Approved by Principal Investigator Date: Approved by Super User: Date:

Size: px
Start display at page:

Download "Approved by Principal Investigator Date: Approved by Super User: Date:"

Transcription

1 Approved by Principal Investigator Date: Approved by Super User: Date: Standard Operating Procedure BNC Commonwealth Dual Ion Beam Deposition System (CDIBS) Version 2010 February 14 I. Purpose This Standard Operating Procedure (SOP) outlines requirements to be considered by an authorized user of the CDIBS as well as describes the normal operation of the CDIBS and any hazards that may be encountered during normal operation. Finally, the SOP explains how to minimize any hazards and how to respond in an emergency situation. This document is to be reviewed one year from the date of approval or as conditions warrant, whichever is the shorter time period. II. Personnel A. Authorized Personnel: The CDIBS may be operated only by authorized personnel who are fully cognizant of all safety issues involved in the operation of such a device. These personnel are to ensure that the CDIBS is only operated in the manner laid out in this document. To become an authorized user, one must: 1. Complete Environment, Health & Safety (EH&S) training class. 2. Complete BNC Safety Orientation. 3. Read and fully understand the SOP 4. Receive training on the CDIBS by an authorized user. 5. Sign the authorized user sheet to affirm that the above steps have been completed.

2 B. Unauthorized personnel: No unauthorized personnel may enter the BNC clean room facility unless accompanied by an authorized user. All visitors must be briefed on proper safety protocol and must wear appropriate protective eyewear located on the premises. III. Hazards A. Electrical Hazards: electrical shock or electrocution could result from direct contact with high voltage. Such hazards are typically interlocked by the CDIBS system. High voltage RF electrode and conductors are located inside the CDIBS system chassis. In addition, the external high power supply unit has connections behind the power supply chassis. Do not disconnect the external power lines. Use normal precautions with external house (110VAC) and three phase (208VAC) connections behind the CDIBS chassis and service corridor. B. Chemical: Bottled gases are used with the CDIBS. Do not disconnect or tamper with gas lines behind the CDIBS. C. Pressure Hazards: Pressurized bottled and house gases are used with the CDIBS. Do not disconnect or tamper with gas lines behind the CDIBS. Contact lab management for information. D. Other: Optical radiation is generated and emitted through the CDIBS chamber viewing port. Wear protective eye wear is not required when looking through the chamber view port. However, it is a requirement when working within the clean room laboratory. IV. Hazard Controls A. Electrical 1. Enclosures for protection against the high voltages of the CDIBS or high voltage power supply may only be removed after the power supply has been unplugged from the outlets and after following the safety procedures outlined in the safety and operations manual provided by the manufacturer. 2. Only qualified personnel may perform all internal maintenance to the CDIBS and more than one user must be present when performing said maintenance. 3. Every portion of the electrical system, including the printed circuit cards, should be assumed to be at dangerous voltage level. B. Chemical and Pressure Standard Operating Procedure BNC CDIBS 2

3 1. Enclosures for protection against valves and internal gas plumbing may only be removed after the system has been turned off and gases have been valve off and relieved of line pressure. C. Other 2. Only qualified personnel may perform all internal gas maintenance to the CDIBS and more than one user must be present when performing said maintenance. 1. Proper eye protection must be worn at all times in the clean room and while operating the CDIBS. V. Normal Operation A. Inspect all electrical and water connections for damage and connectivity. B. Complete the check-in log. Write in the log book your name, date, and process used or maintenance done. C. Introduction The left side of the system is used for ion milling (etching) to remove material from a wafer. The right side of the system mills a selected target, resulting in sputter deposition on a wafer. The respective target can be selected from one of 4 available or a new target mounted in one of the available four positions. For the ease of maintenance, targets should be changed infrequently. Chromium or Titanium, typically used as an adhesion layer, a masking layer, and conduction layer, is normally installed. Gold is normally installed. Nickel, used along with Chromium and gold for adhesion, is also normally installed. D. Operation of the Deposition (Right) Side In many of the steps given below, the exact order of execution does not matter. However, they are provided as to give the novice user a start. D.1. Sign into the Log Book. Make sure all electrical breakers supplying power to the system are turned on. There is a small switch panel on the front of the system (see Picture). It is labeled Vacuum Pump. Turn ON the vacuum pump switch (the pump should turn on in the service corridor). Standard Operating Procedure BNC CDIBS 3

4 D.2. Turn on the gas supply. The Argon tank is located in the service corridor. Open valve on tank and regulator. The pressure is preset to 4 to 5 PSI such that the flow rate and hence the pressure will be correct during operation. D.3. Close the Cryo main gate valve and Vent the chamber. The system is normally left in high vac (with the cryo pump gate valve open). Close HI VAC (Closing the cryo gate valve) by moving the switch to the center position. The light will turn off and the valve motion operation can be heard. Wait until audible motion has ceased. Turn on the VENT by pushing the switch up, allowing nitrogen to fill the chamber. Wait approximately one minute until the pressure inside reaches atmospheric pressure, allowing the chamber door to be opened. The nitrogen can be left on or turned off while the chamber is open. D.4. Remove Target Lids. Wear gloves when working inside the chamber to keep it clean (skin is oily, salty, and sheds particles). Remove the lids from the targets that will be used. With a screw driver, loosen each of the two clamp screw slightly. Swing the clamps just out of the way of the target. Tighten the clamps back down. Finally, remove the lid. Ensure that target block rotates freely if more than one target will be used. Each target has a number. When viewed from the back side of the chamber where rotation is done, the target in use is at the upper left (which is the upper right when viewed from the door side). Presently target 1 is, Target 2 is Cr, Target 3 is Ni, Target 4 is Au. To rotate the target block, pull the large black knurled knob out about a half inch (pass the shiny positioning stopper), rotate in increments of 90 degrees to arrive at the appropriate target of interest, and push the knob back in. D.5. Mount Wafer on Rotating Stage. Place a wafer on the stage (chuck), holding it so that it does not slide off. Use the four spring clips on the chuck to secure the wafer. Ensure that the clips do not protrude so far Standard Operating Procedure BNC CDIBS 4

5 below the chuck that they interfere with chuck rotation. This can be checked by turning the stage rotation and observing it. Leave the wafer surface upward (at 0 degrees) at this time. Turn on the stage rotation. D.6. Pump the Chamber Down. Before closing the door, check that the stage will not bump the chamber wall. Close the door ensuring that it touches the chamber around the entire perimeter. The O- ring on the chamber door must be flush against the chamber wall. Due to the double hinge design, it may take some force to get the door properly positioned. Turn the nitrogen vent off if it is not already off. Open the roughing pump (Rough) valve (switch up). The light goes on. Let the chamber pump down to just 40 mtorr on the thermo couple gauge (TC1), then close the roughing valve (switch in center). This takes about 2 minutes. Don t leave the roughing valve open below 40 mtorr for very long as back streaming of the roughing pump oil into the chamber can occur. This will be evident if your films will not adhere to the wafers. Open the high vac (cryo) valve (switch up). The light goes on. The pressure on the thermocouple gauge should rapidly fall to near zero. Check the temperature on the cryo pump. It should be around 15K. If not, pumping will be slower and the cryo may need regeneration. Turn on the ion gauge, it is not on already. Degas it for up to 1 minute if desired. Let the chamber pump to below 2x10-5 Torr. This may take about 5 minutes. Record the exact time in the log book. D.7. Set Stage Arm Alignment Move the stage arm such that the vertical mark on center of the window, the left side of the stage, and the vertical mark on the back wall of the chamber are aligned. This centers the wafer over the target. A flash light is needed (alternatively, do it when the gun is on for better lighting). Close the covers on the windows such that the film being deposited does not also deposit on the windows. D.8. Cooling water The cooling water should be on continuously. The valves for the cooling water are located in the service corridor. D.11. Turn on Fans and Gas (Right Side) Standard Operating Procedure BNC CDIBS 5

6 Push the FANS button. This turns on the cooling fans to the deposition gun. The gas controls are located on the chamber front lower panel. There are 6 knobs, 4 toggle switches, and one meter. The meter reads in SCCM. The gas flow controller is setup as follows: Channel A is the main gas flow control from the cylinder. Channel B is the gas directed to the deposition ion gun. Channel C is the gas directed to the etching ion gun. Channel D is not connected. Determine whether you are going to etch only, deposit only, or both etch and deposit. If you already know your exact gas flows from previous work, set them up now. Set your gas flows and flip on the required gas switches as shown in figure above. Select the following combinations: A and B for deposition only, A and C for etching only, or A, B, and C for a combination ion gun assisted deposition. Set the cal/set/read dial knob to SET. Use the respective gas regulator knob for the particular selection to set the flows. Since the chamber is at the scale of 10-5 to 10-7 torr, the chamber pressure should rise rapidly, stabilizing at approximately 3 x 10-4 torr. This should take less than a minute to stabilize. If the chamber does not stabilize, check if the gas cylinder regulator is set to 4 PSI. If not, set cylinder pressure accordingly. Let the gas flow for 3 minutes for the first deposition of the day and 1 minute thereafter. This helps flush out water vapor and other contaminants that would not be desirable in the film. Change the Cal/Set/Read knob to READ for monitoring the respective gas flows. D.12. Ion Gun Operation for Deposition D.12.1 The Cathode Module is a current regulated supply that provides power to the ion source system s cathode filament. The filament, in combination with the anode and chamber pressure, initiates and controls the ion beam current. If the beam current decreases, the cathode inverter must be adjusted to increase the filament current in order to maintain the proper beam current. If the beam current increases, the cathode filament current must decrease. Standard Operating Procedure BNC CDIBS 6

7 D.12.3 The Discharge Module is a voltage regulated supply that provides energy for the ionization process. The ionization process is controlled by the emission of electrons from the cathode filament. The emission is controlled by the cathode filament current. The source of electrons for the emission is the negative terminal of the discharge inverter, which is connected to the center tap of the cathode inverter. The positive terminal of the discharge inverter is connected to the positive terminal of the beam inverter and the ion source system s anode to provide a path for electron flow back to the discharge inverter. If the discharge current decreases, the cathode inverter module must be adjusted to increase the cathode filament current, which will in turn increase the discharge current. D.12.4 The Beam Module is a voltage regulated supply that provides voltage and current for the ion beam. The beam inverter maintains beam voltage; however, the beam current is dependent upon the cathode filament current, as discussed, above under Cathode Module. D.12.5 The Accelerator Module is a voltage regulated supply that provides power to the accelerator grid, which focuses the ion beam. The accelerator voltage is typically set for minimum accelerator current. Consequently, this is the lowest power inverter in the system. D.12.6 The Neutralizer Module is a current regulated supply that provides electron emission (neutralizer emission current) from a hot filament. The emission neutralizes the space charge for the ion beam. As a result, the neutralizer emission current must be approximately equal to the beam current. If the neutralizer emission decreases, the neutralizer module must be adjusted to increase the neutralizer filament current in order to maintain the desired balance between the neutralizer emission current and the beam current. Typical Deposition Gun Readings Magnet Glow Cathode Accelerator Extractor Self Bias Neutralizer 3.2A 3.0A 11.0A 200mA <30mA @300V Off Off D.13. Target Cleaning. The wafer should be still facing up, away from the target, to avoid direct material deposition on the wafer. Stage rotation should be on. Sputter clean the first target for up to 5 minutes, depending on the material and previous use. (Gold does not oxidize and should only have some adsorbed species on it. A 1 minute clean on the gold target is sufficient. Chromium oxidizes rapidly and requires a 3 minute clean. Standard Operating Procedure BNC CDIBS 7

8 D.14. Deposit Film. Rotate the wafer such that it is facing down (tilt 180 degrees). Deposit the desired time then turn the wafer back up (tilt 0 degrees). Make sure that the wafer does not touch the target. D.15. Turn Off the Gun. If necessary, turn down all the settings to zero. Push the GUN button to turn it off. Let the fans run for 10% of the total gun-on time for cooling. D.16. More Depositions As Desired. Rotate to the next target and Deposit per D.14. D.17. Cool, Turn Off the Fans, and Gas. Let the fans run for 10% of the total gun-on time for cooling. Push the FANS button to turn off the fans. Turn off the gas on the regulator switches. The pressure on the ion gauge should rapidly drop and return to the 10-6 to 10-7 torr range. D.18. Turn Off the Stage. Turn off the Stage Switch. D.19. Vent. Turn off HI VAC. Wait for the gate valve to close. Turn on VENT. Remove wafers when vented. D.20. Pump Down the Chamber, Leave un High Vacuum. Close the door, ensuring that it touches the chamber around the entire perimeter. Turn the nitrogen VENT off, it it is not already off Open the roughing pump (ROUGH) valve (switch up). The light goes on. Let the chamber pump down to just below 40 mtorr on the thermocouple gauge (TC1 on the right side rack), then close the roughing valve (switch in center). Open the high vacuum (cryo) valve (switch up). The light goes on. The pressure on the thermocouple gauge should rapidly fall to zero. Leave the system in this state. D.21. Turn off the Gas Supply Close the hand valve on the Argon tank. Standard Operating Procedure BNC CDIBS 8

9 E. Operation of the Ion Mill (Left) Side In many of the steps given below, the exact order of execution does not matter. However, they are provided as to give the novice user a start. E.1. Sign into the Log Book. Make sure all electrical breakers supplying power to the system are turned on. There is a small switch panel on the front of the system (see Picture). It is labeled Vacuum Pump. Turn ON the vacuum pump switch (the pump should turn on in the service corridor). E.2. Turn on the gas supply. The Argon tank is located in the service corridor. Open valve on tank and regulator. The pressure is preset to 4 to 5 PSI such that the flow rate and hence the pressure will be correct during operation. E.3. Close the Cryo main gate valve and Vent the chamber. The system is normally left in high vac (with the cryo pump gate valve open). Close HI VAC (Closing the cryo gate valve) by moving the switch to the center position. The light will turn off and the valve motion operation can be heard. Wait until audible motion has ceased. Turn on the VENT by pushing the switch up, allowing nitrogen to fill the chamber. Wait approximately one minute until the pressure inside reaches atmospheric pressure, allowing the chamber door to be opened. The nitrogen can be left on or turned off while the chamber is open. E.4. Check Target Lids. Wear gloves when working inside the chamber to keep it clean (skin is oily, salty, and sheds particles). Lids should be covering each target. At least check that the selected or exposed target is covered such that sputtered material does not coat it. E.5. Mount Wafer on Rotating Stage. Standard Operating Procedure BNC CDIBS 9

10 Place a wafer on the stage (chuck), holding it so that it does not slide off. Use the four spring clips on the chuck to secure the wafer. Ensure that the clips do not protrude so far below the chuck that they interfere with chuck rotation. This can be checked by turning the stage rotation and observing it. Leave the wafer surface upward (at 0 degrees) at this time. Turn on the stage rotation. E.6. Pump the Chamber Down. Before closing the door, check that the stage will not bump the chamber wall. Close the door ensuring that it touches the chamber around the entire perimeter. The O- ring on the chamber door must be flush against the chamber wall. Due to the double hinge design, it may take some force to get the door properly positioned. Turn the nitrogen vent off if it is not already off. Open the roughing pump (Rough) valve (switch up). The light goes on. Let the chamber pump down to just 40 mtorr on the thermo couple gauge (TC1), then close the roughing valve (switch in center). This takes about 2 minutes. Don t leave the roughing valve open below 40 mtorr for very long as back streaming of the roughing pump oil into the chamber can occur. This will be evident if your films will not adhere to the wafers. Open the high vac (cryo) valve (switch up). The light goes on. The pressure on the thermocouple gauge should rapidly fall to near zero. Check the temperature on the cryo pump. It should be around 15K. If not, pumping will be slower and the cryo may need regeneration. Turn on the ion gauge, it is not on already. Degas it for up to 1 minute if desired. Let the chamber pump to below 2x10-5 Torr. This may take about 5 minutes. Record the exact time in the log book. E.7. Set Stage Arm Alignment Move the stage arm such that the vertical mark on center of the window, the left side of the stage, and the vertical mark on the back wall of the chamber are aligned. This centers the wafer over the target. A flash light is needed (alternatively, do it when the gun is on for better lighting). Close the covers on the windows such that the film being deposited does not also deposit on the windows. E.8. Cooling water Standard Operating Procedure BNC CDIBS 10

11 The cooling water should be on continuously. The valves for the cooling water are located in the service corridor. E.11. Turn on Fans and Gas (Left Side) Push the FANS button. This turns on the cooling fans to the deposition gun. The gas controls are located on the chamber front lower panel. There are 6 knobs, 4 toggle switches, and one meter. The meter reads in SCCM. The gas flow controller is setup as follows: Channel A is the main gas flow control from the cylinder. Channel B is the gas directed to the deposition ion gun. Channel C is the gas directed to the etching ion gun. Channel D is not connected. Determine whether you are going to etch only, deposit only, or both etch and deposit. If you already know your exact gas flows from previous work, set them up now. Set your gas flows and flip on the required gas switches as shown in figure above. Select the following combinations: A and B for deposition only, A and C for etching only, or A, B, and C for a combination ion gun assisted deposition. Set the cal/set/read dial knob to SET. Use the respective gas regulator knob for the particular selection to set the flows. Since the chamber is at the scale of 10-5 to 10-7 torr, the chamber pressure should rise rapidly, stabilizing at approximately 3 x 10-4 torr. This should take less than a minute to stabilize. If the chamber does not stabilize, check if the gas cylinder regulator is set to 4 PSI. If not, set cylinder pressure accordingly. Let the gas flow for 3 minutes for the first deposition of the day and 1 minute thereafter. This helps flush out water vapor and other contaminants that would not be desirable in the film. Change the Cal/Set/Read knob to READ for monitoring the respective gas flows. E.12. Ion Gun Operation for Milling Standard Operating Procedure BNC CDIBS 11

12 E.12.1 The Cathode Module is a current regulated supply that provides power to the ion source system s cathode filament. The filament, in combination with the anode and chamber pressure, initiates and controls the ion beam current. If the beam current decreases, the cathode inverter must be adjusted to increase the filament current in order to maintain the proper beam current. If the beam current increases, the cathode filament current must decrease. E.12.3 The Discharge Module is a voltage regulated supply that provides energy for the ionization process. The ionization process is controlled by the emission of electrons from the cathode filament. The emission is controlled by the cathode filament current. The source of electrons for the emission is the negative terminal of the discharge inverter, which is connected to the center tap of the cathode inverter. The positive terminal of the discharge inverter is connected to the positive terminal of the beam inverter and the ion source system s anode to provide a path for electron flow back to the discharge inverter. If the discharge current decreases, the cathode inverter module must be adjusted to increase the cathode filament current, which will in turn increase the discharge current. E.12.4 The Beam Module is a voltage regulated supply that provides voltage and current for the ion beam. The beam inverter maintains beam voltage; however, the beam current is dependent upon the cathode filament current, as discussed, above under Cathode Module. E.12.5 The Accelerator Module is a voltage regulated supply that provides power to the accelerator grid, which focuses the ion beam. The accelerator voltage is typically set for minimum accelerator current. Consequently, this is the lowest power inverter in the system. E.12.6 The Neutralizer Module is a current regulated supply that provides electron emission (neutralizer emission current) from a hot filament. The emission neutralizes the space charge for the ion beam. As a result, the neutralizer emission current must be approximately equal to the beam current. If the neutralizer emission decreases, the neutralizer module must be adjusted to increase the neutralizer filament current in order to maintain the desired balance between the neutralizer emission current and the beam current. Typical Deposition Gun Readings Magnet Glow Cathode Accelerator Extractor Self Bias Neutralizer 2.0A 3.0A 9.5A 100mA <20mA @300V E. 13. Etch Wafer. Standard Operating Procedure BNC CDIBS 12

13 Rotate the wafer such that it is facing up and to the left (tilt 45 degrees), giving the highest sputter yield. Ion mill (etch) for the desired time, then turn the wafer back up and to the right (tilt -10 degrees) E. 14. Turn Off the Gun. If necessary, turn down all the settings to zero. Push the GUN button to turn it off. Let the fans run for 10% of the total gun-on time for cooling. E. 15. Cool, Turn Off the Fans, and Gas. Let the fans run for 10% of the total gun-on time for cooling. Push the FANS button to turn off the fans. Turn off the gas on the regulator switches. The pressure on the ion gauge should rapidly drop and return to the 10-6 to 10-7 torr range. E. 16. Turn Off the Stage. Turn off the Stage Switch. E. 17. Vent. Turn off HI VAC. Wait for the gate valve to close. Turn on VENT. Remove wafers when vented. E. 18. Pump Down the Chamber, Leave un High Vacuum. Close the door, ensuring that it touches the chamber around the entire perimeter. Turn the nitrogen VENT off, it it is not already off Open the roughing pump (ROUGH) valve (switch up). The light goes on. Let the chamber pump down to just below 40 mtorr on the thermocouple gauge (TC1 on the right side rack), then close the roughing valve (switch in center). Open the high vacuum (cryo) valve (switch up). The light goes on. The pressure on the thermocouple gauge should rapidly fall to zero. Leave the system in this state. E. 19. Turn off the Gas Supply Close the hand valve on the Argon tank. Standard Operating Procedure BNC CDIBS 13

14 VI. Emergency Procedures A. CDIBS accidents: Notify lab management and PI immediately. B. Power outage: If there is a power outage, turn off the CDIBS per the CDIBS shut down procedure to avoid a hazardous situation when power is restored. Standard Operating Procedure BNC CDIBS 14

15 Authorized Users I have read and understood the Standard Operating Procedures for CDIBS Name (print) Signature Date PI Initial Standard Operating Procedure BNC CDIBS 15

16 Appendix A In case of medical emergencies, consult lab safety protocol or lab safety plan. In the event of a CDIBS accident, follow the procedure below: 1. Ensure that the CDIBS is shut off. 2. Provide for the safety of the personnel (first aid, evacuation, etc.) as needed. 3. Obtain medical assistance for anyone who may be injured. UC Optometry Clinic (Normal Hours) UC Optometry Clinic (24 Hour Emergencies) University Health Services (Emergency) Ambulance (urgent medical care) If there is a fire, pull the alarm, and contact the fire department by calling Do not fight the fire unless it is very small and you have been trained in fire fighting techniques. 5. Inform the Office of Environment Health, & Safety (EH&S) as soon as possible. 6. During normal working hours, call the following: EH&S Office BNC Safety Officer EH&S Health & Safety Manager After normal working hours, call to contact the UC Police Department who can contact the above using their emergency call list. 7. Inform (PI NAME) and the BNC safety officer as soon as possible. If there is an injury, (PI NAME) will need to submit a report of injury to the Worker s Compensation Office. 8 After the incident, do not resume use of the CDIBS system until the lab manager and EH&S has reviewed the incident and approved the resumption of research. Standard Operating Procedure BNC CDIBS 16

Approved by Principal Investigator Date: Approved by Super User: Date:

Approved by Principal Investigator Date: Approved by Super User: Date: Approved by Principal Investigator Date: Approved by Super User: Date: Standard Operating Procedure BNC OAI 200 Lithographic Mask Aligner (Aligner 3) Version 2011 June 2 I. Purpose This Standard Operating

More information

Approved by Principal Investigator Date: Approved by Super User: Date:

Approved by Principal Investigator Date: Approved by Super User: Date: Approved by Principal Investigator Date: Approved by Super User: Date: Standard Operating Procedure BNC OAI Lithographic Mask Aligner (Aligner 2) Version 2008 October 31 I. Purpose This Standard Operating

More information

Approved by BNC Managing Director Paul Lum Date: Approved by PI (s) /Super User (s): _Peter Hosemann/Andy Minor_Date:

Approved by BNC Managing Director Paul Lum Date: Approved by PI (s) /Super User (s): _Peter Hosemann/Andy Minor_Date: Approved by BNC Managing Director Paul Lum Date: Approved by PI (s) /Super User (s): _Peter Hosemann/Andy Minor_Date: Standard Operating Procedure BNC FEI Quanta 3D FEG/FIB ESEM Version 2011 Aug 30 I.

More information

Operating Procedures for Metal Evaporator I

Operating Procedures for Metal Evaporator I Operating Procedures for Metal Evaporator I Metal Evaporator I is intended as a tool and a training device. Understanding the operation of this equipment should give you a basic knowledge of vacuum and

More information

SPUTTER STATION STANDARD OPERATING PROCEDURE

SPUTTER STATION STANDARD OPERATING PROCEDURE SPUTTER STATION STANDARD OPERATING PROCEDURE Purpose of this Instrument: This instrument is used for deposition of thin metal or oxide films. Source materials supplied by WVU Shared Research Facilities:

More information

Cryo-Evaporator Operation

Cryo-Evaporator Operation Cryo-Evaporator Operation Cara Ricci November 25, 2003 Thin Film Deposition THE UNIVERSITY OF TEXAS AT DALLAS ERIK JOHNSON SCHOOL OF ENGINEERING DOCUMENT NUMBER: FA2003-TF-008 EDITION: 1.1 PAGE: 1 of 28

More information

Issue: H Title: CHA E-Beam Evaporator Page 1 of 7. Table of Contents

Issue: H Title: CHA E-Beam Evaporator Page 1 of 7. Table of Contents Title: CHA E-Beam Evaporator Page 1 of 7 Table of Contents Purpose/Scope... 2 2.0 Reference Documents... 2 3.0 Equipment/Supplies/Material... 2 4.0 Safety... 2 5.0 Set Up Procedures... 2 5.1 PC Logon and

More information

R I T. Title: Amray 1830 SEM Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 09/29/03 1 SCOPE 2 REFERENCE DOCUMENTS

R I T. Title: Amray 1830 SEM Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 09/29/03 1 SCOPE 2 REFERENCE DOCUMENTS Fabrication Laboratory Revision: A Rev Date: 09/29/03 Approved by: Process Engineer / / / / Equipment Engineer 1 SCOPE The purpose of this document is to detail the use of the Amray 1830 SEM. All users

More information

5.1.3 Mechanical Hazards Drive assemblies have sufficient power to cause injury. Keep hands, fingers, clothing and tools clear of moving parts.

5.1.3 Mechanical Hazards Drive assemblies have sufficient power to cause injury. Keep hands, fingers, clothing and tools clear of moving parts. Approved by: Process Engineer / / / / Equipment Engineer 1 SCOPE The purpose of this document is to detail the use of the PE4400. All users are expected to have read and understood this document. It is

More information

Standard Operating Manual

Standard Operating Manual Standard Operating Manual ARC12M Sputter Copyright 11.2015 by Hong Kong University of Science & Technology. All rights reserved. Page 1 Contents 1. Picture and Location 2. Process Capabilities 2.1 Cleanliness

More information

Standard Operating Manual

Standard Operating Manual Standard Operating Manual AB-M Mask Aligner Version 1.1 Page 1 of 18 Contents 1. Picture and Location 2. Process Capabilities 2.1 Cleanliness Standard 2.2 Wafer Chuck Selection 2.3 Mask Holder Selection

More information

1.1 Equipment: substrate, wafer tweezers, metal targets 1.2 Personal Protective Equipment: nitrile gloves, safety glasses 1.

1.1 Equipment: substrate, wafer tweezers, metal targets 1.2 Personal Protective Equipment: nitrile gloves, safety glasses 1. Nanomaster NSC-3000 DC Magnetron Sputter Tool Standard Operating Procedure Faculty Supervisor: Prof. Robert White, Mechanical Engineering (x72210) Safety Office: Peter Nowak x73246 (Just dial this directly

More information

Nordiko Metal Sputtering System Standard Operating Procedure

Nordiko Metal Sputtering System Standard Operating Procedure Nordiko Metal Sputtering System Standard Operating Procedure Specifications : Target Size Gases used in the system Base pressure Sputtering pressure Substrates used Substrate size : 2 inch or 4 inch :

More information

Standard Operating Manual

Standard Operating Manual Standard Operating Manual Denton Explorer 14 RF/DC Sputter Version 1.0 Page 1 of 11 Contents 1. Picture and Location 2. Process Capabilities 1. Cleanliness Standard 2. Available for Sputtering Materials

More information

Nanofabrication Facility: Sputter Evaporator SOP Rev. 04, June 2007

Nanofabrication Facility: Sputter Evaporator SOP Rev. 04, June 2007 Author: Rev. 00: David Webster, TRIUMF, February 22, 1995. Rev. 01: A. Schmalz, October 12, 1999 Rev. 02: Doug Wong, August 2, 2002 (STS File: S02-014) Rev. 03: Mario Beaudoin, April 2006 Rev. 04: Bahador

More information

Login to ilab Kiosk. Revised 05/22/2018. Load your sample:

Login to ilab Kiosk. Revised 05/22/2018. Load your sample: Login to ilab Kiosk Load your sample: 1. Check: The analysis chamber pressure is

More information

Usage Policies Notebook for Xenon Difluoride (XeF 2 ) Isotropic Si Etch

Usage Policies Notebook for Xenon Difluoride (XeF 2 ) Isotropic Si Etch Usage Policies Notebook for Xenon Difluoride (XeF 2 ) Isotropic Si Etch Revision date September 2014 2 Emergency Plan for XeF 2 Si Etcher Standard Operating Procedures for Emergencies Contact information

More information

Standard Operating Procedure. For. PVD E-Beam

Standard Operating Procedure. For. PVD E-Beam P a g e 1 Standard Operating Procedure For PVD E-Beam P a g e 2 Introduction The PVD Electron-Beam Evaporator (E-Beam) thin film deposition machine uses a magnetically guided and collimated stream of electrons

More information

ABM MASK ALIGNERS. NanoFab 26 March 2009 A Micro Machining & Nanofabrication Facility

ABM MASK ALIGNERS. NanoFab 26 March 2009 A Micro Machining & Nanofabrication Facility ABM MASK ALIGNERS LOCATION: Optical Lithography PRIMARY TRAINER: Stephanie Bozic (2-6724, sbozic@ualberta.ca) SECONDARY TRAINER: Jolene Chorzempa (2-4823, jolenec@ualberta.ca) 1. OVERVIEW The ABM Mask

More information

R I T. Title: STS ASE Semiconductor & Microsystems Fabrication Laboratory Revision: Original Rev Date: 01/21/ SCOPE 2 REFERENCE DOCUMENTS

R I T. Title: STS ASE Semiconductor & Microsystems Fabrication Laboratory Revision: Original Rev Date: 01/21/ SCOPE 2 REFERENCE DOCUMENTS Approved by: Process Engineer / / / / Equipment Engineer 1 SCOPE The purpose of this document is to detail the use of the STS ASE. All users are expected to have read and understood this document. It is

More information

MMRC PVD Evaporator Instructions

MMRC PVD Evaporator Instructions Warnings MMRC PVD Evaporator Instructions (Updated Aug 2016) Under PVD conditions, even oils and greases are volatile. WEAR GLOVES, and if you touch your skin or anything else oily or wet, change them.

More information

KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE

KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE Purpose of this Instrument: This instrument is for patterning photosensitive polymers with UV light. Location: White Hall 410 Cleanroom Primary

More information

MJB4 Mask Aligner Operating Procedure. Effective Date: 07/12/2012 Author(s): Jiong Hua Phone:

MJB4 Mask Aligner Operating Procedure. Effective Date: 07/12/2012 Author(s): Jiong Hua Phone: MJB4 Mask Aligner Operating Procedure Effective Date: 07/12/2012 Author(s): Jiong Hua Phone: 402-472-3773 Email: jhua2@unl.edu 1 1 Introduction 1.1 Key Words Karl Suss MJB4 Mask Aligner, Optical Lithography,

More information

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System)

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System) Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System) Revision date October 2014 2 Emergency Plan for Nano Furnace Standard Operating Procedures for Emergencies Contact information Person

More information

Revised: June 7, 2017

Revised: June 7, 2017 LC Technologies Thermal Evaporator Standard Operating Procedure Faculty Supervisor: Prof. Robert White, Mechanical Engineering (x72210) Safety Office: Peter Nowak x73246 (Just dial this directly on any

More information

The Broadest Gauging Line in the Industry

The Broadest Gauging Line in the Industry The Broadest Gauging Line in the Industry Vacuum Measurement Varian s broad line of vacuum gauge controllers and gauge tubes are the most reliable, accurate, and economical means of measuring, monitoring,

More information

Temescal BJD-1800 E-Beam Evaporator 1 System Overview - Cryo-pumped for typical base pressures in the low 10e-7 Torr range. - Four pockets in the

Temescal BJD-1800 E-Beam Evaporator 1 System Overview - Cryo-pumped for typical base pressures in the low 10e-7 Torr range. - Four pockets in the Temescal BJD-1800 E-Beam Evaporator 1 System Overview - Cryo-pumped for typical base pressures in the low 10e-7 Torr range. - Four pockets in the rotating hearth of the electron gun which allows deposition

More information

Angstrom E-Beam Instructions. PROCESS CHECKS: the tooling factors of each metal; Ti/Au layer for wire bonding pull test.

Angstrom E-Beam Instructions. PROCESS CHECKS: the tooling factors of each metal; Ti/Au layer for wire bonding pull test. Angstrom E-Beam Instructions Tool Manager: Joe Palmer (jpalmer@princeton.edu) Office: 8-4706; Cell:609-751-1353 Backup: David Barth (dbarth@princeton.edu) Office: 8-4626; Cell: 610-405-8227 PROCESS CHECKS:

More information

Standard Operating Procedure Porosity Analyzer - The Micromeritics Tri-Star II (surface area) with Micrometrics VacPrep 061 (Sample Degas System)

Standard Operating Procedure Porosity Analyzer - The Micromeritics Tri-Star II (surface area) with Micrometrics VacPrep 061 (Sample Degas System) Standard Operating Procedure Porosity Analyzer - The Micromeritics Tri-Star II (surface area) with Micrometrics VacPrep 061 (Sample Degas System) The Micromeritics Tri-Star II Surface Area and Porosity

More information

THERMAL EVAPORATION UNIT (for Al evaporation)

THERMAL EVAPORATION UNIT (for Al evaporation) THERMAL EVAPORATION UNIT (for Al evaporation) System Owner: NeerajPanwar 9619507210 panwar.iitr@gmail.com System Operator: 1. Bhimraj Sable 9930189878 bhimrajsable71@gmail.com Authorized User: 1. Ramesh

More information

COBILT CA-800 Mask Aligner Equipment Operation

COBILT CA-800 Mask Aligner Equipment Operation COBILT CA-800 Mask Aligner Equipment Operation For the Micro-Electronics Laboratory At University of Notre Dame Department of Electrical Engineering This user manual is not be removed from room 247A. This

More information

Plasma Asher: March PX-500 User guide (May-30, 2017)

Plasma Asher: March PX-500 User guide (May-30, 2017) Plasma Asher: March PX-500 User guide (May-30, 2017) This is a highly versatile plasma etch tool that can etch using a direct plasma configuration (Oxygen plasma cleaner), a downstream plasma (Remote plasma),

More information

Operation Manual - PN A MENSOR MODEL 73 SHOP AIR BOOSTER

Operation Manual - PN A MENSOR MODEL 73 SHOP AIR BOOSTER Operation Manual - PN 0017946001 A MENSOR MODEL 73 SHOP AIR BOOSTER Mensor Model 73 Shop Air Booster System (750 psi Version) April 23, 2012 Trademarks / Copyright Mensor is a registered trademark of Mensor

More information

Usage Policies Notebook for Thermco Atmospheric Diffusion Furnace system

Usage Policies Notebook for Thermco Atmospheric Diffusion Furnace system Usage Policies Notebook for Thermco Atmospheric Diffusion Furnace system Revision date September 2014 2 Emergency Plan for Diffusion Furnaces Standard Operating Procedures for Emergencies Contact information

More information

March CS-1701F Reactive Ion Etcher

March CS-1701F Reactive Ion Etcher March CS-1701F Reactive Ion Etcher Standard Operating Procedure Faculty Supervisor: Prof. Robert White, Mechanical Engineering (x72210) Safety Office: Peter Nowak x73246 (Just dial this directly on any

More information

Warnings: Notes: Revised: January 8,

Warnings: Notes: Revised: January 8, OAI Model 204IR Mask Aligner Standard Operating Procedure Faculty Supervisor: Prof. Robert White, Mechanical Engineering (x72210) Safety Office: Peter Nowak x73246 (Just dial this directly on any campus

More information

Introduction of Vacuum Science & Technology. Diffusion pumps used on the Calutron mass spectrometers during the Manhattan Project.

Introduction of Vacuum Science & Technology. Diffusion pumps used on the Calutron mass spectrometers during the Manhattan Project. Introduction of Vacuum Science & Technology Diffusion pumps used on the Calutron mass spectrometers during the Manhattan Project. 1 What is a vacuum? 760 mm Hg Vacuum ATM A vacuum is defined as less than

More information

Unaxis ICP/RIE SOP Revision 8 09/30/16 Page 1 of 5. NRF Unaxis ICP/RIE Etch SOP

Unaxis ICP/RIE SOP Revision 8 09/30/16 Page 1 of 5. NRF Unaxis ICP/RIE Etch SOP Page 1 of 5 NRF Unaxis ICP/RIE Etch SOP Unaxis Shuttlelock Reactive Ion Etcher with Inductively Coupled Plasma Module. Etch Capabilities: SiO2, Si3N4, Al, dielectrics and other commonly used materials.

More information

KARL SUSS MJB3 UV400 Mask Aligner Standard Operating Procedure

KARL SUSS MJB3 UV400 Mask Aligner Standard Operating Procedure KARL SUSS MJB3 UV400 Mask Aligner Standard Operating Procedure Version: 1.0 February 2014 UNIVERSITY OF TEXAS AT ARLINGTON Nanotechnology Research Center (NRC) 1 TABLE OF CONTENTS 1 Introduction 3 1.1

More information

Nanofabrication Facility: ECR Etcher SOP Rev. 01b, March 06. Standard Operating Procedure for PlasmaQuest ECR II Etching

Nanofabrication Facility: ECR Etcher SOP Rev. 01b, March 06. Standard Operating Procedure for PlasmaQuest ECR II Etching Standard Operating Procedure for PlasmaQuest ECR II Etching Authors: Rev. 00: Al Schmalz, Vighen Pacradouni and Jeff Young, December 21, 1998 Rev. 01: Dr. Andras G. Pattantyus-Abraham, May 24, 2005 Rev.

More information

Chapter 2 General description of the system

Chapter 2 General description of the system Chapter 2 General description of the system This system is a high density plasma etching system having a C to C load-lock system and an ISM (Inductive Super Magnetron) plasma source. The system consists

More information

The SPI Sputter Coater Handbook

The SPI Sputter Coater Handbook The SPI Sputter Coater Handbook Coating of Specimens SPI-Module Sputter Coater with Etch Mode 1. Mount the specimens onto the SEM stub. Keep in mind that many adhesives have high vapor pressure solvents

More information

Inert Air (N2) Systems Manual

Inert Air (N2) Systems Manual INSTRUCTION MANUAL Inert Air (N2) Systems Manual N2-MANUAL 2.10 READ AND UNDERSTAND THIS MANUAL PRIOR TO OPERATING OR SERVICING THIS PRODUCT. GENERAL INFORMATION Positive pressure nitrogen gas pressurizing

More information

LEO 1525 FEG SEM Standard Operating Procedures Mar. 6, 2012 For additional assistance, please contact the facility manager.

LEO 1525 FEG SEM Standard Operating Procedures Mar. 6, 2012 For additional assistance, please contact the facility manager. LEO 1525 FEG SEM Standard Operating Procedures Mar. 6, 2012 For additional assistance, please contact the facility manager. Please contact in case of emergency: SEM microscopist: Mr. Eric Miller, 7-0789

More information

Fig. 1: Mechanical vacuum gauge (left) and capacitive vacuum gauge (right)

Fig. 1: Mechanical vacuum gauge (left) and capacitive vacuum gauge (right) Dear Readers! This is your 4pvd Newsletter. We hope you enjoy the information it contains. If you wish to unsubscribe, please send a blank Email to unsubscribe@4pvd.de June 1 st, 2006, Issue No. 24 Principles

More information

1)! DO NOT PROCEED BEYOND THIS MARK

1)! DO NOT PROCEED BEYOND THIS MARK Operating Instructions for X-ray Photoelectron Spectrometer: Physical Electronics Model 555 XPS/AES (John H. Thomas, III, Ph.D., Electron Spectroscopy) Sample Insertion: figure 1. Sample insertion rod

More information

NORDSON MARCH PX-1000 PLASMA ASHER STANDARD OPERATING PROCEDURE Version: 1.0 July 2016

NORDSON MARCH PX-1000 PLASMA ASHER STANDARD OPERATING PROCEDURE Version: 1.0 July 2016 NORDSON MARCH PX-1000 PLASMA ASHER STANDARD OPERATING PROCEDURE Version: 1.0 July 2016 UNIVERSITY OF TEXAS AT ARLINGTON Nanotechnology Research Center TABLE OF CONTENTS 1. Introduction..3 1.1 Scope of

More information

Oerlikon Sputtering Evaporator SOP

Oerlikon Sputtering Evaporator SOP Oerlikon Sputtering Evaporator SOP Short UNT Cleanroom 1. Taking out sample holder from Transport Chamber : Log in FOM to access the software Go to the software and log in with user1 and password user1

More information

INSTRUCTIONS. VP-100 Ion Pump. Model / R001

INSTRUCTIONS. VP-100 Ion Pump. Model / R001 INSTRUCTIONS 87-900-130-01 (A) March 3, 2011 VP-100 Ion Pump Model 819-1490 / 819-1490R001 GENERAL INFORMATION This equipment is destined for use by professionals. The user should read this instruction

More information

DRAFT. Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35

DRAFT. Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35 Operating Procedures for the NPDGamma Liquid Hydrogen Target V0.03 11/26/05 1 DRAFT Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35 Version 0.03 November 26, 2005

More information

Standard Operating Procedure #COE-SOP-0001 Chemical Fume Hood Operation

Standard Operating Procedure #COE-SOP-0001 Chemical Fume Hood Operation Standard Operating Procedure # Chemical Fume Hood Operation Facility: NMSU College of Engineering Laboratories Written by: Juanita Miller, Safety Specialist, miljgh@nmsu.edu (575)-646-1292 Scope: This

More information

Oxford Instruments Austin, Inc.

Oxford Instruments Austin, Inc. User's User s Manual Issue 01 / March 2013 / OIAI Cryo-Plex 10 Oxford Instruments Austin, Inc. Issue 01 / March 2013 / Original Instructions Oxford Instruments Austin, Inc. is a wholly-owned subsidiary

More information

PLASMA ENHANCED CHEMICAL VAPOR DEPOSITION (PECVD) SOP OXFORD PLASMALAB SYSTEM 100

PLASMA ENHANCED CHEMICAL VAPOR DEPOSITION (PECVD) SOP OXFORD PLASMALAB SYSTEM 100 PLASMA ENHANCED CHEMICAL VAPOR DEPOSITION (PECVD) SOP OXFORD PLASMALAB SYSTEM 100 June 2013 Interface Overview. The Oxford software is divided into 5 main screens. 1) Pump Control page 2) Recipe page 3)

More information

Usage Policies Notebook for Parylene Coating System

Usage Policies Notebook for Parylene Coating System Usage Policies Notebook for Parylene Coating System Revision date September 2014 2 Emergency Plan for Parylene Coating System Standard Operating Procedures for Emergencies Contact information Person Lab

More information

Unifilm Technology PVD-300 Sputter Deposition Operation Instructions

Unifilm Technology PVD-300 Sputter Deposition Operation Instructions Unifilm Technology PVD-300 Sputter Deposition Operation Instructions Contributors: Devin Brown, Kevin Klein, Ben King, Eric Woods Anything that is BOLD UNDERLINED ITALICS means that you should press that

More information

OAI Model 200 Tabletop Mask Aligner Portland State University

OAI Model 200 Tabletop Mask Aligner Portland State University OAI Model 200 Tabletop Mask Aligner Portland State University WARNING: This machine exposes users to ultraviolet radiation. Do not touch the lens underneath the lamp hood as it may damage the machine and

More information

Equipment Operating Procedure Glove Box

Equipment Operating Procedure Glove Box Equipment Operating Procedure Glove Box Page 1 0.0 Changing the Compressed Gas Cylinder 1. Complete Compressed Gas Cylinder training from EHS website before manually exchanging gas cylinders. In order

More information

The Experts in Vacuum Solutions

The Experts in Vacuum Solutions By Woodrow Farrow - Reprinted with permission from Specialty Gas Report Vacuum: a space that is relatively empty of matter, especially when that void has been created through artificial means. The earth

More information

Plasma Etching: Safety Operating Procedures

Plasma Etching: Safety Operating Procedures Plasma Etching: Safety Operating Procedures Amber Cai and Caleb Eades Profs. Donnelly and Van Ryswyk Harvey Mudd College, Claremont, CA Contents 1 Introduction 1 1.1 Goal of Etching..................................

More information

Warnings: Notes: Revised: October 5, 2015

Warnings: Notes: Revised: October 5, 2015 Karl Suss MA6 Mask Aligner Standard Operating Procedure Faculty Supervisor: Prof. Robert White, Mechanical Engineering (x72210) Safety Office: Peter Nowak x73246 (Just dial this directly on any campus

More information

University of MN, Minnesota Nano Center Standard Operating Procedure

University of MN, Minnesota Nano Center Standard Operating Procedure Equipment name: STS Etcher Badger name: STS Revision number: 3 Model: 320 Revisionist: Paul Kimani Location: Bay 3 Date: 1 October 2013 A. Description The 320 is a manually loaded batch plasma etching

More information

Standard Operating Manual

Standard Operating Manual Standard Operating Manual Fisher Scientific Isotemp TM Model 281A Vacuum Oven Version 1.1 Page 1 of 9 Contents 1. Picture and Location 2. Process Capabilities 2.1 Cleanliness Standard 2.2 Substrate Size

More information

Nanofabrication Facility: PECVD SOP Rev. 00, April 24

Nanofabrication Facility: PECVD SOP Rev. 00, April 24 Author: Charlie Yao & Mario Beaudoin Email: charlieyao@gmail.com; Beaudoin@physics.ubc.ca Phone: 604-822-1853(MB). Purpose This document outlines the standard operation for the Trion Plasma Enhanced Chemical

More information

Notes-PECVD: Chamber 1

Notes-PECVD: Chamber 1 plasmatherm (EML) STANDARD OPERATING PROCEDURE CORAL Name: Plasmatherm Model Shuttlelock System VII SLR-770/734 Number: Location: EML What it Deposits the following films via Plasma-Enhanced Chemical Vapor

More information

Granville-Phillips Series 370 Stabil-Ion Vacuum Gauge Controller

Granville-Phillips Series 370 Stabil-Ion Vacuum Gauge Controller Granville-Phillips Series 370 Stabil-Ion Vacuum Gauge Controller All-metal, rack-mount controller for Stabil-Ion and Convectron vacuum gauges is noise-immune and CE compliant Accurate vacuum pressure measurement

More information

Xactix XeF2 OPERATION MANUAL

Xactix XeF2 OPERATION MANUAL General Information The Xactix e-1 is a xenon difluoride (XeF 2) isotropic silicon etcher. XeF 2 is a vapor phase etch, which exhibits very high selectivity of silicon to photo-resist, silicon dioxide,

More information

SOP for Karl Suss MJB3 #1 Mask Aligner

SOP for Karl Suss MJB3 #1 Mask Aligner SOP for Karl Suss MJB3 #1 Mask Aligner Rev. 5 (30/11/2016) Safety UV Exposure: The high-energy light produced by the high-pressure Mercury Xenon lamp can cause eye damage and skin burns. Be sure that the

More information

Operating Procedures for the. SAMCO ICP RIE System

Operating Procedures for the. SAMCO ICP RIE System Operating Procedures for the SAMCO ICP RIE System General Overview: The purpose of the SAMCO Model 200iP Inductively Coupled Plasma Reactive Ion Etcher (ICP RIE) is to etch III-V compound semiconductors

More information

March Asher Operation

March Asher Operation March Asher Operation Roger Robbins 7/31/2006 The University of Texas at Dallas Erik Jonsson Engineering School of Engineering TITLE: March Asher Operation Page 1 of 13 March Asher Operation Roger Robbins

More information

CHEMICAL ENGINEERING SENIOR LABORATORY CHEG Initiated Chemical Vapor Deposition

CHEMICAL ENGINEERING SENIOR LABORATORY CHEG Initiated Chemical Vapor Deposition 1 CHEMICAL ENGINEERING SENIOR LABORATORY CHEG 4139 Initiated Chemical Vapor Deposition Objective: The objective of this experiment is to determine the effect of process variables on the deposition of thin

More information

Vacuum Pumpdown and Venting Procedure, CRaTER Thermal Vacuum System. Dwg. No

Vacuum Pumpdown and Venting Procedure, CRaTER Thermal Vacuum System. Dwg. No Rev. ECO Description Checked Approval Date 01 32- Release M. Smith Vacuum Pumpdown and Venting Procedure, CRaTER Thermal Vacuum System Dwg. No. 32-06003.05 Revision 01 June 18, 2007 1 1. Introduction 1.1.

More information

Standard Operating Procedure Inductively Coupled Plasma Optical Emission Spectrometer (ICP-OES) - Thermo Scientific icap 6300

Standard Operating Procedure Inductively Coupled Plasma Optical Emission Spectrometer (ICP-OES) - Thermo Scientific icap 6300 Standard Operating Procedure Inductively Coupled Plasma Optical Emission Spectrometer (ICP-OES) - Thermo Scientific icap 6300 The Thermo Scientific icap 6300 Inductively Coupled Plasma Optical Emission

More information

LEO SEM SOP Page 1 of 9 Revision 1.4 LEO 440 SEM SOP. Leica Leo Stereoscan 440i

LEO SEM SOP Page 1 of 9 Revision 1.4 LEO 440 SEM SOP. Leica Leo Stereoscan 440i LEO SEM SOP Page 1 of 9 LEO 440 SEM SOP Gun (Filament) Column Manual Valves Chamber Window Chamber Stage Movement Leica Leo Stereoscan 440i 1. Scope 1.1 This document provides the procedure for operating

More information

Plasma-Therm PECVD. Operating Characteristics. Operating Instructions. Typical Processes. I. Loading. II. Operating

Plasma-Therm PECVD. Operating Characteristics. Operating Instructions. Typical Processes. I. Loading. II. Operating Plasma-Therm PECVD A PECVD (plasma enhanced chemical vapor deposition) reacts gases in a RF (radio frequency) induced plasma to deposit materials such as silicon dioxide and silicon nitride. This PECVD

More information

MINIBRUTE ANNEAL TUBE STANDARD OPERATION PROCEDURE

MINIBRUTE ANNEAL TUBE STANDARD OPERATION PROCEDURE Arizona State University NanoFab MINIBRUTE ANNEAL TUBE STANDARD OPERATION PROCEDURE Rev A Title: MINIBRUTE ANNEAL TUBE STANDARD OPERATION PROCEDURE Table of Contents Issue: Rev A Contents Table of Contents...1

More information

Universal Valve Company Inc

Universal Valve Company Inc Universal Valve Company Inc 800-223-0741 www.universalvalve.com 1975-FA34 (Air Tower Troubleshooting Manual) Overview This manual has been arranged as a tool for diagnosing, and repairing Free Air Universal

More information

Pressure Dump Valve Service Kit for Series 3000 Units

Pressure Dump Valve Service Kit for Series 3000 Units Instruction Sheet Pressure Dump Valve Service Kit for Series 000 Units. Overview The Nordson pressure dump valve is used to relieve hydraulic pressure instantly in Series 00, 400, 500, and 700 applicator

More information

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012 JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012 UNIVERSITY OF TEXAS AT ARLINGTON Nanofabrication Research and Teaching Facility TABLE OF CONTENTS 1. Introduction....2 1.1 Scope of Work.....2

More information

The Principles of Vacuum Technology

The Principles of Vacuum Technology The Principles of Vacuum Technology Vacuum Terminology Vacuum units Vacuum regimes How to measure vacuum. Gauge designs. How to create vacuum Pump classifications and designs UHV compatibility considerations

More information

Title: Standard Operating Procedure for Dasibi Model 5008 Gas Dilution Calibrator

Title: Standard Operating Procedure for Dasibi Model 5008 Gas Dilution Calibrator Procedure No: SOP-034 Revision No: 1.0 Revised Dec. 29, 2010 Page No.: 1 of 10 1. INTRODUCTION AND SCOPE This procedure is intended to describe the operations of the Dasibi model 5008 calibrator. The Dasibi

More information

This educational seminar discusses creating, measuring, and troubleshooting Rough Vacuum.

This educational seminar discusses creating, measuring, and troubleshooting Rough Vacuum. This educational seminar discusses creating, measuring, and troubleshooting Rough Vacuum. Specifically, today s talk will cover: Brief review of Vacuum Fundamentals Applications Using Rough Vacuum Rough

More information

product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels

product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels 12.09 product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels Introduction: This manual covers the installation and operation of Humboldt FlexPanels for Triaxial and Permeability

More information

Instruction Manual. Digital Thermocouple Gauge Control Units Models DTC & DTC Models DTC-06M-115 & DTC-06M-230

Instruction Manual. Digital Thermocouple Gauge Control Units Models DTC & DTC Models DTC-06M-115 & DTC-06M-230 Instruction Manual Digital Thermocouple Gauge Control Units Models DTC-531-115 & DTC-531-230 Models DTC-06M-115 & DTC-06M-230 Copyright 1998 by Duniway Stockroom Corp. 021315lh 1 of 7 Table of Contents

More information

Vacuum Science Techniques and Applications Dan Dessau Adv. Lab 2007

Vacuum Science Techniques and Applications Dan Dessau Adv. Lab 2007 Vacuum Science Techniques and Applications Dan Dessau Adv. Lab 2007 Vacuum increases the mean-free-path of gas molecules. Vacuum prevents chemical reaction. Vacuum removes contaminants from surfaces. Vacuum

More information

Procedure for Operating Columbia (Nevis) LHe Electron Bubble Chamber Cryostat. Version 5.1

Procedure for Operating Columbia (Nevis) LHe Electron Bubble Chamber Cryostat. Version 5.1 Project: Novel Electron Bubble Particle Detector Procedure for Operating Columbia (Nevis) LHe Electron Bubble Chamber Cryostat Version 5.1 (Using side filling line) Hand Processed Changes HPC No. Date

More information

Spirax Compact FREME Flash Recovery Energy Management Equipment

Spirax Compact FREME Flash Recovery Energy Management Equipment IM-UK-cFREME UK Issue 1 Spirax Compact FREME Flash Recovery Energy Management Equipment Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4.

More information

Operation of the mask aligner MJB-55

Operation of the mask aligner MJB-55 John Paul Adrian Glaubitz Operation of the mask aligner MJB-55 Department of Physics Faculty of Mathematics and Natural Sciences University of Oslo 1 Introduction The mask aligner is an essential tool

More information

Usage Policies Notebook for Trion RIE / ICP Dry Etch

Usage Policies Notebook for Trion RIE / ICP Dry Etch Usage Policies Notebook for Trion RIE / ICP Dry Etch Revision date September 2014 2 Emergency Plan for Trion RIE/ICP Dry Etch Standard Operating Procedures for Emergencies Contact information Person Lab

More information

Hazardous Energies Control and Lockout/Tagout Program

Hazardous Energies Control and Lockout/Tagout Program Hazardous Energies Control and Lockout/Tagout Program Summary: This program applies to the installation, service, maintenance, or removal of any type of machinery, equipment, or components, in which the

More information

Digital Vacuum Regulator

Digital Vacuum Regulator Temperature Control for Research and Industry Digital Vacuum Regulator User s Manual Model 300 INDEX SECTION PAGE 1. QUICK OPERATING INSTRUCTIONS........................... 3 Safety Notices.................................................

More information

Standard Operating Manual

Standard Operating Manual Standard Operating Manual Oxford Plasmalab 80 Plus Plasma Etcher Page 1 of 24 Contents 1. Picture and Location 2. Process Capabilities 2.1 Cleanliness Standard 2.2 Available Etching Materials 2.3 Performance

More information

Basic ICP Operating Procedures

Basic ICP Operating Procedures Center for High Technology Materials 2 February, 2009 University of New Mexico Created by Beth Fuchs Basic ICP Operating Procedures INTRODUCTION: The ICP is an inductively coupled plasma etching system,

More information

AC1810 / AC1810-A TECHNICAL SPECIFICATIONS. Operating Pressure psi ( kgs/cm²) [AC1810] Displacement. Net Weight

AC1810 / AC1810-A TECHNICAL SPECIFICATIONS. Operating Pressure psi ( kgs/cm²) [AC1810] Displacement. Net Weight Technical Specifications Operating Instructions Maintenance Information Troubleshooting Guide Parts Diagrams AC1810 / AC1810-A THE EVOLUTION OF PERFECTION CAUTION: Before attempting to use or service this

More information

Universal Valve Company Inc

Universal Valve Company Inc 1975-FA34 (Air Tower Troubleshooting Manual) Overview This manual has been arranged as a tool for diagnosing, and repairing Universal Air Towers Please read closely to identify the components that are

More information

Technical Specifications of Hydrogen Isotope Handling and Recovery System

Technical Specifications of Hydrogen Isotope Handling and Recovery System SECTION - C TECHNICAL SPECIFICATIONS OF STORES AND DRAWINGS. Technical Specifications of Hydrogen Isotope Handling and Recovery System INSTITUTE FOR PLASMA RESEARCH GANDHINAGAR, GUJARAT 382428 ANNEXURE-I

More information

DC gun high voltage conditioning with Krypton gas Carlos Hernandez-Garcia October 2008

DC gun high voltage conditioning with Krypton gas Carlos Hernandez-Garcia October 2008 DC gun high voltage conditioning with Krypton gas Carlos Hernandez-Garcia October 2008 Index Background 1 High voltage processing with Helium gas 2 High voltage processing with Krypton gas 3 Some thoughts

More information

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel TANK MANAGER FOR TWO TANKS OPERATING MANUAL 10/31/11 C-More T6C L color touch panel 1 TABLE OF CONTENTS GENERAL...3 INSTALLATION...4 STONE TEST PROCEDURE...7 OPERATIONAL SUMMARY...7 AUTO CARBONATION...10

More information

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS)

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS) Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS) Sensitivity: 1x10 11 A m 2 Applied DC fields: 0 T to 5 T Applied AC fields: 0 G to 3 G (zero-to-peak), 0.01 Hz to 1000 Hz Temperatures

More information

D R A F T. Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13. Version 1.00

D R A F T. Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13. Version 1.00 D R A F T Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13 Version 1.00 October 06, 2010 Operating Procedures for the NPDGamma Liquid Hydrogen Target V1.00 6/10/10 2 Table of Content

More information

Workhorse-15 Oxygen Generator

Workhorse-15 Oxygen Generator 11436 Sorrento Valley Road, San Diego CA 92121 USA 858-558-0202 Fax 858-558-1915 Workhorse-15 Oxygen Generator Model No. 5719, 5727, 5735 for Domestic and International Units Part number 1432 Revision

More information