OAI Model 200 Tabletop Mask Aligner Portland State University

Size: px
Start display at page:

Download "OAI Model 200 Tabletop Mask Aligner Portland State University"

Transcription

1 OAI Model 200 Tabletop Mask Aligner Portland State University WARNING: This machine exposes users to ultraviolet radiation. Do not touch the lens underneath the lamp hood as it may damage the machine and cause sever burns. Exposure to pressurized gas, high voltage electricity and mercury vapor may result from improper use of this equipment. Recommended Apparel: Eyewear rated to 400nm, clean room suits and nitrile gloves are required in this lab environment. For additional safety and emergency information please reference the last page of this manual and the appropriate manufacturer documentation.

2 Preliminary Set Up: Image of pressure buttons Image of exhaust fan 1) Check that the primary systems are connected to a wall outlet and that any power strips or surge protectors in their path are activated. 2) Verify that the vacuum and compressed gas feeds are turned on. If either of these are not working then check that the vacuum pump is on, its valve is open and that the nitrogen gas pressure is at 60 psig. 3) Move the microscope platform to the back of the tabletop and mask aligner platform completely to the right by using the black pressure buttons. 4) Make sure that the ozone exhaust fan in the lamp hood is now on and that the vent tube is securely in place before continuing to the lamp warmup. 5) Set the timer to 1 second and turn it on to enable use of the mask assembly. The shutter will open momentarily. Keep the timer switch on throughout this tutorial. Warmup Procedure: 1) Power on the constant intensity controller, using the large switch. 2) Set Current-Voltage (CV) selector to VOLTS, Intensity-Power (IP) selector to WATTS and the mode to Constant Intensity (CI). 3) Briefly depress the Start switch to turn the lamp on, you will hear a clicking sound. 4) Allow the lamp to warm up for about 10 minutes before moving on with this section of the manual. Please take this time to work through the mask, substrate and alignment procedures. Cooling Diagnostic: 1) After 10 minutes have elapsed the lamp power indicator will probably read between somewhere between 375W-625W. 2) To check if the lamp is operating properly adjust the power knob to set the machine to 500W (rated wattage), flip the CV switch to measure VOLTS and verify that it reads

3 Rated Voltage: Check this out to make sure. 340V± 2.0V. This diagnostic indicates if the lamp is overcooled (<338V ) or undercooled (>342V). 3) In the unlikely event that a cooling problem is found then ask a professor or look in the OAI manuals for directions on adjusting the airflow damper. Open or close this damper to manipulate the voltage back into the proper 4V range before continuing with any experiments. 4) Set the power draw to 450W (idle rating) until ready to preform an exposure, at which point one should readjust this setting to meet experimental parameters. Mask Placement: *Nitrile gloves are mandatory for this section.* 1) Make sure that the mask is cleaned of particulates before installing. 2) Loosen the six placement screws on top of the mask assembly and remove any placeholder material. 3) Place the mask underneath the clamps with the emulsion side down and push it flush against all three alignment pins. 4) A square cutout slid between the mask and the placement brackets may be used to help keep the mask level, secure and limit the exposure area. 5) When the mask is in place, tighten the placement screws enough to mitigate movement but not so much that they bend the surface. 6) If the mask is set at an angle to the front of the module then loosen the thumbscrews on either side of the frame to rotate it until it is parallel to the front of the machine. 7) Push in the Mask Vacuum button to affix the mask to the frame. Intensity Reading: *All recommended apparel should be used in section.* 1) Flip the IP switch to mw/cm^2 and verify the reading of ) Set a UV probe in the center of the exposure plane (on top of the mask assembly). 3) Set exposure timer to 5-10 seconds and check that the CIC is on constant intensity mode.

4 4) Move the assembly and probe under the lamp to activate the shutter and get a baseline reading. 5) If the system has not been calibrated recently then continue with the steps 6-9, otherwise skip to step 10. 6) Set the CIC to CP mode and channel A. 7) Open the shutter and adjust corresponding CAL knob until that the intensity reading on the probe and CIC are approximately equal. 8) Switch back to CI mode and turn the SET knob both clockwise and counter clockwise (higher and lower intensity) to verify that the power supply is accurately tracking the changes seen on the probe. If the tracking is faulty then reattempt the previous step to obtain a better equivalency setting. 9) Switch to channel B and repeat steps 6 and 7 to finish calibrating the device. 10) Check that the readings are within experimental parameters and use the SET control to readjust the desired intensity as need. Both channels A and B can be preconfigured to different values if so desired. Substrate Placement: *Nitrile gloves mandatory for this section.* 1) Move the microscope arm to the far back corner of the bench and then the mask assembly to the far right. The microscope has two movement handles so be sure to use the one closest to the surface of the table top. The mask frame will not open if the microscope is near it. 2) Flip the Mask Frame switch to the Open position and it should automatically rise about 40º. If the frame does not open immediately then recheck that the timer switch is on and that the microscope/mask assemblies are in their proper storage positions. 3) Once the frame is open, place the substrate chip in the middle of the vacuum chuck completely covering the + sign in its center. 4) The chip, like the mask, should be set parallel to the front of the aligner. Any patterning from previous exposures should be oriented to match the current the mask.

5 5) Use the Sub. Vac switch to secure the substrate to the mask aligner. 6) Close the mask frame. Mask Alignment: 1) Rotate the lens selector on the microscope to the empty slot so that it has ample clearance when passing over the placement screws on the mask holder. 2) The microscope should not hit the mask frame when it is in use so adjust the height accordingly. 3) Move the mask assembly slightly to the left so that it is lines up with the microscope. 4) Using the lower movement handle on the microscope arm to pull it forward above the mask. 5) Flip the Ball Vac switch to the unlock position to allow for raising of the substrate. 6) Thee Chuck Z Adjust has a D.C. ammeter read out and is controlled by the belt equipped knob on the front of the alignment module. 7) Turn the Chuck Z Adjust knob clockwise until a reading of ma is had. 8) Select the lowest magnification on the microscope and set the light source to about 50% power. 9) Use the control handle on the upper arm of the microscope assembly to orient the microscope more precisely. The top and bottom buttons allow for small modifications in the Y and X direction respectively. Be careful when using these controls because the light and power sources may get damaged or disconnected if this piece too quickly or far from their initial position. 10) Adjust the microscope till the mask can be seen with both eyes and then focus the optics as needed. The lowest magnification is good for setup and to finding alignment features because it has the best field depth and view. Once the microscope is in focus it will remain that way regardless of magnification changes. 11) Turn the black knob on front of the alignment module (not the Chuck Z Adjust) and view the substrate raising and leveling through the microscope. 12) Once the substrate reaches the mask a significant resistance will be felt in the knob, the belt will stop moving and the chuck should become level. 13) Lock the Ball Vac into position and prepare for final alignment.

6 14) Use the three long stemmed adjustment bars around the outside of the assembly to lower and then precisely align the substrate and mask. The middle bar controls the Y- Axis, the right controls the X and the far left controls rotation, theta. The movements are on the scale of micrometers so it is most beneficial when the microscope is in focus during these adjustments. 15) Raise the substrate with the previously used black knob until contact is made. This is known as making soft contact. The hard contact switch can be thrown to increase resolution but it will cause a residue to form on the mask after exposure. 16) Turn on the Contact Vac to lock in the final changes and prepare for exposure. 17) Rotate microscope lens to the empty compartment and carefully return the arm to its storage position, this can probably be done without changing the elevation of the arm. 18) Turn off the alignment optic power unit. Exposure: *All recommended apparel should be used in this section.* 1) Set the timer to the desired exposure time. 2) Double check power and intensity settings. 3) Move the assembly completely underneath the hood to activate the lamp. To avoid severe burns, do not touch the lamp or hood while in operation or shortly thereafter. 4) Wait for the lamp to finish its exposure and then move the assembly back to its alignment position. Substrate Removal: *Nitrile gloves are mandatory for this section.* 1) Turn off the Hard Contact switch if it was used during the exposure. 2) Turn off the Contact Vac. Adjust switch. 3) Close the contact vacuum by fully rotating the Contact Vac. Adjust valve clockwise. 4) If the substrate is sticking to the mask then turn on the Nitrogen Purge switch and open the Nitrogen Purge Flow Valve for 5-10 seconds to break the adhesion.

7 5) Lower the substrate from the mask using the black knob to avoid accidental contact in later trials. 6) Check that the alignment optics are in storage position. 7) Open the mask frame and turn off the Sub. Vac. 8) Carefully remove the substrate and then close the mask frame. 9) Turn the timer off. Mask Removal: *Nitrile gloves are mandatory for this section.* 1) Loosen the six thumbscrews on top of the mask assembly. 2) Turn off the mask vacuum and remove the mask. Shutdown: 1) If the lamp is going to be use again with the hour then set its power the idle amount of 450W. 2) If the lamp is no longer needed then turn off the power switch on the constant intensity controller. 3) Close the vacuum valve and turn off the vacuum pump. 4) Turn off the compressed gas source. 5) Turn off the external power strip or surge protecter connecting to the main apparatus. Emergency Procedure: 1) The lab should be evacuated immediately whenever an explosion occurs, the lamp malfunctions or smoke can be detected. 2) Shut down electric and gas connections at their external source. 3) Notify an instructor or any other relevant authority of the situation and make mention of a possible mercury vapor leak. 4) If a clean up is to be attempted then use a chemical respirator, full body clean suit, proper lab goggles, double layered nitrile gloves and a syringe capable of picking up liquid mercury. Safety Measures: 1) Protective eyewear should be rated to 400nm (most sunglasses meet this specification).

8 2) Full body clean suits are both required in most cleanroom environments and ideal in use of this machine. In lieu of a ʻbunny suitʼ, lab coats and long pants can provide sufficient UV protection but may contaminate nearby experiments. 3) Nitrile gloves are appropriate at this work station and may be double layered for additional protection. 4) Cosmetics are strictly prohibited in the cleanroom but certain sunscreens may be permitted at instructor discretion. Please reference OAI manuals for more information pertaining to setup, experimental, safety and emergency procedures.

Warnings: Notes: Revised: January 8,

Warnings: Notes: Revised: January 8, OAI Model 204IR Mask Aligner Standard Operating Procedure Faculty Supervisor: Prof. Robert White, Mechanical Engineering (x72210) Safety Office: Peter Nowak x73246 (Just dial this directly on any campus

More information

Standard Operating Manual

Standard Operating Manual Standard Operating Manual AB-M Mask Aligner Version 1.1 Page 1 of 18 Contents 1. Picture and Location 2. Process Capabilities 2.1 Cleanliness Standard 2.2 Wafer Chuck Selection 2.3 Mask Holder Selection

More information

Approved by Principal Investigator Date: Approved by Super User: Date:

Approved by Principal Investigator Date: Approved by Super User: Date: Approved by Principal Investigator Date: Approved by Super User: Date: Standard Operating Procedure BNC OAI 200 Lithographic Mask Aligner (Aligner 3) Version 2011 June 2 I. Purpose This Standard Operating

More information

SOP for Karl Suss MJB3 #1 Mask Aligner

SOP for Karl Suss MJB3 #1 Mask Aligner SOP for Karl Suss MJB3 #1 Mask Aligner Rev. 5 (30/11/2016) Safety UV Exposure: The high-energy light produced by the high-pressure Mercury Xenon lamp can cause eye damage and skin burns. Be sure that the

More information

KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE

KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE Purpose of this Instrument: This instrument is for patterning photosensitive polymers with UV light. Location: White Hall 410 Cleanroom Primary

More information

Karl Suss MA6 Mask Aligner SOP

Karl Suss MA6 Mask Aligner SOP Page 1 of 11 Karl Suss MA6 Mask Aligner SOP Safety UV Exposure: The high energy light produced by the high pressure Mercury Xenon lamp can cause eye damage and skin burns. Be sure that the light guards

More information

MJB4 Mask Aligner Operating Procedure. Effective Date: 07/12/2012 Author(s): Jiong Hua Phone:

MJB4 Mask Aligner Operating Procedure. Effective Date: 07/12/2012 Author(s): Jiong Hua Phone: MJB4 Mask Aligner Operating Procedure Effective Date: 07/12/2012 Author(s): Jiong Hua Phone: 402-472-3773 Email: jhua2@unl.edu 1 1 Introduction 1.1 Key Words Karl Suss MJB4 Mask Aligner, Optical Lithography,

More information

Warnings: Notes: Revised: October 5, 2015

Warnings: Notes: Revised: October 5, 2015 Karl Suss MA6 Mask Aligner Standard Operating Procedure Faculty Supervisor: Prof. Robert White, Mechanical Engineering (x72210) Safety Office: Peter Nowak x73246 (Just dial this directly on any campus

More information

Approved by Principal Investigator Date: Approved by Super User: Date:

Approved by Principal Investigator Date: Approved by Super User: Date: Approved by Principal Investigator Date: Approved by Super User: Date: Standard Operating Procedure BNC OAI Lithographic Mask Aligner (Aligner 2) Version 2008 October 31 I. Purpose This Standard Operating

More information

KARL SUSS MJB3 UV400 Mask Aligner Standard Operating Procedure

KARL SUSS MJB3 UV400 Mask Aligner Standard Operating Procedure KARL SUSS MJB3 UV400 Mask Aligner Standard Operating Procedure Version: 1.0 February 2014 UNIVERSITY OF TEXAS AT ARLINGTON Nanotechnology Research Center (NRC) 1 TABLE OF CONTENTS 1 Introduction 3 1.1

More information

MJB-3 Mask Aligner Property of TAU MNCF August 2012

MJB-3 Mask Aligner Property of TAU MNCF August 2012 MJB-3 Mask Aligner I. Power Up Sequence 1 LOG IN. Turn on Nitrogen & compressed air lines on the back wall. 2 Turn on the vacuum pump. 3 Flip the COMPRESSED AIR toggle on (up) Compressed air is used to

More information

Usage Policies Notebook for Karl Suss MA6 Mid / Deep UV Mask Aligner

Usage Policies Notebook for Karl Suss MA6 Mid / Deep UV Mask Aligner Usage Policies Notebook for Karl Suss MA6 Mid / Deep UV Mask Aligner Revision date September 2014 2 Emergency Plan for Karl Suss MA6 Aligner Standard Operating Procedures for Emergencies Contact information

More information

ABM MASK ALIGNERS. NanoFab 26 March 2009 A Micro Machining & Nanofabrication Facility

ABM MASK ALIGNERS. NanoFab 26 March 2009 A Micro Machining & Nanofabrication Facility ABM MASK ALIGNERS LOCATION: Optical Lithography PRIMARY TRAINER: Stephanie Bozic (2-6724, sbozic@ualberta.ca) SECONDARY TRAINER: Jolene Chorzempa (2-4823, jolenec@ualberta.ca) 1. OVERVIEW The ABM Mask

More information

Standard Operating Manual

Standard Operating Manual Standard Operating Manual Karl Suss MA6 Mask Aligner Version 1.1 Page 1 of 24 Contents 1. Picture and Location 2. Process Capabilities 2.1 Cleanliness Standard 2.2 Substrate Size 2.3 Photo Mask Size 2.4

More information

Quintel Mask Aligner

Quintel Mask Aligner Quintel Mask Aligner (quintel) 1.0 1.0 Title Quintel Q4000 Mask Aligner 2.0 2.0 Purpose The Quintel Q4000 MA (Mask Aligner) is a top and bottom side contact lithography printer with the video-view split

More information

Karl Suss MJB4 Mask Aligner

Karl Suss MJB4 Mask Aligner Karl Suss MJB4 Mask Aligner Tool Manager: Yong Sun ( yongs@princeton.edu; Office 8-8234; Cell 609-917-5076 ) Backup: George Watson ( gwatson@princeton.edu; Office 8-4626; Cell 732-996-2713 ) ******************************************************************************

More information

Equipment Standard Operating Procedure Greg Allion and Kimberly Appel

Equipment Standard Operating Procedure Greg Allion and Kimberly Appel Date Created: May 3, 2004 Date Modified: June 1, 2005 MA6/BA6 Mask Aligner Equipment Standard Operating Procedure Greg Allion and Kimberly Appel 1. Purpose 1.1. Photolithography involves transferring a

More information

COBILT CA-800 Mask Aligner Equipment Operation

COBILT CA-800 Mask Aligner Equipment Operation COBILT CA-800 Mask Aligner Equipment Operation For the Micro-Electronics Laboratory At University of Notre Dame Department of Electrical Engineering This user manual is not be removed from room 247A. This

More information

Operation of the contact mask aligner Canon PPC 210 Projection Print Camera

Operation of the contact mask aligner Canon PPC 210 Projection Print Camera Operation of the contact mask aligner Canon PPC 210 Projection Print Camera Start-up Procedure: 1. Start the grey pump in the service corridor behind the aligner 2. Open the valve for the Nitrogen gas

More information

University of Minnesota Nano Fabrication Center

University of Minnesota Nano Fabrication Center Equipment name: Karl Suss Mask Aligners Badger name: MA6-P Revision number: 0 Model: MA6 Revisionist: Paul Kimani Location: Bay 4 PAN Date: September 17, 2015 1. Introduction The Karl Suss MA6-PAN is a

More information

Operation of the mask aligner MJB-55

Operation of the mask aligner MJB-55 John Paul Adrian Glaubitz Operation of the mask aligner MJB-55 Department of Physics Faculty of Mathematics and Natural Sciences University of Oslo 1 Introduction The mask aligner is an essential tool

More information

O P E R ATING INSTRUCTIONS FOR MODEL SPR-45 Automatic Screen and Stencil Printer

O P E R ATING INSTRUCTIONS FOR MODEL SPR-45 Automatic Screen and Stencil Printer O P E R ATING INSTRUCTIONS FOR MODEL SPR-45 Automatic Screen and Stencil Printer TABLE OF CONTENTS I. SPECIFICATIONS...3. II. SAFETY INSTRUCTIONS...4. III. INSTALLATION...5. IV. SET-UP...6. V. SYSTEM OPERATION...9.

More information

SomnoSuite FAQ. Setup. Calibration 4. What are the calibration requirements for the SomnoSuite? Settings

SomnoSuite FAQ. Setup. Calibration 4. What are the calibration requirements for the SomnoSuite? Settings SomnoSuite FAQ V1.3 January 2015 Setup 1. How do I connect the SomnoSuite to my oxygen source? 2. Is there a way to speed up the downward movement of the pusher block when setting the empty position? 3.

More information

University of Minnesota Nano Fabrication Center

University of Minnesota Nano Fabrication Center Equipment name: Karl Suss Mask Aligners Badger name: MA6 & Maba6 Revision number: 4 Models: Revisionist: Paul Kimani Location: Bay 2 Date: April 25, 2013 1. Introduction The Karl Suss MA6 and MABA6 are

More information

Misaligned Folds Paper Feed Problems Double Feeds Won t Feed FLYER Won t Run iii

Misaligned Folds Paper Feed Problems Double Feeds Won t Feed FLYER Won t Run iii Operator s Manual Table of Contents Operator Safety... 1 Introduction... 2 Unpacking and Setup... 3 Unpacking... 3 Setup... 4 FLYER Overview... 5 FLYER Diagram... 5 Capabilities... 5 Control Panel... 6

More information

Standard Operating Procedure #COE-SOP-0001 Chemical Fume Hood Operation

Standard Operating Procedure #COE-SOP-0001 Chemical Fume Hood Operation Standard Operating Procedure # Chemical Fume Hood Operation Facility: NMSU College of Engineering Laboratories Written by: Juanita Miller, Safety Specialist, miljgh@nmsu.edu (575)-646-1292 Scope: This

More information

Karl Suss Contact Aligner Operation

Karl Suss Contact Aligner Operation Karl Suss Contact Aligner Operation Roger Robbins 6/31/2008 2 nd ed. 3/12/2009 The University of Texas at Dallas Erik Jonsson Engineering School of Engineering TITLE: Karl Suss Contact Aligner Operation

More information

Oerlikon Sputtering Evaporator SOP

Oerlikon Sputtering Evaporator SOP Oerlikon Sputtering Evaporator SOP Short UNT Cleanroom 1. Taking out sample holder from Transport Chamber : Log in FOM to access the software Go to the software and log in with user1 and password user1

More information

Login to ilab Kiosk. Revised 05/22/2018. Load your sample:

Login to ilab Kiosk. Revised 05/22/2018. Load your sample: Login to ilab Kiosk Load your sample: 1. Check: The analysis chamber pressure is

More information

Approved by Principal Investigator Date: Approved by Super User: Date:

Approved by Principal Investigator Date: Approved by Super User: Date: Approved by Principal Investigator Date: Approved by Super User: Date: Standard Operating Procedure BNC Commonwealth Dual Ion Beam Deposition System (CDIBS) Version 2010 February 14 I. Purpose This Standard

More information

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System)

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System) Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System) Revision date October 2014 2 Emergency Plan for Nano Furnace Standard Operating Procedures for Emergencies Contact information Person

More information

BASIC RULES OF USAGE, OLIS DSM-20 CD Management The instrument is currently managed by the Analytical Biophysics Core Facility.

BASIC RULES OF USAGE, OLIS DSM-20 CD Management The instrument is currently managed by the Analytical Biophysics Core Facility. Olis DSM-20 instructrions and rules p. 1 BASIC RULES OF USAGE, OLIS DSM-20 CD Management The instrument is currently managed by the Analytical Biophysics Core Facility. Signup On a first-come, first-served

More information

5.1.3 Mechanical Hazards Drive assemblies have sufficient power to cause injury. Keep hands, fingers, clothing and tools clear of moving parts.

5.1.3 Mechanical Hazards Drive assemblies have sufficient power to cause injury. Keep hands, fingers, clothing and tools clear of moving parts. Approved by: Process Engineer / / / / Equipment Engineer 1 SCOPE The purpose of this document is to detail the use of the PE4400. All users are expected to have read and understood this document. It is

More information

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems Corporation Issued: 5/09 P/N: 600104 Rev. 2 Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems The Gas Addition Accessory permits the

More information

icreasepro Creaser Operators Manual

icreasepro Creaser Operators Manual 6-2013 Version 3.0 icreasepro Creaser Operators Manual WWW.MBMCORP.COM 800-223-2508 TABLE OF CONTENTS SPECIFICATIONS.1a SAFETY PROCEDURES/CARE & MAINTENANCE..1b COMPONENT IDENTIFICATION 2 TOUCH SCREEN

More information

SPUTTER STATION STANDARD OPERATING PROCEDURE

SPUTTER STATION STANDARD OPERATING PROCEDURE SPUTTER STATION STANDARD OPERATING PROCEDURE Purpose of this Instrument: This instrument is used for deposition of thin metal or oxide films. Source materials supplied by WVU Shared Research Facilities:

More information

Section 3- Repair and Calibration Procedures

Section 3- Repair and Calibration Procedures Section 3- Repair and Calibration Procedures 1. Refrigerant Removal Procedures 2. Scale/PC Board Recalibration Procedure 3. PC Board Configuration Procedure of AR400 4. Scale Tare Procedure 5. Gauge Calibration

More information

Standard Operating Manual

Standard Operating Manual Standard Operating Manual Fisher Scientific Isotemp TM Model 281A Vacuum Oven Version 1.1 Page 1 of 9 Contents 1. Picture and Location 2. Process Capabilities 2.1 Cleanliness Standard 2.2 Substrate Size

More information

OPERATION OF THE DIMPLER

OPERATION OF THE DIMPLER OPERATION OF THE DIMPLER After thinning your sample to ~80 μm you can now do a dimpling process to thin the center up to 10 μm. When you walk in and use the DIMPLER it should already be calibrated and

More information

Title: Xactix XeF2 Etcher Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 03/23/2016

Title: Xactix XeF2 Etcher Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 03/23/2016 Approved by: Process Engineer / / / / Equipment Engineer 1 SCOPE The purpose of this document is to detail the use of the Xactix XeF2 Etcher. All users are expected to have read and understood this document.

More information

Equipment Operating Procedure Glove Box

Equipment Operating Procedure Glove Box Equipment Operating Procedure Glove Box Page 1 0.0 Changing the Compressed Gas Cylinder 1. Complete Compressed Gas Cylinder training from EHS website before manually exchanging gas cylinders. In order

More information

LAMINAR FLAME SPEED ANALYSIS USING PIV (PARTICLE IMAGE VELOCIMETRY)

LAMINAR FLAME SPEED ANALYSIS USING PIV (PARTICLE IMAGE VELOCIMETRY) LAMINAR FLAME SPEED ANALYSIS USING PIV (PARTICLE IMAGE VELOCIMETRY) OPERATIONAL PROCEDURES Venue: Project Room, Hopkinson Lab, CUED Experimental date: 25 March 2008 Prepared by: Cheng Tung Chong (ctc31@camacuk)

More information

[USING THE VITROBOT April 9, Using the Vitrobot

[USING THE VITROBOT April 9, Using the Vitrobot Using the Vitrobot The Vitrobot Mk 3 (aka Mark III, Mark 3, etc.) can control both the local temperature and the local humidity during the process of plunge-freezing a grid for cryoem. It does require

More information

PRESSURE SENSOR - ABSOLUTE (0 TO 700 kpa)

PRESSURE SENSOR - ABSOLUTE (0 TO 700 kpa) Instruction Sheet for the PASCO Model CI-6532A PRESSURE SENSOR - ABSOLUTE (0 TO 700 kpa) 012-06859B 10/98 $1.00 polyurethane tubing syringe cable with DIN s to computer interface quick release s (4) pressure

More information

Product Information News

Product Information News Product Information News MMR SECOND STAGE REGULATOR VALVE CORE MSA has changed its recommended rebuilding of the MMR Second Stage Regulator s bypass sleeve assembly during the annual inspection. Based

More information

OPERATION MANUAL RTI RHS650 RTI TECHNOLOGIES, INC East Market Street York, PA Manual P/N

OPERATION MANUAL RTI RHS650 RTI TECHNOLOGIES, INC East Market Street York, PA Manual P/N OPERATION MANUAL RTI RHS650 RTI TECHNOLOGIES, INC. 4075 East Market Street York, PA 17402 Manual P/N 035-80589-02 Table of Contents Components... 2 Test... 4 Recovery/Recycling... 5 Evacuation... 7 Charging...

More information

Inside Front cover This page will remain blank.

Inside Front cover This page will remain blank. Owner s Manual Inside Front cover This page will remain blank. 1 Table of Contents Parts of the AirCAT...3 Assembling the AirCAT...4 Attaching the wheels to the stand...4 Attaching the battery box to the

More information

ACV-10 Automatic Control Valve

ACV-10 Automatic Control Valve ACV-10 Automatic Control Valve Installation, Operation & Maintenance General: The Archer Instruments ACV-10 is a precision automatic feed rate control valve for use in vacuum systems feeding Chlorine,

More information

Operating Procedures for Metal Evaporator I

Operating Procedures for Metal Evaporator I Operating Procedures for Metal Evaporator I Metal Evaporator I is intended as a tool and a training device. Understanding the operation of this equipment should give you a basic knowledge of vacuum and

More information

632 AccuPro Set-up & Operation

632 AccuPro Set-up & Operation 632 AccuPro Set-up & Operation Always check: Reel & Roller bearings Bent or broken blades Make sure the reel spins freely in the frame Place the Reel Into the Machine There are three lifting options for

More information

Table of Contents. Operating Instructions. Resource v.2 Conserving Regulator

Table of Contents. Operating Instructions. Resource v.2 Conserving Regulator Operating Instructions Table of Contents Resource v.2 Conserving Regulator Safety Information Device Precautions Introduction Product Features Product Specifications Feature Illustrations Set Up Usage

More information

MoveRoll Conveyor Operating and Maintenance Manual

MoveRoll Conveyor Operating and Maintenance Manual MoveRoll Conveyor Operating and Maintenance Manual 1. Read this first! This manual contains information for protection of personnel in the roll handling area from possible injury and/or equipment damage.

More information

Standard Operating Procedure. For. PVD E-Beam

Standard Operating Procedure. For. PVD E-Beam P a g e 1 Standard Operating Procedure For PVD E-Beam P a g e 2 Introduction The PVD Electron-Beam Evaporator (E-Beam) thin film deposition machine uses a magnetically guided and collimated stream of electrons

More information

R2S Standard Sampling Assembly OPERATION PROCEDURE

R2S Standard Sampling Assembly OPERATION PROCEDURE PURPOSE 1 of 10 To describe the procedure to monitor for viable airborne bacteria with the Remote-Slit- Sampler Assembly (R2S) from EMTEK, LLC. Principle A 100 mm agar based test plate is placed on the

More information

Birck Nanotechnology Center

Birck Nanotechnology Center EFFECTIVE DATE: October 20, 2016 PAGE 1 of 8 This instruction covers the set-up and use of the bench-top for annealing and oxidizing samples within the cleanroom. 1. SAFETY REQUIREMENTS 1.1 Safety glasses

More information

Solvent System Walkthrough

Solvent System Walkthrough v2.0 1 Solvent System Walkthrough The Contour Glass solvent system is designed to give you air-free anhydrous solvent with minimal effort. However, the system is only as good as its users so please read

More information

The SPI Sputter Coater Handbook

The SPI Sputter Coater Handbook The SPI Sputter Coater Handbook Coating of Specimens SPI-Module Sputter Coater with Etch Mode 1. Mount the specimens onto the SEM stub. Keep in mind that many adhesives have high vapor pressure solvents

More information

USER MANUAL

USER MANUAL C Cimarron Sports 1-888-816-6517 www.cimarronsports.com Combo Pitching Machine USER MANUAL TABLE OF CONTENTS Thank you for purchasing the Cimarron Combo Pitching Machine. The Cimarron Combo Pitching Machine

More information

Chromat Calibration Updated October 27th, 2017

Chromat Calibration Updated October 27th, 2017 Chromat Calibration Updated October 27th, 2017 Calibrating the Chromatograph Performing the Chromat Calibration is highly recommended when starting a new well. The MLogger already has a default calibration

More information

Rejuvenation Instructions

Rejuvenation Instructions Rejuvenation Instructions #401 Air Systems UPR This NRI covers the following: Understanding the applications and operation of flow meters. Understand the application and operation of test pressure gauges.

More information

R I T. Title: Amray 1830 SEM Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 09/29/03 1 SCOPE 2 REFERENCE DOCUMENTS

R I T. Title: Amray 1830 SEM Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 09/29/03 1 SCOPE 2 REFERENCE DOCUMENTS Fabrication Laboratory Revision: A Rev Date: 09/29/03 Approved by: Process Engineer / / / / Equipment Engineer 1 SCOPE The purpose of this document is to detail the use of the Amray 1830 SEM. All users

More information

Approved by BNC Managing Director Paul Lum Date: Approved by PI (s) /Super User (s): _Peter Hosemann/Andy Minor_Date:

Approved by BNC Managing Director Paul Lum Date: Approved by PI (s) /Super User (s): _Peter Hosemann/Andy Minor_Date: Approved by BNC Managing Director Paul Lum Date: Approved by PI (s) /Super User (s): _Peter Hosemann/Andy Minor_Date: Standard Operating Procedure BNC FEI Quanta 3D FEG/FIB ESEM Version 2011 Aug 30 I.

More information

Standard Operating Manual

Standard Operating Manual Standard Operating Manual Branson IPC 3000 O 2 Asher Copyright 2014 by Hong Kong University of Science & Technology. All rights reserved. Page 1 Contents 1. Picture and Location 2. Process Capabilities

More information

Concentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST Industrial Drive, Orlinda, TN 37141

Concentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST Industrial Drive, Orlinda, TN 37141 0 Operation Manual Concentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST 615-654-4441 sales@specialtyh2o.com 615-654-4449 fax TABLE OF CONTENTS Section 1 GENERAL 1.1 Warnings and

More information

1.1 Equipment: substrate, wafer tweezers, metal targets 1.2 Personal Protective Equipment: nitrile gloves, safety glasses 1.

1.1 Equipment: substrate, wafer tweezers, metal targets 1.2 Personal Protective Equipment: nitrile gloves, safety glasses 1. Nanomaster NSC-3000 DC Magnetron Sputter Tool Standard Operating Procedure Faculty Supervisor: Prof. Robert White, Mechanical Engineering (x72210) Safety Office: Peter Nowak x73246 (Just dial this directly

More information

Installation Instructions

Installation Instructions Page 5750-S-1 Installation Instructions General These mounting instructions for Circular INCINO- PAK Burners are in addition to the specific instructions offered for other Maxon component items: Shut-Off

More information

WATER CONTROL SYSTEM QUICK START

WATER CONTROL SYSTEM QUICK START SETTINGS MENU SYSTEM OPTIONS WATER LEVEL BAR GRAPH 3 DS SPRAY ON/OFF CS SPRAY ON/OFF BEACON WATER CONTROL SYSTEM QUICK START WWW.GFWORLDWIDE.COM +1 (208) 664-9291 SERVICE@GFWORLDWIDE.COM DISPLAY SCREEN

More information

Regulator for 2 MPa ARX 20. How to Order. Bracket. Pressure gauge. Port size 1/8 1/4. Panel nut

Regulator for 2 MPa ARX 20. How to Order. Bracket. Pressure gauge. Port size 1/8 1/4. Panel nut Regulator for 2 MPa RX 2 How to Order RX2 1 Regulator 1 Regulating pressure.5 to.85mpa {.51 to 8.7kgf/cm²}.5 to.3mpa {.51 to 3.1kgf/cm²} Thread type Nil N F Rc(PT) NPT (PF) Port size 1 2 ccessories/options

More information

ABRASIVE REGULATOR II

ABRASIVE REGULATOR II ABRASIVE REGULATOR II 13096 Abrasive Regulator II TABLE OF CONTENTS Contact Information and Customer & Technical Service... 1 1 Introduction... 1 2 Abrasive Regulator... 1 Description:... 1 2.1 Regulator

More information

BASIC Z-STACK AND TIME SERIES SCAN ON THE ZEISS LIGHTSHEET Z. 1

BASIC Z-STACK AND TIME SERIES SCAN ON THE ZEISS LIGHTSHEET Z. 1 BASIC Z-STACK AND TIME SERIES SCAN ON THE ZEISS LIGHTSHEET Z. 1 The front door of the main body of the instrument may be open when you arrive. Take the sample chamber and slide it into position with the

More information

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012 JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012 UNIVERSITY OF TEXAS AT ARLINGTON Nanofabrication Research and Teaching Facility TABLE OF CONTENTS 1. Introduction....2 1.1 Scope of Work.....2

More information

Model Air Caddy Orig TABLE OF CONTENTS

Model Air Caddy Orig TABLE OF CONTENTS 92-0919 Orig. 020201 Model 75-0114 Air Caddy TABLE OF CONTENTS CUSTOMER MESSAGE Inside Front Cover SAFETY PRECAUTIONS 3 GENERAL DESCRIPTION 6 SPECIFICATIONS 7 MAINTENANCE 9 INSTALLATION AND OPERATION 11

More information

GV Standard X-Vent. Setup, Commissioning & Installation Guide

GV Standard X-Vent. Setup, Commissioning & Installation Guide GV Standard X-Vent Setup, Commissioning & Installation Guide Technical experts in the design, manufacture and supply of precision engineered, architectural rooflights for residential and commercial buildings.

More information

Safety Powder Spray Systems

Safety Powder Spray Systems Instruction Sheet P/N 107 952C Safety Powder Spray Systems 1. Introduction This section contains general safety instructions for using your Nordson equipment. Task- and equipment-specific warnings are

More information

LEO 1525 FEG SEM Standard Operating Procedures Mar. 6, 2012 For additional assistance, please contact the facility manager.

LEO 1525 FEG SEM Standard Operating Procedures Mar. 6, 2012 For additional assistance, please contact the facility manager. LEO 1525 FEG SEM Standard Operating Procedures Mar. 6, 2012 For additional assistance, please contact the facility manager. Please contact in case of emergency: SEM microscopist: Mr. Eric Miller, 7-0789

More information

Exercise 5-2. Bubblers EXERCISE OBJECTIVE DISCUSSION OUTLINE. Bubblers DISCUSSION. Learn to measure the level in a vessel using a bubbler.

Exercise 5-2. Bubblers EXERCISE OBJECTIVE DISCUSSION OUTLINE. Bubblers DISCUSSION. Learn to measure the level in a vessel using a bubbler. Exercise 5-2 Bubblers EXERCISE OBJECTIVE Learn to measure the level in a vessel using a bubbler. DISCUSSION OUTLINE The Discussion of this exercise covers the following points: Bubblers How to measure

More information

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road PROPORTIONING VALVE Model 150 INSTRUCTION MANUAL March 2017 IMS Company 10373 Stafford Road Telephone: (440) 543-1615 Fax: (440) 543-1069 Email: sales@imscompany.com 1 Introduction IMS Company reserves

More information

Photolithography. Operating Instructions

Photolithography. Operating Instructions Photolithography Operating Instructions The PR used during this laboratory session will be Microposit S1813 (from Shipley). Make sure everyone is following the laboratory protocol. Wear lab coats, safety

More information

Nanofabrication Facility: ECR Etcher SOP Rev. 01b, March 06. Standard Operating Procedure for PlasmaQuest ECR II Etching

Nanofabrication Facility: ECR Etcher SOP Rev. 01b, March 06. Standard Operating Procedure for PlasmaQuest ECR II Etching Standard Operating Procedure for PlasmaQuest ECR II Etching Authors: Rev. 00: Al Schmalz, Vighen Pacradouni and Jeff Young, December 21, 1998 Rev. 01: Dr. Andras G. Pattantyus-Abraham, May 24, 2005 Rev.

More information

Agilent 1220 Infinity II LC Mobile Upgrade Kit

Agilent 1220 Infinity II LC Mobile Upgrade Kit Agilent 1220 Infinity II LC Mobile Upgrade Kit Note 1220 Infinity II LC Mobile Upgrade Kit This note describes the procedures to install an Mobile Upgrade kit to an existing Agilent 1220 Infinity II LC.

More information

Powder Measure. Care & Usage Instructions. Instructions # Product # Revision: A

Powder Measure. Care & Usage Instructions. Instructions # Product # Revision: A Powder Measure Care & Usage Instructions Instructions #1048578 Product #909292 Revision: A 1 INFORMATION AND SAFETY INSTRUCTIONS Ammunition reloading can be dangerous if done improperly and should not

More information

Glove Box Installation Manual

Glove Box Installation Manual Glove Box Installation Manual 1998 by M. Braun Company File: GB-UNI-INS.DOC! Edition 08-00 by M. Boutin! Subject to be changed without notice Glovebox Installation Your Glove box has been fully assembled,

More information

6900 Maintenance Instruction System Flush

6900 Maintenance Instruction System Flush Equipment Required FA74005 Damper Drain Tube FA16005 Cover Removal Tool FA900005 Beaker 0.25 Litre FA900003 Solvent Cleaning Bottle FA940021 Syringe Polypropylene 50 ml as required FA999045 Gloves Latex

More information

RADIATION PROCEDURES MANUAL Procedure Cover Sheet

RADIATION PROCEDURES MANUAL Procedure Cover Sheet RADIATION PROCEDURES MANUAL Procedure Cover Sheet Procedure Title: Calibration of Eberline Portable Particulate Noble Gas Monitor Procedure Number: TSO-08-13-REV 1 Effective Date: July 1, 2008 Approved

More information

RAM 4021-DPX Operation Manual

RAM 4021-DPX Operation Manual RAM 4021-DPX Operation Manual Worldwide Manufacturer of Gas Detection Solutions TABLE OF CONTENTS ABL 4021-DPX / RAM 4021-DPX For Your Safety... 3 Description... 3 Setup Mode... 4 Lights/Alarms... 4 Operation...

More information

RG6000. Refrigerant Recovery Machine. Operating Manual. 99 Washington Street Melrose, MA Phone Toll Free

RG6000. Refrigerant Recovery Machine. Operating Manual. 99 Washington Street Melrose, MA Phone Toll Free TM Refrigerant Recovery Machine RG6000 1 Operating Manual 99 Washington Street Melrose, MA 02176 Phone 781-665-1400 Toll Free 1-800-517-8431 Visit us at www.testequipmentdepot.com Safety Precautions WARNING

More information

Operating Instructions

Operating Instructions Operating Instructions Before operating the thin film evaporator, please be aware of all safety concerns associated with this experiment: Burn hazard from the column and steam lines, Chemical hazards associated

More information

Blue River Technologies Port-A-Poly Mixer w/2.5 GPH LMI Pump And Secondary Water Dilution Line INSTALLATION AND OPERATION

Blue River Technologies Port-A-Poly Mixer w/2.5 GPH LMI Pump And Secondary Water Dilution Line INSTALLATION AND OPERATION Blue River Technologies Port-A-Poly Mixer w/2.5 GPH LMI Pump And Secondary Water Dilution Line INSTALLATION AND OPERATION Install your Blue River Technologies Port-A-Poly mixing system in a clean dry area.

More information

Tire Inflation Cage Kit For servicing only single piece automotive, and most light truck tire/wheel assemblies

Tire Inflation Cage Kit For servicing only single piece automotive, and most light truck tire/wheel assemblies Tire Inflation Cage Kit 85608214 For servicing only single piece automotive, and most light truck tire/wheel assemblies This is a supplement to your operating manual and covers the setup and use of the

More information

Tridak Model 1060 User Guide. Syringe Filling System

Tridak Model 1060 User Guide. Syringe Filling System Tridak Model 1060 User Guide Syringe Filling System 2 Model 1060 Syringe Filler User Guide About Dymax Light-curable materials as well as systems for light curing, fluid dispensing, and fluid packaging.

More information

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS)

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS) Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS) Sensitivity: 1x10 11 A m 2 Applied DC fields: 0 T to 5 T Applied AC fields: 0 G to 3 G (zero-to-peak), 0.01 Hz to 1000 Hz Temperatures

More information

Unaxis ICP/RIE SOP Revision 8 09/30/16 Page 1 of 5. NRF Unaxis ICP/RIE Etch SOP

Unaxis ICP/RIE SOP Revision 8 09/30/16 Page 1 of 5. NRF Unaxis ICP/RIE Etch SOP Page 1 of 5 NRF Unaxis ICP/RIE Etch SOP Unaxis Shuttlelock Reactive Ion Etcher with Inductively Coupled Plasma Module. Etch Capabilities: SiO2, Si3N4, Al, dielectrics and other commonly used materials.

More information

Operating Instructions for Cobra and Lynx Duct Leakage Testers

Operating Instructions for Cobra and Lynx Duct Leakage Testers Operating Instructions for Cobra and Lynx Duct Leakage Testers Table of Contents Introduction Introduction... 2 Safety Precautions Safety Precautions.. 2 Prior to Testing System Preparation.. 4 Power Requirements...

More information

Installation, Operation, Maintenance Manual For Quick-Jaw Models AL363, L364 & AL366

Installation, Operation, Maintenance Manual For Quick-Jaw Models AL363, L364 & AL366 Installation, Operation, Maintenance Manual For Quick-Jaw Models AL363, L364 & AL366 February 2014 Form FVC076 - Rev 07 IMPORTANT: KEEP THIS DOCUMENT WITH THE PRODUCT UNTIL IT REACHES THE END USER. 1.

More information

Installation, Operation & Maintenance Manual for Flo-Max Coupler Bracket Model FM150

Installation, Operation & Maintenance Manual for Flo-Max Coupler Bracket Model FM150 Installation, Operation & Maintenance Manual for Flo-Max Coupler Bracket Model FM150 January 2013 Form FVC 084 - Rev 02 IMPORTANT: KEEP THIS DOCUMENT WITH THE PRODUCT UNTIL IT REACHES THE END USER. 1.

More information

USE AND MAINTENANCE LIGHT TOWER

USE AND MAINTENANCE LIGHT TOWER USE AND MAINTENANCE LIGHT TOWER General Safety Information Allowed use The light tower has been designed to lighten the area in which it is positioned and oriented, after installing it on a generating

More information

Teacher s Assistant Laboratory Guide

Teacher s Assistant Laboratory Guide Teacher s Assistant Laboratory Guide Joseph B. Hakanson 1, Warner Meeks 2, and Dr. Joshua L. Rovey 3 Missouri University of Science and Technology, Rolla, Missouri, 65409 These instructions will discuss

More information

Unifilm Technology PVD-300 Sputter Deposition Operation Instructions

Unifilm Technology PVD-300 Sputter Deposition Operation Instructions Unifilm Technology PVD-300 Sputter Deposition Operation Instructions Contributors: Devin Brown, Kevin Klein, Ben King, Eric Woods Anything that is BOLD UNDERLINED ITALICS means that you should press that

More information

Cover Page for Lab Report Group Portion. Flow Visualization in a Water Channel

Cover Page for Lab Report Group Portion. Flow Visualization in a Water Channel Cover Page for Lab Report Group Portion Flow Visualization in a Water Channel Prepared by Professor J. M. Cimbala, Penn State University Latest revision: 08 September 2017 Name 1: Name 2: Name 3: [Name

More information

INSTALLATION & MAINTENANCE INSTRUCTION

INSTALLATION & MAINTENANCE INSTRUCTION ARCHON Industries, Inc Liquid Level Gauges Models: BT-LLG ND-LLG INSTALLATION & MAINTENANCE INSTRUCTION Instruction No.: 1014.2 Revision Issued: 3/01/03 Approved: Engineering Manager Warning ONLY QUALIFIED

More information