DEPARTMENT OF THE ARMY

Size: px
Start display at page:

Download "DEPARTMENT OF THE ARMY"

Transcription

1 H rocurement rograms ommittee taff rocurement ackup ook 2001 udget stimate W K HI ebruary 2000 II

2 Index for W K HI lin omenclature ilename age umber -1 XHII I I ( ) II I H II I II I () Z K II I I HI & HI I, I HI () Z I () Z HWIZ, () I I HI (88 ) H () Z H I (H) () Z H H I () () Z HI H I Z K () I H : ( ) III H $5.0 (-W) I H $5.0 (-W) I (-W)

3 Index for W K HI lin omenclature ilename age umber 28 HI, I HI, 5.56 (W) H,, 40, K I X107,. 50 I I I K-19 III I Q I W () Z I HI () Z HWIZ, W, 155, 198 () III I Z III H $5.0 (W-W (0925) I H $5.0 (W-W) I (W-W) II (I H ) I (W)

4 H 2001 XHII -1 ebruary 2000 ppropriation: **W & K HI** ctivity: 1. **K HI** () I I I I Q Q Q (1) (2) (3) (4) (7) (8) (9) (10) (11) (12) **K HI** 1 (5208) 8,464 2,628 5,331 2 I (80718) 361, , , , , ,389 3 I (80718) 20,006 () 4 II I (20900) 12,157 23,338 12,098 5 H II I (84600) ,844 6 II I () (Z2500) 2,522 4,315 14,038 7 K II I (1300) 13,298 8,050 10,504 8 I HI I (85100) 537,077 9 & HI (84200) 10 47,712 61, II 446, , ,443-1 age 1 of 6

5 H 2001 XHII -1 ebruary 2000 ppropriation: **W & K HI** ctivity: 1. **K HI** () I I I I Q Q Q (1) (2) (3) (4) (7) (8) (9) (10) (11) (12) **III K HI** 10 I, (1930) 54,998 62,810 45, I HI () (Z2300) 24,513 27,115 31, I () (Z2400) 73,965 31,284 37, HWIZ, ,244 26,824 8,060 () (0400) 14 I (8010) 3, I HI (88 53,588 68,385 ) (0570) 16 H (Z3200) 19, H I (H) () (Z3250) 49,978 81, H H I () 960 1,437 1,692 () (Z3000) 19 (Z3050) 15, K ()(0700) 25,997 31,645 36, II (07 20) H : 12 (0730) 16 36, (0750) 688, , ,828 () -259, , , , , ,422-1 age 2 of 6

6 H 2001 XHII -1 ebruary 2000 ppropriation: **W & K HI** ctivity: 1. **K HI** () I I I I Q Q Q (1) (2) (3) (4) (7) (8) (9) (10) (11) (12) 24 (0750) dv rocurement 260, , , III H $ (-W) (0925) II 987, , ,550 ** QI III** 26 I H $5.0 (-W) (3100) 27 I 9,670 8,852 9,250 (-W) (0050) II 9,759 8,989 9,385 II 1,443,363 1,419,562 1,761,378-1 age 3 of 6

7 H 2001 XHII -1 ebruary 2000 ppropriation: **W & K HI** ctivity: 2. **W H HI** () I I I I Q Q Q (1) (2) (3) (4) (7) (8) (9) (10) (11) (12) **W H HI** 28 HI, I (13000) 1,198 11,399 4,297 38,364 1,196 12, HI, 5.56 (W) (12900) 1,525 5,665 3,698 9, H,, 40, K19-3 (13400) ,064 1,389 22, , I (14900) 16,464 6,771 12,479 5,719 10,314 4, X107,. 50, I I (01500) 1, , I 4 (14904) 6,310 4,194 8,687 5,286 8,309 5, II 43,093 83,288 37,352 **III W H H** 34 K-19 III (3000) 1,971 1, I (3007) 6,721 5,292 2, Q I W () (Z1290) 8,289 9, I HI ()(Z1300) HWIZ, W, 155, 198 () (0430) 3,330 3, III (0401) 4,772 4,763 4, I (Z2800) 5,197 7,148 9, III H $5.0 (W-W) (0925) 1,118 1, II 17,808 31,795 33,359-1 age 4 of 6

8 H 2001 XHII -1 ebruary 2000 ppropriation: **W & K HI** ctivity: 2. **W H HI** () I I I I Q Q Q (1) (2) (3) (4) (7) (8) (9) (10) (11) (12) ** QI III** 42 I H $5.0 1,196 1,201 1,182 (W-W) (3200) 43 I 5,140 4,546 5,152 (W-W) (0050) 44 II (0075) 3,000 3,070 3, (I H ) 2,365 5,133 3,506 (0076) II 11,701 13,950 13,444 II 72, ,033 84,155-1 age 5 of 6

9 H 2001 XHII -1 ebruary 2000 ppropriation: **W & K HI** ctivity: 3. ** I ** () I I I I Q Q Q (1) (2) (3) (4) (7) (8) (9) (10) (11) (12) ** I ** 46 I (W) 20,075 22,738 29,105 (0150) II 20,075 22,738 29,105 II 20,075 22,738 29,105 II 1,536,040 1,571,333 1,874,638-1 age 6 of 6

10 xhibit -40, udget Item ustification heet ebruary 2000 ate: ppropriation / udget ctivity/erial o: -1 Item omenclature: W & K H / 1 / racked ombat ehicles (5208) rogram lements for ode Items: ode: ther elated rogram lements: rior ears o omplete otal rog roc Qty ross ost ess dv roc lus dv roc et roc (-1) Initial pares otal roc ost lyaway / Wpn ys roc / II: unding provided will accomplish modifications to brams raining evices required as a result of changes to the brams tanks or tank training requirements. hese changes are hardware and software modifications to existing equipment to keep simulators abreast of developments in the brams ank ystem. III: his program meets needs validated by the brams user community. egradation of tank training will occur if these modifications are delayed or deleted. he onduct of ire rainer () 603 to 1 onversions are for the ational uard units. nnually, 3,016 tank gunner - commander combinations will use the modified. he onduct of ire rainer () 1 to 11, ptical Improvement (I) and rmament nhancement Initiative (I) modifications are for units at,,, and the ational uard. Item o. 1 age 1 of 12 xhibit -40, udget Item ustification heet

11 xhibit -40 udget Item ustification heet ebruary 2000 ate ppropriation / udget ctivity/erial o. -1 Item omenclature W & K H / 1 / racked ombat ehicles (5208) rogram lements for ode Items ode ther elated rogram lements escription iscal ears I. lassification otal onduct of ire rainer () Image enerator (I) and omputer ehost/pplique perational / od perational ank river rainer od (12 pgrade) perational lose ombat actical rainer ()/ od perational aintenance raining ystem () od perational otals Item o. 1 age 2 of 12 xhibit -40, udget Item ustification heet

12 III I: : II / III: III III ate ebruary 2000 onduct of ire rainer () Image enerator (I) and omputer ehost/pplique and 11 s he Image enerator (I) and computer subsystems that are presently being used in the s are approaching obsolescence. It is becoming more difficult to obtain parts for these Is since they are of the early 1980's design. ustainability is becoming a major issue as repair and replacement parts are becoming more expensive or entirely not available on the commercial market. ikewise, the software designed to run on these components is also difficult to sustain. he goal is to obtain a replacement I and computer that will provide for cheaper and easier software changes and more cost effective parts and maintenance. his will position the fleet to support tank units and institutions beyond the year / I: IH ontractor est and valuation: 4Q99 4Q99 Initial perational est and valuation: 1Q01 Installation chedule: r r otals Inputs utputs o otals omplete Inputs utputs H II: ontractor III I: 9 onths I I: 18 onths ontract ates: 1999 ar ar ar 01 elivery ate: 1999 ep ep ep 02 Item o. 1 age 3 of 12 xhibit -3a Individual odification

13 III III ate ebruary 2000 III I (ont): onduct of ire rainer () Image enerator (I) and omputer ehost/pplique II : ($ in illions) 1998 and rior Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ & Kit Quantity Installation Kits Installation Kits, onrecurring quipment quipment, onrecurring ngineering hange rders ata raining quipment upport quipment ther Interim ontractor upport Installation of Hardware 1998 & rior qpt -- Kits 1999 qpt -- Kits 2000 qpt -- Kits 2001 qpt -- Kits 2002 qpt -- kits 2003 qpt -- kits 2004 qpt -- kits 2005 qpt -- kits quip-kits otal Installment otal rocurement ost Item o. 1 age 4 of 12 xhibit -3a Individual odification

14 III I: : II / III: / od dvanced unnery raining ystem III III ate ebruary 2000 his funding will modify existing 12 dvanced unnery raining imulators to represent the most recent changes to the 12. It is cheaper to modify existing training devices than to procure new ones. / I: IH ontractor est and valuation: Initial perational est and valuation: 3Q03 4Q03 Installation chedule: r r otals Inputs 2 4 utputs o otals omplete Inputs utputs H II: ontractor III I: 6 onths I I: 18 onths ontract ates: an 01 elivery ate: an 03 Item o. 1 age 5 of 12 xhibit -3a Individual odification

15 III III ate ebruary 2000 III I (ont): / od II : ($ in illions) 1998 and rior Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ & Kit Quantity Installation Kits Installation Kits, onrecurring quipment quipment, onrecurring ngineering hange rders ata raining quipment upport quipment ther Interim ontractor upport Installation of Hardware 1998 & rior qpt -- Kits 1999 qpt -- Kits 2000 qpt -- Kits 2001 qpt -- Kits 2002 qpt -- kits 2003 qpt -- kits 2004 qpt -- kits 2005 qpt -- kits quip-kits otal Installment otal rocurement ost Item o. 1 age 6 of 12 xhibit -3a Individual odification

16 III I: : II / III: III III ate ebruary 2000 ank river rainer od (12 pgrade) ank river rainer he ank river rainer () simulates actual tank performance for beginner and transitioning drivers. It provides a range of motion and simulated environments, terrain and situations which are difficult or impossible for the driver to experience in normal training or operations. he 12 driver's compartment and tasks are significantly different from the 11. his project upgrades existing 11 ank river rainers at the rmor chool to match student enrollment as more 12s enter the field. / I: IH ontractor est and valuation: Initial perational est and valuation: 3Q00 4Q00 Installation chedule: r r otals Inputs utputs o otals omplete Inputs 3 utputs 3 H II: ontractor III I: 6 onths I I: 12 onths ontract ates: 1999 un elivery ate: 1999 ec Item o. 1 age 7 of 12 xhibit -3a Individual odification

17 III III ate ebruary 2000 III I (ont): ank river rainer od (12 pgrade) II : ($ in illions) 1998 and rior Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ & Kit Quantity Installation Kits Installation Kits, onrecurring quipment quipment, onrecurring ngineering hange rders ata raining quipment upport quipment ther Interim ontractor upport Installation of Hardware 1998 & rior qpt -- Kits 1999 qpt -- Kits 2000 qpt -- Kits 2001 qpt -- Kits 2002 qpt -- kits 2003 qpt -- kits 2004 qpt -- kits 2005 qpt -- kits quip-kits otal Installment otal rocurement ost Item o. 1 age 8 of 12 xhibit -3a Individual odification

18 III I: : II / III: III III ate ebruary 2000 lose ombat actical rainer ()/ od lose ombat actical rainer () his funding will modify existing lose ombat actical rainer modules to represent the most recent changes to the 12. / I: IH ontractor est and valuation: Initial perational est and valuation: 3Q02 4Q02 Installation chedule: r r otals Inputs 18 8 utputs o otals omplete Inputs utputs H II: ontractor III I: 6 onths I I: 15 onths ontract ates: ar an 01 elivery ate: Item o. 1 age 9 of 12 xhibit -3a Individual odification

19 III III ate ebruary 2000 III I (ont): lose ombat actical rainer ()/ od II : ($ in illions) 1998 and rior Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ & Kit Quantity Installation Kits Installation Kits, onrecurring quipment quipment, onrecurring ngineering hange rders ata raining quipment upport quipment ther Interim ontractor upport Installation of Hardware 1998 & rior qpt -- Kits 1999 qpt -- Kits 2000 qpt -- Kits 2001 qpt -- Kits 2002 qpt -- kits 2003 qpt -- kits 2004 qpt -- kits 2005 qpt -- kits quip-kits otal Installment otal rocurement ost Item o. 1 age 10 of 12 xhibit -3a Individual odification

20 III I: : II / III: III III ate ebruary 2000 aintenance raining ystem () od aintenance rainers his funding will modify existing 12 aintenance raining ystems to represent the most recent changes to the 12. / I: IH ontractor est and valuation: Initial perational est and valuation: 3Q01 4Q01 Installation chedule: r r otals Inputs 2 utputs o otals omplete Inputs 2 utputs 2 H II: ontractor III I: 6 onths I I: 18 onths ontract ates: 1999 ar an an 01 elivery ate: ep 01 Item o. 1 age 11 of 12 xhibit -3a Individual odification

21 III III ate ebruary 2000 III I (ont): aintenance raining ystem () od II : ($ in illions) 1998 and rior Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ & Kit Quantity Installation Kits Installation Kits, onrecurring quipment quipment, onrecurring ngineering hange rders ata raining quipment upport quipment ther Interim ontractor upport Installation of Hardware 1998 & rior qpt -- Kits 1999 qpt -- Kits 2000 qpt -- Kits 2001 qpt -- Kits 2002 qpt -- kits 2003 qpt -- kits 2004 qpt -- kits 2005 qpt -- kits quip-kits otal Installment otal rocurement ost Item o. 1 age 12 of 12 xhibit -3a Individual odification

22 xhibit -40, udget Item ustification heet ebruary 2000 ate: ppropriation / udget ctivity/erial o: -1 Item omenclature: W & K H / 1 / racked ombat ehicles I (80718) rogram lements for ode Items: ode: ther elated rogram lements: rior ears o omplete otal rog roc Qty ross ost ess dv roc lus dv roc et roc (-1) Initial pares otal roc ost lyaway / Wpn ys roc / II: he radley ase ustainment rogram initiated a program to upgrade first generation radleys(0) into the 2 configuration and bridge the production gap until the introduction of the 3 upgrade vehicles provides four years of 3 I vehicles. 01 marks the first full rate production year of the 3 configuration. he upgraded 3 radley ighting ehicle will facilitate enhanced command and control, provide greater lethality, survivability, mobility, and sustainability required to defeat current and future threat forces while remaining operationally compatible with the main battle tank. III: he 01 udget will provide the first year of full rate of production for the 3 upgrade program. he 3 upgrade program will provide digital communications and target acquisition upgrades required to fight as a member of the combined arms team. hese vehicles will be remanufactured in the prime contractor's plant to preserve the critical skills and vendor base to allow for future modernization. Quantities are all 0-2's in 96 and prior; inebackers and 35 3's in 97; and 18 3's in 98; 53 2 and 73 3's in fy99; 60 2 and and 803's in 00; and all 3's thereafter. three year multi-year contract is planned for 's Item o. 2 age 1 of 18 xhibit -40, udget Item ustification heet

23 xhibit -40 udget Item ustification heet ebruary 2000 ate ppropriation / udget ctivity/erial o. -1 Item omenclature W & K H / 1 / racked ombat ehicles I (80718) rogram lements for ode Items ode ther elated rogram lements 3 dvanced rocurement etail (in ils): iscal ear for 2002 (memo) for 2003 (memo) (memo) (11.564) 2002 for 2003 (memo) (memo) (11.362) 2004 for 2005 (memo) for 2006 (memo) for 2007 (memo) (memo) (11.657) 2005 for 2006 (memo) for 2007 (memo) (memo) (9.562) 2007 (memo) (9.488) Item o. 2 age 2 of 18 xhibit -40 udget Item ustification heet

24 xhibit -5, Weapon ppropriation/ udget ctivity/erial o: -1 ine Item omenclature: Weapon ystem ype: ate: W ost nalysis W & K H / 1 / racked ombat ehicles I (80718) ebruary 2000 I ost lements otalost Qty nitost otalost Qty nitost otalost Qty nitost otalost Qty nitost $ ach $ $ ach $ $ ach $ $ ach $ I (2) I (3) Item o. 2 age 3 of 18 xhibit -5, Weapon ystem ost nalysis

25 xhibit -40, udget Item ustification heet ebruary 2000 ate: ppropriation / udget ctivity/erial o: -1 Item omenclature: W & K H / 1 / racked ombat ehicles I (22/) (80716) rogram lements for ode Items: ode: ther elated rogram lements: rior ears o omplete otal rog roc Qty ross ost ess dv roc lus dv roc et roc (-1) Initial pares otal roc ost lyaway / Wpn ys roc / II: he radley ase ustainment rogram initiated a program to upgrade first generation radleys(0) into the 2 configuration and bridge the production gap until the introduction of the 3 upgrade vehicles. 99 marks the third production year of the 3 configuration. he upgraded 3 radley ighting ehicle will facilitate enhanced command and control, provide greater lethality, survivability, mobility, and sustainability required to defeat current and future threat forces while remaining operationally compatible with the main battle tank. Quantities are all 0-2's in 96 and prior, inebackers 97, and 80, 53 and 's in 98, 99 and 00 respectively. Item o. 2 age 4 of 18 xhibit -40, udget Item ustification heet

26 xhibit -5, Weapon ppropriation/ udget ctivity/erial o: -1 ine Item omenclature: Weapon ystem ype: ate: W ost nalysis I (22/) W & K H / 1 / racked ombat ehicles (80716) ebruary 2000 I ost lements otalost Qty nitost otalost Qty nitost otalost Qty nitost otalost Qty nitost $ ach $ $ ach $ $ ach $ 1. HI ther (ew) ther (eman) ontractor ngineering ational uard ielding inebacker ngineering - ontractor inebacker ngineering - overnment ielding Item o. 2 age 5 of 18 xhibit -5, Weapon ystem ost nalysis

27 xhibit -5a, udget rocurement History and lanning ebruary 2000 ppropriation / udget ctivity/erial o: Weapon ystem ype: -1 ine Item omenclature: W & K H / 1 / racked ombat ehicles I (22/) (80716) W ost lements: ontractor and ocation ontract pecs ate ocation of ward ate ate of irst Q nit ost ethod vail evsn iscal ears and ype elivery ach $ ow? vail 1. HI ate: Issue ate 99, ork / ug-99 an es o 00, ork / ar-00 ct es o K: Item o. 2 age 6 of 18 xhibit -5, rocurement History and lanning

28 -1 Item omenclature: ate: 00 / 01 I H I (22/) (80716) ebruary iscal ear 98 iscal ear 99 Q I alendar ear 98 alendar ear 99 ach HI 1 97& I I I K H umber rior 1 ct. fter 1 ct. fter 1 ct. fter 1 ct. / I I X. + III , ork III III III III Item o. 2 age 7 of 18 xhibit -21, roduction chedule

29 -1 Item omenclature: ate: 00 / 01 I H I (22/) (80716) ebruary iscal ear 00 iscal ear 01 Q I alendar ear 00 alendar ear 01 ach HI 1 97& I I I K H umber rior 1 ct. fter 1 ct. fter 1 ct. fter 1 ct. / I I X. + III 1, ork III III III III Item o. 2 age 8 of 18 xhibit -21, roduction chedule

30 -1 Item omenclature: ate: 00 / 01 I H I (22/) (80716) ebruary iscal ear 02 iscal ear 03 Q I alendar ear 02 alendar ear 03 ach HI 1 97& I I I K H umber rior 1 ct. fter 1 ct. fter 1 ct. fter 1 ct. / I I X. + III 1, ork III III III III Item o. 2 age 9 of 18 xhibit -21, roduction chedule

31 xhibit -40, udget Item ustification heet ebruary 2000 ate: ppropriation / udget ctivity/erial o: -1 Item omenclature: W & K H / 1 / racked ombat ehicles I (23) (80717) rogram lements for ode Items: ode: ther elated rogram lements: rior ears o omplete otal rog roc Qty ross ost ess dv roc lus dv roc et roc (-1) Initial pares otal roc ost lyaway / Wpn ys roc / II: he radley ase ustainment rogram initiated a program to upgrade first generation radleys(0) into the 2 configuration and bridge the production gap until the introduction of the 3 upgrade vehicles provides the first four years of 3 I vehicles. 01 marks the first full rate production year of the 3 configuration. he upgraded 3 radley ighting ehicle will facilitate enhanced command and control, provide greater lethality, survivability, mobility, and sustainability required to defeat current and future threat forces while remaining operationally compatible with the main battle tank. III: he 01 udget will provide the first full rate production year for the 3 upgrade program. he 3 upgrade program will provide digital communications and target acquisition upgrades required to fight as a member of the combined arms team. hese vehicles will be remanufactured in the prime contractor's plant to preserve the critical skills and vendor base to allow for future modernization. three year multi-year contract is planned for 's Item o. 2 age 10 of 18 xhibit -40, udget Item ustification heet

32 xhibit -40 udget Item ustification heet ebruary 2000 ate ppropriation / udget ctivity/erial o. -1 Item omenclature W & K H / 1 / racked ombat ehicles I (23) (80717) rogram lements for ode Items ode ther elated rogram lements 3 dvanced rocurement etail (in ils): iscal ear for 2002 (memo) for 2003 (memo) (memo) (11.564) 2002 for 2003 (memo) (memo) (11.362) 2004 for 2005 (memo) for 2006 (memo) for 2007 (memo) (memo) (11.657) 2005 for 2006 (memo) for 2007 (memo) (memo) (9.562) 2007 (memo) (9.488) Item o. 2 age 11 of 18 xhibit -40 udget Item ustification heet

33 xhibit -5, Weapon ppropriation/ udget ctivity/erial o: -1 ine Item omenclature: Weapon ystem ype: ate: W ost nalysis I (23) W & K H / 1 / racked ombat ehicles (80717) ebruary 2000 I ost lements otalost Qty nitost otalost Qty nitost otalost Qty nitost otalost Qty nitost $ ach $ $ ach $ $ ach $ 1. ehicle I I ther eman (ontractor) re od epot aint ngineering--overnment ngineering--ontractor roject anagement dministration eimbursable atrix upport est and valuation ummins ngine ife-of-ype () uy 13. eculiar upport quipment lassroom pares 15. ielding ross -1 nd ost ess: rior ear dv roc et -1 ull unding ost lus: -1 dv roc ther on -1 osts Initial pares ods Item o. 2 age 12 of 18 xhibit -5, Weapon ystem ost nalysis

34 xhibit -5a, udget rocurement History and lanning ebruary 2000 ppropriation / udget ctivity/erial o: Weapon ystem ype: -1 ine Item omenclature: W & K H / 1 / racked ombat ehicles I (23) (80717) W ost lements: ontractor and ocation ontract pecs ate ocation of ward ate ate of irst Q nit ost ethod vail evsn iscal ears and ype elivery ach $ ow? vail 1. ehicle ate: Issue ate 99, ork / ov-98 ar , ork / ay-00 pr , ork / ar-01 pr I 99 I, X/ / ov-98 eb I, X/ / an-00 eb / ec-00 eb I 99 I, X / an-99 ec I, X / an-00 ec I, X / an-01 ec K: ulti year procurements (01-03) for ehicle, and I. ulti year procurement (00-01) for I Item o. 2 age 13 of 18 xhibit -5, rocurement History and lanning

35 -1 Item omenclature: ate: 00 / 01 I H I (23) (80717) ebruary iscal ear 98 iscal ear 99 Q I alendar ear 98 alendar ear 99 ach ehicle I I I K H umber rior 1 ct. fter 1 ct. fter 1 ct. fter 1 ct. / I I X. + III , ork III III III III ue to downsizing/reorganization and multi product multi program production planning intiatives, realistic min/max rates are not available. Item o. 2 age 14 of 18 xhibit -21, roduction chedule

36 -1 Item omenclature: ate: 00 / 01 I H I (23) (80717) ebruary iscal ear 00 iscal ear 01 Q I alendar ear 00 alendar ear 01 ach ehicle I I I K H umber rior 1 ct. fter 1 ct. fter 1 ct. fter 1 ct. / I I X. + III , ork III III III III ue to downsizing/reorganization and multi product multi program production planning intiatives, realistic min/max rates are not available. Item o. 2 age 15 of 18 xhibit -21, roduction chedule

37 -1 Item omenclature: ate: 00 / 01 I H I (23) (80717) ebruary iscal ear 02 iscal ear 03 Q I alendar ear 02 alendar ear 03 ach ehicle I I I K H umber rior 1 ct. fter 1 ct. fter 1 ct. fter 1 ct. / I I X. + III , ork III III III III ue to downsizing/reorganization and multi product multi program production planning intiatives, realistic min/max rates are not available. Item o. 2 age 16 of 18 xhibit -21, roduction chedule

38 -1 Item omenclature: ate: 00 / 01 I H I (23) (80717) ebruary iscal ear 04 iscal ear 05 Q I alendar ear 04 alendar ear 05 ach ehicle I I I K H umber rior 1 ct. fter 1 ct. fter 1 ct. fter 1 ct. / I I X. + III , ork III III III III ue to downsizing/reorganization and multi product multi program production planning intiatives, realistic min/max rates are not available. Item o. 2 age 17 of 18 xhibit -21, roduction chedule

39 -1 Item omenclature: ate: 00 / 01 I H I (23) (80717) ebruary iscal ear 06 iscal ear 07 Q I alendar ear 06 alendar ear 07 ach ehicle I I I K H umber rior 1 ct. fter 1 ct. fter 1 ct. fter 1 ct. / I I X. + III , ork III III III III ue to downsizing/reorganization and multi product multi program production planning intiatives, realistic min/max rates are not available. Item o. 2 age 18 of 18 xhibit -21, roduction chedule

40 xhibit -40, udget Item ustification heet ebruary 2000 ate: ppropriation / udget ctivity/erial o: -1 Item omenclature: W & K H / 1 / racked ombat ehicles I ( ) (80718) rogram lements for ode Items: ode: ther elated rogram lements: rior ears o omplete otal rog roc Qty ross ost ess dv roc lus dv roc et roc (-1) Initial pares otal roc ost lyaway / Wpn ys roc / II: dvance rocurement for Q material. III: Q funding supports more economical buys than can be achieved with single year procurements. Item o. 3 age 1 of 6 xhibit -40, udget Item ustification heet

41 irst ystem ward ate: irst ystem ompletion ate: ate: dvance rocurement equirements nalysis-unding (-10) ecember 1999 pril 2001 ebruary 2000 ppropriation / udget ctivity/erial o: -1 ine Item omenclature / Weapon ystem: W & K H / 1 / racked ombat ehicles I ( ) (80717) ($ in illions) When rior o (mos) eq'd* ears omp otal conomic rder Quantity ehicle lat anel isplay ommander's Iindependent iewer / urret rocessing nit Hull rocessing nit unner's Hand tation ommander's Hand tation osition Interface ox ransmission urret rive urret rive ontrol nit I ermination iability otal dvance rocurement escription: *umber of months (olumn 3) refers to integration of components, not to Q material. Q funding four one four-year multiyear and one three-year multiyear. Item o. 3 age 2 of 6 xhibit -10 (), dvance rocurement equirements nalysis

42 dvance rocurement equirements nalysis-udget ustification (-10) ebruary 2000 ppropriation / udget ctivity/erial o: -1 ine Item omenclature / Weapon ystem: W & K H / 1 / racked ombat ehicles I ( ) (80717) ($ in illions) Quantity er nit ontract otal ontract otal (mos) ssembly ost Qty orecast ate ost equest Qty orecast ate ost equest conomic rder Quantity (Q) 109 ar 01 ate: 1. ehicle 17 1 / ar lat anel isplay 6 2 / ar ommander's Iindependent iewer 12 1 / ar / 6 1 / ar urret rocessing nit 12 1 / ar Hull rocessing nit 12 1 / ar unner's Hand tation 6 1 / ar ommander's Hand tation 6 1 / ar osition Interface ox 6 1 / ar ransmission 6 1 / ar urret rive 6 1 / ar urret rive ontrol nit 6 1 / ar I 13 1 / ar ermination iabality otal dvance rocurement 20.0 escription: Quantity and unit cost are not applicable. unding is for Q material, not full up components. Item o. 3 age 3 of 6 xhibit -10 (), dvance rocurement equirements nalysis

43 dvance rocurement equirements nalysis-resent alue nalysis (-10) ebruary 2000 ppropriation / udget ctivity/erial o: -1 ine Item omenclature / Weapon ystem: W & K H / 1 / racked ombat ehicles I ( ) (80717) ($ in illions) o r rs omp otal ate: roposal w/o hen ear ost onstant ear ost resent alue roposal hen ear ost onstant ear ost resent alue avings (ifference) hen ear ost onstant ear ost resent alue emarks: here are currently no proposals; these are estimates. Item o. 3 age 4 of 6 xhibit -10 (), dvance rocurement equirements nalysis

44 dvance rocurement equirements nalysis-xecution (-10) ebruary 2000 ppropriation / udget ctivity/erial o: -1 ine Item omenclature / Weapon ystem: W & K H / 1 / racked ombat ehicles I ( ) (80717) ($ in illions) ontract ctual otal ctual ontract ctual otal ctual ontract ontract orecast ontract ost ontract orecast ontract ost ontract orecast orecast (mos) Qty ate ate equest ost Qty ate ate equest ost Qty ate Qty ate nd Item 109 ar 01 ate: 1. ehicle 17 ar lat anel isplay 6 ar ommander's Iindependent iewer 12 ar / 6 ar urret rocessing nit 12 ar Hull rocessing nit 12 ar unner's Hand tation 6 ar ommander's Hand tation 6 ar osition Interface ox 6 ar ransmission 6 ar urret rive 6 ar urret rive ontrol nit 6 ar I 13 ar 01 otal dvance rocurement escription: lanned advance procurement. o advance procurement history. Item o. 3 age 5 of 6 xhibit -10 (), dvance rocurement equirements nalysis

45 dvance rocurement equirements nalysis-bligations/xpenditures (-10) ebruary 2000 ppropriation / udget ctivity/erial o: -1 ine Item omenclature / Weapon ystem: W & K H / 1 / racked ombat ehicles I ( ) (80717) ($ in illions) 00 otal nding otal bl/xp alance rogram ct ov ec an eb ar pr ay un ul ug ep (um) (um) ate: 98 ermination iability chedule xpenditures 99 ermination iability chedule xpenditures 00 ermination iability chedule 01 ermination iability chedule arrative: here is no termination liability within this advance procurement line. Q requirements were calculated based on a percentage of the bill of material cost and sub-contractor component cost. Item o. 3 age 6 of 6 xhibit -10 (), dvance rocurement equirements nalysis

46 xhibit -40, udget Item ustification heet ebruary 2000 ate: ppropriation / udget ctivity/erial o: -1 Item omenclature: W & K H / 1 / racked ombat ehicles II I (20900) rogram lements for ode Items: ode: ther elated rogram lements: rior ears o omplete otal rog roc Qty ross ost ess dv roc lus dv roc et roc (-1) Initial pares otal roc ost lyaway / Wpn ys roc / escription: he radley dvanced raining ystem () is a crew station simulator for the 3 turret. here are two configurations. ne is used for precision gunnery training and comes with an Instructor/perator's station and a remote monitoring station. he basis of issue for the gunnery version is one per mechanized infantry battalion and eight each at the and I. otal requirement is 32. he second configuration is maximized for use in the lose ombat actical rainer () simulation. he focus is on the unit level collective training in maneuver and command and control. In this configuration, utilizes the aster ontrol onsole from the and does not have the instructor/operator station. It does have drivers and squad compartments. asis of issue for the maneuver version is 14 per installation equipped with 3s plus requirements. otal requirement is 72. radley esktop rainers () are computer workstations running the actual 23 software. It is equipped with touch-screen monitor, commander's handstation and data entry tool. his trainer facilitates the new equipment and sustainment training on the commander's tactical display and digital command and control software. asis of issue is four per mechanized infantry battalion. he 23 aintenance rainer will be used at the installations to train the maintenance personnel. he system will consist of a Hands-on urret rainer (H) and a computer workstation for classroom training. It is similar to the trainers in use for the brams tank system. asis of issue is 8 H and 32 workstations for rmy rmor chool. ustification: he 23 is a significant departure from the earlier versions of the radley. he digital architecture facilitates embedded test and diagnostics and enhances crew efficiency. s a result, the maintenance concept is radically different from the 22. he vehicle fire control system and inherent crew duties are also significantly different. he increased cost of actual vehicle hardware mandates the increased use of rng ids, evices and imulators. he requirement for these devices is the result of a detailed training analysis and they are a key part of the raining upport lan for the 23. Without these devices, additional vehicles would be required in and additional funding would be required for units. Item o. 4 age 1 of 6 xhibit -40, udget Item ustification heet

47 roduction xhibit -5, Weapon ppropriation/ udget ctivity/erial o: -1 ine Item omenclature: Weapon ystem ype: ate: W ost nalysis II I W & K H / 1 / racked ombat ehicles (20900) ebruary 2000 I ost lements otalost Qty nitost otalost Qty nitost otalost Qty nitost otalost Qty nitost $ ach $ $ ach $ $ ach $ $ ach $ 1. radley dvanced raining ystem () radley esktop rainer () aintenance rainers Item o. 4 age 2 of 6 xhibit -5, Weapon ystem ost nalysis

48 xhibit -5a, udget rocurement History and lanning ebruary 2000 ppropriation / udget ctivity/erial o: Weapon ystem ype: -1 ine Item omenclature: W & K H / 1 / racked ombat ehicles II I (20900) W ost lements: ontractor and ocation ontract pecs ate ocation of ward ate ate of irst Q nit ost ethod vail evsn iscal ears and ype elivery ach $ ow? vail 1. radley dvanced raining ystem () 99 nited efense () ul-99 ay nited efense () un-00 pr nited efense () ec-00 ov ate: Issue ate 2. radley esktop rainer () 99 nited efense () eb-00 ay nited efense () un-00 ug aintenance rainers I-rlando ar-00 ay I-rlando ar-01 ay K: Item o. 4 age 3 of 6 xhibit -5, rocurement History and lanning

49 -1 Item omenclature: ate: 00 / 01 I H II I (20900) ebruary iscal ear 98 iscal ear 99 Q I alendar ear 98 alendar ear 99 ach radley dvanced raining ystems () radley esktop rainer () aintenance rainers I I I K H umber rior 1 ct. fter 1 ct. fter 1 ct. fter 1 ct. / I I X. + III 1 nited efense () 2 nited efense () III 3 III III III Item o. 4 age 4 of 6 xhibit -21, roduction chedule

50 -1 Item omenclature: ate: 00 / 01 I H II I (20900) ebruary iscal ear 00 iscal ear 01 Q I alendar ear 00 alendar ear 01 ach radley dvanced raining ystems () radley esktop rainer () aintenance rainers I I I K H umber rior 1 ct. fter 1 ct. fter 1 ct. fter 1 ct. / I I X. + III 1 nited efense 2 nited efense III 3 III III III Item o. 4 age 5 of 6 xhibit -21, roduction chedule

51 -1 Item omenclature: ate: 00 / 01 I H II I (20900) ebruary iscal ear 02 iscal ear 03 Q I alendar ear 02 alendar ear 03 ach radley dvanced raining ystems () radley esktop rainer () aintenance rainers I I I K H umber rior 1 ct. fter 1 ct. fter 1 ct. fter 1 ct. / I I X. + III 1 nited efense () 2 nited efense () III 3 III III III Item o. 4 age 6 of 6 xhibit -21, roduction chedule

52 xhibit -40, udget Item ustification heet ebruary 2000 ate: ppropriation / udget ctivity/erial o: -1 Item omenclature: W & K H / 1 / racked ombat ehicles H II I (84600) rogram lements for ode Items: ode: ther elated rogram lements: rior ears o omplete otal rog roc Qty ross ost ess dv roc lus dv roc et roc (-1) Initial pares otal roc ost lyaway / Wpn ys roc / II: he Wolverine (Heavy ssault ridge) raining ids, evices, imulators, and imulations () enables the total training capability that results in combat ready ngineer and rdnance soldiers supporting the mounted maneuver force. Wolverine provides complete training capability for operators and maintainers employing or supporting the Wolverine system. nvisioned is support to the institutional, unit, and collective level. Wolverine program provides the development of a training strategy and supporting tools to train operators, leaders, and maintainers. he program fields at both the institution and ombat raining enter. III: Wolverine optimizes unit, institutional and training effectiveness, minimizing the peration and upport (&) costs associated with onvehicle training, as well as the environmental impact the result of actual vehicle operations. he Wolverine program has been terminated. he decision to terminate the program was based on an assessment of affordability and acceptance of operational risk against higher rmy ransformation priorities. Item o. 5 age 1 of 2 xhibit -40, udget Item ustification heet

53 xhibit -5, Weapon ppropriation/ udget ctivity/erial o: -1 ine Item omenclature: Weapon ystem ype: ate: W ost nalysis W & K H / 1 / racked ombat ehicles H II I (84600) ebruary 2000 I ost lements otalost Qty nitost otalost Qty nitost otalost Qty nitost otalost Qty nitost $ ach $ $ ach $ $ ach $ $ ach $ 1. roject anagement rogram loseout ote: 00 program is being reassessed in light of the rmy's transformation. Item o. 5 age 2 of 2 xhibit -5, Weapon ystem ost nalysis

54 xhibit -40, udget Item ustification heet ebruary 2000 ate: ppropriation / udget ctivity/erial o: -1 Item omenclature: W & K H / 1 / racked ombat ehicles II I () (Z2500) rogram lements for ode Items: ode: ther elated rogram lements: ombat ehicle Improvement rogram rior ears o omplete otal rog roc Qty ross ost ess dv roc lus dv roc et roc (-1) Initial pares otal roc ost lyaway / Wpn ys roc / II: pgrades to the raining evices are required every time the vehicle software changes. urrent vehicle plans call for an annual software update. hese changes will effect the functionality of the radley dvanced raining ystem (), radley esktop rainer (), recision unnery ystem () and the 23 aintenance rainers. 1. he introduction of the 3 requires a modification kit for to interface to the digital architecture. total of 256 mod kits are required for the ctive rmy. 2. he hrough ight ideo system also requires a mod kit to interface to the digital architecture on the 23. his mod kit is a redesigned cable harness that will be used on the existing video recording device. total of 80 kits are required for the ctive rmy. 3. he modifications are designed to replace out-of-date omputer and Image enerator hardware with state-of-the-art equipment. It will also include installation of the pplique computer system in order to completely match the vehicle. It is following the same program for brams s. total of 125 will be modified in both ctive and eserve omponents. art of the total requirement is funded by I through perations and upport ost savings. his will insure the will remain a viable raining evice as long as the 22 is in the inventory. 4. rocurement of the uperelevation witchbox will continue. his component enables the army standard I system to interface with the 22. otal I is approximately 900 kits for those units equipped with the 22. III: his program meets the requirements as stated in the radley perational equirements ocument. degradation of training will take place if these modifications are delayed or cancelled. Without satisfactory raining evices, additional vehicles and increased funding would be required. Item o. 6 age 1 of 14 xhibit -40, udget Item ustification heet

55 xhibit -40 udget Item ustification heet ebruary 2000 ate ppropriation / udget ctivity/erial o. -1 Item omenclature W & K H / 1 / racked ombat ehicles II I () (Z2500) rogram lements for ode Items ode ther elated rogram lements escription iscal ears I. lassification otal oftware pgrades perational recision unnery tstem () ods perational nit onduct f ire rainer () ods perational hrough ight ideo ystem () ods perational aintenance rainer ods perational I ods perational otals Item o. 6 age 2 of 14 xhibit -40, udget Item ustification heet

56 III I: : II / III: oftware oftware pgrades III III ate ebruary 2000 s, recision unnery ystem,, radley esktop rainer, aintenance raining ystems. escription: oftware uddates will be required of training devices. s a system is upgraded/modified, software on the training device must be modified to ensure adequate training for the soldier. lanned upgrades include I 3 intercom adapter for existing hrough ight ideo (), recision unnery ystem (), I,, ehost, aintenance rainer,and eserve omponent quipment ods. / I: reliminary esign eview ritical esign eview ontractor est & valuation Initial perational est and valuation I roduction ecision vailable Installation chedule: Inputs utputs r r otals o otals omplete Inputs utputs H II: ontractor III I: 12 onths I I: 12 onths ontract ates: Q Q Q01 elivery ate: Q Q Q02 Item o. 6 age 3 of 14 xhibit -3a Individual odification

57 III III ate ebruary 2000 III I (ont): oftware pgrades II : ($ in illions) 1998 and rior Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ & oftware ods oftware ods Installation of Hardware 1998 & rior qpt -- Kits 1999 qpt -- Kits 2000 qpt -- Kits 2001 qpt -- Kits 2002 qpt -- kits 2003 qpt -- kits 2004 qpt -- kits 2005 qpt -- kits quip-kits otal Installment otal rocurement ost Item o. 6 age 4 of 14 xhibit -3a Individual odification

58 III I: : II / III: recision unnery tstem () ods recision unnery ystem III III ate ebruary 2000 he introduction of the 3 requires a modification kit for to interface to the digital architecture. total of 256 mod kits are required for the ctive rmy. / I: reliminary esign eview ritical esign eview ontractor est & valuation Initial perational est and valuation I roduction ecision vailable Installation chedule: r r otals Inputs utputs o otals omplete Inputs 128 utputs 128 H II: ontractor III I: 11 onths I I: 12 onths ontract ates: 1999 ug ec elivery ate: 1999 ug ul Item o. 6 age 5 of 14 xhibit -3a Individual odification

59 III III ate ebruary 2000 III I (ont): recision unnery tstem () ods II : ($ in illions) 1998 and rior Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ & Kit Quantity Installation Kits Installation Kits, onrecurring quipment quipment, onrecurring ngineering hange rders ata raining quipment upport quipment ther Interim ontractor upport : pplication costs are included in procurement unit cost Installation of Hardware 1998 & rior qpt -- Kits 1999 qpt -- Kits 2000 qpt -- Kits 2001 qpt -- Kits 2002 qpt -- kits 2003 qpt -- kits 2004 qpt -- kits 2005 qpt -- kits quip-kits otal Installment otal rocurement ost Item o. 6 age 6 of 14 xhibit -3a Individual odification

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO II xhibit -40, udget ine Item ustification: 2017 rmy : ebruary 2016 ppropriation / udget ctivity / udget ub ctivity: 2035: ther rocurement, rmy / 01: actical and upport ehicles / 10: actical ehicles -1

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO. Total Obligation Authority

UNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO. Total Obligation Authority xhibit -40, udget ine Item ustification: 2016 avy ate: ebruary 2015 1109: rocurement, arine orps / 05: upport ehicles / 2: actical ehicles I ode (=ervice eady, =ot ervice eady) : rogram lements for ode

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 14 P-1 Line #3

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 14 P-1 Line #3 II xhibit -40, udget ine Item ustification: 2015 rmy ate: arch 2014 ppropriation / udget ctivity / udget ub ctivity: 2034: rocurement of mmunition, rmy / 01: mmunition / 30: mall/ edium al mmunition -1

More information

Department of Defense Fiscal Year (FY) 2018 Budget Estimates

Department of Defense Fiscal Year (FY) 2018 Budget Estimates II epartment of efense iscal ear () 2018 udget stimates ay 2017 avy ustification ook olume 1 of 1 Weapons rocurement, avy II he estimated cost for this report for the epartment of avy () is $31,566. he

More information

Department of Defense Fiscal Year (FY) 2019 Budget Estimates

Department of Defense Fiscal Year (FY) 2019 Budget Estimates II epartment of efense iscal ear () 2019 udget stimates ebruary 2018 ir orce ustification ook olume 1 of 1 issile rocurement, ir orce II II HI II K II II ir orce udget stimates 2019 rocurement olume 1

More information

There are no restrictions on the reproduction of this pamphlet in whole or part. Recommendations for improvements or corrections should be sent to:

There are no restrictions on the reproduction of this pamphlet in whole or part. Recommendations for improvements or corrections should be sent to: here are no restrictions on the reproduction of this pamphlet in whole or part. ecommendations for improvements or corrections should be sent to: efense ecurity ervice ecurity ducation, raining and wareness

More information

CE100 Introduction to Civil Engineering Transportation Engineering B D Lecture 6 D E R Quiz Tuesday April 8th 2003

CE100 Introduction to Civil Engineering Transportation Engineering B D Lecture 6 D E R Quiz Tuesday April 8th 2003 Introduction to ivil ngineering ransportation ngineering ecture 6 lectrical ngineering he volution of ransportation ngineering Mechanical ngineering hemical ngineering MIIY NGINING eronautical ngineering

More information

DEPARTMENT OF THE NAVY NAVAL AIR SYSTEMS COMMAND RADM WILLIAM A. MOFFEIT BUILDING BUSE ROAD, BLDG 2272 PATUXENT RIVER, MARYLAND,

DEPARTMENT OF THE NAVY NAVAL AIR SYSTEMS COMMAND RADM WILLIAM A. MOFFEIT BUILDING BUSE ROAD, BLDG 2272 PATUXENT RIVER, MARYLAND, - DEPARTMENT OF THE NAVY NAVAL AIR SYSTEMS COMMAND RADM WILLIAM A. MOFFEIT BUILDING 47123 BUSE ROAD, BLDG 2272 PATUXENT RIVER, MARYLAND, 20670-1547 NAVAIRINST 4790.20C AIR-6.0 NA VAIR INSTRUCTION 4790.20C

More information

ARTIFICIAL TURF FIELD Haddonfield High School

ARTIFICIAL TURF FIELD Haddonfield High School IFIIL F FILD addonfield igh School SB 2012 resented By rtificial urf vs. Natural rass thletic Fields rtificial urf Development addonfield thletic Demand sage aintenance ost nalysis rtificial urf Warranty

More information

MOTOMAN-MH, HP, and UP Series

MOTOMAN-MH, HP, and UP Series Multi-Purpose obot MOOMN-MH, HP, and P eries 3 55 333 www.ragroup.com.au ertified for IO9 and IO4 QM ccreditation 9 JQ-83 JQ-EM94 otal olutions to chieve hort Processing he Highest Potential in the World!

More information

Current and Projected Enrollments and Occupancies

Current and Projected Enrollments and Occupancies urrent and Projected nrollments and ccupancies able 1 (nrollment) tate ated apacity () 2017 (fficial 2018 2019 2020 2021 2022 2023 202 2025 2026 2027 rowth 2017-2022 rowth 2017-2027 nofficial tudent ata

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete Total Total Program Element

More information

Roadway Departure Focus State Initiative Roadside Safety Systems Inspection, Maintenance & Designers Mentoring Program

Roadway Departure Focus State Initiative Roadside Safety Systems Inspection, Maintenance & Designers Mentoring Program Roadway Departure Focus State Initiative Roadside Safety Systems Inspection, Maintenance & Designers Mentoring Program Why worry about the roadside? 18,586 deaths per year in the USA Annual U.S. Fatalities

More information

Road Data Input System using Digital Map in Roadtraffic

Road Data Input System using Digital Map in Roadtraffic Data Input System using Digital Map in traffic Simulation Namekawa,M 1., N.Aoyagi 2, Y.Ueda 2 and A.Satoh 2 1 College of Management and Economics, Kaetsu University, Tokyo, JAPAN 2 Faculty of Engineering,

More information

Advancements in Personnel Incapacitation Methodologies for Multiple Cartridge Projectiles (MPCs)

Advancements in Personnel Incapacitation Methodologies for Multiple Cartridge Projectiles (MPCs) U.S. Army Research, Development and Engineering Command Advancements in Personnel Incapacitation Methodologies for Multiple Cartridge Projectiles (MPCs) NDIA Joint Armaments: Conference, Exhibition, and

More information

Summary Report for Individual Task M-1650 Operate Vehicle Using Drivers Vision Enhancer Status: Approved

Summary Report for Individual Task M-1650 Operate Vehicle Using Drivers Vision Enhancer Status: Approved Report Date: 05 Dec 2014 Summary Report for Individual Task 551-88M-1650 Operate Vehicle Using Drivers Vision Enhancer Status: Approved Distribution Restriction: Approved for public release; distribution

More information

EWC EARLY WARNING CONTROL OPERATIONAL PRESENTATION. Charles Dickens (757)

EWC EARLY WARNING CONTROL OPERATIONAL PRESENTATION. Charles Dickens (757) EARLY WARNING CONTROL OPERATIONAL PRESENTATION Charles Dickens (757) 831-2626 Controls still continue to use the foundations of technologies that were developed in the 1970 s. Because of the perceived

More information

THE CANDU 9 DISTRffiUTED CONTROL SYSTEM DESIGN PROCESS

THE CANDU 9 DISTRffiUTED CONTROL SYSTEM DESIGN PROCESS THE CANDU 9 DISTRffiUTED CONTROL SYSTEM DESIGN PROCESS J.E. HARBER, M.K. KATTAN Atomic Energy of Canada Limited 2251 Speakman Drive, Mississauga, Ont., L5K 1B2 CA9900006 and M.J. MACBETH Institute for

More information

American made since 1954

American made since 1954 Hampden Engineering Corporation LOOK TO HAMPDEN FOR YOUR TRAINING NEEDS! Hampden s selection of Instrumentation and Process Control Training equipment is far larger than we are able to show you in this

More information

INNOVATIVE MOORING SYSTEMS

INNOVATIVE MOORING SYSTEMS INNOVATIVE MOORING SYSTEMS VESSEL AUTOMOORING MODULES QUAY AUTOMOORING INSTALLATIONS DOCKLOCK brings mooring to a next level PAGE 2 FOR OVER A CENTURY THE WORLD S LEADING EXPERT IN MOORING, BERTHING AND

More information

2600T Series Electronic Transmitters Models 264_268HS/NS 264GS/AS, 264HF/NF

2600T Series Electronic Transmitters Models 264_268HS/NS 264GS/AS, 264HF/NF pares ist 600 eries lectronic ransmitters odels 6_6/ 6/, 6/ his spare list publication applies for transmitters manufactured from november 00, using the new housing and covers. Instruments with this new

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 6 R-1 Line #72

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 6 R-1 Line #72 COST ($ in Millions) Prior Years FY 2013 FY 2014 Base OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Air Force Page 1 of 6 R-1 Line #72 Cost To Complete Total Program Element - 5.832 7.273 8.854-8.854 8.242

More information

MK 48 ADCAP TORPEDO UPGRADES

MK 48 ADCAP TORPEDO UPGRADES MK 48 ADCAP TORPEDO UPGRADES Navy ACAT III Program Prime Contractor Total Number of Systems: MK 48 Mod 5: 1,087 MK 48 Mod 6: 403 Northrop Grumman & Raytheon Electronic Systems Total Program Cost (TY$):

More information

56th Annual Fuze Conference Conference & Exhibition Event #2560 May 14-16, 2012 Baltimore, Maryland

56th Annual Fuze Conference Conference & Exhibition Event #2560 May 14-16, 2012 Baltimore, Maryland 56th Annual Fuze Conference Conference & Exhibition Event #2560 May 14-16, 2012 Baltimore, Maryland Next Generation Fuzing for Next Generation Weapons Medium Caliber Ammunition Scalable Airburst Fuze Presented

More information

AIRCREW TRAINING SYSTEMS PROVIDING AEROSPACE SINCE 1969 TRAINING SOLUTIONS. Acceleration PHYSIOLOGY DISORIENTATION PHYSIOLOGY TRAINING CENTERS

AIRCREW TRAINING SYSTEMS PROVIDING AEROSPACE SINCE 1969 TRAINING SOLUTIONS. Acceleration PHYSIOLOGY DISORIENTATION PHYSIOLOGY TRAINING CENTERS AIRCREW TRAINING SYSTEMS PROVIDING AEROSPACE TRAINING SOLUTIONS SINCE 1969 Acceleration PHYSIOLOGY TACTICAL FLIGHT SPATIAL DISORIENTATION ALTITUDE PHYSIOLOGY NIGHT VISION AND SURVIVAL TRAINING PILOT SELECTION

More information

General Information. Related Documents Have the Operator Manual at hand for drill movements M Operator, CTA4000HD. Notations and Conventions

General Information. Related Documents Have the Operator Manual at hand for drill movements M Operator, CTA4000HD. Notations and Conventions Great Plains Mfg., Inc. Installation Instructions 1 Opener Stop pdate CTA4000H Air rill Implements sed with: CTA4000H-5010 CTA4000H-6575 CTA4000H-8006 General Information These instructions explain how

More information

The HumiSys. RH Generator. Operation. Applications. Designed, built, and supported by InstruQuest Inc.

The HumiSys. RH Generator. Operation. Applications. Designed, built, and supported by InstruQuest Inc. The HumiSys RH Generator Designed, built, and supported by InstruQuest Inc. Versatile Relative Humidity Generation and Multi-Sensor System The new HumiSys with single or dual RH probes capabilities is

More information

Retrofitting kit New Emax Direct Replacement of Megamax and Novomax

Retrofitting kit New Emax Direct Replacement of Megamax and Novomax New Emax Direct of Megamax and Novomax With just very few modifications and sustainable costs, Retrofitting kits are the perfect solution for improving low voltage switchgear. The direct replacement retrofitting

More information

SUSTAINABLE COMMUTING MADE EASY

SUSTAINABLE COMMUTING MADE EASY UIBL CUI CLICK U CI F IC P BL XPL U CU PI! or a ur hm o Hill nd ic jax Vaughan oronto rin Brampton L uelph/ ramosa Halton Hills Lakeshore Campus ississauga City Boundaries uelph Lake ntario ilton akville

More information

Personal Flotation Device (PFD) JAPBI Industry Day

Personal Flotation Device (PFD) JAPBI Industry Day Project Manager Soldier Protection and Individual Equipment Our Strength and Purpose Product Manager Soldier Clothing and Individual Equipment (PM SCIE) LTC Jonathan Allen PdM SCIE Personal Flotation Device

More information

POLYSWITCH RESETTABLE DEVICES Surface-Mount Devices

POLYSWITCH RESETTABLE DEVICES Surface-Mount Devices POLYSWITH RSTTL VIS PolySwitch surface-mount devices are an effective circuit protection method for computer, consumer, multimedia, portable and automotive electronics applications. In an affort to reduce

More information

TIDEWATER GOVERNMENT INDUSTRY COUNCIL

TIDEWATER GOVERNMENT INDUSTRY COUNCIL TIDEWATER COUNCIL Communications During Acquisition Planning to Better Support the Requirement and the Mission How Communication Among the Full Acquisition Team Including Industry Can Result in Clear,

More information

City of Camas Six Year Street Priorities

City of Camas Six Year Street Priorities ity of amas 2018 2023 ix Year treet riorities 37 35 31 11 10 40 16 38 36 19 39 1 N Brady Rd 2 N Larkspur t 3 ity ide ransportation apital Facilities lan 3 4 Lake Rd. & Everett t. Intersection s 5 ADA Access

More information

Training Fees 3,400 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch.

Training Fees 3,400 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch. Training Title DISTRIBUTED CONTROL SYSTEMS (DCS) 5 days Training Venue and Dates DISTRIBUTED CONTROL SYSTEMS (DCS) Trainings will be conducted in any of the 5 star hotels. 5 22-26 Oct. 2017 $3400 Dubai,

More information

Progress with the Road Investment Strategy

Progress with the Road Investment Strategy Report by the Comptroller and Auditor General Department for Transport and Highways England Progress with the Road Investment Strategy HC 1056 SESSION 2016-17 22 MARCH 2017 4 Key facts Progress with the

More information

MIL-STD-883G METHOD

MIL-STD-883G METHOD STEADY-STATE LIFE 1. PURPOSE. The steady-state life test is performed for the purpose of demonstrating the quality or reliability of devices subjected to the specified conditions over an extended time

More information

Attachment A: Columbus Area Metropolitan Transportation Plan Objectives, Performance Measures, and Targets

Attachment A: Columbus Area Metropolitan Transportation Plan Objectives, Performance Measures, and Targets OBJECTIVE: Reduce the percentage of commuters driving alone, and increase the percentage of commuters riding transit, ing Reducing single occupancy auto commutes and increasing commuters using alternative

More information

Scope of Work for Traffic Signal and Interconnect Design Services for Santa Rosa Road

Scope of Work for Traffic Signal and Interconnect Design Services for Santa Rosa Road Scope of Work for Traffic Signal and Interconnect Design Services for Santa Rosa Road Background As part of a broader study concerning safety issues on Santa Rosa Road, the firm of Katz Okitsu was requested

More information

STAND alone & p.c. VERSION

STAND alone & p.c. VERSION STAND alone & p.c. VERSION ECONOMY TRACK SYSTEMS 1/4 & 1/8 Mile Asphalt Track Dirt / Sand Track Mud Track Snowmobile Track R/C Car Track Custom Track Systems Timing to.001 Accuracy Time Slip Printer Optional

More information

PART TWO CAMOUFLAGE DURING TACTICAL OPERATIONS. Chapter 4 Camouflage Techniques FM 20-3

PART TWO CAMOUFLAGE DURING TACTICAL OPERATIONS. Chapter 4 Camouflage Techniques FM 20-3 PART TWO CAMOUFLAGE DURING TACTICAL OPERATIONS Chapter 4 Camouflage Techniques Camouflage is an integral part of tactical operations. It is integrated into METT-T analyses at all echelons through terrain

More information

Ingersoll Rand. X-Series System Automation

Ingersoll Rand. X-Series System Automation Ingersoll Rand -Series System Automation Energy Savings on Demand! Ingersoll Rand As much as 20% to 60% of the energy used to operate compressed air systems is wasted. This is primarily due to operating

More information

Exam timetable May/June 2018

Exam timetable May/June 2018 x timetable ay/june 2018, Q ertificates,,, Q, rojects and Technical wards elect your qualification Week view Timetable notes eneral notes 1. and pplied (ouble ward) exs are timetabled in common ex slots

More information

RFMSS SCHEDULING SUPPORT ITEMS

RFMSS SCHEDULING SUPPORT ITEMS RFMSS SCHEDULING SUPPORT ITEMS The information included in this instruction pack will aid unit schedulers in scheduling SUPPORT ITEMS in RFMSS. Numerous sections aboard MCB Quantico are involved in the

More information

Exhibit R-2, RDT&E Budget Item Justification February 2008

Exhibit R-2, RDT&E Budget Item Justification February 2008 PE NUMBER: 6476F PE TITLE: Life Support Systems Exhibit R-2, RDT&E Budget Item Justification February 28 5 System Development and Demonstration (SDD) 6476F Life Support Systems ($ in Millions) 412A Total

More information

Distributed Control Systems

Distributed Control Systems Unit 41: Unit code Distributed Control Systems M/615/1509 Unit level 5 Credit value 15 Introduction With increased complexity and greater emphasis on cost control and environmental issues, the efficient

More information

Helicopter Safety Recommendation Summary for Small Operators

Helicopter Safety Recommendation Summary for Small Operators Helicopter Safety Recommendation Summary for Small Operators Prepared by the International Helicopter Safety Team September 2009 Introduction This document is intended to provide a summary of the initial

More information

IMI Systems innovative weapon solutions empower ground forces across the contemporary battlefield

IMI Systems innovative weapon solutions empower ground forces across the contemporary battlefield IMI Systems innovative weapon solutions empower ground forces across the contemporary battlefield "Artillery is the king of battle declared Napoleon, the first general in the world to use mass artillery

More information

House Rules for Nuts! Final Version Version 1.3 by Jeff Glasco

House Rules for Nuts! Final Version Version 1.3 by Jeff Glasco 1. The basic game uses a 3' x 3' table. This is fine for very dense combat, like in a major urban campaign, but is too small for a larger attack, like a platoon attack. A platoon attack would be on an

More information

Electro-hydraulic Proportional Flow and Direction Control Valve

Electro-hydraulic Proportional Flow and Direction Control Valve lectro-hydraulic control valve his valve uses a D solenoid in a traditional 4- way solenoid valve to create a solenoid valve capable of both direction switching and highspeed control. he lineup consists

More information

M E M B E R S H I P P L A N

M E M B E R S H I P P L A N MEMBERSHIP PLAN C AREFULLY R EVIEW A LL M EMBERSHIP D OCUMENTS Every person who desires to obtain a membership ( Membership ) in the RiverTowne Country Club ( Club ), or owns or purchases a Lot within

More information

HEADQUARTERS FM DEPARTMENT OF THE ARMY GRENADES AND PYROTECHNIC SIGNALS

HEADQUARTERS FM DEPARTMENT OF THE ARMY GRENADES AND PYROTECHNIC SIGNALS HEADQUARTERS FM 23-30 DEPARTMENT OF THE ARMY GRENADES AND PYROTECHNIC SIGNALS DISTRIBUTION RESTRICTION: Approved for public release; distribution is unlimited. *FM 3-23-30 (23-30) FIELD MANUAL NO. 3-23.30

More information

Exam timetable May/June 2018

Exam timetable May/June 2018 x timetable ay/june 2018, Q ertificates,,, Q, rojects and Technical wards elect your qualification Week view Timetable notes eneral notes 1. and pplied (ouble ward) exs are timetabled in common ex slots

More information

6 th Meeting of the Scientific Committee Puerto Varas, Chile, 9-14 September 2018

6 th Meeting of the Scientific Committee Puerto Varas, Chile, 9-14 September 2018 6 th Meeting of the Scientific Committee Puerto Varas, Chile, 9-14 September 218 SC6-Doc23_rev1 China s Annual Report, part I (Jack mackerel) Gang Li, Xiaorong Zou & Luoliang Xu Annual Report of China

More information

Mike Lambert, AICP Director, Mid-Atlantic Transit and Rail

Mike Lambert, AICP Director, Mid-Atlantic Transit and Rail Bus Priority Treatment Guidelines Mike Lambert, AICP Director, Mid-Atlantic Transit and Rail mlambert@vhb.com 1 2 Toda ay s Brief fing 3 Ackno owled dgem ments 4 S tudy Bac ckgro ound Guidelines Detailed

More information

CAMPUS MASTER PLAN UPDATE

CAMPUS MASTER PLAN UPDATE FLORIDA INTERNATIONAL UNIVERSITY CAMPUS MASTER PLAN UPDATE 2010-2020 Work Session #2 FOCUS GROUP 6 2 Group 6 Transportation Typical items to be discussed at each Focus Group Provide overview of Campus

More information

A high flying simplicity DUAL SOFT BAG INJECTION SYSTEM

A high flying simplicity DUAL SOFT BAG INJECTION SYSTEM A high flying simplicity DUAL SOFT BAG INJECTION SYSTEM THE INNOVATIVE SOLUTION for contrast media and saline injection in CT medical imaging Designed for MULTI-USE Dual soft bag injector for MONO & BI-LIQUID

More information

Upgrading Vestas V47-660kW

Upgrading Vestas V47-660kW Guaranteed performance gains and efficiency improvements Upgrading Vestas V47-660kW Newly developed controller system enables increased Annual Energy Production up to 6.1% and safe turbine lifetime extension

More information

GUIDE TO RUNNING A BIKE SHARE. h o w t o p l a n a n d o p e r a t e a s u c c e s s f u l b i k e s h a r e p r o g r a m

GUIDE TO RUNNING A BIKE SHARE. h o w t o p l a n a n d o p e r a t e a s u c c e s s f u l b i k e s h a r e p r o g r a m GUIDE TO RUNNING A BIKE SHARE h o w t o p l a n a n d o p e r a t e a s u c c e s s f u l b i k e s h a r e p r o g r a m 20150209 The bicycle is the most loved form of transportation. No other machine

More information

ROV Development ROV Function. ROV Crew Navigation IRATECH SUB SYSTEMS 2010

ROV Development ROV Function. ROV Crew Navigation IRATECH SUB SYSTEMS 2010 IR AT EC H SU B SY ST EM S 20 10 Remotely Operated Vehicle ROV INTRODUCTORY 2008 2008 1 KEY POINTS ROV Introductory ROV Development ROV Function Types of ROV ROV Crew Navigation ROV Components 2 ROV Development

More information

HAMILTON-T1 Intelligent transport ventilation for armed forces

HAMILTON-T1 Intelligent transport ventilation for armed forces HAMILTON-T1 HAMILTON-T1 Intelligent transport ventilation for armed forces The HAMILTON-T1 combines for the first time the functionality of a fully featured intensive care unit ventilator with the compactness

More information

CITY OF VANCOUVER ADMINISTRATIVE REPORT

CITY OF VANCOUVER ADMINISTRATIVE REPORT A5 CITY OF VANCOUVER ADMINISTRATIVE REPORT Report Date: July 03, 2008 Author: Daniel Hilton Phone No.: 604.665.6082 RTS No.: 07407 VanRIMS No.: 08-2000-20 Meeting Date: July 22, 2008 TO: FROM: SUBJECT:

More information

Chapter II Existing Conditions

Chapter II Existing Conditions hapter xisting onditions his chapter provides a general description of the study corridor, an overview of historic considerations, and traffic related data including volumes, levels of service, crash history,

More information

180 Series Rotary Shear Directional Control Valve

180 Series Rotary Shear Directional Control Valve 180 Series Rotary Shear Directional Control Valve Up to l 38 lpm, 10 US gpm l 700 bar, 10,000 psi Milwaukee, WI 53235, US el: +1 (414) 769-6400 sales-us@webtec.com St. Ives, Cambs. E27 3LZ, UK el: +44

More information

The 11 th International Scientific Conference elearning and Software for Education Bucharest, April 23-24, 2015

The 11 th International Scientific Conference elearning and Software for Education Bucharest, April 23-24, 2015 The 11 th International Scientific Conference elearning and Software for Education Bucharest, April 23-24, 2015 10.12753/2066-026X-14-067 SIMULATION TECHNIQUES FOR TRAINING AND COACHING OF NAVY OFFICERS

More information

Connect with Confidence NO POWER NO PROBLEM

Connect with Confidence NO POWER NO PROBLEM Connect with Confidence NO POWER NO PROBLEM The ideal solution to implement wireless sensor monitoring in IoT applications where power is not available. At last, there s a roll-out ready way to implement

More information

Addendum #1 to the Alternatives Analysis:

Addendum #1 to the Alternatives Analysis: ddendum #1 to the lternatives nalysis: ontents 1. Introduction... 2 2. Scope... 2 3. etermination of Intersection and Roadway Volumes... 4 4. VISSIM Model evelopment... 5 5. 6. 4.1. IndyGo Operational

More information

Passing Lane Effectiveness on Tw o-lane Roads

Passing Lane Effectiveness on Tw o-lane Roads Passing Lane Effectiveness on Tw o-lane Roads D o u g l a s W. H a r w o o d M idw est R esearch Institute K ansas City, M issouri IN T R O D U C T IO N A passing lane is an added lane provided in one

More information

DT-12 HEAVY BLASTER PISTOL. A short barreled heavy blaster favored by some non-humans due to its wide trigger guard. Cost: 950 Credits. Rarity: 6.

DT-12 HEAVY BLASTER PISTOL. A short barreled heavy blaster favored by some non-humans due to its wide trigger guard. Cost: 950 Credits. Rarity: 6. WEAPONS Engaged Short Medium Long Extreme Ranges Encumbrance DH-17 BLASTER PISTOL Damage Critical Rating Art and game stats are Lucasfilm or Fantasy Flight Games property - except for the fancreated crappy

More information

Engineer Proponent Approved High Physical Demand Task Guidebook 06 November 2017

Engineer Proponent Approved High Physical Demand Task Guidebook 06 November 2017 United States Army Engineer School High Physical Demand Tasks Guidebook Engineer Proponent Approved High Physical Demand Task Guidebook 06 November 2017 HIGH PHYSICAL DEMAND TASKS BOARD AGENDA TRAINING

More information

Medium Support Helicopter Aircrew Training Facility (MSHATF)

Medium Support Helicopter Aircrew Training Facility (MSHATF) Medium Support Helicopter Aircrew Training Facility (MSHATF) Introduction to CAE s MSHATF The Medium Support Helicopter Aircrew Training Facility (MSHATF) was developed by CAE in partnership with the UK

More information

Typical Wayside Reader System Quotation

Typical Wayside Reader System Quotation Typical Wayside Reader System Quotation Please note that components can be added or deleted to the quotation to meet the customer s individual requirements. This is in response to your request for a quotation

More information

AGW SYSTEMS. Blue Clock W38X

AGW SYSTEMS. Blue Clock W38X AGW SYSTEMS Blue Clock W38X Contents table BLUECLOCKS...3 THE EVOLUTION...4 WHAT S NEW!...5 HARDWARE...6 SOFTWARE...7 MULTI COMPANY...8 INSTANTLY...9 EVEN MORE!...10 WHAT S INSIDE HOW DOES IT WORK...11...12

More information

X-FACTOR THINKING CHANGING THE WAY YOU THINK ABOUT DR A SINGLE DETECTOR. A FAMILY OF SOLUTIONS. DRX Family of Products

X-FACTOR THINKING CHANGING THE WAY YOU THINK ABOUT DR A SINGLE DETECTOR. A FAMILY OF SOLUTIONS. DRX Family of Products DRX Family of Products A SINGLE DETECTOR. A FAMILY OF SOLUTIONS. The imaging solutions in the DRX Family are all designed around the remarkable X-Factor wireless detector platform. This allows the same

More information

North Wenatchee Transportation Master Plan

North Wenatchee Transportation Master Plan North Wenatchee Transportation Master Plan xpanding Regional Mobility nhancing Community Connections Improving Business Access QR Code As Adopted February 2011 What is the North Wenatchee Transportation

More information

ME 8843-Advanced Mechatronics. Project Proposal-Automatic Bike Transmission

ME 8843-Advanced Mechatronics. Project Proposal-Automatic Bike Transmission ME 8843-Advanced Mechatronics Project Proposal-Automatic Bike Transmission 1/21/09 Razid Ahmad Brandon Borm Todd Sifleet Project Proposal: Our goal for the semester long project is to create and automatic

More information

Char Renault D2 Tier III Medium Tank

Char Renault D2 Tier III Medium Tank Char Renault D2 Tier III Medium Tank Overview: The D2 is a Tier III medium tank. It starts off with a gun with poor penetration so it would be best to pick another gun. Like its predecessor, the D2 has

More information

SAFE WORK METHOD STATEMENT (Part 1)

SAFE WORK METHOD STATEMENT (Part 1) AFE WO ETHOD TATEENT (Part 1) Work Activity ocation of Work Activity Personnel qualifications & experience required Engineering details / certificates / WorkCover approvals required egislation, Codes of

More information

TE Connectivity DEUTSCH AFD Series MIL-DTL Series II Connectors

TE Connectivity DEUTSCH AFD Series MIL-DTL Series II Connectors pplications eatures igh-performance military aircraft ommercial aircraft ommunications equipment rmored personnel carriers & tanks igh temperature industrial equipment igh-reliability onnectivity eries

More information

WARNING. I. About Your Trainer. II. Parts List. Notes: III. Assembly

WARNING. I. About Your Trainer. II. Parts List. Notes: III. Assembly Thank you for purchasing a Travel Trac trainer. The luid-mag orce Trainer provides the same speed, distance and ride time data available from a full-featured cycling computer, plus information on power

More information

PREDICTING THE ABILITY OF SURVIVAL AFTER DAMAGE IN TANKERS. José Poblet Martínez - SENER, (Spain) José Javier Díaz Yraola - SENER, (Spain)

PREDICTING THE ABILITY OF SURVIVAL AFTER DAMAGE IN TANKERS. José Poblet Martínez - SENER, (Spain) José Javier Díaz Yraola - SENER, (Spain) 8 th International Conference on 477 PREDICTING THE ABILITY OF SURVIVAL AFTER DAMAGE IN TANKERS Abstract José Poblet Martínez - SENER, (Spain) José Javier Díaz Yraola - SENER, (Spain) To meet the demand

More information

Crew Training for NSR Shipping

Crew Training for NSR Shipping Crew Training for NSR Shipping Standards for Training, Certification & Watchkeeping (STCW) IMO s STCW -- is the international set of rules regulating the overall education and training requirements for

More information

unsignalized signalized isolated coordinated Intersections roundabouts Highway Capacity Manual level of service control delay

unsignalized signalized isolated coordinated Intersections roundabouts Highway Capacity Manual level of service control delay Whether unsignalized or signalized, isolated or coordinated, you can use TransModeler to simulate intersections with greater detail and accuracy than any other microsimulation software. TransModeler allows

More information

Yokogawa Systems and PCI Training

Yokogawa Systems and PCI Training Yokogawa Systems and PCI Training 09 th December 2014 Nico Marneweck 082 883 2652 Kallie Bodenstein 083 226 2787 Marco Coccioni 072 409 5779-1 - Introduction Training customised for the South Africa Industrial

More information

Viking Xtreme Manual Valves Air Control Valves

Viking Xtreme Manual Valves Air Control Valves atalog 0697 Viking Xtreme anual Valves ir ontrol Valves The Viking Xtreme anual valve range is robust, versatile and combines high performance with compact installation dimensions. The valves rugged lever

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

2011 Annual Symposium " Leading Entrepreneurial and Innovative Projects Eugene Maltsev

2011 Annual Symposium  Leading Entrepreneurial and Innovative Projects Eugene Maltsev 2011 Annual Symposium " Leading Entrepreneurial and Innovative Projects Eugene Maltsev Startup company must deliver high quality product in a short time to penetrate market and survive: Limited capital

More information

Waveguide and Flange Data

Waveguide and Flange Data Waveguide and lange ata requency Range (hz) ritish W Waveguide esignation I R I WR Internal imensions (mm) lann Standard flange details Please see page 110-115 for outline dimensions lange esignation escription

More information

SERIES BA TRASH BASKETS

SERIES BA TRASH BASKETS SERIES BA TRASH BASKETS T AB L E O F C O N T E N T S V e n d o r D a t a Ap p l i c a t i o n a n d S p e c i f i c a t i o n Installation and Maintenance Instructions Limited Warranty 1 VENDOR DATA HALLIDAY

More information

Alvin Debrief Summary Seven Cruises for 91 dives. Southern California Juan de Fuca Costa Rica Guaymas Basin Galapagos

Alvin Debrief Summary Seven Cruises for 91 dives. Southern California Juan de Fuca Costa Rica Guaymas Basin Galapagos Seven Cruises for 91 dives Southern California Juan de Fuca Costa Rica Guaymas Basin Galapagos Overview All the PIs were very satisfied with their Alvin experience and felt that their scientific goals

More information

Please see the attached memo for additional project background and information.

Please see the attached memo for additional project background and information. Agenda Bill City Council tudy ession March 13, 018 UBJC: DA UBMID: March 07, 018 DPARMN: Issaquah Fall City Road - 4nd to Klahanie DR, Project Update Public Works NDD FROM COUNCIL: Action Direction Informational

More information

SODV - PAC REACTION PAPER SUBSEA VISUALIZATION SYSTEMS

SODV - PAC REACTION PAPER SUBSEA VISUALIZATION SYSTEMS SODV - PAC REACTION PAPER SUBSEA VISUALIZATION SYSTEMS Prepared by David Christie for PAC Past and Future The predominant and essential requirement of subsea visualization in support of drilling operations

More information

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report Preparedby: ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS Final Report Prepared for Maricopa County Department of Transportation Prepared by TABLE OF CONTENTS Page EXECUTIVE SUMMARY ES-1

More information

EasySas. The most advanced airlock electronics on the market. Recyclable product. Eco-design. Energy savings

EasySas. The most advanced airlock electronics on the market. Recyclable product. Eco-design. Energy savings EasySas The most advanced airlock electronics on the market Eco-design Energy savings Recyclable product ELECTRONIC AIRLOCK MANAGEMENT SkySas range UniSas range CompacSas range An electronic management

More information

series Insert for Threading

series Insert for Threading Great roductivity Improvement series for ing he high precision mold technology High quality, Long tool life and Cost efficient ipe ipe apered apered Metric New! 61 Unifide Whitworth arallel ipe ipe descriptions

More information

Rail Station Fact Sheet Southwestern Medical District/Parkland Station

Rail Station Fact Sheet Southwestern Medical District/Parkland Station ail tation Fact heet outhwestern edical istrict/parkland tation tation verview outhwestern edical istrict/parkland tation is near Parkland emorial Hospital and the edical istrict rive and Harry Hines Boulevard

More information

Resumes are not accepted in place of applications. Resumes may be submitted in addition to a completed application.

Resumes are not accepted in place of applications. Resumes may be submitted in addition to a completed application. Employment, Volunteer & uxiliary membership application for the Swannanoa Fire Department pplication Revision 04/01/2004 he Swannanoa Volunteer Fire Department & Rescue Squad nc. s an equal opportunity

More information

Trim and Stabilisation systems NEXT GENERATION IN BOAT CONTROL.

Trim and Stabilisation systems NEXT GENERATION IN BOAT CONTROL. Trim and Stabilisation systems NEXT GENERATION IN BOAT CONTROL www.humphree.com WHEN EFFICIENCY AND PERFORMANCE REALLY MATTERS! Humphree proudly presents the new HCS-5 The HCS-5 combines exceptional mechanical

More information

Wärtsilä ELAC VE 5900

Wärtsilä ELAC VE 5900 Wärtsilä ELAC VE 5900 Naval echo sounder system for surface vessels The high-end naval echo sounder system Wärtsilä ELAC VE 5900 is especially designed to meet the requirements of modern surface combatant.

More information

PROJECT OVERVIEW. Auburn Station Access Improvements Project

PROJECT OVERVIEW. Auburn Station Access Improvements Project ROJECT OVERVIEW Auburn Station Access Improvements roject Average daily ridership on the south Sounder line has been growing rapidly over the past few years and is expected to increase approximately 70

More information

215 Liquid Handler Up-Grade Manual

215 Liquid Handler Up-Grade Manual BRUKER NMR 220 25 Liquid Handler Up-Grade Manual For Up-Grade to Run with XWINNMR Vers.. Manual # H977 The kit will include: H9770 BEST NMR Up-Grade Kit to No. Article Bruker # Comment 500mm Capillary

More information