Teacher s Assistant Laboratory Guide

Size: px
Start display at page:

Download "Teacher s Assistant Laboratory Guide"

Transcription

1 Teacher s Assistant Laboratory Guide Joseph B. Hakanson 1, Warner Meeks 2, and Dr. Joshua L. Rovey 3 Missouri University of Science and Technology, Rolla, Missouri, These instructions will discuss the assembly of several experiments that can be used for undergraduate education in DC plasma. Experimental breakdown curves and Langmuir Probe curves will be studied with the use of a DC glow test article. p*d = pressure-distance parameter Nomenclature I. Introduction This document has been written to help the Teacher s Assistant (TA) in the preparation and execution of the laboratory experiment. This document includes instructions on how to assemble each part of the experiment, but does not address how to acquire or manufacture the parts themselves. Additionally, a separate document titled Plasma Theory for Undergraduate Education provides instructions on how to perform the experiments, which should also be given to the students. II. Experimentation Apparatus The AP Lab has assembled a DC glow discharge similar to that used by the Princeton Plasma Physics Laboratory [1]. The test article is constructed from a 3 ¾ diameter Pyrex tube T-joint, an Edwards Series 3 rough pump, and a Varian V70 turbo pump (see Figure 1). Two electrodes are suspended in a parallel configuration with a variable gap distance. Argon gas or air is used to backfill the chamber to the desired pressure from high vacuum. To control the backfill system, an Alicat Scientific digital flow regulator is used. To power the electric discharge a Glassman High Voltage Inc. 1000V 100mA variable DC power supply is connected to one electrode while grounding the second and is monitored by a Tenima Benchtop Digital Multimeter. For the Langmuir study, a BK Precision 1739 DC Power Supply was used to bias the probe. 1 Undergraduate Student, Aerospace and Mechanical Engineering, 2009 Maxwell St. Apt. A 2 Graduate Student, Mechanical and Aerospace Engineering, wcm994@mst.edu 3 Professor, Mechanical and Aerospace Engineering, 292D Toomey Hall 1

2 Figure 1. Apparatus Setup III. Experiment Assembly A. Lab Equipment Checklist To begin this lab, first verify that all necessary equipment has been identified and located: 1) DC Glow Apparatus a) Pair of rounded, polished electrodes for observation b) High-voltage cable Don't Touch 2) Argon Backfill Supply (optional) a) Filled tank of argon b) Bottle and Gauge valves c) Flow regulator 3) Power Supply a) 1000V power Supply b) 30V power supply 4) Pumps a) Rough pump b) Turbo pump (optional) 5) Sensors and Probes a) Digital pressure gauge b) Digital multimeters One to monitor discharge current and probe current and one to monitor discharge voltage c) Langmuir Probe d) Oscilloscope 2

3 B. General Assembly This section shall contain details of assembling parts of the experiment that shall be consistent between both the Paschen Study and the Langmuir Probe experiments. 1) DC Glow Apparatus a) As indicated in Figure 1., the two concentric openings of the T-joint shall be capped with stainless steel plates which will serve as the fixture point for each electrode. Just below the bottom plate is a 6-way cross piece that will allow the turbo pump to be connected and the electrode to slide directly through. The hole which the electrodes slide through is hermetically sealed, meaning that the electrode gap may be adjusted even when the chamber is evacuated. b) The 1000V power supply should be grounded on the negative side, and the positive side should be connected to the top electrode. The high-voltage line needs to have sufficient insulation to prevent accidental electrocution. 2) Electrical Sensors a) If the 1000V power supply electrical display lacks the precision needed for the experiments, then separate multimeters may be used to monitor the system. In this case, a multimeter should be set to measure DC voltage, and placed in parallel across the power supply. To monitor current, a multimeter can be set to measure DC current and arranged in series with the circuit. Because not much current is drawn by the plasma, the maximum current rating of the multimeter is not exceeded, and a clamp on induction meter is not needed. b) A digital pressure sensor should be placed in the chamber and can simply be powered by the cart s power strip. Therefore the sensor will turn on whenever the cart is turned on. c) The volumetric flow regulator should be connected to the argon supply line as close to the chamber as possible to eliminate as much line capacitance as possible. If there is much line between the regulator and the chamber, then there will be a substantial lag whenever the flow rate is changed because the gas requires much time to disperse through the long, skinny tube. The flow regulator should be turned on and off by connecting/disconnecting the power line directly to the flow meter. 3) Gas Pumps a) The turbo pump should be connected directly to the 6-way cross piece below the chamber and powered by a nearby power by the cart power strip. Note that the turbo pump is only necessary when purging the chamber for non-air gas studies. b) The rough pump should be connected to the exhaust from the turbo pump. The exhaust from the rough pump should be vented to a filtration system. The rough pump should be powered by a nearby wall outlet. When evacuating the chamber, the rough pump should be used initially to bring the pressure down to 20 mtorr, and then the turbo pump may be used to reduce the pressure to 0.05 mtorr. C. Paschen Study Assembly This section will specify all necessary modifications to the General Assembly that are needed to perform the Paschen Study. 1) Gap Distance a) The independent variable of the Paschen Curve, p*d, depends on d. Therefore, several iterations of the experiment can be performed at different gap distances to capture more of the p*d spectrum. b) To adjust the gap distance, loosen the nut on the bottom electrode by hand when the power supply is turned off. Then slide the electrode up or down. The top electrode need not be adjusted. D. Langmuir Probe Assembly This section will specify all necessary modifications to the General Assembly that are needed to perform the Langmuir Probe Study. 1) Gap Distance a) To adjust the gap distance, loosen the nut on the bottom electrode when the power supply is turned off. Then slide the electrode up or down. In doing so, make sure that the probe will still capture the desired region of the plasma. If needed, the top electrode may be adjusted by using 9/16 wrenches to loosen the two locked nuts. Be sure that the electrode is fully discharged before touching it because there may be some small capacitance associated with the electrode. 2) Langmuir Probe 3

4 a) The Langmuir Probe will be inserted into the vacuum chamber through the non-collinear leg of the T-joint. Position the probe so that the tungsten leads are along the perimeter of the plasma glow. This is done to insure that the probe isn t in the direct path of the electrons as they flow between probes, but is rather capturing the stray electrons of the glow. Make sure that the probe is positioned appropriately to capture the positive column of the glow. 3) Electrical equipment a) The Langmuir Probe circuit should follow the diagram in Figure 2. Note that the voltmeter in the diagram can be pulled from the initial apparatus setup after the 1000V supply has been tuned to a specific desired voltage. b) The 30V supply should initially be grounded on the negative terminal with the grounding strap and power should be drawn from the positive terminal. When the students desire to sweep the negative spectrum, the grounding strap should be flipped to the positive terminal, and the banana cable should be moved to the negative terminal. c) Because the plasma is drawing such little current, the voltage across a large resister is used to calculate the precise current. If a resistor matching the one used in the APL cannot be found (167 kohms), a resistor or resistor circuit of similar magnitude can be substituted. Figure 2. Langmuir Probe Circuit IV. Conclusion Through these experiments, undergraduate students should gain a richer understanding of the properties and characterization of DC plasma. With a solid grounding in these basics, more complicated applications of plasma technology may be explored. 4

5 References [1] Stephanie A. Wissel, A. Z. (2012). The Use of DC Glow Discharges as Undergraduate Education Tools. Princeton Plasma Physics Laboratory,

Lab 1c Isentropic Blow-down Process and Discharge Coefficient

Lab 1c Isentropic Blow-down Process and Discharge Coefficient 058:080 Experimental Engineering Lab 1c Isentropic Blow-down Process and Discharge Coefficient OBJECTIVES - To study the transient discharge of a rigid pressurized tank; To determine the discharge coefficients

More information

Plasma Cleaner. Yamato Scientific America. Contents. Innovating Science for Over 125 Years. Gas Plasma Dry Cleaner PDC200/210/510 PDC610G.

Plasma Cleaner. Yamato Scientific America. Contents. Innovating Science for Over 125 Years. Gas Plasma Dry Cleaner PDC200/210/510 PDC610G. Yamato Scientific America Innovating Science for Over 125 Years Plasma Cleaner Contents Gas Plasma Dry Cleaner PDC200/210/510 PDC610G Gas Plasma Reactor 145 146 147 149 144 Gas Plasma Dry Cleaner Plasma

More information

Approved by Principal Investigator Date: Approved by Super User: Date:

Approved by Principal Investigator Date: Approved by Super User: Date: Approved by Principal Investigator Date: Approved by Super User: Date: Standard Operating Procedure BNC Commonwealth Dual Ion Beam Deposition System (CDIBS) Version 2010 February 14 I. Purpose This Standard

More information

The Experts in Vacuum Solutions

The Experts in Vacuum Solutions By Woodrow Farrow - Reprinted with permission from Specialty Gas Report Vacuum: a space that is relatively empty of matter, especially when that void has been created through artificial means. The earth

More information

AC : MEASUREMENT OF HYDROGEN IN HELIUM FLOW

AC : MEASUREMENT OF HYDROGEN IN HELIUM FLOW AC 2010-2145: MEASUREMENT OF HYDROGEN IN HELIUM FLOW Randy Buchanan, University of Southern Mississippi Christopher Winstead, University of Southern Mississippi Anton Netchaev, University of Southern Mississippi

More information

DRAFT. Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35

DRAFT. Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35 Operating Procedures for the NPDGamma Liquid Hydrogen Target V0.03 11/26/05 1 DRAFT Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35 Version 0.03 November 26, 2005

More information

The Broadest Gauging Line in the Industry

The Broadest Gauging Line in the Industry The Broadest Gauging Line in the Industry Vacuum Measurement Varian s broad line of vacuum gauge controllers and gauge tubes are the most reliable, accurate, and economical means of measuring, monitoring,

More information

Installation, operating and maintenance Instructions for Seemag bypass level indicator

Installation, operating and maintenance Instructions for Seemag bypass level indicator Issue: S Date: 05-09-14 Type G35 General information The Seetru bypass magnetic level indicator, abbreviate SEEMAG, serves to show the filling level of fluids in tanks, basins, tubes etc. The Seemag operates

More information

A Journal of Practical and Useful Vacuum Technology. By Phil Danielson

A Journal of Practical and Useful Vacuum Technology. By Phil Danielson A Journal of Practical and Useful Vacuum Technology From By Phil Danielson Thermal Conductivity Gauges Thermal conductivity pressure gauges are extremely common in vacuum technology, but an understanding

More information

High-performance submersible pressure transmitter For level measurement Model LH-10

High-performance submersible pressure transmitter For level measurement Model LH-10 Electronic pressure measurement High-performance submersible pressure transmitter For level measurement Model LH-10 WIKA data sheet PE 81.09 Applications Level measurement in rivers and lakes Deep well

More information

OAI Model 200 Tabletop Mask Aligner Portland State University

OAI Model 200 Tabletop Mask Aligner Portland State University OAI Model 200 Tabletop Mask Aligner Portland State University WARNING: This machine exposes users to ultraviolet radiation. Do not touch the lens underneath the lamp hood as it may damage the machine and

More information

5.1.3 Mechanical Hazards Drive assemblies have sufficient power to cause injury. Keep hands, fingers, clothing and tools clear of moving parts.

5.1.3 Mechanical Hazards Drive assemblies have sufficient power to cause injury. Keep hands, fingers, clothing and tools clear of moving parts. Approved by: Process Engineer / / / / Equipment Engineer 1 SCOPE The purpose of this document is to detail the use of the PE4400. All users are expected to have read and understood this document. It is

More information

14 UD Tank Opening Report #122 A/B

14 UD Tank Opening Report #122 A/B 14 UD Tank Opening Report #122 A/B A: 3 March 5 March 2014 B: 6 March 12 March 2014 Team leader Report compiled by Tank crew Gas handling Electronics Unit A. Muirhead P. Linardakis, A. Muirhead A. Cooper,

More information

LOW PRESSURE EFFUSION OF GASES adapted by Luke Hanley and Mike Trenary

LOW PRESSURE EFFUSION OF GASES adapted by Luke Hanley and Mike Trenary ADH 1/7/014 LOW PRESSURE EFFUSION OF GASES adapted by Luke Hanley and Mike Trenary This experiment will introduce you to the kinetic properties of low-pressure gases. You will make observations on the

More information

Heat Engine. Reading: Appropriate sections for first, second law of thermodynamics, and PV diagrams.

Heat Engine. Reading: Appropriate sections for first, second law of thermodynamics, and PV diagrams. Heat Engine Equipment: Capstone, 2 large glass beakers (one for ice water, the other for boiling water), temperature sensor, pressure sensor, rotary motion sensor, meter stick, calipers, set of weights,

More information

SomnoSuite FAQ. Setup. Calibration 4. What are the calibration requirements for the SomnoSuite? Settings

SomnoSuite FAQ. Setup. Calibration 4. What are the calibration requirements for the SomnoSuite? Settings SomnoSuite FAQ V1.3 January 2015 Setup 1. How do I connect the SomnoSuite to my oxygen source? 2. Is there a way to speed up the downward movement of the pusher block when setting the empty position? 3.

More information

Pump Performance Testing

Pump Performance Testing Pump Performance Testing SAFETY Keep water away from all electrical equipment except the pump, and do your best to keep the pump motor dry. Don t handle the power supply or multimeter(s) with wet hands

More information

PLASMA PHYSICS ADVANCED LAB

PLASMA PHYSICS ADVANCED LAB PLASMA PHYSICS ADVANCED LAB Rev. 2010 Laboratory Cautions 1. The energy from the RF amplifier can can cause burns or even be lethal. Be aware of all electrical connections to the output of this device.

More information

Mass Spec will not Autotune

Mass Spec will not Autotune Mass Spec will not Autotune Applies to 5973A/N MSD What could be the problem? There could be several things that would cause your Mass Spec not to Autotune. The most common, easily corrected Autotune problems

More information

LMP 307. Stainless Steel Probe. Stainless Steel Sensor. accuracy according to IEC 60770: standard: 0.35 % FSO option: 0.25 % / 0.

LMP 307. Stainless Steel Probe. Stainless Steel Sensor. accuracy according to IEC 60770: standard: 0.35 % FSO option: 0.25 % / 0. LMP 07 Stainless Steel Sensor accuracy according to IEC 60770: standard: 0.5 % FSO option: 0.5 % / 0. % FSO Nominal pressure from 0... mho up to 0... 50 mho Output signals -wire: 4... 0 ma -wire: 0...

More information

ACV-10 Automatic Control Valve

ACV-10 Automatic Control Valve ACV-10 Automatic Control Valve Installation, Operation & Maintenance General: The Archer Instruments ACV-10 is a precision automatic feed rate control valve for use in vacuum systems feeding Chlorine,

More information

High-performance submersible pressure transmitter For level measurement Model LH-10

High-performance submersible pressure transmitter For level measurement Model LH-10 Electronic pressure measurement High-performance submersible pressure transmitter For level measurement Model LH-10 WIKA data sheet PE 81.09 Applications Level measurement in rivers and lakes Deep well

More information

Table of Contents Want full page pictures with most important parts labeled in the beginning.

Table of Contents Want full page pictures with most important parts labeled in the beginning. 1 Table of Contents Want full page pictures with most important parts labeled in the beginning. Precool Procedures (Perform before cooling down): 1. Check N2 and 4He gas tanks to be sure that there is

More information

INSTRUMENTS A THERMAL MASS FLOW SENSOR USING A CONSTANT DIFFERENTIAL TEMPERATURE ABOVE THE AMBIENT GAS TEMPERATURE

INSTRUMENTS A THERMAL MASS FLOW SENSOR USING A CONSTANT DIFFERENTIAL TEMPERATURE ABOVE THE AMBIENT GAS TEMPERATURE TELEDYNE HASTINGS TECHNICAL PAPERS INSTRUMENTS A THERMAL MASS FLOW SENSOR USING A CONSTANT DIFFERENTIAL TEMPERATURE ABOVE THE AMBIENT GAS TEMPERATURE Proceedings of FEDSM 98 1998 ASME Fluids Engineering

More information

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS)

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS) Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS) Sensitivity: 1x10 11 A m 2 Applied DC fields: 0 T to 5 T Applied AC fields: 0 G to 3 G (zero-to-peak), 0.01 Hz to 1000 Hz Temperatures

More information

Manual Solvent Purification System. Innovative Technology, Inc.

Manual Solvent Purification System. Innovative Technology, Inc. Innovative Technology, Inc. 2 New Pasture Road, Newburyport, MA 01950-4054 USA Email: Info@gloveboxes.com TEL: +1 978 462 4415 FAX: +1 978 462 3338 Manual Solvent Purification System Copyright Innovative

More information

CHEMICAL ENGINEERING LABORATORY CHEG 239W. Control of a Steam-Heated Mixing Tank with a Pneumatic Process Controller

CHEMICAL ENGINEERING LABORATORY CHEG 239W. Control of a Steam-Heated Mixing Tank with a Pneumatic Process Controller CHEMICAL ENGINEERING LABORATORY CHEG 239W Control of a Steam-Heated Mixing Tank with a Pneumatic Process Controller Objective The experiment involves tuning a commercial process controller for temperature

More information

TWC Services, Inc. Structured On-The-Job Training for JT- 1, 2, 3

TWC Services, Inc. Structured On-The-Job Training for JT- 1, 2, 3 TWC Services, Inc. Structured On-The-Job Training for JT- 1, 2, 3 The following tasks parallel the Jr. Tech (JT-1, 2, 3) description and development plan and use the Refrigeration and Air conditioning

More information

Instruction Manual. PE-25/32/37 Tapping Machines. POLYTAPP Valves

Instruction Manual. PE-25/32/37 Tapping Machines. POLYTAPP Valves Instruction Manual PE-25/32/37 Tapping Machines & POLYTAPP Valves Nov 2016, Revision 2 Document Number 3000111 2 M.T. Deason Company, Inc. PO Box 101807 Birmingham, AL 35210 Phone: 205 956 2266 Fax: 205

More information

INSTRUCTION MANUAL. January 23, 2003, Revision 0

INSTRUCTION MANUAL. January 23, 2003, Revision 0 INSTRUCTION MANUAL Model 810A In-Vitro Test Apparatus for 310B Muscle Lever January 23, 2003, Revision 0 Copyright 2003 Aurora Scientific Inc. Aurora Scientific Inc. 360 Industrial Parkway S., Unit 4 Aurora,

More information

MEMORIAL UNIVERSITY OF NEWFOUNDLAND Faculty of Engineering and Applied Science FLUID MECHANICS LABORATORY PIPE FRICTION

MEMORIAL UNIVERSITY OF NEWFOUNDLAND Faculty of Engineering and Applied Science FLUID MECHANICS LABORATORY PIPE FRICTION MEMORIAL UNIVERSITY OF NEWFOUNDLAND Faculty of Engineering and Applied Science FLUID MECHANICS LABORATORY PIPE FRICTION Objective To estimate the fluid pressure drops and roughness specifications for copper

More information

Cover Page for Lab Report Group Portion. Head Losses in Pipes

Cover Page for Lab Report Group Portion. Head Losses in Pipes Cover Page for Lab Report Group Portion Head Losses in Pipes Prepared by Professor J. M. Cimbala, Penn State University Latest revision: 02 February 2012 Name 1: Name 2: Name 3: [Name 4: ] Date: Section

More information

JANIS OPERATING INSTRUCTIONS FOR SUPERCONDUCTING MAGNET CRYOSTATS

JANIS OPERATING INSTRUCTIONS FOR SUPERCONDUCTING MAGNET CRYOSTATS OPERATING INSTRUCTIONS FOR SUPERCONDUCTING MAGNET CRYOSTATS INTRODUCTION The Janis Research Company's Superconducting Magnet/Cryostat System is one of the most versatile tools available to the scientist

More information

Instruction Manual. Digital Thermocouple Gauge Control Units Models DTC & DTC Models DTC-06M-115 & DTC-06M-230

Instruction Manual. Digital Thermocouple Gauge Control Units Models DTC & DTC Models DTC-06M-115 & DTC-06M-230 Instruction Manual Digital Thermocouple Gauge Control Units Models DTC-531-115 & DTC-531-230 Models DTC-06M-115 & DTC-06M-230 Copyright 1998 by Duniway Stockroom Corp. 021315lh 1 of 7 Table of Contents

More information

D R A F T. Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13. Version 1.00

D R A F T. Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13. Version 1.00 D R A F T Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13 Version 1.00 October 06, 2010 Operating Procedures for the NPDGamma Liquid Hydrogen Target V1.00 6/10/10 2 Table of Content

More information

Cover Page for Lab Report Group Portion. Pump Performance

Cover Page for Lab Report Group Portion. Pump Performance Cover Page for Lab Report Group Portion Pump Performance Prepared by Professor J. M. Cimbala, Penn State University Latest revision: 02 March 2012 Name 1: Name 2: Name 3: [Name 4: ] Date: Section number:

More information

LOW PRESSURE EFFUSION OF GASES revised by Igor Bolotin 03/05/12

LOW PRESSURE EFFUSION OF GASES revised by Igor Bolotin 03/05/12 LOW PRESSURE EFFUSION OF GASES revised by Igor Bolotin 03/05/ This experiment will introduce you to the kinetic properties of low-pressure gases. You will make observations on the rates with which selected

More information

Approved by Principal Investigator Date: Approved by Super User: Date:

Approved by Principal Investigator Date: Approved by Super User: Date: Approved by Principal Investigator Date: Approved by Super User: Date: Standard Operating Procedure BNC OAI 200 Lithographic Mask Aligner (Aligner 3) Version 2011 June 2 I. Purpose This Standard Operating

More information

Vacuum Systems and Cryogenics for Integrated Circuit Fabrication Technology 01

Vacuum Systems and Cryogenics for Integrated Circuit Fabrication Technology 01 INAOE. Tonantzintla, Mexico. 2010-06-23. June 23 rd, 2010 Vacuum Systems and Cryogenics for Integrated Circuit Fabrication Technology 01 Joel Molina INAOE Microelectronics Group jmolina@inaoep.mx 1 Vacuum

More information

Oxidation Stability of Gasoline and Aviation Fuels

Oxidation Stability of Gasoline and Aviation Fuels Oxidation Stability of Gasoline (Induction Period Method) Oxidation Stability of Aviation Fuels (Potential Residue Method) Test Method Provides an indication of the tendency of gasoline and aviation fuels

More information

AMS 2710 PCB pressure sensor module with V output

AMS 2710 PCB pressure sensor module with V output FEATURES Universal pressure sensor module with 0.. 10 V voltage output Fully calibrated and temperature compensated sensor module Variants for (bidirectional) differential, gage, absolute and barometric

More information

660 Multipoint Electronic Level Switch

660 Multipoint Electronic Level Switch 660 Multipoint Electronic Level Switch General Instructions The Multipoint Electronic Level Switch is a level sensing device which reads process level by capacitance measurement. Capacitance varies according

More information

The SPI Sputter Coater Handbook

The SPI Sputter Coater Handbook The SPI Sputter Coater Handbook Coating of Specimens SPI-Module Sputter Coater with Etch Mode 1. Mount the specimens onto the SEM stub. Keep in mind that many adhesives have high vapor pressure solvents

More information

Review of the Hall B Gas System Hardware. George Jacobs

Review of the Hall B Gas System Hardware. George Jacobs of the Hardware George Jacobs DSG Staff 2 Hall B Gas Utilities for detectors Drift Chamber (DC) Low Threshold Cherenkov Counter (LTCC) Micromegas Vertex Tracker (MVT) Forward Tagger (FT) Ring Imaging Cherenkov

More information

Process: Chlorine etch. Item Qty Description Price/Unit Total

Process: Chlorine etch. Item Qty Description Price/Unit Total To: University of Colorado Issued: November 25, 2015 Dept. of ECEE Expiry date: February 23, 2016 Boulder CO 80309-0425 Sales Contact: Paul Sadlek Attn: USA Won Park Phone: 303-735-3601 Project: Apex SLR

More information

RAI-M series RUDDER ANGLE INDICATOR SYSTEM

RAI-M series RUDDER ANGLE INDICATOR SYSTEM RUDDER ANGLE INDICATOR SYSTEM RAI-M series SEAFIRST ENGINEERING CO 45-16, Ga Um Dong, Chang Won, Kyong Nam Korea Tel : 82 55 267 1645 Fax ; 82 55 266 1646 http://www.seafirst.co.kr GENERAL Seafirst Rudder

More information

Long term stability tests of INO RPC prototypes

Long term stability tests of INO RPC prototypes Long term stability tests of INO RPC prototypes While the problem of sudden aging in the glass RPC prototypes is being investigated, a few RPCs of dimension 40 cm 30 cm were fabricated, using glass procured

More information

Product Safety and the use of EMC techniques to evaluate the 30 Amp Ground continuity test

Product Safety and the use of EMC techniques to evaluate the 30 Amp Ground continuity test Product Safety and the use of EMC techniques to evaluate the 30 Amp Ground continuity test Ron Duffy Product Safety Engineer Agilent Technologies, Inc ron_duffy@agilent.com Richard Georgerian Product Compliance

More information

Vacuum Pumpdown and Venting Procedure, CRaTER Thermal Vacuum System. Dwg. No

Vacuum Pumpdown and Venting Procedure, CRaTER Thermal Vacuum System. Dwg. No Rev. ECO Description Checked Approval Date 01 32- Release M. Smith Vacuum Pumpdown and Venting Procedure, CRaTER Thermal Vacuum System Dwg. No. 32-06003.05 Revision 01 June 18, 2007 1 1. Introduction 1.1.

More information

AN EXPERIMENTAL AND ANALYTICAL STUDY OF PLASMA CLOSING SWITCHES FILLED WITH ENVIRONMENTALLY FRIENDLY GASES

AN EXPERIMENTAL AND ANALYTICAL STUDY OF PLASMA CLOSING SWITCHES FILLED WITH ENVIRONMENTALLY FRIENDLY GASES AN EXPERIMENTAL AND ANALYTICAL STUDY OF PLASMA CLOSING SWITCHES FILLED WITH ENVIRONMENTALLY FRIENDLY GASES C. McGarvey, I. V. Timoshkin, S. J. MacGregor, M. P. Wilson, M. J. Given, High Voltage Technologies,

More information

QUICK START GUIDE CB-450 DATA BUOY PLATFORM

QUICK START GUIDE CB-450 DATA BUOY PLATFORM What s Included (1) Buoy hull with data well, 450 lb buoyancy (1) Buoy tower (3) 10W Solar panels (1) Data well lid (isic-cb or pass-through) (3) Top-side lifting eyes (3) Bottom-side mooring eyes (1)

More information

SINGLE VALVE WITH LOW-FLOW BYPASS

SINGLE VALVE WITH LOW-FLOW BYPASS CONTROL VALVES Pressure Reducing Valve Sizing Guide Sizing pilot operated reducing valves is not a complicated process. It starts with determining requirements and following these guidelines in valve size

More information

R I T. Title: Amray 1830 SEM Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 09/29/03 1 SCOPE 2 REFERENCE DOCUMENTS

R I T. Title: Amray 1830 SEM Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 09/29/03 1 SCOPE 2 REFERENCE DOCUMENTS Fabrication Laboratory Revision: A Rev Date: 09/29/03 Approved by: Process Engineer / / / / Equipment Engineer 1 SCOPE The purpose of this document is to detail the use of the Amray 1830 SEM. All users

More information

How Bright Is Your Glow Stick? Measure It!

How Bright Is Your Glow Stick? Measure It! How Bright Is Your Glow Stick? Measure It! https://www.sciencebuddies.org/science-fair-projects/project_ideas/chem_p072/chemistry/measure-brightness-glow-stick (http://www.sciencebuddies.org/science-fairprojects/project_ideas/chem_p072/chemistry/measure-brightness-glow-stick)

More information

WSN: XXXXXX 101 ROME COURT FORT COLLINS, CO, PHONE #: (970) FAX #: (970) TO-Clean Manual

WSN: XXXXXX 101 ROME COURT FORT COLLINS, CO, PHONE #: (970) FAX #: (970) TO-Clean Manual WSN: XXXXXX 101 ROME COURT FORT COLLINS, CO, 80524 PHONE #: (970) 221-9179 FAX #: (970) 221-9364 TO-Clean Manual Copyright 2008 by Wasson ECE Instrumentation, Inc. (SJC 02/05/2008) All rights reserved

More information

This educational seminar discusses creating, measuring, and troubleshooting Rough Vacuum.

This educational seminar discusses creating, measuring, and troubleshooting Rough Vacuum. This educational seminar discusses creating, measuring, and troubleshooting Rough Vacuum. Specifically, today s talk will cover: Brief review of Vacuum Fundamentals Applications Using Rough Vacuum Rough

More information

Inert Air (N2) Systems Manual

Inert Air (N2) Systems Manual INSTRUCTION MANUAL Inert Air (N2) Systems Manual N2-MANUAL 2.10 READ AND UNDERSTAND THIS MANUAL PRIOR TO OPERATING OR SERVICING THIS PRODUCT. GENERAL INFORMATION Positive pressure nitrogen gas pressurizing

More information

Study the Addition of Lab-Made Gas Mixing Unit with Varying of Inter-Electrode Distances on the Characterization of DC Magnetron Sputtering System

Study the Addition of Lab-Made Gas Mixing Unit with Varying of Inter-Electrode Distances on the Characterization of DC Magnetron Sputtering System Open Access Library Journal 2017, Volume 4, e3269 ISSN Online: 2333-9721 ISSN Print: 2333-9705 Study the Addition of Lab-Made Gas Mixing Unit with Varying of Inter-Electrode Distances on the Characterization

More information

Operating Procedures for the. SAMCO ICP RIE System

Operating Procedures for the. SAMCO ICP RIE System Operating Procedures for the SAMCO ICP RIE System General Overview: The purpose of the SAMCO Model 200iP Inductively Coupled Plasma Reactive Ion Etcher (ICP RIE) is to etch III-V compound semiconductors

More information

Ocean Observatories Initiative. Coastal & Global Scale Nodes. Hydrogen Safety. OOI Surface Mooring Hydrogen Safety Review

Ocean Observatories Initiative. Coastal & Global Scale Nodes. Hydrogen Safety. OOI Surface Mooring Hydrogen Safety Review Ocean Observatories Initiative Coastal & Global Scale Nodes Hydrogen Safety CP01 Mooring Timeline: 21 November 2013: CP01CNSM was deployed and transitioned to shore controlled operations. 17 Feb. 2014:

More information

DC gun high voltage conditioning with Krypton gas Carlos Hernandez-Garcia October 2008

DC gun high voltage conditioning with Krypton gas Carlos Hernandez-Garcia October 2008 DC gun high voltage conditioning with Krypton gas Carlos Hernandez-Garcia October 2008 Index Background 1 High voltage processing with Helium gas 2 High voltage processing with Krypton gas 3 Some thoughts

More information

Operations Manual. Internal automatic Pressure control for orbital tube welding. By Exel Orbital Systems, Inc. Page

Operations Manual. Internal automatic Pressure control for orbital tube welding. By Exel Orbital Systems, Inc. Page Operations Manual Internal automatic Pressure control for orbital tube welding. By Exel Orbital Systems, Inc. Page SG1 Overview and Dimensions 5.25 / 133 mm PS Power Supply Connection 4.06 / 103 mm Top

More information

ARTICLE IN PRESS. Nuclear Instruments and Methods in Physics Research A

ARTICLE IN PRESS. Nuclear Instruments and Methods in Physics Research A Nuclear Instruments and Methods in Physics Research A 602 (2009) 845 849 Contents lists available at ScienceDirect Nuclear Instruments and Methods in Physics Research A journal homepage: www.elsevier.com/locate/nima

More information

Pure Water Power Purification System 4-Stage RODI Operations Manual

Pure Water Power Purification System 4-Stage RODI Operations Manual Pure Water Power Purification System 4-Stage RODI Operations Manual Flush Valve Lever Quick Disconnect for RO Water Testing Water Supply In Drain Hose Pure Water Out to Waterfed Pole New Machine Setup

More information

GDS OPERATING PROCEDURE

GDS OPERATING PROCEDURE SU/GP-B P0886 Rev A 4 September, 2002 STANFORD UNIVERSITY W.W. HANSEN EXPERIMENTAL PHYSICS LABORATORY GRAVITY PROBE B, RELATIVITY GYROSCOPE EXPERIMENT STANFORD, CALIFORNIA 94305-4085 GDS OPERATING PROCEDURE

More information

MIL-STD-883G METHOD

MIL-STD-883G METHOD STEADY-STATE LIFE 1. PURPOSE. The steady-state life test is performed for the purpose of demonstrating the quality or reliability of devices subjected to the specified conditions over an extended time

More information

COMPACT TRIPLE WALL OUTLET STATION MODEL INSTALLATION AND OPERATING INSTRUCTIONS

COMPACT TRIPLE WALL OUTLET STATION MODEL INSTALLATION AND OPERATING INSTRUCTIONS COMPACT TRIPLE WALL OUTLET STATION MODEL 6255-1 INSTALLATION AND OPERATING INSTRUCTIONS To assure safe operation and conformation to local fire codes, all Porter Outlet Stations are designed to be used

More information

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax: 2 Table Of Contents 1. Introduction 3 2. About this Manual 3 3. Contacting YZ Systems 3 4. Vessel Components 4 5. Specifications 5 6. Application 6 7. Theory of Operation 7 8. DuraSite Installation & Use

More information

Gerber Sabre 404 and 408 Installation Instructions

Gerber Sabre 404 and 408 Installation Instructions 1 TITLE: Gerber FastFact # Supplied by: Last Modified: Summary: Gerber Sabre 404 and 408 Installation Instructions 5002 Gerber Service November 13, 2001 This document provides the installation and set-up

More information

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System)

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System) Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System) Revision date October 2014 2 Emergency Plan for Nano Furnace Standard Operating Procedures for Emergencies Contact information Person

More information

KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE

KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE Purpose of this Instrument: This instrument is for patterning photosensitive polymers with UV light. Location: White Hall 410 Cleanroom Primary

More information

6890 GC Site Preparation

6890 GC Site Preparation 6890 GC Site Preparation (a16011) This document is believed to be accurate and up-to-date. However, Agilent Technologies, Inc. cannot assume responsibility for the use of this material. The information

More information

Agilent ICP-MS Interactive Troubleshooting tool for Plasma ignition problem

Agilent ICP-MS Interactive Troubleshooting tool for Plasma ignition problem Agilent ICP-MS Interactive Troubleshooting tool for Plasma ignition problem Rev. B 2017, January, 20 Next > Preconditions 7900, 7800, 7700, 8800, or 8900 ICP-MS is used. Sample introduction type is PeriPump.

More information

1 Overview. Pressure Measurement Single-range transmitters for general applications. 1/22 Siemens FI US Edition

1 Overview. Pressure Measurement Single-range transmitters for general applications. 1/22 Siemens FI US Edition Siemens AG 07 SITRANS LH00 Transmitter for hydrostatic level Overview Function U const. p U I EM The pressure transmitter SITRANS LH00 is a submersible sensor for hydrostatic level measurement. The pressure

More information

Flow in a shock tube

Flow in a shock tube Flow in a shock tube April 30, 05 Summary In the lab the shock Mach number as well as the Mach number downstream the moving shock are determined for different pressure ratios between the high and low pressure

More information

LOW PRESSURE VOLTAGE BREAKDOWN TEST PROCEDURE FOR GSS FSU FLIGHT SPARE HVA BOARD October 28, P0938 Rev

LOW PRESSURE VOLTAGE BREAKDOWN TEST PROCEDURE FOR GSS FSU FLIGHT SPARE HVA BOARD October 28, P0938 Rev W. W. Hansen Experimental Physics Laboratory STANFORD UNIVERSITY STANFORD, CALIFORNIA 94305-4085 Gravity Probe B Relativity Mission LOW PRESSURE VOLTAGE BREAKDOWN TEST PROCEDURE FOR GSS FSU FLIGHT SPARE

More information

BLEED DOWN OF THE HIGH GMA PRESSURE

BLEED DOWN OF THE HIGH GMA PRESSURE SU/GP-B STANFORD UNIVERSITY W.W. HANSEN EXPERIMENTAL PHYSICS LABORATORY GRAVITY PROBE B, RELATIVITY GYROSCOPE EXPERIMENT STANFORD, CALIFORNIA 94305-4085 BLEED DOWN OF THE HIGH GMA PRESSURE GP-B ENGINEERING

More information

Glove Box Installation Manual

Glove Box Installation Manual Glove Box Installation Manual 1998 by M. Braun Company File: GB-UNI-INS.DOC! Edition 08-00 by M. Boutin! Subject to be changed without notice Glovebox Installation Your Glove box has been fully assembled,

More information

Operation manual Level sensor DC-LS-50 Operation Manual Level Sensor DC-LS-50

Operation manual Level sensor DC-LS-50 Operation Manual Level Sensor DC-LS-50 Operation Manual Level Sensor DC-LS-50 Rev.02 (2014.06) OL Page 1 of 8 Table of contents I. STRUCTURE OF THE MANUAL / CLARIFICATION... 3 II. SAFETY AND HEALTH CONCERNS... 4 1 INTRODUCTION... 5 1.1 Use

More information

Installation and commissioning instructions 255 series and 256 series

Installation and commissioning instructions 255 series and 256 series Installation and commissioning instructions 255 series and 256 series Table of contents 1 General information... 3 1.1 About these instructions... 3 1.2 About this product... 3 1.3 Appropriate usage...

More information

ATEX VACUUM PUMPS AND GAUGES CHEMICALLY RESISTANT, OIL-FREE AND SAFE

ATEX VACUUM PUMPS AND GAUGES CHEMICALLY RESISTANT, OIL-FREE AND SAFE ATEX VACUUM PUMPS AND GAUGES CHEMICALLY RESISTANT, OIL-FREE AND SAFE ATEX CHEMISTRY DIAPHRAGM PUMPS. ATEX VARIO CHEMISTRY DIAPHRAGM PUMPS. Chemistry diaphragm pumps, vacuum systems and gauges for use in

More information

Chapter 2 General description of the system

Chapter 2 General description of the system Chapter 2 General description of the system This system is a high density plasma etching system having a C to C load-lock system and an ISM (Inductive Super Magnetron) plasma source. The system consists

More information

A i r c r a f t E l e c t r i c a l S y s t e m s ( 1 2 B )

A i r c r a f t E l e c t r i c a l S y s t e m s ( 1 2 B ) 8 5 4 9 A i r c r a f t E l e c t r i c a l S y s t e m s ( 1 2 B ) 40S/40E/40M An Aviation and Aerospace Technologies Course 8 5 4 9 : A i r c r a f t E l e c t r i c a l S y s t e m s ( 1 2 B ) 4 0

More information

The Discussion of this exercise covers the following points:

The Discussion of this exercise covers the following points: Exercise 5-3 Wet Reference Leg EXERCISE OBJECTIVE Learn to measure the level in a vessel using a wet reference leg. DISCUSSION OUTLINE The Discussion of this exercise covers the following points: Measuring

More information

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road PROPORTIONING VALVE Model 150 INSTRUCTION MANUAL March 2017 IMS Company 10373 Stafford Road Telephone: (440) 543-1615 Fax: (440) 543-1069 Email: sales@imscompany.com 1 Introduction IMS Company reserves

More information

MODEL WEIGH MODULE

MODEL WEIGH MODULE MODEL 65082 WEIGH MODULE INSTALLATION & OPERATING MANUAL P.O. Box 775 - Farmington, NH 03835 Tel: 603-755-3885 email: cands_nh@msn.com www.candscontrols.com Model 65023 Cantilever Beam Transducer Nickel-Plated

More information

Evaporative Emissions (EVAP) system, checking

Evaporative Emissions (EVAP) system, checking Page 1 of 12 24-136 Evaporative Emissions (EVAP) system, checking CAUTION! Whenever carrying out work on the fuel supply and/or fuel injection systems, read and carefully follow the Cautions, Warnings,

More information

HCMTCB MATERIALS SAMPLING & TESTING PERFORMANCE CHECKLIST

HCMTCB MATERIALS SAMPLING & TESTING PERFORMANCE CHECKLIST HCMTCB MATERIALS SAMPLING & TESTING PERFORMANCE CHECKLIST Release Date: January 7, 2014 Sampling Coarse Aggregate PERFORMANCE CHECKLIST AASHTO T-2 Sampling of Aggregates Sampling From A Stockpile 1 When

More information

Fig. 1: Mechanical vacuum gauge (left) and capacitive vacuum gauge (right)

Fig. 1: Mechanical vacuum gauge (left) and capacitive vacuum gauge (right) Dear Readers! This is your 4pvd Newsletter. We hope you enjoy the information it contains. If you wish to unsubscribe, please send a blank Email to unsubscribe@4pvd.de June 1 st, 2006, Issue No. 24 Principles

More information

NPDGamma LH2 Target OJT Lesson Plan: Senior Operator for the NPDGamma LH2 Target Operators

NPDGamma LH2 Target OJT Lesson Plan: Senior Operator for the NPDGamma LH2 Target Operators 0. Introduction Object of this on-the-job Training (OJT) Lesson Plan is to train Senior Operators for the NPDGamma LH2 target system. After successful of this OJT and authorization by line management Senior

More information

Cambridge International Examinations Cambridge International General Certificate of Secondary Education

Cambridge International Examinations Cambridge International General Certificate of Secondary Education Cambridge International Examinations Cambridge International General Certificate of Secondary Education *8269683414* PHYSICS 0625/31 Paper 3 Extended October/November 2014 1 hour 15 minutes Candidates

More information

OPERATION. Estimated kerf width compensation. HPR260 Manual Gas Instruction Manual 4-9

OPERATION. Estimated kerf width compensation. HPR260 Manual Gas Instruction Manual 4-9 Estimated kerf width compensation The widths in the chart below are for reference. Differences between installations and material composition may cause the specific user results to vary from those shown

More information

Oxford Instruments Plasma Technology. PlasmaPro NGP80. Installation Data Sheet. Original Instructions.

Oxford Instruments Plasma Technology. PlasmaPro NGP80. Installation Data Sheet. Original Instructions. Oxford Instruments Plasma Technology www.oxford-instruments.com About this data sheet This data sheet provides basic information about the installation of a tool. Floor and wall loadings Table 1 lists

More information

Covered Task 409OP Training Guide Inspecting Interference Bonds

Covered Task 409OP Training Guide Inspecting Interference Bonds Directions This training guide is to be used by a Subject matter expert (SME) authorized Evaluator/Trainer and Trainee during on-thejob training (OJT) or prior to an evaluation as a resource. (S) Indicates

More information

Instrumentation & Data Acquisition Systems

Instrumentation & Data Acquisition Systems Instrumentation & Data Acquisition Systems Section 3 -Level Robert W. Harrison, PE Bob@TheHarrisonHouse.com Made in USA 1 Level Section Question Which level measuring technology is the best solution when

More information

METHOD 2E - DETERMINATION OF LANDFILL GAS PRODUCTION FLOW RATE. NOTE: This method does not include all of the

METHOD 2E - DETERMINATION OF LANDFILL GAS PRODUCTION FLOW RATE. NOTE: This method does not include all of the 287 METHOD 2E - DETERMINATION OF LANDFILL GAS PRODUCTION FLOW RATE NOTE: This method does not include all of the specifications (e.g., equipment and supplies) and procedures (e.g., sampling and analytical)

More information

QUICK START GUIDE CB-950 DATA BUOY PLATFORM

QUICK START GUIDE CB-950 DATA BUOY PLATFORM What s Included (1) Buoy hull with data well, 950 lb buoyancy (1) Buoy tower (3) 40W Solar panels (1) Data well lid (isic-cb or pass-through) (3) Top-side lifting eyes (3) Bottom-side mooring eyes (1)

More information

QUICK START GUIDE CB-150 DATA BUOY PLATFORM

QUICK START GUIDE CB-150 DATA BUOY PLATFORM What s Included (1) Buoy hull with data well, 150 lb buoyancy (1) Buoy tower (3) 6W Solar panels (1) Data well lid (isic-cb or pass-through) (3) Top-side lifting eyes (3) Bottom-side mooring eyes Common

More information

Purge Star & Ring Purge Systems

Purge Star & Ring Purge Systems March 2013 Operator s Manual Purge Star & Ring Purge Systems Additional instruction for Purge Star Single Hose, Purge Star Double (bypass) Hose and Ring Purge with bypass hose and gas dump valve feature.

More information

(12) Patent Application Publication (10) Pub. No.: US 2017/ A1

(12) Patent Application Publication (10) Pub. No.: US 2017/ A1 (19) United States (12) Patent Application Publication (10) Pub. No.: US 2017/0176367 A1 PENNINGTON et al. US 201701.76367A1 (43) Pub. Date: Jun. 22, 2017 (54) (71) (72) (21) (22) (60) APPARATUS TO MEASURE

More information