Exposed geomembrane covers: Part 2 - geomembrane restraint

Size: px
Start display at page:

Download "Exposed geomembrane covers: Part 2 - geomembrane restraint"

Transcription

1 Expose geomembrane covers: Part 2 - geomembrane restraint By Gregory N. Richarson, Ph.D., P.E., principal of GN Richarson an Assoc. In the previos Designer s Form, esign proceres were presente to evalate the tension in expose geomembrane covers (EGCs) e to win-p lift loaing. his article explores alternative means of proviing anchorage to the EGC to resist sch plift forces. In general, this will involve attempting to se conventional featres of a final cover, (e.g. roaways, swales, etc.) to provie a portion of the reqire restraint. In aition to proviing mass to act as a restraint, sch featres still mst serve their primary fnctions. hese fnctions incle proviing access for roaways an srface-water control for swales an own chtes. hs, in many ways, the system of primary anchors se to resist win plift of the expose geomembrane will mirror featres of the complete final cover. (a) (b) (c) Figre : Examples of anchor trenches (a, b) an a bench (c). In this article, the varios anchorage systems are sbivie into three categories: () horizontally oriente anchors, (2) vertically oriente anchors, an (3) seconary anchors. Horizontally oriente anchors se final cap featres sch as swales an roaways that are primarily horizontally oriente. Vertically oriente anchors se featres sch as own-chtes that are primarily vertically oriente. Seconary anchors generally o not reflect a final featre of the complete cap, bt are interim points of anchorage. hs, the final anchorage system may incorporate several categories of plift anchorage. Horizontally oriente anchors Figre shows three types of horizontally oriente anchors propose by Giro (999). wo of these horizontally oriente anchors, b an c, moify sie-slope swales or roaways to create plift anchorage. he thir, a, is a moifie application of the stanar anchor trench. Anchor Bench Drainage swale moifications probably are the most intitive anchorage. hey provie several specific alternatives for the esigner that serve to illstrate the general esign approach. Figre 2 shows the general geometry of an anchor bench appropriate for a roaway or swale application. he EGC tensions,, are calclate sing the proceres iscsse in Part of this article. Using geometry, the EGC tensions can be resolve into forces vertical an horizontal to the horizon at the base of the anchor bench, as shown in Figre 3. he geomembrane tensions rece the sta- Reprinte with permission of Instrial Fabrics Association International. θ Direction R R α δ a Direction R Direction normal to the base of the bench Figre 2: Forces acting on an anchor bench when the geomembrane is plifte by win action. δ θ

2 bility of the bench anchor in two istinct ways: () the vertical components of the tension rece the effective weight of the bench an therefore the base friction, an (2) the horizontal component of the lower EGC acts to pll the anchor off the bench. he latter is of particlar concern if the tension in one of the EGCs is significantly larger than in the other. For this general case, Giro (999) shows how to etermine the minimm anchor weight reqire in Figre 4. In this eqation, min DON is the minimm weight if the EGC tensions rag the anchor own the slope, min UP is the minimm R 2 Figre 3: Decomposition of the forces weight if the EGC tensions rag the anchor p the slope, is the tension in the geomembrane below the anchor, is the tension in the acting on an anchor bench into vertical components (sbscript ) an components parallel to the base of the anchor geomembrane above the anchor, ß is the slope angle below the anchor, ß is the slope angle above the anchor, ß a is the slope angle immeiately below the anchor, θ is the bench (sbscript 2). angle between the plifte EGC an the slope below the anchor, θ is the angle between the plifte EGC an the slope above the anchor, an δ is the interface friction angle between the anchor an the EGC. he minimm weight base on vertical plift is given by H 2 R α R a 2 H Direction normal to the base of the bench minplift = sin (Θ ) + sin (Θ ) However, Giro showe that min DON > minplift an min UP > minplift. his means that the sliing conitions govern for a bench anchor an not the pre plift conition. A key point in the constrction of sch bench anchors can best be mae by looking at the two esign etails shown in Figres 5a-5b. he leaing ege of the bench anchor will be lifte by the tension in the EGC, an mst be stabilize in some manner to prevent raveling of the soil. Figre 5a shows the bench anchor etail se at the Delaware Soli aste Athority EGC project (Germain, et al, 996). min DON = ± cos (θ + δ + a )+ cos (θ + δ ) UP sin (δ + a ) Figre 4: Minimm anchor weight reqire. his esign encapslates the anchor soil in a geomembrane to contain it an prevent its loss. Alternative containment col se trf reinforcement mats (RMs) or geogri reinforcement. Figre 5b shows a bench roaway anchor etail that this athor evelope for caps at the Department of Energy s Oak Rige facility. Here, containment of the eges is provie by gabions or timber cribbing. Anchor rench An anchor trench provies passive earth pressre against the sie of the trench to resist the reslting horizontal component of the EGC tensions. Koerner (997) presents a goo iscssion Reprinte with permission of Instrial Fabrics Association International. 2

3 of the horizontal restraint of conventional anchor trenches. he net horizontal resistance of the anchor trench is given as P P -P A. P P is the passive resistance of the trench wall the anchor is being plle into an P A is the active force of the sie the anchor is being plle away from. he general eqations for P P an P A for the anchorage trenches are as follows: P A = / 2 γ 2 K a P P = / 2 γ 2 K p 2 aste Graing Soil 2.5 DSA Swale Anchor Protective Geomembrane Varies Final Graing Layer Daily/Intermeiate Layer Graing Soil Expose Geomembrane Figre 5a: Detail of swale bench anchor se at the Delaware Soli aste Athority EGC project. here γ is the nit weight of the soil forming the trench, is the epth of the trench, K a = tan2(45- φ/2), K p = tan2(45+ φ/2), an φ is the angle of shearing resistance of the soil forming the trench. Cshion Layer Gravel Srface Geocells Gabion Or imber Crbing hile P A an P P proce frictional forces on the sie of the trench that resist plift, these forces will be small in typical EGC applications. he resistance to plift is provie primarily by the weight of soil within the trench. his weight mst excee minplift previosly efine by Giro. Geotextile Gas Vent DOE Roaway Anchor Figre 5b: DOE roaway anchor. Geomembrane Care mst be taken in esign to ensre that the fll weight of soil within the trench will contribte effectively to plift restraint. Giro sggests that the sies of the trench mst be as vertical as possible, with a epth-to-with ratio of more than his ensres that the pressre acting on the geomembrane on the bottom of the trench is as niform as possible. An effective confinement of the soil in the trench mst be ensre by the esign. Vertical anchors Common vertical featres on lanfill sie slopes incle srface- water own-chtes an lanfill gas (LFG) collection pipes. A ternative EGCs have been constrcte to provie primary anchorage to the EGC geomembrane sing these vertical featres. his changes the orientation of the spans, e.g. horizontal vs. vertical, of the geomembranes an some esign concerns. Down-Chte Anchors Figre 6 shows a section throgh a rainage own-chte constrcte in the early 90s on the lateral perimeter of a mixe-waste lanfill EGC cap. he minimm weight of own-chte reqire to hol own plift forces from an EGC can be shown to eqal Reprinte with permission of Instrial Fabrics Association International. 3

4 min = left sin (Θ left ) + right sin (Θ right ) right an left simply enote the ECS tension on either size of the own-chte. Since ownchtes form a channel to contain flow, the nee for stabilization or reinforcement at the ege of the chte is not as ifficlt to achieve as for bench anchors. LFG Collection rench Anchors Figre 7 shows restraint of the EGC achieve by attaching it to LFG collection trenches that rn p the sie slopes an are evenly space horizontally. As with horizontal anchor trenches, the LFG collection trenches will not be move laterally by the horizontal forces from the EGC. Interim Geotextile Cshion Geomembrane Cap Revetment Mat eep Holes Gron Srface Revetment Mat Anchor Existing Stream Be Down Chte Anchor Figre 6: Section of a rainage own-chte. Vegetation Geotextile Anchor Geomembrane Anchor Compacte Backfill he minimm weight of the LFG collection trench can be calclate sing the previos soltion presente for own-chtes. Note that this neglects the friction forces on the sies of the trench. Seconary anchors he previos anchorage systems are base on featres of the final cover, that is, the EGC pls the lateral rainage, vegetative spport, an vegetative layer. hese anchorage systems lose their anchor role in the final cover, bt retain their fnamental role. Expose Geomembrane ' 0" el Geomembrane o HDPE Geogri Along Rib Gas Collection rench (30"X30") wo istinct types of seconary anchors incle both point an line anchors. he point anchors se commercially available earth anchors to provie restraint. o achieve a high loa capacity (>000 lbs.), these anchors are set in both the interim soil cover an the nerlying waste. Costing less than $00 each, they can be installe in the fiel to tensile capacities greater than 0,000 lbs. he ability to fielproof loa the tensile capacity of the varios point anchor systems is another benefit. aste LFG Collector Pipe Anchor HDPE Geogri Intermeiate Figre 7: Restraint of EGC by attachment to LFG collection trenches. Reprinte with permission of Instrial Fabrics Association International. 4

5 Remember that the primary markets for these point anchors are stabilize tility poles an win restraints for mobile homes. he installation simplicity of the anchors reflects this market. Seconary line anchors can be mae by filling polyethylene pipes with water or grot, then cap-stripping the pipe to the EGC. hese seconary line anchors provie spplemental plift protection, bt also provie a means of controlling srface-water flow over the EGC. his control of srface water can be critical ring the life of the EGC, since time of concentration of srface waters is minimal. hese seconary line anchors are particlarly helpfl if a vertically oriente primary anchorage system is se, since they o not break p the slope. he seconary line anchors increase anchorage an provie interim swales. Design factors of safety he economical anchorage of an EGC reqires the esigner to tilize featres of the final cap pls limite seconary anchorage systems. A minimm safety factor of.5 is recommene for bench anchors,.25 for trench anchors, an.0 for seconary anchors. All systems shol be inspecte if the esign win velocity is exceee at the site. his inspection, an proceres for sbseqent repairs, if reqire, shol be part of the facility operations manal. Smmary he athor acknowleges the benefits of a ecae of his own work on EGCs for the Department of Energy an the ongoing work by J.P. Giro to efine rigorosly the reqirements for sch systems. One interesting evice for proviing restraint to an EGC not covere by this article is a sction vent. Place in the pper portions of the slope, sction vents allow the win to raw air from beneath the EGC to proce a sction force below the EGC. Unfortnately, recent feeral reglations limit or ability to vent LFG irectly into the atmosphere. For non-ms lanfill applications, sch vents may be esirable. he thir an final installment of the EGC series will examine the criteria for selection of the type of geomembrane to se with seconary line anchors. References Chapman,., Peggs, I., Richarson, G., an ell, L Report of the ag-6 Interim Avisory Panel. DOE, Oak Rige, N. Germain, A., Gleason, M., an atson, R Design of an Expose Geomembrane Cap. SANA s 34th Annal International Soli aste Exposition, astecon. Giro, J.P., Gleason, M.H., an Zoinberg, J.G Design of Geomembrane Anchorage Against in Action. Geosynthetics International. Vol. 6, No. 6; Koerner, R.M Designing ith Geosynthetics. Forth EItion. Prentice Hall, Upper Sale River, NJ. Reprinte with permission of Instrial Fabrics Association International. 5

Formation level = m. Foundation level = m. Height of the wall above the Ground Level = 7.42 m

Formation level = m. Foundation level = m. Height of the wall above the Ground Level = 7.42 m DESIGN OF RETAINING WALL INTRODUCTION: This wall is designed for active earth pressure and live load surcharge pressure The loads for the purpose of design are calculated per meter length of wall. BASIC

More information

Introduction. Geomembrane lining systems are used in a variety of different applications. Landfill Lining Landfill Capping Salt Piles Lagoons / Ponds

Introduction. Geomembrane lining systems are used in a variety of different applications. Landfill Lining Landfill Capping Salt Piles Lagoons / Ponds Contents 1. Introduction/Overview 2. Traditional Methods of Anchoring Geomembrane Liners 3. What can go wrong? 4. Net Down 5. Theory and how Net Down works 6. Installation Details 7. Technical Information

More information

Notice of Intent to Close Inactive CCR Surface Impoundments

Notice of Intent to Close Inactive CCR Surface Impoundments Notice of Intent to Close Inactive CCR Surface Impoundments Virginia Electric and Power Company Possum Point Power Station Coal Combustion Residual Surface Impoundments A, B, C, D, and E Dumfries, Virginia

More information

Final Report. Design and Installation of Torque Anchors for Tiebacks and Foundations

Final Report. Design and Installation of Torque Anchors for Tiebacks and Foundations ii Final Report Design and Installation of Torqe Anchors for Tiebacks and Fondations iii TABLE OF CONTENTS Page LIST OF ILLUSTRATIONS... vi LIST OF TABLES... vii OVERVIEW OF HELICAL ANCHORS... 9 1.1 INTRODUCTION...

More information

Reinforced Soil Retaining Walls-Design and Construction

Reinforced Soil Retaining Walls-Design and Construction Lecture 32 Reinforced Soil Retaining Walls-Design and Construction Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Example calculation An 8 m high

More information

CHART SOLUTIONS FOR ANALYSIS OF EARTH SLOPES

CHART SOLUTIONS FOR ANALYSIS OF EARTH SLOPES CHART SOLUTONS FOR ANALYSS OF EARTH SLOPES John H. Hnter, Department of Civil Engineering, Virginia Polytechnic nstitte and State University; and Robert L. Schster, Department of Civil Engineering, University

More information

Proposed Procedure for Selecting Traffic Signal Control at School Crossings

Proposed Procedure for Selecting Traffic Signal Control at School Crossings TRANSPORTATION RESEARCH RECORD 1244 23 Proposed Procedre for Selecting Traffic Signal Control at School Crossings JAMES A. BoNNESON AND JosEPH D. BLASCHKE This paper describes the crrent criteria sed to

More information

Effect of Pavement Type and Condition on the Fuel Consumption of Vehicles

Effect of Pavement Type and Condition on the Fuel Consumption of Vehicles 28 Transportation Research Record lono Effect of Pavement Type and Condition on the Fel Consmption of Vehicles CHRISTO J. BESTER ABSTRACT The effect of pavement type and condition (roghness) on the rolling

More information

Systems and Components

Systems and Components new LINEAR SYSTEMS AND COMPONENTS SELF-ALIGNING LINEAR BEARINGS & PILLOW BLOCKS TM LINEAR SYSTEMS AND COMPONENTS TECHNICAL INTRODUCTION 29-228 PRECISION HARDENED AND GROUND SHAFTING 240-243 Linear Ball

More information

The Use of Weibull Analysis Methods in Assessing Field Failure Problems

The Use of Weibull Analysis Methods in Assessing Field Failure Problems Prde University Prde epbs nternational Compressor Engineering Conference School of Mechanical Engineering 1994 The Use of Weibll Analysis Methods in Assessing Field Failre Problems F. M. Simpson Copeland

More information

General Safety Notes for Chain Slings (Grade 50/60) Last revised: January 2018

General Safety Notes for Chain Slings (Grade 50/60) Last revised: January 2018 General Safety Notes for Chain Slings (Grae 50/60) Last revise: January 2018 Ketten Wäler GmbH Chain Technology Gewerbegebiet 5 83093 Ba Enorf, Germany Fon +49 (0)80 53-20 29-10 Fax +49 (0)80 53-20 29-31

More information

UNIT-I SOIL EXPLORATION

UNIT-I SOIL EXPLORATION SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road 517583 QUESTION BANK (DESCRIPTIVE) Subject with Code : Geotechnical Engineering - II (16CE127) Year & Sem: III-B.Tech & II-Sem

More information

Stability of Pipeline and details of Anchor blocks

Stability of Pipeline and details of Anchor blocks Stability of Pipeline and details of Anchor blocks For Offshore pipeline laying at Gulf of Kutch, Gujarat. Client WELSPUN (I) LTD, Gujarat EPC Contactor PATEL CONSTRUCTION CO. Consultants Prof. R. Sundaravadivelu

More information

THE PROBABILITY OF COLLISION DURING VESSEL OVERTAKING PRAWDOPODOBIEŃSTWO KOLIZJI PODCZAS WYPRZEDZANIA STATKÓW

THE PROBABILITY OF COLLISION DURING VESSEL OVERTAKING PRAWDOPODOBIEŃSTWO KOLIZJI PODCZAS WYPRZEDZANIA STATKÓW Jornal of KONiN,3 4,5 00 IN 895-88 DOI 0.478/v0040-008-067-7 THE PROAILITY OF COLLIION DURING VEEL OVERTAKING PRAWDOPODOIEŃTWO KOLIZJI PODCZA WYPRZEDZANIA TATKÓW Gynia Maritime University 8-345 Gynia l.

More information

EUROFLO CULVERT PIPE. Fittings / Pipes

EUROFLO CULVERT PIPE. Fittings / Pipes EUROFLO CULVERT PIPE Fittings / Pipes F EUROFLO FITTINGS RUBBERS SIZE CODE COMMENT 160 OD 200 OD 250 OD 315 OD 400 OD 500 OD 630 OD 800 OD 1000 OD 1200 OD 1550 OD 1750 OD 1950 OD 520-160-RBR 520-200-RBR

More information

In-Situ Testing of Gas Orifice Meters

In-Situ Testing of Gas Orifice Meters In-Sit Testing of Gas Orifice Meters By: Ron Beaty, PE David Simpson, MSME both of Amoco Prodction Co. Overview Why do we do in-sit testing Test Eqipment Design Considerations Smmary 1 Elements of a Differential

More information

Amec Foster Wheeler 2016.

Amec Foster Wheeler 2016. Landfill Closure An Innovative Geosynthetic Barrier System ESAA Remtech 2016 Dean Wall & Ian MacLeod Why Do We Close Landfills? It s the law To minimize post closure environmental liability To minimize

More information

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

SUNDERLAND SAFE ROADS SCOPING STUDY SUNDERLAND STP BP14(21) TOWN OF SUNDERLAND, VT January 29, 2016

SUNDERLAND SAFE ROADS SCOPING STUDY SUNDERLAND STP BP14(21) TOWN OF SUNDERLAND, VT January 29, 2016 SUNDERLAND SAFE ROADS SCOPING STUDY SUNDERLAND STP BP14(1) TOWN OF SUNDERLAND, VT January 9, 016 Submitte to: Town of Sunerlan 104 Mountain View Roa Sunerlan, VT 0550 An James Sullivan, Director Bennington

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Reservoir II Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

Utilization and Timing of Signal Change Interval

Utilization and Timing of Signal Change Interval 86 TRANSPORTATION RESEARCH RECORD 1114 Utilization and Timing of Signal Change Interval FENG-BOR LIN, DONALD COOKE, AND SANGARANATHAN VIJAYAKUMAR The problem or timing the signal change Interval has received

More information

TESTING APPLICATION STANDARD (TAS)

TESTING APPLICATION STANDARD (TAS) TESTING APPLICATION STANDARD (TAS) No. 00(A)-9 TEST PROCEDURE FOR WIND AND WIND DRIVEN RAIN RESISTANCE AND/OR INCREASED WINDSPEED RESISTANCE OF SOFFIT VENTILATION STRIP AND CONTINUOUS OR INTERMITTENT VENTILATION

More information

MODELLING VALVE DYNAMICS AND FLOW IN RECIPROCATING COMPRESSORS

MODELLING VALVE DYNAMICS AND FLOW IN RECIPROCATING COMPRESSORS MODELLING VALVE DYNAMICS AND FLOW IN RECIPROCATING COMPRESSORS Dr Dobrivoje Ninković, oc. r Dragan Taranović, mr Saša Milojević 1, PhD Caniate an r Raivoje Pešić, Fll Professor, University of Kragjevac,

More information

Written Closure Plan. Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

Written Closure Plan. Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016 Written Closure Plan Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado October 17, 2016 Revised: March 27, 2019 Table of Contents 1.0 General Information... 3 2.0 Description

More information

19.1 Problem: Maximum Discharge

19.1 Problem: Maximum Discharge 19.1 Problem: Maximum Discharge In partially full channel having an equilateral triangular cross section, the rate of discharge is Q = KAR/3 in which K is a constant, A flow area, R is the hydraulic mean

More information

For a cantilever pile wall shown in Figure 1, assess the performance of the system and answer the following questions.

For a cantilever pile wall shown in Figure 1, assess the performance of the system and answer the following questions. Question 1 For a cantilever pile wall shown in Figure 1, assess the performance of the system and answer the following questions. Figure 1 - Cantilever Pile Wall i. Estimate the net resulting horizontal

More information

Process Name Material Handling/MSD Prevention Program

Process Name Material Handling/MSD Prevention Program CNM WAY PROCESS CNM Process Name Material Hanling/MSD Prevention Program (04/10/2018 Revision) Overview of Material Hanling/MSD Prevention Program Purpose: To provie a safe an healthy working environment

More information

Depth Optimization of Designed New Ferry Berth

Depth Optimization of Designed New Ferry Berth International Journal on Marine Navigation an Safety of Sea Transportation olume Number 4 December 2007 Depth Optimization of Designe New Ferry Berth S. Gucma & S. Jankowski Maritime University of Szczecin,

More information

Chutes Part 2: Synthetic linings

Chutes Part 2: Synthetic linings s Part 2: Synthetic linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [2] [1] s can

More information

Evaluation of Network Traffic Performance Measures

Evaluation of Network Traffic Performance Measures Transportation Research Record 819 43 valation of Network Traffic Performance Measres by Use of Compter Simlation Models WLLAM D. BRG AND CHUL-UNG DO The relation between traffic-signal-timing parameters

More information

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Ottumwa-Midland Landfill Prepared for: Ottumwa-Midland Landfill 15300 130 th Street Ottumwa, Iowa 52501 Prepared by: SCS ENGINEERS

More information

Coal Combustion Residuals Closure Plan

Coal Combustion Residuals Closure Plan Virginia Electric and Power Company Chesterfield Power Station Upper (East) Pond Chesterfield County, Virginia GAI Project Number: C150035.00 October 2016 Prepared by: GAI Consultants, Inc. Richmond Office

More information

Products no longer available

Products no longer available Technical ata sheet R7..R haracterize control valves, 3-way, with flange PN 6 for open an close col an warm water systems for moulating control on the water sie of air-hanling an heating systems air bubble-tight

More information

Products no longer available

Products no longer available Technical ata sheet R7..R Open-close ball valves, 3-way, with flange PN 6 for open an close col an warm water systems for switching functions on the water sie an 2-point controls in air-hanling an heating

More information

MEMORANDUM. TNC Fisher Slough Final Design and Permitting Subject: DRAFT Technical Memorandum: Levee Emergency Spillway Design

MEMORANDUM. TNC Fisher Slough Final Design and Permitting Subject: DRAFT Technical Memorandum: Levee Emergency Spillway Design MEMORANUM TNC Fisher Slough Final esign and Permitting Subject: RAFT Technical Memorandum: Levee Emergency Spillway esign To: From: Internal Memorandum For Record Yen Hsu Chen (Tetra Tech) avid Cline (Tetra

More information

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL AFTER MARCH 1, 2012 ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL 400.1 Description. This item shall govern for all excavation required for the construction of all structures, except pipe or box sewers for

More information

Safety Impacts of Bicycle Lanes

Safety Impacts of Bicycle Lanes TRANSPORTATION RESEARCH RECORD 1168 49 Safety Impacts of Bicycle Lanes ROBERT L. SMITH, JR., AND THOMAS WALSH In September 1977 bicycle lanes were implemented on a 1.3 ml section of a one-way arterial

More information

Old Woodward Ave & W Maple Road. Streetscape Design Presentation February 2, 2017

Old Woodward Ave & W Maple Road. Streetscape Design Presentation February 2, 2017 Old Woodward Ave & W Maple Road Streetscape esign Presentation February 2, 2017 Revisions To The esign Concept Per The City Commission 2 Add planted medians to Old Woodward Ave center turn lane; Hamilton

More information

MIRABAY PILOT PROJECT REPORT

MIRABAY PILOT PROJECT REPORT MIRABAY PILOT PROJECT REPORT 9/25/2014 By: Ingenium, Inc./Carl A. Hazenberg, P.E. Seawalls along the MiraBay canal system started experiencing problems shortly after construction. Following the issues,

More information

Multi-Flow Product Catalog

Multi-Flow Product Catalog Multi-Flow Product Catalog Multi-Flow offers a variety of multi-purpose reducing connectors (06005-0600N, 12005-1200Q, and 18005-1800Q) that allow for complete flexibility in the design of drainage patterns.

More information

DESIGN OF AXIALLY LOADED STEPPED FOOTING DATA :- SBC of soil =200 KN /m 2 Concrete Mix =M20 Steel Grade = Fe 415 Clear cover of bottom slab =50 mm

DESIGN OF AXIALLY LOADED STEPPED FOOTING DATA :- SBC of soil =200 KN /m 2 Concrete Mix =M20 Steel Grade = Fe 415 Clear cover of bottom slab =50 mm STEPPED FOOTING The construction of sloped footing is sometimes difficult and when the slope of the top face of footing is more, say more than 1 vertically to 3 horizontally, it may be difficult to finish

More information

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for:

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for: Annual CCR Landfill Inspection Lansing Landfill Prepared for: Interstate Power and Light Company Lansing Generating Station 2320 Power Plant Drive Lansing, Iowa 52151 Prepared by: SCS ENGINEERS 2830 Dairy

More information

OCTOBER 2017 ISSUE Page 1 of 7

OCTOBER 2017 ISSUE Page 1 of 7 Field testing is performed on fully assembled pipelines for the purpose of determining pipeline acceptability. Following visual acceptance of joints and pipeline components, pressure pipelines in their

More information

LAMINATED POLES. engineered to solve problems. Coastal Douglas-fir. Field Raked and Tangent Poles

LAMINATED POLES. engineered to solve problems. Coastal Douglas-fir. Field Raked and Tangent Poles Coastal Douglas-fir Field Raked and Tangent Poles LAMINATED POLES engineered to solve problems 1 Design Criteria Submission Form You can either fax this information to 253-627-4188 or submit your drawings

More information

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering REVETMENTS Ijsseldam, the Netherlands Orson P. Smith, PE, Ph.D. Instructor Purposes and Operational Constraints Purposes Erosion control o o Embankment Toe protection for a seawall, retaining wall or other

More information

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax Instructions: For a driveway access permit, fill in sections 1, 2, 3 and 4, and the appropriate drawings and sign. For a Utility access, fill in sections 1, 2, 3 and 5, and figures 1 and 3. Prepare a detailed

More information

Applying Construction Fall Protection Concepts to General Industry

Applying Construction Fall Protection Concepts to General Industry Applying Construction Fall Protection Concepts to General Industry Applying Construction Fall Protection Concepts to General Industry Michael Tesmer, CSP and David Jewell, CSP Conney Safety Products This

More information

BIOREACTOR LANDFILLS: GEOTECHNICAL ASPECTS OF STABILITY EVALUATION

BIOREACTOR LANDFILLS: GEOTECHNICAL ASPECTS OF STABILITY EVALUATION BIOREACTOR LANDFILLS: GEOTECHNICAL ASPECTS OF STABILITY EVALUATION Presented by James Law SCS Engineers Master Class ISWA Congress 2009 Lisbon 10 October 2009 PRESENTATION OVERVIEW Landfill Slope Stability

More information

Estimation of Wind Drift Current in the Soya Strait

Estimation of Wind Drift Current in the Soya Strait Estimation of Wind Drift Crrent in the Soya Strait Wei Zhang 1, Naoto Ebchi 1, Yasshi Fkamachi 1, and Ytaka Yoshikawa 2 1 Institte of Low Temperatre Science, Hokkaido University 2 Gradate School of Science,

More information

As temporary grade control facilities along waterways until final stabilization is established.

As temporary grade control facilities along waterways until final stabilization is established. Check Dams (CD) EC-12 Description Check dams are temporary grade control structures placed in drainage channels to limit the erosivity of stormwater by reducing flow velocity. Check dams are typically

More information

RoaDrain Synthetic Subsurface Drainage Layer (SSDL)

RoaDrain Synthetic Subsurface Drainage Layer (SSDL) RoaDrain Synthetic Subsurface Drainage Layer (SSDL) INSTALLATION QUALITY ASSURANCE MANUAL Contents 1.0 INTRODUCTION... 1 2.0 ROLL PACKAGING... 1 3.0 MATERIAL DELIVERY... 1 4.0 UNLOADING & STORAGE PROCEDURES...

More information

STAD BALANCING VALVES

STAD BALANCING VALVES BAANCING BAANCING VAVES BAANCING VAVE The STAD balancing valve elivers accurate hyronic perfomance in an impressive range of applications. Ieally suite for use on the seconary sie in heating an cooling

More information

Tutorial 5 Relative equilibrium

Tutorial 5 Relative equilibrium Tutorial 5 Relative equilibrium 1. n open rectangular tank 3m long and 2m wide is filled with water to a depth of 1.5m. Find the slope of the water surface when the tank moves with an acceleration of 5m/s

More information

SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE

SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE LANDSLIDE RISK ASSESSMENT SOUTHERN REGION SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE LEGAL LOCATION: LSD 4-3-21-4 W5M and 1-4-21-4 W5M REFERENCE LOCATION ALONG HIGHWAY The slide area is located between

More information

TECHNICAL CIRCULAR. Circular No: S-P 32/13 Revision: 1 Page: 1 of 7 Date:

TECHNICAL CIRCULAR. Circular No: S-P 32/13 Revision: 1 Page: 1 of 7 Date: Circular No: S-P 32/13 Revision: 1 Page: 1 of 7 Date:22.05.2014 Related Requirement: UR S27 (Rev.6 June 2013) Subject: Retroactive Application for Strength Requirements for Fore Deck Fittings and Equipment

More information

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad CIVIL ENGINEERING TUTORIAL QUESTION BANK

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad CIVIL ENGINEERING TUTORIAL QUESTION BANK INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad - 00 04 CIVIL ENGINEERING TUTORIAL QUESTION BANK Course Name Course Code Regulation Course Structure Course Coordinator Course Faculty

More information

January 18, 2019 See next page for additional Wednesday meetings. Page 1

January 18, 2019 See next page for additional Wednesday meetings. Page 1 See next page for additional Wednesday meetings. ASTM Committee D35 Wednesday 01/30/2019 Arboretum IV Dogwood Magnolia Mesquite Shula's Restaurant 8:00 AM 8:00 AM 11:00 AM 11:00 AM 1 D35 Women's Networking

More information

GAIT PARAMETER ADAPTATION TO ENVIRONMENTAL PERTURBATIONS IN QUADRUPEDAL ROBOTS

GAIT PARAMETER ADAPTATION TO ENVIRONMENTAL PERTURBATIONS IN QUADRUPEDAL ROBOTS May 25, 27 13:6 WSPC - Proceeings Trim Size: 9in x 6in clawar7 1 GAIT PARAMETER ADAPTATION TO ENVIRONMENTAL PERTURBATIONS IN QUADRUPEDAL ROBOTS E. GARCIA, J. ESTREMERA, P. GONZALEZ DE SANTOS an M. ARMADA

More information

European Handball Federation TM EHF Beach Handball Commission

European Handball Federation TM EHF Beach Handball Commission Beach Handball Court Construction Guide EHF Promotion and Development Vienna, March 2016 1 Guide topics Location Court, markings Goals, lines Construction Sand quality requirements Lighting requirements

More information

Predicting Failure Modes of Snow Anchors

Predicting Failure Modes of Snow Anchors Predicting Failure Modes of Snow Anchors ART FORTINI Sierra Madre Search & Rescue November 2005 International Technical Rescue Symposium Disclaimer The information contained in this document is based on

More information

The Challenge of Wave Scouring Design for the Confederation Bridge

The Challenge of Wave Scouring Design for the Confederation Bridge 13: Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. John s, NL, Canada MARCH 2013 Paper Code. (13 - walsh) The Challenge

More information

PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. Push Pier Systems PN #MBPPT

PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. Push Pier Systems PN #MBPPT PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. PN #MBPPT Push Pier Systems About Foundation Supportworks is a network of the most experienced and knowledgeable foundation repair and new construction

More information

Written Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

Written Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016 Written Closure Plan Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado October 17, 2016 Table of Contents 1.0 General Information... 1 2.0 Description of Closure Plan

More information

Verdura 40/60 Retaining Wall Feasibility Design and Response to Plan Review Comments from City of Lake Forest

Verdura 40/60 Retaining Wall Feasibility Design and Response to Plan Review Comments from City of Lake Forest Verdura 40/60 Retaining Wall Feasibility Design and Response to Plan Review Comments from City of Lake Forest Project: Portola Center Project (North Parcel), TTM 17300 Lake Forest, CA Prepared for: USA

More information

Verdura 40/60 Retaining Wall Feasibility Design and Response to Plan Review Comments from City of Lake Forest

Verdura 40/60 Retaining Wall Feasibility Design and Response to Plan Review Comments from City of Lake Forest Verdura 40/60 Retaining Wall Feasibility Design and Response to Plan Review Comments from City of Lake Forest Project: Portola Center Project (South Parcel), TTM 15353 Lake Forest, CA Prepared for: SunRanch

More information

FALL PROTECTION COMPARISON BETWEEN VARIOUS OSHA STANDARDS, NAVY and EM 385 (2008) REQUIREMENTS

FALL PROTECTION COMPARISON BETWEEN VARIOUS OSHA STANDARDS, NAVY and EM 385 (2008) REQUIREMENTS Requirements FALL PROTECTION COMPARISON BETWEEN VARIOUS OSHA STANDARDS, NAVY and EM 385 (2008) REQUIREMENTS Navy FP Chapter 13 of OPNAVINST 5100.23G (2005) and Fall Protection Guide for Ashore Facilities

More information

On the Use of Pickets and Flukes as Snow Anchors

On the Use of Pickets and Flukes as Snow Anchors On the Use of Pickets and Flukes as Snow Anchors ART FORTINI Sierra Madre Search & Rescue International Technical Rescue Symposium Denver, CO November 2002 Pickets Placements Traditional vertical Horizontal

More information

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS GUIDE TO STREAM CROSSINGS (Revised February,2005) CULVERTS, BRIDGES, AND FORDS Culverts, bridges, and fords are all methods used to cross-streams. Culverts are the most common stream crossing structure.

More information

Dry Hydrants. The installation of a non-pressurized pipe system into local water sources provides a ready means of supplying water to fire engines.

Dry Hydrants. The installation of a non-pressurized pipe system into local water sources provides a ready means of supplying water to fire engines. Dry Hydrants What is a Dry Hydrant? A dry hydrant is a non-pressurized pipe system permanently installed in existing lakes, ponds and streams that provides a suction supply of water to a fire department

More information

-FRU FREEZE RESISTANT WATER VALVE COOLERS SYSTEM

-FRU FREEZE RESISTANT WATER VALVE COOLERS SYSTEM I N S TA L L AT I O N / I MN SA TA I N TL EL NAT AIN OC N E / MI AN IS NT RE UN CA TN I CO E N SI N S T R U C T I O N S INSTALLATION INSTRUCTIONS FOR -FRU OPTION Important: Read all instructions and refer

More information

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad - 500 043 CIVIL ENGINEERING Tutorial Question Bank Name : FOUNDATION ENGINEERING Code : A60126 Class : III B. Tech II Semester Branch

More information

OUTLINE FOR Chapter 4

OUTLINE FOR Chapter 4 16/8/3 OUTLINE FOR Chapter AIRFOIL NOMENCLATURE The leaing ege circle: (usually raius =. chor length c) The trailing ege: The chor line: Straight line connecting the center of leaing ege circle an the

More information

E 084 Tank top mounting Connection up to G1 / -16 SAE Nominal flow rate up to 80 l/min / 21.1 gpm

E 084 Tank top mounting Connection up to G1 / -16 SAE Nominal flow rate up to 80 l/min / 21.1 gpm Return-Suction Filters E 08 Tank top mounting Connection up to G / -6 SE Nominal flow rate up to 80 l/min /. gpm Description pplication For operation in units with hydrostatic drives, when the return flow

More information

Diversity and complexity of angler behavior drive socially optimal input and output regulations in a bioeconomic recreational-fisheries model

Diversity and complexity of angler behavior drive socially optimal input and output regulations in a bioeconomic recreational-fisheries model International Institte for Applied Systems Analysis Schlossplatz 1 A-2361 Laxenbrg, Astria Tel: +43 2236 807 342 Fax: +43 2236 71313 E-mail: pblications@iiasa.ac.at Web: www.iiasa.ac.at Interim Report

More information

WARNING! DO NOT THROW AWAY THESE INSTRUCTIONS! READ AND UNDERSTAND BEFORE USING EQUIPMENT!

WARNING! DO NOT THROW AWAY THESE INSTRUCTIONS! READ AND UNDERSTAND BEFORE USING EQUIPMENT! Guardian Fall Protection Kent, WA 800-466-6385 www.guardianfall.com GENERAL SYSTEM SELECTION CRITERIA: Selection of fall protection shall be made by a Competent Person. All fall protection equipment shall

More information

ROOFING FALL PROTECTION 27.I

ROOFING FALL PROTECTION 27.I ROOFING FALL PROTECTION 27.I Prior to the start of work, a structural analysis of the roof shall be conducted by a Qualified Person to assure that the load capacity of the roof deck will not be exceed.

More information

Geofabrics. Products to improve the playability of your course. golf courses

Geofabrics. Products to improve the playability of your course. golf courses Geofabrics Products to improve the playability of your course golf courses Megaflo Drainage is the foundation of high performance. Introduction Golf course superintendents are under pressure to improve

More information

Tabulation of Bids. Counties:

Tabulation of Bids. Counties: Page 1 of 27 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS SCHEDLE 0005 153005M PROGRESS SCHEDLE PDATE 0006 154003P MOBILIZATION 0009 157004M CONSTRCTION LAYOT 0010 157006M MONMENT

More information

Walking-Working Surfaces

Walking-Working Surfaces Walking-Working Surfaces 29 CFR 1910, Subpart D Presented by: Chesapeake Region Safety Council Rod Markley, CSP, CHST, CET Subpart D - Walking-Working Surface Topics we will cover: Background of rule Overview

More information

EUROFLO CULVERT PIPE. Fittings / Pipes

EUROFLO CULVERT PIPE. Fittings / Pipes EUROFLO CULVERT PIPE Fittings / Pipes F EUROFLO FITTINGS RUBBERS SIZE CODE COMMENT 250 OD 315 OD 400 OD 500 OD 630 OD 800 OD 1000 OD 1200 OD 520-250-RBR 520-315-RBR 520-400-RBR 520-500-RBR 520-630-RBR

More information

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Ottumwa-Midland Landfill Prepared for: Ottumwa-Midland Landfill 15300 130 th Street Ottumwa, Iowa 52501 Prepared by: SCS

More information

Tension Cracks. Topics Covered. Tension crack boundaries Tension crack depth Query slice data Thrust line Sensitivity analysis.

Tension Cracks. Topics Covered. Tension crack boundaries Tension crack depth Query slice data Thrust line Sensitivity analysis. Tension Cracks 16-1 Tension Cracks In slope stability analyses with cohesive soils, tension forces may be observed in the upper part of the slope. In general, soils cannot support tension so the results

More information

Fall Protection / Open Holes & Guardrail

Fall Protection / Open Holes & Guardrail Fall Protection / Open Holes & Guardrail 1. Leading Edges Policy Statement It is GW Communications policy that any worker exposed to a fall 6 or greater, shall be protected from coming into contact with

More information

Construction Dewatering

Construction Dewatering Construction Dewatering Introduction The control of groundwater is one of the most common and complicated problems encountered on a construction site. Construction dewatering can become a costly issue

More information

Successful slope stabilization under severe conditions

Successful slope stabilization under severe conditions Successful slope stabilization under severe conditions Andreas BRANDNER, Dipl.-Ing., Chartered Consulting Engineer Abstract Two examples of successful slope stabilization show the versatility and strength

More information

This section applies to all open excavations made in the earth's surface. Excavations are defined to include trenches.

This section applies to all open excavations made in the earth's surface. Excavations are defined to include trenches. Appendix H Specific Excavation Requirements This section applies to all open excavations made in the earth's surface. Excavations are defined to include trenches. Surface encumbrances All surface encumbrances

More information

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS CITY OF REDMOND, OREGON 2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS TABLE OF CONTENTS SECTION 1 TRENCHES TITLE 1-1 Utility Trench 1-2 Water Line & Sewer Line Separation 1-3 RR X-ING Single/Joint Use

More information

Cardiac Science Trainer AED Manual

Cardiac Science Trainer AED Manual Cardiac Science Trainer AED Manal Get an original copy of the Cardiac Science Trainer AED Manal for manfactrer information abot service, available accessories and how to se and maintain yor device. AED

More information

Grading Plan - Drawing No. C-2 - Project Revision 1 dated January 30, 2018.

Grading Plan - Drawing No. C-2 - Project Revision 1 dated January 30, 2018. patersongroup consulting engineers memorandum re: Geotechnical Recommendations Reinforced Slope Details Proposed Commercial Building 2510 Walkley Road - Ottawa to: Christopher Simmonds Architect Inc. -

More information

HYDRODYNAMIC LOAD ON THE BUILDING CAUSED BY OVERTOPPING WAVES

HYDRODYNAMIC LOAD ON THE BUILDING CAUSED BY OVERTOPPING WAVES HYDODYNAMIC LOAD ON THE BUILDING CAUSED BY OVETOPPING WAVES Xexe Chen 1, Wael Hassan,3, Wim Uijttewaal 1, Toon Verwaest, Henk Jan Verhagen 1, Tomohiro Szki 1,,3, Sebastiaan N. Jonkman 1 Wide crested dike

More information

The Use and Performance of Geogrids in Kentucky

The Use and Performance of Geogrids in Kentucky Transportation Kentucky Transportation Center Research Report University of Kentucky Year 2003 The Use and Performance of Geogrids in Kentucky Aric Cowne Richard Reitenour David L. Allen R. Clark Graves

More information

A Parametric Study of Gross Building Coverage Ratio (GBCR) Variation on Outdoor Ventilation in Singapore s High-rise Residential Estates

A Parametric Study of Gross Building Coverage Ratio (GBCR) Variation on Outdoor Ventilation in Singapore s High-rise Residential Estates A Parametric Stdy of Gross Bilding Coverage Ratio (GBCR) Variation on Otdoor Ventilation in Singapore s High-rise Residential Estates Ro-Xan Lee *1, Nyk-Hien Wong 2 *1,2 Department of Bilding, School of

More information

Regulation Summary: Walking-Working Surfaces & Personal Protective Equipment (Fall Protection Systems); OSHA s Final Rule

Regulation Summary: Walking-Working Surfaces & Personal Protective Equipment (Fall Protection Systems); OSHA s Final Rule Regulatory Update Regulation Summary: Walking-Working Surfaces & Personal Protective Equipment (Fall Protection Systems); OSHA s Final Rule General Industry 29 CFR 1910 On November 17, 2016, OSHA published

More information

Loads on Structures. Dead Load / Fixed Load Live Load / Imposed Load Earthquake Load Wind Load Snow Load

Loads on Structures. Dead Load / Fixed Load Live Load / Imposed Load Earthquake Load Wind Load Snow Load Loads on Structures Dead Load / Fixed Load Live Load / Imposed Load Earthquake Load Wind Load Snow Load Characteristics of Wind Load Depends upon - velocity and density of the air height above ground level

More information

Coupling a Neural Network-Based forward Model and a Bayesian Inversion Approach to Retrieve Wind Field from Spaceborne Polarimetric Radiometers

Coupling a Neural Network-Based forward Model and a Bayesian Inversion Approach to Retrieve Wind Field from Spaceborne Polarimetric Radiometers Sensors 2008, 8, 7850-7865; DOI: 10.3390/s8127850 Article OPEN ACCESS sensors ISSN 1424-8220 www.mdpi.com/jornal/sensors Copling a Neral Network-Based forward Model and a Bayesian Inversion Approach to

More information

SOIL ANCHORS ETSAB/UPC J.Llorens - ETSAB/UPC PASSIVE ANCHORS - ANTECEDENTS

SOIL ANCHORS ETSAB/UPC J.Llorens - ETSAB/UPC PASSIVE ANCHORS - ANTECEDENTS SOIL ANCHORS ignasi.llorens@upc.edu ETSAB/UPC - 2013 PASSIVE ANCHORS - ANTECEDENTS Antecedents of passive anchors can be found in Nature. Roots feed plants and provide uplift resistance against the wind

More information

Mesoscale Meteorology: Sea, Lake, and Land Breeze Circulations 7, 9 March 2017 Introduction Breeze-type circulations result from differential heating

Mesoscale Meteorology: Sea, Lake, and Land Breeze Circulations 7, 9 March 2017 Introduction Breeze-type circulations result from differential heating Mesoscale Meteorology: Sea, Lake, an Lan Breeze Circulations 7, 9 March 2017 Introuction Breeze-type circulations result from ifferential heating (aytime warming, nighttime cooling) of lan an water surfaces.

More information

computed using Equation 3-18 by setting the 2nd term equal to 0 and K A equal to K o and using the pressure distribution as shown in Figure 3-23.

computed using Equation 3-18 by setting the 2nd term equal to 0 and K A equal to K o and using the pressure distribution as shown in Figure 3-23. computed using Equation 3-18 by setting the 2nd term equal to 0 and K A equal to K o and using the pressure distribution as shown in Figure 3-23. (2) For the resisting side, passive pressure theory indicates

More information

RB 4700 Commercial & Industrial Regulator

RB 4700 Commercial & Industrial Regulator RB 4700 Commercial & Inustrial Regulator The RB 4700 regulator is esigne for use in inustrial an istribution applications such as istrict station an heating plants, an for inustrial customers. DESCRIPTION

More information

CHAPTER 4: BEST MANAGEMENT PRACTICES FOR EROSION AND SEDIMENTATION CONTROL

CHAPTER 4: BEST MANAGEMENT PRACTICES FOR EROSION AND SEDIMENTATION CONTROL Figure 4.4m. Type III Floating Turbidity Barrier Source: American Boom and Barrier Corporation and Virginia Department of Transportation (DOT) Standard Sheets 71 4.4.6 Floating Turbidity Barrier Definition

More information