City of Camas Six Year Street Priorities
|
|
- Cora Gaines
- 6 years ago
- Views:
Transcription
1 ity of amas ix Year treet riorities N Brady Rd 2 N Larkspur t 3 ity ide ransportation apital Facilities lan 3 4 Lake Rd. & Everett t. Intersection s 5 ADA Access Upgrades itywide 5 6 acific Rim Blvd & ayne Rd ignal 7 N Brady Road & 16th ignal 8 N 38th Ave (h 3) 9 N 23 rd Ave 10 NE oodwin Rd/28th t N oodwin Road ignal 12 N Leadbetter Dr hase 2 13 R 14 -est amas lough Bridge 14 Bybee Rd 15 N 6th Ave orridor Imp 16 NE 28th t & NE 23 Ave Intersection Imp. 17 N Lake Rd. 18 North hore East/est Arterial 19 NE 9th t 20 R 500 (Everett t/rd) 21 NE 3 rd Ave, ashougal River Bridge 22 N Astor t. 23 N 16th Ave/Hood/18th Ave 24 N 18th Ave 25 N 18th Ave/ayne Rd 26 NE 43rd Ave 27 N Astor t. /43rd Ave 28 N Brady Rd ed & Bike s 29 treet "B" (North Dwyer reek Area) 30 N ayne t. 31 treet "A" (North Dwyer reek Area) 32 N McIntosh Rd 33 NE oodburn Dr. 34 E 15th t./norse Rd 35 NE 18th t 36 NE 28th t 37 N amas Meadows Dr (est) 38 NE 23 Ave 39 NE 24 Ave 40 N Ingle Rd Extension ix Year treet lan Map D-2.1
2 ashington tate Department of ransportation Agency: ity of amas o. No.: 06 o. Name: lark o. ity No.: 0145 MO/RO: R ix Year ransportation rogram FROM: 2018 O: 2023 roject Identification roject osts in housands of Dollars A. in/roject No. B. I ID Fund ource Information Expenditure chedule rojects Only. roject itle hase tart tate Fund s tate Funds Local Funds otal Funds E. Begin & End ermini 3rd 4th thru 6th ype Required F. roject Description. tructure ID R 7/1/ N Brady Road N 7/1/2019 OHER N 16th to N 25th idening, bike lanes E YE Functional lass riority Number ype(s) tatus otal Length Utility s roject hase N Larkspur treet N Lake Rd. to 6200 Block idening, sidewalk itywide ransportation apital Facilities lan Includes Everett t. orridor Analysis otals N 6/1/2018 IB otals E 7/1/ NO E YE otals ALL 1/1/2019 OHER Lake Road & Everett 0 Intersection improvements YE ADA Access Upgrades otals ALL 1/1/ itywide NO (Ongoing) otals ALL 7/1/ N acific Rim E ayne Rd. raffic signal YE otals Report Date: 6/12/2017 age 1 of 10
3 Agency: ity of amas o. No.: 06 ity No.: 0145 o. Name: lark o. MO/RO: R FROM: 2018 O: 2023 roject Identification A. in/roject No. B. I ID roject osts in housands of Dollars Fund ource Information Expenditure chedule rojects Only. roject itle hase tart tate Fund s tate Funds Local Funds otal Funds E. Begin & End ermini 3rd 4th thru 6th ype Required F. roject Description. tructure ID ALL 1/1/ N Brady N 16th Ave. Functional lass riority Number ype(s) tatus otal Length Utility s roject hase NO raffic signal N 38th Avenue N arker to rass Valley ark idening, bike lanes otals ALL 1/1/2022 (U) E YE N 23rd Avenue Nw Astor to N ierra 17 9 idening, sidewalk otals ALL 1/1/ YE NE oodwin Road/28th treet N amas Meadows Dr. to NE 23 Ave. iden to 5 lanes with bike lanes west of Ingle iden to 3 lanes with bike lanes east of Ingle otals ALL 1/1/2023 (U) 6880 OHER E YE NE oodwin NE Ingle Rd raffic signal otals E 6/1/ N Leadbetter Drive N Lake Rd. to N Fremont t idewalk N 1/1/ otals NO Report Date: 6/12/2017 age 2 of 10
4 Agency: ity of amas o. No.: 06 ity No.: 0145 o. Name: lark o. MO/RO: R FROM: 2018 O: 2023 roject Identification A. in/roject No. B. I ID roject osts in housands of Dollars Fund ource Information Expenditure chedule rojects Only. roject itle hase tart tate Fund s tate Funds Local Funds otal Funds E. Begin & End ermini 3rd 4th thru 6th ype Required F. roject Description. tructure ID ALL 1/1/2023 DO R-14 est amas lough Bridge Functional lass riority Number ype(s) tatus otal Length Utility s roject hase iden to 4 lanes NO NOE: E phase began 1/2006 Bybee Road Realignment E 15th t. to E 20th t N/NE 6th Avenue orridor s N Norwood to NE arfield Access and multimodal upgrades otals ALL 1/1/ otals ALL 1/1/2020 OHER YE NO NE 28th treet & NE 23 Avenue otals ALL 6/1/ Intersection improvements NO Lake Road N Lacamas Lane to NE Everett idening, sidewalk otals ALL 6/1/ YE New North hore E/ Arterial NE 14th t. to Everett Rd. Includes ritical Areas and Alignment Investigation otals E 6/1/ otals Report Date: 6/12/2017 age 3 of 10
5 Agency: ity of amas o. No.: 06 ity No.: 0145 o. Name: lark o. MO/RO: R FROM: 2018 O: 2023 roject Identification A. in/roject No. B. I ID roject osts in housands of Dollars Fund ource Information Expenditure chedule rojects Only. roject itle hase tart tate Fund s tate Funds Local Funds otal Funds E. Begin & End ermini 3rd 4th thru 6th ype Required F. roject Description. tructure ID E 6/1/ NE 9th treet NE 23 Ave. to NE 24 Ave Includes ritical Areas and Alignment Investigation Functional lass riority Number ype(s) tatus otal Length Utility s roject hase R-500 (Everett t./rd.) N Lake Rd. to E 4th t iden with bike lanes, sidewalks, illumination otals E 6/1/ NE 3rd Avenue ashougal River Bridge ALL 1/1/2022 BR NO eismic rating, scour critical, and footing rehabilitation otals E 1/1/ N Astor treet/n 11th Avenue R 1/1/ N 16th Ave. to McIntosh Rd. N 6/1/ idening, bike lanes Includes path on Forest Home Road from Forest Home Lane to Astor treet otals R 1/1/ N 18th Avenue, et al N 6/1/ N Astor to N 16th, include N Hood iden curb, sidewalk YE YE N 18th Avenue N hitman t. to N Brady Rd with bike lanes otals E 1/1/ Report Date: 6/12/2017 age 4 of 10
6 Agency: ity of amas o. No.: 06 ity No.: 0145 o. Name: lark o. MO/RO: R FROM: 2018 O: 2023 roject Identification A. in/roject No. B. I ID roject osts in housands of Dollars Fund ource Information Expenditure chedule rojects Only. roject itle hase tart tate Fund s tate Funds Local Funds otal Funds E. Begin & End ermini 3rd 4th thru 6th ype Required F. roject Description. tructure ID E 1/1/ N 18th Avenue N hitman t. to est ity Limits idening, bike lanes Functional lass riority Number ype(s) NE 43rd Avenue R-500 East ity Limits iden to 3 lanes with bike lanes tatus otal Length Utility s roject hase ALL 1/1/ YE N 43rd/N Astor - N ierra to N 38th idening, bike lanes Brady Road McIntosh to est ity Limits Bike & edestrian s otals E 1/1/ E 1/1/ North Dwyer reek Master lan treet "B" N Friberg t./trunk to N Larkspur t N ayne treet N Lake Rd. to N amas Meadows Dr idening E 1/1/ E 1/1/ Report Date: 6/12/2017 age 5 of 10
7 Agency: ity of amas o. No.: 06 ity No.: 0145 o. Name: lark o. MO/RO: R FROM: 2018 O: 2023 roject Identification A. in/roject No. B. I ID roject osts in housands of Dollars Fund ource Information Expenditure chedule rojects Only. roject itle hase tart tate Fund s tate Funds Local Funds otal Funds E. Begin & End ermini 3rd 4th thru 6th ype Required F. roject Description. tructure ID E 1/1/ North Dwyer reek Master lan treet "A" N Lake Rd. to N amas Meadows Dr Functional lass riority Number ype(s) N McIntosh Road N Brady Rd. to N 11th Ave idening, bike lanes tatus otal Length Utility s roject hase E 1/1/ ALL 1/1/ NE oodburn Drive E 283rd Ave. to E 15th t YE Includes 23rd t. realignment otals E 1/1/ E 15th treet/nourse Road amas High chool NE 283rd Ave iden to 3 lanes with bike lanes E 1/1/ NE 18th treet NE 19 Ave. to NE oodwin Rd. (potential alternate alignment) NE 28th treet NE 23 Ave. to NE 24 Ave iden to 3 lanes with bike lanes E 1/1/ Report Date: 6/12/2017 age 6 of 10
8 Agency: ity of amas o. No.: 06 ity No.: 0145 o. Name: lark o. MO/RO: R FROM: 2018 O: 2023 roject Identification A. in/roject No. B. I ID roject osts in housands of Dollars Fund ource Information Expenditure chedule rojects Only. roject itle hase tart tate Fund s tate Funds Local Funds otal Funds E. Begin & End ermini 3rd 4th thru 6th ype Required F. roject Description. tructure ID E 1/1/ N amas Meadows Drive NE 13th t. to NE 18th t (potential alternate alignment) Functional lass riority Number ype(s) tatus otal Length Utility s roject hase NE 23 Avenue NE 28th to NE 9th t iden to 3 lanes with bike lanes E 6/1/ NE 24 Avenue NE 28th t. to NE 14th t. 39 iden to 3 lanes with bike lane E 6/1/ NE Ingle Road Extension oodwin to 23 Ave E 6/1/ N Maryland treet N 19th to N 24th NE Nevada treet NE 3rd to NE 6th Reconstruct ALL 6/1/ otals ALL 6/1/ NO NO otals Report Date: 6/12/2017 age 7 of 10
9 Agency: ity of amas o. No.: 06 ity No.: 0145 o. Name: lark o. MO/RO: R FROM: 2018 O: 2023 roject Identification A. in/roject No. B. I ID roject osts in housands of Dollars Fund ource Information Expenditure chedule rojects Only. roject itle hase tart tate Fund s tate Funds Local Funds otal Funds E. Begin & End ermini 3rd 4th thru 6th ype Required F. roject Description. tructure ID ALL 1/1/ N Lake N ierra t. Functional lass riority Number ype(s) tatus otal Length Utility s roject hase NO raffic signal NE oodwin N amas Meadows Drive otals ALL 1/1/ NO raffic signal N acific arker treet otals E 1/1/ raffic signal Leadbetter Road E 1/1/ Access ontrol New E/ Arterial E 6/1/ raffic signal NE 28th 24 Avenue E 6/1/ raffic signal Report Date: 6/12/2017 age 8 of 10
10 Agency: ity of amas o. No.: 06 ity No.: 0145 o. Name: lark o. MO/RO: R FROM: 2018 O: 2023 roject Identification A. in/roject No. B. I ID roject osts in housands of Dollars Fund ource Information Expenditure chedule rojects Only. roject itle hase tart tate Fund s tate Funds Local Funds otal Funds E. Begin & End ermini 3rd 4th thru 6th ype Required F. roject Description. tructure ID E 6/1/ NE 14th Ave. Functional lass riority Number ype(s) ontrolled Access tatus otal Length Utility s roject hase NE 23 Ingle Extension E 6/1/ Roundabout avement reatments (maintenance & preservation) N 6/1/ NO Overlays, surface treatments otals ALL 1/1/2018 DB Reconstructs itywide NO idewalk rojects otals N 1/1/2018 DB NO idewalk installations itywide urb Ramp rojects Future curb ramp installations 28 otals N 1/1/ NO otals Report Date: 6/12/2017 age 9 of 10
11 Agency: ity of amas o. No.: 06 ity No.: 0145 o. Name: lark o. MO/RO: R FROM: 2018 O: 2023 roject Identification A. in/roject No. B. I ID roject osts in housands of Dollars Fund ource Information Expenditure chedule rojects Only. roject itle hase tart tate Fund s tate Funds Local Funds otal Funds E. Begin & End ermini 3rd 4th thru 6th ype Required F. roject Description. tructure ID ALL 1/1/ hared ath s itywide NO Functional lass riority Number ype(s) tatus otal Length Utility s roject hase afety rojects otals ALL 1/1/ Future safety projects Includes traffic revisions, N Fargo urve afety Analysis NO otals N 1/1/ torm rate Replacements (Bike s) NO torm grate replacements for bike lane improvements otals N 1/1/ Future Bike Route s itywide Future bike route improvements NO otals N 1/1/ treet Lighting itywide treet Lighting NO otals Report Date: 6/12/2017 age 10 of 10
City of Camas Six Year Street Priorities
9 3 ity of amas 21 22 ix Year treet riorities 31 29 3 32 33 1 N 6th Ave & Norwood ignal 2 N Brady Rd 3 N amas Meadows Dr (East) 4 N Larkspur t N 38th Ave (h 3) 8 2 23 1 2 19 24 2 3 4 16 26 18 11 1 22 17
More informationProject Development & Environment (PD&E) Study JUNE 22, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1
Financial Management Number: 432639-6-22-01 Federal Aid Project Number: 0202-054-P Efficient Transportation Decision Making Number: 14230 Project Development & Environment (PD&E) tudy R 90 (W 8th treet
More informationUS 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)
US 20 Feasibility Study Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) Village Board Meeting Bartlett Village Hall February 16, 2016 1 Background 1991 IDOT Study Recommendations
More informationBrooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017
Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn
More informationUpcoming City of Bellevue Projects in Your Neighborhood
April 2010 Upcoming City of Bellevue rojects in Your Neighborhood In 2009, Bellevue s Transportation staff began working with a Traffic Committee comprised of resident volunteers to address traffic concerns
More informationCITY OF LANCASTER PROPOSED NEW PROJECTS
CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4
More informationPROJECT OVERVIEW. Auburn Station Access Improvements Project
ROJECT OVERVIEW Auburn Station Access Improvements roject Average daily ridership on the south Sounder line has been growing rapidly over the past few years and is expected to increase approximately 70
More informationCITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES
CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES PROJECT LOCATION MAP (1) DEYOUNG PARK IMPROVEMENTS Project Description - DeYoung Park Improvements include treehouse deck, play area, new
More informationODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.
ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,
More informationOperations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No
Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:
More informationBuilding Great Neighbourhoods BELLEVUE AND VIRGINIA PARK
Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting
More informationMPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017
MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017 RECOMMENDED ACTION: Update on the NDDOT US Business 2 Project Programmed for 2019 Matter of the NDDOT US Business
More informationCity of Gainesville Transportation/Roadway Needs PROJECT SUMMARY
A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St
More informationComplete Streets Funding Program Project Prioritization Plan
Funding Program Project Prioritization Plan Location and Type Needs South Street Crosswalk Installation Stripe a new formalized crosswalk across South Street at the Anne T. Dunphy School pedestrian path
More informationC Line Rapid Bus Preliminary Station Design
C Line Rapid Bus Preliminary Station Design C Terrence Anderson, Community Outreach Coordinator Shawn Walding, Senior Engineer Metro Transit TAAC February 1, 2016 1 C Line project overview Substantially
More informationBuilding Great Neighbourhoods BONNIE DOON
Building Great Neighbourhoods BONNIE DOON We Are Here Today To Explain the Neighbourhood Renewal Process Show you the Westwood Preliminary Design Ask for local knowledge Highlight the Local Improvement
More informationMunicipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018
Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Background Agenda Traffic Study Update Class EA Alternatives Bridge
More informationPlease see the attached memo for additional project background and information.
Agenda Bill City Council tudy ession March 13, 018 UBJC: DA UBMID: March 07, 018 DPARMN: Issaquah Fall City Road - 4nd to Klahanie DR, Project Update Public Works NDD FROM COUNCIL: Action Direction Informational
More informationFLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN TRANSIT SAFETY ASSESSMENT SR 55/US 19 AT 80 TH AVE N DRAFT JUNE
More informationStation 1: Street & Sidewalk Upgrades
Station 1: Street & Sidewalk Upgrades Existing no left turn; Potential left turn arrow, see Circulation Study boards for more information Thru-lane guidance Improved lead-in green bike lane 17TH ST CASTRO
More informationBasalt Creek Transportation Refinement Plan Recommendations
Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for
More informationRegional Context CORRIDOR STUDY
- Hwy 87 egional ontet his board shows the regional contet of the project study area. he roadway corridors are bisected by the major roads of ollege Drive, ast ershing Boulevard, Whitney oad, and hristensen
More informationBluffdale/ UDOT South High-T Intersection Project Type Operations
Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South
More informationU.S. HIGHWAY 50 IMPROVEMENT PROJECT
U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY
More informationNorth Avenue Corridor Study
North Avenue Corridor Study Advisory Committee Meeting #6 July 1, 2014 Agenda Concept Revisions based on Advisory Committee feedback Review of New Concept Scoring & Costs Concept Discussion/Questions Voting:
More informationComplete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis)
Mobility MassDOT Program Project Prioritization Plan (Revised 3/31/16) Municipality Winchendon 7/25/2017 Location Needs Request Schedule 1 Development of roundabout at the intersection of Front Street
More informationCalifornia Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016
California Department of Transportation, District 4 Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016 Agenda Welcome and introductions Project overview, history and
More informationSOUND TRANSIT AT A GLANCE
SOUND TRANSIT AT A GLANCE STATION ACCESS IMROVEMENTS ROJECT Sound Transit operates Sounder commuter trains, ST Express buses and Link light rail. The 2008 voter-approved Sound Transit 2 package included
More informationAnnual Listing of Obligated MPO Projects
Thurston Regional Planning Council Annual Listing of Obligated MPO Projects CY 2015 March, 2016 2424 Heritage Court SW, Suite A, Olympia, WA 98502 360.956.7575 www.trpc.org About TRPC, established in 1967,
More informationOTTAWA AVENUE NEIGHBORHOOD
OTTAWA AVENUE NEIGHBORHOOD 4.17.2018 RECAP September 19, 2016 Meeting Identify concerns * needs * wants of neighborhood residents Safety Improvements Ottawa Avenue, Ayersville Avenue, Cleveland Avenue,
More informationCITY OF ELKO BICYCLE AND PATHWAY PLAN
CITY OF ELKO BICYCLE AND PATHWAY PLAN INTRODUCTION: The City of Elko is intended to provide the basic framework for the development of a functional bicycle and pathway system for the community with connections
More informationAMERICANS WITH DISABILITIES ACT TRANSITION PLAN LEON COUNTY FOR CURB RAMPS AND SIDEWALKS DEPARTMENT OF PUBLIC WORKS. 1 P age
AMERICANS WITH DISABILITIES ACT TRANSITION PLAN FOR CURB RAMPS AND SIDEWALKS 2015 LEON COUNTY DEPARTMENT OF PUBLIC WORKS 1 P age INTRODUCTION The goal of the Americans with Disabilities Act (ADA) Transition
More informationSIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS
TOTAL LETTING DATE AWARD DATE NOTES Interstate Maintenance s 2.00 IM 0020(155) 04X N McCook Minnehaha 0.0 Mitchell Region on I90 Scour Protection $873,000 $960,000 Cancelled $0 $0 Minor Arterial 1.00 Minor
More informationCity of Redmond Transportation Improvement Program Adopted: September 16, 2014 Table of Contents
City of Redmond 2015-2012 Transportation Improvement Program Adopted: September 16, 2014 Table of Contents 1. What is the Six-Year Transportation Improvement Program (TIP)?... 1 2. What is included in
More informationSR 2108-A12 Forbes Avenue Betterment. March 1, 2018
SR 2108-A12 Forbes Avenue Betterment March 1, 2018 Introductions Project Team PENNDOT Cheryl Moon-Sirianni, PE; District Executive Jason Zang, P.E.; Acting Assistant District Executive-Construction John
More informationCORVALLIS AREA METROPOLITAN PLANNING ORGANIZATION
CORVALLIS AREA METROPOLITAN PLANNING ORGANIZATION 301 SW 4 th Street, Suite 240 Corvallis, Oregon 97333 Phone: 541-758-1911 Fax: 541-758-1903 www.corvallisareampo.org PROJECT ADVISORY COMMITTEE (PAC) Friday,
More informationSTATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)
Appendix P.1 STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013) The 2009 Pedestrian Master Plan establishes 21 core recommendations in three goal areas to improve pedestrian transportation in
More informationTraffic Signals at Bike Boulevards
Traffic Signals at Bike Boulevards A Review of Eight Locations in Seattle Presented at ITE Western District Annual Meeting July 13 th, 2016 Introduction What? Analysis of eight intersections before and
More informationRoadway Project Recommendations:
Northwest RTPO Regional Transportation Improvement Program Recommendations (RTIPR) for NMDOT District 6 (Cibola, McKinley) & District 5 (San Juan) 2018-2023 for 5 Year STIP (FY 2018 through FY 2023) way
More informationMajor Bike Routes 102 Avenue Workshop April 21, 2015
Major Bike Routes 102 Avenue Workshop April 21, 2015 Our Purpose Today Provide context on how Major Bike Routes fit into Edmonton s future Share information on what we heard in our last phase, and how
More informationBicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017
Bicycle and Pedestrian Chapter TPP Update Overview TAB September 20, 2017 Bicycling & Walking in the Twin Cities Where are we now? The Bike-Pedestrian system Current trends New developments Where are we
More informationSD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.
SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN 6926 By Josh Larson McLaury Engineering Inc. Project Limits SD 50 from Broadway to Burleigh and from Marne Creek to Archery
More informationAppendix 1. Public Participation
Appendix 1 Public Participation Norfolk Transportation Plan 2030 Short-, Mid-, and Long-Term Roadway Improvements (Preliminary Recommendations) Roadway Limits Scope of Improvements Estimated Cost (2006
More informationRail Station Fact Sheet Spring Valley Station
Rail tation Fact heet pring Valley tation tation Overview pring Valley tation is located near the intersection of West pring Valley Road and Lingco Drive in Richardson. he station opened in 2002 and is
More informationACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments
Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments Note: Definitions for each drop down menu appear as Comments (scroll over the column title or in the Review mode, choose
More informationACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments
Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments Note: Definitions for each drop down menu appear as Comments (scroll over the column title or in the Review mode, choose
More informationEnvironmental Assessment Findings & Recommendations. Public Hearing November 13, 2014
Environmental Assessment Findings & Recommendations Public Hearing November 13, 2014 Welcome! Welcome and Introductions Project and Environmental Assessment Overview Public Comments Adjourn Purpose of
More informationSecondary System Albemarle County Construction Program Estimated Allocations
econdary ystem Albemarle County Construction Program Estimated Allocations Fund FY29 FY21 FY211 FY212 FY213 FY214 econdary Unpaved Roads $642,951 $545,67 $596,222 $519,924 $44,932 $44,932 $3,186,28 TeleFee
More informationPublic Open House #2. THE CITY OF NORTH VANCOUVER CHESTERFIELD AVENUE CYCLING IMPROVEMENTS (4th - 13th STREET) JULY 2013
CHESTERFIELD AVENUE CYCLING IMPROVEMENTS (4th - 13th Street) Public Open House #2 1 Chesterfield Avenue provides an important north/south connection between Lonsdale Quay and West 23rd Street Purpose of
More informationFreeway ramp intersection study
Freeway ramp intersection study Supporting Vision Zero: Zero traffic deaths in San Francisco by 2024 Study Goals: Primary Improve Safety Improve Accessibility Secondary Provide Efficient Circulation Accommodate
More informationInformation on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps
Public information meeting #4 4 to 7 p.m., September 30, 2009 Hales Corners Welcome Thank you for attending this public information meeting for the WIS 100 Corridor Study. Your interest and comments are
More informationCLOSED. Highlights of the Final Concept Design:
The final Concept Design is the result of many months of listening, learning, creating, balancing, and understanding different needs and viewpoints, as well as incorporating technical requirements and
More informationMEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION
MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie
More informationSURVEY minutes to complete this questionnaire. Your feedback will help the City determine a future design for Ocean Avenue and Geneva Avenue. Thanks!
OCEAN AVENUE CORRIDOR DESIGN ROJECT WORSHO #4 Thank you for your interest in the Ocean Avenue Corridor Design project. lease take a few SURVEY minutes to complete this questionnaire. Your feedback will
More informationCity of Moorhead Committee of the Whole Meeting
City of Moorhead Committee of the Whole Meeting Corridor Study Limits Center Avenue (Red River to 8th Street) TH 10 (Red River to TH 336) TH 75 (20th Ave S to Main Avenue) 2 Study Need: Project Overview
More informationATTRIBUTABLE FUNDS COMMITTEE. Summary of Project Updates and New Funding Requests. September 5, 2018
ATTRIBUTABLE FUNDS COMMITTEE Summary of Project Updates and New Funding Requests September 5, 2018 Funding Management Process Review & Update Policies Adopt Funding Commitments Public Comment Public Comment
More informationFDOT Treasure Coast Traffic Report
July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationSR 2108-A12/SR 2308-A02 Forbes Avenue Betterment and SR 2108-A13 Forbes Avenue Corridor Improvements. July 17, 2017
SR 2108-A12/SR 2308-A02 Forbes Avenue Betterment and SR 2108-A13 Forbes Avenue Corridor Improvements July 17, 2017 Agenda Welcome Ralph Horgan, CMU Overview of Projects Feedback and Proposed Improvements
More informationBuilding Great Neighbourhoods QUEEN ALEXANDRA
Building Great Neighbourhoods QUEEN ALEXANDRA We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.
More informationColchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016
Colchester/Riverside/Barrett/ Mill Intersection Study PAC Meeting #3 September 22, 2016 Tonight s Agenda Review Project Purpose and Need Describe short term and long improvements and changes since public
More informationRail Station Fact Sheet Southwestern Medical District/Parkland Station
ail tation Fact heet outhwestern edical istrict/parkland tation tation verview outhwestern edical istrict/parkland tation is near Parkland emorial Hospital and the edical istrict rive and Harry Hines Boulevard
More informationAPRIL 1, 2015 APWA CONFERENCE. TIM HANSEN, PE Chief Operating Officer AHBL, Inc. Project Designer
DIANE WIATR Active Transportation Coordinator/Senior Planner City of Tacoma APRIL 1, 2015 APWA CONFERENCE TIM HANSEN, PE Chief Operating Officer AHBL, Inc. Project Designer MATT PAVOLKA Project Manager
More informationCity of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate
City of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate Project ID Project Category Project Name Qty/Len(Mi) Cost Estimate BB 1 Bike boulevard Jefferson Street or
More informationMnDOT. City of Zumbrota. Goodhue County
MnDOT City of Zumbrota Goodhue County Downtown Zumbrota about 1908 MHS Photograph Collection, Postcard ca. 1925 MHS Photograph Collection, Postcard ca. 1908 MN 58 Subarea Study Guides short- through long-term
More informationRebuilding Highway 7 Town Centre Boulevard to Sciberras Road
Rebuilding Highway 7 Town Centre Boulevard to Sciberras Road Project Status Update Presentation to City of Markham Development Services Committee October 22, 2013 Presentation Outline Background Status
More informationLake Waterford Community Association Meeting. November 15, 2016
Lake Waterford Community Association Meeting November 15, 2016 Introduction Staff Introduction Project Overviews - Completed Projects - Pavement Management Program - Pasadena Road Sidewalk Improvements
More informationCITY OF SPOKANE VALLEY Request for Council Action
CITY OF SPOKANE VALLEY Request for Council Action Meeting Date: December 16, 2014 Department Director Approval: Check all that apply: consent old business new business public hearing information admin.
More informationWELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary
WELCOME! Thank you for attending our open house. There will be no formal presentation today so please take the time to read the boards. If you have any questions, please do not hesitate to approach one
More informationMerrick and Memorial Neighborhood Study 5/14/2014 Public Meeting
Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting Study Area April 9 Public Meeting Comments Summary Pedestrian Safety - A Walking Neighborhood Pedestrian traffic is very difficult A need
More information122 Avenue: 107 Street to Fort Road
: 107 Street to Fort Road November 24, 2015 4:30 8:00 p.m. Meeting Purpose Summarize project work completed to date Share results of public input from Phase 1 Share the draft concept plan and proposed
More informationDerby Street. Project Updates. Salem, Massachusetts
Derby Street Project Updates Salem, Massachusetts September 13, 2017 Project Limits Derby Street Project Objectives 1. Improve complete streets elements on Derby Street 2. Improve sidewalks on finger streets
More informationDowntown Signals Traffic Analysis
Downtown Signals Traffic Analysis City of St. Mary s April 16, 2018 Presented by: Allan Heitbrink, P.E. & Craig Eley, P.E. Who We Are Craig Eley, P.E o o o Previously the ODOT D7 Traffic and Safety Engineer.
More informationState Route 160 (Blue Diamond Highway)
State Route 160 (Blue Diamond Highway) ~ Multi-Year Expansion Program ~ Highway Improvement Projects in Clark and Nye Counties EXHIBIT G Treasures Document consists of 16 slides. Entire exhibit provided.
More informationSR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016
SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility
More informationLegislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension
Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate
More informationWhat Is a Complete Street?
Session 5 Charleen Zimmer, AICP, Zan Associates May 5-7, 2010 What Is a Complete Street? May 2010 5-1 Not a Complete Street More of a Complete Street May 2010 5-2 Benefits of Complete Streets Safety for
More informationCLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey:
Old Strathcona s neighbourhood renewal process is now at the draft concept design phase. Over the last several months, the city has been gathering local knowledge and resident input that has been used
More informationI-290 Phase I Study Village of Forest Park November 9, of 25
I-290 Phase I Study Village of Forest Park November 9, 2015 1 of 25 I-290 Study Area Reconstruction Section (9 miles) Re-striping Section (4 miles) 13 miles West of Mannheim Road to Racine Avenue Connects
More informationCity of Richmond Bicycle Master Plan
City of Richmond Bicycle Master Plan October 2011 Prepared by Fehr & Peers In association with Eisen Letunic City of Richmond Bicycle Master Plan October 2011 Prepared by Fehr & Peers In association with
More informationThe Year Ahead: Virginia Department of Transportation Northern Virginia District
The Year Ahead: Virginia Department of Transportation Northern Virginia District Nicholas J. Roper, P.E. District Project Development Engineer Phone: (703)259-1953 Email: nicholas.roper@vdot.virginia.gov
More informationPresentation Outline. Project/Study Purpose. Existing Conditions. Future Conditions. Understanding the Streetside. Similar Walkable Environments
Presentation Outline Project/Study Purpose Study Area Map Existing Conditions Future Conditions Understanding the Streetside Similar Walkable Environments Conceptual Alternatives Magnolia/NE 1st Ave Block
More informationMay 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013
May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationChapter 4: Funding and Implementation
Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,
More informationFY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects
-2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo
More informationsection 4 Existing Conditions, Issues, and Options
section 4 Existing Conditions, Issues, and Options 4.0 Existing Conditions, Issues, and Options This section analyzes each segment of the corridor on a street to street basis. Each segment is discussed
More informationAccess Routes from US 101 to the Richmond San Rafael Bridge
Access Routes from US 101 to the Richmond San Rafael Bridge TAM Board Meeting January 28, 2016 RSRB Project Elements Eastbound Third Lane: Sir Francis Drake Blvd. to Marine Street 10 ft Barrier Separated
More informationCHIEF PEGUIS TRAIL EXTENSION WEST
1 PRELIMINARY DESIGN OF THE CHIEF PEGUIS TRAIL EXTENSION WEST Public Information Session June 6, 2017 Welcome 1 Thank you for attending today s public information session. The following boards provide
More informationCTH M Reconstruction
CTH M Reconstruction ID 5992 09 81 City of Madison, South Pleasant View Road (Cross Country Road Prairie Hill Road) CTH M Dane County Public Information Meeting Thursday, May 24, 2012 6 p.m. to 8 p.m.
More informationEl Dorado County / Tahoe Roadwork Schedule
Today s Date: Friday, August 3, 2012, #12-220 District: District 3 - Marysville, http://www.dot.ca.gov/dist3 Jody Jones, District Director Contact: Deanna Shoopman deanna_shoopman@dot.ca.gov 530. 741.4566
More informationR A M P U P! - City of Tacoma's Curb Ramp Installation Matrix
R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix DESCRIPTION OF WORK NEW CONSTR. ALTERATION MAINT. COMMENTS STREET PAVING New street paving or overlay through an intersection (Figures 1 &
More informationPine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session
Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session February 20, 2018 Meeting Agenda Study Overview Existing Conditions Access Management Potential Gateway Features
More informationADA TRANSITION PLAN FOR ACCESSIBILITY OF PEDESTRIAN FACILITIES WITHIN THE PUBLIC RIGHT-OF-WAYS FRANKLIN COUNTY, FLORIDA
ADA TRANSITION PLAN FOR ACCESSIBILITY OF PEDESTRIAN FACILITIES WITHIN THE PUBLIC RIGHT-OF-WAYS FRANKLIN COUNTY, FLORIDA APPROVED BY THE FRANKLIN COUNTY BOARD OF COUNTY COMMISSIONERS MAY 5, 2015 1 I. INVENTORY
More informationWELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015
WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015 Traffic Improvements Project Goals Widen roadway to construction two-way left turn lanes-greatly decreases congestion Ease access to & from
More informationTIP Amendment #4 - Proposed PAG TIP PROJECTS. A Add project and funding to match ADOT 5-year Program PROPOSED PROPOSED PROPOSED.
PAG 213-217 PROJETS A and funding to match AOT 5-year I I State/Fed I STREET/PROJET NAME PROJET ESRIPTION 56.12 I-1: ortaro Road TI (Right-of-Way). I-1 and ortaro Road Purchase ROW for ortaro Road TI FUNING
More informationAmericans with Disabilities Act Transition Plan for Public Right-of-Way Improvements
Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Prepared by: Public Works Department Engineering Division October 2015 Table of Contents Section I Introduction.. 3
More informationTonight is for you. Learn everything you can. Share all your ideas.
Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.
More informationFUNDING SOURCES CHAPTER 6
CHAPTER 6 6.1 BICYCLE 6.1.1 Local 6.1.2 Regional 6.1.3 State 6.1.4 Federal 6.1.5 Public Facilities 6.1.6 Bicycle Registration and Licensing Fees 6.1.7 Summary Table 6.1 of Bicycle Funding Sources 6 2 6.2
More informationSecondary System Albemarle County Construction Program Estimated Allocations
econdary ystem Albemarle County Construction Program Estimated Allocations Fund FY2010 FY2011 FY2012 FY2013 FY2014 FY2015 econdary Unpaved Roads TeleFee $324,624 $324,624 $324,624 $324,624 $324,624 $324,624
More informationADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility
ADA Transition Plan FY19-FY28 Date: November 5, 2018 Prepared by: City Of Gainesville Department of Mobility 1.0 INTRODUCTION 1.1 BACKGROUND The federal statute known as the Americans with Disabilities
More informationTaylor Road Resurfacing Project
Project General Information: Contractor: Perk Company, Inc. Awarded: July 28, 2011 Signed Contract: August 25, 2011 Project Bid Price: $3,600,000 Project Length: 1.5 miles 2 General Information: Project
More information