2 Davis-Besse Small Bore Class 1 Piping Socket Weld Destructive Examination Authors: Ryan Hosler (AREVA) Beverly Cyrus (AREVA) Steve Fyfitch (AREVA); Presenter Trent Henline (FENOC)
3 Introduction Davis-Besse LRA includes a requirement to volumetrically or destructively examine (DE) welds (that have been exempted due to size by ASME XI) as a result of age-related OE Weld selection was based on SCC susceptibility Highest temperature Dead legs (stagnant) DE was selected because each DE counts as two NDE in the LR AMP 42 of the most susceptible welds were being removed due to SG replacement 15 of those welds were chosen as a representative sample to satisfy the LR AMP requirements for socket welds Steve Fyfitch August p.3
4 Locations Examined: SG Channel Head Drain Lines SG 1-1 Drain Line SG 1-2 Drain Line Steve Fyfitch August p.4
5 Locations Examined: Hot Leg High Point Vent Lines HL HPV Lines at SG 1-1 HL HPV Lines at SG 1-2 Steve Fyfitch August p.5
6 General Sectioning Plan Mount/Polish/Etch 0 Face Mount/Polish/Etch 90 Face Mount/Polish/Etch 270 Face Mount/Polish/Etch 180 Face Steve Fyfitch August p.6
7 Weld Socket Weld Gap Gap Steve Fyfitch August p.7
8 0 Face SG 1-1 Drain Line Weld 7 8x 900x 180 Face 8x 50x Steve Fyfitch August p.8
9 SG 1-1 Drain Line Weld 8 (270 Face of 8-A2) 8x Steve Fyfitch August p.9
10 SG 1-1 Drain Line Weld 8 (270 Face of 8-A2) 25x Steve Fyfitch August p x
11 SG 1-1 Drain Line Weld 8 (270 Face of 8-A1a) 8x Steve Fyfitch August p.11
12 SG 1-1 Drain Line Weld 8 (270 Face of 8-A1a) 50x Steve Fyfitch August p.12
13 SG 1-2 Drain Line Weld 23 8x Steve Fyfitch August p.13
14 SG 1-2 Drain Line Weld 23 Steve Fyfitch August p.14
15 SG 1-2 Drain Line Weld 24 (180 Face) 8x Steve Fyfitch August p.15
16 SG 1-2 Drain Line Weld 24 (180 Face) 200x 8x 500x Steve Fyfitch August p.16
17 SG 1-2 Drain Line Weld 24 (270 Face) 8x 8x Steve Fyfitch August p.17
18 SG 1-2 Drain Line Weld 24 (270 Face) 500x 200x 8x 600x Steve Fyfitch August p.18
19 SG 1-1 HL HPV Line Weld 3C 8x Steve Fyfitch August p.19
20 SG 1-1 HL HPV Line Weld 3C 200x 1500x Steve Fyfitch August p.20
21 1-5% TW gap 40-65% TW gap Summary of Results: SG Channel Head Drain Lines 40-50% TW gap 20-35% TW gap No Flaw gap SG 1-1 Drain Line No Flaw gap SG 1-2 Drain Line 1-5% OD gap Steve Fyfitch August p.21
22 No Flaw gap No Flaw No gap Summary of Results: Hot Leg High Point Vent Lines No Flaw gap 1-5% TW No gap No Flaw gap HL HPV Lines at SG 1-1 No Flaw gap No Flaw gap No Flaw No gap HL HPV Lines at SG 1-2 Steve Fyfitch August p.22
23 Conclusions Cracking originating at or near the weld root was observed in 5 of the 15 socket welds examined Flaws indicative of TGSCC with some IGSCC and IGA Three synergistic requirements of SCC met (consistent with laboratory testing and operating experience) Susceptible Material Austenitic stainless steel (Type 316 and 308/308L) Aggressive Environment Stagnant water can accumulate elevated levels of dissolved O 2 and Cl, which can be exacerbated at the weld root by the crevice created by the socket weld geometry Temperature likely >200 F at locations of indications due to proximity to SG/HL Sustained Tensile Stress Socket weld geometry creates a stress concentration at the weld root Steve Fyfitch August p.23
24 Questions? Steve Fyfitch August p.24
25
JAPANESE PD EXAMINATIONS FOR DEPTH SIZING OF SCC IN AUSTENITIC STAINLESS STEEL PIPES FROM 2006 TO 2012
JAPANESE PD EXAMINATIONS FOR DEPTH SIZING OF SCC IN AUSTENITIC STAINLESS STEEL PIPES FROM 2006 TO 2012 Keiji Watanabe, Hajime Shohji, and Koichiro Hide PD center, Central Research Institute of Electric
More informationULTRASOUND & SUBMARINE ADVANCEMENTS FOR RPV INTERNALS BAFFLE BOLT INSPECTION. S.W. Glass, B. Thigpen, AREVA, USA A. Bleuze, E. Brau, AREVA, France
More Info at Open Access Database www.ndt.net/?id=18551 ULTRASOUND & SUBMARINE ADVANCEMENTS FOR RPV INTERNALS BAFFLE BOLT INSPECTION S.W. Glass, B. Thigpen, AREVA, USA A. Bleuze, E. Brau, AREVA, France
More informationEvent Time Event Name Meeting Room Sunday, January Monday, January
Event Time Event Name Meeting Room Sunday, January 25 2015 Opens @ 12:00 PM - 06:00 PM Registration Opens @ 12:00 PM - 06:00 PM ASME Office 01:00 PM - 03:00 PM CNC Task Group on NQA-1 Part II Checklist
More informationEnbridge Pipelines Inc. PIPELINE INTEGRITY AXIAL CRACK THREAT ASSESSMENT
Enbridge Pipelines Inc. Line 9B Reversal and Line 9 Capacity Expansion Project Appendix A to Updated Pipeline Engineering Assessment PIPELINE INTEGRITY AXIAL CRACK THREAT ASSESSMENT Table of Contents 1.
More informationJustification of Risk Reduction through In-Service Inspection / REDUCE
NUGENIA+ WP6.12 Justification of Risk Reduction through In-Service Inspection / REDUCE Jens Gunnars Inspecta Technology AB jens.gunnars@inspecta.com WP6.12 Task Leader NUGENIA+ Final Seminar, Helsinki
More informationAPI HPHT 6BX Flange Design, Verification & Capabilities: Example use of Methodology
API HPHT 6BX Flange Design, Verification & Capabilities: Example use of Methodology January 22 nd, 2018 Summary 1. Determine the suitability of the existing BX gaskets for 20K 2. Use Robert Eichenberg
More informationASME BOILER CODE WEEK AND PRESSURE VESSEL CODE WEEK May 5-10, 2019 Grand and Little America Hotels, Salt Lake City, Utah
ASME BOILER CODE WEEK AND PRESSURE VESSEL CODE WEEK May 5-10, 2019 Grand and Little America Hotels, Salt Lake City, Utah ***The schedule is subject to change. Please pick up the most updated schedule onsite***
More informationVACUVENT VE SERIES CATALOGUE
VACUVENT VE SERIES CATALOGUE October 2018 " ba f wa e " The Triple Function Air Valve Vacuvent offers a tri function air valve that not only breaks vacuum, but also reduces surge on pipeline filling and
More informationCURI Pierside Stainless Diesel Tank
Mechanical Integrity Report for the CURI Pierside Stainless Diesel Tank at 208 North Palmetto Boulevard Clemson, South Carolina 29631 Inspection: 26 September 2012 Prepared by: George E. Matthews, E.I.T.
More informationHYDROGEN STANDARDIZATION INTERIM REPORT For
STP/PT-003 Designator: Meta Bold 24/26 Revision Note: Meta Black 14/16 HYDROGEN STANDARDIZATION INTERIM REPORT For Tanks, Piping, and Pipelines Date of Issuance: June 6, 2005 This report was prepared as
More informationCONVECTION SECTION FAILURE ANALYSIS AND FITNESS-FOR-SERVICE ASSESSMENT
ASSET INTEGRITY INTELLIGENCE CONVECTION SECTION FAILURE ANALYSIS AND FITNESS-FOR-SERVICE ASSESSMENT JAMES R. WIDRIG, Manager Advanced Engineering at Quest Integrity Group VOLUME 23, ISSUE 6 NOVEMBER DECEMBER
More informationAssessment of correlations between NDE parameters and tube structural integrity for PWSCC at U-bends
Assessment of correlations between NDE parameters and tube structural integrity for PWSCC at U-bends S. Bakhtiari, T. W. Elmer, Z. Zeng and S. Majumdar Nuclear Engineering Division Argonne National Laboratory
More informationInspection Credit for PWSCC Mitigation via Peening Surface Stress Improvement
Inspection Credit for PWSCC Mitigation via Peening Surface Stress Improvement Glenn A. White, Kyle P. Schmitt, Kevin J. Fuhr, Markus Burkardt, and Jeffrey A. Gorman Dominion Engineering, Inc. Paul Crooker
More informationPIP PN03SV0S01 Piping Material Specification 3SV0S01 Class 300, Alloy 254 SMO (UNS S31254), Socket Weld, C.A. Process (PTFE Packing/Gaskets)
May 2016 Piping PIP PN03SV0S01 Piping Material Specification 3SV0S01 Class 300, Alloy 254 SMO (UNS S31254), Socket Weld, 0.000 C.A. Process (PTFE Packing/Gaskets) PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES
More informationPIP PN03SA0S03 Piping Material Specification 3SA0S03 Class 300, 304/304L Stainless Steel, Socket Weld, C.A.-None, Low Temperature Process
February 2018 Piping PIP PN03SA0S03 Piping Material Specification 3SA0S03 Class 300, 304/304L Stainless Steel, Socket Weld, C.A.-None, Low Temperature Process PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES
More informationBall Float Steam Trap UNA 45 MAX, UNA 46 MAX, UNA 46A MAX PN 40/Class 300 DN 40, 50, 65
Data Sheet 819346-02 Issue Date: 05/17 Ball Float Steam Trap UNA 45 MAX, UNA 46 MAX, UNA 46A MAX PN 40/Class 300, 50, 65 UNA 45hl MAX, UNA 46hl MAX, UNA 46Ahl MAX UNA 45v MAX with cover for mounting electrode
More informationFig 7, 33, 33.1, 34, 34HP, 36, 36HP, 37, 3616 and Fig 3716 Flanged Strainers Installation and Maintenance Instructions
16352/11 IM-S6-18 ST Issue 11 Fig 7, 33, 33.1, 34, 34HP, 36, 36HP, 37, 3616 and Fig 3716 Flanged Strainers Installation and Maintenance Instructions 1. Safety information 2. General product information
More informationASME BOILER CODE WEEK AND PRESSURE VESSEL CODE WEEK October 29 - November 3, 2017 Pointe Hilton Squaw Peak Hotel
ASME BOILER CODE WEEK AND PRESSURE VESSEL CODE WEEK October 29 - November 3, 2017 Pointe Hilton Squaw Peak Hotel *** This schedule is subject to change. Please pick up the most updated schedule onsite***
More informationLine and Equipment Opening Global Safety Team-Safety Workshop Ana Caroline Trindade The Dow Chemical Company
Line and Equipment Opening 2014 Global Safety Team-Safety Workshop Ana Caroline Trindade The Dow Chemical Company Summary 1. Life Critical Standards 2. Definition 3. Examples 4. Exceptions 5. Past Incidents
More informationTable 6: Schedule of Operational Commitments
Page 26 of 46 Table 6: Schedule of s OC 1558.1 OC 1558.2 OC 1560.1 OC 1560.2 OC 1560.3 OC 1560.4 OC 1560.5 OC 1560.6 Close out Requir This restriction was complied with prior to the core offload. Completed
More information2003 WJTA American Waterjet Conference August 17-19, 2003 Houston, Texas Paper PIPE THREADS-WHAT IS THE LIMIT?
23 WJTA American Waterjet Conference August 17-19, 23 Houston, Texas Paper PIPE THREADS-WHAT IS THE LIMIT? D. Wright, J. Wolgamott, G. Zink StoneAge, Inc. Durango, Colorado, U.S.A. ABSTRACT At present
More informationPC3_ and PC4_ Pipeline Connectors
1283050/4 IM-P128-06 ST Issue 4 PC3_ and PC4_ Pipeline Connectors Installation and Maintenance Instructions 1. Safety information 2. Description PC30 shown 3. Installation 4. Welding of pipeline connector
More informationPC10HP Pipeline Connector (ASME 600)
1280051/2 IM-P128-13 ST Issue 2 PC10HP Pipeline Connector (ASME 600) Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning 5. Spare
More informationAmerican Petroleum Institute Purchasing Guidelines Purchase API Spec 6DSS online at
Purchase API Spec online at www.api.org/publications 7.2 Pressure and temperature ratings The nominal pressure (PN) class or the ASME rating class shall be used for the specification of the required pressure
More information300 BAR HIGH STRENGTH SEAMLESS STEEL GAS CYLINDERS
300 BAR HIGH STRENGTH SEAMLESS STEEL GAS CYLINDERS IGC Doc 124/04/E Revision of TN 514/93 EUROPEAN INDUSTRIAL GASES ASSOCIATION AVENUE DES ARTS 3-5 B 1210 BRUSSELS Tel : +32 2 217 70 98 Fax : +32 2 219
More informationBDV1 and BDV2 Blowdown / Depressurisation Valves
6000050/8 IM-P600-02 ST Issue 8 BDV1 and Blowdown / Depressurisation Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation BDV1 4. Commissioning
More informationBallot ID: Action item Reference Number: Addition of common causes and susceptibility diagram to API RP 581, 3rd Edition, Section 12
Ballot ID: Action item Reference Number: Title Addition of common causes and susceptibility diagram to API RP 581, 3rd Edition, Section 12 Date: October 2018 Purpose: Revision: Impact: Rationale: Technical
More informationAPPENDIX 1. PART 10: Leak Detection Inspector, Level 1, 2 and 3 CERTIFICATION SCHEME FOR PERSONNEL. 3 rd Edition, February 2016
CERTIFICATION SCHEME FOR PERSONNEL Document No. CSWIP-ISO-NDT-11/93-R Requirements for the Certification of Personnel Engaged in Non- Destructive Testing in accordance with the requirements of BS EN ISO
More informationMaterials : Forged carbon steel A105N
Certificate 3.1 Size : Ends : Min Temperature : Max Temperature : DN 1/4" to 2 Female - Female BSP or NPT, Socket Welding - 29 C + 425 C Max Pressure : 136 Bars (Class 800) Specifications : With draining
More informationWELCOME to CAUx Local India 2018
WELCOME to CAUx Local India 2018 Flange Design In Detail Prepared by Sachin Pol and Fauzan Badiwale Some Typical Flange Images 3 Some Typical Gasket Images 4 Flange Design As Per ASME Sec.VIII Div.1 Mandatory
More informationPOP Safety Valve. POP Safety Valve INTRODUCTION DEFINITIONS
POP Safety Valve POP Safety Valve INTRODUCTION The effects of exceeding safe pressure levels in an unprotected pressure vessel or system, can have catastrophic effects on both plant and personnel. Safety
More informationPIP PN03SA0S01 Piping Material Specification 3SA0S01 Class 300, 304/304L Stainless Steel, Socket Weld, C.A., Process
May 2016 Piping PIP PN03SA0S01 Piping Material Specification 3SA0S01 Class 300, 304/304L Stainless Steel, Socket Weld, 0.000 C.A., Process PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to
More informationAnalysis A1 and B2 Methods of Hydrostatic Testing Applied at Gas Pipeline; Cause Study A1-Method
Analysis A1 and B2 Methods of Hydrostatic Testing Applied at Gas Pipeline; Cause Study A1-Method Alfred HASANAJ Abstract in this paper we will analyze methods of hydrostatic testing applied in Trans Adriatic
More informationEUROFLO CULVERT PIPE. Fittings / Pipes
EUROFLO CULVERT PIPE Fittings / Pipes F EUROFLO FITTINGS RUBBERS SIZE CODE COMMENT 250 OD 315 OD 400 OD 500 OD 630 OD 800 OD 1000 OD 1200 OD 520-250-RBR 520-315-RBR 520-400-RBR 520-500-RBR 520-630-RBR
More informationRoyal Process Gauges, ±0.5% Accuracy 316 SS Tube and Socket Dial Size
Dial Sizes: 4 1 /2 Case: Standard with style #2 case; Polypropylene safety case (solid front, blow-out back) suitable for surface or direct mounting. 11 Bourdon Tube: 316 stainless steel Socket: 316 stainless
More information5th Pan American Conference for NDT 2-6 October 2011, Cancun, Mexico. Inspection of Dissimilar Metal Welds in Reactor Pressure Vessels in Spain
5th Pan American Conference for NDT 2-6 October 2011, Cancun, Mexico Inspection of Dissimilar Metal Welds in Reactor Pressure Vessels in Spain J.R. Gadea, J.J. Regidor, J.A. Peláez, P. Serrano Tecnatom,
More informationAn example of systems that are inherently excellent applications for the cupronickel product are:
W&O Supply, founded in 1975, is the leading provider of marine piping solutions in the United States. W&O Supply, through its branch locations, distributes and provides services for valves, pipe, fittings,
More informationTHE PROCESS OF JOINT INTEGRITY
BOLTED JOINTS A.333 THE PROCESS OF JOINT INTEGRITY To assist in managing a process, ask yourself the following questions: why, what, who, and how? Why do we need a Flange Joint Integrity program? This
More informationVertical and Horizontal Bladder Tanks
DATA SHEET Vertical and Horizontal Tanks Application The ANSUL bladder tank is one component in a balanced pressure proportioning system. Its operation requires no external power other than a pressurized
More informationASYBCO 90 O ELBOW LONG RADIUS O.D. I.D.
90 O ELBOW LONG RADIUS Standard weight Extra strong Schedule 160 Double extra strong ASTM A-234 ASME / ANSI B16.9 Carbon and ferritic alloy steel Produced from X-rayed, stress-relieve welded pipe. Welds
More informationRULE 36 & H 2 S SAFETY
OUTLINE OF RULE 36 RULE 36 & H 2 S SAFETY RULE 36 IS A SAFETY RULE DESIGNED TO PROTECT THE GENERAL PUBLIC FROM THE HAZARDS OF H 2 S RESULTING FROM INTENTIONAL AND ACCIDENTAL RELEASES. PROPERTIES OF H 2
More informationAE50S Automatic Air and Gas Vent for Liquid Systems Installation and Maintenance Instructions
0176050/3 IM-P017-11 ST Issue 3 AE50S Automatic Air and Gas Vent for Liquid Systems Installation and Maintenance Instructions 1 General safety information 2 General product information 3 Installation 4
More informationMLS Series Liquid Level Switches. Installation and Operations Manual Section 15
MLS Series Liquid Level Switches Installation and Operations Manual 00-02-0730 2012-11-11 Section 15 In order to consistently bring you the highest quality full featured products, we reserve the right
More informationCOMPONENTS MANUFACTURING
COMPONENTS MANUFACTURING ASSEMBLY TESTING Manifolds Valex Manifolds PCW, CFOS, UHP Configurations with ball valve, diaphragm valve & bellows valve options Main run lengths up to 24 feet & 12 inch in diameter
More informationS1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators
0231150/8 IM-P023-55 ST Issue 8 S1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning
More informationPressure Reducing Valves Pressure Reducing with. Broady Flow Control. C Series Range. Pressure Reducing Valves. Broady Flow Control
Pressure Reducing Valves 00 Pressure Reducing with Broady Flow Control C Series Range Pressure Reducing Valves Broady Flow Control The Company Broady Flow Control is an Independent Valve Manufacturer,
More informationThe Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd
The Benefits Of Composite Materials In Deepwater Riser Applications 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd Composite Benefits and Challenges Composite Materials offer
More informationENGINEERING TECHNICAL REPORT
SSP DUOLOK FITTINGS ON 1.000 x 0.139 WALL 316SS TUBING ENGINEERING TECHNICAL REPORT SSP 8250 Boyle Parkway Twinsburg, Ohio 44087 U.S.A. mysspusa.com 1.330.425.4250 1 TABLE OF CONTENTS 1.0 Introduction
More informationCOLD WATER STORAGE CONTROL AYLESBURY DELAYED ACTION FLOAT-ACTIVATED VALVES
COLD WATER STORAGE CONTROL AYLESBURY TM DELAYED ACTION FLOAT-ACTIVATED VALVES Keraflo have manufactured top quality, delayed action float valves in the UK for over 30 years. The Aylesbury TM range is synonymous
More informationS1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators Installation and Maintenance Instructions
PREVIOUS REFERENCE NO. IMP02355 0231150/13 IMF0501ENISS2 CMGT S1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators Installation and Maintenance Instructions 1. Safety information 2. General product information
More information2.1 Contractor The company that supplies the hot tap machine and its operating personnel.
RCCE Competence Center Engineering North America Procedure Maintenance Hot Tapping of Piping GS-P-ME-001 Page 1 of 6 Issue March 2010 Supersedes MP-56 1. PURPOSE AND BENEFITS 1.1 To establish a controlled
More informationThe Need for a New Joining Technology for the Closure Welding of Radioactive Materials Containers
ABSTRACT The Need for a New Joining Technology for the Closure Welding of Radioactive Materials Containers - 9516 G.R. Cannell Fluor Government Group P.O Box 1000, Richland, WA 99352 G.J. Grant Pacific
More informationRegulating valves Type REG 6-65 Type REG-SS REFRIGERATION AND AIR CONDITIONING. Technical leaflet
Regulating valves Type REG 6-65 Type REG-SS 15-40 REFRIGERATION AND AIR CONDITIONING Technical leaflet Content Page Introduction........................................................................................3
More informationDate of Issue: July 2016 Affected Publication: API Specification 16C, Choke and Kill Equipment, Second Edition, March 2015 ADDENDUM 1
Date of Issue: July 2016 Affected Publication: API Specification 16C, Choke and Kill Equipment, Second Edition, March 2015 ADDENDUM 1 Page 16, Section 4.6, delete the entire section and renumber all subsequent
More informationBall Float Steam Trap UNA 43 PN 16/CL 125/JIS 10K UNA 46 PN 40/CL 150/CL 300/JIS 10K/JIS 20K DN 80, 100, 150, 3", 4", 6"
Data Sheet 819584-00 Issue Date: 01/17 Ball Float Steam Trap UNA 43 PN 16/C 125/JIS 10K UNA 46 PN 40/C 150/C 300/JIS 10K/JIS 20K DN 80, 100, 150, 3", 4", 6" UNA 43 hl, UNA 46 hl UNA 43 v, UNA 46 v with
More informationTechnical Standard. API6D Ball & Plug Valve. Inspection & Test Procedure
Technical Standard API6D Ball & Plug Valve Inspection & Test Procedure 1 Scope This standard provides specific inspection items to be performed on all ball & plug valves. The valves shall be provided with
More informationHYGIENIC SIGHT FLOW INDICATORS
Section: T500 Bulletin: T500.3 Date: 03/16/15 Supersedes: NEW HYGIENIC SIGHT FLOW INDICATORS Installation, Operation, and Maintenance Manual Table of Contents 1. Introduction... 2 1.1. Specification...
More informationSection: R100 Bulletin: R100.50A Date: 12/07 Supersedes: 08/06 THE STANDARD
Section: R100 Bulletin: R100.50A Date: 12/07 Supersedes: 08/06 THE STANDARD APPROVED APPROVED THE ELECTROLEV (PROBE) COLUMN CONNECTIONS Connections may be flanged, socket welded, butt welded or screw type.
More informationHM and HM34 Inverted Bucket Steam Traps Installation and Maintenance Instructions
0670350/4 IM-S03-11 ST Issue 4 HM and HM34 Inverted Bucket Steam Traps Installation and Maintenance Instructions 1. Safety information 2. General product information HM Series 3. Installation 4. Commissioning
More informationInstallation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No
Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Guide Cables No Guide Cables 1 August 4, 2011 Assembly Instructions: (Shown with a 2 board, 12 ft kit) ITEM NO. PART NUMBER DESCRIPTION
More informationEXPIRATION DATE: October 31, 2018 (FOR RENEWAL, SEE 49 CFR )
East Building, PHH-30 1200 New Jersey Avenue S.E. U.S. Department of Transportation Washington, D.C. 20590 Pipeline and Hazardous Materials Safety Administration DOT-SP 10440 (NINTH REVISION) EXPIRATION
More informationGREIG FILTERS, INC. OPERATION MANUAL
GREIG FILTERS, INC. OPERATION MANUAL MODEL DCFH 3P 15/3 100 S4 DOE/222 DUAL CARTRIDGE FILTER HOUSING TABLE OF CONTENTS I. INTRODUCTION II. CARTRIDGE FILTER HOUSING UNIT A. OPERATION B. INSTALLATION C.
More informationCOLD WATER STORAGE CONTROL AYLESBURY TM FLOAT VALVE RANGE
COLD WATER STORAGE CONTROL AYLESBURY TM FLOAT VALVE RANGE Keraflo have manufactured top quality, delayed action float valves in the UK for over 30 years. The Aylesbury TM range is synonymous with float
More informationFig 3, 7, 33, 34, 34HP, 36, 36HP, 37, 3616 and Fig 3716 Flanged Strainers
16352/8 IM-S6-18 ST Issue 8 Fig 3, 7, 33, 34, 34HP, 36, 36HP, 37, 3616 and Fig 3716 Flanged Strainers Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation
More informationPC3000, PC3001 and PC4000, PC4001 Pipeline Connectors
1285550/1 IM-P128-35 ST Issue 1 PC3000, PC3001 and PC4000, PC4001 Pipeline Connectors Installation and Maintenance Instructions 1. Safety information 2. Description 3. Installation 4. Welding of pipeline
More informationHigh Pressure Equipment Taper Seal Valves, Fittings and Tubing
igh quipment Taper Seal Valves, ittings and Tubing 0,000 and,000 psi service igh quipment Company has developed the Taper Seal line of products to assure safe and easy plumbing through,000 psi. These needle
More informationCA44, CA44S, CA46 and CA46S Air and Gas Traps
1484450/3 IM-P148-37 ST Issue 3 CA44, CA44S, CA46 and CA46S Air and Gas Traps Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning
More informationINTEGRITY MANAGEMENT OF STRESS CORROSION CRACKING IN GAS PIPELINE HIGH CONSEQUENCE AREAS
Designator: Meta Bold 24/26 Revision Note: Meta Black 14/16 INTEGRITY MANAGEMENT OF STRESS CORROSION CRACKING IN GAS PIPELINE HIGH CONSEQUENCE AREAS Date of Issuance: October 31, 2008 This report was prepared
More informationInstallation Operation Maintenance
682 Seal Cooler New generation seal cooler to meet and exceed the seal cooler requirements stated in the 4th Edition of API Standard 682 Installation Operation Maintenance Experience In Motion Description
More informationCERTIFICATION OF COMPLIANCE OF THE USER S DESIGN SPECIFICATION
CERTIFICATION OF COMPLIANCE OF THE USER S DESIGN SPECIFICATION I, the undersigned, being experienced and competent in the applicable field of design related to pressure vessel requirements relative to
More information- Written price quotations are valid for 30 days from the date of the quote unless otherwise noted.
SPECIFICATIONS - All material is solid brass with a #8 mirror finish unless otherwise noted. - All material sold by length is priced in one foot increments. ORDERING PROCEDURE - Use a Purchase Order number.
More informationVERTICAL BLADDER TANK
Balanced Pressure Proportioning System Reliable Foam System Requiring Only Water Power Perfect For Tight Spaces UL Listed, ASME, National Board Registered Bladder-UL162 Approved, High Tensile Pressure
More informationASSESSMENT AND ANALYSIS OF PIPELINE BUCKLES
ASSESSMENT AND ANALYSIS OF PIPELINE BUCKLES GE Oil & Gas PII Pipeline Solutions Inessa Yablonskikh Principal Consultant Aberdeen, November, 14 th 2007 Assessment And Analysis Of Pipeline Buckles Introduction
More informationHORIZONTAL BLADDER TANK
Balanced Pressure Proportioning System Reliable Foam System Requiring Only Water Power Perfect For Low Ceilings UL Listed, ASME, National Board Registered Bladder-UL162 Approved, High Tensile Pressure
More information2017 Award Nomination
Title of Innovation: DeOx - DeOxygenation System Nominee(s) Jimmy O Connor, South-Tek Systems Category: (select one below) 2017 Award Nomination Coatings and Linings Cathodic Protection Materials Design
More informationAIR BEARINGS IN HIGH PRECISION SYSTEMS
AIR BEARINGS IN HIGH PRECISION SYSTEMS I. Crăcăoanu 1 and F. Bremer 1 1 Royal Philips Electronics, Philips Innovation Services, Eindhoven, The Netherlands Abstract: In high precision system applications
More informationDCV6 Disc Check Valve
1342050/6 IM-P134-22 ST Issue 6 DCV6 Disc Check Valve Installation and Maintenance Instructions Printed IM-P134-22 in the UK ST Issue 6 Copyright 20101 Safe operation of this product can only be guaranteed
More informationCopper Bonded Ground Rod / Grounding Rods / Copper Bonded Earth Rod / Earthing rods
Copper Bonded Ground Rod / Grounding Rods / Copper Bonded Earth Rod / Earthing rods Copper bonded earth rods are made from low carbon Steel. Earth Rods are molecularly bonded with 99.9% pure electrolytic
More informationGAS DELIVERY PRESSURE AND MEASUREMENT
GAS DELIVERY PRESSURE AND MEASUREMENT I. PURPOSE: To establish a uniform basis on which to provide gas measurement and pressure regulation facilities on customers premises. II. DELIVERY PRESSURES AND PROVISIONS:
More informationM10HTi ISO Tobacco Ball Valve Screwed, SW, BW and Flanged versions
IM-P133-75 ST Issue 1 M10HTi ISO Tobacco Ball Valve Screwed, SW, BW and Flanged versions Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4.
More informationINTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS
INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS IAPMO GUIDE CRITERIA FOR WATER HEATER SUPPLY SHUTOFF VALVE WITH A / THERMAL EXPANSION CONTROL VALVE IGC 128-2006a8 1. PURPOSE 1.1 The purpose
More information5. STRUCTURAL ANALYSIS
5. STRUCTURAL ANALYSIS The skeletal structure of the experiment casing is constructed from UNISTRUT with all experiment equipment mounted by UNISTRUT provided fasteners. All maximum loads for nuts, bolts,
More informationTechnical Information Cleanfit CUA451
TI00369C/07/EN/13.13 71238305 Products Solutions Services Technical Information Cleanfit CUA451 Manually operated retractable assembly for water, wastewater and process media Application Drinking water
More informationPV4 and PV6 Piston Valves
1181250/1 IM-P118-05 ST Issue 1 PV4 and PV6 Piston Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning 5. Operation 6.
More informationGAS STRUT SAFETY INFORMATION
VERSION 4.0 - PAGE 1 CONTENTS 1. SAFETY REQUIREMENTS 2. INSTALLATION 3. DO S AND DON TS 4. PERIODIC INSPECTION 5. SERVICE LIFE 6. FUNCTIONAL SAFETY 7. DAMAGED GAS STRUTS VERSION 4.0 - PAGE 2 SAFETY REQUIREMENTS
More informationHigh Pressure Equipment Medium Pressure Valves, Fittings and Tubing
igh Pressure quipment Medium Pressure Valves, ittings and Tubing service igh Pressure quipment Company has developed a line of Medium Pressure products to assure safe and easy plumbing through. These needle
More informationHigh Pressure Equipment Medium Pressure Valves, Fittings and Tubing
igh Pressure quipment Medium Pressure Valves, ittings and Tubing service igh Pressure quipment Company has developed a line of Medium Pressure products to assure safe and easy plumbing through. These needle
More informationDEMACO DESIGN DOCUMENT. INVESTIGATION CRYOSTAT for the VIRGO EXPERIMENT
DEMACO DESIGN DOCUMENT INVESTIGATION CRYOSTAT for the VIRGO EXPERIMENT Projectnr P100331 Purchasenr 00043376 Revision Org Date 30 Mar 2011 By PRI/ML Org 30-03-11 PRI/ML First Release ML PRI Draft 16-09-10
More informationBVM CORPORATION TYPE AAX TONG 55,000 FT/LBS. TORQUE Part number: Serial Number:
BVM CORPORTION TYPE X TONG 55,000 FT/LBS. TORQUE Part number: Serial Number: WRNING: Manual tongs which have experienced excessive wear or are found to have cracks should be replaced or repaired by BVM
More informationPTF4 Pivotrol Pump (patented) version Dual Mechanism - Pressure Powered Pump
Local regulations may restrict the use of this product to below the conditions quoted. In the interests of development and improvement of the product, we reserve the right to change the specification without
More informationFlange Bolt Torquing. for Resistoflex Plastic-Lined Piping Products. Torquing. Retorquing. Hydrotesting. Annual retorquing
Flange Bolt Torquing for Resistoflex Plastic-Lined Piping Products Torquing When assembling flange connections, always use a full complement of clean, new high strength A193-B7 bolting. If using stainless
More informationDesign. Pompetravaini-NSB API SB Liquid Ring Compressor for Gas Processing. Working Principle
SB Pompetravaini-NSB API SB Liquid Ring Compressor for Gas Processing A family of API liquid ring compressors has been developed and has been in the market for nearly a decade, they are specifically made
More informationSAFETY FOR HYDRAULIC SYSTEM
INTER PLANT STANDARD STEEL INDUSTRY IPSS SAFETY FOR HYDRAULIC SYSTEM IPSS: 1-11-032-17 0. FOREWORD 0.1 This Inter Plant Standard prepared by Standards Committee on Safety Appliances and Procedures, IPSS
More informationRail Track. Deck. Figure 3.9 Standard Fitting and Accessories for Single Deck Roof
Rim Seal Gauge Hatch Pontoon Deck Manway Manway Bleeder Vent Support Leg Liquid Deck Roller Ladder Rail Track Drain Sump with isolation Drain Pipe Gauger Platform Figure 3.9 Standard Fitting and Accessories
More information776 Cryogenic Safety Valve
776 Cryogenic Safety Valve INTRODUCTION 776 Cryogenic Safety Valve The effects of exceeding safe pressure levels in an unprotected pressure vessel or system, can have catastrophic effects on both plant
More informationASME Boiler & Pressure Vessel Code Analysis of the 1497 MHz High-Current Cryomodule Helium Vessel
1.0 Introduction ASME Boiler & Pressure Vessel Code Analysis of the 1497 MHz High-Current Cryomodule Helium Vessel Katherine Wilson 28 May 2007 To minimize the hazards associated with vacuum and pressure
More informationButtweld Fittings ANSI B16.9, ANSI B16.28, MSS-SP-43, MSS-SP-95, MSS-SP-97
uttweld Fittings NSI 16.9, NSI 16.28, SS-SP-43, SS-SP-95, SS-SP-97 90 LR ELOWS 45 LR ELOWS 180 LR ELOWS 90 SR ELOWS oncentric and eccentric reducers, equal and reducing tees, 45 and 90 elbows, buttweld
More informationRegulating valves REG-SA and REG-SB
MAKING MODERN LIVING POSSIBLE Technical brochure Regulating valves REG-SA and REG-SB REG-SA and REG-SB are angleway and straightway hand regulating valves, which act as normal stop valves in closed position.
More informationExpert Hydrostatic Level Transmitters
Expert Hydrostatic s General Features MJK Expert hydrostatic level transmitters are designed for level measurement by submerging the transmitter in open channels, drains and tanks. Expert hydrostatic level
More informationFTGS14 Ball Float Steam Trap DN15 (½") to DN25 (1")
1458050/5 IM-P145-12 ST Issue 5 FTGS14 Ball Float Steam Trap DN15 (½") to DN25 (1") Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning
More information