REGION 2. Eysturoy (north)

Size: px
Start display at page:

Download "REGION 2. Eysturoy (north)"

Transcription

1 REGION 2. Eysturoy (north) DATE OF SURVEY: October 2000 General Description of the Area including Tidal Information The region consists of the northern part of Eysturoy, within which are the coastal villages of Fuglafjørður, Oyndarfjørður, Elduvík, Funningur, Funningsfjørður and Gjógv. Fuglafjørður as it is well protected by the surrounding land has the largest harbour with commercial wharves and a large small boat harbour inside a rock armour breakwater. Funningsfjørður also has a similar small fishing and boat harbour. Neither of these can be protected by conventional booms due to the rocks, but should be protected by at least one and preferable more strings of sorbent boom. There is a small pier at Funningur, which is very exposed. At Gjógv, which is approached through a narrow chasm, boats are hauled out of the water on a boatlift. There is also a boat harbour at Oyndarfjørður, which can be protected. The remaining shoreline of the region is rocky and cannot be protected, however there are a number of fish farms within the fjords, which will require protection Fuglafjørd is a fish nursery area and the fjords generally shelter seaduck. The cliffs of the north coast are important for seabirds from February to August. Tides off the north coast are strong, with severe eddies, but within the fjords are generally weak Maps and Charts Required Kort & Matrikelstyrelsen Føroyar Topograpfisk Atlas 1: Admiralty Charts ChartNumbers 117, 3557 Detailed Access to the Rendezvous Point (RVP) Føroyar Topograpfisk Kort 1: ,412,413,511,512 There is no large central place suitable for an RVP, however, Fuglafjørður, Oyndarfjørður, and Funningsfjørður have sufficient space to store and laydown equipment for local operations. Communications Both UK Cellnet and Vodaphone operate well over the majority of the area. However it is nonexistent in some places. Clearly there is also a shortage of public telephones and therefore portable Inmarsat M sets would be essential in a large-scale operation. Contact Numbers Fuglafjørður Harbour Harbourmaster, Kristian Oluf Christiansen / Funningsfjørður Harbour Harbourmaster Gjógv Harbourmaster, Sofus D Johannesen / Coastal Protection Sites in Priority Order 1. Oyndarfjørður Harbour Aquaculture There are many fish farms in the area that will need to be protected. See the joint ITOPF and UK Maritime and Coastguard Agency Report Protection of Fish farms and Mariculture facilities from Oil Spills for recommended protection and cleanup methods. Region 2: Eysturoy (north) R2:1 Introduction

2 Fish Farms Observed Alilaks (Vestlaks), Fuglafjørður. Laksaling Vík, Oyndarfjørður. Funninsglaks, Funningsfjórður Refer to Environmental Sensitivities summary map Region 2 for known locations of fish farms. Unprotectable Sites The majority of the coastline cannot be protected. The reasons are many, but include: Inaccessibility. Highly sensitive sites could possibly be approached by sea. Rocky shoreline which would cut up the boom. Too wide an area to be protected, requiring an excessive length of boom. Excessive tidal or current strength causing oil to pass below the boom. Shoreline Clean-up Sites 1. Fuglafjørður Region 2: Eysturoy (north) R2:2 Introduction

3 Section 2a: Coastal Protection Sites Site 1. OYNDARFJØRÐUR HARBOUR...4 Region 2a R2:3 Table of Contents

4 Region Area Site Grid Reference EYSTUROY (NORTH) OYNDARFJØRÐUR 1. OYNDARFJØRÐUR HARBOUR Access Route From Tórshavn take Road 50 north. Join Road 10 at grid reference and follow to Nesvík. Cross the bridge onto the island of Eysturoy and pass through the tunnel. At grid reference turn left onto Road 643 and follow to Oyndarfjørður. Detailed Site Access In Oyndarførður follow the road to the harbour and the boomsite is on the northern side. Site Hazards/ Safety This is an operational port hence care will need to be taken when working in the area. The quaysides are unfenced and often slippery. Landowners and Contact Numbers There is no obvious landowner at this site. Communications Cellphone Reception : Very good FR-01: Very good Bank Characteristics including Load-Bearing Capability The harbour area is constructed of concrete and is suitable for large vehicles. Environmental Conditions Water Depth Max: Unknown Min: Unknown Tidal Strength Max: Weak Min: Weak Channel Width The entrance to the harbour is approximately 20 metres Laydown Area There is ample hard-standing suitable for laydown in the harbour area. R2a - SITE 1. OYNDARFJØRÐUR R2:4 Grid Ref:

5 GEM Network; Færoe Islands Coastal Protection Plans Booming Objectives and Configuration Two booms at this site will form a V shape with the apex at the northern end of the harbour. The objective is to protect the harbour and also prevent oil entering the rock armour on the eastern side. Fig. 2a.1 R2a - SITE 1. OYNDARFJØRÐUR R2:5 Grid Ref:

6 Site Photographs Photo 2a.1 Oyndarfjørður protection/ collection boom Photo 2a.1.1 View of Oyndarfjørður harbour from the access road R2a - SITE 1. OYNDARFJØRÐUR R2:6 Grid Ref:

7 Main Equipment Required 2 legs of 75m x air tube and skirt boom 25m x sorbent boom 8 x 30kg anchors and tripping buoys 4 x running moorings 200m, 17mm polypropylene mooring rope 1 x work boat Ancillaries and support box Personnel Required 3 personnel on shore 3 personnel to crew the work boat Method of Deployment Install running moorings Layout and inflate boom Attach boom to running moorings at the northern end Tow booms into position with work boat and attach to running mooring at the entrance Attach anchors and tripping buoys Install sorbent boom Recovery Equipment Vacuum equipment/ trucks or any size skimmers suitable for the type of oil can be used at this site. There is a Hi-ab crane available at the collection point for skimmer deployment. Temporary Storage Equipment and Site There is ample space to station temporary storage tanks on the quayside. R2a - SITE 1. OYNDARFJØRÐUR R2:7 Grid Ref:

8 Section 2b: Shoreline Clean-up Sites Site 1. FUGLAFJØRÐUR SHORELINE...9 Region 2b R2:8 Table of Contents

9 Region Area Site Grid Reference EYSTUROY (NORTH) EYSTUROY 1. FUGLAFJØRÐUR SHORELINE Access Route Cross the bridge from Streymoy to Eysturoy at Nesvík and follow Road 10 south signposted to Runavík. At Skipanes, grid reference turn onto Road 70 signposted Gut/ Klaksvík. At grid reference continue straight on Road 65 signposted to Fuglafjørður. Site Hazards/ Safety There is slippery single in parts. Landowners and Contact Numbers Kristian Oluf Christiansen Fuglafjórður Harbour / Shoreline Type The shoreline is shingle and sediment with larger shingle at the upper shore. A stream runs through the beach at the western end. Clean-up method Remove the bulk oil from the shingle. Where there is sediment lightly rake the oil onto bags. As this beach is immediately in front of boat-houses further cleaning will be necessary hence consideration may be given to stone-washing. Temporary Storage Equipment and Site There is a hard-standing area behind the beach which could be used for storage. R2b - SITE 1. FUGLAFJØRÐUR R2:9 Grid Ref:

10 GEM Network; Færoe Islands Coastal Protection Plans Shoreline Clean-up Location The shoreline is at the head of Fuglafjørður in northern Esturoy. Fig. 2b.1 R2b - SITE 1. FUGLAFJØRÐUR R2:10 Grid Ref:

11 Photo 2b.1 Fuglafjørður shoreline viewed from the road leading to the town Photo 2b.1.1 Fuglafjørður shoreline; showing the shingle and sediment R2b - SITE 1. FUGLAFJØRÐUR R2:11 Grid Ref:

12 Photo 2b.1.2 Fuglafjørður shoreline; in front of the boathouses Photo 2b.1.3 Fuglafjørður; access to the shoreline alongside the boathouses R2b - SITE 1. FUGLAFJØRÐUR R2:12 Grid Ref:

GEM Network; Færoe Islands Coastal Protection Plans. REGION 1. Viðoy. DATE OF SURVEY: October 2000

GEM Network; Færoe Islands Coastal Protection Plans. REGION 1. Viðoy. DATE OF SURVEY: October 2000 REGION 1. Viðoy DATE OF SURVEY: October 2000 General Description of the Area including Tidal Information This region consists of the northern parts of Borðoy, Kalsoy, Kunoy, Svínoy as well as Fugloy. Borðoy

More information

Fowey Harbour Commissioners Appendix Page 106 APPENDICES

Fowey Harbour Commissioners Appendix Page 106 APPENDICES Fowey Harbour Commissioners Appendix Page 106 APPENDICES Fowey Harbour Commissioners Appendix Page 107 Contents Appendix 1 Adler & Allan Limited Contents Adler & Allan Limited Accreditation Certificate...

More information

Shoreline Sensitivity Map 6651 Sisimiut

Shoreline Sensitivity Map 6651 Sisimiut Airphoto Keymap Legend Contents Phys. Env. & Logistics Map Keymap 66 30' 66 40' 66 50' 67 00' Area 223 209 Area 222 isimiut 221 9 L e c (Holsteinsborg) b439m Gu438 Al436 Kangerluarsuk Tulleq 4 0 222 Area

More information

Western Canadian Spill Services Ltd. Field Testing Exercise Report

Western Canadian Spill Services Ltd. Field Testing Exercise Report Western Canadian Spill Services Ltd. Field Testing Exercise Report Wednesday, July 15, 2009 Clearwater River, Rocky Mountain House, AB Background Western Canadian Spill Services Ltd. (WCSS) held a field

More information

Chief-Planning & Readiness USCG Sector Houston-Galveston

Chief-Planning & Readiness USCG Sector Houston-Galveston Boom Efficacy During the DEEPWATER HORIZON Response LCDR Joseph J. Leonard, Jr. Chief-Planning & Readiness USCG Sector Houston-Galveston June 2011 Boom Selection Responder Skill Sets Boom Utilization Site

More information

Hydrographic Surveying Methods, Applications and Uses

Hydrographic Surveying Methods, Applications and Uses Definition: Hydrographic Surveying Methods, Applications and Uses It is the branch of surveying which deals with any body of still or running water such as a lake, harbor, stream or river. Hydrographic

More information

Implementation and Effect of Major Oil Recovery System Exercises

Implementation and Effect of Major Oil Recovery System Exercises Implementation and Effect of Major Oil Recovery System Exercises by Svein Edward Kjellsen Senior Executive Officer Norwegian Pollution Control Authority Commercial Services Unit Implementation and Effect

More information

3 Star Sea Training Notes

3 Star Sea Training Notes 3 Star Sea Training Notes Technical Syllabus Part A Personal Paddling Skills A.1 Lifting, carrying, launching and landing Training should aim to develop good, safe lifting and carrying techniques appropriate

More information

***This summary does not include shad and herring net requirements.***

***This summary does not include shad and herring net requirements.*** South Carolina Department of Natural Resources Marine Resources Division Summary of Seine and Gill Net Laws (Saltwater) 2013-2014 This document should be kept on board all vessels using seines or gill

More information

coastal Safety challenge Leaders notes

coastal Safety challenge Leaders notes coastal Safety challenge Leaders notes Leaders notes COASTAL SAFETY CHALLENGE INTRODUCTION The Scout Association is pleased to be working with The Maritime and Coastguard Agency (MCA) to bring you the

More information

3 Maps and Charts In order to navigate we need to use some form of map. The two choices are nautical charts, or land maps.

3 Maps and Charts In order to navigate we need to use some form of map. The two choices are nautical charts, or land maps. 13 3 Maps and Charts In order to navigate we need to use some form of map. The two choices are nautical charts, or land maps. Charts Nautical Charts only show the land detail that is visible from the sea.

More information

ADMINISTRATIVE INSTRUCTION No. STCW-14 QUALIFICATION / CERTIFICATION REQUIRED FOR OPERATION OF A DOMESTIC VESSESL

ADMINISTRATIVE INSTRUCTION No. STCW-14 QUALIFICATION / CERTIFICATION REQUIRED FOR OPERATION OF A DOMESTIC VESSESL ADMINISTRATIVE INSTRUCTION No. STCW-14 QUALIFICATION / CERTIFICATION REQUIRED FOR OPERATION OF A DOMESTIC VESSESL (Issued under section 3(5) of the Gibraltar Merchant Shipping (Safety etc.) Ordinance 1993

More information

Part 3 : Data Directory

Part 3 : Data Directory Aberdeen Harbour Board Part 3: Page 1 Section 10: Contents Contents Part 3 : Section 10 : Contact Directory... 3 Section 11 : Resources Directory 11.1 Tier 1... 8 11.2 Tier 2...10 11.3 Tier 3...11 11.4

More information

Marine Renewables Industry Association. Marine Renewables Industry: Requirements for Oceanographic Measurements, Data Processing and Modelling

Marine Renewables Industry Association. Marine Renewables Industry: Requirements for Oceanographic Measurements, Data Processing and Modelling Marine Renewables Industry Association Marine Renewables Industry: Requirements for Oceanographic Measurements, Data Processing and Modelling October 2009 Table of Contents 1. Introduction... 1 2. Measurements

More information

Geographic Response Plan Map: EFL-25. Map Continued on Page: EFL-30. EFL25-01 Cape Canaveral Air Force Station Nesting Beach - South

Geographic Response Plan Map: EFL-25. Map Continued on Page: EFL-30. EFL25-01 Cape Canaveral Air Force Station Nesting Beach - South r. 80 37'30"W Banana River 28 30'0"N!d! White Geographic Response Plan Map: EFL-25 Point Map Continued on Page: EFL-30 80 30'0"W 28 30'0"N! Cactus Point a th)! er erve Map Continued on Page: EFL-26!S(!d

More information

West Coast Anchorages

West Coast Anchorages West Coast Anchorages This document aims to catalogue a number of anchorages along the West Coast of Tasmania where shelter may be sought. In addition the degree of protection from the wind, and holding

More information

Visiting Lake Macquarie

Visiting Lake Macquarie Visiting Lake Macquarie Lake Macquarie is the largest coastal salt water lake in Australia and is a prime boating destination for both small and large vessels. Many sailing regattas and fishing activities

More information

Pilotage. Planning for pilotage

Pilotage. Planning for pilotage Pilotage Planning for pilotage Being one step ahead of the game is key to effective pilotage. Only then will you know what to expect and what s lurking around the next bend. It s useful to construct a

More information

Spill Response on Rivers, Lakes and Sheltered Marine Waters: An Alternative Approach

Spill Response on Rivers, Lakes and Sheltered Marine Waters: An Alternative Approach 693 Spill Response on Rivers, Lakes and Sheltered Marine Waters: An Alternative Approach J.W. (Ian) Lambton Riverspill Response Canada Ltd. Riverspill@telus.net Abstract Prospective spill response recovery/control

More information

Around the Island Race Course Map and Instructions

Around the Island Race Course Map and Instructions Around the Island Race Course Map and Instructions The primary aim of these instructions is the safety of the crew competing in the race. The next main consideration is fairness of racing. The third key

More information

LOCAL NOTICES TO MARINERS 1/13. Valid from: 01/1/13 Expires on: Until withdrawn. HHAL Local Notice To Mariners In Force

LOCAL NOTICES TO MARINERS 1/13. Valid from: 01/1/13 Expires on: Until withdrawn. HHAL Local Notice To Mariners In Force LOCAL NOTICES TO MARINERS 1/13 Valid from: 01/1/13 Expires on: Until withdrawn HHAL Local Notice To Mariners In Force 1. 01/07 Lower Leading Light / Day Mark 2. 03/11 North Quay Works 3. 08/11 Bathymetric

More information

XXX. Chisolm Island Creeks. Map Continued on SC-48. Judge Island. SC49-03 Jenkins Creek/Morgan River Intersection XXX. Saint Helena Island

XXX. Chisolm Island Creeks. Map Continued on SC-48. Judge Island. SC49-03 Jenkins Creek/Morgan River Intersection XXX. Saint Helena Island w River 32 30'0"N ufort County 80 37'30"W 802 Coosaw River 250 450 SC41-05 Geographic Response SC41-03 Plan Map: Coosaw SC-49 River Chisolm Island Chisolm Island s u Map Continued on SC-41 3 (west side)

More information

Shoreline Response to an Offshore Wave Screen, Blairgowrie Safe Boat Harbour, Victoria, Australia

Shoreline Response to an Offshore Wave Screen, Blairgowrie Safe Boat Harbour, Victoria, Australia Shoreline Response to an Offshore Wave Screen, Blairgowrie Safe Boat Harbour, Victoria, Australia T.R. Atkins and R. Mocke Maritime Group, Sinclair Knight Merz, P.O. Box H615, Perth 6001, Australia ABSTRACT

More information

ADANI PORTS & SEZ LTD. ++ MUNDRA PORT ++ GENERAL INFORMATION

ADANI PORTS & SEZ LTD. ++ MUNDRA PORT ++ GENERAL INFORMATION ADANI PORTS & SEZ LTD. ++ MUNDRA PORT ++ GENERAL INFORMATION LOCATION Mundra Port is all weather, independent, commercial port with geographical and hydrological advantages on the West Coast of India,

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM WHITSTABLE HARBOUR PORT MARINE SAFETY CODE SAFETY MANAGEMENT SYSTEM Issue: No 10 January 2015 CONTENTS PAGE 1.0 Safe Marine Operations Policy 4 2.0 Introduction 5 3.0 Overview of Harbour Operations 5 4.0

More information

Case study 64. Shoreham Harbour Shingle Bypassing and Recycling

Case study 64. Shoreham Harbour Shingle Bypassing and Recycling Case study 64. Shoreham Harbour Shingle Bypassing and Recycling Authors: Tony Parker, Uwe Dornbusch Main driver: Improved defences Project stage: Ongoing construction/operation since 1992 Photo 1: Shoreham

More information

Mooring Areas Porirua Harbour - Channel

Mooring Areas Porirua Harbour - Channel Porirua Harbour - Channel Planning Map 3A Titahi Bay 2. orthwest Reservoir The extent of the mooring area is defined by shading and bounded by the following sight lines: Onepoto Mooring Area 6009000 1.

More information

REVISED SILT CURTAIN DEPLOYMENT PLAN

REVISED SILT CURTAIN DEPLOYMENT PLAN Contract No.: HY/2009/11 Central Wanchai Bypass, North Point Reclamation REVISED SILT CURTAIN DEPLOYMENT PLAN Name Prepared by: China Harbour Engineering Co., Ltd. China Road and Bridge Corporation Joint

More information

Standard Operating Procedure

Standard Operating Procedure Standard Operating Procedure BOOMS Offshore RO-BOOM / Lamor HD boom Equipment description SOP intended for the use and deployment of Lamor HD 1300 and Desmi Ro-clean 1500 offshore boom. The boom reel holds

More information

Response Boat & Barge

Response Boat & Barge Response Boat & Barge Oil Spill Equipment Floating Barriers Incinerators ELASTEC INLANDER BOAT & BARGE Work Horse of the Waterways With the speed of a thoroughbred and the strength of a draft horse, the

More information

Port Sections Guide Section 01

Port Sections Guide Section 01 s Guide 01 Cow Bay Marina Date 10/1/2016 Position (lat / lon) Minimum controlled water depth Chart datum Range of water densities Tidal range alongside Bottom type Dredging regime Distance pilot station

More information

Barge MM 46 Response Natchez, MS Lower Mississippi River Mile Marker 363

Barge MM 46 Response Natchez, MS Lower Mississippi River Mile Marker 363 UNCLASSIFIED Barge MM 46 Response Natchez, MS Lower Mississippi River Mile Marker 363 UNCLASSIFIED RRT Activation: Type of Product & Amount spilled: Cause of Spill: None Catalytic Cracked Clarified Oil

More information

PILOTAGE INFORMATION

PILOTAGE INFORMATION PILOTAGE INFORMATION Revised A PILOTAGE DIRECTIONS The Gloucester Harbour Trustees is the Competent Harbour Authority for the Gloucester Harbour under the Pilotage Act 1987 and responsible for the provision

More information

THE SYLLABUS FOR WRITTEN EXAMINATION PILOT'S FOURTH CLASS LICENCE (TEES AND HARTLEPOOL) AND

THE SYLLABUS FOR WRITTEN EXAMINATION PILOT'S FOURTH CLASS LICENCE (TEES AND HARTLEPOOL) AND PD TEESPORT CONSERVANCY DIVISION HARBOUR MASTER'S OFFICE THE SYLLABUS FOR WRITTEN EXAMINATION IN RESPECT OF A PILOT'S FOURTH CLASS LICENCE (TEES AND HARTLEPOOL) AND PILOTAGE EXEMPTION CERTIFICATE (Issued

More information

Forth Ports Limited. Ruling Depths & Under Keel Clearances

Forth Ports Limited. Ruling Depths & Under Keel Clearances Forth Ports Limited - Forth Vessels are scheduled into / out of ports on the Forth & Tay in accordance with the under keel clearance criteria specified in this section of the Marine Guidelines & Port Information.

More information

Provisions for Moorings

Provisions for Moorings Provisions for Moorings Tasman Resource Management Plan Summary Guide No. 11 Current: July 2013 1. Introduction Structures and occupation of the coastal marine area (CMA) are managed to control the location

More information

Harbourmaster s Office Tamaki River. Navigation Safety Operating Requirements 2014

Harbourmaster s Office Tamaki River. Navigation Safety Operating Requirements 2014 Harbourmaster s Office Tamaki River Navigation Safety Operating Requirements 2014 Auckland Council Harbourmaster s Office TAMAKI RIVER Navigation Safety Operating Requirements FOREWARD The purpose of these

More information

RISK ASSESSMENT -HEATS-

RISK ASSESSMENT -HEATS- Honda RYA Youth RIB Championship 2018 RISK ASSESSMENT -HEATS- Issued by Royal Yachting Association October 2017 Page 1 of 12 Risk Assessment Event Summary Event Honda RYA Youth RIB Championship Organising

More information

This training is intended to be educational and should not be construed as legal guidance. It is provided as a courtesy to our customers and others

This training is intended to be educational and should not be construed as legal guidance. It is provided as a courtesy to our customers and others June 2012 This training is intended to be educational and should not be construed as legal guidance. It is provided as a courtesy to our customers and others who may benefit from the information contained

More information

Notice of operations at London Array Offshore Wind Farm

Notice of operations at London Array Offshore Wind Farm London Array Ltd. Construction Management Port of Ramsgate Military Road Ramsgate CT11 9LG www.londonarray.com Notice of operations at London Array Offshore Wind Farm Date of Notice: June 19th 2011 Notice

More information

Map 8: Ayrshire Coast: Ardrossan North Bay to Stevenston Pier Map Content Descriptions

Map 8: Ayrshire Coast: Ardrossan North Bay to Stevenston Pier Map Content Descriptions Map 8: Ayrshire Coast: Ardrossan North Bay to Stevenston Pier Map Content Descriptions 1. Built Heritage and Archaeology A total of twenty four sites were recorded in the area covered by Map 8. Of these

More information

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL August 23 STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL performed by Lee E. Harris, Ph.D., P.E. Consulting

More information

Dive Operations Plan for Personal Submersibles. Revision

Dive Operations Plan for Personal Submersibles. Revision Dive Operations Plan for Personal Submersibles Revision 2011.1 1 Table of Contents 1 EVENT...3 1.1 Summary of planned dive...3 1.1.1 PSUBS Guidelines...3 1.1.2 Maximum dive depth planned...3 1.1.3 Number

More information

Geographic Response Plan Map: SFL-21. Map continued on: SFL-31S XXX. k Curry Hammock. SFL21-05 Grassy Key Beaches. Map continued on: SFL-20

Geographic Response Plan Map: SFL-21. Map continued on: SFL-31S XXX. k Curry Hammock. SFL21-05 Grassy Key Beaches. Map continued on: SFL-20 ! 81 0'0"W Geographic Response Plan Map: SFL-21 Map continued on: SFL-31S 80 52'30"W Arse XXX S A 24 52'30"N j Everglades National Park [] [ 24 52'30"N Florida Bay Flo Nati S 9N-01 oo Banks ock 54! Bamboo

More information

Use of. Sorbents. for Spill Response OPERATIONAL GUIDE

Use of. Sorbents. for Spill Response OPERATIONAL GUIDE Use of Sorbents for Spill Response OPERATIONAL GUIDE Use of Sorbents for Spill Response OPERATIONAL GUIDE This guide was produced with financial support from the Maritime Affairs Directorate, Total and

More information

HARBOR INFRASTRUCTURE INVENTORIES Kenosha Harbor, Wisconsin

HARBOR INFRASTRUCTURE INVENTORIES Kenosha Harbor, Wisconsin HARBOR INFRASTRUCTURE INVENTORIES Kenosha Harbor, Wisconsin Harbor Location: Kenosha Harbor is on the west shore of Lake Michigan about 54 miles north of Chicago, Illinois. Authority: River & Harbor Acts

More information

Marine Tourism and Angling Development Facilities

Marine Tourism and Angling Development Facilities Marine Tourism and Angling Development Facilities Contents Introduction... 2 List of Partners... 2 Gribben Quay... 3 Backwater... 4 Mellon Beat... 5 Malin Head... 6 Benone Beach Activity Centre... 7 Greencastle

More information

Orkney and Shetland Islands (2016)

Orkney and Shetland Islands (2016) Clyde Cruising Club Amendments to Sailing Directions Clyde Cruising Club Publications Ltd. Orkney and Shetland Islands (2016) This PDF file contains all the amendments for the above volume of the CCC Sailing

More information

WELCOME TO THE MILLENNIUM RIBBLE LINK

WELCOME TO THE MILLENNIUM RIBBLE LINK WELCOME TO THE MILLENNIUM RIBBLE LINK The prestigious 5.8m project to construct the Millennium Ribble Link opened in 2002. This is the first new navigation to be built in England since the Manchester Ship

More information

Sensor Platform Project Marine Trials Bidders Conference. Fundy Ocean Research Center for Energy fundyforce.ca

Sensor Platform Project Marine Trials Bidders Conference. Fundy Ocean Research Center for Energy fundyforce.ca Sensor Platform Project Marine Trials Bidders Conference Fundy Ocean Research Center for Energy fundyforce.ca 1 Project Team FORCE OceanWorks International Preliminary Design, Operational Procedures Murray

More information

Beach profile surveys and morphological change, Otago Harbour entrance to Karitane May 2014 to June 2015

Beach profile surveys and morphological change, Otago Harbour entrance to Karitane May 2014 to June 2015 Beach profile surveys and morphological change, Otago Harbour entrance to Karitane May 2014 to June 2015 Prepared for Port Otago Ltd Martin Single September 2015 Shore Processes and Management Ltd Contact

More information

Multi-Purpose Workboats and Vessels. Marine Engineering and Construction. Salvage and Wreck Removal. Marine Consultancy Services

Multi-Purpose Workboats and Vessels. Marine Engineering and Construction. Salvage and Wreck Removal. Marine Consultancy Services Multi-Purpose Workboats and Vessels Marine Engineering and Construction Salvage and Wreck Removal Marine Consultancy Services Marine Expertise and Support We are a progressive company with more than 50

More information

final information Causeway coast marathon 23rd Sept 2017 event photographers traffic annoucement trail conditions route diversion

final information Causeway coast marathon 23rd Sept 2017 event photographers traffic annoucement trail conditions route diversion final information Causeway coast marathon 23rd Sept 2017 The preparations for the 2017 Causeway Coast Events on Saturday 23rd are well under way and with a matter of days to go to the start we hope that

More information

Chart Features Maritime maps and Admiralty charts have these features:

Chart Features Maritime maps and Admiralty charts have these features: Introduction to Charts A chart or map of the area is an important safety item to carry on board. It allows the Master to obtain knowledge of the area to be travelled, and indicates the navigable channels

More information

Oil Spill Incident from Drilling Operation East Java

Oil Spill Incident from Drilling Operation East Java OIL SPILL COMBAT EXPERIENCES Oil Spill Incident from Drilling Operation East Java Deployment Vessel Towing Vessel 500 m Oil Spill Location Assist Vessel Oil Spill during drilling operation occurred during

More information

Chapter 9: Sea operations

Chapter 9: Sea operations Chapter 9: Sea operations ANTARES takes advice from IFREMER for the sea operations, which concern the installation and recovery of the different components of the detector : Junction Box, Strings, Interconnecting

More information

Chichester Harbour. A Walker s Guide

Chichester Harbour. A Walker s Guide A Walker s Guide - Chichester Harbour Chichester Harbour A Walker s Guide Chichester Harbour is an Area of Outstanding Natural Beauty on the south coast of Britain. Virtually flat with far reaching sea

More information

OECS Regional Engineering Workshop September 29 October 3, 2014

OECS Regional Engineering Workshop September 29 October 3, 2014 B E A C H E S. M A R I N A S. D E S I G N. C O N S T R U C T I O N. OECS Regional Engineering Workshop September 29 October 3, 2014 Coastal Erosion and Sea Defense: Introduction to Coastal/Marine Structures

More information

Appendix J: Q1-Highway 35 Route Construction Plan

Appendix J: Q1-Highway 35 Route Construction Plan PSC REF#:150055 Wisconsin CPCN Appendix J Appendix J: Q1-Highway 35 Route Construction Plan Public Service Commission of Wisconsin RECEIVED: 06/29/11, 8:51:24 AM Hampton Rochester La Crosse 345 kv Transmission

More information

OPRC Level I. Oil containment booms

OPRC Level I. Oil containment booms OPRC Level I Oil containment booms Aim Be able to distinguish between the various types of Containment Booms Outline General Purpose of Booms Curtain Booms Fence Booms Beach Booms What is boom? Barriers

More information

Objectives. Demonstrate proper first responder swiftwater PPE and safety. Demonstrate proper floating throw bag throwing technique.

Objectives. Demonstrate proper first responder swiftwater PPE and safety. Demonstrate proper floating throw bag throwing technique. Objectives Demonstrate proper first responder swiftwater PPE and safety. Demonstrate proper floating throw bag throwing technique. Demonstrate proper set up of a tension diagonal rescue system. Demonstrate

More information

This direction contains the requirements for the compulsory pilotage areas within the Auckland region. This

This direction contains the requirements for the compulsory pilotage areas within the Auckland region. This Harbourmaster s Direction 2-15 Pilotage Foreword This direction contains the requirements for the compulsory pilotage areas within the Auckland region. This direction updates and supersedes previous Harbourmaster

More information

Wexford Harbour. Yachting Guide. Navigation

Wexford Harbour. Yachting Guide. Navigation Wexford Harbour Yachting Guide Navigation This document supersedes all previous editions. Approvals: Yacht Club Committee April, 2015 Wexford Board of Directors April, 2015 # Date Section Revision 1 6.5.2015

More information

C Crane. Installation & Operation Manual. SWL 120kg. The Hansa CRANE ID#: Davit ISO/DIS June 2000 Sling AS Sept 2000

C Crane. Installation & Operation Manual. SWL 120kg. The Hansa CRANE ID#: Davit ISO/DIS June 2000 Sling AS Sept 2000 The Hansa C Crane CRANE ID#: Installation & Operation Manual Ideal for the safe and dignified transference of sailors with disabilities from a wharf to the boat. The crane is also suited to many other

More information

Implications of proposed Whanganui Port and lower Whanganui River dredging

Implications of proposed Whanganui Port and lower Whanganui River dredging PO Box 637 Wanganui 4540 Attention: Rowan McGregor Dear Rowan 1 Summary We understand that it has been proposed to bring large vessels into the Port at Whanganui requiring the excavation of a channel up

More information

Figure 1, Chart showing the location of the Breach at Old Inlet and sensors deployed in Great South Bay.

Figure 1, Chart showing the location of the Breach at Old Inlet and sensors deployed in Great South Bay. The Impact on Great South Bay of the Breach at Old Inlet Charles N. Flagg and Roger Flood School of Marine and Atmospheric Sciences, Stony Brook University The Great South Bay project (http://po.msrc.sunysb.edu/gsb/)

More information

COUPLED MANAGEMENT STRATEGY LAKE CATHIE ESTUARY & COAST

COUPLED MANAGEMENT STRATEGY LAKE CATHIE ESTUARY & COAST Lake Cathie Progress Association Inc. ABN 28 251 433 854 P.O. Box 247 Lake Cathie NSW 2445 PHONE/FAX: 02 6584 8211 EMAIL: r3packag@bigpond.com 20 th October 2009 Port Macquarie Hastings Council PO Box

More information

Assessors Name: East Coast OGA Sub Committee Date: 28 April 2015 Persons Affected: Skipper & Crew. Quantifying Risks

Assessors Name: East Coast OGA Sub Committee Date: 28 April 2015 Persons Affected: Skipper & Crew. Quantifying Risks Risk Assessment: EAST COAST RACE EVENT 2015 Risk Assessments of: East Coast Race Event 17 th 19 th July 2015. Man Overboard, Physical Injury or Illness, Sea Sickness, Fire, Gear Failure, Grounding or Shipwreck,

More information

WCMRC Technical Manual. Waste Management Tactics

WCMRC Technical Manual. Waste Management Tactics WCMRC Technical Manual Waste Management Tactics this page left intentionally blank 74 P a g e WASTE MANAGEMENT TACTICS PURPOSE OF THE WASTE MANAGEMENT TACTICS This section covers waste management issues

More information

Rising Tide Oyster Company 2.0 Acre Bellamy Site Marine Aquaculture License Application

Rising Tide Oyster Company 2.0 Acre Bellamy Site Marine Aquaculture License Application Rising Tide Oyster Company 2.0 Acre Bellamy Site Marine Aquaculture License Application Joshua and Jessica Carloni 264 Swain Road Barrington, N.H. 03825 Summary This is an amendment to our existing license

More information

Essential Safety. in Chichester Harbour. An essential guide for the new or less experienced mariner

Essential Safety. in Chichester Harbour. An essential guide for the new or less experienced mariner Essential Safety in Chichester Harbour An essential guide for the new or less experienced mariner 01243 512301 www.conservancy.co.uk 1 Enjoying Chichester Harbour in safety Chichester Harbour is renowned

More information

Maps The maps provided are a guide and are not to scale. Please use OS Explorer Map 120 (Chichester).

Maps The maps provided are a guide and are not to scale. Please use OS Explorer Map 120 (Chichester). A Walker s Guide - Chichester Harbour Useful Information Directions All the walks were tested in 201. Please note, however, that some footpaths may be diverted and buildings such as pubs may have changed

More information

Walk NOC 03 Location: Llyn y Fan (the lake) and Fan Brycheinog (the mountain) off Trecastle Road

Walk NOC 03 Location: Llyn y Fan (the lake) and Fan Brycheinog (the mountain) off Trecastle Road 8 Walk NOC 03 Location: Llyn y Fan (the lake) and Fan Brycheinog (the mountain) off Trecastle Road Directions: Distance (miles): Time (hours): Length of Walk: Turn right out of the castle, take first left

More information

IRMP firefighting and rescue operations at sea. Direct line Website

IRMP firefighting and rescue operations at sea. Direct line Website Fire and Rescue Service Circular Circular number 35-2004 Date issued 13 September 2004 This circular is For guidance No response required This circular is Status Relevant to the National Framework Service

More information

Water Rescue Boat Operation. Level: 3. Credit value: 6. Assessment criteria. Learning outcomes. The learner can: The learner will:

Water Rescue Boat Operation. Level: 3. Credit value: 6. Assessment criteria. Learning outcomes. The learner can: The learner will: Title: Water Rescue Boat Operation Level: 3 Credit value: 6 Learning outcomes The learner will: 1 understand the role of the rescue boat operator 2. understand the personal protective, communications and

More information

UPPER BEACH REPLENISHMENT PROJECT RELATED

UPPER BEACH REPLENISHMENT PROJECT RELATED ASSESSMENT OF SAND VOLUME LOSS at the TOWNSHIP of UPPER BEACH REPLENISHMENT PROJECT RELATED to the LANDFALL OF HURRICANE SANDY - PURSUANT TO NJ-DR 4086 This assessment is in response to Hurricane Sandy

More information

NETLAKE guidelines for automated monitoring system development

NETLAKE guidelines for automated monitoring system development Page 2 NETLAKE guidelines for automated monitoring system development Objective 001 Options for buoy design In this factsheet, we describe some of the options that can be used to house an automatic monitoring

More information

St. Abbs Harbour Information Sheet

St. Abbs Harbour Information Sheet St. Abbs Harbour Information Sheet Welcome to St. Abbs Harbour located in one of the United Kingdoms top diving sites; the information contained herewith will hopefully make your visit to the area both

More information

DC Pentland Skerries 4 6 9

DC Pentland Skerries 4 6 9 Pentland Skerries Powerful tidal waters around Lowther Beacon Chris Jex DC Pentland Skerries 4 6 9 1 No. 1 Grade C 20km 4-5 hours OS Sheet 7 Tidal Port Dover Start X Burwick Pier (438 839) Finish O John

More information

Rates and Charges Operative from 1st January 2019

Rates and Charges Operative from 1st January 2019 Rates and Charges Operative from 1 st January 2019 P a g e 1 Port of Cromarty Firth Rates and Charges Operative from 1 st January 2019 All enquiries regarding Rates and Charges to:- Port of Cromarty Firth

More information

MESSOLOGI LAGOON AREA (GREECE)

MESSOLOGI LAGOON AREA (GREECE) MESSOLOGI LAGOON AREA (GREECE) 20 Contact: Kyriakos SPYROPOULOS TRITON Consulting Engineers 90 Pratinou Str. 11634 Athens (GREECE) Tel: +32 10 729 57 61 Fax: +32 10 724 33 58 e-mail: kspyropoulos@tritonsa.gr

More information

Port Infrastructure to Support Floating Offshore Wind West Coast USA

Port Infrastructure to Support Floating Offshore Wind West Coast USA Port Infrastructure to Support Floating Offshore Wind West Coast USA Focus on California Figure: Principle Power Aaron Porter, P.E., & Shane Phillips, P.E. Mott MacDonald Seattle, WA BOEM Project Manager:

More information

SECTION II NM 11/13 NAVIGATION PUBLICATIONS COAST PILOT CORRECTIONS. Chapter 4 Paragraphs 85 to 86; read: (85)

SECTION II NM 11/13 NAVIGATION PUBLICATIONS COAST PILOT CORRECTIONS. Chapter 4 Paragraphs 85 to 86; read: (85) NAVIGATION PUBLICATIONS COAST PILOT CORRECTIONS COAST PILOT 1 42 Ed 2012 Change No. 13 LAST NM 9/13 Chapter 4 Paragraph 9; read: (9) Round Rock, which uncovers, and The Boring Stone, 3 feet high and bare,

More information

Coastal Processes and Landforms

Coastal Processes and Landforms Coastal Processes and Landforms These icons indicate that teacher s notes or useful web addresses are available in the Notes Page. This icon indicates that the slide contains activities created in Flash.

More information

KNOLL BEACH, STUDLAND

KNOLL BEACH, STUDLAND KNOLL BEACH, STUDLAND Emergency Action Plan (EAP) Normal Operating Plan 1. Key Roles Page 3 2. Equipment required (MIN) Page 3 3. Tide Times Page 3 4. Communications Page 3 5. Reference to Swimmers Page

More information

NAUTICAL TERMINOLOGY

NAUTICAL TERMINOLOGY It s important to have a basic understanding of common nautical terms associated with the parts, positions and directions of your vessel. Knowing these terms will make it easier to communicate with people

More information

Maritime and Coastguard Agency LogMARINE GUIDANCE NOTE. Safety during Transfers of Persons to and from Ships

Maritime and Coastguard Agency LogMARINE GUIDANCE NOTE. Safety during Transfers of Persons to and from Ships Maritime and Coastguard Agency LogMARINE GUIDANCE NOTE MGN 432 (M+F) Amendment 1 Safety during Transfers of Persons to and from Ships Notice to all Owners, Operators and Masters of Merchant Ships, Large

More information

Introduction of the term Traffic Control Zone and formalization of Fraser River Traffic Control Zone procedures

Introduction of the term Traffic Control Zone and formalization of Fraser River Traffic Control Zone procedures Consideration Report Introduction of the term Traffic Control Zone and formalization of Fraser River Traffic Control Zone procedures Background Under the Canada Marine Act, all Canada Port Authorities

More information

Marine Guide for Ship Masters Contents

Marine Guide for Ship Masters Contents Marine Guide for Ship Masters Contents Marine Guide for Ship Masters... 1 Port Operating Company... 2 Harbour Authority... 2 Location... 2 Pilotage... 2 Pilot Boat... 3 Pilot Ladder... 3 Pilots and Tugs

More information

HENLEY ROYAL REGATTA 2018

HENLEY ROYAL REGATTA 2018 HENLEY ROYAL REGATTA 2018 TRAFFIC RULES AND TRAINING TIMES For the Committee of Management Regatta Headquarters Henley-on-Thames Secretary Henley Royal Regatta To Friday 30th June 6th July at 5.00p.m.

More information

CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY DECK OFFICER STCW 95 OFFICER IN CHARGE OF NAVIGATIONAL WATCH REG. II/1 (UNLIMITED)

CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY DECK OFFICER STCW 95 OFFICER IN CHARGE OF NAVIGATIONAL WATCH REG. II/1 (UNLIMITED) CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY DECK OFFICER EXAMINATIONS ADMINISTERED BY THE SCOTTISH QUALIFICATIONS AUTHORITY ON BEHALF OF THE MARITIME AND COASTGUARD AGENCY STCW 95 OFFICER IN CHARGE

More information

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD) INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD) FACILITY OPERATOR: NextEra Energy Resources, LLC 700 Universe Boulevard Juno Beach, FL 33408 For Horizontal Directional Drilling Contents

More information

Geographic Response Plan Map: EFL-13NW AB 608 AB 5 1 AB 68 ") 770. !Å Heliport [ Historical!Å Site!(RSeagrass! Manatee

Geographic Response Plan Map: EFL-13NW AB 608 AB 5 1 AB 68 ) 770. !Å Heliport [ Historical!Å Site!(RSeagrass! Manatee ! 27 30'0"N 80 22'30"W! Geographic Response Plan Map: EFL-13NW [k Indian River - Vero Beach to Ft. Pierce Aquatic Preserve Ft. Pierce State Park [k J a c k I s l a n d 80 18'45"W [\ 27 30'0"N ]^607A ")

More information

Spring Poole Swim SANDBANKS BEACH, POOLE. 21 ST MAY :45hrs. Normal Operating Plan (NOP) Emergency Action Plan (EAP)

Spring Poole Swim SANDBANKS BEACH, POOLE. 21 ST MAY :45hrs. Normal Operating Plan (NOP) Emergency Action Plan (EAP) Spring Poole Swim SANDBANKS BEACH, POOLE 21 ST MAY 2016 08:45hrs Normal Operating Plan (NOP) Emergency Action Plan (EAP) Normal Operating Plan 1 Key Roles Page 3 2 Equipment required (MIN) Page 3 3 Tide

More information

Certified Professionals in Hydrographic Solutions

Certified Professionals in Hydrographic Solutions Certified Professionals in Hydrographic Solutions Client Satisfaction is our Deliverable Port of Brisbane Pty Ltd Port Surveys Certified Professionals in Hydrographic Surveying Tel +61 (0) 7 3258 4820

More information

Paper for consideration by ENC Working Group. Use of AU6 ENC cells as an option for Bathymetric ENCs (benc)

Paper for consideration by ENC Working Group. Use of AU6 ENC cells as an option for Bathymetric ENCs (benc) Paper for consideration by ENC Working Group Use of AU6 ENC cells as an option for Bathymetric ENCs (benc) Submitted by: Alvaro Sanchez (AHS) Executive Summary: Compilation of high density bathymetric

More information

LAKKOPETRA (GREECE) EUROSION Case Study. Contact: Kyriakos SPYROPOULOS. TRITON Consulting Engineers. 90 Pratinou Str Athens (GREECE)

LAKKOPETRA (GREECE) EUROSION Case Study. Contact: Kyriakos SPYROPOULOS. TRITON Consulting Engineers. 90 Pratinou Str Athens (GREECE) LAKKOPETRA (GREECE) Contact: Kyriakos SPYROPOULOS TRITON Consulting Engineers 90 Pratinou Str. 11634 Athens (GREECE) Tel: +32 10 729 57 61 Fax: +32 10 724 33 58 e-mail: kspyropoulos@tritonsa.gr 19 1 1.

More information

APC Operating Procedures Oil Tankers

APC Operating Procedures Oil Tankers APC Operating Procedures Oil Tankers August 2013 The APC Operating Procedures were developed to aid the Master and Operator of oil tankers in ensuring all aspects of the APC are complied with when transiting

More information

Quarterly report of the marine Safety Management System (SMS) performance and incident statistics April Q1 2019

Quarterly report of the marine Safety Management System (SMS) performance and incident statistics April Q1 2019 Quarterly report of the marine Safety Management System (SMS) performance and incident statistics April 9 - Q 9 Serious and very serious incidents There has been serious incident so far in 9 which is below

More information

Plot the Path into the Harbor

Plot the Path into the Harbor Plot the Path into the Harbor By Mary Anne Otten, Rudyard Area Schools and Joan Chadde, Michigan Technological University Subject/Grade: Grade 3 6, Math, Social Studies, Science Duration: 35 minutes Lesson

More information