Twenty-fifth Meeting of AFI Satellite Network Management Committee

Size: px
Start display at page:

Download "Twenty-fifth Meeting of AFI Satellite Network Management Committee"

Transcription

1 Twenty-fifth Meeting of AFI Satellite Network Management Committee Freetown, Sierra, 8 December 07 Agenda Item : Operational Statistics (Missing FPL) (Presented by ASECNA)

2 . INTRODUCTION According to the conclusion 8/7 of APIRG / 8, each ASECNA center was sensitized to conduct monthly surveys to find a suitable solution to the problem of missing flight plans. The investigations carried out concerning the missing flight plans of all aircraft both on arrival and over flight. The present Working Paper gives a report on the availability of the FPL in ASECNA area from January to October 07..

3 . Availability global of FPL in ASECNA area IMPROVED RECEPTION FPL Received Not received Number of FPL not received: 03 : : : : : ,% 03 :789 FPL,8%,43%,37%,5% 95,84% 98,8% 98,57% 04 : 3053 FPL 05 : 3778 FPL 98,3% 98,85% 0 : 494 FPL 0 : FPL 3

4 3. global Result of missing FPL By continent Europe; 9; 8,09% America; 0; 5,49% Asia; 0; 5,74% 07 KENYA,34% By ANSP in Africa SOUDAN,5% OUGANDA 0,44% Autres 7,05% ASECNA 7,03% ETHIOPIE,% 00% Africa; 95; 80,8% By African Region GUINEE 3,49% ONDA,37% LIBERIA,5% RVA 0,94% GCAA 0,84% ENNA 0,75% 80% 0% 40% 0% 0% ANGOLA 3,0% ATNS,47% OACA 0,7% NAMA 4,0% D F G H ASECNA Others 4

5 Missing FPL from the indicators D area AFI Number of missing FPL at ASECNA centre from D region Jan - Nov Douala Lomé Abidjan Ouaga Cotonou Brazzaville Libreville Malabo DN DG DA DT Lomé: All these FPL are for incoming flight from DNAA, DNMM and DGAA, DGLE; Douala : All these FPL are for overflight from DNMM, DNAA, DNPO, DNEN, DNKN and DGAA; Abidjan : Majority of these FPL relate to flights on arrival and Some are overflights from DGAA; Ouagadougou: All these FPL relate to flights on arrival from DGAA; Cotonou : All these FPL are for incoming flight from DNMM and DNPO Libreville: Majority of these FPL are for overflight from DNMM, DNAA and DNPO; Some FPL relate to flghts on arrival from DNMM and DNPO; Details are in the next slides 5

6 5. Missing FPL at LOME from DN Missing FPL at Lomé from DN 3 4 SKK033 DNAA/DXXX 4 SKK05 DNMM/DXXX SKK03 DNAA/DXXX ETH39 DNMM/DXXX OLA70 DNMM/DXXX SKK033 DNAA/DXXX SKK03 DNAA/DXXX 3 SKK05 DNMM/DXXX 5VTTM DNMM/DXXX NGR93 DNMM/DXXX SKK05 DNMM/DXXX SKK03 DNMM/DXXX SKK05 DNMM/DXXX SKK033 DNAA/DXXX SKK03 DNAA/DXXX 4 SKK05 DNMM/DXXX SKK033 DNAA/DXXX 5NBSJ DNMM/DXXX MAXAIR DNAA/DXXX SKK05 DNMM/DXXX SKK037 DNAA/DXXX 3 SKK05 DNMM/DXXX SKK037 DNAA/DXXX SKK03 DNAA/DXXX SKK05 DNMM/DXXX SKK05 DNMM/DXXX JANVIER FÉVRIER MARS AVRIL MAI JUIN JUILLET AOÛT SEPTEMBRE OCTOBRE NOVEMBRE

7 . Missing FPL at LOME from DG Missing FPL at Lomé from DG 9 5 SKK0 DGAA/DXXX ETH90 DGAA/DXXX SKK0 DGAA/DXXX SKK903 DGAA/DXXX FAT DGAA/DXXX 3 DHV53 DGAA/DXXX SKK0 DGAA/DXXX SKK950 DGAA/DXXX 3 VRE505 DGAA/DXXX 3 CTM40 DGAA/DXXX SKK0 DGAA/DXXX SKK047 DGAA/DXXX ZSLIZ DGAA/DXXX 8 SKK0 DGAA/DXXX TAP54 DGAA/DXXX GHF94 DGAA/DXXX 7 5 SKK0 DGAA/DXXX DHV8 DGAA/DXXX KNE50 DGLE/DXXX 7 3 SKK0 DGAA/DXXX 3 SKK03 DGAA/DXXX GHA0 DGAA/DXXX AFW7 DGLE/DXXX JANVIER FÉVRIER MARS AVRIL MAI JUIN JUILLET AOÛT NOVEMBRE 7

8 7. Missing FPL at DOUALA from DN Missing FPL at Douala from DN 4 5 RWD0 DNMM/HRYR ETD955 DNMM/HKJK KQA533 DNMM/HKJK KQA577 DNMM/HKJK 3 SAA089 DNAA/FAOR CLX7 DNPO/FZAA T70 DNKN/FNLU SAA089 DNAA/FAOR RWD0DNMM/HRYR CLX74 DNPO/FAOR KQA533 DNMM/HKJK ETD955 DNMM/HKJK ACP DNMM/HKJK 9 RWD0 DNMM/HRYR 3 ETD955 DNMM/HKJK 3 ETH930 DNEN/HAAB KQA533 DNMM/HKJK 5NFGS DNAA/FKYS SAA089 DNAA/FAOR CLX7 DNPO/FZAA 0 AJK30 DNAA/FKKD ETH900 DNMM/HAAB ETH930 DNEN/HAAB SKK04 DNMM/FKKD N37X DNAA/FALE TRAFR DNAA/FOOL ZSKGS DNKN/FNLU MYUMN DNKN/FCOD 4 ETH3900 DNEN/HAAB ETH900 DNMM/HAAB RWD0 DNMM/HRYR 9 4 ETH900 DNMM/HAAB 4 KQA533 DNMM/HKJK 3 RWD0 DNMM/HRYR RWD03 DNMM/HRYR ETD955 DNMM/HKJK ETH930 DNEN/HAAB SKK030 DNAA/FKYS DANT DNAA/FNLU 9 GRA38 DNKN/FNLU NGR9 DNAA/FKYS GSH459 DNPO/FCPP ASM475 DNKN/FNLU OWE49 DNAA/FNLU ZSANZ DNAA/FALA UNO50P DNAA/FKYS 5NEXJ DNMM/HRYR 7 7 ETH930 DNEN/HAAB 4 ETH900 DNMM/HAAB KQA533 DNMM/HKJK RWD03 DNMM/HRYR KQA53 DNMM/HKJK T70 DNKN/FNLU 7 CLX7 DNPO/FZAA KQA533 DNMM/HKJK ZSEZY DNMM/HKJK LRK4 DNPO/FNLU RWD03 DNMM/HRYR AJK4 DNMM/HUEN UAE9759 DNMM/HKJK 5 AJK3 DNMM/FGSL 3 AJK30 DNPO/FKKD RWD03 DNMM/HRYR ETH930 DNEN/HAAB EXD009 DNAA/FALA 5NBTX DNMM/HTDA Janvier Février Mars Avril Mai Juin Juillet Août Septembre Octobre 8

9 8. Missing FPL at DOUALA from DG Missing FPL at Douala from DG 0 5 ETH90 DGAA/HAAB KQA503 DGAA/HKJK CLX7 DGAA/HKJK MALEN DGAA/HUEN 9 7 ETH90 DGAA/HAAB ETH507 DGAA/HAAB KQA503 DGAA/HKJK 0 ETH90 DGAA/HAAB KQA503 DGAA/HKJK 9 5 KQA503 DGAA/HKJK ETH90 DGAA/HAAB KQA505 DGAA/HKJK KQA503 DGAA/FEFF 7 4 KQA503 DGAA/HKJK ETH90 DGAA/HAAB RWD DGAA/HRYR 0 5 ETH90 DGAA/HAAB 3 KQA505 DGAA/HKJK KQA503 DGAA/HKJK ETH390 DGAA/HAAB 3 3 RWD DGAA/HRYR 3 ETH90 DGAA/HAAB KQA505 DGAA/HKJK 0 KQA505 DGAA/HKJK JANVIER FÉVRIER MARS AVRIL MAI JUIN JUILLET AOÛT SEPTEMBRE OCTOBRE 9

10 8. Missing FPL at ABIDJAN from DG Missing FPL at Abidjan from DG 4 IVY00 DGAA/DIAP GHN DGAA/DNMM SAA05 DGAA/DIAP RWD0 DGAA/HRYR 3 RWD0 DGAA/HRYR SAA05 DGAA/DIAP T7ANA DGAA/DIAP 0 4 VRE50 DGAA/DIAP SAA05 DGAA/DIAP GHN DGAA/DIAP VRE503 DGAA/DIAP MSR88 DGAA/DIAP 30 0 VRE50 DGAA/DIAP 8 GHN DGAA/DIAP VRE503 DGAA/DIAP MSR88 DGAA/DIAP VRE7 DGAA/DIAP VRE50 DGAA/DIAP 9GAEH DGAA/DIAP TUHAC DGAA/DIAP 9NHHH DGAA/DIAP 8 VRE50 DGAA/DIAP 5 VRE503 DGAA/DIAP 4 GHN DGAA/DIAP VRE50 DGAA/DIAP VRE7 DGAA/DIAP 9GASS DGAA/DIAP 5 GHN DGAA/DIAP 4 VRE50 DGAA/DIAP VRE837 DGAA/DIAP MSR88 DGAA/DIAP 9 VRE50 DGAA/DIAP 3 MSR88 DGAA/DIAP SAA05 DGAA/DIAP GHN DGAA/DIAP 9GASG DGAA/DIAP VRE5 DGAA/DIAP VRE7 DGAA/DIAP VRE8 DGAA/DIAP GHN00 DGAA/DIAP VBW50 DGAA/DIAP JANVIER FÉVRIER MARS AVRIL MAI JUIN JUILLET AOÛT 0

11 8. Missing FPL at OUAGA from DG Missing FPL at Ouagadougou from DG 8 VBW05 DGAA/DFFD ZSRZW DGLE/DFFD 9GFWC DGAA/DFFD 5 3 VBW05 DGAA/DFFD ZSSON DGAA/DFFD 0 4 VBW05 DGAA/DFFD SKK04 DGAA/DFFD RMAF33 DGAA/DFFD MUSIK DGAA/DFFD 0 0 VBW05 DGAA/DFFD VBW05 DGAA/DFFD 0 VBW05 DGAA/DFFD JANVIER FÉVRIER MARS AVRIL MAI JUIN JUILLET AOÛT SEPTEMBRE OCTOBRE

12 8. Missing FPL at COTONOU from DG Missing FPL at Cotonou from DN 5 DHV7 DNMM/DBBB 3 KQA54 DNMM/DBBB 3 ARA380 DNMM/DBBB 3 3 DHV7 DNMM/DBBB 8 5 DHV7 DNMM/DBBB KQA54 DNMM/DBBB FHSBN DNPO/DBBB ROJ0 DNKA/DBBB 7 4 DHV7 DNMM/DBBB 3 AFR805 DNPO/DBBB 4 DHV7 DNMM/DBBB KQA54 DNMM/DBBB SKYHORSE DNPO/DBBB 4 DHV7 DNMM/DBBB KQA54 DNMM/DBBB MFG04 DNMM/DBBB DHV7 DNMM/DBBB 5 DHV7 DNMM/DBBB KQA54 DNMM/DBBB EXECUTIVE DNMM/DBBB DHV7 DNMM/DBBB 5NBJH DNPO/DBBB DHV7 DNMM/DBBB JANVIER FÉVRIER MARS AVRIL MAI JUIN JUILLET AOÛT SEPTEMBRE OCTOBRE

13 8. Missing FPL at LIBREVILLE from DN Missing FPL at Libreville from DN 0 SAA089 DNAA/FAOR ARA3 DNMM/FNLU ARA39 DNPO/FOOL CLX70 DNMM/FCBB AJK3 DNMM/FOOL ZSTAE DNMM/FZAA SKK004 DNMM/FZAA ARA03F DNMM/FAOR TTN39 DNAA/FCPP TRLEY DNAA/FOOL 3 ARA3 DNMM/FNLU VRE80 DNMM/FOOL 5NDGN DNMM/FCBB 0 3 ARA39 DNPO/FOOL LRK48 DNPO/FNLU T708 DNKN/FNLU JANVIER FÉVRIER MARS AVRIL MAI JUIN 3

14 4. Missing FPL from the indicators F area AFI Number of missing FPL at ASECNA centre from F region Jan - Nov Brazzaville : Majority of these FPL traffic are for overflight and some relate to flights on arrival from FZAA, FZEA, FZAU, FZAG, FZQA and FNLU; Bangui: Majority are ONU traffics from FZIC, FZFD, FZFA, FZEA; Brazzaville Bangui Douala Libreville Lomé FZ FN FA FY FG FC Douala & Libreville: Majority of these FPL are for overflight from FACT, FAOR, FAUP, FACA Details are in the next slides 4

15 8. Missing FPL at BRAZZAVILLE from FZ Missing FPL at Brazzaville from FZ 9 5 UNO3H FZEA/FCBB TN37 CONGO03 TNAIH SKK044 3 UNO3H ETH384 ODEKF 5YCGD 5 4 UNO3H 3 5YCGD SVG0 SKK044 FGVZI LMG EKA YCGY 5 SKK044 4 VRE83 3 UNO5H 3 UNO3H FGVZI SVG0 VRE837 VPCGE FJXVG UN850 ZSTBZ UNO890 9 SVG0 SVG EKJ4 ZSOOF UNO3H SKK044 VRE83 VPCYB 5 UNO3H 3 VRE83 ETH84 SVG0 RMAF08 SKK044 BAF UNO4H EKJ7 SKK044 COC4 UNO3H FZEA 5 SKK044 4 VRE83 3 5YCGY FHTOP FGRGP EKJ4 FZAU 3 5YCGY 3 UNO74H VRE83 SKK044 FHTOP FZQA UNO3H SVG0 FGRGP EKJ FZQA ETH YCGY 5 SKK044 3 VRE8 FHTOP FZAG UNO74H FZEA UNO3H FZEA ABD30 FHREG SVG0 JANVIER FÉVRIER MARS AVRIL MAI JUIN JUILLET AOÛT SEPTEMBRE OCTOBRE 5

16 8. Missing FPL at BRAZZAVILLE from FN Missing FPL at Brazzaville from FN 5 DTA5 FNLU DTA9 FNCA 7 DTA5 FNLU DDTH FNLU 4 DTA5 FNLU P4BFM FNLU DERQ FNLU 3 CONG003 DTA5 JANVIER FÉVRIER MARS AVRIL MAI JUIN JUILLET AOÛT SEPTEMBRE OCTOBRE

17 8. Missing FPL at BANGUI from FZ Missing FPL at Bangui from FZ 4 UNO3H 0 5 UNO3H UNO3P FZFD UNO3H FZFA4 UNO3H FZFA NKP3 FZIC & FZFD NKP8 FZFA UNO578H FZEA 5 UNO3H FZFA NFT9043 FZIC NFT9045 FZIC NFT904 FZIC ZSRBL FZIC ZSDIH FZIC 9 UNO3H FZEA FZFD FZFA 5YDAF FZIC 9QCYF 4 0 UNO3H UNO3H 4 8 UNO74H 3 UNO3H 9 UNO3H JANVIER FÉVRIER MARS AVRIL MAI JUIN JUILLET AOÛT SEPTEMBRE OCTOBRE NOVEMBRE 7

18 8. Missing FPL at DOUALA from FA Missing FPL at Douala from FA 4 4 DLH575 FACT/EDDM 3 KLM394 FACT/EHAM CFG9 FACT/EDDF BAW4 FAOR/EGLL EDW85 FACT/LSZH AFR87 FACT/LFPG ZSSAB FACT/DNPO 3 AFR87 FACT/LFPG CFG9 FACT/EDDF N99OBB FAOR/DNKN ADB5F FACT/EDDP BAW5 FAOR/EGLL DLH575 FACT/EDDM DLH577 FACT/EDDF EDW85 FACT/LSZH KLM394 FACT/EHAM OOEJA FACT/LFLL 4 BAW4 FACT/EGLL AFR87 FACT/LFPG CFG9 FACT/EDDF ZSSAB FACA/DNPO 4 BAW58L FACT/EGLL CCC47 FAUP/EDDN CFG9 FACT/EDDF KLM57 FACT/EHAM AFR87 FACT/LFPG DLH577 FACT/EDDF 4 3 BAW58L FACT/EGLL KLM394 FACT/EHAM AFR995 FAOR/LFPG IBE050 FAOR/LEMD JANVIER FÉVRIER MARS AVRIL JUIN JUILLET AOÛT SEPTEMBRE 8

19 0 4. Missing FPL from the indicators G area AFI Number of missing FPL at ASECNA centre from G region Jan - Nov Abidjan Brazzaville Lomé Douala Ouaga Nouakchott GU GM GL GF Brazzaville : Majority of these FPL are for overflight from GMMM; Abidjan: Majority of these FPL are for overflight from GUCY and GLRB Details are in the next slides 9

20 8. Missing FPL at ABIDJAN from GU Missing FPL at Abidjan from GU VRE7 GUCY/DIAP 4 ETH934 GUCY/DIAP VRE75 GUCY/DIAP 4 VRE709 GUCY/DIAP 7 VRE7 GUCY/DIAP 5 ETH934 GUCY/DIAP 4 4 VRE7 GUCY/DIAP9 VRE7 GUCY/DIAP 3 ETH934 GUCY/DIAP5 ETH934 GUCY/DIAP 9 5 VRE7 GUCY/DIAP 3 ETH934 GUCY/DIAP VRE709 GUCY/DIAP 5 FÉVRIER MARS AVRIL MAI JUIN JUILLET AOÛT SEPTEMBRE OCTOBRE 0

21 8. Missing FPL at ABIDJAN from GL Missing FPL at Abidjan from GL 5 VRE75 GLRB/DIAP 3 VRE759 GLRB/DIAP GHN5 GLRB/DGAA SIV05 GLRB/DIAP 3 VRE75 GLRB/DIAP 3 VRE759 GLRB/DIAP 7 3 VRE75 GLRB/DIAP VRE759 GLRB/DIAP GHN5 GLRB/DGAA SIV05 GLRB/DIAP DPM00 GLMN/DIAP 3 MARS MAI JUIN JUILLET AOÛT SEPTEMBRE OCTOBRE

22 Missing FPL from the indicators H area AFI Number of missing FPL at ASECNA centre from H region Jan - Nov Douala Bangui Brazzaville Lomé Cotonou Tana Abidjan HA HK HR HS HU HT Douala : All FPL relate to overflight from HAAB, HKJK and HRYR; Lomé: Majority of these FPL are for overflight and some are flights on arrival from HAAB; Bangui: Majority are ONU flights from HSNN, HSSJ, HSSS and HSPN; Cotonou: All these FPL are flights on arrival from HAAB Brazzaville: All these FPL are for overflight from HAAB; Details are in the next slides

23 8. Missing FPL at DOUALA from HA Missing FPL at Douala from HA 5 9 ETH50 HAAB/DXXX 4 ETH955 HAAB/DBBB 3 ETH39 HAAB/DNMM 3 ETH9 HAAB/DGAA ETH3907 HAAB/DNEN ETH90 HAAB/DNMM ETH393 HAAB/DNMM 9 5 ETH955 HAAB/DBBB 3 ETH39 HAAB/DXXX 3 ETH50 HAAB/DXXX 3 ETH90 HAAB/DNMM ETH9 HAAB/DGAA ETH508 HAAB/DXXX ETH93 HAAB/DNEN ETH935 HAAB/DIAP 5 4 ETH90 HAAB/DNMM 9 ETH9 HAAB/DGAA 7 ETH50 HAAB/DXXX 5 ETH393 HAAB/DNMM 4 ETH955 HAAB/DBBB 3 ETH39 HAAB/DNMM 3 ETH508 HAAB/DXXX ETH3907 HAAB/DXXX ETH93 HAAB/DNEN ETH90 HAAB/DGAA ETH935 HAAB/DXXX 5 ETH39 HAAB/DNMM 3 ETH508 HAAB/DXXX 3 ETH90 HAAB/DNMM 3 ETH9 HAAB/DGAA ETH50 HAAB/DXXX ETH97 HAAB/DBBB ETH393 HAAB/DNMM ETH397 HAAB/DGAA ETH935 HAAB/DIAP 37 9 ETH9 HAAB/DGAA 7 ETH90 HAAB/DNMM ETH508 HAAB/DXXX 5 ETH393 HAAB/DNMM 4 ETH97 HAAB/DBBB 3 ETH39 HAAB/DNMM ETH50 HAAB/DXXX ETH93 HAAB/DNMM ETH50 HAAB/DXXX 4 ETH9 HAAB/DGAA 3 ETH508 HAAB/DXXX 3 ETH97 HAAB/DBBB 3 ETH93 HAAB/DNEN ETH3907 HAAB/DXXX ETH90 HAAB/DNMM 4 ETH3907 HAAB/DNMM ETH39 HAAB/DXXX ETH50 HAAB/DXXX ETH97 HAAB/DBBB 8 ETH9 HAAB/DGAA 5 ETH50 HAAB/DXXX 5 ETH508 HAAB/DXXX 3 ETH90 HAAB/DNMM 3 ETH97 HAAB/DBBB 3 ETH93 HAAB/DNEN ETH39 HAAB/DNMM ETH880 HAAB/DIAP QTR407 HAAB/DNMM 4 4 ETH93 HAAB/DNEN ETH508 HAAB/DXXX ETH95 HAAB/FGSL ETH9 HAAB/DGAA ETH393 HAAB/DNMM ETH905 HAAB/FKKD ETH907 HAAB/DXXX ETH93 HAAB/FKYS JANVIER FÉVRIER MARS AVRIL MAI JUIN JUILLET AOÛT OCTOBRE SNMC 5/ Freetown, Guinea, 8 - December 07 3

24 8. Missing FPL at DOUALA from HK Missing FPL at Douala from HK 8 4 KQA50 HKJK/DGAA 3 KQA5 HKJK/GABS KQA50 HKJK/DGAA 5 KQA50 HKJK/DGAA KQA53 HKJK/DNMM KQA5 HKJK/GABS KQA50 HKJK/DIAP 4 KQA54 HKJK/DNMM KQA50 HKJK/DGAA N7TX HKJK/DNMM 3 KQA5 HKJK/GABS KQA50 HKJK/DGAA KQA53 HKJK/DNMM KQA50 HKJK/DIAP KQA50 HKJK/DBBB RWD0 HKJK/DNMM 3 KQA50 HKJK/DIAP KQA53 HKJK/DNMM KQA5 HKJK/GABS JANVIER FÉVRIER MARS AVRIL MAI JUIN AOÛT SNMC 5/ Freetown, Guinea, 8 - December 07 4

25 8. Missing FPL at DOUALA from HR Missing FPL at Douala from HR 9 4 RWD00 HRYR/DNMM 3 RWD0 HRYR/DNMM RWD0 HRYR/DNMM 9 ETH80 HRYR/GOOY 3 RWD00 HRYR/DNMM 4 RWD0 HRYR/DNMM RWD4 HRYR/FKKD 7 RWD0 HRYR/DGAA RWD00 HRYR/DNMM 4 RWD00 HRYR/DNMM RWD0 HRYR/DNMM 8 4 RWD0 HRYR/DNMM RWD HRYR/DNMM GHA005 HRYR/DGAA TUVAD HRYR/DIAP TOGO0 HRYR/DXXX ETH870 HRYR/DXXX RWD0 HRYR/DNMM RWD9 HRYR/DBBB JANVIER FÉVRIER MARS MAI JUIN JUILLET AOÛT 5

26 8. Missing FPL at LOME from HA Missing FPL at Lomé from HA 3 ETH508 HAAB/DXXX 3 ETH50 HAAB/SBGR 3 ETH508 HAAB/DXXX 3 ETH50 HAAB/SBGR 4 ETH50 HAAB/SBGR ETH508 HAAB/DXXX 4 ETH935 HAAB/DXXX ETH50 HAAB/SBGR ETH39 HAAB/DXXX 3 ETH508 HAAB/DXXX ETH50 HAAB/SBGR 5 3 ETH508 HAAB/DXXX ETH50 HAAB/SBGR 4 ETH508 HAAB/DXXX ETH3907 HAAB/DXXX ETH50 HAAB/SBGR 3 ETH50 HAAB/SBGR 3 ETH508 HAAB/DXXX ETH508 HAAB/DXXX JANVIER FÉVRIER MARS AVRIL MAI JUIN JUILLET AOÛT SEPTEMBRE

27 8. Missing FPL at BANGUI from HS Missing FPL at Bangui from HS 5 4 EGY30X HSNN/FEFF VAL800 HSWW/FEFF EGY30 HSNN/FEFF RAMF07 HSSJ/DIAP EKJ00 HSSJ/FEFF N04 HSSJ/FEFF TUM9740 HSPN/FEFF TCTAV HSSS/FEFF 3 EGY3XX HSNN/FEFF TUM9740 HSPN/FEFF FGRGP HSOB/FEFF STGFD HSNN/FEFF 4 EGY3X HSNN/FEFF RAMF34 HSSJ/DGAA UNO054P HSSJ/FKYS 4 4 EGY3XX HSNN/FEFF 4 TUM9740 HSPN/FEFF EGY33 HSNN/FEFF SAF00 HSNN/FEFF 5YBVO HSSJ/FEFF UNO577H HSSJ/FEFF UNO74H HSNN/FEFF UNO99P HSSJ/FEFF JANVIER FÉVRIER MARS AVRIL MAI JUIN JUILLET AOÛT 7

28 8. Missing FPL at COTONOU from HA Missing FPL at Cotonou from HA 5 5 ETH97 HAAB/DBBB 4 4 ETH97 HAAB/DBBB 3 3 ETH97 HAAB/DBBB ETH955 HAAB/DBBB ETH955 HAAB/DBBB ETH955 HAAB/DBBB ETH955 HAAB/DBBB ETH97 HAAB/DBBB ETH97 HAAB/DBBB JANVIER FÉVRIER MARS AVRIL MAI JUIN JUILLET AOÛT SEPTEMBRE 8

29 8. Missing FPL at BRAZZAVILLE from HA Missing FPL at Brazzaville from HA ETH93 HAAB/FKYS ETH9 HAAB/DGAA ETH905 HAAB/FKKD ETH8 HAAB/FCPP 7 ETH8 HAAB/FCPP ETH9 HAAB/DGAA ETH95 HAAB/FOOL ETH905 HAAB/FKKD ETH50 HAAB/DXXX ETH97 HAAB/DBBB ETH95 HAAB/FGSL 3 ETH90 HAAB/DNMM ETH90 HAAB/DXXX ETH905 HAAB/FKKD 3 ETH905 HAAB/FKKD ETH93 HAAB/FKYS ETH97 HAAB/DGAA ETH83 HAAB/FCBB ETH83 HAAB/FCBB ETH83 HAAB/FCBB JANVIER FÉVRIER MARS MAI JUIN JUILLET AOÛT 9

30 3. Comments Majority of missing FPL not received at ASECNA centers listed in figure above concern the overflight; UTA of Lomé (DXXXZQZX) and APP (DBBBZRZX) of Cotonou are missed on the list of recipient of the FPL concerning the overflight of ACCRA FIR; UTA of Douala (FKKKZQZX) and UTA of Libreville (FOOOZQZX) are omitted on the of recipient of the FPL concerning the overflight of BRAZZAVILLE FIR ; Same remark for UTA of Abidjan (DIIIZQZX) in DAKAR FIR and UTA of Ouagadougou in NIAMEY FIR; 30

31 4. Main causes Omission of AFTN addresses of certain organism in charge of air traffic control; Ignorance of management of air space for certain FIR stirring the bad application of routing procedures; Technical failure; delayed restart of defective AFTN circuits due to the absence of focal point for coordination. 3

32 5. Corrective measures Exchanges of data on missing flight plans between different centers concerned in accordance with the conclusion7/4 of the 7th APIRG; Establish a mean of coordination to investigate punctually and systematic on the causes of the missing FPL; Check and Update regularly the routing table of each center to take into account new AFTN circuits; Elaborate a technical contact list per center to allow a quick restart of defective circuits: Maintaining awareness local information staff in charge of flight plan to respect the routing procedures of flight plans in accordance with the 8/8 conclusion of the 8th APIRG, using: For UTA of Lomé and Cotonou, we suggest that Accra Centre will create and publish a collective address (PDAI) include the AFTN address of these UTA and those of Accra that centre will use to address the FPL concerning the aircraft overflight this FIR; For UTA of Douala and Libreville, a collective address have already created FCZZZQZX for the Brazzaville FIR and we ask to all center to use for all aircraft overflight on Brazzaville FIR; For UTA of Abidjan use the address collective GOZZZQZX of Dakar FIR; For UTA of Ouagadougou use the address collective DRZZZQZX of Niamey FIR; 3

33 .CONCLUSION The meeting is invited to: note the above information related to the missing FPL; Reinforce co-operation between COM Centers in technical and operational domain to improve the availability of FPL; 33

34 THANK YOU!!!!! 34

AFI Regional Air Navigation Planning and Implementation Issues. 4.2: Communication, Navigation and Surveillance (CNS)

AFI Regional Air Navigation Planning and Implementation Issues. 4.2: Communication, Navigation and Surveillance (CNS) International Civil Aviation Organization AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP SIXTEENTH MEETING (APIRG/16) (Kigali, Rwanda 19-23 November 2007) Agenda Item 4.0: AFI Regional Air Navigation Planning

More information

SPECIAL AFRICA-INDIAN OCEAN (AFI) REGIONAL AIR NAVIGATION (RAN) MEETING

SPECIAL AFRICA-INDIAN OCEAN (AFI) REGIONAL AIR NAVIGATION (RAN) MEETING International Civil Aviation Organization SP AFI/08-WP/59 21/10/08 WORKING PAPER SPECIAL AFRICA-INDIAN OCEAN (AFI) REGIONAL AIR NAVIGATION (RAN) MEETING Durban, South Africa, 24 to 29 November 2008 Agenda

More information

AFI AFTN ROUTING DIRECTORY. (Presented by the Secretariat)

AFI AFTN ROUTING DIRECTORY. (Presented by the Secretariat) SAT/12 - WP/16 INTERNATIONAL CIVIL AVIATION ORGANIZATION TWELFTH MEETING ON THE IMPROVEMENT OF THE AIR TRAFFIC SERVICES IN THE SOUTH ATLANTIC (Sal, Cape Verde, 15 17 December 2004) Agenda Item 4: Communications

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION ORGANISATION DE L'AVIATION CIVILE INTERNATIONALE

INTERNATIONAL CIVIL AVIATION ORGANIZATION ORGANISATION DE L'AVIATION CIVILE INTERNATIONALE INTERNATINAL CIVIL AVIATIN RGANIZATIN RGANISATIN DE L'AVIATIN CIVILE INTERNATINALE AFTN RUTING DIRECTRY AFRICA INDIAN CEAN REGIN ANNUAIRE D'ACHEMINEMENT DU RSFTA REGIN AFRIQUE CEAN INDIEN FIFTEENTH/ QUINZIEME

More information

TION (CIC) INTER REGIONAL. ICC GoG

TION (CIC) INTER REGIONAL. ICC GoG CENTREE INTERREGIONAL DE COORDINAT TION (CIC) INTER REGIONAL COORDINATION CENTRE (ICC) Pour la mise en œuvre de la stratégie régionale de sûreté et sécurité maritimes de l Afrique Centrale et de l Afrique

More information

TION (CIC) INTER REGIONAL. ICC GoG 09, 2018

TION (CIC) INTER REGIONAL. ICC GoG 09, 2018 CENTREE INTERREGIONAL DE COORDINAT TION (CIC) INTER REGIONAL COORDINATION CENTRE (ICC) Pour la mise en œuvre de la stratégie régionale de sûreté et sécurité maritimes de l Afrique Centrale et de l Afrique

More information

L heure et la date. aujourd hui today hier yesterday demain tomorrow

L heure et la date. aujourd hui today hier yesterday demain tomorrow Page 1 of 28 Nom La date L heure et la date Les jours de la semaine The days of the week lundi - Monday mardi Tuesday mercredi Wednesday jeudi - Thursday vendredi - Friday samedi - Saturday dimanche -

More information

DESIGNING STREETS FOR CITIZENS: UNEP SHARE THE ROAD PROGRAMME

DESIGNING STREETS FOR CITIZENS: UNEP SHARE THE ROAD PROGRAMME DESIGNING STREETS FOR CITIZENS: UNEP SHARE THE ROAD PROGRAMME Susan Wothaya Share the Road Programme UNEP, Transport Unit susan.wothaya@unep.org www.uneptransport/sharetheroad Content The Reality- transport

More information

2 nd AFI WEEK 27 June 1st July 2016, Malabo, Equatorial Guinea

2 nd AFI WEEK 27 June 1st July 2016, Malabo, Equatorial Guinea 2 nd AFI WEEK 27 June 1st July 2016, Malabo, Equatorial Guinea 3rd AFI AVIATION SYMPOSIUM, 28 June Presentation by the Cameroon Civil Aviation Authority SEARCH AND RESCUE (SAR) PREPARADENESS 2 ARE WE PREPARED?

More information

Africa on the Rise: Opportunities and Challenges

Africa on the Rise: Opportunities and Challenges 1 Africa on the Rise: Opportunities and Challenges African Development Bank Group Domenico Fanizza Executive Director October 2018 Africa: a vast and fragmented continent The Africa Rising Story.. SSA

More information

French Festivals and Traditions

French Festivals and Traditions French Festivals and Traditions Activities and Teaching Ideas for Primary Schools Nicolette Hannam and Michelle Williams Contents Introduction... 4 Analysis by year group... 5 Analysis by objective...

More information

septembre/ September 2017 Wednesday Mercredi Gr. 8 Reading Assessments 20 Day 1 21 Day 2 Study Skills 5:45 6:45pm Parent Night 6:45 8:20pm

septembre/ September 2017 Wednesday Mercredi Gr. 8 Reading Assessments 20 Day 1 21 Day 2 Study Skills 5:45 6:45pm Parent Night 6:45 8:20pm septembre/ September 2017 Mentor Training 9am 2pm 1 2 3 4 5 Day 0 School Opening Gr. 8 @ 10:00-12:00 Gr. 9-12 @ 12:30-1:15 6 Day 1 7 Day 2 8 Day 1 9 10 11 Day 2 12 Day 1 13 Day 2 Gr. 8 Reading Assessments

More information

ECOWAS GOVERNANCE STRUCTURE

ECOWAS GOVERNANCE STRUCTURE A ECOWAS GOVERNANCE STRUCTURE A.1 Introduction. The Economic Community of West African States (ECOWAS) comprises three arms of governance. namely. the Executive. the Legislature and the Judiciary. At the

More information

MEMBER NATIONAL ASSOCIATIONS IN AFRICA (34 MEMBERS)

MEMBER NATIONAL ASSOCIATIONS IN AFRICA (34 MEMBERS) MEMBER NATIONAL ASSOCIATIONS IN AFRICA (34 MEMBERS) -updated as of June 13, 2003) Angola Benin Burkina Faso Cameroon provisional as of Oct. 16, 2002 Cape Verde Central African Republic Comoros provisional

More information

23 rd Road Governance Report UEMOA Draft

23 rd Road Governance Report UEMOA Draft 2 rd Road Governance Report UEMOA Draft This report presents information on checkpoints, bribes and delays based on data from January 1 to March 1, 201. The report includes two sections: 1 The eight corridors

More information

AFI METEOROLOGICAL BULLETINS EXCHANGE (AMBEX) HANDBOOK

AFI METEOROLOGICAL BULLETINS EXCHANGE (AMBEX) HANDBOOK INTERNATINAL CIVIL AVIATIN RGANIZATIN AFI METERLGICAL BULLETINS EXCHANGE (AMBEX) HANDBK Seventh Etion Amendment 4 December - 2014 Prepared by the ICA ESAF & WACAF ffices And published under the authority

More information

SWISS reports stable load factors

SWISS reports stable load factors SWISS Corporate Communications Phone: +41 (0)848 773 773 Fax: +41 (0)44 564 2127 communications@swiss.com SWISS.COM Media release Zurich Airport, October 10, 2008 SWISS reports stable load factors SWISS

More information

Meeting of the ICP Inter-Agency Coordination Group Principals. March 4, 2018 Millennium Hotel, New York

Meeting of the ICP Inter-Agency Coordination Group Principals. March 4, 2018 Millennium Hotel, New York Meeting of the ICP Inter-Agency Coordination Group Principals March 4, 2018 Millennium Hotel, New York OPENING REMARKS 2 Meeting Agenda 1. BRIEF GLOBAL UPDATE Status of global activities, timetable and

More information

THE BRENTHURST FOUNDATION. African Futures and Drivers More Important or More Impoverished? Greg Mills

THE BRENTHURST FOUNDATION. African Futures and Drivers More Important or More Impoverished? Greg Mills THE BRENTHURST FOUNDATION African Futures and Drivers More Important or More Impoverished? Greg Mills Point of Departure Six Drivers for the Future. Point of Departure Six Drivers. Six Drivers People.

More information

Road Safety in Africa and beyond

Road Safety in Africa and beyond Road Safety in Africa and beyond George Yannis National Technical University of Athens, Greece European Commission DG for Research and Innovation - 11 June 2018 Co-funded by the Horizon 2020 Framework

More information

"Fighting Terrorism In Africa"

Fighting Terrorism In Africa "Fighting Terrorism In Africa" Douglas Farah Before The House Committee on International Relations Subcommittee on Africa April, 2004 Thank you for the opportunity to talk with you today about the extremely

More information

Coaches Conferencein Ottawa Novembre Lecturer of ICF

Coaches Conferencein Ottawa Novembre Lecturer of ICF Coaches Conferencein Ottawa Novembre 2010 Zakaria Mahmoudi Lecturer of ICF Briefhistory First African federation established in 1956 (South Africa) Confederation of African Canoeing (CAC) founded in 2000

More information

Financial Inclusion in the ECCAS region: where do we stand

Financial Inclusion in the ECCAS region: where do we stand International Monetary Fund African Department Financial Inclusion in the ECCAS region: where do we stand ECCAS Regional Conference, Brazzaville, Congo Boriana Yontcheva Resident Representative Cameroon

More information

International Initiatives Illegal Fishing (IUU Fishing)

International Initiatives Illegal Fishing (IUU Fishing) International Initiatives Illegal Fishing (IUU Fishing) Per Erik Bergh pebergh@nfds.info www.stopillegalfishing.com Targeting policy process and partnerships Pan African Programme Both inland and marine

More information

18 th Road Governance Report UEMOA

18 th Road Governance Report UEMOA 18 th Road Governance Report UEMOA This report presents information on checkpoints, bribes and delays based on data collected October 1 to December 31, 211. The report includes two sections : 1 The six

More information

ECA-ECE-ICAP Workshop on Improving Road Safety Situation in Africa: UN Road Safety Conventions and Approaches to Preventing Drink Driving

ECA-ECE-ICAP Workshop on Improving Road Safety Situation in Africa: UN Road Safety Conventions and Approaches to Preventing Drink Driving ECA-ECE-ICAP Workshop on Improving Road Safety Situation in Africa: UN Road Safety Conventions and Approaches to Preventing Drink Driving African Action Plan for the Road Safety Decade Soteri Gatera Industrialization

More information

CAADP Implementation and Achievement of Outcomes. Sam Benin, IFPRI

CAADP Implementation and Achievement of Outcomes. Sam Benin, IFPRI CAADP Implementation and Achievement of Outcomes Sam Benin, IFPRI Introduction and Objectives Last 2 days: learned about significant growth and poverty reduc7on in Africa in recent decades Ques6on: how

More information

Reported Cases of Dracunculiasis by Country, 1972 to 2005

Reported Cases of Dracunculiasis by Country, 1972 to 2005 D A T A T A B L E 1 5 Reported Cases of Dracunculiasis by Country, 1972 to 2005 Description Dracunculiasis, or guinea worm disease, is the result of contact with water contaminated with a parasite, and

More information

HOSPITALLER ORDER OF THE BROTHERS OF ST JOHN OF GOD

HOSPITALLER ORDER OF THE BROTHERS OF ST JOHN OF GOD HOSPITALLER ORDER OF THE BROTHERS OF ST JOHN OF GOD Updated to 31-12-2016 General Secretariat Total number of Brothers in the Order, including Novices: 1085 distributed as follows by Religious Province:

More information

Physical oceanography in the Gulf of Guinea

Physical oceanography in the Gulf of Guinea Physical oceanography in the Gulf of Guinea PLAN 1. Recalls & scientific context 2. International & regional programs and main goals of EGEE/AMMA, PIRATA & TACE 3. What is RIPIECSA and goals of RIPIECSA-Ocean

More information

Predictability of the African Drought. Part III: Evaluation of NCAR/CSM and UK Metoffice/PRECIS models

Predictability of the African Drought. Part III: Evaluation of NCAR/CSM and UK Metoffice/PRECIS models Predictability of the African Drought. Part III: Evaluation of NCAR/CSM and UK Metoffice/PRECIS models Dr. Andre KAMGA Foamouhoue ICTP/ African Drought Conference- June 2008 Motivation Economic and social

More information

ADVANCED TRADITIONAL TRAINING In XIN YI QUAN. Two Year Programme

ADVANCED TRADITIONAL TRAINING In XIN YI QUAN. Two Year Programme ADVANCED TRADITIONAL TRAINING In XIN YI QUAN Two Year Programme Association Wan Laisheng France 29 av Corentin Cariou, 75019 Tel : 09 54 34 11 18 http://fr.wanlaisheng.com Email : association@wanlaisheng.com

More information

NYU International Hospitality Industry Investment Conference

NYU International Hospitality Industry Investment Conference NYU International Hospitality Industry Investment Conference Industry Update: The Statistical Reality Presented by Randy Smith, Chairman and Founder, STR Global Lodging Performance Global Regions Occupancy

More information

Mission Daily Allowances and Hotel Ceilings Updated values at July 2013

Mission Daily Allowances and Hotel Ceilings Updated values at July 2013 EUROPEAN COMMISSION EUROSTAT Directorate C: National Accounts, Prices and Key Indicators Unit C.3: Statistics for administrative purposes Luxembourg, 6 th March 2014 Doc. A6465/14/73 Meeting of the Working

More information

Global growth forecasts Key countries/regions,

Global growth forecasts Key countries/regions, Global growth forecasts Key countries/regions, 2014-2018 Percent 7 6 5 4 3 2 1 0 Developing Asia Sub-Saharan Africa Middle East and North Africa Latin America and the Caribbean United States Euro area

More information

An Atlas of Oceanic Internal Solitary Waves (February 2004) by Global Ocean Associates Prepared for Office of Naval Research Code 322 PO

An Atlas of Oceanic Internal Solitary Waves (February 2004) by Global Ocean Associates Prepared for Office of Naval Research Code 322 PO Overview covers approximately 5500 km of coast between Western Sahara (22 o N, 17 o W) and Angola (5 o S, 12 o E) (Figure 1). The continental shelf in the region varies significantly in width. The region

More information

DEFENSE POW/MIA ACCOUNTING AGENCY

DEFENSE POW/MIA ACCOUNTING AGENCY DEFENSE POW/MIA ACCOUNTING AGENCY Establishing Global Priorities and Initiatives Brigadier General Mark Spindler Deputy Director, Operations Fulfilling our Nations Promise For Official Use Only Past Identifications

More information

Family Picture with all participants at the CAT AGM 2018

Family Picture with all participants at the CAT AGM 2018 The Confederation of African Tennis (CAT) organized in conjunction with Rwanda Tennis Federation its Annual General Meeting (AGM) on 28 th April 2018 at the Hotel des Mille Collines in Kigali with the

More information

2016 Bali, Indonesia Trip Fast Achievement System (FAS) Tiens Europe Region, Jan 2016

2016 Bali, Indonesia Trip Fast Achievement System (FAS) Tiens Europe Region, Jan 2016 2016 Bali, Indonesia Trip Fast Achievement System (FAS) Tiens Europe Region, Jan 2016 For New DS - Fast Tracker Month 1 Month 2 Month 3 Month... 5 New *... For New DS - Fast Tracker Month Methodology Rank

More information

The African Road Safety Observatory

The African Road Safety Observatory Committee on Transportation in Tuesday, 15 January 2019 Washington D.C. The African Road Safety Observatory George Yannis 1, Antonino Tripodi 2, Luca Persia 2 1 National Technical University of Athens

More information

Assessing air traffic noise around airports: a fuzzy approach

Assessing air traffic noise around airports: a fuzzy approach AUN2014 : Airports in Urban Networks 15-16 Apr 2014 CNIT - Paris la Défense (France) Assessing air traffic noise around airports: a fuzzy approach Assane DIOP, ASECNA, Dakar, Sénégal, tapadiop2000@yahoo.fr

More information

Africa s Third Liberation? 21 st Century Development Drivers. Greg Mills SIDA

Africa s Third Liberation? 21 st Century Development Drivers. Greg Mills SIDA THEBRENTHURST FOUNDATION Africa s Third Liberation? 21 st Century Development Drivers Greg Mills SIDA 19 January 2012 Point of Departure: Six Di Drivers People. Growth and Differentiation. Democracy

More information

from evidence to advocacy. Presented by Clare Bartels African Physical Activity Network

from evidence to advocacy. Presented by Clare Bartels African Physical Activity Network 2012-2013 Physical activity in Africa: from evidence to advocacy Presented by Clare Bartels African Physical Activity Network Who is AFPAN? AFPAN is a network relating to physical activity and public health,

More information

Proposal for cooperation between GRASP and the CMS Gorilla Agreement

Proposal for cooperation between GRASP and the CMS Gorilla Agreement Proposal for cooperation between GRASP and the CMS Gorilla Agreement Background Great Apes Survival Partnership The Great Apes Survival Partnership (GRASP) was founded in 2001 at the World Summit on Sustainable

More information

4 th IEA-IEF-OPEC Symposium on Energy Outlooks. Riyadh, 22 January 2014

4 th IEA-IEF-OPEC Symposium on Energy Outlooks. Riyadh, 22 January 2014 4 th IEA-IEF-OPEC Symposium on Energy Outlooks Riyadh, 22 January 2014 Spare or stranded?* mb/d 7.0 Medium-Term Oil Market Balance 6.0 5.0 4.0 3.0 2.0 1.0 0.0-1.0 2004 2005 2006 2007 2008 2009 2010 2011

More information

FY12 IDA Allocations

FY12 IDA Allocations FY12 IDA Allocations 1. The IDA16 replenishment arrangements provide that IDA country allocations be made available for information to IDA s Executive Directors at the end of each fiscal year during the

More information

Overview of the Dracunculiasis (Guinea Worm Eradication) Program

Overview of the Dracunculiasis (Guinea Worm Eradication) Program Overview of the Dracunculiasis (Guinea Worm Eradication) Program Ernesto Ruiz-Tiben, Ph.D. Director, Dracunculiasis Eradication, The Carter Center Number of reported cases ( in Thousands) Number of Reported

More information

Telecommunication satellites & services. Azerspace-1, 46 0 E Azerspace-2, 45 0 E

Telecommunication satellites & services. Azerspace-1, 46 0 E Azerspace-2, 45 0 E Telecommunication satellites & services Azerspace-1, 46 0 E Azerspace-2, 45 0 E SERVICES AND SOLUTIONS 1. Space Segment Leasing Services Full Time Space Segment Leasing capacity on both C-band and Ku-band

More information

AVOID ABERRANT FLIGHT PLAN ROUTES

AVOID ABERRANT FLIGHT PLAN ROUTES AVOID ABERRANT FLIGHT PLAN ROUTES By: Rudy VOGEL LFMM ACC ATC Supervised by: Alain BENOIT LFMM ACC RAD Manager and FMP Deputy Manager AGENDA What are aberrant routes? What is done today to avoid them?

More information

Project Management in Changing Markets. Klaus Steen Mortensen President, Vestas Northern Europe

Project Management in Changing Markets. Klaus Steen Mortensen President, Vestas Northern Europe Project Management in Changing Markets Klaus Steen Mortensen President, Vestas Northern Europe 29 March 2017 Agenda 1. Vestas in Brief 2. Project Management in Construction & Installation 3. Our Challenges

More information

Fact sheet on elections and membership

Fact sheet on elections and membership Commission on Narcotic Drugs Commission on Crime Prevention and Criminal Justice Fact sheet on elections and membership States members of the CCPCJ and CND (and other functional commissions of the Economic

More information

Some Facts About Output

Some Facts About Output Some Facts About Output GNP as a Percentage of GDP in 2009 Country % Kuwait 110,38 United Kingdom 102 Japan 103,14 United States 99,24 China 100,87 Germany 101,41 Mexico 98,34 Poland 96,76 Ireland 81,19

More information

AU STATUTORY MEETINGS AND PARALLEL EVENTS From 25 June to 3 July 2018

AU STATUTORY MEETINGS AND PARALLEL EVENTS From 25 June to 3 July 2018 DURING THE PERIOD OF THE JUNE/JULY 2018 NOUAKCHOTT, AU STATUTORY MEETINGS AND PARALLEL EVENTS From 25 June to 3 July 2018 AU STATUTORY MEETINGS As at 28 June 2018 (1) THIRTY SIXTH (36 TH ) ORDINARY SESSION

More information

RIVERMEAD GOLF CLUB. Junior Program

RIVERMEAD GOLF CLUB. Junior Program RIVERMEAD GOLF CLUB Junior Program 2018 About the 2018 Rivermead Junior Program The Rivermead Junior Program includes: 14 weekly one-hour group lessons for five different age categories (Bilingual instruction

More information

International Association for Marine Aids to Navigation and Lighthouse Authorities Jacques Manchard, IALA Senior Adviser

International Association for Marine Aids to Navigation and Lighthouse Authorities Jacques Manchard, IALA Senior Adviser International Association for Marine Aids to Navigation and Lighthouse Authorities Jacques Manchard, IALA Senior Adviser SAIHC 15 August 2018 Eden Island, Seychelles SUMMARY About IALA The future Risk

More information

Charming African mammals need policies other than CITES listings

Charming African mammals need policies other than CITES listings Charming African mammals need policies other than CITES listings Sam Ferreira SANParks Savanna Science Network Meeting March 2017 pinterest.com animalcruely-india.blogspot.com Protecting species from unsustainable

More information

CESA Yaoundé 2017 IMPROVING INFORMATION SHARING FOR MARITIME SAFETY IN AFRICA CDR LOÏC MOUDOUMA GABON NAVY 18/07/2017 CESA 1

CESA Yaoundé 2017 IMPROVING INFORMATION SHARING FOR MARITIME SAFETY IN AFRICA CDR LOÏC MOUDOUMA GABON NAVY 18/07/2017 CESA 1 CESA Yaoundé 2017 IMPROVING INFORMATION SHARING FOR MARITIME SAFETY IN AFRICA CDR LOÏC MOUDOUMA GABON NAVY 18/07/2017 CESA 1 18/07/2017 CESA 2 PRESENTATION PLAN How can the different regions of Africa

More information

IDA COUNTRY ALLOCATIONS FOR FY17

IDA COUNTRY ALLOCATIONS FOR FY17 IDA COUNTRY ALLOCATIONS FOR FY17 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized IDA Resource Mobilization Department (DFiRM) October

More information

Organizing Entity Host City Start Date End Date Remarks Held in New York 04 December December 2017 Confirmed

Organizing Entity Host City Start Date End Date Remarks Held in New York 04 December December 2017 Confirmed Organizing Entity Host Start Date End Date Remarks France 04 December 2017 05 December 2017 Confirmed United Kingdom 13 November 2017 14 November 2017 Confirmed Senegal Held in Dakar 02 November 2017 03

More information

Dr. Danny Jordaan Video

Dr. Danny Jordaan Video Dr. Danny Jordaan Video QUOTE BY AHMAD AHMAD, THE CURRENT CAF PRESIDENT DURING HIS CAMPAIGN Woman s football growth agenda is a subject at the heart of CAF President Ahmad Ahmad The rest of the world

More information

LLINs for Continuous and Campaign Distribution in Sub Saharan Africa: A Collation of Global Funding Commitments for

LLINs for Continuous and Campaign Distribution in Sub Saharan Africa: A Collation of Global Funding Commitments for LLINs for Continuous and Campaign Distribution in Sub Saharan Africa: A Collation of Global Funding Commitments for 2011 16 Lucy Paintain For the Continuous LLIN Distribution Systems Work Stream of the

More information

Agenda item 6 Report by the BIML Director on BIML activities

Agenda item 6 Report by the BIML Director on BIML activities Agenda item 6 Report by the BIML Director on BIML activities 53rd CIML Meeting Hamburg 2018 1 Dear Colleagues: Welcome to Hamburg I wish to acknowledge Dr Roman Schwartz and all of his team for the organization

More information

EFFECTIVE DATE: 03 JANUARY Contents Coordination requirement for flights operating inside restricted airspace.

EFFECTIVE DATE: 03 JANUARY Contents Coordination requirement for flights operating inside restricted airspace. REPUBLIC OF IRAQ IRAQ CIVIL AVIATION AUTHORITY DIRECTORATE OF AIR TRAFFIC SERVICES AERONAUTICAL INFORMATION SERVICES P.O. BOX 23003 BAGHDAD Form No. 03 AIRAC AIP Amendment 01/19 06 DEC 2018 AFTN: ORBIYNYX

More information

FIELD GUIDE COMMERCIAL MARINE RESOURCES OF THE GULF OF GUINEA TO THE FAO SPECIES IDENTIFICATION SHEETS FOR FISHERY PURPOSES

FIELD GUIDE COMMERCIAL MARINE RESOURCES OF THE GULF OF GUINEA TO THE FAO SPECIES IDENTIFICATION SHEETS FOR FISHERY PURPOSES FAO SPECIES IDENTIFICATION SHEETS FOR FISHERY PURPOSES FAO REGIONAL OFFICE FOR AFRICA - RAFR FIELD GUIDE TO THE COMMERCIAL MARINE RESOURCES OF THE GULF OF GUINEA FOOD AND AGRICULTURE ORGANIZATION OF THE

More information

SWISS Traffic Figures May 2004

SWISS Traffic Figures May 2004 SWISS Traffic Figures May 2004 SWISS continues seat load factor improvement in May SWISS s load factor for May was 4.8 percentage points better than for the same period last year. Seat load factor for

More information

MDB Road Safety Initiative: A Development Priority

MDB Road Safety Initiative: A Development Priority MDB Road Safety Initiative: A Development Priority Every six seconds, someone is killed or maimed on the world s roads. Over 90 percent of these injuries occur in low- and middle-income countries. The

More information

INTERNATIONAL TABLE TENNIS FEDERATION. Table Tennis

INTERNATIONAL TABLE TENNIS FEDERATION. Table Tennis INTERNATIONAL TABLE TENNIS FEDERATION Table Tennis A. EVENTS (4) Men s Events (2) Women s Events (2) Singles Team Singles Team B. ATHLETES QUOTA 1. Total Quota for Table Tennis: Qualification Places Host

More information

NCC Cable System Order

NCC Cable System Order Order # 62508883 Flight s 03/13/18-04/01/18 Syscode 2107 Agency Canal Partners Media System Name Spectrum/DISH- I+ Tampa-St. Pete, FL Advertiser Levine For Governor Phone (301) 951-2620 Credit Update 03/13/18

More information

WATERFRONT CONGRESS CENTRE

WATERFRONT CONGRESS CENTRE ACHIEVING GLOBAL GOALS 2030 3RD GLOBAL MINISTERIAL CONFERENCE ON ROAD SAFETY WATERFRONT CONGRESS CENTRE STOCKHOLM 19 20 FEB 2020 SWEDEN TO HOST GLOBAL MINISTERIAL CONFERENCE ON ROAD SAFETY IN 2020 Sweden

More information

COUNTRY COUNTRY CODE Ranges/Mobile/City codes

COUNTRY COUNTRY CODE Ranges/Mobile/City codes COUNTRY COUNTRY CODE Ranges/Mobile/City codes Aeromobile 88 299 Afghanistan 93 7 Ascension 247 All country Australia 61 14711 Australia 61 14712 Australia 61 14713 Australia 61 14717 Australia 61 14718

More information

REPOBLIKAN NY MADAGASIKARA FITIAVANA-TANINDRAZANA-FANDROSOANA MINISTERE DES RESSOURCES HALIEUTIQUES ET DE LA PECHE

REPOBLIKAN NY MADAGASIKARA FITIAVANA-TANINDRAZANA-FANDROSOANA MINISTERE DES RESSOURCES HALIEUTIQUES ET DE LA PECHE IOTC-2018-WPDCS14-13 REPOBLIKAN NY MADAGASIKARA FITIAVANA-TANINDRAZANA-FANDROSOANA MINISTERE DES RESSOURCES HALIEUTIQUES ET DE LA PECHE UNITE STATISTIQUE THONIERE D ANTSIRANANA (USTA) 14 TH WORKING PARTY

More information

1. FGF : Presentation of the Association 1.1 Creation

1. FGF : Presentation of the Association 1.1 Creation Fédération des Géomètres Francophones 40 Avenue Hoche 75008- PARIS 00 33 153 83 88 12 1. FGF : Presentation of the Association 1.1 Creation Created in 2005 in Rabat French-speaking sessions during the

More information

Tabcorp Holdings Limited. Citigroup Wagering Forum 9 November 2011

Tabcorp Holdings Limited. Citigroup Wagering Forum 9 November 2011 Tabcorp Holdings Limited Citigroup Wagering Forum 9 November 2011 Agenda Investment highlights Wagering market growth 1Q Wagering KPIs Fixed odds Distribution platforms Victorian Wagering and Betting licence

More information

Fisheries management in West Africa

Fisheries management in West Africa Fisheries management in West Africa Dir. M. Henri ZERBO General Directorate for Fish Resources, Ministry of Animal and Fish Resources Ouagadougou, Burkina Faso Dipl. Ing. Dr. Raymond OUEDRAOGO Institute

More information

Monthly Digest February 2016 No. 2016/04. Copyrights Statistics Botswana 2016

Monthly Digest February 2016 No. 2016/04. Copyrights Statistics Botswana 2016 STATISTICS BOTSWANA BOTSWANA INTERNATIONAL MERCHANDISE TRADE STATISTICS Monthly Digest February 2016 No. 2016/04 Copyrights Statistics Botswana 2016 Contact Statistician: Malebogo Rakgantswana Email: mrakgantswana@gov.bw

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun Jul

More information

Appendix B - Kilometric Rates - Modules 1, 2 and 3

Appendix B - Kilometric Rates - Modules 1, 2 and 3 Appendix B - Kilometric Rates - Modules 1, 2 and 3 Effective April 6, 2018 The rates payable in cents per kilometre for the use of privately owned vehicles driven on authorized NPP business travel are

More information

Appendix B - Kilometric Rates - Modules 1, 2 and 3

Appendix B - Kilometric Rates - Modules 1, 2 and 3 Appendix B - Kilometric Rates - Modules 1, 2 and 3 Effective July 17, 2017 The rates payable in cents per kilometre for the use of privately owned vehicles driven on authorized NPP business travel are

More information

International Civil Aviation Organization. Sixth Meeting (MSG/6) (Cairo, Egypt, 3-5 December 2018) MET MATTERS. (Presented by the Secretariat) SUMMARY

International Civil Aviation Organization. Sixth Meeting (MSG/6) (Cairo, Egypt, 3-5 December 2018) MET MATTERS. (Presented by the Secretariat) SUMMARY 20/11/2018 International Civil Aviation Organization MIDANPIRG STEERING GROUP Sixth Meeting (MSG/6) (Cairo, Egypt, 3-5 December 2018) Agenda Item 5.3: Specific Air Navigation Issues MET MATTERS (Presented

More information

Appendix B - Kilometric Rates - Modules 1, 2 and 3

Appendix B - Kilometric Rates - Modules 1, 2 and 3 Appendix B - Kilometric Rates - Modules 1, 2 and 3 Effective October 9, 2018 The rates payable in cents per kilometre for the use of privately owned vehicles driven on authorized NPP business travel are

More information

SOCIAL EXCLUSION AND INCLUSION PROCESSES IN DAKAR AND NOUAKCHOTT

SOCIAL EXCLUSION AND INCLUSION PROCESSES IN DAKAR AND NOUAKCHOTT URBANIZATION, PUBLIC SPACE AND SUSTAINABLE MANAGMENT IN WEST AFRICA: SOCIAL EXCLUSION AND INCLUSION PROCESSES IN DAKAR AND NOUAKCHOTT EPFL and SDC Colombia, 19-25 November 2007 Speakers: Jérôme Chenal,

More information

TomTom South African Congestion Index

TomTom South African Congestion Index TomTom South African Congestion Index Disclaimer All copyrights, commercial rights, design rights, trademarks and other elements considered intellectual property that are published in this report are reserved

More information

International standardization Normalisation internationale. Montpellier 23 juin - 4 juillet 2008 Gourlot J.-P.

International standardization Normalisation internationale. Montpellier 23 juin - 4 juillet 2008 Gourlot J.-P. International standardization Normalisation internationale Montpellier 23 juin - 4 juillet 2008 Gourlot J.-P. Plan of presentation Plan de présentation Introduction Existing standards Calibration Drift

More information

India: Can the Tiger Economy Continue to Run?

India: Can the Tiger Economy Continue to Run? India: Can the Tiger Economy Continue to Run? India s GDP is on the rise US$ trillions Nominal GDP (left axis) GDP growth (right axis) 3.0 2.5 2.0 1.5 1.0 0.5 0.0 1990 1992 1994 1996 1998 2000 2002 2004

More information

4 th Substitute in Extra Time

4 th Substitute in Extra Time 4 th Substitute in Extra Time Experimental Study Protocol 06.07.2016, v2.0 Table of Contents I. Background and history... 3 II. Objective and Research Questions... 3 III. Existing findings... 4 IV. Conditions

More information

COMCEC COMMUNICATIONS OUTLOOK

COMCEC COMMUNICATIONS OUTLOOK COMCEC COMMUNICATIONS OUTLOOK Burak Karagöl Director @ COMCEC Coordination Office Transport and Communications Working Group 9 th Meeting March 16th, 2016 Ankara, Turkey OUTLINE Importance of communications

More information

Monthly Mission Review. Project Status Overview. July 12, Neil Johnson NRL Gamma-ray Large Area Space Telescope

Monthly Mission Review. Project Status Overview. July 12, Neil Johnson NRL Gamma-ray Large Area Space Telescope Gamma-ray Large Area Space Telescope Monthly Project Status Overview Neil Johnson NRL neil.johnson@nrl.navy.mil N. Johnson, NRL 1 LAT Monthly Agenda Teleconference: 888-935-421 Passcode: 936674 3:3 3:45

More information

Country programme documents ending in 2018, 2019 and 2010

Country programme documents ending in 2018, 2019 and 2010 Office of the Secretary of the Board United Nations Children s Fund (UNICEF) Country documents ending in 2018, 2019 and 2010 This document provides an overview of the country documents that will expire

More information

AU STATUTORY MEETINGS

AU STATUTORY MEETINGS DURING THE PERIOD OF THE JANUARY 2018 ADDIS ABABA, AU STATUTORY MEETINGS AND PARALLEL EVENTS From 17 to 29 January 2018 AU STATUTORY MEETINGS As at 26 January 2018 (1) AU GENDER PRE-SUMMIT - WGDD : 17

More information

January 2019 FY Key Performance Report

January 2019 FY Key Performance Report January 2019 FY 2019 - Key Performance Report Management Notes: The information in this report is based on the FY 2019 Operating Budget, adopted by the Board on June 11, 20. RT s farebox recovery ratio

More information

Report authors 2. Introduction 3. Match schedule 4. Report notes 5. Top-line coverage and audience summary 6. Executive summary 7

Report authors 2. Introduction 3. Match schedule 4. Report notes 5. Top-line coverage and audience summary 6. Executive summary 7 Contents Report authors 2 Introduction 3 Match schedule 4 Report notes 5 Top-line coverage and audience summary 6 Executive summary 7 Key market summaries 8 In-home data sources and methodology 10 Global

More information

USFWS CARPE Meeting. Structure & Programs. Species, Geography, Themes (Funding Priorities) Performance Measures

USFWS CARPE Meeting. Structure & Programs. Species, Geography, Themes (Funding Priorities) Performance Measures USFWS CARPE Meeting Structure & Programs Species, Geography, Themes (Funding Priorities) Performance Measures U.S. Department of the Interior U.S. Department of the Interior International Programs U.S.

More information

Market Update for RUTF and other LNS products. Evaluation of Procurement Objectives (RUTF tender 2015)

Market Update for RUTF and other LNS products. Evaluation of Procurement Objectives (RUTF tender 2015) UNICEF Supply Division RUTF pre-tender industry consultation Copenhagen 11-13 June 2018 Market Update for RUTF and other LNS products Evaluation of Procurement Objectives (RUTF tender 2015) Jan Debyser

More information

big IXP Jedi and TraceMON RIPE Atlas tools in Africa

big IXP Jedi and TraceMON RIPE Atlas tools in Africa big IXP Jedi and TraceMON RIPE Atlas tools in Africa Jasper den Hertog Research and Development RIPE NCC 22-24 August 2017 AfPIF2017 Abidjan The System probe 10,000+ Jasper den Hertog 22 August 2017 AfPIF2017

More information

Statistically Speaking

Statistically Speaking Statistically Speaking NYU International Hospitality Investment Conference June 2018 Amanda W. Hite President & CEO ahite@str.com 2018 STR, Inc. All Rights Reserved. Any reprint, use or republication of

More information

African Ministers Council On Water (AMCOW) North AMCOW (NAMCOW) Sub-regional Report 5 th NAMCOW Meeting

African Ministers Council On Water (AMCOW) North AMCOW (NAMCOW) Sub-regional Report 5 th NAMCOW Meeting African Ministers Council On Water (AMCOW) North AMCOW (NAMCOW) Sub-regional Report 5 th NAMCOW Meeting Brazzaville, Congo May 28 th, 2007 The Fifth Meeting of the North African Minister's Council on Water

More information

RIVERMEAD GOLF CLUB Junior Program and Camps 2019

RIVERMEAD GOLF CLUB Junior Program and Camps 2019 RIVERMEAD GOLF CLUB Junior Program and Camps 2019 About the Rivermead Junior Program The Rivermead Junior Program includes: 14 weekly one-hour group lessons for five different age categories (Bilingual

More information

FOR SALE BILLBOARD EASEMENT OFF US Laurelwood Rd, Santa Clara, CA 95054

FOR SALE BILLBOARD EASEMENT OFF US Laurelwood Rd, Santa Clara, CA 95054 All Sperry Van Ness Offices Independently Owned & Operated. The information listed above has been obtained from sources we believe to be reliable, however, we accept no responsibility for its correctness.

More information

What we have learned over the years Richard Williams I Sales Manager

What we have learned over the years Richard Williams I Sales Manager Subtitle Content Specialists in Remote Monitoring Benefits of Remote Synchronised Interruption What we have learned over the years Richard Williams I Sales Manager Slide: 1: # Agenda 1. Overview of MERLIN

More information

Illegal Ivory Trade. Ivory, the material that composes the tusks of elephants, is considered a highly desirable

Illegal Ivory Trade. Ivory, the material that composes the tusks of elephants, is considered a highly desirable Illegal Ivory Trade Ivory, the material that composes the tusks of elephants, is considered a highly desirable luxury product for most of the world. It makes up various products, such as chopsticks, jewelry,

More information