PLEASE TURN CELL PHONES ON SILENT DURING MEETINGS

Size: px
Start display at page:

Download "PLEASE TURN CELL PHONES ON SILENT DURING MEETINGS"

Transcription

1 CITY OF TOMAHAWK Tuesday, October 3, :00PM BOARD OF PUBLIC WORKS City Hall, City Council Chamber 23 N 2 nd Street BOARD MEMBERS STEVEN E. TASKAY MAYOR MICKEY LOKA DISTRICT 1 DALE ERNST DISTRICT 2 STEVE DING BARTZ DISTRICT 3 WILL GARSKE AT LARGE REP A. CALL TO ORDER AGENDA B. PUBLIC COMMENTS (During this item on the agenda the Board listens to oral comments from members of the public on non-agenda items. When speaking please state your name and limit your time to five minutes.) C. MINUTES 1. September 5, 2017 D. OTHER BUSINESS Project Updates i. Bradley Farm Road/Kings Road Storm Sewer Improvements ii. Storm Water Study iii Chip Sealing iv Crack Sealing 2. Storm Water at South Tomahawk Avenue and Recreation Trail (Abandoned Rail Road Right of Way) 3. City Garage Bay Number 5 (Main Snow Plow Door) 4. Request from Metco to Conduct Five Soil Borings and Convert to Monitoring Wells and Pone Piezometer on Wisconsin Avenue 5. Request from a Resident for Dead End Sign at Cheryl Avenue 6. 5 Year Capital Improvement Plan Board of Public Works Proposed Budget E. DIRECTOR S REPORT F. NEXT MEETING 1. November 7, 2017 at 5:00PM G. ADJOURN Any additions to this agenda will be added to the original posted at City Hall. Any person who has a qualifying disability as defined by the American s with Disabilities Act, that requires the meeting or materials at the meeting to be in an accessible location or format must contact the Clerk-Treasurer at City Hall, , at least three days prior to the meeting so any necessary arrangements can be made to accommodate each request. PLEASE TURN CELL PHONES ON SILENT DURING MEETINGS POSTED 09/25/2017 Page 1 of 1

2 CALL TO ORDER ROLL CALL PUBLIC COMMENTS MINUTES OTHER BUSINESS MINUTES OF THE BOARD OF PUBLIC WORKS City of Tomahawk September 05, 2017 Mayor TASKAY called the meeting of the Board of Public Works to order at 5:01PM. Members present were Mayor Steve Taskay, Mickey Loka, Steve Bartz, Dale Ernst and Will Garske. Also present were Public Works Director John Cole, Clerk-Treasurer Amanda L. Bartz and Office Assistant Brenda Crass. There were no public comments. MICKEY LOKA MOVED to approve the August 01, 2017 minutes and GARSKE seconded. The VOTE was unanimous. GARSKE MOVED to approve the August 08, 2017 minutes and MICKEY LOKA seconded. The VOTE was unanimous. 1.) 2017 Project Updates Bradley Farm Road/Kings Road Storm Sewer Improvements COLE reported that everything is ready to begin on the improvement project. He stated there will be a pre-construction meeting at City Hall, Council Chambers on September 07 at 10:00AM with A1 Construction. Storm Water Study Kevin Wagner, Rukert and Mielke reviewed the findings of the storm water study. He stated they surveyed the culverts and storm water sections of the City and explained where the different basins are and how they are draining. Wagner noted that South Tomahawk Avenue is a critical issue and this year there is a lot more water than previous years. He stated it is estimated a 70 percent increase of rainfall this year which intensifies flooding. Wagner reported replacing the pipe at South Tomahawk Avenue is a high-ticket item, however, the roadway is in decent shape. He noted a high capacity portable pump Board of Public Works September 05, 2017 Page 1 of 3

3 would also help to have a constant flow of storm water from the basin to relieve the culvert for a lower cost. Wagner noted to assign the main vein is $25,000 - $50,000 in maintenance costs to the system total would be $500,000 for the next three years and coincides with paving projects. COLE stated that Wagner did a nice job on the report. Dick Ebert questioned if the pipe is pitched in the wrong direction. Wagner confirmed the pipe is pitched in the wrong direction. MICKEY LOKA asked if the pipe was laid all at once into the existing system. COLE confirmed the pipe was laid all at once. BARTZ asked if there could be recourse for the engineering firm to fix the problem or if we are out of luck. COLE stated that would be a question for the City attorney. Ed Nystrom stated the original pipe was a maintenance nightmare when it was installed. Rejeana Ebert confirmed that MSA was the engineering firm, however, DOT oversaw most of it and it was a DOT project Chip Sealing COLE reported the chip sealing is complete for 2017 by Scot Construction. He stated there was an eight-inch water break on Spirit Avenue with a part of the water main breaking off and part of the road had to be dug up Crack Sealing COLE reported Pitclick & Wik will be here this week to finish up crack sealing various roads by Friday or Saturday, weather permitting. 2.) Storm Water at South Tomahawk Avenue and Recreation Trail (Abandoned Rail Road Right of Way) There was nothing new to report. 3.) 2017 Sidewalk Program COLE reported a sidewalk repair bid was put together for Ward 2, however, there weren t any bids received. He stated he compiled a list of sidewalks that needed repairs and has taken the worst of the worst off the list and the Public Works Department will Board of Public Works September 05, 2017 Page 2 of 3

4 get as much done as possible before it begins freezing. He noted he hopes to get 46 pieces done by fall. Clerk BARTZ explained the process as presented. COLE noted a 4 foot 5X5 square would cost approximately $ Rejeana Ebert questioned if a property is missing a sidewalk or missing segments if the residents would have the option of removing the sidewalk rather than repairing it. COLE noted the properties without sidewalks will be addressed later. Ed Nystrom asked if there is any relief for street trees that push up City sidewalks. Clerk BARTZ stated that there is currently no relief. 4.) Wisconsin Public Service Natural Gas Service Upgrades COLE reported Wisconsin Public Service is conducting natural gas lateral upgrades around the City. 5.) Wisconsin Public Service Temporary Access Agreement (Kaphaem Road) Clerk BARTZ explained Wisconsin Public Service is asking for temporary access to City property by the CESA 9 building on Kaphaem Road. MICKEY LOKA MOVED to approve Wisconsin Public Service temporary access to Kaphaem Road and ERNST seconded. The VOTE was unanimous. DIRECTOR S COLE reported on the Highway S railroad crossing and a detour that will be in place REPORT September 18, He noted they conducted work on the Somo Avenue railroad crossing and thanked the Public Works Department for their accomplishments over the summer and is happy where they are headed. NEXT The Board of Public Works will meet October 03, 2017 at 5:00PM at City Hall in the MEETING Council Chambers. ADJOURN MICKEY LOKA MOVED to adjourn the meeting of the Board of Public Works and ERNST seconded. The VOTE was unanimous. The meeting was adjourned at 5:57PM. Approved: Draft Amanda L. Bartz CMC, Clerk-Treasurer Board of Public Works September 05, 2017 Page 3 of 3

5

6

7 City of Tomahawk, Wisconsin Public Works - 5 Year CIP thru PROJECTS & FUNDING SOURCES BY CATEGORY Category Priority City Garage - Capital Improvements City Garage Door Replacement STR ,000 3,500 4,000 10,500 Capital Projects Fund 3,000 3,500 4,000 10,500 City Garage - Capital Improvements Snow/Ice - Capital Equipment 3,000 3,500 4,000 10,500 Patrol Truck STR , ,000 Capital Projects Fund 140, ,000 Snow/Ice Reserve 10,000 10,000 Snow/Ice - Capital Equipment Street Cleaning - Capital Equipment 150, ,000 Street Sweeper STR , ,000 Capital Projects Fund 65,000 65,000 Sale of Street Equipment 25,000 25,000 Street Cleaning Fund 60,000 60,000 Street Cleaning - Capital Equipment Street Machinery - Capital Equipment 150, ,000 4X4 Pickup Truck STR ,000 45,000 Capital Projects Fund 45,000 45,000 Wood Chipper STR ,000 55,000 Capital Projects Fund 45,000 45,000 Sale of Street Equipment 10,000 10,000 Bucket Truck STR ,000 50,000 Capital Projects Fund 50,000 50,000 Sale of Street Equipment 0 0 Tool Cat STR ,000 40,000 Capital Projects Fund 40,000 40,000 Sale of Street Equipment 0 0 Loader STR , ,000 Capital Projects Fund 125, ,000 Sale of Street Equipment 0 0 Street Machinery - Capital Equipment Street Main. - Capital Improvements 45, , , ,000 Annual Street Paving/Chip Sealing STR , , , , , ,000 Capital Projects Fund 100, , , , , ,000 Annual Crack Filling STR ,000 40,000 40,000 40,000 40, ,000 Capital Projects Fund 40,000 40,000 40,000 40,000 40, ,000 Public Works Monday, September 25, 2017

8 Category Priority Kings Road Reconstruction STR ,000 75, ,000 Capital Projects Fund 75,000 75,000 G.O. Financing 385, ,000 Southgate Drive STR , ,000 G.O. Financing 620, ,000 Municipal Parking Lot STR ,000 23,000 15,000 60,000 Capital Projects Fund 12,000 23,000 15,000 50,000 Donations 10,000 10,000 Bridge Blandder Gland STR ,500 2,500 Capital Projects Fund 2,500 2,500 S. Tomahawk Ave Storm Water STR ,000 75,000 Capital Projects Fund 75,000 75,000 Nelson Ln STR ,000 25,000 Capital Projects Fund 25,000 25,000 6th Street Reconstruction STR , ,000 G.O. Financing 250, ,000 Washington Ave Reconstruction STR , ,000 G.O. Financing 275, ,000 W Somo Ave Reconstruction (HWY 86) STR ,250,000 1,250,000 G.O. Financing 1,250,000 1,250,000 E Somo Ave Reconstruction (HWY 86) STR ,250,000 1,250,000 G.O. Financing 1,250,000 1,250,000 E Lincoln Ave Reconstruction STR ,000,000 1,000,000 G.O. Financing 1,000,000 1,000,000 Street Main. - Capital Improvements Street Main. - Sidewalk Program 624, , ,000 2,640,000 1,140,000 6,135,500 Sidewalk Program STR ,000 8,000 8,000 8,000 8,000 40,000 Capital Projects Fund 3,000 3,000 3,000 3,000 3,000 15,000 Special Assessments 5,000 5,000 5,000 5,000 5,000 25,000 Street Main. - Sidewalk Program 8,000 8,000 8,000 8,000 8,000 40,000 GRAND TOTAL 680,500 1,347, ,000 2,648,000 1,148,000 6,801,000 Public Works Monday, September 25, 2017

9 City Garage - 5 Year CIP STR Years Project Name City Garage Door Replacement Category City Garage - Capital Improve Improvement Door replacement Priority 1 Critical Project Cost: $10,500 Front door to municipal garage is rotted, sill is rotted and needs to be replaced. Buildings ,000 3,500 4,000 10,500 3,000 3,500 4,000 10,500 Capital Projects Fund ,000 3,500 4,000 10,500 3,000 3,500 4,000 10,500 City Garage Friday, September 22, 2017

10 Snow and Ice - 5 Year CIP STR years Project Name Patrol Truck Category Snow/Ice - Capital Equipment Equipment New patrol truck with 12' front plow, underbody wing, etc. Priority 1 Critical Project Cost: $150,000 Replace main salt patrol truck as it is getting older and will require more maintenance. Equip/Vehicles/Furnishings , , , ,000 Capital Projects Fund Snow/Ice Reserve , ,000 10,000 10, , ,000 None. Snow and Ice Friday, September 22, 2017

11 Street Cleaning - 5 Year CIP STR years Project Name Street Sweeper Category Street Cleaning - Capital Equip Equipment New vac sweeper. Priority 2 Very Important Project Cost: $150,000 Current sweeper was purchased used and is a conveyer system (1996). Suction sweeper does a better job. Equip/Vehicles/Furnishings Capital Projects Fund Sale of Street Equipment Street Cleaning Fund , , , , ,000 65,000 25,000 25,000 60,000 60, , ,000 Street Cleaning Friday, September 22, 2017

12 Public Works - 5 Year CIP STR Equipment 15 years Project Name 4X4 Pickup Truck Category Street Machinery - Capital Equ Public Works Pickup truck with plow. Priority 2 Very Important Project Cost: $45,000 Replace existing pickup truck (2wd) with a 4wd with a plow. Pickup will be retained by Public Works to use at work/crew truck as we are short on vehicles. Equip/Vehicles/Furnishings ,000 45,000 45,000 45,000 Capital Projects Fund ,000 45,000 45,000 45,000 Street Machinery Monday, September 25, 2017

13 Public Works - 5 Year CIP STR years Project Name Wood Chipper Category Street Machinery - Capital Equ Equipment New 15"-18" wood chipper. Priority 2 Very Important Project Cost: $55,000 Old chipper was a 1995 demo and has reached the end of its life. It now requires lots of maintenance cost and has a lot of breakdowns. Equip/Vehicles/Furnishings Capital Projects Fund Sale of Street Equipment ,000 55,000 55,000 55, ,000 45,000 10,000 10,000 55,000 55,000 Street Machinery Monday, September 25, 2017

14 Public Works - 5 Year CIP STR years Project Name Bucket Truck Category Street Machinery - Capital Equ Equipment Purchase of a used (5 year old) bucket truck Priority 2 Very Important Project Cost: $50,000 Our current bucket truck was purchased in 2001 used. Equip/Vehicles/Furnishings Capital Projects Fund Sale of Street Equipment ,000 50,000 50,000 50, ,000 50, ,000 50,000 Street Machinery Monday, September 25, 2017

15 Public Works - 5 Year CIP STR years Project Name Tool Cat Category Street Machinery - Capital Equ Equipment Multi use machine with attachments Priority 3 Important Project Cost: $40,000 The current multi use machine is Toolcat purchased new in It has lots of hours on it and is a 4 season machine. Equip/Vehicles/Furnishings Capital Projects Fund Sale of Street Equipment ,000 40,000 40,000 40, ,000 40, ,000 40,000 Street Machinery Monday, September 25, 2017

16 Public Works - 5 Year CIP STR years Project Name Loader Category Street Machinery - Capital Equ Equipment Purchase of a new loader Priority 2 Very Important Project Cost: $125,000 The current loader is Volvo. Repairs and warranty will be up on this piece of equipment. Loader is also used in snow blowing process Equip/Vehicles/Furnishings Capital Projects Fund Sale of Street Equipment , , , , , , , ,000 Street Machinery Monday, September 25, 2017

17 Street Maintenance - 5 Year CIP STR Bronstead Rd - 6" Gravel 2 1/2" Blacktop (560') Birchwood Ave - Pulverize and Pave road from Kwik Trip to End of Road (2,140') N 9th St (Lincoln Ave to Somo Ave) - Pulverize and Pave, connect storm water from Pride Park to catch basin on east side (31,506 s/f) 2019 Murphy Ave - Recycle/Overlay (750') Bridge St - Recycle/Overlay (750') Division St - Recycle/Overlay (800') Charles Ave - Recycle/Overlay (400') Jersey Ln - Recycle/Overlay (2,100') 2020 Pfeifer Rd (Jaecks Rd to Pine Ave) - Recycle/Overlay (3,232') Jaecks Rd - Recycle/Overlay (1,067') Pride St - Recycle/Overlay (581') Pine St - Recycle/Overlay (686') Birch Ave - Recycle/Overlay (528') Vink St - Recycle/Overlay (250') Roads to be determined at a later date based on road ratings (condition) Roads to be determined at a later date based on road ratings (condition). Priority Maintenance 10 years Project Name Annual Street Paving/Chip Sealing Category Street Main. - Capital Improve 1 Critical Project Cost: $748,000 Pavement Management System identifies condition of roadways and determines length of time until failure or unusable condition. Significant cracking and failure need to be avoided by annual maintenance. Status Active Construction/Maintenance , , , , , , , , , , , ,000 Capital Projects Fund , , , , , , , , , , , ,000 None. Street Maintenance Friday, September 22, 2017

18 Street Maintenance - 5 Year CIP STR years Project Name Annual Crack Filling Category Street Main. - Capital Improve Improvement Annual Crack Sealing Program. Road to be determinded based on current road ratings. Priority 1 Critical Project Cost: $230,000 Construction/Maintenance ,000 40,000 40,000 40,000 40, ,000 40,000 40,000 40,000 40,000 40, ,000 Capital Projects Fund ,000 40,000 40,000 40,000 40, ,000 40,000 40,000 40,000 40,000 40, ,000 Street Maintenance Friday, September 22, 2017

19 Street Maintenance - 5 Year CIP STR Kings Road from end of curb to Kings Hill Road. Includes storm sewer, pavement, sidewalk, curb and gutter and engineering Kings Hill Road. Includes storm sewer, pavement, sidewalk, curb and gutter and engineering. Project Name Kings Road Reconstruction Category Street Main. - Capital Improve Priority Status Improvement 2 Very Important Active Project Cost: $460,000 Road is in poor condition and there is no storm sewer. Construction/Maintenance ,000 75, , ,000 75, ,000 Capital Projects Fund G.O. Financing ,000 75, , , ,000 75, ,000 Street Maintenance Friday, September 22, 2017

20 Street Maintenance - 5 Year CIP STR years Project Name Southgate Drive Category Street Main. - Capital Improve Improvement Mill & Fill of Southgate Drive. Inclueds storm sewer, curb, 5' sidewalk Priority 1 Critical Project Cost: $620,000 County Road S (Southgate Drive) is being completed by Lincoln County. Planning/Design Construction/Maintenance , , , , , ,000 G.O. Financing , , , ,000 None. Street Maintenance Friday, September 22, 2017

21 Street Maintenance - 5 Year CIP STR Patch asphalt, seal coat, paint stalls and repair concrete as needed. Install underground electricl service (lighting and 4 power point) Install street lighting Signage and landscaping. Priority 20 years Project Name Municipal Parking Lot Category Street Main. - Capital Improve Status Improvement Project Cost: $60,000 2 Very Important Active Lot needs to be seal coated and asphalt needs to be repaired. Construction/Maintenance ,000 23,000 15,000 60,000 22,000 23,000 15,000 60,000 Capital Projects Fund Donations ,000 23,000 15,000 50,000 10,000 10,000 22,000 23,000 15,000 60,000 Street Maintenance Friday, September 22, 2017

22 Street Maintenance - 5 Year CIP STR Project Name Bridge Blandder Gland Category Street Main. - Capital Improve Improvement 5 years N 4th Street Bidge bladdar gland replacement. Priority 1 Critical Project Cost: $2,500 Old gland is torn and needs to be replaced. Equip/Vehicles/Furnishings ,500 2,500 2,500 2,500 Capital Projects Fund ,500 2,500 2,500 2,500 Street Maintenance Friday, September 22, 2017

23 Street Maintenance - 5 Year CIP STR Improvement 50 years Project Name S. Tomahawk Ave Storm Water Category Street Main. - Capital Improve Plan may be revised after the Storm Water Study is completed. Priority 1 Critical Project Cost: $75,000 Replace 24" storm sewer with a plastic 24" storm sewer pitched from east to west. We hope to do this project in-house. If so, project cost would be cut in half. The 24" pipe (south) is pitched from west to east not allowing the water to flow. This is casuing storm water to stand on S Tomahawk Avenue, Merril Ave, and S 4th St. Construction/Maintenance ,000 75,000 75,000 75,000 Capital Projects Fund ,000 75,000 75,000 75,000 Street Maintenance Friday, September 22, 2017

24 Street Maintenance - 5 Year CIP STR years Project Name Sidewalk Program Category Street Main. - Sidewalk Progra Improvement Replace/Repair of non-compliance sidewalks. Priority 1 Critical Project Cost: $40,000 Construction/Maintenance ,000 8,000 8,000 8,000 8,000 40,000 8,000 8,000 8,000 8,000 8,000 40,000 Capital Projects Fund Special Assessments ,000 3,000 3,000 3,000 3,000 15,000 5,000 5,000 5,000 5,000 5,000 25,000 8,000 8,000 8,000 8,000 8,000 40,000 Street Maintenance Friday, September 22, 2017

25 Street Maintenance - 5 Year CIP STR years Project Name Nelson Ln Category Street Main. - Capital Improve Improvement Full Reconstruction of Nelson Lane Priority 3 Important Project Cost: $25,000 Replacement of watermain and repave. (1,200') Construction/Maintenance ,000 25,000 25,000 25,000 Capital Projects Fund ,000 25,000 25,000 25,000 Street Maintenance Friday, September 22, 2017

26 Street Maintenance - 5 Year CIP STR years Project Name 6th Street Reconstruction Category Street Main. - Capital Improve Improvement Wisconsin Avenue to Lincoln Avenue Priority 3 Important Project Cost: $250,000 Full resconstruction to include curb and gutter, storm water, water and sewer. Road is in terible condition and storm sewer system in failing. There is currently no curb and gutter in this location. Construction/Maintenance , , , ,000 G.O. Financing , , , ,000 None. Street Maintenance Friday, September 22, 2017

27 Street Maintenance - 5 Year CIP STR years Project Name Washington Ave Reconstruction Category Street Main. - Capital Improve Improvement Full Reconstruction of Washington Avenue Priority 1 Critical Project Cost: $275,000 Includes water, sewer, repave and new curb & gutter. Construction/Maintenance , , , ,000 G.O. Financing , , , ,000 Street Maintenance Friday, September 22, 2017

28 Street Maintenance - 5 Year CIP STR years Project Name W Somo Ave Reconstruction (HWY 86) Category Street Main. - Capital Improve Improvement Full reconstruction of W Somo Avenue. (4th Street to Railroad tracks) Priority 1 Critical Project Cost: $1,250,000 Replace water, sewer, curb & gutter, sidewalk and repave. Construction/Maintenance ,250,000 1,250,000 1,250,000 1,250,000 G.O. Financing ,250,000 1,250,000 1,250,000 1,250,000 Street Maintenance Friday, September 22, 2017

29 Street Maintenance - 5 Year CIP STR years Project Name E Somo Ave Reconstruction (HWY 86) Category Street Main. - Capital Improve Improvement Full reconstruction of E Somo Avenue. (4th Street to Charlotte) Priority 1 Critical Project Cost: $1,250,000 Replace water, sewer, curb & gutter, sidewalk and repave. Construction/Maintenance ,250,000 1,250,000 1,250,000 1,250,000 G.O. Financing ,250,000 1,250,000 1,250,000 1,250,000 Street Maintenance Friday, September 22, 2017

30 Street Maintenance - 5 Year CIP STR years Project Name E Lincoln Ave Reconstruction Category Street Main. - Capital Improve Improvement Full reconstruction of E Lincoln Ave. (4th Street to Kings Road) Priority 1 Critical Project Cost: $1,000,000 Replace water, sewer, curb & gutter, sidewalk and repave. Construction/Maintenance ,000,000 1,000,000 1,000,000 1,000,000 G.O. Financing ,000,000 1,000,000 1,000,000 1,000,000 Street Maintenance Friday, September 22, 2017

31 MISSION STATEMENT The City of Tomahawk Department of Public Works mission is to maintain, preserve, document and protect the infrastructure of the City in the most efficient and effective manner possible, while providing quality, professional, timely service to residents, businesses and visitors. STAFFING 2010 Actual 2011 Actual 2012 Actual 2013 Actual 2014 Actual 2015 Actual 2016 Actual 2017 Actual 2018 Proposed Public Works Management Streets From 1998 to 2004 the Public Works Department was staffed with 1 Public Works Management and 6 Streets Employees. In 2005 a waste water employee retired and a DPW employee transferred to the Waste Water Department and the positions were not filled in DPW. EXPENDITURE SUMMARY 2014 Actual 2015 Actual 2016 Actual 2017 Projected 2017 Budgeted 2018 Proposed Personnel 314, , , , , , Operating 290, , , , , ,55 Capital Outlay 264,25 85, , , , ,50 869, , , , , ,247, MILESTONE (Proposed) * Miles of Roads Miles of Road Reconstructed Miles of Roads Maintained Annual Snowfall N/A N/A 2014 Addition of 0.27 miles of County Highway A and 0.27 mils of Hometown Drive 2016 Addition of.12 miles of Leather Court Page 1 of 5

32 9/25/2017 2:24 PM Proposed Budget Overview - Summary PUBLIC WORKS - EXPENDITURE SUMMARY Page: ACCT Actual Projected 2017 Proposed % Change Year-End Year-End Budget Budget In Budget DPW DIRECTOR - PERSONNEL 100, , , , STREET MACHINERY - PERSONNEL 33, , , , CITY GARAGE - PERSONNEL 6, , , , STREET MAINTENANCE - PERSONNEL 168, , , , STREET CLEANING - PERSONNEL 14, , , , SNOW/ICE REMOVAL - PERSONNEL 37, , , , PERSONNEL 360, , , , DPW DIRECTOR - OPERATING 5, , ,95 4, STREET MACHINERY - OPERATING 15, , ,55 14, CITY GARAGE - OPERATING 27, , ,70 10, STREET MAINTENANCE - OPERATING 49, , , , STREET CLEANING - OPERATING , ,25 2,00 6 SNOW/ICE REMOVAL - OPERATING 27, , ,00 23, TRAFFIC CONTROL - OPERATING 1, , ,50 1,50 TRAFFIC LIGHTING - OPERATING 86, , ,00 78, OPERATING 213, , , , STREET MACHINERY - CAPITAL 42, ,00 9,80 45, CITY GARAGE - CAPITAL 9, , STREET MAINTENANCE - CAPITAL 157, ,00 138, , STREET CLEANING - CAPITAL SNOW/ICE REMOVAL - CAPITAL TRAFFIC CONTROL - CAPITAL TRAFFIC LIGHTING - CAPITAL CAPITAL OUTLAY 199, , , , Expenses 774, , , ,247, , , , ,247, Net s Page 2 of 5

33 Proposed Budget Overview - Detail PUBLIC WORKS - EXPENDITURE SUMMARY Actual Projected 2017 Proposed % Change Account Number Year-End Year-End Budget Budget In Budget BPW DIR/SUP - WAGES - REGULAR 46, BPW DIR/SUP - SICK PAY 1, BPW DIR/SUP - VACATION PAY 19, BPW DIR/SUP - LONGEVITY PAY BPW DIR/SUP - HOLIDAY PAY 1, BPW DIR/SUP - FUNERAL LEAVE BPW DIR/SUP - SOCIAL SECURITY 4, BPW DIR/SUP - RETIRE EMPLYOER 2, , , , , , , , , , , , , , , , BPW DIR/SUP - HEALTH INSURANCE 24, , , , DPW DIRECTOR - PERSONNEL 100, , , , ST MACHINERY - WAGES 25, ST MACHINERY - OVERTIME ST MACHINERY - SICK PAY 1, ST MACHINERY - VACATION PAY -2, ST MACHINERY - LONGEVITY PAY ST MACHINERY - HOLIDAY PAY 1, ST MACHINERY - FUNERAL LEAVE ST MACHINERY - SOCIAL SECURITY 2, ST MACHINERY - RETIRE EMPLOYR 2, , , , , , , , , , , , , , , , ST MACHINERY - HEALTH INS 1, , , , STREET MACHINERY - PERSONNEL 33, , , , CITY GARAGE - WAGES 5, CITY GARAGE - OVERTIME CITY GARAGE - SOCIAL SECURITY , , , , , , CITY GARAGE - RETIRE- EMPLOYER , , , CITY GARAGE - PERSONNEL 6, , , , ST MAINT - WAGES 65, ST MAINT - PART-TIME WAGES ST MAINT - OVERTIME 3, ST MAINT - SICK PAY ST MAINT - VACATION PAY 9, ST MAINT - LONGEVITY PAY ST MAINT - HOLIDAY PAY 3, ST MAINT - FUNERAL LEAVE ST MAINT - SOCIAL SECURITY 5, ST MAINT - RETIRE - EMPLOYER 7, ST MAINT - HEALTH INSURANCE 72, , , , , , , , , , , , , , , , , , , , , , ST MAINT - LIFE INSURANCE STREET MAINTENANCE - PERSONNEL 168, , , , ST CLEANING - WAGES 12, ST CLEANING - OVERTIME ST CLEANING - SOCIAL SECURITY , , , ST CLEANING - EMPLOYR RETIRE STREET CLEANING - PERSONNEL 14, , , , SNOW/ICE - WAGES 22, SNOW/ICE - CALL TIME 25,00 27,90 28, , , , Page 3 of 5

34 Proposed Budget Overview - Detail PUBLIC WORKS - EXPENDITURE SUMMARY Actual Projected 2017 Proposed % Change Account Number Year-End Year-End Budget Budget In Budget SNOW/ICE - OVERTIME 11, SNOW/ICE - SOCIAL SECURITY 2, , , , ,64 2, , SNOW/ICE - RETIRE - EMPLOYER 1, , , , SNOW/ICE REMOVAL - PERSONNEL 37, , , , PERSONNEL 360, , , , BPW DIR/SUP - PRO SVC BPW DIR/SUP - UTILITIES 1, BPW DIR/SUP - REPR/MAINT SVC BPW DIR/SUP - OTHR CONTRD SVC BPW DIR/SUP - DUES/SUBSCRIP BPW DIR/SUP- TRAVEL EXPENSES 2, BPW DIR/SUP - OPP SUPPLIES BPW DIR/SUP - CLOTHING/UNIFORM , ,00 1, , ,50 1, BPW DIR/SUP - OTHR SUPP/EXPNS DPW DIRECTOR - OPERATING 5, , ,95 4, ST MACHINERY - REPAR/MAINT SVC 1, ST MACHINERY - OTHR CONCTD SVC 1, ST MACHINERY - TRAVEL EXPENSES ST MACHINERY - OPP SUPPLIES 1, ST MACHINERY - CLOTHING/UNIFRM ,50 2, , , ,00 3, ST MACHINERY - REPAR/MAINT SUP 8, , ,00 7,00 STREET MACHINERY - OPERATING 15, , ,55 14, CITY GARAGE - UTILITIES 12, CITY GARAGE - REPAIR/MAIN SVC CITY GARAGE - OTHR CONTRCD SVC 2, CITY GARAGE - OFFICE SUPPLIES CITY GARAGE - OPP SUPPLIES 3, CITY GARAGE - REPR/MAINT SUPP 1, , , , ,00 1, , ,20 3, , ,00 2, CITY GARAGE - OTHR SUPP/EXPNS 6, , ,50 2,00-2 CITY GARAGE - OPERATING 27, , ,70 10, ST MAINT - REPAIR/MAINT ST 4, ST MAINT - OTHR CONT SVC 16, ST MAINT - OPP SUPPLIES 19, ST MAINT - CLOTHING & UNIFORMS 2, ST MAINT - REPAIR/MAINT SUPPLY 2, , ,00 3, , ,00 15, , , , , ,50 3,50 2, ,50 2, ST MAINT - OTHR SUPP/EXPNS 4, , ,50 2,00-2 STREET MAINTENANCE - OPERATING 49, , , , ST CLEANING -OPP SUPPLIES ST CLEANING - REPAIR/MAINT SUP , , ST CLEANING - OTHR SUP/EXPNS STREET CLEANING - OPERATING , ,25 2, SNOW/ICE - OPPERATING SUPPLIES 22, SNOW/ICE - REPAIR/MAINT SUPPLY 4, , ,00 20, , ,00 3,00 5 Page 4 of 5

35 Proposed Budget Overview - Detail PUBLIC WORKS - EXPENDITURE SUMMARY Actual Projected 2017 Proposed % Change Account Number Year-End Year-End Budget Budget In Budget SNOW/ICE REMOVAL - OPERATING 27, , ,00 23, TRAFFIC CONTROL - UTILITIES 1, TRAFFIC CONTROL - OTHR CTD SVC 1, ,00 1, TRAFFIC CONTROL - OPP SUPPLIES TRAFFIC CONTROL - OPERATING 1, , ,50 1, TRAFFIC LIGHT - UTILITIES 83, , ,00 75, TRAFFIC LIGHT - REPAR/MAINT SV 3, , ,00 3,00 5 TRAFFIC LIGHTING - OPERATING 86, , ,00 78, OPERATING 213, , , , ST MACHINERY - CAPITAL EQUIP 8, ST MACHINERY - CAPITAL EQUIP 34, ,00 9,80 55, ST MACHINERY - CAP IMPROVEMENT STREET MACHINERY - CAPITAL 42, ,00 9,80 55, CITY GARAGE - CAPITAL IMPROVE 9, , CITY GARAGE - CAPITAL 9, , ST MAINT - CAPITAL IMPROVEMENT 13, ST MAINT - CAPITAL EQUIPMENT ST MAINT - CAPITAL IMPORVEMENT 143, ,00 130, , ST MAINT - SIDEWALK PROGRAM 8,00 8, , STREET MAINTENANCE - CAPITAL 157, ,00 138, , ST CLEANING - CAPITAL EQUIP STREET CLEANING - CAPITAL SNOW/ICE - CAPITAL EQUIP SNOW/ICE REMOVAL - CAPITAL TRAFFIC CONTROL TRAFFIC CONTROL - CAPITAL ST LIGHTING - CAPITAL IMPROV TRAFFIC LIGHTING - CAPITAL CAPITAL OUTLAY 199, , , , Expenses 774, , , ,257, Net s -774, , , ,257, Page 5 of 5

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000

More information

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Prepared by: Public Works Department Engineering Division October 2015 Table of Contents Section I Introduction.. 3

More information

AGENDA CAPITAL IMPROVEMENT PROGRAM ADMINISTRATIVE COMMITTEE Tuesday, March 14, :00 a.m. Common Council Chambers, Lower Level, City Hall Plaza

AGENDA CAPITAL IMPROVEMENT PROGRAM ADMINISTRATIVE COMMITTEE Tuesday, March 14, :00 a.m. Common Council Chambers, Lower Level, City Hall Plaza CITY OF MARSHFIELD MEETING NOTICE AGENDA CAPITAL IMPROVEMENT PROGRAM ADMINISTRATIVE COMMITTEE Tuesday, March 14, 2017 8:00 a.m. Common Council Chambers, Lower Level, City Hall Plaza 1. Call to Order Chris

More information

2008 REPORT OF THE HIGHWAY COMMISSIONER

2008 REPORT OF THE HIGHWAY COMMISSIONER Ozaukee County Highway Department 410 South Spring Street P.O. Box 994 Port Washington, Wisconsin 53074-0994 Robert Dreblow Highway Commissioner Phone 262-238-8331 Fax 262-238-8343 2008 REPORT OF THE HIGHWAY

More information

2018 ROAD MAINTENANCE PROGRAM

2018 ROAD MAINTENANCE PROGRAM 2018 ROAD MAINTENANCE PROGRAM John Tiger Anastasi Town of Bethlehem Superintendent of Highways June 27, 2018 AGENDA Why do we maintain our roads? How is the Road Maintenance Plan developed? The process

More information

Lake Waterford Community Association Meeting. November 15, 2016

Lake Waterford Community Association Meeting. November 15, 2016 Lake Waterford Community Association Meeting November 15, 2016 Introduction Staff Introduction Project Overviews - Completed Projects - Pavement Management Program - Pasadena Road Sidewalk Improvements

More information

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT Meeting Date: May 10, 2016 Department: Submitted By: Prepared By: Agenda Title: Mission Statement We Care for Our Residents by Working Together to Build a Better Community for Today and Tomorrow. CITY

More information

ADA TRANSITION PLAN 2013

ADA TRANSITION PLAN 2013 ADA TRANSITION PLAN 2013 TABLE OF CONTENTS Contents Introduction 1 Purpose 2 Identified Obstacles to the Public Right of Way 3 Criteria for Determining Impediments at Village Facilities 4 Removing Barriers

More information

LOCAL REVENUE MEASURE ANNUAL COMMUNITY REPORT

LOCAL REVENUE MEASURE ANNUAL COMMUNITY REPORT LOCAL REVENUE MEASURE ANNUAL COMMUNITY REPORT Fiscal Year SLO Swim Center Pool: The Local Revenue Measure paid for the replacement of the shell plaster at the SLO Swim Center s pool at Sinsheimer Park,

More information

Wabasha County Capital Improvement Plan

Wabasha County Capital Improvement Plan Wabasha County 2017 2021 Capital Improvement Plan 2017-2021 Capital Improvement Plan Wabasha County, Minnesota Board of Commissioners Rich Hall - First District Brian Goihl - Second District Don Springer

More information

Kentucky s Surface Transportation System

Kentucky s Surface Transportation System Kentucky s Surface Transportation System ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit

More information

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc. SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN 6926 By Josh Larson McLaury Engineering Inc. Project Limits SD 50 from Broadway to Burleigh and from Marne Creek to Archery

More information

Pavement Management Report. City Council Meeting of May 21, 2013

Pavement Management Report. City Council Meeting of May 21, 2013 Pavement Management Report City Council Meeting of May 21, 2013 Previous Meetings Summary In February, we presented the 2012 pavement survey and our consultant presented general pavement management strategies

More information

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015 Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT February 12, 2015 What is Pavement Management? At a Network Level: Pavement management refers to a systematic

More information

SECTION 5: PEER CITY REVIEW

SECTION 5: PEER CITY REVIEW SECTION 5: PEER CITY REVIEW 5.1 Introduction It is evident that the City of Lincoln continually strives to improve its operations and practices. To that end, a list of peer cities was developed to compare

More information

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study Houston, TX Technical Memorandum April 15 th, 2009 Prepare by: 2950 North Loop West, Ste. 900 Houston, TX 77092

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012 CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012 Item 31, Report No. 39, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan

More information

20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison

20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison 20 minute presentation on proposed project Comments and Questions following presentation 2016 2017 Replace concrete pavement & base Replace curb and sidewalk as needed Proposed contra-flow bike lane Replace

More information

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting

More information

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 City Street and County Road Maintenance Program The preservation and keeping of public street and road rights-of-way

More information

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by

More information

New Mexico Transportation Funding Challenges

New Mexico Transportation Funding Challenges New Mexico Transportation Funding Challenges Rocky Mountain Pavement Preservation Partnership Meeting October 29-31, 2008 Ernest Archuleta, P.E. Field Operations Division Director 1 NMDOT DISTRICT OFFICES

More information

STREETS AND SANITATION COMMITTEE MEETING MINUTES May 23, :30 p.m.

STREETS AND SANITATION COMMITTEE MEETING MINUTES May 23, :30 p.m. STREETS AND SANITATION COMMITTEE MEETING MINUTES May 23, 2011 6:30 p.m. MEMBERS PRESENT STAFF PRESENT OTHERS Dave Soeldner Val Mellon Terry Fox, Attorney Jason Sladky Greg Minikel Jean Stahl, 1336 N. 8

More information

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

Fifth & Kirkham Traffic-Calming Project. 5 th Avenue and Kirkham Street Presented at the UCSF Quarterly Parnassus Community Meeting May 3, 2018

Fifth & Kirkham Traffic-Calming Project. 5 th Avenue and Kirkham Street Presented at the UCSF Quarterly Parnassus Community Meeting May 3, 2018 Fifth & Kirkham Traffic-Calming Project 5 th Avenue and Kirkham Street Presented at the UCSF Quarterly Parnassus Community Meeting May 3, 2018 1 Agenda Welcome and introductions Project history, goals,

More information

Derby Street. Project Updates. Salem, Massachusetts

Derby Street. Project Updates. Salem, Massachusetts Derby Street Project Updates Salem, Massachusetts September 13, 2017 Project Limits Derby Street Project Objectives 1. Improve complete streets elements on Derby Street 2. Improve sidewalks on finger streets

More information

Environment and Public Works Committee Presentation

Environment and Public Works Committee Presentation Mixed Use Centers Complete Streets Guidelines Project Environment and Public Works Committee Presentation December 10, 2008 Project Objectives: Conduct an inter-departmental and agency process to study

More information

Welcome! Sherbrooke Neighbourhood Renewal Open House. Sherbrooke Open House February 3, Capital Construction

Welcome! Sherbrooke Neighbourhood Renewal Open House. Sherbrooke Open House February 3, Capital Construction Welcome! Sherbrooke Neighbourhood Renewal Open House Overview of the Neighbourhood Renewal Program Presented By: Annie Duong, P.Eng. Current Neighbourhood Roadway Infrastructure Neighbourhoods in Edmonton:

More information

Hospital Link Project Project Update September 2017

Hospital Link Project Project Update September 2017 Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

CITY OF SOUTH DAYTONA

CITY OF SOUTH DAYTONA CITY OF SOUTH DAYTONA FIVE YEAR WORK PLAN for HALF-CENT SALES TAX FY 2020-2025 Table of Contents Executive Summary Purpose of the Work Program... 3 Project List Magnolia Avenue North Roadway, Drainage

More information

MEMORANDUM. DATE: October 6, Mayor & Council Members. Mike Anderson, Assistant to the City Manager. City Manager s Report

MEMORANDUM. DATE: October 6, Mayor & Council Members. Mike Anderson, Assistant to the City Manager. City Manager s Report MEMORANUM ATE: October 6, 2017 TO: FROM: SUBJECT: Mayor & Council Members Mike Anderson, Assistant to the City Manager City Manager s Report Old TH HWY 14/Elm Ave Update *Please see attached document*

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

2012 Capital Budget Capital Improvement Program

2012 Capital Budget Capital Improvement Program 2012 Capital Budget Capital Improvement Program Agency Name: Eng. - Bicycle and Pedestrian Agency Number: 53L Capital Budget Future Year Estimates Project Name 2012 2013 2014 2015 2016 2017 1 Bikeways

More information

CTH M HIGHWAY PROJECT CTH Q to STH 113

CTH M HIGHWAY PROJECT CTH Q to STH 113 CTH M HIGHWAY PROJECT CTH Q to STH 113 PUBLIC INFORMATIONAL MEETING #3 Wednesday, May 25, 2005 Town of Westport Administration Building 5387 Mary Lake Road 6:00 p.m. to 8:00 p.m. PUBLIC INFORMATIONAL MEETING

More information

Montgomery County Life Sciences Center Loop Trail

Montgomery County Life Sciences Center Loop Trail Montgomery County Life Sciences Center Loop Trail Advisory Committee Meeting #1 February 10, 2015 Agenda 1. Project Background 2. Existing Conditions Analysis 3. Examples from Elsewhere 4. Discussion Project

More information

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

U.S. HIGHWAY 50 IMPROVEMENT PROJECT U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY

More information

APPENDIX E Activity Defect Assignment

APPENDIX E Activity Defect Assignment APPENDIX E Activity Defect Assignment Activity Defect Pct Applicable 2010-ML - SHALLOW PATCHING (STN - 2010-TL - SHALLOW PATCHING (STN - 2020-ML - DEEP PATCHING (STN - 2020-TL - DEEP PATCHING (STN - 2030-ML

More information

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017 WELCOME Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017 Purpose of the Open House The purpose of this Open House is to gain public input on the bicycle lanes proposed

More information

AGENDA SAN CLEMENTE GOLF COURSE COMMITTEE THURSDAY, JULY 5, 2018, 6:00PM. City Hall, 100 Avenida Presidio, San Clemente CA Council Chambers

AGENDA SAN CLEMENTE GOLF COURSE COMMITTEE THURSDAY, JULY 5, 2018, 6:00PM. City Hall, 100 Avenida Presidio, San Clemente CA Council Chambers AGENDA SAN CLEMENTE GOLF COURSE COMMITTEE THURSDAY, JULY 5, 2018, 6:00PM City Hall, 100 Avenida Presidio, San Clemente CA Council Chambers **PLEASE NOTE TIME AND LOCATION** FOR ADDRESSING THE COMMITTEE:

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present

More information

Minutes of the Minnesott Beach Town Commissioners' July 12,2011

Minutes of the Minnesott Beach Town Commissioners' July 12,2011 Minutes of the Minnesott Beach Town Commissioners' July 12,2011 Meeting The regular meeting of the Board of Commissioners, Town of Minnesott Beach, was held Tuesday, July 12,2011 at 7:00 pm, at the Minnesott

More information

4-County Big Oil Oil Impacts Analysis Dunn, McKenzie, Mountrail, & Williams Counties in association with:

4-County Big Oil Oil Impacts Analysis Dunn, McKenzie, Mountrail, & Williams Counties in association with: 4-County Big Oil Oil Impacts Analysis Dunn, McKenzie, Mountrail, & Williams Counties in association with: In association with: Interim Energy Development and Transmission Legislative Committee March 8,

More information

UPDATES 11/14/2018: 10/25/2018: CLOSED 10/22/2018: 10/12/2018: 10/05/2018: 09/27/2018:

UPDATES 11/14/2018: 10/25/2018: CLOSED 10/22/2018: 10/12/2018: 10/05/2018: 09/27/2018: Veterans Boulevard (formerly Boundary Road) This two-year construction project will widen and pave all of Veterans Boulevard. In 2017, the first portion of the road from Highway 16A to 44 Avenue was completed.

More information

ITEM 3 ATTACHMENT A RESOLUTION NO

ITEM 3 ATTACHMENT A RESOLUTION NO ITEM 3 ATTACHMENT A RESOLUTION NO. 2018-1575 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CALABASAS, CALIFORNIA, ADOPTING THE FISCAL YEAR 2017-18 LIST OF PROJECTS FUNDED BY SB 1: THE ROAD REPAIR AND

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic modifications on Twin Peaks Boulevard between Christmas

More information

Chapter 3 DESIGN SPECIFICATIONS

Chapter 3 DESIGN SPECIFICATIONS Brampton PathWays Planning and Design Guidelines 27 Chapter 3 DESIGN SPECIFICATIONS 3.1 CLASS 1 MULTI-USE PATH Off-road multi-use trails are the backbone of the Brampton PathWays Network. They are typically

More information

Township of Springwater

Township of Springwater Township of Springwater Approved: November 2008 Effective: Date of Passing Next Review: TBD Department: Public Works Subject: Sidewalks Policy Number: A09 SI A. Authority This policy shall be approved

More information

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM City of West Des Moines PAVEMENT MANAGEMENT SYSTEM 12/11/2018 Municipal Street Seminar (11-14-2018) JEFF NASH 1 City Background Information: - West Des Moines current census Population is around 66,000

More information

Geary Bus Rapid Transit Project

Geary Bus Rapid Transit Project Geary Bus Rapid Transit Project Urban Forestry Council Planning and Funding Committee Meeting September 13, 2016 SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY SAN FRANCISCO MUNICIPAL TRANSPORTATON AGENCY

More information

Culpeper District. Albemarle County Monthly Report September, 2011

Culpeper District. Albemarle County Monthly Report September, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

Mark Malone, P.E. SD DOT

Mark Malone, P.E. SD DOT Mark Malone, P.E. SD DOT SD10 Grading & Surfacing From 8 th Ave W to 8 th Ave E 1 mile plus transition lengths Complete Urban Reconstruction Grading, C&G, Storm Sewer, Sidewalk, Concrete Surfacing Railroad

More information

Regional Transportation Priorities Survey Results. Introduction

Regional Transportation Priorities Survey Results. Introduction Regional Transportation Priorities Survey Results Introduction Northern Maine Development Commission completed a regional transportation priorities survey in August 2015. The survey was completed using

More information

Engineering - Bicycle and Pedestrian

Engineering - Bicycle and Pedestrian Capital Improvement Plan Project Summary # Bikeways Program 781,000 860,000 900,000 933,000 933,000 933,000 # Cannonball Path 1,200,000-780,000 - - - # Capital City Trail - 70,000 - - 910,000 - # Goodman

More information

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road West Dimond Blvd Jodhpur St to Sand Lake CSS Transportation Project Summary Municipality of Anchorage Project # 05 005 Project Manager: John Smith, P.E. (MOA PM&E) Project Administrator: Julie Makela,

More information

Highway 56 Traffic Study Rymal Road to Cemetery Road

Highway 56 Traffic Study Rymal Road to Cemetery Road January 31, 2018 6:00 pm 8:00 pm Highway 56 Traffic Study Rymal Road to Cemetery Road City of Hamilton Public Meeting 2 2 Purpose of Public Meeting To review and obtain public input and comments on the

More information

Item No Halifax Regional Council January 16, 2018 January 30, 2018

Item No Halifax Regional Council January 16, 2018 January 30, 2018 P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 9.2.1 Halifax Regional Council January 16, 2018 January 30, 2018 TO: Mayor Savage and Members of Halifax Regional Council Original Signed SUBMITTED

More information

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004 Roadway Classification Design Standards and Policies Pueblo, Colorado November, 2004 Table of Contents Page Chapter 1. General Provisions 1.1 Jurisdiction 3 1.2 Purpose and Intent 3 1.3 Modification 3

More information

Land Use Bicycle Spaces Required Type Residential

Land Use Bicycle Spaces Required Type Residential SAMPLE ORDINANCES AND RESOLUTIONS APPENDIX B SAMPLE BICYCLE PARKING ORDINANCE Land Use Bicycle Spaces Required Type Residential Single Family/Two Family N/A N/A Apartment/Townhome 1 per unit plus 6 space

More information

2016 FACT SHEET ENGINEERING STREET OPERATIONS. Engineering Street Operations net 2016 budget is $5,199,900 WHAT IS ENGINEERING STREET OPERATIONS?

2016 FACT SHEET ENGINEERING STREET OPERATIONS. Engineering Street Operations net 2016 budget is $5,199,900 WHAT IS ENGINEERING STREET OPERATIONS? WHAT IS STREET OPERATIONS? This section maintains approximately 570 km of major, collector and residential roads throughout Saanich. Some of the major programs include road surface treatments (pothole

More information

Item No. 14 Town of Atherton

Item No. 14 Town of Atherton Item No. 14 Town of Atherton CITY COUNCIL STAFF REPORT CONSENT AGENDA TO: THROUGH: FROM: HONORABLE MAYOR AND CITY COUNCIL GEORGE RODERICKS, CITY MANAGER MICHAEL KASHIWAGI, COMMUNITY SERVICES DIRECTOR MARTY

More information

Infrastructure, Transportation and Safety Sub-committee MINUTES

Infrastructure, Transportation and Safety Sub-committee MINUTES The Corporation of the City of Stratford Infrastructure, Transportation and Safety Sub-committee MINUTES Date: Time: Location: Sub-committee Present: Staff Present: Also present: 4:30 P.M. Council Chamber,

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton

More information

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems CHAPTER 8 STAKING STAKING Correct staking of traffic control signal or lighting systems is critical to the appropriate placement of system components. 8.1 Traffic Control Signal Systems Locating the components

More information

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY STAFF REPORT MEETING DATE: September 13, 2016 TO: FROM: City Council Bob Brown, Community Development Director Russ Thompson, Public Works Director Patrick Filipelli, Management Analyst 922 Machin Avenue

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: , TOWN OF PALM BEACH DATE: November 9, 2018 FOR IMMEDIATE RELEASE MEDIA CONTACT: Patricia Strayer, P.E., Town Engineer Phone: 561-838-5440, Email: pstrayer@townofpalmbeach.com Construction & Traffic Highlights

More information

AGENDA REQUEST. Unfinished Business BY Neighborhood and Development Services. November 1, 2010 SUBJECT:

AGENDA REQUEST. Unfinished Business BY Neighborhood and Development Services. November 1, 2010 SUBJECT: AGENDA REQUEST AGENDA HEADING: Unfinished Business BY Neighborhood and Development Services Originating Department COMMISSION MEETING DATE: November 1, 2010 Timothy Litchet Department Head AGENDA ITEM

More information

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission FOR IMMEDIATE RELEASE Date: October 31, 2014 Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission Kalamazoo, MI- In a collaborative effort

More information

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach CONNECTIVITY PLAN Adopted December 5, 2017 City of Virginia Beach CONTENTS 1.0 Background & Purpose... 2 2.0 Existing Inventory & Analysis... 3 ViBe District Existing Walking Conditions... 4 3.0 ViBe District

More information

Project Update May 2018

Project Update May 2018 Project Update May 2018 Dakota County, in cooperation with the City of Lakeville, is planning to reconstruct 202 nd Street West (County Road 50) from Holyoke Avenue to Cedar Avenue (County Road 23). 202

More information

Brookings Traffic Safety Committee 2017 Annual Report

Brookings Traffic Safety Committee 2017 Annual Report Brookings Traffic Safety Committee 2017 Annual Report PURPOSE The current Traffic Safety Committee was formed by Resolution 58-79 dated December 18, 1979 with its stated duties and responsibilities of

More information

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017 DES MOINES AREA MPO Presentation to Iowa Commercial Real Estate Association April 6, 2017 Presentation Outline MPO Overview Trends We re Watching Plans, Projects, Initiatives, Regional Transportation Priorities

More information

Fleur Drive Reconstruction

Fleur Drive Reconstruction Fleur Drive Reconstruction October 29, 2018 1 Agenda: Fleur Drive Reconstruction Project Scope & Cost Overview Fleur Drive Cross Section Elements - Travel Lane Widths - Sidewalk Widths - Parkway Widths

More information

SUMMARY OF TRANSPORTATION INVESTMENTS

SUMMARY OF TRANSPORTATION INVESTMENTS Santa Cruz County 2016 Measure D: Transportation Improvement Expenditure Plan - Approved by over 2/3 of Santa Cruz County voters on November 8, 2016 - Overview Measure D, the 2016 Transportation Improvement

More information

BIKE AND PEDESTRIAN PATH PLANNING COMMITTEE

BIKE AND PEDESTRIAN PATH PLANNING COMMITTEE Office of the Clerk/Treasurer W240N3065 Pewaukee Road Pewaukee, WI 53072 (262) 691-0770 Fax 691-1798 BIKE AND PEDESTRIAN PATH PLANNING COMMITTEE MEETING NOTICE AND AGENDA Wednesday, January 16, 2019 4:30

More information

Building Great Neighbourhoods BONNIE DOON

Building Great Neighbourhoods BONNIE DOON Building Great Neighbourhoods BONNIE DOON We Are Here Today To Explain the Neighbourhood Renewal Process Show you the Westwood Preliminary Design Ask for local knowledge Highlight the Local Improvement

More information

The District Municipality of Muskoka 70 Pine Street Bracebridge ON P1L 1N3

The District Municipality of Muskoka 70 Pine Street Bracebridge ON P1L 1N3 Public Information Centre Summary Report Muskoka Road 15 (Santa s Village Road) Transportation Improvements from the Beaver Creek Bridge to the Entrance of Santa s Village The District Municipality of

More information

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Atwood Avenue Fair Oaks Avenue Cottage Grove Road Atwood Avenue Fair Oaks Avenue Cottage Grove Road Agenda Purpose Review project scope & goals Present design alternatives Gather feedback Answer Questions Format Open House Presentation Q&A Open House

More information

Warsaw Village Council Meeting Minutes: December 17, 2014

Warsaw Village Council Meeting Minutes: December 17, 2014 Warsaw Village Council Meeting Minutes: December 17, 2014 The regular meeting of the Warsaw Village Council was held on Wednesday December 17 th, 2014. Mayor Ron Davis, who led the Pledge of Allegiance,

More information

Marinette County HIGHWAY DEPARTMENT. Raymond G. Palonen Highway Commissioner

Marinette County HIGHWAY DEPARTMENT. Raymond G. Palonen Highway Commissioner Marinette County HIGHWAY DEPARTMENT Raymond G. Palonen Highway Commissioner MINUTES Meeting of the Highway Committee Wednesday, January 6, 2016 9:00 a.m. Peshtigo Highway Office Members Present: Others

More information

ENGINEERING AND PUBLIC WORKS. Transportation Improvements: Santa s Village Road (MR15) Public Meeting

ENGINEERING AND PUBLIC WORKS. Transportation Improvements: Santa s Village Road (MR15) Public Meeting ENGINEERING AND PUBLIC WORKS Transportation Improvements: Santa s Village Road (MR15) Public Meeting March 22, 2018 Agenda Welcome and Introductions Fred Jahn: Commissioner of Engineering and Public Works

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, November 10, 2016 5:30 to 7 P.M. Festival Foods 810 E. Washington

More information

BRIDGE REPLACEMENT AND REHABILITATION PROGRAM

BRIDGE REPLACEMENT AND REHABILITATION PROGRAM BRIDGE REPLACEMENT AND REHABILITATION PROGRAM INTRODUCTION An integral element of the City's transportation infrastructure is a network of bridges designed to carry vehicular, railroad, light rail, pedestrian,

More information

Highway Construction

Highway Construction Ohio Department of Transportation Traffic Advisory DISTRICT 1 KIRK SLUSHER, P.E., DISTRICT DEPUTY DIRECTOR 1885 North McCullough St. Lima, Ohio 45801 www.transportation.ohio.gov/dist1 www.facebook.com/odotdistrict1;

More information

Driveway Design Criteria

Driveway Design Criteria Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved

More information

City of Madison: 2017 Capital Budget Capital Improvement Plan

City of Madison: 2017 Capital Budget Capital Improvement Plan Capital Improvement Plan Project Summary Bikeways Program 779,000 751,000 630,000 670,000 703,000 703,000 Cannonball Path 210,000 - - 730,000 - - Cap City Trail 1,140,000-360,000 - - 910,000 Ice Age Junction

More information

Bicycling Routes on Provincial Roads Policy

Bicycling Routes on Provincial Roads Policy Bicycling Routes on Provincial Roads Policy Policy Statement Rationale To support bicycling in Nova Scotia, the Department of Transportation and Infrastructure Renewal (TIR) may designate some portions

More information

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT PROJECT NO. 093 MA 199 H 5807 01C FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENI HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT (INTERSECTION IMPROVEMENT) US 93/US 60 FINAL PROJECT ASSESSMENT April

More information

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco Capital Needs In 2006, the Mayor and Board of Supervisors approved San

More information

BPP / SUB

BPP / SUB Development Services Department Project/File: Lead Agency: Site address: Millwell Place Subdivision/ BPP15-0031/ SUB15-0064 This is a preliminary plat application to allow for the development of 68 building

More information

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS RT 81 Corridor Study CLINTON ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS View north on High Street, with potential improvements to the streetscape Draft Recommendations November 8 th, 2018 TOWN OF CLINTON

More information

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA CITY OF SIGNAL HILL 2175 Cherry Avenue Signal Hill, CA 90755-3799 AGENDA ITEM TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: STEVE MYRTER, P. E. DIRECTOR OF PUBLIC WORKS SUBJECT: SPRING STREET

More information

League City Parkway at Brittany Lakes/Fennigan Intersection Evaluation/ Traffic Study. Second Public Meeting February 6, 2018

League City Parkway at Brittany Lakes/Fennigan Intersection Evaluation/ Traffic Study. Second Public Meeting February 6, 2018 League City Parkway at Brittany Lakes/Fennigan Intersection Evaluation/ Traffic Study Second Public Meeting February 6, 2018 City Project Information League City Parkway and Brittany Lakes Dr./ Fennigan

More information

Draft Provisional Financial Plan. October 30, 2017

Draft Provisional Financial Plan. October 30, 2017 2018-2022 Draft Provisional Financial Plan October 30, 2017 Presentation Overview Fund Overview Building Blocks Budget Adjustments Spending Packages 20 Year Capital Plan Summary 2018 Provisional Financial

More information

Safe Routes to School Action Plan Aberdeen, Idaho

Safe Routes to School Action Plan Aberdeen, Idaho Background Aberdeen, Idaho is a largely agricultural community of nearly 2,000 people and is located in the southeast portion of the state on the western edge of American Falls Reservoir. The community

More information

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013 May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

Chair and Members of Transportation Standing Committee. Bruce Zvaniga, P.Eng., Director, Transportation and Public Works

Chair and Members of Transportation Standing Committee. Bruce Zvaniga, P.Eng., Director, Transportation and Public Works P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 12.1.1 Transportation Standing Committee December 7, 2017 TO: Chair and Members of Transportation Standing Committee SUBMITTED BY: ORIGINAL SIGNED

More information

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS Locating the components of a traffic control signal is not an exact science; many factors influence the location of the components. These factors include: lane widths, radii, pedestrian curb ramp requirements,

More information