and lighting on Main Road. Note only one Single Vehicle crash at Main Road despite high speed of through traffic bypassing left turn vehicle on shoulder. Other crashes to north within merge following truck climbing lane.
10 Note variety of crash types within 44 foot curb to curb roadway under 30 MPH speed limit. Photos below show typical view looking south. Route 22A looking south along east curb line. Route 22A looking south along west curb line. The 44 foot curb to curb width would accommodate a 3-lane section including a center turn lane or two-way center turn lane responding to rear end crashes and sideswipe crashes.
11 Note alternate circulation routes around park, wide pavement areas, long pedestrian crosswalks, angle parking, and absence of northbound left turn lane onto Route 22A at Route 4A split. Note Head On crash at bottom of 14% grade below RR crossing where two crashes occurred. Also note residential area to south with homes close to roadway and no sidewalk.
12 Panoramic set of four photos looking south on Route 22A / 4A. Looking north toward at grade rail crossing Looking northwest from Route 4A to Route 22A. Looking north toward Routes 22A and 4A split. Note no northbound left turn lane and adjacent parking lane. Looking northeast from Route 22A to Route 4A. Looking south toward RR crossing at top of 14 % grade from Route 4A at stop line.
13 Itro Uquqdens_ ldll4l!1lgq / 82 lgfq!!!-9.-tlqnftl$p.lntltrkmdtrdto.$ft3h@tdd6odtret.dabqnsoteatb.ronrorlnsof n!.d.rdmtne.tffit:.ffilfrffi: m hr*lr d.l[ E mt InFrd,.eofie g to Fr. Tha ffi tooh ple. at6g nf tdg tim ot rh. rrhty F-[ R/ SATURDAY, MAY 29,200+ uw,rutkndlx Two rigs rolled over in nearly the same spot ihfi Repofi BENSON -A tractor-trailer truck :arrying 8,(M) pounds of scrap metal olled orier on Route 22A in almost the :xact location where another ractorrailer rolled over a day earlier. In bodr rollovers, the drivers only uffered minor injuries. Vcrmont Statc Police said the latest 'ollovcr took place Wednesday when oseph Morrill, 56, of Whitehall, N.Y, ras itriving a 1998 tractor-trailer for Na{ Engbnd Q nlityservicesofhusfnrd. Police said Morrill lost control of thc vehicle as he was headed north, driving off the east side of the road. The reason for the loss of control was unknown. Police said Morrill rolled over in nearly the same spot as a tractor-trailer carrying paint thinner rolled over on Tuesday. ln that incident, Robert Seaman was driving for New Penn Motors Express Inc. Morrill's tnrck rolled over onto its right side. About 8,000 pounds of scrap mctal scattered across the ProP ertybfjoan Cun ningham of Benson. Policesaid a tow uuck removed the tractor-railer and the scrap metal was cleaned up from the property. Driven in both crasheswere issucd traffic cickets for failing o keep their vehicles in the roadway, police said. Damage to Cunningham's properry' was estimatcd at SS,fiX).
14 -..tf n. l/ol tood *rbc-k ctcci dernt Yo, zsi. incleu^ e.t tr)go-+h.rf r+ luas O.e *o not leyvrave< la*er u.,i*t bac Fvts ir.. -t\e-!^aeador^rr ;?l't it^ftl l.(-con d; *ion d. tcle- wefe ho* te rvn\zergqcl.
15 N N \o v') P t r r\) L-x t l.!? sr cl AD
16 i i \ a!! r j : - I l " v v s 3ii r*t.i.' J j j- c. Ac{ ; ; { r,- + * l_ t F.r iijrjliri $i s d g ij{t;s{lsv- ;i Y ci rl {i;j{:irti cr +'i ii $ j{$s;,slljt ii {sr{ i*s -, *-r{lr**=ii!: :jii, s.r s J - sd?u!l..lf.$*d-fi.3: ii.s.;i zi,.[ ;Ji.,itli"n*ii; 1--$ Ei rsu g**-i;f -.{ij*$tu 3:d -E 5i-Q li;'t{st,clj riifi j * ;!;i i i ;;;s:t-e33- s'" =i:: i*i it$! ji -fri* d+g ;: Fis; A -i5e io4;-
17 avte F"?r5rrh. h3r 3 };Szhial. thmr lrrlrfo rtslths tar L!r6$./ Fwal Lulirr *n6 -friri{q ta-, 0 Jqjg,,-tacjs +dtail cr ujorz vct wd
18
Military Road Safety Improvements
Military Road Safety Improvements 26 th Road North to 31 st Street North SUMMARY OF DATA REVIEW AND PRELIMINARY RECOMMENDATIONS Prepared for: Department of Environmental Services Traffic Engineering and
More informationSwamp Road Residents Study
Swamp Road Residents Study SRRG Meeting with PennDot and Elected Officials Newtown and Wrightstown, PA April 25, 2008 Newtown Township Section of Swamp Road Limited Public Funds No reconstruction of a
More informationReadington Road (C.R. 637) Construction
Public Information Meeting Thursday, August 2, 2012 Readington Road (C.R. 637) Construction from Dreahook Road to Harlan School Road Branchburg Township, Somerset County Readington Township, Hunterdon
More informationJ-Turn An Intersection Safety Improvement Purdue Road School 2016 Tuesday, March 8, 2016 Brian Malone, INDOT & Josh Cook, HNTB
J-Turn An Intersection Safety Improvement Purdue Road School 2016 Tuesday, March 8, 2016 Brian Malone, INDOT & Josh Cook, HNTB US 231 and SR 62 and SR 68 US 231 and SR 62 Intersection Traffic Data Traffic
More informationCHAPTER 6H. TYPICAL APPLICATIONS
2006 Edition Page 6H-1 CHAPTER 6H. TYPICAL APPLICATIONS Section 6H.01 Typical Applications Support: Whenever the acronym TTC is used in this Chapter, it refers to temporary traffic control. Standard: The
More informationLong Island Rail Road Expansion Project Floral Park to Hicksville
Long Island Rail Road Expansion Project Floral Park to Hicksville Final Environmental Impact Statement Appendix 1-D Complete Streets Policy Checklist April 2017 0902ML PIN: Project Location: 18A-4 Floral
More informationTruck Climbing Lane Traffic Justification Report
ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:
More informationDriver Education Ch. 4: Safe Driving Rules & Regulations. Ms. Marx
Driver Education Ch. 4: Safe Driving Rules & Regulations Ms. Marx Speed Control Speed is one of the most common contributing factors of fatal & other types of accidents School zones, business or residential
More informationPERFORMANCE ACTIVITY 405 LIMB MANAGEMENT
PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT 405 LIMB MANAGEMENT ACTIVITY DESCRIPTION Cut and/or remove and/or grind tree limbs from the right-of-way. TRAFFIC CONTROL Utilize intermittent mobile operations
More informationOff-road Trails. Guidance
Off-road Trails Off-road trails are shared use paths located on an independent alignment that provide two-way travel for people walking, bicycling, and other non-motorized users. Trails specifically along
More informationDOT Policy and Procedure Integrity Excellence Respect
DOT Policy and Procedure 05.05.020 Integrity Excellence Respect Alaska s Speed Limit Policy Contained in DOT Policy and Procedure (P&P) 05.05.020, Establishment of Speed Limits and Zones Incorporates pertinent
More informationCHAPTER 6H. TYPICAL APPLICATIONS
Section 6H.01 Typical Applications Support: CHAPTER 6H. TYPICAL APPLICATIONS Chapter 6G contains discussions of typical temporary traffic control activities. Chapter 6H presents typical applications for
More informationIncluding Revision 1 dated May 2012 and Revision 2 dated May 2012
Including Revision 1 dated May 2012 and Revision 2 dated May 2012 Page 634 2009 Edition Notes for Figure 6H-1 Typical pplication 1 Work eyond the Shoulder 1. If the work space is in the median of a divided
More informationENGINEER S PRELIMINARY REPORT. for the #######-###### COLLISION
ENGINEER S PRELIMINARY REPORT for the #######-###### COLLISION By: Lance E. Robson, P.E. October 3, 2005 1 INVESTIGATION OF THE #######-###### COLLISION ENGINEER S PRELIMINARY REPORT October 3, 2005 ---------------------------------------------------------------------------------------------------------------
More informationPEDESTRIAN SAFETY STUDY
PEDESTRIAN SAFETY STUDY SR 699 (BLIND PASS RD/GULF BLVD) FROM 93 RD AVENUE TO PINELLAS BAYWAY PINELLAS COUNTY SECTION NO.: 15100 MILEPOST: 0.111 3.569 STUDY LIMITS Prepared For: Florida Department of Transportation
More informationGeometric Design Tables
Design Manual Chapter 5 - Roadway Design 5C - Geometric Design Criteria 5C-1 Geometric Design Tables A. General The following sections present two sets of design criteria tables - Preferred Roadway Elements
More informationSign Design Manual (TEM 295-2)
TEMPORARY TRAFFIC CONTROL SIGNS INDEX Regulatory Signs R1-1 R-1 STOP R1-2 R-2 YIELD R1-2a R-2A TO ONCOMING TRAFFIC R4-1 R-33 DO NOT PASS R4-2 R-34 PASS WITH CARE R4-3 R-35 SLOWER TRAFFIC KEEP RIGHT R4-9
More informationAGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive
AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell
More informationAGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT
May 15, 2018 AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT TYPE OF ITEM: Discussion STATEMENT OF ISSUE The Florida Department of Transportation
More informationDriveway Design Criteria
Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved
More informationCity of Edinburg Department of Public Works 415 W. University Dr. Edinburg, TX (956) SPEED HUMPS INSTALLATION POLICY
City of Edinburg Department of Public Works 415 W. University Dr. Edinburg, TX 78541 (956) 388-8210 SPEED HUMPS INSTALLATION POLICY A. GENERAL Speed humps are an effective and appropriate device for safely
More informationCity of Vallejo Traffic Calming Toolbox
City of Vallejo Traffic Calming Toolbox June 1, 2013 Final Table of Contents Introduction... 1 Non-Physical Devices... 3 High-Visibility Crosswalk... 3 In Pavement Lighted Crosswalk... 4 Rapid Flashing
More informationMUNICIPALITY OF ANCHORAGE Traffic Department MEMORANDUM
MUNICIPALITY OF ANCHORAGE DATE: MEMORANDUM TO: FROM: SUBJECT: Anchorage Contractors, Builders, Designers, and Land Owners Robert E. Kniefel, P.E., Municipal Traffic Engineer Municipal Driveway Standards
More informationAccess Management in the Vicinity of Intersections
Access Management in the Vicinity of Intersections FHWA-SA-10-002 Technical Summary Photo: Ralph Bentley (used with permission) 0 Access Management is: The design, implementation and management of entry
More informationBoard of Supervisors February 27, 2017
: Traffic Analysis Results & Draft Conceptual Plan Board of Supervisors February 27, 2017 Transportation Solutions Building Better Communities Presentation Overview Background Summary of Traffic Analysis
More informationAppendix C. TRAFFIC CALMING PROGRAM TOOLBOX
Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX PHASE I...2 Do Not Enter Sign...3 One-Way Sign...4 Turn Prohibition...5 Pavement Markings...6 Speed Monitoring Trailer...7 Neighborhood Speed Watch...8 Police
More informationMulti-Modal Traffic Analysis. Parisi and Associates
Mill Valley to Corte Madera Bicycle and Pedestrian Corridor Study Appendix D: Multi-Modal Traffic Analysis Prepared by Parisi and Associates August 2009 Appendix D - Multi-Modal Traffic Analysis Table
More informationSTREET and UTILITY REPAIRS WORK AREA PROTECTION GUIDE
STREET and UTILITY REPAIRS WORK AREA PROTECTION GUIDE May 2006 Street and Utility Repairs Work Area Protection Guide TABLE OF CONTENTS 1. Introduction... 1 2. Typical Applications... 11 2.1 Use of Hand-Signaling
More informationLesson #7. Review: Lesson #6 Destination: Eureka. SKILLS A. Protected Left Turns
SKILLS A. Protected Left Turns Lesson #7 Review: Lesson #6 Destination: Eureka 1. The only time you are protected from oncoming traffic is when you have a green left turn arrow 2. Oncoming traffic has
More informationINTERSECTIONS AT GRADE INTERSECTIONS
INTERSECTIONS 1 AT GRADE INTERSECTIONS INTERSECTIONS INTERSECTIONS = INTERRUPTED FACILITIES Definitions and key elements An intersection is defined as an area where two or more roadways join or cross.
More informationDraft North Industrial Area-Wide Traffic Plan
Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block
More informationOttawa Beach Road Study
Ottawa Beach Road Study Prepared For: Park Township September 30, 2014 Project No. G140303 OTTAWA BEACH ROAD STUDY PREPARED FOR: PARK TOWNSHIP SEPTEMBER 30, 2014 PROJECT NO. G140303 TABLE OF CONTENTS 1.0
More informationTRAFFIC SIGNAL WARRANT STUDY
TRAFFIC SIGNAL WARRANT STUDY 5 th STREET & ENCHANTED PINES DRIVE JANUARY 2013 TRAFFIC OPERATIONS ENGINEERING SERVICES/PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS INTERSECTION LOCATION MAP ii INTRODUCTION
More informationIntersection Traffic Control Feasibility Study
Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,
More informationIntersection Design. Leah Ness, Craig Hardy and Eric Sorensen
Intersection Design Leah Ness, Craig Hardy and Eric Sorensen OVERVIEW TYPES OF INTERSECTIONS SCOPING COORDINATION INTERSECTION EVALUATION HORIZONTAL AND VERTICAL LAYOUTS DESIGN COORDINATION CONSTRUCTION
More informationDeveloped by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA
Addendum Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 800-272-8772 This material is based upon work supported by
More informationCity of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS
SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable
More informationWEST AVENUE AND NEW ROAD TRAFFIC STUDY PART III WEST AVENUE CLOSURE ALTERNATIVES ANALYSIS
WEST AVENUE AND NEW ROAD TRAFFIC STUDY PART III WEST AVENUE CLOSURE ALTERNATIVES ANALYSIS CITY OF LINWOOD ATLANTIC COUNTY, NEW JERSEY March 30, 2006 PREPARED FOR: City of Linwood 400 Poplar Avenue Linwood,
More informationM-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016
M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has
More informationTRAFFIC STUDY. Birch Bluff Road / Pleasant Avenue 01/15/2018. City of Tonka Bay 4901 Manitou Road Tonka Bay, MN WSB PROJECT NO.
TRAFFIC STUDY Birch Bluff Road / Pleasant Avenue 01/15/2018 City of Tonka Bay 4901 Manitou Road Tonka Bay, MN 55331 WSB PROJECT NO. 10805-000 Birch Bluff Road/ Pleasant Avenue Traffic Study For: City of
More informationIntersection Safety 6/7/2015 INTERSECTIONS. Five basic elements should be considered in intersection design. Intersection Safety (continued)
Intersection Safety S. M. SOHEL MAHMUD Assistant Professor Accident Research Institute (ARI), Bangladesh University of Engineering and Technology (BUET) Dhaka-1000, Bangladesh 1 Outline of the Presentation
More informationDesigning for Pedestrian Safety. Alabama Department of Transportation Pre-Construction Conference May 2016
Designing for Pedestrian Safety Alabama Department of Transportation Pre-Construction Conference May 2016 1 Designing for Pedestrians Marking Crosswalks at Signalized intersections High Visibility Markings
More informationMEMORANDUM. Discussion of the planned crosswalk improvement on Mount Vernon Road near Stratham Drive
MEMORANDUM To: From: Mayor and City Council Michael Smith, Public Works Director Date: August 24, 2015 Subject: Discussion of the Mount Vernon Road Crosswalk Improvement ITEM DESCRIPTION Discussion of
More informationAPPENDIX A Urban Control Zone Corridor Study Reports
APPENDIX A Urban Control Zone Corridor Study Reports California Sites Table A-1. California Study Corridors California Study Corridor County Name Length (miles) State Highway 1 Orange 7.0 State Highway
More informationDuwamish Way-finding and CTR Report
V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail
More informationTENW Transportation Engineering NorthWest
DRAFT FOR CLIENT REVIEW ONLY TENW Transportation Engineering NorthWest MEMORANDUM DATE: August 22, 2017 TO: FROM: SUBJECT: Patrick Yamashita City of Mercer Island Chris Forster, P.E. TENW Trip Generation
More informationImproving Cyclist Safety at the Dundas Street West and Sterling Road Intersection
STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee
More informationThis Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.
4.1 GENERAL This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans. These Roadway Standards are for new construction and modification
More informationComplete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER
Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER Complete Streets City Commission adopted a Complete Streets policy in 2012 Complete Streets are road networks that are designed for all users:
More informationRoute 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection
TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC
More informationAlberta Highway 881. Corridor Management Plan. Session Forum 1 - Highways. Tri-Party Transportation Conference Moving Alberta Into the Future
Tri-Party Transportation Conference Moving Alberta Into the Future Alberta Highway 881 Corridor Management Plan Lac La Biche to Anzac Session Forum 1 - Highways March 2017 INTRODUCTION + 241 km long, 2
More informationNeighborhood Pedestrian Safety and Traffic Calming Study
Neighborhood Pedestrian Safety and Traffic Calming Study for the area bounded by Foster Avenue, Bedford Avenue, Farragut Road and Ocean Avenue Flatbush, Brooklyn, New York prepared by Michael King, miking@trafficcalmer.com
More informationROUTE 22 CORRIDOR STUDY: CORRIDOR MANAGEMENT PLAN APPENDIX A A-12
ROUTE 22 CORRIDOR STUDY: CORRIDOR MANAGEMENT PLAN APPENDIX A A-12 3.0 HARLEM VALLEY TRANSPORTATION PLAN Incorporates transportation systems management and safety improvements. Location: Route 22 corridor
More informationHidden Oaks Elementary School
Hidden Oaks Elementary School SCHOOL ROUTE PLAN For HIDDEN OAKS ELEMENTARY SCHOOL LOCATION 13 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering
More informationALLEY 24 TRAFFIC STUDY
ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland
More informationTraffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report
Traffic Study of Fuller Street, Cady Street, West Street and West Avenue Final Report July 2005 Prepared for: Town of Ludlow Prepared by: Pioneer Valley Planning Commission 26 Central Street West Springfield,
More informationControlled. Semi-Controlled PAGE 01 CHAPTER 12 INTERSECTIONS
PAGE 01 CHAPTER 12 INTERSECTIONS You will cross many intersections while driving. Intersections are especially dangerous because vehicles are crossing each other s driving path. Many crashes happen at
More informationAlexander Ikefuna City of Charlottesville Director of Neighborhood and Development Services
To: CC: From: Alexander Ikefuna City of Charlottesville Director of Neighborhood and Development Services Jeanette Janiczek, City of Charlottesville UCI Program Manager, NDS Tony Edwards, City of Charlottesville
More informationDesign Criteria. Design Criteria
F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road
More informationCounty of Greenville South Carolina. Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program
County of Greenville South Carolina Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program (rev) August 2008 I. PURPOSE The potential negative impacts from vehicular traffic
More informationTable 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line
Grade Crossing Enhancements CPUC 1 2 3 4 5 Citrus Avenue, Riverside County Palmyrita Ave., Columbia Avenue, Marlborough Ave., Spruce St., MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3
More informationPERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4
PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 1 WORK DESCRIPTION 2 WORK DESCRIPTION 3 WORK DESCRIPTION 4 Repair Install Remove Clean 306 DRAINAGE PIPE ACTIVITY DESCRIPTION Install, repair, clean,
More informationBorough of Danville, PA Traffic Calming Program Guidelines
Borough of Danville, PA Traffic Calming Program Guidelines Adopted by Borough Council on 1 INTRODUCTION Speeding Traffic is a major concern in the Borough of Danville because of its detrimental impacts
More informationRoute 117 Review of Ownership Transfer October 2014
Route 117 Review of Ownership Transfer October 2014 Page 1 of 27 I. INTRODUCTION... 3 II. EXISTING CONDITIONS... 4 A. Town of Lancaster Site-Investigation... 4 B. Town of Bolton Site-Investigation... 9
More informationDr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018
Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 What s Happening The City plans to mill and resurface Dr. M.L.
More informationGEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION
TABLE 1A CG-6 CURB AND GUTTER SECTION HORIZONTAL AND VERTICAL CONTROLS CURB AND GUTTER ROADWAYS MAXIMUM 3:1 CUT OR FILL SLOPE CURVE DATA MIN. SIGHT DISTANCE PROJECTED TRAFFIC VOLUME (ADT) MIN. DESIGN SPEED
More informationThe major street is typically the intersecting street with greater traffic volume, larger cross-section, and higher functional class.
INTERSECTIONS DESIGN Definitions and key elements An intersection is defined as an area where two or more roadways join or cross. Each roadway extending from the intersection is referred to as a leg. The
More informationA plan for improved motor vehicle access on Railroad Avenue in Provincetown
A plan for improved motor vehicle access on Railroad Avenue in Provincetown February 2011 A plan for improved motor vehicle access on Railroad Avenue in Provincetown INTRODUCTION AND PROBLEM IDENTIFICATION
More informationCorporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998
R1500 : Traffic Safety at 25 Avenue and 128 Street Intersection Corporate NO: R1500 Report COUNCIL DATE: May 25, 1998 REGULAR COUNCIL TO: Mayor & Council DATE: April 27, 1998 FROM: General Manager, Engineering
More informationCITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study
CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final
More information10.0 CURB EXTENSIONS GUIDELINE
10.0 CURB EXTENSIONS GUIDELINE Road Engineering Design Guidelines Version 1.0 March 2017 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services
More informationBicycle - Motor Vehicle Collisions on Controlled Access Highways in Arizona
Bicycle - Motor Vehicle Collisions on Controlled Access Highways in Arizona Analysis from January 1, 1991 to June 30, 2002 Richard C. Moeur, PE Traffic Design Manager, Northern Region Michelle N. Bina
More informationTHE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL
THE FUTURE OF THE TXDOT ROADWAY DESIGN MANUAL Kenneth Mora, P.E. (Design Division) 10/10/2017 Table of contents 1 2 Reduction in FHWA design controlling criteria Innovative Intersection Guidance 3-7 8-42
More informationVehicular turning and path of travel with a proposed curb bulb on the southwest corner of Mount Diablo Boulevard and Dewing Avenue.
October 3, 2014 James Shively Stantec 100 California Street, Suite 1000, San Francisco CA 94111-4505 Subject: Traffic Study for Proposed Lafayette Chase Bank Dear Mr. Shively: Pursuant to your request,
More informationHow Might Connected Vehicles and Autonomous Vehicles Influence Geometric Design? October 10, 2017
How Might Connected Vehicles and Autonomous Vehicles Influence Geometric Design? October 10, 2017 Overview Design Vehicle Design Driver Potential Geometric Impacts of Autonomous Vehicles Connected Vehicles
More informationCHAPTER 1 STANDARD PRACTICES
CHAPTER 1 STANDARD PRACTICES OBJECTIVES 1) Functions and Limitations 2) Standardization of Application 3) Materials 4) Colors 5) Widths and Patterns of Longitudinal Pavement Marking Lines 6) General Principles
More informationTRAFFIC IMPACT ANALYSIS
TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014
More information2.0 LANE WIDTHS GUIDELINE
2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated
More informationINTERSECTION SITE SAFETY ASSESSMENTS DUBUQUE COUNTY, IOWA
TECHNICAL MEMORANDUM To: Chandra Ravada, East Central Intergovernmental Association From: David Veneziano, Iowa LTAP Safety Circuit Rider and the RSA Team Date: August 6, 2018 Re: Safety Assessment Intersections
More informationCITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM
CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 1, 219 To: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee From:
More informationAPPENDIX E GRADE CROSSING LOCATIONS
APPENDIX E GRADE CROSSING LOCATIONS 1 2 3 Citrus Avenue Riverside County and City Palmyrita Avenue Columbia Avenue MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3 027303M 1. Existing
More informationUnit Six: Driving Faster with More Risk URBAN, SUBURBAN, AND RURAL DRIVING
Unit Six: Driving Faster with More Risk URBAN, SUBURBAN, AND RURAL DRIVING What Is The Impact Of Distraction? Objectives For Unit Six Students will be able to describe the skills necessary to What safely
More informationCommunity Transportation Plan
Community Transportation Plan Appendix A: Traffic Calming CITY OF DECATUR COMMUNITY TRANSPORTATION PLAN Appendix A: City of Decatur City-wide Residential Traffic Calming Program Process & Procedures The
More informationBoston Post Road Design Feasibility Study
Boston Post Road Design Feasibility Study Prepared for the City of Rye Final Report July 18, 2007 Prepared by: Buckhurst Fish & Jacquemart (BFJ) 115 Fifth Avenue New York, NY 10003 www.bfjplanning.com
More informationWhy Zone In on Speed Reduction?
Learn it. Do it. Live it! SPEED REDUCTION IN THE ZONE Why Zone In on Speed Reduction? Speeding is a serious issue that plays a major role in the risk of serious injury and pedestrian fatality in a crash.
More informationMEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff
MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:
More informationDRAFT Sellwood Bridge Existing Roadway Deficiencies
Technical Memorandum DRAFT Sellwood Bridge Existing Roadway Deficiencies Executive Summary Purpose Roadway design standards are developed to support safety and mobility goals. Roadway deficiencies have
More informationChapter 6 Performing Basic Vehicle Maneuvers
Chapter 6 Performing Basic Vehicle Maneuvers Correct hand position To turn use Hand over hand steering Push and Pull steering Steering Turn Signals Use indicators/signals Indicators inform other drivers
More informationTOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES
TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES (Adopted by the Town Council on June 30, 2004) (Revised December 6, 2010) (Revised February 8, 2016) POLICY AND PROCEDURES FOR TRAFFIC
More informationTRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane
July 24, 2018 TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane DPWandYOU.com Making a difference, together Meeting Agenda Purpose of the project Overview of work conducted
More informationCITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY
RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study
More informationA Sample Report of TRAFFIC CONTROL DEVICES REVIEW
A Sample Report of TRAFFIC CONTROL DEVICES REVIEW Introduction We performed a peer review of traffic control devices at selected locations on the City s street system. As the result of our review, we have
More informationDEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:
DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,
More informationCity of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY
4.10 ALBERT LEA CROSSWALK POLICY PURPOSE: Pedestrian crosswalks are an integral part of our transportation infrastructure. To be effective and promote safety, marked crosswalks must be installed after
More informationWELCOME Public Information Centre
WELCOME Public Information Centre Fernforest Drive Brampton Soccer Centre Community Room #2 Tuesday January 19, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background
More informationTypical Cross Section: DOWNTOWN (Observer Highway - 8th Street)
Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street) DRAFT SEPTEMBER 23, 14 1 Washington Street Typical Block Downtown Typical Block: DOWNTOWN (Observer Highway - 8th Street) New crosswalks
More informationMEMORANDUM TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR SUBJECT: CONSIDERATION OF RESTRICTING PARKING ADJACENT TO 170 AND 171 BRISCO ROAD
MEMORANDUM TO: FROM: BY: TRAFFIC COMMISSION TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR MATT HORN, CITY ENGINEER SUBJECT: CONSIDERATION OF RESTRICTING PARKING ADJACENT TO 170 AND 171 BRISCO ROAD DATE:
More informationPART A: IDENTIFICATION/LOCATION
Appendix A. Quick Bus Stop Checklist QUICK BUS STOP CHECKLIST A1 Street Name: PART A: IDENTIFICATION/LOCATION A2 Nearest Cross Street (street name or landmark if mid-block): A3 A4 A5 Bus Route Direction:
More informationCONTENTS EXECUTIVE SUMMARY. 1 SUMMARY OF EXISTING CONDITIONS Issues and Observations Public Meeting (December 2005) 1
CONTENTS CHAPTER PAGE EXECUTIVE SUMMARY ES-1 1 SUMMARY OF EXISTING CONDITIONS 1 1.1 Issues and Observations 1 1.2 Public Meeting (December 2005) 1 2 LIST OF POTENTIAL IMPROVEMENT STRATEGIES 2 2.1 Traffic
More informationSign Designs and Markings Manual (TEM 295-2) Page 8-3
Sign Designs and Markings Manual (TEM 295-2) Page 8-3 TEMPORARY TRAFFIC CONTROL SIGNS INDEX Regulatory Signs R1-1 STOP R1-2 YIELD R1-2a TO ONCOMING TRAFFIC R2-1 SPEED LIMIT R2-H2a VEHICLES OVER 4 TONS
More information