1 Water UK Leakage Conference 2012 Managing Leakage and Preparing for the 2012 Olympics Andrew Oakes Thames Water - Leakage Planning Manager Steven Harvey Thames Water - Asset Modelling and Design Specialist

2 Managing Leakage and Preparing for the 2012 Olympics Planning for millions of expected visitors, traffic congestion and extensive street works restrictions Resilience work completed on the network in the lead up to the Games Monitoring technologies installed prior to and used during the Games Organisational management implemented to manage events during the games During the Games Thames Water s ambition was to do the basics well. Stay out of sight and out of mind. 2

3 London Background Thames Water has been working on the Olympics for over 5 years: Started with diverting assets to make way for the Olympic park in Stratford Oversaw construction of all water and waste water infrastructure, making sure it met the demand for both games and legacy Ensured installations carried out to the required standards and water regulations Worked with the ODA to build a new water recycling plant to provide non-potable water for toilet flushing and irrigation Worked with DEFRA on contingency planning in response to malicious attack 3

4 London Planning What might we expect? Vast majority of the Olympic estate is in the TW region, including 27 venues, athletes villages, training camps, media hub, road events and Olympic routes During the Games 10,500 Olympic and 4,200 Paralympic athletes 20,000 press, broadcasters and photographers Up to 800,000 people per day travelling to venues Total demand for water unknown so planned for the worst The eyes of the world on London the consequences for getting it wrong were massive 4

5 London Planning Who we worked with LOCOG London Organising Committee to ensure we have adequate incident response plans in place should something go wrong Ensure continuation of the games Safe and efficient movement of people to and from venues TfL Transport for London Responsible for all other Olympic routes No planned work, only reactive during the games Local authorities Could add side streets into embargo areas as required 5

6 London Planning Street-works restrictions and games lanes 7000 street embargoes, 20% of Thames Water s patch Planned work restricted from 1 st March 2012 all core routes, around venues and one alternative route from 1 st July all other streets All roads impacted by Olympics marked up on our GIS Impact on all aspects of leakage control activity 6

7 London Planning - Overall Area These Central include: London area 39 presents Boroughs a unique Multiple and Major complex set Roads of challenges. 271 Tube Stations and 2,900 km of rail path 2,795 km of Trunk Main 13,000+ km of Distribution Main 7

8 London 2012 Planning The Olympic Route Network Within Transport Restrictive the for Central London London and Embargoes LOCOG area, were 18 Event considered placed Venues roads specific and 17 routes within Games the to be North Time critical and Training/Paralympic for South the Circular. success of Event Further London Venues restrictions 2012 were designated. Olympic were placed Games. by local authorities on routes considered to be sensitive. 8

9 No. Gangs London Planning CaLM modelling of 2012/13 delivery plan Uncertainties modelled: SAP implementation, Olympics, and later the drought Expected increases in demand and associated increases in pressure and therefore leakage Reducing numbers of detected leaks repaired and increasing repair times of visible leaks during the period leading up to and during the games Repair Resource by Workstream Scenarios produced to balance off leakage target delivery, expenditure and variation in contractor resourcing levels Profile of activity front and back end loaded with extra leak detection sweeps undertaken in DMAs around venues prior to the games 0 April May June July August September October November December January February March No Leakage Gangs Olympic Gangs NM Order-book agreed with and issued to contractors 9

10 London Resilience Managing Risk to the Games To effectively manage risk to the games, multiple factors must be examined. Interruption to games-critical services Risk to public/events due to flooding Review all asset source to games venue mains (Trunk mains which feed venues) Review mains in areas of greatest potential risk (Critical Routes and Venues) Monitor or replace mains as necessary. Develop contingency plans for all examined spans. 10

11 Examining Source to Venue Mains 385 km Examined 72 chambers installed These trunk mains provide clean water from Thames Operational sites to venues and training areas. Flag mains with a significant failure history for additional monitoring chamber installation. 11

12 London Resilience Mitigating Risk to the Public & Events Risk is highest where games-critical routes intersect assets, and within proximity of venues. These are areas where the largest event participant groups will be and where access will be the most limited. 12

13 The Olympic Route Network Network Critical routes Analysis routes were were is ground-level. identified by by TFL TFL and and Assets LOCOG were (in (in red). red). examined Mains history metre was by metre examined along Olympic within 50 routes. metres of either side of a critical route. 13

14 London Resilience Mitigating Risk to the Public & Events Flag highest risk distribution mains for renewal Flag lower risk distribution mains for monitoring via noise logger Flag high risk trunk mains for additional chamber installation (if none currently in place) 14

15 The Olympic Venues 200 m Olympic Consider Venues all all routes may have near higher venues, foot traffic including surrounding the the original areas metre buffer area. Examine assets around the venues within 200 metres. 15

16 London Resilience Mitigating Risk to the Public & Events Flag highest risk distribution mains for renewal Flag lower risk distribution mains for monitoring via noise logger Flag high risk trunk mains for additional chamber installation (if none currently in place)

17 Critical Areas Inside the North/South Circular The Assets highest Mitigation within 50 solutions concentration metres in of place these of (rehab, activity routes were existing was within monitoring, the examined. North new and monitoring, South Circular noise Roads. logging) Critical Routes within this area included Core, Venue, Training, and Alternative. 17

18 London Resilience Total Assets Examined 372 km of Source to Venue main 451 km of Trunk Main (by flood risk) 250 km of Trunk Main (by critical route) 70 km of Trunk Main (near venues) 436 km of Distribution Main (by critical route) 4.5 km of Distribution Main (near venues) History of all fittings, valves, and joints along all included mains 18

19 The End Result 219 Existing Trunk Main Chambers 72 Additional Olympic Trunk Main Chambers 3.6 km of distribution mains renewal 600+ Noise Loggers with 24 hour per day monitoring 19

20 London 2012 Monitoring technologies Big city equals big noise: Underground stations, non-stop traffic routes, overnight filling etc. Security: liaise with police and authorities, notify deployment and label equipment and seal covers

21 London 2012 Monitoring technologies Once installed, leaks are identified by the leak noise logger using an algorithm (noise level and consistency) Data is transmitted by the data logger via low cost GPRS or SMS telemetry This removes the requirement for expensive site visits and drive by data retrieval. 21

22 London Organisational management Event team of 226 staff created Five hubs set up across London to manage events Core team working 24/7 Event Duration Period 1 15 th July 25 th July Period 2 26 th July 12 th August Period 3 13 th August 27 th August Period 4 28 th August 9 th September Senior manager event management Single point of contact with duty manager for all Olympic related issues Three conference calls per day Ring fenced R&M crews to provide 30 minute responses around venues and 3 hours elsewhere irrespective of traffic Most R&M work undertaken through the night, starting at 11pm 22

23 London Outcome Overall, the games was a great success No major incidents during the games Customer demand changed little Able to undertake active repairs between Olympics and Paralympics Fast recovery of leakage achieved after the games with the planned increase in resource Although leakage increased during the games, it has not jeopardised delivery of our leakage target 23

2012 Olympic and Paralympic Games: The Transport Security Challenge. London TravelWatch 6 th

2012 Olympic and Paralympic Games: The Transport Security Challenge. London TravelWatch 6 th 2012 Olympic and Paralympic Games: The Transport Security Challenge London TravelWatch 6 th th July 2010 Stephen Thomas Assistant Chief Constable The Games Contents The Transport Challenge Summer of Celebration

More information

2012 Olympics National Grid s preparations

2012 Olympics National Grid s preparations 2012 Olympics National Grid s preparations Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

More information

Progress with the Road Investment Strategy

Progress with the Road Investment Strategy Report by the Comptroller and Auditor General Department for Transport and Highways England Progress with the Road Investment Strategy HC 1056 SESSION 2016-17 22 MARCH 2017 4 Key facts Progress with the

More information

Olympic Route Network

Olympic Route Network Olympic Route Network Will Miller TfL Surface Transport Games Team Today... Olympic Route Network Measures & Games lanes Engagement Programme Impacts Road Events Local Area Traffic Management & Parking

More information

Emergency Situation Assessment

Emergency Situation Assessment Appendix 1 Emergency Situation Assessment Emergency Situation Assessment In-coming mains electricity failure sites with generator backup Useful Information: Severity 2 Risk Rating Low / 10 Likelihood 5

More information

LONDON 2012 Transport Strategy Don t even think of using your car

LONDON 2012 Transport Strategy Don t even think of using your car http://blogs.gsd.harvard.edu/loeb-fellows/ LONDON 2012 Transport Strategy Don t even think of using your car By Camilla Ween July 20, 2012 Photo: Olympic Development Authority I met Hugh Sumner, director

More information

Olympics 2012: Understanding and Managing the Challenges. Summer /06/2012 p. 1

Olympics 2012: Understanding and Managing the Challenges. Summer /06/2012 p. 1 Olympics 2012: Understanding and Managing the Challenges Summer 2012 12/06/2012 p. 1 Overview The aim of this presentation is to provide our stakeholders with information about the impact that the London

More information

London 2012 Stewarding Update. 1 st March 2012 Eileen Williams City Operations Manager Olympic Park

London 2012 Stewarding Update. 1 st March 2012 Eileen Williams City Operations Manager Olympic Park London 2012 Stewarding Update 1 st March 2012 Eileen Williams City Operations Manager Olympic Park Agenda Steward requirements Internal Venue Event Services External To Venue City Operations - Last Mile

More information

STADIUM London demonstration - Olympics 2012

STADIUM London demonstration - Olympics 2012 STADIUM London demonstration - Olympics 2012 STADIUM London demonstration Event Context - Olympics 2012 Main transport solutions Features of the demonstrator Demo role in the transport context The demo

More information

RIVER CROSSINGS: EAST OF SILVERTOWN CROSSINGS

RIVER CROSSINGS: EAST OF SILVERTOWN CROSSINGS TRANSPORT FOR LONDON RIVER CROSSINGS: EAST OF SILVERTOWN CROSSINGS SUPPORTING TECHNICAL DOCUMENTATION TRAFFIC IMPACT REPORT Neil Georgeson July 2014 This report examines the traffic impacts that potential

More information

2012 Olympics and Paralympics Challenges and Opportunities

2012 Olympics and Paralympics Challenges and Opportunities 2012 Olympics and Paralympics Challenges and Opportunities Richard Browning Director, TfL Games Transport 6 July 2010 London TravelWatch My presentation describes : Scope of Presentation Transport for

More information

How to plan an event. Step 1: First things first. Step 2: How to make it all happen?

How to plan an event. Step 1: First things first. Step 2: How to make it all happen? As an event organiser, you have a legal responsibility to ensure the health, safety and welfare of all those involved in your event - all employees, volunteer helpers and contractors as well as members

More information

Applied Pressure Management Techniques to Reduce and Control Leakage

Applied Pressure Management Techniques to Reduce and Control Leakage Applied Pressure Management Techniques to Reduce and Control Leakage Bambos Charalambous Head Technical Services Water Board of Lemesos, Lemesos, Cyprus Sophie Kanellopoulou Deputy Director Water Supply

More information

London 2012 Olympics The Green Build. Rachel Krzeminski Aggregate Industries UK Ltd

London 2012 Olympics The Green Build. Rachel Krzeminski Aggregate Industries UK Ltd London 2012 Olympics The Green Build Rachel Krzeminski Aggregate Industries UK Ltd Aggregate Industries UK Ltd Aggregate Industries is an international aggregates, construction and building materials group

More information

Living Streets response to the Draft London Plan

Living Streets response to the Draft London Plan Living Streets response to the Draft London Plan Contents Living Streets response to the Draft London Plan... 1 About Living Streets... 2 Summary... 2 Consultation response... 3 Chapter 1: Planning London

More information

Consultation response. Response to the Ofcom Consultation London 2012 Olympic Games and Paralympic Games.

Consultation response. Response to the Ofcom Consultation London 2012 Olympic Games and Paralympic Games. Consultation response Response to the Ofcom Consultation London 2012 Olympic Games and Paralympic Games. Background St John Ambulance is one of the primary providers of out-of-hospital care in England

More information

Report to Cabinet. 18 May 2016

Report to Cabinet. 18 May 2016 Agenda Item 8 Report to Cabinet 18 May 2016 Subject: Presenting Cabinet Member: Proposed CCTV Enforcement of Traffic Contraventions in a Bus Lane (Key Decision Ref. No. HE030) Highways and Environment

More information

London 2012 Olympic and Paralympic Safety and Security Strategy

London 2012 Olympic and Paralympic Safety and Security Strategy London 2012 Olympic and Paralympic Safety and Security Strategy July 2009 A major factor in the decision to bring the 2012 Olympic and Paralympic Games to London was the commitment from the UK Government

More information

Recent Developments in Pressure Management

Recent Developments in Pressure Management Water Loss 2010 - June 06-09, 2010 São Paulo/SP Recent Developments in Pressure Management Marco Fantozzi, MIYA Allan Lambert, ILMSS Ltd The Renaissance in Pressure Management 2001: IWA International Report:Water

More information

MARINE SAFETY PLAN

MARINE SAFETY PLAN PORT MARINE SAFETY CODE MARINE SAFETY PLAN 2015-2017 Introduction As required at article 3.20 of the Port Marine Safety Code (PMSC), the Port of London Authority (PLA) publishes its Marine Safety Plan

More information

LONDON GAMES GOLD MEDAL PROJECT DELIVERY. Report of seminar 156 held on 12th May 2010 at CBI Centre Point, 103 New Oxford Street, London SUMMARY

LONDON GAMES GOLD MEDAL PROJECT DELIVERY. Report of seminar 156 held on 12th May 2010 at CBI Centre Point, 103 New Oxford Street, London SUMMARY LONDON GAMES GOLD MEDAL PROJECT DELIVERY Report of seminar 156 held on 12th May 2010 at CBI Centre Point, 103 New Oxford Street, London SUMMARY KEY CONCLUSIONS KEY CONCLUSIONS In introducing the seminar

More information

Delivering the. Strategy 7.0

Delivering the. Strategy 7.0 7.0 Delivering the Strategy 7.1 Introduction This chapter presents a framework for the delivery of the strategy. Key challenges and opportunities are identified that will have an impact on the successful

More information

London March Donna Taylor Head of Accommodation. 13th

London March Donna Taylor Head of Accommodation. 13th London 2012 13th March 2008 Donna Taylor Head of Accommodation The Olympic and Paralympic Games An event like no other An exceptional set of associated values A unique opportunity to be involved in making

More information

Agreement between. The London Organising Committee of the Olympic Games and Paralympic Games. and

Agreement between. The London Organising Committee of the Olympic Games and Paralympic Games. and LOCOG: taking action to ensure respect for workers rights in global supply chains Agreement between The London Organising Committee of the Olympic Games and Paralympic Games and Trades Union Congress on

More information

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK INSTRUCTION ISOLATION OF A WATER NETWORK

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK INSTRUCTION ISOLATION OF A WATER NETWORK Document Title: Work Instruction Isolation of a Water Network Document Reference: DOM-WN-WIN-00000302 Approved By: Asset Management Title: General Manager Record of Changes and Amendments Amendment No.

More information

Building a sustainable world city: the role of transport and land use in London. London s relationship with transport

Building a sustainable world city: the role of transport and land use in London. London s relationship with transport Building a sustainable world city: the role of transport and land use in London Peter Wright Policy Manager, TfL Overview London s relationship with transport Past Current Future Questions? 1 London s

More information

London Organising Committee of the Olympic Games and Paralympic Games. 14 June 2010

London Organising Committee of the Olympic Games and Paralympic Games. 14 June 2010 London Organising Committee of the Olympic Games and Paralympic Games 14 June 2010 London 2012 Olympic and Paralympic Games Volunteer Protocol Title This document shall be known as the London 2012 Olympic

More information

Games-time travel planning Steve Kearns Transport for London

Games-time travel planning Steve Kearns Transport for London Games-time travel planning Steve Kearns Transport for London Twin objectives: To deliver a great 2012 Games and Keep London and the UK moving London well suited to hosting the Games 1.1 billion Tube journeys

More information

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE REPAIR OF BURST MAINS

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE REPAIR OF BURST MAINS Document Title: Work Procedure Repair of Burst Mains Document Reference: DOM-WN-PRC-00000306 Approved By: Asset Management Title: General Manager Record of Changes and Amendments Amendment No. Document

More information

WINNER S CASE STUDY. BNFL Award 2012 Olympic Delivery Authority

WINNER S CASE STUDY. BNFL Award 2012 Olympic Delivery Authority Category Winner BNFL Award 2012 Olympic Delivery Authority Sponsor Overview London s successful bid for the 2012 Olympic and Paralympic Games created the need for a major regeneration and construction

More information

Faster, higher, stronger greener

Faster, higher, stronger greener Faster, higher, stronger greener Sustainability at the 2012 London Olympics International events with a global audience are an ideal vehicle to promote sustainable development. In 1986 the President of

More information

Chart 1: DfT Pothole Action Fund Productivity and Spend Chart 2017/18 Accumulative Information by Month.

Chart 1: DfT Pothole Action Fund Productivity and Spend Chart 2017/18 Accumulative Information by Month. March 2018 Pothole Action Fund Around 10,000 road potholes had been repaired to end of February and this figure expected to rise to around 11,000 by end of March. This includes around 3,000 potholes addressed

More information

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE REPAIR OF BURST MAINS

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE REPAIR OF BURST MAINS DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY REPAIR OF BURST MAINS Document Title: Work Procedure Repair of Burst Mains Document Reference: DOM-WN-PRC-00000306 Date: October 2013 Approved By: Asset

More information

Protection Group Providing Solutions. Developing Your Emergency Preparedness

Protection Group Providing Solutions. Developing Your Emergency Preparedness Protection Group Providing Solutions Developing Your Emergency Preparedness Emergency Preparedness and the Efficient, Effective Management of Incidents Introduction Based on the Wilton International site

More information

2012 Olympic Games Impact on Relocation

2012 Olympic Games Impact on Relocation Information from Cartus on Relocation and International Assignment Trends and Practices 2012 Olympic Games Impact on Relocation This issue is the second in a series of Cartus communications, providing

More information

COUNCIL POLICY. Document No: CPL260.5 Approval Date: 23 March 2010 Obstruction

COUNCIL POLICY. Document No: CPL260.5 Approval Date: 23 March 2010 Obstruction COUNCIL POLICY Road Reserve and Footpath Document No: CPL260.5 Approval Date: 23 March 2010 Obstruction Approved By: Council Review Date: 31 December 2013 Responsible Officer: Version No: 02 General Manager

More information

PART 1: INFRASTRUCTURE OPPORTUNITIES

PART 1: INFRASTRUCTURE OPPORTUNITIES PART 1: INFRASTRUCTURE OPPORTUNITIES AUTHORS This article was authored by David Nancarrow (Partner, Perth), Alyson Eather (Senior Associate, Perth) and Celeste Koravos (Associate, Melbourne and Tokyo).

More information

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS Page 1 of 9 EXECUTIVE SUMMARY Alberta Transportation ( AT ) is preparing to construct the final sections of the Calgary Ring Road. This includes the South West Ring Road ( SWRR ) (from Lott Creek Blvd

More information

Coachman Ridge Neighborhood Plan. Neighborhood Strengths and Weaknesses

Coachman Ridge Neighborhood Plan. Neighborhood Strengths and Weaknesses Coachman Ridge Neighborhood Plan Neighborhood Strengths and Weaknesses At the first public neighborhood meeting held by the study committee on March 22, 2001, participants divided up into three groups

More information

What Geologists Need to Know about Drilling

What Geologists Need to Know about Drilling INTEGRITY RESPECT ACCOUNTABILITY SAFETY RESILIENCE SUCCESS What Geologists Need to Know about Drilling Wayne Pengelly 27 March 2018 newhopegroup.com.au Introduction Teamwork Only need one Crew to achieve

More information

Presented by the Corporate Director of Parklands & Venues

Presented by the Corporate Director of Parklands & Venues Agenda Item No: 7 Report No: LEE VALLEY REGIONAL PARK EXECUTIVE COMMITTEE E/126/11 21 APRIL 2011 AT 10:30AM GAMES TIME TRAINING VENUE AT LEYTON MARSH Presented by the Corporate Director of Parklands &

More information

PRESSURE SYSTEMS POLICY

PRESSURE SYSTEMS POLICY PRESSURE SYSTEMS POLICY PRESSURE SYSTEMS POLICY 1. Introduction 2. Policy Statement 3. Scope 4. Background 5. Roles & Responsibilities 6. Training 7. Contractors 8. Policy Review 1. Introduction The Kilmarnock

More information

Bristol City Council has produced a draft Bristol Transport Strategy document.

Bristol City Council has produced a draft Bristol Transport Strategy document. Bristol Transport Strategy Summary Document Introduction Bristol City Council has produced a draft Bristol Transport Strategy document. The Strategy fills a gap in transport policy for Bristol. We have

More information

Implementation Report # False Creek Bridges

Implementation Report # False Creek Bridges Implementation Report #1 2013-04-24 False Creek Bridges ECONOMY PEOPLE ENVIRONMENT Intro Council Requested Report Back Topics Progress on Planning for Broadway Subway False Creek Bridges Local Transit

More information

London Cycle Network Annual Report 2000

London Cycle Network Annual Report 2000 London Cycle Network Annual Report 2000 A cycle network for London by 2005 A cycle network for London by 2005 The London Cycle Network will: provide local links between residential neighbourhoods, railway

More information

5 DECEMBER Cycling In London. Andrew Summers, Transport for London Strategy and Policy Manager Active Travel and Health.

5 DECEMBER Cycling In London. Andrew Summers, Transport for London Strategy and Policy Manager Active Travel and Health. 5 DECEMBER 2017 Cycling In London Andrew Summers, Transport for London Strategy and Policy Manager Active Travel and Health 2017 TRL Ltd CYCLING IN LONDON Contents 1. Why is cycling so important for London?

More information

A Strategy for Increasing Walking and Cycling

A Strategy for Increasing Walking and Cycling 37 5 A Strategy for Increasing Walking and Cycling 5. Increasing Walking and Cycling through Developing Greenways 38 5 Increasing Walking and Cycling through Developing Greenways If our society decided

More information

Safe roads, reliable journeys, informed travellers. The economic assessment of Managed Motorways - All lanes running Interim Advice Note 164/12

Safe roads, reliable journeys, informed travellers. The economic assessment of Managed Motorways - All lanes running Interim Advice Note 164/12 Safe roads, reliable journeys, informed travellers The economic assessment of Managed Motorways - All lanes running INTERIM ADVICE NOTE 164/12 The Economic Assessment of Managed Motorways All Lanes Running

More information

Local Sustainable Transport Fund

Local Sustainable Transport Fund I II III Sustainable travel in Greater Manchester: The journey to a low carbon economy Greater Manchester has a vision of sustainable commuting at the heart of its blueprint for a low carbon economy, as

More information

Report to COUNCIL for decision

Report to COUNCIL for decision 17 152 Title: Section: Prepared by: Olympic Pool Business Case Community & Recreation Andrew White (Community & Recreation Manager) Meeting Date: 18 May 2017 Legal Financial Significance = Medium Report

More information

Guidance on piling, heavy loads, excavations, tunnelling and dewatering

Guidance on piling, heavy loads, excavations, tunnelling and dewatering Guidance on piling, heavy loads, excavations, tunnelling and dewatering thameswater.co.uk/developerservices Contents 1 Introduction... 3 2 Works That Can Impact Our Assets And Cause Damage... 3 3 What

More information

Wayfinding and Walking in London. Lilli Matson Transport for London May 2013

Wayfinding and Walking in London. Lilli Matson Transport for London May 2013 Wayfinding and Walking in London Lilli Matson Transport for London May 2013 I want to make walking in London as attractive and enjoyable as possible by making walking count Mayor of London Boris Johnson

More information

Mill Hill Broadway Capacity Improvement

Mill Hill Broadway Capacity Improvement 1 16 MARCH 2016 Mill Hill Broadway Capacity Improvement Presentation to Barnet Members and Mill Hill Residents Association 2 Background A1 is one of 23 Transport for London Road Network (TLRN) Strategic

More information

QLDC Council 24 July Report for Agenda Item: Fergburger Proposed Shotover Street Footpath Upgrade

QLDC Council 24 July Report for Agenda Item: Fergburger Proposed Shotover Street Footpath Upgrade 127 COU 14/07/05 QLDC Council 24 July 2014 Department: Infrastructure and Assets Report for Agenda Item: 5 5. Fergburger Proposed Shotover Street Footpath Upgrade Purpose 1 To consider a request for Council

More information

Birmingham 2022 Commonwealth Games: A golden opportunity

Birmingham 2022 Commonwealth Games: A golden opportunity Birmingham 2022 Commonwealth Games: A golden opportunity Mace Birmingham 2022 Commonwealth Games August 2018 3 Foreword Leveraging sport for economic growth The 2022 Commonwealth Games in Birmingham is

More information

Ormond & McKinnon Walks Response to Draft Glen Eira Community Plan

Ormond & McKinnon Walks Response to Draft Glen Eira Community Plan Response to Draft Glen Eira Community Plan We would like to take this opportunity to thank Glen Eira City Council for the opportunity to comment on the Glen Eira Draft Community Plan. Below is an outline

More information

Grip on speed. A multi-stakeholder approach to road safety

Grip on speed. A multi-stakeholder approach to road safety Grip on speed A multi-stakeholder approach to road safety Authors: Erik Donkers VIA, traffic consultancy & software, The Netherlands Berry de Jong SRE (Eindhoven Urban Region), The Netherlands Polis Conference

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

Business Plan Presentation

Business Plan Presentation 2019 Department of Water Resources Business Plan Presentation Wednesday, August 29, 2018 Mission To Provide Superior Water Services at an Excellent Value Vision To be widely recognized as a leader in the

More information

London 2012 Olympics

London 2012 Olympics London 2012 Olympics Key Dates Torch relay nationwide from 19 May, arriving in London 21 July for a weeklong tour of the capital Olympics Transition Paralympics 27 July to 12 August 13 28 August 29 August

More information

Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths

Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths Road Asset Technical Accord - RATA The Centre of Excellence for Road Asset Planning in the Waikato Region Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths

More information

APPENDIX A: Risk Assessment for all activities at Farm

APPENDIX A: Risk Assessment for all activities at Farm APPENDIX A: Risk Assessment for all activities at Farm Sheet No...of...... Drafted by Nick Laister Date of Revision: January 08 Location: Southcombe, Chipping Norton Heading: General Organisation L C R

More information

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager LONDON BOROUGH OF RICHMOND UPON THAMES DATE: AUGUST 2015 DECISION MAKER: LEAD OFFICER: SUBJECT: WARDS: Cabinet Member for Highways & Streetscene Highway Infrastructure Manager PROPOSED CYCLING IMPROVEMENTS

More information

TEMPORARY OLYMPIC STRUCTURES

TEMPORARY OLYMPIC STRUCTURES TEMPORARY OLYMPIC STRUCTURES The temporary stands for the beach volleyball were set up in front of Horse Guards Parade in August 2011 LOCOG TEMPORARY OLYMPIC STRUCTURES In a bid to meet sustainability

More information

TOUR DE FRANCE GRAND DÉPART YORKSHIRE

TOUR DE FRANCE GRAND DÉPART YORKSHIRE TOUR DE FRANCE GRAND DÉPART YORKSHIRE Economic Impact Assessment Report for Calderdale Metropolitan Borough Council New Economy www.neweconomymanchester.com 28 September 2012 New Economy 1 1 Introduction

More information

Modelling Today for the Future. Advanced Modelling Control Techniques

Modelling Today for the Future. Advanced Modelling Control Techniques CwMAG 1 st Autumn Conference 2012 Modelling Today for the Future Advanced Modelling Control Techniques What are advanced modelling controls? Why do we have them? How can we use them? What are the differences

More information

PRE GAMES TRAINING CAMPS Northern Ireland PAUL SCOTT SPORT NORTHERN IRELAND

PRE GAMES TRAINING CAMPS Northern Ireland PAUL SCOTT SPORT NORTHERN IRELAND PRE GAMES TRAINING CAMPS Northern Ireland PAUL SCOTT SPORT NORTHERN IRELAND What is a Pre Games Training Camp? A Pre Games Training Camp (PGTC) is a training camp for athletes of one or more disciplines

More information

London 2012 Olympic and Paralympic Games

London 2012 Olympic and Paralympic Games London 2012 Olympic and Paralympic Games Connecting the Olympic Games The story from Celebration to Implementation Jon Osbiston MAPM 2012 Venue Management BT London 2012 Delivery Programme You may have

More information

Bicycle Facilities Planning

Bicycle Facilities Planning Bicycle Facilities Planning Overview Types of Cyclists Purpose for Riding Types of Facilities Bike Lanes Bicycle Boulevards Cycle Tracks Intersections Signals Signing and Marking Discussion Types of Bicyclists

More information

Warfield Neighbourhood Plan: 4.4 Infrastructure

Warfield Neighbourhood Plan: 4.4 Infrastructure Warfield Neighbourhood Plan: 4.4 Infrastructure Previously decided Policy headings: Policy WNP16 Transport Impact of Development Policy WNP17 Transport Proposals Policy WNP18 New School Buildings Policy

More information

Planning Daily Work Trip under Congested Abuja Keffi Road Corridor

Planning Daily Work Trip under Congested Abuja Keffi Road Corridor ISBN 978-93-84468-19-4 Proceedings of International Conference on Transportation and Civil Engineering (ICTCE'15) London, March 21-22, 2015, pp. 43-47 Planning Daily Work Trip under Congested Abuja Keffi

More information

2016 UMD Project Management Symposium How much important is IT project management for Olympic Games success? Rio2016 Case Study

2016 UMD Project Management Symposium How much important is IT project management for Olympic Games success? Rio2016 Case Study 2016 UMD Project Management Symposium How much important is IT project management for Olympic Games success? Rio2016 Case Study F. A. Lima 12, Ph.D*, PMP, PMI-RMP 1 Business Research Unit, Lisbon University

More information

FIRE PROTECTION. In fact, hydraulic modeling allows for infinite what if scenarios including:

FIRE PROTECTION. In fact, hydraulic modeling allows for infinite what if scenarios including: By Phil Smith, Project Manager and Chen-Hsiang Su, PE, Senior Consultant, Lincolnshire, IL, JENSEN HUGHES A hydraulic model is a computer program configured to simulate flows for a hydraulic system. The

More information

UK CYCLING EVENTS. Event Plan Wiggle Chilterns Classic Sportive

UK CYCLING EVENTS. Event Plan Wiggle Chilterns Classic Sportive UK CYCLING EVENTS Event Plan Wiggle Chilterns Classic Sportive Introduction UK Cycling Events organise amateur non competitive cycling events in the UK. These events support amateur cyclists by selecting

More information

London Cycling Campaign. 2 Feburary Bridge H14 (Monier Road Bridge)

London Cycling Campaign. 2 Feburary Bridge H14 (Monier Road Bridge) London Cycling Campaign 2 Feburary 2017 Bridge H14 (Monier Road Bridge) http://planningregister.londonlegacy.co.uk/swift/apas/run/wphappdetail.displayurl?theapnid=16 /00587/REM&backURL=%3Ca%20href=wphappcriteria.display?paSearchKey=141084%3ESearch%20

More information

Reliability Assessment of the Whistler Propane Vaporizers

Reliability Assessment of the Whistler Propane Vaporizers Reliability Assessment of the Whistler Propane Vaporizers Prepared for: Terasen & Fransen Engineering Prepared by: ClearSky Risk Management Inc. 815 23 rd Ave East Vancouver, BC V6B 5Z3 Phone: 604.899.1470

More information

London Prepares. series

London Prepares. series Prepares series c/o The Organising Committee of the Olympic Games and Paralympic Games Ltd. 23rd Floor, One Churchill Place Canary Wharf,, E14 5LN Reception +44 (0)20 3 2012 0 0 0 Fax +44 (0)20 3 2012

More information

STRATEGIC PLAN for the participation of the 2012 Australian Olympic Team

STRATEGIC PLAN for the participation of the 2012 Australian Olympic Team AUSTRALIAN OLYMPIC COMMITTEE STRATEGIC PLAN for the participation of the 2012 Australian Olympic Team EXECUTIVE SUMMARY Games of the XXX th Olympiad London, Great Britain 27 July - 12 August 2012 Nick

More information

YouGov / ITV Survey Results

YouGov / ITV Survey Results YouGov / ITV Survey Results Sample Size: 2042 GB Adults Fieldwork: 22nd - 23rd October 2009 Do you think people who run public sector organisations should get paid more, less or about the same as their

More information

2017 Temporary traffic control guidelines for pedestrians. v.2

2017 Temporary traffic control guidelines for pedestrians. v.2 2017 Temporary traffic control guidelines for pedestrians v.2 Temporary Traffic Control Guidelines for Pedestrians (2017) The safety and mobility of pedestrians, cyclists and motorists must be considered

More information

Hospital Link Project Project Update September 2017

Hospital Link Project Project Update September 2017 Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

Distribution Operation Maintenance Strategy Scottish Waters DOMS IAF Impact Risk Assessment Form Completion Guide

Distribution Operation Maintenance Strategy Scottish Waters DOMS IAF Impact Risk Assessment Form Completion Guide Legal tice: This document and the intellectual property rights in it belong to Scottish Water and except where you are specifically licensed to use this document, you have no right to re-use it. Disclosure

More information

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21 DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.

More information

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input WELCOME Purpose of the Open House The Town of Smiths Falls has initiated the Beckwith Street Redevelopment Plan that includes the preparation of a streetscape functional design for the renewal of Beckwith

More information

Copyright Thames Water Utilities Ltd Alternative water supplies policy.

Copyright Thames Water Utilities Ltd Alternative water supplies policy. Alternative water supplies policy. Version 1.3 Publish Date: 21 February 2017 Effective from: 1 April 2017 Public Contents 1. Background... 4 2. Scope... 4 3. Definition of terms... 4 4. Principles...

More information

Report by the Comptroller and. SesSIon february 2010

Report by the Comptroller and. SesSIon february 2010 Report by the Comptroller and Auditor General HC 298 SesSIon 2009 2010 26 february 2010 Preparations for the London 2012 Olympic and Paralympic Games: Progress report February 2010 Our vision is to help

More information

2012 Olympic Games Impact on Relocation

2012 Olympic Games Impact on Relocation Information from Cartus to keep you informed on news that may impact your international assignment programme. 2012 Olympic Games Impact on Relocation This issue is the fifth in a series of Cartus communications,

More information

Bogo Operations Pollution Incident Response Management Plan

Bogo Operations Pollution Incident Response Management Plan Bogo Operations Pollution Incident Response Management Plan Rhyolite Hard Rock Aggregate Quarry 134 Paynes Road BOOKHAM NSW 2582 PO Box 426 COWRA NSW 2794 p: 02 6227 7260 p: 02 6345 4253 e: info@bogoquarry.com.au

More information

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM City of West Des Moines PAVEMENT MANAGEMENT SYSTEM 12/11/2018 Municipal Street Seminar (11-14-2018) JEFF NASH 1 City Background Information: - West Des Moines current census Population is around 66,000

More information

TRAFFIC ACCOMMODATION IN WORK AREAS

TRAFFIC ACCOMMODATION IN WORK AREAS TRAFFIC ACCOMMODATION IN WORK AREAS TRAFFIC ACCOMMODATION IN WORK AREAS Copyright 2005 All rights reserved. Reproduction of this document in whole or in part by any means is prohibited, unless authorized

More information

Strategies for Maintaining & Renewing Innovative Street Projects. Elyse Parker, Director of Policy & Innovation, City of Toronto NACTO, LA, 2018

Strategies for Maintaining & Renewing Innovative Street Projects. Elyse Parker, Director of Policy & Innovation, City of Toronto NACTO, LA, 2018 Strategies for Maintaining & Renewing Innovative Street Projects Elyse Parker, Director of Policy & Innovation, City of Toronto NACTO, LA, 2018 1 OUR ASSETS $12B in Assets $20B Replacement Cost $372M Capital

More information

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 May 2016 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable.

More information

Secondary Road Program

Secondary Road Program Secondary Road Program Joint Legislative Transportation Oversight Committee October 5, 2012 1 Secondary Roads Program The Big Picture The Secondary Road System Needs and Project Types Paved and Unpaved

More information

Highways England Creative M Welcome. Smart motorway M6 junctions 16 to 19 public information exhibition

Highways England Creative M Welcome. Smart motorway M6 junctions 16 to 19 public information exhibition Welcome Smart motorway junctions 16 to 19 public information exhibition Smart motorway junctions 16 to 19 Making the motorway better The is also part of the Highways England strategic road network connecting

More information

The latest automotive systems require innovative leak test methods and fixturing.

The latest automotive systems require innovative leak test methods and fixturing. Leak Testing Auto Parts The latest automotive systems require innovative leak test methods and fixturing. In the past, automobile manufacturers only required basic forms of leak testing to check standard

More information

2016 Planning Conference July 26, CONNECT COLUMBUS Building Columbus Transportation Future

2016 Planning Conference July 26, CONNECT COLUMBUS Building Columbus Transportation Future 2016 Planning Conference July 26, 2016 CONNECT COLUMBUS Building Columbus Transportation Future What Is Connect Columbus? Project Process OUR PROCESS COMPLETE ONGOING Discovery + Desire Project Goals Columbus

More information

Works on Local Government Controlled Roads. & Traffic Control Permit No

Works on Local Government Controlled Roads. & Traffic Control Permit No Works on Local Government Controlled Roads & Traffic Control Permit No. 171219-000220 Pursuant to Local Government Act 2009 (Section 75) This permit is valid for the following purpose(s) at the locations,

More information

Active Travel Towns Funding Scheme Project Proposal. Sligo. Sligo Local Authorities

Active Travel Towns Funding Scheme Project Proposal. Sligo. Sligo Local Authorities Active Travel Towns Funding Scheme 2014-2016 Project Proposal for Sligo by Sligo Local Authorities Introduction Over the last two years, Sligo Local Authorities have implemented years 1 & 2 of their 5

More information

Process for managing parking on verges, footways and footpaths

Process for managing parking on verges, footways and footpaths Process for managing parking on verges, footways and footpaths Author: MG/NR Highways and Transport Environment Department Date: 28 July 2015 Version: 2.0 PARKING ON VERGES, FOOTWAYS AND FOOTPATHS Introduction

More information

FEASIBLE SOLUTIONS FOR REDUCING TRAFFIC FROM MEERAMAKKAM MOSQUE JUNCTION TO THOPAWANA TEMPLE AREA IN KANDY

FEASIBLE SOLUTIONS FOR REDUCING TRAFFIC FROM MEERAMAKKAM MOSQUE JUNCTION TO THOPAWANA TEMPLE AREA IN KANDY FEASIBLE SOLUTIONS FOR REDUCING TRAFFIC FROM MEERAMAKKAM MOSQUE JUNCTION TO THOPAWANA TEMPLE AREA IN KANDY A.M.Z. Zimar 1*, P. Sanjeevan 2 1 South Eastern University of Srilanka, Srilanka 2 Central Engineering

More information