SOUTHWEST RPO RTIPR for NMDOT District 1. for 7 Year STIP (FY 2012 through FY 2018) Roadway Project Recommendations:

Size: px
Start display at page:

Download "SOUTHWEST RPO RTIPR for NMDOT District 1. for 7 Year STIP (FY 2012 through FY 2018) Roadway Project Recommendations:"

Transcription

1 Key: New s SOUTHWEST RPO RTIPR for NMDOT District 1 for 7 Year STIP (FY 2012 through FY 2018) Roadway Recommendations: Note: Required Local Government Match is subject to change by FHWA at the time of agreement. Last revision 6/6/ COST IN MATCH IN (14.56%) Local (L) or State (S) Lead YEAR(S), IF! 1 Silver Silver Silver City Silver & Drainage Improvement 0.45 $1,087 $ Reconstruction STP L 2010, Revised All but ITS Preliminary design complete, final design to be completed upon project funding 2 Stewart East Bayard 3 Hermanas Grade Bisbee Rd. & Int. of NM9 4 NM 427 NM 11 5 NM Hidalgo 6 Pear Pear /Nickel Construct a new culvert crossing on Stewart ft. $452 $65.81 STP L Luna Hermanas Grade $3,600 $ STP L Florida Thrulane Widening from NM 11 to Santa Barbara Riley and Tyson Low Water Crossings Pear & Nickel Drai nage & Reconstruction of Intersection 0.20 $202 $29.41 Reconstruction STP S OR L 200 ft. $710 $ STP S Pear/Nickel $510 $74.26 Reconstruction STP L 2003/ REVISED N N N N N LGRF FUNDED ANNING & DESIGN; COTRUCTION ONLY NEEDED. US border patrol use more than 50%, Appropriations request Feb. for $500,000 to address lowwater crossings SURVEYS TO BEGIN APRIL, HIGH TURNING VOLUMES/ REDUCED TRAFFIC FLOW; FLOODING CAUSES ISOLATION OF VIRDEN FROM EMERGENCY RES, ETC. Moved from s in Planning and design completed, additional funding requested through CDBG program for construction. 7 Pear Pear /8th Pear & Sl ate Intersection reconstruction to include drainage 0.25 $285 $41.50 Reconstruction STP L Subtotal of Roadway s: $6,846,000 $996,778 N Planning and design completed, additional funding requested through CDBG program for construction. Enhancement Recommendations: TE: Enhancement requirements include the following: 1) local county, municipal or tribal sponsor, 2) two local resolutions (early recognition of governing body and later commitment of matching funds), and 3) cost breakdown for 25% local match (excluding design costs) 1 NM 356 N. Foy to US 180 Bayard 2 Bayard 0 Santa Clara 3 32nd Silver City South side of NM 356 from N. Foy to US 180 PHASE II, ENHANCEMENTS ON BAYARD ST. Swan to NM15 COST IN MATCH IN (25%) 0.36 $ Paid in Phase I 0.37 $1,652 $ $518 $ sidewalk, ADA improvements, reconstruction of deteriorated curb and gutter Sidewalks/LIGHT ING Sidewalks and Transit Stops RESOLU TION SUBMIT TED? (Required ) YEAR, IF! Phase I of PIF submitted /REVISED 2006/REVISED - 4 certification renewals Phase I improvements were constructed the summer of 2010 utilizing ARRA and funding. $532, remaining from Phase I. Roadway recently completed through CN3303. BID FOR DESIGN JULY ; CREATION OF SIDEWALKS AND TRAIT IMPROVE SAFETY FOR Page 1 RTIPR SWRPO

2 4 Cedar Sidewalks East Country Club Road east to the intersection with Pine /I-10 connector on south side of Cedar 1.35 $399 $99.75 Sidewalk Yes/Ma rch 5 s Town of Silver City Little Walnut to Cain Drive across to Swan St and Silver down Gold to 12th up Grant 5.00 $950 $ Bike lanes, widening of shoulders, painting, lighting, sidewalks No 2009/REVISED CREATES CONNECTIVITY THROUGHOUT TOWN FROM THE RTH TO THE SOUTH 6 7 s Cedar Sidewalks West 0 Santa Clara Prescott, Cedar, Cleveland, and Oak. 0.6 $193 $48.25 Sidewalks Pine to ~500ft. West Yes/Ma of Country Club Rd $178 $44.50 Sidewalk rch on south side of Cedar Subtotal of Enhancements Category: $3,890,000 $972, /REVISED ACES SIDEWALKS IN AREA AROUND ELEM.; SAFER FOR STUDENTS Recommendations: TE: projects are listed here for reference purposes only. They are not presented as RPO prioritized projects. The projects are evaluated on their own merits. COST IN MATCH IN (20%) 1 Maple Santa Cl ara Maple 100 ft. $830 $ Oak Santa Cl ara Oak 125 ft. $1,000 $20 3 NM Grant Bear Creek Crossing 350 ft. $2,500 $50 Subtotal of Category: $4,330,000 $866,000 Replacement BR BR BR On System (ON) or Off System (OFF) OFF Off On YEAR, IF! 1997/REVISED 2005/REVISED 1995/REVISED SUBSTRUCTURE RATING OF 4 IUFFICIENT, TRAFFIC SAFETY FEATURES RATES INADEQUATE; NMDOT APIED FOR HSIP FY 10 UAFE CROSSING FOR EMERGENCY PERSONNEL, PRIMARY BUS CROSSING FOR NEW SCHOOL UNDER COTRUCTION EMERGENCY PERSONNEL UNABLE TO CROSS WHEN FLOODING Scenic Byways Program Recommendations: TE: 20% local match, all federal funds are on a reimbursement basis. COST IN MATCH IN (20%) Local(L) or State (S) Lead YEAR, IF! Total Cost of Scenic Byways Program: $0 $ $0 $0 Page 2 RTIPR SWRPO

3 Planning Recommendations: Note: Required Local Government Match is subject to change by FHWA at the time of agreement. 1 2 M apl e Cedar M apl e NM113 4 US180 5 NM Swan N. 8th St Country Club Rd. 38th St N. 8th/2nd. NM Pine NUMBE R Loop 22 NM 427 NM 427 (FL 5339) NM NM Santa Cl ara Hidalgo Grant Hidalgo Town of Silver City 14 All 0 Santa Clara Maple Cedar connection near Pearl Int. 9 & 113 to Mini Farms REDESIGN OF CULVERTS & CROSSING Hwy 180 & Kirkland Rd. On Hwy 80 from MP 31 S. to AZ State Line Drai nage & Improvements on Swan From 38th to Cain Dr. From 2nd. to New School to include Chaparral Blvd. On Country Club R. from Florida to Pine Pine /Spruce realignment of Intersection Truck Bypass to NM 26 from Exit 85 Interchange to NM 26 NM 427 Reconstruction 8th Reconstruction from NM 427 to Loop 22 NM 11 from Pear to Florida Transportation Master Plan Professional Services COST [] MATCH IN % of Professional Services 100 ft. $80 $750 $16.00 Replacement 0.40 $194 $985 $28.25 Reconstruction L 100 ft. $56 $445 $8.15 Reconstruction S 0.20 $80 $420 $11.65 Reconstruction S OR L $800 $4,115 $ Reconstruction S OR L 0.35 $185 $1,118 $26.94 Reconstruction L 0.82 $124 $723 $18.05 Reconstruction L 1.00 $239 $1,450 $34.80 Reconstruction L 0.28 $187 $1,033 $27.23 Reconstruction L 3.16 $2,520 $20,000 $ L Local(L) or State (S) Lead 3.90 $335 $1,897 $48.78 Reconstruction S OR L 0.93 $394 $2,413 $57.37 Reconstruction S OR L 0.50 $356 $1,980 $51.83 Reconstruction S OR L L YEAR(S), IF! All $50 $0 $1 Master Plan L 2010 SUBSTRUCTURE RATING OF 4 IUFFICIENT, TRAFFIC SAFETY FEATURES RATES INADEQUATE; NMDOT APIED FOR HSIP FY 10 CITY WANTS TO USE PEARL ST. PROGRAMMED FOR FY '13; CHANGE OF TERMINI AND SCOPE NEEDS TO BE APPROVED VIA COMMISSION FLOODING ACROSS ROAD CREATES HAZARD FOR USBP AND MILITARY TO AYAS; PIF 2010 for Planning and Design; Moved from in SAFETY CONCER; PIF IN 2010 FOR ANNING AND DESIGN SAFETY HAZARD; PIF 2010 for Design and Planning. DESIGN YET; ENGINEERS HAVE DONE COST ESTIMATE AND SCOPE OF WORK ROAD T EQUIPPED FOR SAFE BUS TRAVEL/PIF '10 FOR ANNING AND DESIGN CREATE TURNING LN./ ADD SHOULDERS; FY 10 PIF ANNING & DESIGN COMETION OF ARRA ES11220; FY 10 PIF FOR ANNING & DESIGN SAFER TRAFFIC FLOW WITH TRUCK TRAFFIC ON CREATED BY-PASS; FY 10 PIF FOR ANNING AND DESIGN CREATION OF CENTER TURN LANE; FY 10 PIF FOR ANNING & DESIGN CREATION OF MID. TURN LN. AND SIGNALIZATION; FY 10 PIF FOR ANNING & DESIGN CREATE TURNING LN./WIDEN SHOULDERS; FY 10 PIF FOR ANNING & DESIGN WOULD AID IN FUTURE AND ID OF DETERIORATING ROADWAYS. Page 3 RTIPR SWRPO

4 15 Oak Oak 16 NM s 32nd s NM 356 Cedar Si dewal ks East Cedar Si dewal ks West Santa Clara Grant 0 Santa Clara Silver City N. Foy to US 180 Oak & Bellm Bayard & Plannin Lari at g and Design Town of Silver City Bayard Village of Santa Cl ara Oak Bear Creek Crossing Prescott, Cedar, Cleveland, and Oak. Swan to NM15 Little Walnut to Cain Drive across to Swan St and Silver down Gold to 12th up Grant South side of NM 356 from N. Foy to US 180 Country Club Road east to the intersection with Pine /I- 10 connector on south side of Cedar Pine to ~500ft. West of Country Club Rd. on south side of Cedar Bayard & Oak, east to Bellm and south to Lariat 125 ft. $400 $650 $8 New L 200 ft. $948 $1,552 $ S OR L $400 $12.50 Sidewalks L $74 $445 $ $50 $900 $ $80 $375 $19.91 Sidewalks and Transit Stops Bike lanes, widening of shoulders, painting, lighting, sidewalks sidewalk, ADA improvements, reconstruction of deteriorated curb and gutter L L S OR L 1.35 $64 $335 $16.00 Sidewalk L 0.95 $32 $147 $8.00 Sidewalk L 0.60 $260 $1,721 $65.00 Reconstruction curb and gutter, paving, sidewalks and lighting L UAFE CROSSING FOR EMERGENCY PERSONNEL, PRIMARY BUS CROSSING FOR NEW SCHOOL UNDER COTRUCTION EMERGENCY PERSONNEL UNABLE TO CROSS WHEN FLOODING ACES SIDEWALKS IN AREA AROUND ELEM.; SAFER FOR STUDENTS BID FOR DESIGN JULY ; CREATION OF SIDEWALKS AND TRAIT IMPROVE SAFETY FOR CREATES CONNECTIVITY THROUGHOUT TOWN FROM THE RTH TO THE SOUTH Phase I improvements were constructed the summer of 2010 utilizing ARRA and funding. The improvements will ensure continuity of planning, design and construction completed on CN3303 to include the second section of the principal route through Santa Clara. Subtotal for Planning Category: $7,557,640 $43,854,000 $1,244,442 Page 4 RTIPR SWRPO

5 Safe Routes to School Program Recommendations: COST IN DATE OF TICE OF PRIOR RTIPR SUBMIS SION? YEAR, IF! CONTINGENCIES 1 Hill E terminus of Hill Town of Silver City East terminus of Hill and Silva Creek $250 new pedestrian/bicycle bridge 1/6/ 2007 Revised survey showing public access easements, public access all weather surface ADA compliant, gate or access point with letter from school, address NEPA section 4f 2 noninfrastructure NA Silver Consolidated School District NA NA $25 Education/Encour agement 4/7/ Encourage walking and bicycling to school as a safe and appealing transportation option for children by hiring instructor/contractor to create walking school buses, classroom curriculum and activities by professional bicyclists, develop 3 events - Walk and Roll to School Day, Dia de los Muertos Bicycle Parade and Monsoon Puppet Parade, and after school bicycle program. 3 8th, Desert Sun Apt., W 4th, N Tin, Lead, Nickel, Iron Chaparral, W 3rd., US 180, Winston, E 4th and E 5th various NM DOT District 1 various NA $ striping, continental style crosswalks, lighting, warning detection pads, signs, ADA ramps, sidewalks, curb, bollards, paths & path widening, landscaping, school zone flashers TBA Create safe walking and biking routes to Ruben S. Torres Elementary School. 4 noninfrastructure NA Public Schools NA NA $25 Education/Encour agement TBA Hire a Local Champion to oversee the Program and creation and distribution of pedestrian and biking safety materials, educational classroom curricula, posters and flyers for events, photographs, public awareness campaigns, etc. Total Cost of Safe Routes to School $573,751 Page 5 RTIPR SWRPO

6 NWRPO, SWRPO, MRRPO Regional Transportation Improvement Program Recommendations (RTIPR/Zipper) for NMDOT District 6 for 7 Year STIP (FY 2012 through FY 2018) Roadway Recommendations: REQUESTO R COST ESTIMATED LOCAL MATCH (14.56%) Local(L) or State (S) Lead PRIOR RTIPR SUBMISSIO N? YEAR(S), IF! W/DISTRICT 6? ROAD CLASSIFIED MAJOR COLLECTOR OR ABOVE? Additional Information or Comments 1 NM 12 Catron on NM 12 US 180 Int. East for 6 miles 6.00 $10,000,000 $1,456,000 Overlay and add shoulders STP S or L Yes/2003 Yes Falling Rocks. Hill needs to be trimmed back. Enhancement Recommendations: TE: Enhancement requirements include the following: 1) local county, municipal or tribal sponsor, 2) two local resolutions (early recognition of governing body and later commitment of matching funds), and 3) cost breakdown for 25% local match (excluding design costs) REQUESTO R 1 NM 435 Reserve NM 435 from Starkweather Cnyn S. to Village Limits COST IN ESTIMATED LOCAL MATCH (25%) 0.90 $179,323,000 $26,109,429 Sidewalks and decorative lighting Local(L) or State (S) Lead PRIOR RTIPR SUBMISSIO N? YEAR, IF! W/DISTRICT 6? ROAD CLASSIFIED MAJOR COLLECTOR OR ABOVE? L Yes Yes Yes Yes No Additional Information or Comments

Combined RTIPRfor NMDOT District 1 Southwest and South Central RPOs. for 7 Year STIP (FY 2012 through FY 2018)

Combined RTIPRfor NMDOT District 1 Southwest and South Central RPOs. for 7 Year STIP (FY 2012 through FY 2018) Combined RTIPRfor NMDOT District 1 Southwest and South Central RPOs for 7 Year STIP (FY 2012 through FY 2018) KEY: South Central RPO s Southwest RPO s Roadway Recommendations: Note: Required Local Government

More information

Roadway Project Recommendations: PROJECT COST IN $000 TYPE IMPROVEMENT. $16,000-$20,000 (higher estimate in total - below)

Roadway Project Recommendations: PROJECT COST IN $000 TYPE IMPROVEMENT. $16,000-$20,000 (higher estimate in total - below) NWRPO, SWRPO, MRRPO Regional Transportation Improvement Program Recommendations (RTIPR/) for NMDOT District 6 2013-2018 for 6 Year STIP (FY 2012 through FY 2017) Final as prioritized by NWRPO, SWRPO, MRRPO

More information

Roadway Project Recommendations:

Roadway Project Recommendations: Northwest RTPO Regional Transportation Improvement Program Recommendations (RTIPR) for NMDOT District 6 (Cibola, McKinley) & District 5 (San Juan) 2018-2023 for 5 Year STIP (FY 2018 through FY 2023) way

More information

Roadway Project Recommendations: PROJECT COST IN $000 TYPE IMPROVEMENT. Road Reconstruction - paving, widening, shoulders, drainage improvement

Roadway Project Recommendations: PROJECT COST IN $000 TYPE IMPROVEMENT. Road Reconstruction - paving, widening, shoulders, drainage improvement Northwest RPO Regional Transportation Improvement Program Recommendations (RTIPR) for NMDOT District 6 (Cibola, ) & District 5 (San Juan) 2015-2020 for 5 Year STIP (FY 2015 through FY 2020) FINAL Prioritized

More information

REVISION 2 Prioritized by NWRTPO

REVISION 2 Prioritized by NWRTPO Northwest RTPO Regional Transportation Improvement Program Recommendations (RTIPR) for NMDOT District 6 (Cibola, McKinley) & District 5 (San Juan) 2017-2022 for 5 Year STIP (FY 2017 through FY 2022) REVISION

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session February 20, 2018 Meeting Agenda Study Overview Existing Conditions Access Management Potential Gateway Features

More information

Complete Streets Funding Program Project Prioritization Plan

Complete Streets Funding Program Project Prioritization Plan Funding Program Project Prioritization Plan Location and Type Needs South Street Crosswalk Installation Stripe a new formalized crosswalk across South Street at the Anne T. Dunphy School pedestrian path

More information

Enhanced Walkabout Summary Report

Enhanced Walkabout Summary Report Enhanced Walkabout Summary Report Introduction On September 18, 2013, thirteen participants met at Galax Elementary School in Galax, Virginia to examine the walking and bicycling network around the elementary

More information

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

Transportation and General Civil Engineering Projects

Transportation and General Civil Engineering Projects Continuing Engineering Services for Transportation and General Civil Engineering Projects Broward County, Florida Why Atkins 2 Existing and Past Clients 3 25+ years Experienced in Civil Engineering PM

More information

Complete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis)

Complete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis) Mobility MassDOT Program Project Prioritization Plan (Revised 3/31/16) Municipality Winchendon 7/25/2017 Location Needs Request Schedule 1 Development of roundabout at the intersection of Front Street

More information

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING 4. IMPLEMENTATION PHASES & FUNDING HOOPA DESIGN FAIR 4-1 4. IMPLEMENTATION PHASES & FUNDING Phase One Development 1. Implementation The Conceptual Plan recommends five concept elements to revitalize downtown

More information

FUNDING SOURCES CHAPTER 6

FUNDING SOURCES CHAPTER 6 CHAPTER 6 6.1 BICYCLE 6.1.1 Local 6.1.2 Regional 6.1.3 State 6.1.4 Federal 6.1.5 Public Facilities 6.1.6 Bicycle Registration and Licensing Fees 6.1.7 Summary Table 6.1 of Bicycle Funding Sources 6 2 6.2

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction

More information

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road West Dimond Blvd Jodhpur St to Sand Lake CSS Transportation Project Summary Municipality of Anchorage Project # 05 005 Project Manager: John Smith, P.E. (MOA PM&E) Project Administrator: Julie Makela,

More information

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects -2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo

More information

SRTS IMPLEMENTATION COSTS

SRTS IMPLEMENTATION COSTS SRTS IMPLEMENTATION COSTS What Is a Estimate? A cost estimate establishes the anticipated budget required to implement the actions (the improvement projects and programs) identified in your School Travel

More information

Chapter 4: Funding and Implementation

Chapter 4: Funding and Implementation Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,

More information

Long Island Rail Road Expansion Project Floral Park to Hicksville

Long Island Rail Road Expansion Project Floral Park to Hicksville Long Island Rail Road Expansion Project Floral Park to Hicksville Final Environmental Impact Statement Appendix 1-D Complete Streets Policy Checklist April 2017 0902ML PIN: Project Location: 18A-4 Floral

More information

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building. CEDAR-ISLES-DEAN NEIGHBORHOOD ASSOCIATION ( CIDNA ) RESOLUTION OPPOSING A DRUG STORE DRIVE THRU, AND COMMENDING DORAN COMPANIES FOR PROPOSING MITIGATING AMENITIES INCLUDING NEW LANDSCAPING AND A DEDICATED

More information

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Prepared by: Public Works Department Engineering Division October 2015 Table of Contents Section I Introduction.. 3

More information

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility

More information

Improvements Infrastructure Gap Assessment and Improvements Street Striping

Improvements Infrastructure Gap Assessment and Improvements Street Striping Infrastructure Project Proposal The federal-aid Safe Routes to School program funds infrastructure/engineering projects that fall into two categories: Design (available only to School Development Authority

More information

APPENDIX L: COST ESTIMATING TOOLS

APPENDIX L: COST ESTIMATING TOOLS APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders

More information

Basalt Creek Transportation Refinement Plan Recommendations

Basalt Creek Transportation Refinement Plan Recommendations Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

Implementation Plan. 5.1 Improvement Program

Implementation Plan. 5.1 Improvement Program 5 Implementation Plan Section 4 presented detailed recommendations for transportation improvements and land use strategies in the Route 6 Hop River corridor. This section outlines how the transportation

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1 Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1 June 8, 2017 Meeting Agenda Study Overview Community Survey Existing Conditions Access Management Potential Safety Countermeasures Potential

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ % Fee Program Project List - 2004 General Plan Cost Estimate 2004 Alternative Route Study West Valley Condition 27 Alternative connection between, Feasibility study. Included in /White Rock Connector. south

More information

Item No. 14 Town of Atherton

Item No. 14 Town of Atherton Item No. 14 Town of Atherton CITY COUNCIL STAFF REPORT CONSENT AGENDA TO: THROUGH: FROM: HONORABLE MAYOR AND CITY COUNCIL GEORGE RODERICKS, CITY MANAGER MICHAEL KASHIWAGI, COMMUNITY SERVICES DIRECTOR MARTY

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council Bicycle and Pedestrian Connectivity Study Old Colony Planning Council Outline Why consider bike/peds in road designs? Why are measures needed? Connecting Land Use with Transportation Evaluation Tools:

More information

Culpeper District. Albemarle County Monthly Report October, 2011

Culpeper District. Albemarle County Monthly Report October, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

RZC Appendix 8A Marymoor Subarea Street Requirements

RZC Appendix 8A Marymoor Subarea Street Requirements RZC Appendix 8A Marymoor Subarea Street Requirements For additional design details for Marymoor Subarea infrastructure, refer to the 2017 Marymoor Subarea Infrastructure Planning Report. STREET REQUIREMENTS

More information

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL ve ha 8t G B A Mantorville Ave N 240th Ave 16th St NE 11th Ave NE K-M HIGH SCHOOL SUNRISE TRAIL TO MANTORVILLE MNTH 57 SUNSET TRAIL TO MANTORVILLE NE PARK 16TH ST NE TRAIL K-M ELEMENTARY SCHOOL K-M MIDDLE

More information

2019 Federal Transportation Improvement Program

2019 Federal Transportation Improvement Program VEN051211 Ventura SCCAB VEN051211 CAX63 L NON-EXEMPT 0 Description: PTC 4,417 Agency CAMARILLO LAS POSAS ROAD FROM VENTURA BLVD TO PLEASANT VALLEY ROAD WIDEN FROM 2 TO 6 LANES CITY FUNDS 4,417 4,417 4,417

More information

MnDOT. City of Zumbrota. Goodhue County

MnDOT. City of Zumbrota. Goodhue County MnDOT City of Zumbrota Goodhue County Downtown Zumbrota about 1908 MHS Photograph Collection, Postcard ca. 1925 MHS Photograph Collection, Postcard ca. 1908 MN 58 Subarea Study Guides short- through long-term

More information

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. 28 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. PROJECT

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

Project Status Update

Project Status Update Project Status Update : Novato Boulevard, 4th & 3rd Streets, Sir Francis Drake Boulevard (3), and Miller Avenue Major roads projects target the most heavily traveled roads in Marin County for repairs,

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

Bay to Bay Boulevard Complete Streets Project

Bay to Bay Boulevard Complete Streets Project Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information

More information

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017 Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets

More information

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Atwood Avenue Fair Oaks Avenue Cottage Grove Road Atwood Avenue Fair Oaks Avenue Cottage Grove Road Agenda Purpose Review project scope & goals Present design alternatives Gather feedback Answer Questions Format Open House Presentation Q&A Open House

More information

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc. SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN 6926 By Josh Larson McLaury Engineering Inc. Project Limits SD 50 from Broadway to Burleigh and from Marne Creek to Archery

More information

Rio Mills Rd/Berkmar Dr Extended Connection

Rio Mills Rd/Berkmar Dr Extended Connection SMART SCALE Application Rio Mills Rd/Berkmar Dr Extended Connection Status: Scored ID: F2-0000001408-R02 General Point of Contact Information Point of Contact Name Kevin McDermott Point of Contact Phone

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton

More information

July 5, Arthur R. Ware, Jr. Elementary School 2017 Safe Routes to School Walkabout Report

July 5, Arthur R. Ware, Jr. Elementary School 2017 Safe Routes to School Walkabout Report July 5, 2017 Arthur R. Ware, Jr. Elementary School 2017 Safe Routes to School Walkabout Report 1 Walkabout Report Introduction On April 28, 2017, City, School, and SAWMPO staff met to conduct a Safe Routes

More information

Funding Sources Appendix I. Appendix I. Funding Sources. Virginia Beach Bikeways and Trails Plan 2011 Page I-1

Funding Sources Appendix I. Appendix I. Funding Sources. Virginia Beach Bikeways and Trails Plan 2011 Page I-1 Funding Sources Virginia Beach Bikeways and Trails Plan 2011 Page I-1 Funding Sources Federal and state agencies provide funding for local bikeway and trail projects. Descriptions follow for programs that

More information

Welcome to the Sellwood Bridge Project Open House!

Welcome to the Sellwood Bridge Project Open House! Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred

More information

MIAMI & ERIE CANAL SHARED USE TRAIL

MIAMI & ERIE CANAL SHARED USE TRAIL New Bremen, Ohio Survey Transportation Engineering Grant Writing Project Cost Engineers Estimate: $509,358 Bid Amount $480,892 Size 1.12 miles $597,696 ODOT TEP $249,815 ODNR Completion Projected 11/15/14

More information

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD Appendix T CCMP 3.3.4 TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD 3.3.4 Trail Traffic and Transportation Design Multi-use trails have certain design standards, which vary depending on the agency that

More information

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT PROJECT NO. 093 MA 199 H 5807 01C FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENI HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT (INTERSECTION IMPROVEMENT) US 93/US 60 FINAL PROJECT ASSESSMENT April

More information

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN TRANSIT SAFETY ASSESSMENT SR 55/US 19 AT 80 TH AVE N DRAFT JUNE

More information

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY 7B BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY PLACEMENT: REQUESTS AND PRESENTATIONS PRESET: TITLE: FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) PRESENTATION RECONSTRUCTION OF SR-76 (SW KANNER HIGHWAY)

More information

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015 FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION June 26, 2015 s (PPLs) RMP Roadways PPL RMP Bicycle and Pedestrian PPL RMP Strategic Intermodal System (SIS) PPL Transportation Systems Management (TSM) PPL

More information

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31 2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31 2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Part 1: General Information Funding

More information

Project Application. Project Location: Salem Drive (Federal Route 1101)

Project Application. Project Location: Salem Drive (Federal Route 1101) Project Application General Information Municipality/Lead Agency: Hoffman Estates 1. Contact Person: Michael Hankey 2. Contact Phone: 847 252-5801 3. Contact Email: mike.hankey@hoffmanestates.org Project

More information

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County. SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i July 25, 2016 6. HIGHWAY MATTERS A. PLAN PROJECT UPDATES Attached for your reference please find project updates on ongoing VDOT construction projects

More information

Multimodal Design Guidance. October 23, 2018 ITE Fall Meeting

Multimodal Design Guidance. October 23, 2018 ITE Fall Meeting Multimodal Design Guidance October 23, 2018 ITE Fall Meeting Introductions Jessica Wilson TDOT Multimodal Division Office of Multimodal Planning Program Supervisor Jessica.L.Wilson@tn.gov Ali Hangul TDOT

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access COMMUNITY MEETING Project Update March 15, 2010 Purcellville, Virginia OVERVIEW Project need / objectives Project recap Design elements Proposed improvements Summary of project benefits / next steps PROJECT

More information

DISTRICT BICYCLE PROGRAM

DISTRICT BICYCLE PROGRAM DISTRICT BICYCLE PROGRAM TxDOT Fort Worth District Public Hearing Bicycle Use on the State Highway System Public Hearing Agenda 1 2 3 4 5 6 Introduction Susan Howard TxDOT Public Involvement Specialist

More information

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...

More information

Brian D. Hare, P.E. Bureau of Design PennDOT PA APA Annual Conference Investing in a Sustainable Future October 5, 2009

Brian D. Hare, P.E. Bureau of Design PennDOT PA APA Annual Conference Investing in a Sustainable Future October 5, 2009 Brian D. Hare, P.E. Bureau of Design PennDOT 2009 PA APA Annual Conference Investing in a Sustainable Future October 5, 2009 1 What is Smart Transportation? Photographer: heyjude. Used through license

More information

St. Francis Drive through the City of Santa Fe Corridor Study

St. Francis Drive through the City of Santa Fe Corridor Study VII. ENGINEERING AND ENVIRONMENTAL EVALUATION TRAIL CONNECTIVITY In the southern portion of the Corridor there is a lack of a sidewalk, trail or bicycle facility within the right-ofway. However, the City

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018 Public Information Meeting Orange Camp Road Dr. Martin Luther King Jr. Beltway to I-4 Presented by: Volusia County August 2, 2018 1 Project Goals To improve the operations and safety for Orange Camp Road

More information

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:

More information

Annual Listing of Obligated MPO Projects

Annual Listing of Obligated MPO Projects Thurston Regional Planning Council Annual Listing of Obligated MPO Projects CY 2015 March, 2016 2424 Heritage Court SW, Suite A, Olympia, WA 98502 360.956.7575 www.trpc.org About TRPC, established in 1967,

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by

More information

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2. Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW

More information

US Route 4 Traffic and Pedestrian Improvement Project

US Route 4 Traffic and Pedestrian Improvement Project Welcome to the public meeting for US Route 4 Traffic and Pedestrian Improvement Project June 5, 2018 Introduction Project Team Town of North Greenbush, Tony Germano, Town Comptroller Lou Desso, Town Supervisor

More information

IMPLEMENTATION WORKBOOK

IMPLEMENTATION WORKBOOK Lawrence Township Bicycle and Pedestrian Planning Assistance Study IMPLEMENTATION WORKBOOK Final Action Plan - Part 2 April 2009 Prepared For: The Township of Lawrence and the New Jersey Department of

More information

Minutes of the regular meeting of the City of Birmingham Multi-Modal Transportation Board held June 19, 2014.

Minutes of the regular meeting of the City of Birmingham Multi-Modal Transportation Board held June 19, 2014. CITY OF BIRMINGHAM START-UP MEETING OF THE MULTI-MODAL TRANSPORTATION BOARD THURSDAY, JUNE 19, 2014 City Commission Room 151 Martin Street, Birmingham, Michigan Minutes of the regular meeting of the City

More information

2.0 Existing Conditions

2.0 Existing Conditions 20 2.0 Existing Conditions 2.1 Land Use, Future Growth Patterns, Physical Barriers Geographic Overview Sutter County s land use pattern is characterized by extensive agricultural areas, significant natural

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

Building Great Neighbourhoods QUEEN ALEXANDRA

Building Great Neighbourhoods QUEEN ALEXANDRA Building Great Neighbourhoods QUEEN ALEXANDRA We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.

More information

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

U.S. HIGHWAY 50 IMPROVEMENT PROJECT U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY

More information

Application to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District.

Application to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District. September 7 th, 2007 Application to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District. Acting District Administrator Mr. Morteza Salehi has endorsed

More information

INDOT Complete Streets Guideline & Policy

INDOT Complete Streets Guideline & Policy INDOT Complete Streets Guideline & Policy INTRODUCTION The Complete Streets guidelines build upon multiple efforts and promote a multimodal transportation system that is integrated and sustains land use

More information

TRANSPORTATION TRAINING TOPICS. April 6, 2010

TRANSPORTATION TRAINING TOPICS. April 6, 2010 TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA

More information

ROAD PROJECTS. Primary and Interstate Roads LRTP; Southern- Western Neighborhoods MP

ROAD PROJECTS. Primary and Interstate Roads LRTP; Southern- Western Neighborhoods MP Desktop > Trans Priorities 0 >TRANPSORTATION PRIORITIES > new priority list format.doc ALBEMARLE COUNTY TRANSPORTATION PRIORITIES (DRAFT) April, 0: The following are the counties strategies priorities

More information

900 BICYCLE FACILITIES Traffic Engineering Manual

900 BICYCLE FACILITIES Traffic Engineering Manual TABLE OF CONTENTS Part 9 - BICYCLE FACILITIES 900 GENERAL... 9-3 900-1 General Background... 9-3 900-2 Designated Bicycle Routes... 9-3 901 SIGNINGS... 9-4 902 MARKINGS... 9-4 902-1 General... 9-4 902-2

More information

SAFE ROUTES TO SCHOOL

SAFE ROUTES TO SCHOOL SAFE ROUTES TO SCHOOL Forest Ridge Elementary School Existing Conditions and ACTION PLAN > Oak Creek - Franklin Joint School District Table of Contents CONTEXT Enrollment Boundaries

More information

Westgate/Belvedere Homes Community Redevelopment Agency. Belvedere Heights. Streetlights & Sidewalks Improvements Project.

Westgate/Belvedere Homes Community Redevelopment Agency. Belvedere Heights. Streetlights & Sidewalks Improvements Project. Westgate/Belvedere Homes Community Redevelopment Agency Belvedere Heights Streetlights & Sidewalks Improvements Project Phase II TPA 2018 Transportation Alternatives Program (TAP) BTPAC Presentation Thursday,

More information

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Passaic County Complete Streets Checklist - Concept Development Project Name Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Existing Plans Have

More information

Fairfax County Parkway Widening Fairfax County

Fairfax County Parkway Widening Fairfax County Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

CY2017 Summary of STP applications

CY2017 Summary of STP applications CY2017 Summary of STP applications Project Sponsor Project Name Project Location Project Description County Line Road Widening Project Indian Ripple Road Reconstruction County Line Road from Willow Run

More information