Integrated Waterway Management of the Danube in Austria

Size: px
Start display at page:

Download "Integrated Waterway Management of the Danube in Austria"

Transcription

1

2 Integrated Waterway Management of the Danube in Austria Thomas Hartl / Senior Expert Waterway Management via donau Österreichische Wasserstraßen-Gesellschaft mbh Vienna, October 14, 2014

3 Page 3

4 Figures and facts Founded in 2005 on the legal basis of the Austrian Waterway Act 100% ownership by the Federal Ministry for Transport, Innovation and Technology 270 employees 4 Service Centres along the Danube, main office in Vienna 9 Danube lock facilities to operate Page 4

5 The Danube as a multifunctional system recreation transport ecology nature reserve agriculture Danube flood control tourism drinking water energy fishery Page 5

6 Our three company pillars Economy Environment Safety The integrative approach is inherent to the waterway system! Page 6

7 Three company pillars Economy Infrastructure management ensuring the availability of an efficient and reliable waterway infrastructure (maintenance and improvement) collection and provision of hydrographic and hydrological basic data Logistics and ports development of cost-effective logistics solutions on the Danube river in cooperation with private business

8 Three company pillars Environment Renaturation projects Free-flowing sections of the Danube: Wachau, east of Vienna Morava river Ship emission reduction improving the environmental performance of inland navigation Climate change development of potential adaptation strategies for climate change

9 Three company pillars Safety Flood control via donau ensures the safety of more than 500,000 people reconstruction of the flood control dyke on the Morava and the lower Thaya rivers Traffic management national provider of River Information Services (RIS) in Austria (DoRIS) supervision and traffic control at river locks

10 Federal waterways in Austria Danube: km Danube Canal (Vienna): km Danube tributaries Traun (1.80 km), Enns (2.70 km) and March (6.00 km) In sum, km of public waterways Page 10

11 Nautical situation 75 % impounded 25 % free-flowing Wachau Lock Main office Service Centre east of Vienna 10 lock facilities with specific paramters (width and length) 2 free-flowing sections with fairway restrictions (depth and width) Page 11

12 Infrastructure restrictions Usable lock dimensions on the Austrian Danube: 230 x 24 m = UNECE waterway class VIb (4-unit pushed convoy) maximum encounter case = two 4-unit pushed convoys Pushed convoy (pusher + 4 Europe II B lighters) l = 188 m; b = 22.0 m; t max = 2.7 m (6,800 t) Page 12

13 Traffic per type of vessel Configuration of pushed convoys (pusher + pushed lighters) at the Freudenau lock in 2012 (trips) Configuration of coupled convoys (motor cargo vessel + pushed lighters) at the Freudenau lock in 2012 (trips) Page 13

14 Traffic per type of vessel 19 vessels per day on average (peak in summer from May to September due to passenger transport) Ratio of individual vessels to convoys = 52% : 48% 51.6% of all trips are performed by individual vessels 26.5% of all trips by pushed convoys with two barges 11.5% of all trips by coupled convoys with one barge Vessel/convoy type Melk 2012 Altenwörth 2012 share [%] Single vessels (1/2/3/4) ,6% Coupled convoy 1xbarge (5a) ,5% Coupled convoy 2xbarge (5b) ,5% Coupled convoy 3xBarge (5c) ,3% Pushed convoy 1xbarge (7a) ,3% Pushed convoy 2xbarge (7b) ,5% Pushed convoy 3xbarge (7c) ,2% Pushed convoy 4xbarge (7d) ,2% Total number vessels ,0% Page 14

15 Strategy: the fairway maintenance cycle Philosophy: "the whole is greater than the sum of its parts" Page 15

16 Customer-oriented waterway management Surveying Dredging Information Page 16

17 Riverbed surveying on the Austrian Danube Standard: twice per year complete surveying of free-flowing sections: March + October: east of Vienna April + November: Wachau 50 m standard profiles and 25 m profiles in sections with critical locations Equipment: single beam + multi beam Page 17

18 Riverbed surveying on the Austrian Danube Monitoring of critical locations: Additional surveying of critical locations according to catalogue of shallow sections in July each year prior to low-water period Additional monthly surveying of critical locations (prioritisation) Page 18

19 Riverbed surveying on the Austrian Danube Quality control of dredging works: Survey of dredging area prior to and after performance of dredging by assigned company supplementary claims, if necessary Equipment used: multi-beam Page 19

20 Multi-beam surveying Ford Rothenhof after dredging: km / April 2012 Page 20

21 Multi-beam surveying numerical depth values Ford Rothenhof after dredging: km / April 2012 Page 21

22 Multi-beam surveying published information Ford Rothenhof after dredging: km / April 2012 Page 22

23 Free-flowing sections of the Danube Wachau valley (river-km 2, to1,998.00): From river power plant Melk to the Port of Krems East of Vienna (river-km 1, to 1,872.70): From river power plant Freudenau to Austrian-Slovakian border Page 23

24 Critical locations on the Austrian Danube Identification of critical locations on the two free-flowing secions of the Austrian Danube in line with "caution areas" in Inland ECDIS charts Catalogue of fords and lateral accumulations in sum 36 critical locations of which 19 are critical Prioritisation according to urgency for intervention East of Vienna: 7 fords + 6 lat. accum. Wachau valleay: 5 fords + 1 lat. accum. lateral accumulation ford lateral accumulation Page 24

25 Wachau: critical locations Fords: Lateral accumulations: Page 25

26 East of Vienna: critical locations Fords: Lateral accumulations: Page 26 Page 26

27 Long-term frequency of low-water periods Exceedance of low navigation & regulation level (LNRL) metres ( ) and average monthly load factor of vessels Exceedance frequency [%] JAN - FEB 40-45% MAR 20% APR - AUG 0-5% SEP 25% OCT - DEC 50-55% Average monthly load factor [dm] Months Page 27

28 Prioritisation of measures Why prioritise? Waterway users need sufficient fairway depths in low-water periods need to remove critical locations as fast as possible and prior to low-water periods The weakest location on a specific stretch determines the possible draught loaded of a vessel Once the weakest spot has been eliminated, the second weakest spot determines the draught loaded etc. Determining factors: Limited dredging capacity on the market; suitability of equipment for free-flowing river; time needed for receiving official notifications (environmental, navigation law) Page 28

29 Optimisation of time frame for dredging Optimal timeframe for most urgent dredging works Dredging works for most critical shallow sections shall take place at the beginning Page 29 of autumn (starting from September) before the potential low water period!

30 Sample schedule for prioritised dredging (1) July 2013: Hydrographical survey of critical location in freeflowing sections (2) Beginning of Aug. 2013: Briefing for dredging works; prioritisation of measures (3) Beginning of Sept. 2013: Start of dredging works at priority locations in both freeflowing sections Page 30

31 Some facts on dredging Cubature: annually ~ 300,000 to 400,000 m 3 in both free-flowing sections taken together Dredged material: gravel (in fairway; mean gravel size = 26 mm; but up to 120 to 150 mm) fine sediments (in reservoirs, at berthing areas, in port access channels) Budget: annually ~ 4 to 6 million EUR Execution: contracting of private companies Page 31

32 Determining factors for dredging Discharge (in free-flowing section east of Vienna): LNQ = 980 m 3 /s MQ = 1,930 m 3 /s HQ = 10,400 m 3 /s Mean flow velocity (in free-flowing sections): ~ 7 km/h at low navigable water level ~ 12 km/h or more at higher water levels (MWL) Fairway width: between 100 and 120 m in straight sections (more in bend) Page 32

33 Levels of service as a strategy for prioritisation Identification of the width of the "traffic lane" needed by vessels/convoys for critical locations in the two free-flowing stretches of the Austrian Danube waterway in consideration of different curve radii on critical stretches of the waterway on the basis of three general traffic situations ("encounter cases" or "levels of service") Fairway depth of 2.5 m at LNWL (ENR) (= 343 days/year) Page 33

34 Levels of service: encounter cases Maximum encounter case: The critical encounter probability in oncoming traffic for two 4-unit pushed convoys is less than once a week Most probable encounter case: Individual vessel encountering a 2-unit pushed or coupled convoy Page 34

35 Fairway widths and vessel types Definition of fairway LoS in Austria is based on studies published by the DST Duisburg (Development Centre for Ship Technology and Transport Systems) The chart visualizes the assumed distances for the passing of two 4-unit convoys navigating through water at 14 km/h at a flow velocity of the river of 6 km/h Page 35

36 3 levels of service in fairway maintenance Traffic situation: Level 1 Convoy of max. dimension* going downstream in oneway traffic Level 2 Convoy of max. dimension* going downstream meets motor cargo vessel going upstream Level 3 Encounter of two convoys of max. dimension* Width of "traffic lane" according to curve radii: < 1,000 m 80 m 120 m 160 m 1,000-1,500 m 60 m 100 m 120 m > 1,500 m 40 m 80 m 100 m * According to waterway class foreseen for this stretch (UNECE / DC) Page 36

37 Principle of fairway continuity Establish the continuity of the fairway as fast as possible + prior to low-water periods (proactive maintenance) = LoS 1 Increase the availability of the fairway step by step, starting with the most critical location Provide the availability of the entire fairway width in a sequential manner = LoS 2 + LoS 3 Priority 3 Priority 2 Priority 1 Level of Service 1 Priority 6 Priority 5 Priority 4 Page 37

38 Example: Ford Regelsbrunn east of Vienna Page 38

39 Ford Regelsbrunn: LoS parameters Excerpt from the catalogue of critical locations: name kind position - right - centre - left curve radius - upstream - centre - downstream LoS 1-3 fairway width area of critical location Page 39

40 Ford Regelsbrunn: LoS 1 = 40 m width Page 40

41 Ford Regelsbrunn: LoS 2 = 80 m width Page 41

42 Online information on critical locations Distribution via web service to different (online) media: DoRIS website (Donau River Information Services) and DoRIS mobile app for smart phones etc. Danube FIS portal (Fairway Information Services) Page 42

43 Online information on critical locations Page 43

44 LoS for statistical purposes (LoS 1 in 2013) Availability of LoS 1 in free-flowing sections 2013: Wachau: 98% (6 / 365) East of Vienna: 86% (50 / 365) Page 44

45 Thank you for your attention Contact Mag. Thomas Hartl, MAS Senior Expert Waterway Management Phone Donau-City-Straße 1, 1220 Vienna, Austria Page 45

46

SPEECH. by Deputy Director-General of the Danube Commission s Secretariat. Mr. Pjotr Suvorov. (Linz, April 2013)

SPEECH. by Deputy Director-General of the Danube Commission s Secretariat. Mr. Pjotr Suvorov. (Linz, April 2013) SPEECH by Deputy Director-General of the Danube Commission s Secretariat Mr. Pjotr Suvorov on the 5 th Meeting of the Steering Group for Priority Area 1a of the EUSDR (Linz, 17-18 April 2013) At the 3

More information

Infrastructure measures

Infrastructure measures Infrastructure measures Juha Schweighofer via donau Österreichische Wasserstraßen GmbH Second ECCONET Stakeholder Workshop Amsterdam, November 2 nd, 2011 Contents Objectives in ECCONET Weather related

More information

Status of the Fairway Rehabilitation and Maintenance Master Plan for the Danube and its navigable tributaries (dated )

Status of the Fairway Rehabilitation and Maintenance Master Plan for the Danube and its navigable tributaries (dated ) Status of the Fairway Rehabilitation and Maintenance Master Plan for the Danube and its navigable tributaries (dated 23-11-2018) Key achievements since the endorsement of the Master Plan in 2014 The Fairway

More information

Monitoring system on implementation of waterway maintenance declaration & short-term measures

Monitoring system on implementation of waterway maintenance declaration & short-term measures Monitoring system on implementation of waterway maintenance declaration & short-term measures Linz, 16 April 2013 Thomas Hartl Joint Technical Secretariat PAC 1a Slide No. 2 Status: April 2013 Slide No.

More information

TRAFFIC MANAGEMENT, RELIABILITY AND ECONOMIC TRANSPORT ON THE INLAND WATERWAY DANUBE by

TRAFFIC MANAGEMENT, RELIABILITY AND ECONOMIC TRANSPORT ON THE INLAND WATERWAY DANUBE by TRAFFIC MANAGEMENT, RELIABILITY AND ECONOMIC TRANSPORT ON THE INLAND WATERWAY DANUBE by Markus Hoffmann 1, Alexander Haberl 1, Thomas Hartl 2, Christoph Konzel 2 and Markus Simoner 2 ABSTRACT The analysis

More information

FAIRway Danube. a milestone for the realization of the Masterplan of the Danube and its navigable tributaries , Katja Rosner / viadonau

FAIRway Danube. a milestone for the realization of the Masterplan of the Danube and its navigable tributaries , Katja Rosner / viadonau FAIRway Danube a milestone for the realization of the Masterplan of the Danube and its navigable tributaries 15.11.2016, Katja Rosner / viadonau Agenda FAIRway Danube in a nutshell Developments in selected

More information

Overview Vessel Types on the Danube

Overview Vessel Types on the Danube Overview Vessel Types on the Danube 1. Introduction This document describes the most important vessel types for Danube IWT. In the first part of the document, various vessel types and their load capacities

More information

National Action Plans

National Action Plans Fairway Rehabilitation and Maintenance MASTER PLAN for the Danube and its navigable tributaries: National Action Plans Update October 2015 Version: final draft Date: 14.12.2015 Status: internal Disclaimer

More information

Fairway Rehabilitation and Maintenance Master Plan for the Danube and its Navigable Tributaries

Fairway Rehabilitation and Maintenance Master Plan for the Danube and its Navigable Tributaries Fairway Rehabilitation and Maintenance Master Plan for the Danube and its Navigable Tributaries PA1a Working Group Session, Vukovar, 28 October 2014 Gudrun Maierbrugger, Technical Secretariat Priority

More information

Waterway management projects co-funded by CEF Programme rkm Danube section in Hungary -

Waterway management projects co-funded by CEF Programme rkm Danube section in Hungary - Waterway management projects co-funded by CEF Programme - 1811-1433 rkm Danube section in Hungary - PÁL KÖTÉL, KÁROLY GOMBÁS MSc in water engineering Fluvial flod protection, deputy department leader NORTH-TRANSDANUBIAN

More information

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD ST. LOUIS SECTION PROJECT OF THE YEAR AWARD Originality and Innovation The St. Louis Harbor Project is located in the Upper Mississippi River between the entrance to the Chain of Rocks Canal at River

More information

applied to Port Development and Inland Waterway Transport

applied to Port Development and Inland Waterway Transport applied to Port Development and Inland Waterway Transport Wytze de Boer March 12, 2018 w.d.boer@marin.nl CHALLINGING WIND AND WAVES applied to port development and inland waterway transport AGENDA 1. Introduction

More information

READER THE DANUBE WATERWAY ECONOMIC GEOGRAPHY

READER THE DANUBE WATERWAY ECONOMIC GEOGRAPHY READER THE DANUBE WATERWAY ECONOMIC GEOGRAPHY Extract of relevant passages from the Manual of Danube Navigation, via donau (2012) and the Annual Report 2014 from via donau i Statistical data for the EU-27

More information

SWISS reports stable load factors

SWISS reports stable load factors SWISS Corporate Communications Phone: +41 (0)848 773 773 Fax: +41 (0)44 564 2127 communications@swiss.com SWISS.COM Media release Zurich Airport, October 10, 2008 SWISS reports stable load factors SWISS

More information

FEASIBILITY STUDY FOR A WATERWAY MAINTENANCE MANAGEMENT SYSTEM (WMMS) FOR THE DANUBE

FEASIBILITY STUDY FOR A WATERWAY MAINTENANCE MANAGEMENT SYSTEM (WMMS) FOR THE DANUBE NETWORK OF DANUBE WATERWAY ADMINISTRATIONS data & user orientation SOUTH EAST EUROPE TRANSNATIONAL COOPERATION PROGRAMME FEASIBILITY STUDY FOR A WATERWAY MAINTENANCE MANAGEMENT SYSTEM (WMMS) FOR THE DANUBE

More information

Good Navigation Status

Good Navigation Status Good Navigation Status Regional GNS workshop Strasbourg, 16 th September 2016 Agenda for today 9:00 Welcome and introduction 9:10 Session 1: Presentation of Good Navigation Status study Questions & answers

More information

Study of river training measures to overcome inland navigation constraints due to future climate changes

Study of river training measures to overcome inland navigation constraints due to future climate changes S. Wurms, P.M. Schroeder www.baw.de Outline Background and project aim The research programme KLIWAS Hydraulic bottlenecks under changing hydrological conditions River training options for adaptation to

More information

15 th Meeting of the Steering Group for Priority Area 1a of the EUSDR Vienna, Austria 09 October 2018

15 th Meeting of the Steering Group for Priority Area 1a of the EUSDR Vienna, Austria 09 October 2018 EU Strategy for the Danube Region Priority Area 1a To improve mobility and multimodality: Inland waterways 15 th Meeting of the Steering Group for Priority Area 1a of the EUSDR Vienna, Austria 09 October

More information

CORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG

CORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG CORPS FACTS Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG Disaster Response Sedimentation in the channel is caused by the normal cycle of silt movement, erosion from high water or heavy

More information

INLAND WATERWAYS DESIGN CRITERIA AND ITS APPLICATIONS IN EGYPT

INLAND WATERWAYS DESIGN CRITERIA AND ITS APPLICATIONS IN EGYPT Ninth International ater Technology Conference, ITC9 2005, Sharm El-Sheikh, Egypt 905 INLAND ATERAYS DESIGN CRITERIA AND ITS APPLICATIONS IN EGYPT Hossam El-Sersawy * and A.F. Ahmed ** * Doctor, Researcher,

More information

Conclusions. on effective waterway infrastructure rehabilitation and maintenance on the Danube and its navigable tributaries. Danube Ministers Meeting

Conclusions. on effective waterway infrastructure rehabilitation and maintenance on the Danube and its navigable tributaries. Danube Ministers Meeting Conclusions on effective waterway infrastructure rehabilitation and maintenance on the Danube and its navigable tributaries Danube Ministers Meeting Rotterdam 20 th June 2016 We, the Ministers and Heads

More information

In this issue... Foreword

In this issue... Foreword volume 1 : issue 1 - January 2003 : page 1 volume 1 : issue 6 October 2003 In this issue... Particularities of navigation on inland waterways Foreword Gert-Jan Muilerman from via donau Inland navigation

More information

7th meeting of Steering Group Priority Area 1a of the Danube Region Strategy on Inland Waterways

7th meeting of Steering Group Priority Area 1a of the Danube Region Strategy on Inland Waterways 7th meeting of Steering Group Priority Area 1a of the Danube Region Strategy on Inland Waterways Vienna 9 May 014 7th Steering Group meeting Priority Area 1a of the EUSDR Vienna, 9 May 014 Reinhard Vorderwinkler

More information

CO 2 reduction due to "topography orientated" voyage-planning and navigation. -Prerequisites of ship handling simulators as training tool-

CO 2 reduction due to topography orientated voyage-planning and navigation. -Prerequisites of ship handling simulators as training tool- reduction due to "topography orientated" voyage-planning and navigation -Prerequisites of ship handling simulators as training tool- Development Centre for Ship Technology and Transport Systems TopoNav

More information

Table of. contents. Photos: viadonau, NEWADA duo, Haslinger, Zinner Layout: viadonau

Table of. contents. Photos: viadonau, NEWADA duo, Haslinger, Zinner Layout: viadonau COMMON DANUBE REPORT 2015 Imprint NEWADA duo project consortium Network of Danube Waterway Administrations data and user orientation Information about the project consortium can be found on pp. 26-27 Photos:

More information

Paper Environmental friendly solutions to improve the navigation fairway of the Danube in Serbia

Paper Environmental friendly solutions to improve the navigation fairway of the Danube in Serbia Paper 166 - Environmental friendly solutions to improve the navigation fairway of the Danube in Serbia ZUIJDERWIJK Michel, MUSKATIROVIC Jasna, MITROVIC Ivan, TJERRY Soren, ZANETTI Roberto Witteveen+Bos,

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council Distr.: General 4 August 2010 Original: English Economic Commission for Europe Inland Transport Committee Working Party on Inland Water Transport Fifty-fourth

More information

Lower Coquitlam River Project Water Use Plan. Temperature Monitoring Lower Coquitlam River Project Year 2 Report

Lower Coquitlam River Project Water Use Plan. Temperature Monitoring Lower Coquitlam River Project Year 2 Report Lower Coquitlam River Project Water Use Plan Temperature Monitoring Lower Coquitlam River Project Year 2 Report COQMON#6 Temperature Monitoring Study Lower Coquitlam River Study Period: Year 2-2007 Report

More information

Centre Albert Borschette, 36 Rue Froissart - Room CCAB-0B, 1040 Brussels

Centre Albert Borschette, 36 Rue Froissart - Room CCAB-0B, 1040 Brussels MINUTES 2nd Advisory Committee Meeting Date 13.12.2016 Time 14:00 17:00 Place Participants For the minutes Centre Albert Borschette, 36 Rue Froissart - Room CCAB-0B, 1040 Brussels See list of participants

More information

Economic and Social Council

Economic and Social Council UNITED NATIONS E Economic and Social Council Distr. GENERAL ECE/TRANS/SC.3/2006/8 7 July 2006 ENGLISH Original: RUSSIAN ECONOMIC COMMISSION FOR EUROPE INLAND TRANSPORT COMMITTEE Working Party on Inland

More information

HELSINKI COMMISSION HELCOM SAFE NAV 4/2014 Group of Experts on Safety of Navigation Fourth Meeting Helsinki, Finland, 4 February 2014

HELSINKI COMMISSION HELCOM SAFE NAV 4/2014 Group of Experts on Safety of Navigation Fourth Meeting Helsinki, Finland, 4 February 2014 HELSINKI COMMISSION HELCOM SAFE NAV 4/2014 Group of Experts on Safety of Navigation Fourth Meeting Helsinki, Finland, 4 February 2014 Agenda Item 3 Accidents and ship traffic in the Baltic Sea Document

More information

MARINE SAFETY PLAN

MARINE SAFETY PLAN PORT MARINE SAFETY CODE MARINE SAFETY PLAN 2015-2017 Introduction As required at article 3.20 of the Port Marine Safety Code (PMSC), the Port of London Authority (PLA) publishes its Marine Safety Plan

More information

Auckland Transport Monthly Indicators Report 2018/19

Auckland Transport Monthly Indicators Report 2018/19 Attachment 1 Auckland Transport Monthly Indicators Report 218/19 August 218 Table of Contents Page 2. 1. Summary of indicators 1.1 SOI performance measures 1.2 AT Metro patronage breakdown 2. Monthly indicators

More information

Properties. terc.ucdavis.edu 8

Properties. terc.ucdavis.edu 8 Physical Properties 8 Lake surface level Daily since 1900 The lowest lake level on record was 6,220.26 feet on Nov. 30, 1992. Since 1900, lake level has varied by more than 10 feet. Lake level typically

More information

THE PEP Partnership on Cycling

THE PEP Partnership on Cycling THE PEP Partnership on Cycling Pan-European Master Plan for Cycling THE PEP Bureau Meeting, July 4 th /5 th, 2017 Robert Thaler Head of Division Mobility, Transport, Noise Austrian Federal Ministry of

More information

Kentucky Lock Project Update Inland Waterways Users Board

Kentucky Lock Project Update Inland Waterways Users Board Kentucky Lock Project Update Inland Waterways Users Board Mr. Don Getty Project Manager Nashville District Great Lakes and Ohio River Division 1 March 2018 The views, opinions and findings contained in

More information

Annex E Bridge Pier Protection Plan

Annex E Bridge Pier Protection Plan Annex E Bridge Pier Protection Plan Table E1 Bridge Types and Locations Table E2 Flow Conditions For River Sections Figure E1 Bridge Abutment Protection Figure E2 Bridge Pier Protection Figure E3 Central

More information

Healthy and Environmental Friendly Transport in the City Region

Healthy and Environmental Friendly Transport in the City Region Healthy and Environmental Friendly Transport in the City Region Reindert Augustijn Team manager traffic and transport Arnhem Nijmegen City Region www.polisnetwork.eu/2014conference #polis14 Fact and figures

More information

Congestion Evaluation Best Practices

Congestion Evaluation Best Practices Congestion Evaluation Best Practices Todd Litman Victoria Transport Policy Institute Presented International Transportation and Economic Development Conference 10 April 2014 Congestion Indicators Indicator

More information

Coquitlam/Buntzen Project Water Use Plan

Coquitlam/Buntzen Project Water Use Plan Coquitlam/Buntzen Project Water Use Plan Temperature Monitoring Lower Coquitlam River Project Year 3 Report Reference: COQMON#6 Study Period: March 2008 April 2009 Report Date: April 2009 Trow Associates

More information

Active Travel Strategy Dumfries and Galloway

Active Travel Strategy Dumfries and Galloway Active Travel Strategy Dumfries and Galloway Our Active Travel Strategy The agreed Interventions for Dumfries and Galloway Council s Local Transport Strategy includes an action to Develop an Active Travel

More information

Sediment management plans for the Dutch Rhine branches. Arjan Sieben Rijkswaterstaat Waterdienst

Sediment management plans for the Dutch Rhine branches. Arjan Sieben Rijkswaterstaat Waterdienst zurück zum Inhaltsverzeichnis zur Kurzfassung Sediment management plans for the Dutch Rhine branches Arjan Sieben Waterdienst 8 oktober 2009 What happens downstream Lobith? Plans and trends Daily practice

More information

A Government Service to State Owned Enterprise.

A Government Service to State Owned Enterprise. Re-organization of Hydrographic Survey Operations in Finland A Government Service to State Owned Enterprise Kari Pohjola Hydro 2010, Rostock-Warnemuende, Germany, 02-05 November 2010 Re-organization of

More information

1.3.4 CHARACTERISTICS OF CLASSIFICATIONS

1.3.4 CHARACTERISTICS OF CLASSIFICATIONS Geometric Design Guide for Canadian Roads 1.3.4 CHARACTERISTICS OF CLASSIFICATIONS The principal characteristics of each of the six groups of road classifications are described by the following figure

More information

THE CHALLENGES OF A LARGE-AREA BATHYMETRIC SURVEY

THE CHALLENGES OF A LARGE-AREA BATHYMETRIC SURVEY THE CHALLENGES OF A LARGE-AREA BATHYMETRIC SURVEY Agenda: - Introduction - Tender - Project Planning - Survey - Processing - Delivery - Conclusion 2 Introduction We know less of the oceans at our feet,

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun Jul

More information

The Herzliya Conference The Economic Dimension Prof. Rafi Melnick Provost, Interdisciplinary Center (IDC) Herzliya

The Herzliya Conference The Economic Dimension Prof. Rafi Melnick Provost, Interdisciplinary Center (IDC) Herzliya The Herzliya Conference The Economic Dimension 2009 Provost, Interdisciplinary Center (IDC) Herzliya The Big Issues The broken crystal ball A crisis that happens once in 100 years From a country oriented

More information

Bluetongue Disease (BT)

Bluetongue Disease (BT) Bluetongue Disease (BT) Analysis of ADNS data since 01/2018 Reporting period: 2018-01-01 2018-12-09 Data query: 2018-12-10 AGES DSR Austrian Agency for Health and Food Safety www.ages.at Parameters Data

More information

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION STRUCTURE S-65 This structure is a reinforced concrete, gated spillway with discharge controlled by three cable operated, vertical lift gates, and a reinforced concrete lock structure with two pairs of

More information

Innovative Technologies for a Resilient Marine Transportation System

Innovative Technologies for a Resilient Marine Transportation System Innovative Technologies for a Resilient Marine Transportation System Transportation Research Board MG John Peabody, P.E. Deputy Commanding General for Civil and Emergency Operations, U.S. Army Corps of

More information

THE PEP Workshop Batumi 30 Sept-1 Oct 2010 Investing in Cycling Saving Health Costs, Boosting Regional Economy and Green Jobs - Austrian Experience Robert Thaler Head of Division Transport, Mobility, Human

More information

The District Cooling System in Hong Kong

The District Cooling System in Hong Kong The District Cooling System in Hong Kong Mr. Raymond KY POON Electrical & Mechanical Services Department Hong Kong Special Administrative Region Government July 2018 1 Climate Change 2 Climate Change Carbon

More information

SWISS Traffic Figures May 2004

SWISS Traffic Figures May 2004 SWISS Traffic Figures May 2004 SWISS continues seat load factor improvement in May SWISS s load factor for May was 4.8 percentage points better than for the same period last year. Seat load factor for

More information

Cycling and Health. The Austrian Masterplan on Cycling. Promoting Cycling for Health, Environment and Quality of Life

Cycling and Health. The Austrian Masterplan on Cycling. Promoting Cycling for Health, Environment and Quality of Life Cycling and Health The Austrian Masterplan on Cycling Promoting Cycling for Health, Environment and Quality of Life Content Physical Inactivity as a result of changing travel behaviour Promoting Cycling

More information

WINDING HOLES towards a specification for the ideal turning place

WINDING HOLES towards a specification for the ideal turning place WINDING HOLES towards a specification for the ideal turning place Introduction The term winding hole is normal in the narrow canal network, and on adjoining broad canals, for a space in which to turn a

More information

Implementation of CEVNI Rev 5. Reinhard Vorderwinkler Austria

Implementation of CEVNI Rev 5. Reinhard Vorderwinkler Austria Implementation of CEVNI Rev 5 Reinhard Vorderwinkler Austria SC.3 and SC.3/WP.3 History ITC 1956 sub-committee (SC) on IWT for preparation of international conventions in IWT renamed: principal working

More information

VESSEL TRANSIT SCHEDULING AT THE PANAMA CANAL NUMBER AND ORDER OF VESSELS IN THE SCHEDULE

VESSEL TRANSIT SCHEDULING AT THE PANAMA CANAL NUMBER AND ORDER OF VESSELS IN THE SCHEDULE VESSEL TRANSIT SCHEDULING AT THE PANAMA CANAL This document intends to provide our clients with a better understanding of vessel scheduling in the Panama Canal. For any questions not addressed in this

More information

Innovative approaches on the Danube and its navigable tributaries

Innovative approaches on the Danube and its navigable tributaries EU Strategy for the Danube Region Innovative approaches on the Danube and its navigable tributaries Priority Area 1a on Inland Waterways Annual Forum Ulm 29 th October 2015 si Infrastructurii EU Strategy

More information

Konstantin Glukhenkiy Economic Affairs Officer

Konstantin Glukhenkiy Economic Affairs Officer Konstantin Glukhenkiy Economic Affairs Officer Rapid growth of urban areas Very rapid increase in motorisation Substantial increases in traffic congestion Relative decline of public transport usage and

More information

Dipl.-Ing. Thomas FISCHER Reggio Emilia, 22. October 2010

Dipl.-Ing. Thomas FISCHER Reggio Emilia, 22. October 2010 Dipl.-Ing. Thomas FISCHER 2 Overview General data and statistics Planning principles Tempo 30/50 project Traffic Safety Activities 3 City of Graz European Cultural Capital City 2003 Area 127 km² ~ 255.000

More information

Understanding the Impacts of Culvert Performance on Stream Health

Understanding the Impacts of Culvert Performance on Stream Health Understanding the Impacts of Culvert Performance on Stream Health Kristin Thomas Aquatic Ecologist Michigan Trout Unlimited Transportation and the Environment Conference 12/5/2018 Importance of adequately

More information

Little Spokane River Stream Gage Report: Deadman Creek, Dragoon Creek, and the West Branch of the Little Spokane River

Little Spokane River Stream Gage Report: Deadman Creek, Dragoon Creek, and the West Branch of the Little Spokane River Little Spokane River Stream Gage Report: Deadman Creek, Dragoon Creek, and the West Branch of the Little Spokane River June 2010 Spokane County Conservation District N. 210 Havana St. Spokane, WA 99202

More information

Texas Department of Transportation s Gulf Intracoastal Waterway Capacity Study. GICA 112 th Annual Seminar July 28, 2017

Texas Department of Transportation s Gulf Intracoastal Waterway Capacity Study. GICA 112 th Annual Seminar July 28, 2017 Texas Department of Transportation s Gulf Intracoastal Waterway Capacity Study GICA 112 th Annual Seminar July 28, 2017 Study Purpose Determine if current levels of vessel activity on the Texas segment

More information

Regional Bus Priority

Regional Bus Priority Regional Bus Priority Recommendation(s) That the Board: i) Notes the systematic review for bus priority measures on the proposed Frequent Transit Network (FTN). Executive summary The New Network public

More information

Modelling sailing time and cost for inland waterway transport

Modelling sailing time and cost for inland waterway transport EJTIR Issue 17(4), 2017 pp. 508-529 ISSN: 1567-7141 tlo.tbm.tudelft.nl/ejtir Robert G. Hekkenberg 1 Delft University of Technology, department of Maritime & Transport Technology, Delft, The Netherlands.

More information

Laurier Segregated Bike Lane Pilot Project July 2013 update

Laurier Segregated Bike Lane Pilot Project July 2013 update Laurier Segregated Bike Lane Pilot Project July 2013 update Presentation Overview Background Pilot Monitoring Results Mitigation Recommendations Next Steps Laurier 2 Background Laurier Avenue Segregated

More information

Hydrological Condition Report including the issues of High Flow Fluctuation in Chiang Saen

Hydrological Condition Report including the issues of High Flow Fluctuation in Chiang Saen Hydrological Condition Report including the issues of High Flow Fluctuation in Chiang Saen Technical Symposium for ESCIR and MRC on Social Impact Assessment in River Basin Management Sothea KHEM, HENG

More information

The Isar -Plan Project in Munich Great (Un) expectations.

The Isar -Plan Project in Munich Great (Un) expectations. The Isar -Plan Project in Great (Un) expectations. European River Restoration Conference Session 5- Enhancement of Multi-Use Landscapes 11-13 September 2013 The Isar-Plan Project: Basic Facts Approximate

More information

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II) Presentation to the CNRC Board of Directors Regular Meeting March 11, 2015 1 Agenda Preferred Alternate Refinement for University Avenue, 3rd Street, and Beverly Avenue Intersection Improvements validate

More information

Austrian Road Safety Programme

Austrian Road Safety Programme Austrian Road Safety Programme 2011 2020 Objectives Numerical targets: 50% Reduction of fatalities until 2020 (Basis: average of years 2008-2010) 40% Reduction of severe injuries until 2020 (Basis: average

More information

LIST OF CORRECTIONS. 02 / January /052(T) - 07/125(T) - 08/136(T) - 08/137(T) - 12/177(T) - 15/212(T) - 18/232-22/285(T)

LIST OF CORRECTIONS. 02 / January /052(T) - 07/125(T) - 08/136(T) - 08/137(T) - 12/177(T) - 15/212(T) - 18/232-22/285(T) LIST OF CORRECTIONS 105 Chart Kanaal van Gent naar Terneuzen Edition 2016 Updated up to and including NMs 02 / 2018 18 January 2018 The last version of these corrections are available on www.vlaamsehydrografie.be

More information

Work Package 4: Infrastructure

Work Package 4: Infrastructure PLATFORM FOR THE IMPLEMENTATION OF NAIADES II Work Package 4: Infrastructure Good Practice Manual on Inland Waterway Maintenance Focus: Fairway maintenance of free-flowing rivers Grant Agreement: (Sub)Work

More information

Eulachon: State of the Science and Science to Policy Forum

Eulachon: State of the Science and Science to Policy Forum Eulachon: State of the Science and Science to Policy Forum August 27, 2015 Robert Anderson Eulachon Recovery Coordinator National Marine Fisheries Service FCRPS, Dams, and Water Management in the Columbia

More information

Presentation Library for Inland ECDIS

Presentation Library for Inland ECDIS Edition 2.0 1.6.2006 Standard Electronic Chart Display and Information System for Inland Navigation Inland ECDIS for Inland ECDIS In addition to the IHO-S-52 Edition 2.0 IES 20-Section 3 PresLib.doc Page

More information

MR. DAVID DALE, PE, PMP, SES DIRECTOR, Programs Great Lakes & Ohio River Division. 12 August Braddock Dam

MR. DAVID DALE, PE, PMP, SES DIRECTOR, Programs Great Lakes & Ohio River Division. 12 August Braddock Dam Locks and Dams 2, 3, and 4 Monongahela River, PA (Lower Mon Project) Inland Waterways Users Board MR. DAVID DALE, PE, PMP, SES DIRECTOR, Programs Great Lakes & Ohio River Division Braddock Dam 12 August

More information

PORTS AUSTRALIA. PRINCIPLES FOR GATHERING AND PROCESSING HYDROGRAPHIC INFORMATION IN AUSTRALIAN PORTS (Version 1.5 November 2012)

PORTS AUSTRALIA. PRINCIPLES FOR GATHERING AND PROCESSING HYDROGRAPHIC INFORMATION IN AUSTRALIAN PORTS (Version 1.5 November 2012) PORTS AUSTRALIA PRINCIPLES FOR GATHERING AND PROCESSING HYDROGRAPHIC INFORMATION IN AUSTRALIAN PORTS (Version 1.5 November 2012) PREFACE These Principles have been prepared by the Hydrographic Surveyors

More information

Port Sections Guide Section 01

Port Sections Guide Section 01 s Guide 01 Cow Bay Marina Date 10/1/2016 Position (lat / lon) Minimum controlled water depth Chart datum Range of water densities Tidal range alongside Bottom type Dredging regime Distance pilot station

More information

Board Strategy Day. January 25, 2018

Board Strategy Day. January 25, 2018 Board Strategy Day January 25, 2018 Corporate Plan 2018-2022 & beyond Presentation to the board 2018 2022 & beyond 2 Building on the last five-year plan 2013 2017 21% reduction in subway delay minutes

More information

Working Group 1 Waterway Infrastructure & Management

Working Group 1 Waterway Infrastructure & Management Working Group 1 Waterway Infrastructure & Management Bucharest, 27 October 2011 Romeo Soare AFDJ River Administration of the Lower Danube River Administration of the Lower Danube autonomous state control

More information

Encouraging Taxi Drivers to Behave: Grafton Bridge Taxi and Bus Lane Trial. Rob Douglas-Jones Tim Segedin, Edin Ltd.

Encouraging Taxi Drivers to Behave: Grafton Bridge Taxi and Bus Lane Trial. Rob Douglas-Jones Tim Segedin, Edin Ltd. Encouraging Taxi Drivers to Behave: Grafton Bridge Taxi and Bus Lane Trial Rob Douglas-Jones Tim Segedin, Edin Ltd. 2.1km 12 mins Hospital 1.5km 9 mins To Newmarket 5 500 bikes per day 500 pedestrians

More information

Greenup Lock Filling and Emptying System Study

Greenup Lock Filling and Emptying System Study Fourth LACCEI International Latin American and Caribbean Conference for Engineering and Technology (LACCET 2006) Breaking Frontiers and Barriers in Engineering: Education, Research and Practice 21-23 June

More information

Life in the Fast Lane

Life in the Fast Lane Life in the Fast Lane www.barhondaf1.com David France, IT Director www.hondaracingf1.com This evening s presentation The Honda Racing F1 Team The Role of IT Managing Change Managing Parts Q&A 2 www.barhondaf1.com

More information

LIFE HISTORY DIVERSITY AND RESILIENCE

LIFE HISTORY DIVERSITY AND RESILIENCE LIFE HISTORY DIVERSITY AND RESILIENCE SPRING CHINOOK IN THE WILLAMETTE RIVER BASIN Kirk Schroeder Brian Cannon Luke Whitman Paul Olmsted Oregon Department of Fish and Wildlife Corvallis Research Lab Thanks

More information

The Tidal Elbe Concept Sustaining the Tidal River Seaport of Hamburg

The Tidal Elbe Concept Sustaining the Tidal River Seaport of Hamburg The Tidal Elbe Concept Sustaining the Tidal River Seaport of Hamburg 7 th international SedNet event 8. April 2011, Venice Wadden Sea North Sea MSFD Schleswig-Holstein Tidal Elbe Natura 2000 Lower Saxony

More information

SUMP in Emilia Romagna Region and the national level»

SUMP in Emilia Romagna Region and the national level» Local Public Transport and Sustainable Mobility Department SUMP in Emilia Romagna Region and the national level» Andrea Normanno Eleonora Tu SUMP in Europe: best practices and multi-level governance The

More information

Fairway Rehabilitation and Maintenance Master Plan

Fairway Rehabilitation and Maintenance Master Plan Fairway Rehabilitation and Maintenance Master Plan Danube and its navigable tributaries EU Strategy for the Danube Region, Priority Area 1a To improve mobility and multimodality: inland waterways Version

More information

Comparative variant analysis in using ship handling simulators with special respect to assess ease quality and human factor

Comparative variant analysis in using ship handling simulators with special respect to assess ease quality and human factor Comparative variant analysis in using ship handling simulators with special respect to assess ease quality and human factor Iribarren, Jose R.; Cal, Carlos; Atienza, Raul; Verdugo, Ismael Siport21, Madrid,

More information

Capacity of transport infrastructure networks

Capacity of transport infrastructure networks Most infrastructure extension work is concentrated on roads. The total length of the motorway network has increased dramatically during the past two decades (about 3 % per year). Construction of the high-speed

More information

Auckland Transport Monthly Indicators Report 2018/19

Auckland Transport Monthly Indicators Report 2018/19 Attachment 1 Auckland Transport Monthly Indicators Report 218/19 October 218 Table of Contents Page 2. 1. Summary of indicators 1.1 SOI performance measures 1.2 AT Metro patronage breakdown 2. Monthly

More information

LIST OF CORRECTIONS. 14 / July /052(T) - 07/125(T) - 08/136(T) - 08/137(T) - 12/177(T) - 15/212(T) - 18/232-22/285(T)

LIST OF CORRECTIONS. 14 / July /052(T) - 07/125(T) - 08/136(T) - 08/137(T) - 12/177(T) - 15/212(T) - 18/232-22/285(T) LIST OF CORRECTIONS 105 Chart Kanaal van Gent naar Terneuzen Edition 2016 Updated up to and including NMs 14 / 2018 05 July 2018 The last version of these corrections are available on www.vlaamsehydrografie.be

More information

North Carolina Transportation Issues

North Carolina Transportation Issues North Carolina Transportation Issues David T. Hartgen, Ph.D., P.E. Emeritus Professor of Transportation Studies UNC Charlotte Remarks at the Shaftesbury Lecture John Locke Foundation Raleigh, North Carolina

More information

Hard Shoulder Running is a valuable tool July 14, Dean H. Gustafson, PE, PTOE State Operations Engineer VDOT Operations Division

Hard Shoulder Running is a valuable tool July 14, Dean H. Gustafson, PE, PTOE State Operations Engineer VDOT Operations Division Hard Shoulder Running is a valuable tool July 14, 2016 Dean H. Gustafson, PE, PTOE State Operations Engineer VDOT Operations Division Virginia 2 VDOT s Statewide Operations Program Operations Statistics

More information

Micro Hydropower and Fish.

Micro Hydropower and Fish. Micro Hydropower and Fish. Garry O Neill. Senior Fisheries Officer. Inland Fisheries Branch. 1. Value of Fisheries. 2. Life cycle of the Salmon. 3. Potential impacts of Hydro s on Fish. 4. Fisheries Legislation.

More information

CFE certification Bicycle-friendly Employer

CFE certification Bicycle-friendly Employer CFE certification Bicycle-friendly Employer EU-Project Bike2Work The manual was created as part of the EU project Bike2Work". The EU project focuses on the expansion and strengthening of the successful

More information

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M) Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M) Shallow draft coastal harbors include a subsistence harbor at Silver Lake CONGRESSIONAL DISTRICT: NC 3 and 7 DATE: 23 February 2015 1.

More information

Wisconsin 511 Traveler Information Annual Usage Summary January 3, Wisconsin 511 Phone Usage ( )

Wisconsin 511 Traveler Information Annual Usage Summary January 3, Wisconsin 511 Phone Usage ( ) Wisconsin 511 Traveler Information 211 Annual Usage Summary January 3, 212 Overall to-date Summary 36 months of operation 1,16,63 total calls the 1 Million mark was passed on December 3, 212 3,627,527

More information

African swine fever in domestic pigs and wild boar (ASF)

African swine fever in domestic pigs and wild boar (ASF) African swine fever in domestic pigs and wild boar (ASF) Analysis of ADNS data since 01/2018 Reporting period: 2018-01-01 2018-12-09 Data query: 2018-12-10 AGES DSR Austrian Agency for Health and Food

More information

STRUCTURE 65-B PURPOSE SPILLWAY OPERATION

STRUCTURE 65-B PURPOSE SPILLWAY OPERATION STRUCTURE 65-B This structure is a reinforced concrete, gated spillway with discharge controlled by three cable operated vertical lift gates and a reinforced concrete lock structure with two pairs of sector

More information

A review of 2015 fatal collision statistics as of 31 December 2015

A review of 2015 fatal collision statistics as of 31 December 2015 A review of fatal collision statistics as of 31 December This report summarises the main trends in road fatalities that have emerged in. This has been prepared by the Road Safety Authority following analysis

More information

ECRR and ARRN Technical Exchange Meeting / ARRN forum 2014 (29 Oct in Vienna, Austria)

ECRR and ARRN Technical Exchange Meeting / ARRN forum 2014 (29 Oct in Vienna, Austria) Study on ecological flow of Nanxi River (China) based on ecological conservation objective China Institute of Water Resources and Hydropower Research Beijing Runheng EEI CO., LTD October 29, 214 Overview

More information