1 Dam Breach Inundation Analysis Using HEC-RAS And GIS TWO CASE STUDIES IN BRITISH COLUMBIA, CANADA Canadian Dam Association 2014 Conference - Banff Alberta

2 Presenters 2 Dwayne Meredith, P.Ag. KWL Vernon Ahmad Asnaashari, P. Eng. In BC

3 Introduction 3 Presentation Outline Introduction Dam Break Modelling Purposes Case Studies Challenges and Lessons Learned Recommendations

4 Introduction 4 CDA 2007: The analyses leading to consequence assessment and classification of the dam typically include the following steps: 1. Characterization of hypothetical dam breach, 2. Flood wave routing, 3. Inundation mapping, and 4. Evaluation of the impacts

5 Introduction 5 Objective Summarize challenges and lesson learned during the modelling and simulations of two case studies.

6 Introduction 6 Why is this important? 1. Understanding potential consequences from an unanticipated release of water; 2. Derives dam classification; 3. Affects design requirements; 4. Assigns regulated activities; 5. Necessitates level of planning (ie OMS and EPP)

7 Introduction 7 Historic (and Recent!) Events Testalinden Mt. Polley Photo Credit: CBC.ca Photo Credit: CBC.ca

8 Two Case Studies 8 Pinaus Lake Dam dam dimensions: 1.7 m high x 23.1 m wide small dam replacement concrete gravity to sheet pile weir impoundment : 2.65 million m 3 Cold Spring Creek Dam dam dimensions: 4.6 m high x 22.0 m long concrete gravity structure impoundment: 1,600 m 3

9 Two Case Studies 9 Pinaus Lake Dam

10 Two Case Studies 10 Cold Spring Creek Dam

11 11 Dam Break Modelling

12 12 Tools Guideline Engineering Judgment Dam Safety

13 13

14 Dam Failure to Inundation Area 14 Photo Credit: FEMA

15 Dam Breach Model Output Estimate Breach Outflow under extreme events 2. Route the Breach Outflow in the DS Creek 1. Flow at DS locations 2. Water Levels 3. Flood arrival time 4. Velocity 5. and more (if needed)

16 Challenges 16 Data Availability and Resolution Coarse topographic data Shallow water Incremental water level Site specific PMF value and hydrograph BC PMF Estimator Creager Graph Model Stability

17 Challenges 17 Model instability Model Crashing!

18 I like the blue bar 18

19 Challenges 19 Factors Affecting Case Studies Models Stability Channel slope Low flow conditions (before breach) e.g. Sunny day cases Big changes in flow (after breach) Cross section spacing Computational time step Manning s n values Initial flow/water level conditions Breach parameters (B, t)

20 Cold Spring Creek Dam Model 20 dam dimensions: 4.6 m high x 22.0 m long impoundment: 1,600 m 3

21 Coarse Topographic Data (TRIM) 21 Cutting Cross Sections (Scale 1:20,000) Horizontal line in cross sections In floodplain Channel data from field measurement Pilot channel

22 Cold Spring Creek Dam Model 22 Incremental Water Level Q=1 m 3 /s Cold Spring Creek Breach Outflow (Sunny-Day failure)

23 Cold Spring Creek Dam Model 23 Incremental Water Level Cold Spring Creek Breach Outflow (Flood condition failure)

24 Cold Spring Creek Dam Model 24 PMF (NO Breach) El m PMF (Breach) El m Cold Spring Creek Breach Outflow (Flood condition failure)

25 Lesson Learned 25 Cross Sections Spacing Steep slopes => closer cross sections High velocity area => closer cross sections Cross sections spacing: Not too close, Not too far (Balanced!) Maximum spacing: Dr. Fread's Equation, Samuals Equation Trial and error Balance with time step

26 Lesson Learned 26 Junction Bed Elevation At creek junctions (confluences), tributary and river bed elevation should be the same or very close. Otherwise, model will crash.

27 Lesson Learned 27 Manning n Adjustment Increase Manning n DS of Dam Account for associated sediment, debris and turbulence for a dam breach This is a conservative assumption Increase Manning n on Steep Slopes Auburn Cofferdam

28 Lesson Learned 28

29 Effects of Large Water Bodies Downstream Q p =65 m 3 /s Q p =50 m 3 /s Little Pinaus Lake Inlet Little Pinaus Lake Outlet Flow (m 3 /s) :00 PM 03:00 PM 06:00 PM 09:00 PM 12:00 AM 03:00 AM 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM Time Step (Hours)

30 Lesson Learned 30 Qp=65 m 3 /s Qp=50 m 3 /s

31 Lesson Learned 31 Select "Mixed Flow Regime" to help model stability

32 Thank you! 32 Questions? Dwayne Meredith, P.Ag. (250) Ahmad Asnaashari, P.Eng. (604)

Plan B Dam Breach Assessment

Plan B Dam Breach Assessment Plan B Dam Breach Assessment Introduction In support of the Local Sponsor permit applications to the states of Minnesota and North Dakota, a dam breach analysis for the Plan B alignment of the Fargo-Moorhead

More information

VIRGINIA SOIL AND WATER CONSERVATION BOARD GUIDANCE DOCUMENT ON DAM BREAK INUNDATION ZONE AND INCREMENTAL DAMAGE ANALYSIS AND MAPPING PROCEDURES

VIRGINIA SOIL AND WATER CONSERVATION BOARD GUIDANCE DOCUMENT ON DAM BREAK INUNDATION ZONE AND INCREMENTAL DAMAGE ANALYSIS AND MAPPING PROCEDURES (Approved XXXXX, 2010) Working Draft Version January 14, 2010 VIRGINIA SOIL AND WATER CONSERVATION BOARD GUIDANCE DOCUMENT ON DAM BREAK INUNDATION ZONE AND INCREMENTAL DAMAGE ANALYSIS AND MAPPING PROCEDURES

More information

Annex E Bridge Pier Protection Plan

Annex E Bridge Pier Protection Plan Annex E Bridge Pier Protection Plan Table E1 Bridge Types and Locations Table E2 Flow Conditions For River Sections Figure E1 Bridge Abutment Protection Figure E2 Bridge Pier Protection Figure E3 Central

More information

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL APRIL 2011 APRIL 2011 Page 1 Preface TIDEROUT 2, Build 1.22 dated June 29, 2006 is the current

More information

BC Ministry of Forests. March Fish Stream Crossing Guidebook. Forest Practices Code of British Columbia.

BC Ministry of Forests. March Fish Stream Crossing Guidebook. Forest Practices Code of British Columbia. FRST 557 Lecture 7c Bridges and Culverts: Water Velocity and Discharge Lesson Background and Overview: The previous two lessons presented methods for estimating water volume flow at a particular site and

More information

Northwest Hydro Association Dam Safety Impacts of 2017

Northwest Hydro Association Dam Safety Impacts of 2017 Northwest Hydro Association Dam Safety Impacts of 2017 February 21, 2018 Catrin Bryan, M.Sc., P.Eng., PE. South Fork Dam - Nanaimo BC S.Pamminger What is happening in Canada? South Fork Dam - Nanaimo BC

More information

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision J.Linortner & R.Faber Pöyry Energy GmbH, Turkey-Austria E.Üzücek & T.Dinçergök General Directorate of State Hydraulic

More information

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application HEC 26 Aquatic Organism Passage Design Manual Evolution & Application Sven Leon, P.E., Hydraulics Engineer Federal Highway Administration 2015 Alaska Fish Passage Meeting October 13 14, 2015 VTRC, Juneau,

More information

Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA

Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA TOPICS COVERED Aquatic Organism Passage (AOP) Benefits of AOP Crossings

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Reservoir II Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

Sussex County, DE Preliminary Study Overview

Sussex County, DE Preliminary Study Overview Sussex County, DE Preliminary Study Overview Coastal study scope: 102 miles of entire County shoreline Revised 102 panels for coastal study Riverine study scope: 14 streams, 67.1 miles, within the Nanticoke

More information

What I ve Learned About Dam Safety Good, Bad and Ugly

What I ve Learned About Dam Safety Good, Bad and Ugly What I ve Learned About Dam Safety Good, Bad and Ugly Ron Gruzesky Dam Safety and Floodplain Compliance Kentucky Division of Water Department for Environmental Protection August 26, 2015 What is a Dam?

More information

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration.

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration. HY-8 Version 7.2 Build Date January 17, 2012 Federal Highway Administration http://www.fhwa.dot.gov/engineering/hydraulics/software/hy8/index.cfm SIMPLE Simple to use Use for simple culverts and bridges

More information

Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project #

Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project # Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project # 4602004 Prepared for Weyerhaeuser Company Ltd. Jason Ladyman R.P.F. 1550 Mission Flats Road PO Box 40 Kamloops BC V2C 5K3 Prepared

More information

APPENDIX A Hydrodynamic Model Qualicum Beach Waterfront Master Plan

APPENDIX A Hydrodynamic Model Qualicum Beach Waterfront Master Plan Page 1 of 21 CLIENT: Town of Qualicum Beach PROJECT: SIGNATURE DATE CONTRIBUTORS : M. Marti Lopez REVIEWED BY : P. St-Germain, EIT APPROVED BY: J. Readshaw, P.Eng ISSUE/REVISION INDEX Issue Details Code

More information

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Culvert Design for Low and High Gradient Streams in the Midwest Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Overview Culvert Design Considerations Hydraulic Terms Culvert Impacts Low

More information

HISTORY OF CONSTRUCTION

HISTORY OF CONSTRUCTION HISTORY OF CONSTRUCTION CFR 257.73(c)(1) West Boiler Slag Pond Clifty Creek Plant Madison, Indiana October, 2016 Prepared for: Indiana Kentucky Electric Corporation Prepared by: American Electric Power

More information

APPENDIX J HYDROLOGY AND WATER QUALITY

APPENDIX J HYDROLOGY AND WATER QUALITY APPENDIX J HYDROLOGY AND WATER QUALITY J-1 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed / Preliminary Creek Constructed Natural Channel Culvert J-2 Preliminary

More information

Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods

Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods Gregory Richards, P.E., CFM, Gannett Fleming, Inc. Blake Tullis, Ph.D., Utah Water Research

More information

1 PIPESYS Application

1 PIPESYS Application PIPESYS Application 1-1 1 PIPESYS Application 1.1 Gas Condensate Gathering System In this PIPESYS Application, the performance of a small gascondensate gathering system is modelled. Figure 1.1 shows the

More information

Stormwater Management Pond Design Brief. Greely Village Centre - Commercial Phase - Ultimate Conditions - - City of Ottawa -

Stormwater Management Pond Design Brief. Greely Village Centre - Commercial Phase - Ultimate Conditions - - City of Ottawa - Stormwater Management Pond Design Brief Greely Village Centre - Commercial Phase - Ultimate Conditions - - City of Ottawa - December 2008 Ref: 647-07 J.F. Sabourin and Associates Inc. Water Resources and

More information

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan Assessment of Baseline Geomorphic Features at Proposed Stream Crossings On The Proposed County Road 595 Marquette County, Michigan Prepared for: Kennecott Eagle Minerals Company Marquette, Michigan Prepared

More information

St. Louis County, MN Coastal Hazard Analysis Flood Risk Review Meeting. May 2, 2018

St. Louis County, MN Coastal Hazard Analysis Flood Risk Review Meeting. May 2, 2018 St. Louis County, MN Coastal Hazard Analysis Flood Risk Review Meeting May 2, 2018 Agenda Introductions Coastal Flood Risk Study and Mapping Program Current Status Technical Overview of Study and Mapping

More information

Summary of HEC 18, Evaluating Scour at Bridges FHWA NHI Should really follow HEC 18, but this summary will get you the main points.

Summary of HEC 18, Evaluating Scour at Bridges FHWA NHI Should really follow HEC 18, but this summary will get you the main points. Summary of HEC 18, Evaluating Scour at Bridges FHWA NHI 01-001 Should really follow HEC 18, but this summary will get you the main points. 1: Determine scour analysis variables 2: Analyze long-term bed

More information

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 Plum Creek Floodwater Retarding Structure No. 6 is located in an area of Kyle, Texas, that is currently

More information

SELBY CREEK SILVERADO TRAIL CULVERT FISH PASSAGE ASSESSMENT

SELBY CREEK SILVERADO TRAIL CULVERT FISH PASSAGE ASSESSMENT SELBY CREEK SILVERADO TRAIL CULVERT FISH PASSAGE ASSESSMENT NAPA COUNTY, CALIFORNIA PREPARED BY NAPA COUNTY RESOURCE CONSERVATION DISTRICT 1303 JEFFERSON ST. SUITE 500B NAPA, CALIFORNIA 94559 WWW.NAPARCD.ORG

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY 1

TABLE OF CONTENTS EXECUTIVE SUMMARY 1 SLI Doc. No. 505573-3001-4HER-0001 00 12-Sept-2012 ii TABLE OF CONTENTS PAGE EXECUTIVE SUMMARY 1 1 INTRODUCTION... 3 2 OBJECTIVES... 5 3 WIND DATA... 6 3.1 Wind Rose... 7 4 SOCIÉTÉ D ÉNERGIE DE LA BAIE

More information

Bayfield & Ashland Counties, WI Coastal Hazard Analysis Flood Risk Review Meeting. June 05, 2018

Bayfield & Ashland Counties, WI Coastal Hazard Analysis Flood Risk Review Meeting. June 05, 2018 Bayfield & Ashland Counties, WI Coastal Hazard Analysis Flood Risk Review Meeting June 05, 2018 Agenda Introductions Coastal Flood Risk Study and Mapping Program Current Status Technical Overview of Study

More information

Cumberland River Flood Preparedness Mapping and Products

Cumberland River Flood Preparedness Mapping and Products Cumberland River Flood Preparedness Mapping and Products Barry P. Moran, P.E. Hydraulic Engineer Nashville District September 2013 US Army Corps of Engineers BUILDING STRONG Authority: As a result of the

More information

Door County, WI Coastal Hazard Analysis Flood Risk Review Meeting. August 21, 2017

Door County, WI Coastal Hazard Analysis Flood Risk Review Meeting. August 21, 2017 Door County, WI Coastal Hazard Analysis Flood Risk Review Meeting August 21, 2017 Agenda Introductions Coastal Flood Risk Study and Mapping Program Current Status Technical Overview of Study and Mapping

More information

PRELIMINARY RISK ASSESSMENT RIDM PROJECT FOR A DAM WITH A VEGETATION- LINED SPILLWAY AND FERC PILOT

PRELIMINARY RISK ASSESSMENT RIDM PROJECT FOR A DAM WITH A VEGETATION- LINED SPILLWAY AND FERC PILOT PRELIMINARY RISK ASSESSMENT FOR A DAM WITH A VEGETATION- LINED SPILLWAY AND FERC PILOT RIDM PROJECT MAY 3, 2018 DAVID S. BOWLES AND LOREN R. ANDERSON RAC ENGINEERS AND ECONOMISTS, LLC AND UTAH STATE UNIVERSITY

More information

APPENDIX C ESTIMATING SCOUR IN BOTTOMLESS ARCH CULVERTS

APPENDIX C ESTIMATING SCOUR IN BOTTOMLESS ARCH CULVERTS OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11, EVALUATING SCOUR AT BRIDGES APPENDIX C ESTIMATING SCOUR IN BOTTOMLESS ARCH CULVERTS APRIL 2011 APPENDIX C ESTIMATING SCOUR IN

More information

6.6 Gradually Varied Flow

6.6 Gradually Varied Flow 6.6 Gradually Varied Flow Non-uniform flow is a flow for which the depth of flow is varied. This varied flow can be either Gradually varied flow (GVF) or Rapidly varied flow (RVF). uch situations occur

More information

Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA

Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA Prepared For: Woodard & Curran 95 Cedar Street, Suite 100 Providence, RI 02903

More information

Consigned to the deep: requiem or recovery of VR2W receivers in a freshwater river gorge after a 1:2-3 3 year ARI flood

Consigned to the deep: requiem or recovery of VR2W receivers in a freshwater river gorge after a 1:2-3 3 year ARI flood Consigned to the deep: requiem or recovery of VR2W receivers in a freshwater river gorge after a 1:2-3 3 year ARI flood 1 Ivars Reinfelds, 2,3 Chris Walsh and 1 Tim Haeusler 1 Department of Water and Energy,

More information

WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS

WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS v. 8.4 WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS Objectives Define a conceptual schematic of the roadway, invert, and downstream

More information

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN SPALDING COUNTY, GEORGIA CHAPTER 4 4.0 CULVERT DESIGN... 4-1 4.1 INTRODUCTION... 4-1 4.2 SYMBOLS AND DEFINITIONS... 4-1 4.3 ENGINEERING DESIGN CRITERIA... 4-2 4.3.1 FREQUENCY FLOOD... 4-2 4.3.2 VELOCITY

More information

Presented by Fred Halterman, URS Jennie Agerton, URS

Presented by Fred Halterman, URS Jennie Agerton, URS Presented by Fred Halterman, URS Jennie Agerton, URS What is Eco Friendly Culvert Design? Culvert design that: Maintains connectivity for aquatic organism migration Maintains connectivity for gene flow

More information

HYDRAULIC JUMP AND WEIR FLOW

HYDRAULIC JUMP AND WEIR FLOW HYDRAULIC JUMP AND WEIR FLOW 1 Condition for formation of hydraulic jump When depth of flow is forced to change from a supercritical depth to a subcritical depth Or Froude number decreases from greater

More information

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING Rev. 18 Feb 2015 1 SBEACH Modeling 1.0 Introduction Following the methodology

More information

Modeling of Long Culverts and Stormdrains A Comparison of Different Methods

Modeling of Long Culverts and Stormdrains A Comparison of Different Methods Modeling of Long Culverts and Stormdrains A Comparison of Different Methods Shrinivas Kaulgud, P.E., CFM Cheryl Hannan, P.E., CFM, LEED AP October 12, 2017 Presentation Outline Introduction Case Studies

More information

Bay County, MI Coastal Hazard Analysis Flood Risk Review Meeting. May 14, 2018

Bay County, MI Coastal Hazard Analysis Flood Risk Review Meeting. May 14, 2018 Bay County, MI Coastal Hazard Analysis Flood Risk Review Meeting May 14, 2018 Agenda Introductions Coastal Flood Risk Study and Mapping Program Current Status Technical Overview of Study and Mapping Floodplain

More information

General Information for Culvert Design

General Information for Culvert Design Design Manual Chapter 2 - Stormwater 2E - Culvert Design 2E-1 General Information for Culvert Design A. Introduction A culvert is a conduit under an embankment that transports stormwater from one side

More information

Lower Churchill Management Corporation. Nalcor Doc. No. MFA-PT-MD-0000-EN-PL

Lower Churchill Management Corporation. Nalcor Doc. No. MFA-PT-MD-0000-EN-PL Lower Churchill Management Corporation Muskrat Falls Dam Related Emergency (Winter Headpond Construction Phase) Emergency Nalcor Doc. No. MFA-PT-MD-0000-EN-PL-0001-01 MFA-PT-MD-0000-EN-PL-0001-01 A4 1

More information

Free Surface Flow Simulation with ACUSIM in the Water Industry

Free Surface Flow Simulation with ACUSIM in the Water Industry Free Surface Flow Simulation with ACUSIM in the Water Industry Tuan Ta Research Scientist, Innovation, Thames Water Kempton Water Treatment Works, Innovation, Feltham Hill Road, Hanworth, TW13 6XH, UK.

More information

Chadbourne Dam Repair and Fish Barrier

Chadbourne Dam Repair and Fish Barrier Chadbourne Dam Repair and Fish Barrier Final Report for the Western Native Trout Initiative Prepared by: Carol Endicott Yellowstone Cutthroat Trout Conservation Biologist Montana Fish, Wildlife & Parks

More information

2016 NC Coastal Local Governments Annual Meeting

2016 NC Coastal Local Governments Annual Meeting 2016 NC Coastal Local Governments Annual Meeting Coastal Flood Study Modeling and Mapping 101 April 21, 2016 Tom Langan, PE, CFM Engineering Supervisor NCEM Floodplain Mapping Program FEMA Coastal Flood

More information

The Hydraulic Design of an Arced Labyrinth Weir at Isabella Dam

The Hydraulic Design of an Arced Labyrinth Weir at Isabella Dam Utah State University DigitalCommons@USU International Symposium on Hydraulic Structures Jun 28th, 1:30 PM The Hydraulic Design of an Arced Labyrinth Weir at Isabella Dam E. A. Thompson Sacramento District

More information

Modeling Historic Columbia River Flood Impacts

Modeling Historic Columbia River Flood Impacts Modeling Historic Columbia River Flood Impacts Columbia River Estuary Workshop May 30, 2014 Present by: Lumas Helaire; Graduate Student, Portland State University Andrew Mahedy; Graduate Student, Portland

More information

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd.

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd. Indiana LTAP Road Scholar Core Course #10 Culvert Drainage Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd. Objectives Review culvert shapes, end sections, and materials

More information

What Happens Downstream Stays Downstream, or Does It? Potential Failure Modes from Spillway Exit Flows

What Happens Downstream Stays Downstream, or Does It? Potential Failure Modes from Spillway Exit Flows What Happens Downstream Stays Downstream, or Does It? Potential Failure Modes from Spillway Exit Flows Gregory Richards, P.E., CFM, Gannett Fleming, Inc. Paul Schweiger, P.E., CFM, Gannett Fleming, Inc.

More information

Coquitlam/Buntzen Project Water Use Plan

Coquitlam/Buntzen Project Water Use Plan Coquitlam/Buntzen Project Water Use Plan Temperature Monitoring Lower Coquitlam River Project Year 3 Report Reference: COQMON#6 Study Period: March 2008 April 2009 Report Date: April 2009 Trow Associates

More information

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011 APPENDIX C VEGETATED EMERGENCY SPILLWAY VERSION 1.0 March 1, 2011 [NOTE: Could use a better photo more clearly showing the emergency spillway in the context of the dam.] SECTION C-1: DESCRIPTION OF PRACTICE

More information

Baraga County, MI Coastal Hazard Analysis Flood Risk Review Meeting. July 12, 2018

Baraga County, MI Coastal Hazard Analysis Flood Risk Review Meeting. July 12, 2018 Baraga County, MI Coastal Hazard Analysis Flood Risk Review Meeting July 12, 2018 Agenda Introductions Coastal Flood Risk Study and Mapping Program Current Status Technical Overview of Study and Mapping

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Check Dams DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] Though not generally considered

More information

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer Washington State Fish Passage Barrier Removal Projects Casey Kramer, PE WSDOT State Hydraulics Engineer 2014 National Hydraulic Engineering Conference Iowa City, IA August 20 th, 2014 WSDOT Fish Passage

More information

Hydrologic, Hydraulic and Geomorphic Technical Memorandum

Hydrologic, Hydraulic and Geomorphic Technical Memorandum Appendix A Hydrologic, Hydraulic and Geomorphic Technical Memorandum 01054/8410233/14/Rohner_Alt_Analysis_Report Rohner Creek Flood Control, Habitat and Seismic Improvement Project Alternatives Analysis

More information

WOODFIBRE LNG VESSEL WAKE ASSESSMENT

WOODFIBRE LNG VESSEL WAKE ASSESSMENT Woodfibre LNG Limited WOODFIBRE LNG VESSEL WAKE ASSESSMENT Introduction Woodfibre LNG Limited (WLNG) intends to build a new LNG export terminal at Woodfibre, Howe Sound, British Columbia. WLNG has engaged

More information

Rock Ramp Design Guidelines. David Mooney MS Chris Holmquist-Johnson MS Drew Baird Ph.D. P.E. Kent Collins P.E.

Rock Ramp Design Guidelines. David Mooney MS Chris Holmquist-Johnson MS Drew Baird Ph.D. P.E. Kent Collins P.E. Rock Ramp Design Guidelines David Mooney MS Chris Holmquist-Johnson MS Drew Baird Ph.D. P.E. Kent Collins P.E. Rock Ramp Design Guidelines OUTLINE Local and System Interactions with Rock Ramps Ramp Geometry

More information

Massachusetts Stream Crossing Case Studies

Massachusetts Stream Crossing Case Studies Massachusetts Stream Crossing Case Studies Amy Singler Associate Director, River Restoration Program Carrie Banks River Continuity Coordinator Case Studies: Public Benefits: Movement of goods and people

More information

Emergency Preparedness and Response plan

Emergency Preparedness and Response plan Emergency Preparedness and Response plan Extracted from: Operation, Maintenance and Surveillance Manual ; Section 9 Prepared by BGC, June 31, 013 Document No. HMLOMS_RO_3107013 Submitted to MEM August

More information

Dam Modification Report Stingy Run Fly Ash Reservoir Appendix E Spillway System Design Calculations E1: Spillway/Energy Dissipater Design for 100-year Event CHE8273 8 September 4, 2014 Written by: CJW

More information

Lower Coquitlam River Project Water Use Plan. Temperature Monitoring Lower Coquitlam River Project Year 2 Report

Lower Coquitlam River Project Water Use Plan. Temperature Monitoring Lower Coquitlam River Project Year 2 Report Lower Coquitlam River Project Water Use Plan Temperature Monitoring Lower Coquitlam River Project Year 2 Report COQMON#6 Temperature Monitoring Study Lower Coquitlam River Study Period: Year 2-2007 Report

More information

Lower Mekong Basin. John G. Williams. Petrolia, California.

Lower Mekong Basin. John G. Williams. Petrolia, California. Technical Comment on Sabo et al. Designing river flows to improve food security futures in the Lower Mekong Basin John G. Williams Petrolia, California jgwill@frontiernet.net Abstract: Sabo et al. (1)

More information

Structure and discharge test cases

Structure and discharge test cases Chapter 28 Structure and discharge test cases 28.1 Introduction Three test case have been implemented to test the performance and applicability of the structures and discharges modules. drythin Simulates

More information

Exercise (4): Open Channel Flow - Gradually Varied Flow

Exercise (4): Open Channel Flow - Gradually Varied Flow Exercise (4): Open Channel Flow - Gradually Varied Flow 1) A wide channel consists of three long reaches and has two gates located midway of the first and last reaches. The bed slopes for the three reaches

More information

Spillway Design for Small Dams

Spillway Design for Small Dams Spillway Design for Small Dams by David E. Fantina, PE Introduction: This course presents an overview of the features that go into the design of spillways for small dams. Small dams in this course refer

More information

+)) Lower Churchill Project RIPRAP DESIGN FOR WIND-GENERATED WAVES SNC LAVALIN. SLI Document No HER

+)) Lower Churchill Project RIPRAP DESIGN FOR WIND-GENERATED WAVES SNC LAVALIN. SLI Document No HER +)) SNC LAVALIN Lower Churchill Project RIPRAP DESIGN FOR SLI Document No. 505573-3001-4HER-0011-00 Nalcor Reference No. MFA-SN-CD-0000-CV-RP-0006-01 Rev. 81 Date: 07 -Dec-2012 Prepared by: Checked by:

More information

Rideau Valley Conservation Authority 3889 Rideau Valley Drive, PO Box 599, Manotick, Ontario, Canada

Rideau Valley Conservation Authority 3889 Rideau Valley Drive, PO Box 599, Manotick, Ontario, Canada Rideau Valley Conservation Authority 39 Rideau Valley Drive, PO Box 599, Manotick, Ontario, Canada 613-692-3571 www.rvca.ca Technical Memorandum July 17, 217 Subject: Lead Investigator: Rideau River Flood

More information

Evaluating Surge Potential in CSO Tunnels

Evaluating Surge Potential in CSO Tunnels 14 Evaluating Surge Potential in CSO Tunnels Karen E. Ridgway Tunnels are being proposed to control combined sewer overflow (CSO) in numerous cities in the United States and Canada. The tunnels are intended

More information

COLUMBIA LAKE DAM REMOVAL PROJECT

COLUMBIA LAKE DAM REMOVAL PROJECT COLUMBIA LAKE DAM REMOVAL PROJECT Major Goals of the Columbia Lake Dam Removal: Reconnect 10 miles of the Paulins Kill River to the Delaware River, restoring natural flow regime and sediment transport.

More information

SEA LEVEL RISE IMPACT ASSESSMENT AND MITIGATION ALTERNATIVES DEVELOPMENT FOR BALBOA ISLANDS, CITY OF NEWPORT BEACH, CALIFORNIA

SEA LEVEL RISE IMPACT ASSESSMENT AND MITIGATION ALTERNATIVES DEVELOPMENT FOR BALBOA ISLANDS, CITY OF NEWPORT BEACH, CALIFORNIA SEA LEVEL RISE IMPACT ASSESSMENT AND MITIGATION ALTERNATIVES DEVELOPMENT FOR BALBOA ISLANDS, CITY OF NEWPORT BEACH, CALIFORNIA Ying Poon 1, Brett Sanders 2, Randy Mason 3 and Robert Stein 4 The City of

More information

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8 Seventeenth Statewide Conference on Local Bridges Culvert Design An Overview of the NYS Highway Design Manual Chapter 8 Tuesday, October 25, 2011 Training Session: Culvert Design, Analysis - talk 2 Presented

More information

Gerald D. Anderson. Education Technical Specialist

Gerald D. Anderson. Education Technical Specialist Gerald D. Anderson Education Technical Specialist The factors which influence selection of equipment for a liquid level control loop interact significantly. Analyses of these factors and their interactions

More information

Hydraulic Modeling of Stream Enhancement Methods

Hydraulic Modeling of Stream Enhancement Methods Hydraulic Modeling of Stream Enhancement Methods Matthew J. Curry John J. Levitsky Abstract Development within watersheds increases the amounts of runoff causing stream erosion and degradation of stream

More information

Stormwater Management Report for the Macri Dixon Condo Block

Stormwater Management Report for the Macri Dixon Condo Block for the Macri Dixon Condo Block Town of Milton February 2017 JFSA Ref. No.: 1287-15 Prepared for : Prepared by : David Schaeffer Engineering Ltd. 52 Springbrook Drive, Ottawa, ON K2S 1B9 tel.: 613.836.3884,

More information

Technical Report Culvert A Hydraulic Analysis

Technical Report Culvert A Hydraulic Analysis DATE: November 3, 2011 Technical Report Culvert A Hydraulic Analysis TO: FROM: RE: Jim Reiser, P.E. Project Manager Parsons Brinckerhoff, Inc. Kurt Killian, P.E., CFM Parsons Brinckerhoff, Inc. Design

More information

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati Module - 4 Hydraulic Jumps Lecture - 1 Rapidly Varied Flow- Introduction Welcome

More information

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION Abstract Lonie I * Tailings and Dams, GHD Brisbane, QLD, Australia Queensland Alumina Limited operates

More information

Evaluating the Spillway Capacity of the Morning Glory Spillway at Harriman Dam

Evaluating the Spillway Capacity of the Morning Glory Spillway at Harriman Dam Evaluating the Spillway Capacity of the Morning Glory Spillway at Harriman Dam Damian M. Gomez, P.E., CFM, Gomez and Sullivan Engineers, D.P.C. Dan Gessler, Ph.D., P.E., D.WRE, Alden Research Laboratory,

More information

Columbia Lake Dam Removal Project

Columbia Lake Dam Removal Project Columbia Lake Dam Removal Project The Columbia Lake dam located 1/4 mile upstream of the Paulins Kill River's confluence with the Delaware River in Knowlton Township, Warren County has been proposed for

More information

SPILLWAY REPLACEMENT PROJECT NUMERICAL AND PHYSICAL MODELING. Kara Hurtig, Water Resources Engineer, Northwest Hydraulic Consultants, BC, Canada

SPILLWAY REPLACEMENT PROJECT NUMERICAL AND PHYSICAL MODELING. Kara Hurtig, Water Resources Engineer, Northwest Hydraulic Consultants, BC, Canada POINTE DU BOIS GENERATING STATION SPILLWAY REPLACEMENT PROJECT NUMERICAL AND PHYSICAL MODELING Kara Hurtig, Water Resources Engineer, Northwest Hydraulic Consultants, BC, Canada David S. Brown, Senior

More information

Exercise (3): Open Channel Flow Rapidly Varied Flow

Exercise (3): Open Channel Flow Rapidly Varied Flow Exercise (3): Open Channel Flow Rapidly Varied Flow 1) A hydraulic jump exists in a trapezoidal channel having a bed width of 7 m and side slope of 1:1. The flowing discharge is 25 m 3 /sec. Construct

More information

Fish Habitat Restoration and Monitoring in Southeast Washington. Andy Hill Eco Logical Research, Inc.

Fish Habitat Restoration and Monitoring in Southeast Washington. Andy Hill Eco Logical Research, Inc. Fish Habitat Restoration and Monitoring in Southeast Washington Andy Hill Eco Logical Research, Inc. Fish Habitat Restoration and Monitoring in Southeast Washington Talk overview: Restoration projects

More information

DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN

DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN Elsa Alves *, Felix Hernando and Rafael Chacón * Laboratório Nacional de Engenharia Civil (LNEC) Av. do Brasil, 101, 1700-066 Lisboa, Portugal

More information

CHAPTER 5 CULVERT DESIGN

CHAPTER 5 CULVERT DESIGN CHAPTER 5 CULVERT DESIGN HYDRAULICS OF CULVERTS There are two major types of culvert flow: 1) flow with inlet control, and 2) flow with outlet control. For each type, different factors and formulas are

More information

Discussion on the Selection of the Recommended Fish Passage Design Discharge

Discussion on the Selection of the Recommended Fish Passage Design Discharge Discussion on the Selection of the Recommended Fish Passage Design Discharge Introduction The provision of fish passage is a requirement for most proposed culvert and bridge installations in Alberta, depending

More information

Khosla's theory. After studying a lot of dam failure constructed based on Bligh s theory, Khosla came out with the following;

Khosla's theory. After studying a lot of dam failure constructed based on Bligh s theory, Khosla came out with the following; Khosla's theory After studying a lot of dam failure constructed based on Bligh s theory, Khosla came out with the following; Following are some of the main points from Khosla's Theory From observation

More information

Existing vs. Purpose-built Barriers for Sea Lamprey Control

Existing vs. Purpose-built Barriers for Sea Lamprey Control Existing vs. Purpose-built Barriers for Sea Lamprey Control Existing Structures were originally built for purposes other than blocking sea lamprey and are important to sea lamprey control and are more

More information

Skagit River Historical Flood Elevations and Peak Flow Estimates

Skagit River Historical Flood Elevations and Peak Flow Estimates Skagit River Historical Flood Elevations and Peak Flow Estimates to be presented at Skagit River GI H&H Technical Workshop Wednesday, June 17, 2009 Background Corps of Engineers began a General Investigation

More information

Simulating Streams Through Culverts in Mat-Su, Alaska

Simulating Streams Through Culverts in Mat-Su, Alaska Simulating Streams Through Culverts in Mat-Su, Alaska Project Managers Bill Rice, P.E., USFWS Hydrologist Mary Price, USFWS Fishery Biologist The Team Approach US Fish and Wildlife Service Bill Rice, P.E.,

More information

Experimental Investigation on Changes of Water Surface Profile with Gaussian Shaped Bottom and Side Roughness

Experimental Investigation on Changes of Water Surface Profile with Gaussian Shaped Bottom and Side Roughness Experimental Investigation on Changes of Water Surface Profile with Gaussian Shaped Bottom and Side Md. Rafiue Islam a, Shariful Islam b*, Md. Abdul Qaiyum Talukder c, S. M. Rezwan Hossain d Abstract Bed

More information

Figure 1 - Photo of Surveyed Area. Figure 2 - Void Survey Results

Figure 1 - Photo of Surveyed Area. Figure 2 - Void Survey Results We have received the first PRELIMINARY results from several tests (science) conducted on the dam area. Per the engineers they are still refining the depths of the void areas (holes under the concrete areas).

More information

LiDAR FOA vs. IfSAR FOA: A Case Study for Base Level Engineering (formerly First Order Approximation)

LiDAR FOA vs. IfSAR FOA: A Case Study for Base Level Engineering (formerly First Order Approximation) LiDAR FOA vs. IfSAR FOA: A Case Study for Base Level Engineering (formerly First Order Approximation) Thuy Patton, CFM, Colorado Water Conservation Board John Loranger, PE, CFM AMEC Foster Wheeler ASFPM

More information

4.6 MODELING COASTAL RIVERS OPERATIONALLY: A CASE STUDY OF THE ST. JOHNS RIVER, FLA.

4.6 MODELING COASTAL RIVERS OPERATIONALLY: A CASE STUDY OF THE ST. JOHNS RIVER, FLA. 4.6 MODELING COASTAL RIVERS OPERATIONALLY: A CASE STUDY OF THE ST. JOHNS RIVER, FLA. Reggina Cabrera Garza 1, Janice Sylvestre 2, and Michael Watts 2 1 NOAA, National Weather Service, Southeast River Forecast

More information

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS. 7E-12 Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures Sediment Basin BENEFITS Flow Control Erosion Control Sediment Control Runoff Reduction Flow Diversion

More information

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection TOPIC: COMMON PROBLEMS FOR SMALL DAMS WITH CONCRETE CHANNEL SPILLWAYS The State Dam Safety Program has inspection requirements for state regulated dams. A dam, like any man-made structure, will change

More information

ANSWERS TO QUESTIONS IN THE NOTES AUTUMN 2018

ANSWERS TO QUESTIONS IN THE NOTES AUTUMN 2018 ANSWERS TO QUESTIONS IN THE NOTES AUTUMN 2018 Section 1.2 Example. The discharge in a channel with bottom width 3 m is 12 m 3 s 1. If Manning s n is 0.013 m -1/3 s and the streamwise slope is 1 in 200,

More information

Response of a Newly Created Marsh-Wetland Affected by Tidal Forcing, Upland Discharge, and Groundwater Interaction

Response of a Newly Created Marsh-Wetland Affected by Tidal Forcing, Upland Discharge, and Groundwater Interaction Response of a Newly Created Marsh-Wetland Affected by Tidal Forcing, Upland Discharge, and Groundwater Interaction Mouth of Columbia River, Cape Disappointment State Park, Washington 12 Hans R. Moritz

More information

APPENDIX C. Fluvial and Tidal Hydraulics Report

APPENDIX C. Fluvial and Tidal Hydraulics Report APPENDIX C Fluvial and Tidal Hydraulics Report BUENA VISTA LAGOON ENHANCEMENT PROJECT FLUVIAL AND TIDAL HYDRAULICS ANALYSES Prepared for: SANDAG 401 B Street, Suite 800 San Diego, California 92101 Contact:

More information