1 CS Construction & Geotechnic Pte. Ltd., CS Bored Pile System Pte. Ltd., L&M Foundation Specialist Pte. Ltd., Double Wong Foundation Pte. Ltd., Soil Investigation Pte. Ltd., THL Foundation Equipment Pte. Ltd., Wisescan Engineering Services Pte. Ltd., Borneo Geotechnic Sdn. Bhd., G-Pile Sistem Sdn. Bhd., Spectest Sdn. Bhd. Quality, Environmental, Health & Safety Policy President/Group CEO defines the Quality, Environmental and Occupational Health & Safety (QEHS) Policy as follows: To deliver the highest quality of works, through the identification of customer requirements and statutory requirements. The management will do its utmost best to provide an accident-free workplace for all employees and interested parties as well as a sustainable green environment by ensuring the outputs of work activities do not cause undue pollution to the society. Safety Handbook The company will strive to prevent environmental, health & safety hazards that are undesirable to employees and interested parties through continual reviews and improvement of its integrated management system. Complying with the applicable regulations as required by Ministry of Manpower, relevant authorities and the clients. Published on 1 st April President/Group CEO s Message Your safety is our utmost concern. The Group is committed to delivering quality work to all our clients, within agreed time schedule and free from incidents or injuries. Safety is something that we will not compromise under any circumstance. We fully recognise the importance of identifying and minimising the risks and impacts that may affect the health, safety and the environment of our workforce as well as the members of the public. To build upon CSC Group s achievement in all areas of operational excellence, I am counting on each and everyone of us to continuously commit to our Safe Work Practices which are designed to identify, assess, mitigate or eliminate risks. I therefore, urge YOU to use this easy-to-use reference manual frequently as a reminder of our Safe Work Practices and support the tenets of operations. Thank you for your ongoing commitment. Stay Safe Today and Everyday. See Yen Tarn President/Group CEO 2 General Rules 1. The employee is responsible for and must wear the appropriate Personal Protective Equipment (PPE) at all times while at work. 2. PPE must not be abused, and if damaged must be replaced before continuing the work. 3. All accidents, property damage, dangerous s or near-misses must be reported to the safety department immediately, failing which CSC shall not accept to entertain the case. 4. No smoking while operating the machines. 5. Anyone caught stealing, fighting or causing property damage will be disciplined and may be subject to immediate dismissal at the Management s discretion. 6. Follow safety instruction; do not take chances. If you do not know, ask. 7. Immediately correct and report unsafe conditions. 8. Observe and obey all warning signs. 9. Horseplay will not be tolerated. 10. Use the right tools and equipment for the job and use them safely. 11. Always follow Safe Work Procedures. 12. The use, possession or being under the influence of illegal drugs or intoxicants is prohibited on site. 13. Any electrical connections, alterations and repairs should only be done by competent electrician. 3
2 General Rules 14. All non-life threatening accidents cases which require medical attention must be referred to company s designated hospital (Raffles Hospital). Company will not reimburse medical fees if the injured employee is referred to other hospital/clinic. 15. Do not carry out work without an approved Permit- To-Work, where PTW for the work is in force. 16. Follow all the other safety rules as stated in the company s Safety Management System, failing which penalty shall be served on employees according to the infringement fines as stated in the Safety Management System. Lifting Operations Never wrap a sling around Severe bending L must be greater than S No job is so urgent or important that we cannot take time and effort to do it SAFELY Severe bending can cause breakage of sling 4 No person is allowed to stand under a suspended load Always use tagline to control the load 5 Lifting Operations Manual Handling Broken wire Bird caging Kinked Crushed All damaged slings must be removed from site Follow these rules during lifting operations:» Inspect lifting gear and lifting machine before use.» Use only approved rigging equipment.» Use proper rigging technique.» Never overload the lifting gear or lifting machine.» Lifting must be done gradually with the load lifted 1~2 inches off the ground initially to check stability.» Never stand under a suspended load.» Lifting crew must understand their specific duties and responsibilities and must stop any lifting work if an unsafe condition is identified.» Always insert padding or use lifting frame to prevent severe bending or breakage of sling. 6 7
3 Personal Protective Equipment (PPE) Welding and electrical safety Every employee must use and wear PPE while working on site. The type of PPE used will depend on the nature of work. However, basic PPE such as safety helmet, safety boots and reflective vest must be worn at all times. Earth rod must be inserted Face shield must be worn Rod holder must be fully insulated Helmet with chin strap Dust mask Proper clamp must be used Standby fire extinguisher Cable must be kept tidy Ear plugs Ear mufflers DB box must be locked at all times Do not lay cable on ground Warning sign must be displayed clearly Safety harness Safety boots Rubber safety boots Welding gloves Rubber gloves Reflective vest ELCB must be installed in DB box Electrical hand tools must be inspected by LEW monthly and documented Cable to be hung on insulated hook 8 9 Excavation safety Waste Management & Housekeeping Risk Assessment briefing for Operator before work starts Banksman to guide excavator during operations Do not leave the door open when the operator is not present Do not operate machinery which emits black smog, send it for servicing Bucket should be placed facing downward when not in use to avoid collecting water Blinker light must be working in good condition Standby fire extinguisher in the cabin in case of fire Provide proper access ladder for trenches > 1.2m deep 10 11
4 Safety in Load Test Erection Area must be cordoned off with Danger signage to prevent unauthorised entry Steel plates must be provided for safe crane footing Concrete blocks to be seated on steel plates for stability purpose Lifting lugs must be checked before lifting Chipped or cracked concrete blocks must not be used and should be discarded from site Safety harness must be anchored while working at height Use certified mancage for transporting workers onto the ground General worker 1. Obey all safety instructions. 2. Avoid horseplay and unsafe practices that can result in incident/accident. 3. Make full and proper use of all Personal Protective Equipment and safety devices provided. 4. Report unsafe conditions, injuries and incidents to Supervisor immediately. 5. Practice good housekeeping at all times. 6. Ask the Supervisor if you are not sure of how to do the work safely. 7. Do not engage in a fight with fellow workers, refer all disputes to Supervisor. 8. Ensure that proper Risk Assessment (RA) has been briefed to you by your Supervisor before work is carried out. 9. Do not carry out work without approved Permit-To- Work. 10. Always follow Safe Work Procedure. Follow these rules during load test erection:» Inspect lifting gear and lifting machine before use.» Area to be cordoned off to prevent unauthorised entry.» Workers must anchor safety harness while at height.» Lifting crew including crane operator must coordinate with one and another properly Rigger / Signalman 1. All riggers and signalmen must be suitably qualified with accredited training qualification. 2. Must follow instructions as given by Lifting Supervisor. 3. Must follow standard rigging and signalling methods to avoid confusion. 4. Must work together as a team with the Lifting Supervisor and Crane Operator. 5. Shall discontinue any lifting operations if unsafe condition is spotted during lifting operations. Report to Lifting Supervisor immediately. 6. Always follow Safe Work Procedure. Machine operator 1. Operate the required machinery which they are competent in. 2. Perform daily maintenance check of the machine. 3. Follow Safe Work Procedure. 4. Lock the cabin door if the machine is unattended to. 5. Do not move the machine without proper instruction or Banksman guiding the movement. 6. To coordinate lifting operations with and the advice of the lifting Supervisor, and diligently keep a safe lookout during machinery operations with signalman and rigger. 14 Lifting Supervisor 1. Ensure all lifting operations are carried out in accordance with safety requirements both legal and in-house requirements. 2. Stop all lifting operations immediately if unsafe condition is spotted. 3. Ensure lifting crew are properly briefed before lifting operations are carried out. 4. Follow Safe Work Procedure and Risk Assessment at all times. 5. Ensure that Permit-To-Lift is approved with necessary Lifting Plan. Site Supervisor / Site Foreman 1. Ensure works performed in accordance with client s safety requirements. 2. Coordinate and execute work safely. 3. Ensure safety procedures are followed at all times. 4. Report an unsafe act or unsafe condition to WSHS / WSHC and rectify immediately if life threat is present. 5. Supervise the work closely and act swiftly if work is done in a haphazard manner. 15
5 Project Coordinator 1. Responsible for coordinating manpower, plant & equipment and materials arrangement. 2. Monitor work progress and ensure work is carried out safely. 3. Verify records and reports submitted by Site Supervisors. 4. Ensure work is carried out according to Safe Work Procedure. Mechanics 1. Execute repairing or servicing according to Safe Work Procedure and machine maintenance instructions. 2. Use and wear appropriate PPE when carrying out repair work. 3. Report all unsafe conditions to Site and WSHS/WSHC immediately. 4. Consult expertise from specialist if unsure of how to repair the machine. 5. Do not take short cut when repairing the machine. 6. Keep proper record of maintenance report for future reference. Project Engineer 1. Ensure Risk Assessment is done before work is executed. 2. Ensure work is done according to Safe Work Procedure. 3. Ensure work is done according to client s safety requirements. 4. Accountable for all safety related issues and ensure all safety shortcomings are addressed properly before work is continued. Project Manager 1. Overall in charge of projects in terms of progress & safety. 2. Accountable for all safety related issues and ensure all safety shortcoming are addressed properly before work is continued. 3. Represent project team in attending to client s safety requirements. 4. Provide technical and engineering support to the operations team and ensure work is executed safely Accident Reporting Procedure Emergency Contact Numbers Accident External contacts:- Only requires first aid treatment Worker returns to work Report to supervisor & First Aider Attend to injured and give treatment If further treatment is required, send to nearest Raffles Clinic / Hospital Site conduct accident investigation Supervisor reports to site WSHS / WSHC WSHS /WSHC reports to EHS Mgr. & PM FIRE AMBULANCE POLICE RAFFLES HOSPITAL SINGAPORE GH TAN TS HOSPITAL TRAFFIC LIGHT PIPED GAS SUPPLY SINGTEL CABLE More than 3 days MC Hospitalisation more than 24 hrs / amputation case Life threatening / Fatal case Dangerous Internal contacts:- WSHO submits i-report within 10 days after accident WSHO submits i-report within 10 days after accident Accident review by project safety committee and follow up with necessary actions Stop work, call police, ambulance & MOM Committee of inquiry WSHO submits i- report within 10 days after accident Stop work, inform MOM WSHO submits i-report within 10 days after accident Follow up actions Guard House (Corporate Head Office) Brandon Toh (Corporate EHS Mgr.) Balaraman Deivakumar (LMFS EHS Mgr.) Mohammed Ismail Nanwi (CSCG EHS Mgr.) Follow up actions Chandrasekar Baskar (CSBP EHS Mgr.) 18
6
1.1 OHS Policy and Responsibilities
1.1 OHS Policy and Responsibilities At Canadian Rope Access Specialists Inc. safety is our primary concern and the health and safety of our employees, clients and contractors is of paramount importance
More informationLOOK. THINK. DO. Basic Workplace Safety and Health (WSH) Rules 6for Working at Heights. Secure safety harness when working at heights.
6for Working at Heights Falls are the leading cause of workplace fatalities in Singapore. Every month, one worker dies from falling from buildings, structures and ladders. Do your risk assessment before
More informationEMPLOYEE SAFETY ORIENTATION - PHYSICAL PLANT, RESIDENCE
Name Department Initial Orientation Date Supervisor Review Instructions: Check off each section once you have read and discussed it with your Supervisor. EMPLOYEE SAFETY ORIENTATION - PHYSICAL PLANT, RESIDENCE
More informationWorker s Safety Handbook for Rigger and Signalman
Worker s Safety Handbook for Rigger and Signalman Contents Preface 3 Proper Attire for Rigger and Signalman 4 Roles and Responsibilities of a Rigger 5 Good and Bad Rigging Practices 12 Inspection of Hooks
More information1. What is the top priority when working on Canadian Pacific (CP) property? 2. When working on CP property what must all Contractors comply with?
1. What is the top priority when working on Canadian Pacific (CP) property? A. Production B. Safety C. Quality D. Project deadline 2. When working on CP property what must all Contractors comply with?
More informationSafety in Precast Erection
Safety in Precast Erection C. Kirubakaran R Star Consultants Pte Ltd, Singapore Abstract: Construction industry is known to be one of the most hazardous among different industries all over the world. The
More informationCONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA
RECOMMENDED ADDITIONAL CONTROLS TASK / ACTIVITY/ EQUIPMENT/ FACILITY HAZARDS UNWANTED EVENT MINIMUM CONTROLS REQUIRED RISK NO. LIKELI-HOOD CONSE-QUENCE RISK VALUE Project Risk Assessment Page 1 of 16 All
More informationB S Glass Ltd Safety procedures- outsourced Workplaces
B S Glass Ltd Jan 17 B S Glass Ltd Safety procedures- outsourced Workplaces Index - - - - - - - - Page No On Site safety - - - - - - - - - - - - - - - - - - - Content 3. 1.00 Health and Safety Mission
More informationHow severely could the risk hurt someone?
Safe Work Method Statement No: WMS-08 Task: Install Drainage This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd Authorised
More informationContractor/Visitor Safety Orientation UNBC
Contractor/Visitor Safety Orientation UNBC 3333 University Way, Prince George, BC V2N 4Z9 Revised: October 2015 For All Emergencies call Security 250-960-7058 ***DO NOT DIAL 911*** Important UNBC Telephone
More informationMethod Statement Author
Plan Bee Limited 3.3 Etna Industrial estate Clamp Road Motherwell Scotland ML2 7XQ Tel: 01698580572 Method Statement Method Statement Details Method Statement Number 7 Method Statement Date Monday 3rd
More informationCONTRACTOR SAFETY INDUCTION HANDBOOK
CONTRACTOR SAFETY INDUCTION HANDBOOK As a valued contractor for Total Group we would ask that you read and carefully consider the details included in this document. Total Group carry out work for a number
More informationSafe Work Method Statement (SWMS)
Safe Work Method Statement (SWMS) Organisation Details : Organisation Name Northern Plumbing Contact ABN 17 15 41 4 Position Director Address 47 Thomas Street Edgeworth 85 Phone Number 0411 10 4 Project
More informationKIERNAN ELECTRICAL SITE INDUCTION. Site Supervisors: Chris Lettice
KIERNAN ELECTRICAL SITE INDUCTION Site Supervisors: Chris Lettice Safety Officer: Lilianne Magner INDUCTION CONTENTS Introduction to company safety policy Scope of Works Site team members Site Layout Site
More informationCOREWEST DIAMOND DRILLING LTD. * ENVIROMENT, HEALTH AND SAFETY PROGRAM* APPENDIX A GENERAL WORKSAFE PRACTICES
COREWEST DIAMOND DRILLING LTD. * ENVIROMENT, HEALTH AND SAFETY PROGRAM* APPENDIX A- - - - - - - GENERAL WORKSAFE PRACTICES 1) HEALTH AND SAFETY POLICY 2) PERSONAL PROTECTIVE EQUIPMENT 3) HOUSEKEEPING 4)
More informationSafe Work Method Statement
Title Skid Steer Operation (Bobcat) SWMS No. 14 Authorized and email Signed by the (Managing Director / CEO / Partner / Proprietor) on Date 01/08 /2016 Safe Work Procedure for the Work:- Yes No Employees
More informationDangerous Occurrence: Collapse of mobile crane
Accident Case Studies Dangerous Occurrence: Collapse of mobile crane Crane Operator had hoisted up a bag of sand (780 Kg) over the rooftop. While doing so, the Overload Radius Indicator (ORI) alarm sounded
More informationMinimum Safety Requirements for Contractors Working on Railway Property
Minimum Safety Requirements for Contractors Working on Railway Property Effective_ April 1, 2007 Introduction Canadian Pacific is committed to provide a Safe and Healthy working environment for all Railway
More informationWaste Industry Safety & Health
Waste Industry Safety & Health A practical pocket guide for the Waste industry Supported by: Delivering the Solution Together Introduction The Waste Industry Safety and Health (WISH) forum is supporting
More information"RIGGING SAFETY IN CONSTRUCTION ENVIRONMENTS"
PRESENTER'S GUIDE "RIGGING SAFETY IN CONSTRUCTION ENVIRONMENTS" Part of the "CONSTRUCTION SAFETY KIT" Series Quality Safety and Health Products, for Today...and Tomorrow OUTLINE OF MAJOR PROGRAM POINTS
More informationOMG Southeast & Southwest RIGGING SAFETY PROGRAM (29 CFR Part , , , , , & ANSI B30.5, ANSI B30.
OMG Southeast & Southwest RIGGING SAFETY PROGRAM (29 CFR Part 1926.251, 1926.550, 1910.180, 1910.184, 1910.330, & ANSI B30.5, ANSI B30.8) Nearly every project is required to perform some type of rigging
More informationRigging Safety. 1 Copyright 2014 by PEC Safety Management, Inc. PPT-SM-RIGGING 2014
Rigging Safety 1 Copyright by PEC Safety Management, Inc. Rigger Role Assist the crane operator by properly attaching and detaching loads the crane Know how to safely connect and disconnect loads Discuss
More informationSAFE WORK METHOD STATEMENT
SAFE WORK METHOD STATEMENT AUGER / POST HOLE DIGGER Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES
More informationCONSTRUCTION SAFETY PROGRAM FOR. Golder Acoustics Inc.
CONSTRUCTION SAFETY PROGRAM FOR Golder Acoustics Inc. TABLE OF CONTENTS Topic... Page Safety and Health Policy... 2 Safety and Health Objectives... 3 Job Site Inspections... 4 Contractor Safety Administrator...
More informationCONTRACTOR SAFETY RULES
CONTRACTOR SAFETY RULES CONTRACTOR SAFETY RULES AND REGULATIONS This manual sets forth policy with regards to contractor safety. Each Quinn facility consists of one or several diverse operations under
More informationChairman: Doctor: Ambulance: Secretary: Gardai: Other: The Club will comply with Schedule 3 of the Safety, Health and Welfare at Work Act 2005 by:
SAFETY STATEMENT SECTION 20 SAFETY, HEALTH AND WELFARE AT WORK ACT 2005 CLUB NAME: ADDRESS: This Safety Statement is our programme in writing to manage health and safety. It is aimed at protecting our
More informationAdvice On Risk Control Measures For Working In Hazy Conditions
Advice On Risk Control Measures For Working In Hazy Conditions Thursday, 20 June 2013 The haze levels in Singapore have reached a record high of PSI level 371 (1:00pm Thursday) and are now at levels which
More informationHealth, Safety and Welfare Policy
Health, Safety and Welfare Policy This Policy is prepared in accordance with section 2(3) the Health and Safety at work etc. Act 1974, with the intention of promoting a safe working environment that will,
More informationCode of Practice and Instructions to Contractors Working for Viridor
Date of issue: 20 Code of Practice and Instructions to Contractors Working for Viridor Prepared by: Ian Powell Head of Safety Management 4.6.3 Revision: 2.0 Contents Introduction... 2 Legal obligations...
More informationSTABLESAFE TRAINERS AUDIT TOOL
STABLESAFE TRAINERS AUDIT TOOL Name Address Date Postcode To assist stables in managing OH&S requirements trainers are encouraged to complete this stable audit tool. This audit is designed to help identify
More informationBogo Operations Pollution Incident Response Management Plan
Bogo Operations Pollution Incident Response Management Plan Rhyolite Hard Rock Aggregate Quarry 134 Paynes Road BOOKHAM NSW 2582 PO Box 426 COWRA NSW 2794 p: 02 6227 7260 p: 02 6345 4253 e: info@bogoquarry.com.au
More informationSection J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS
Section J How to develop safety elements for project safety management system 1. Once the project management has developed or adopted a safety policy, it needs to develop safety elements to meet the objectives
More informationFEDERATION OF PILING SPECIALISTS CODE OF INDUSTRY BEST PRACTICE LIFTING OPERATIONS AND LIFTING EQUIPMENT REGULATIONS 1998
FEDERATION OF PILING SPECIALISTS CODE OF INDUSTRY BEST PRACTICE LIFTING OPERATIONS AND LIFTING EQUIPMENT REGULATIONS 1998 CONTENTS 1. Introduction 2. Definitions and Statements 3. LOLER Considerations
More informationIMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY
IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY Approved by the Trustees: November 2016 Health and Safety Policy Introduction The main piece of health and safety legislation is the Health and Safety
More informationHEALTH & SAFETY HANDBOOK. Venues/HSE/08/16
HEALTH & SAFETY HANDBOOK Venues/HSE/08/16 CONTENTS Emergency Numbers 1 HSE Policy Statement 2 Introduction 3 Site Access 4 Permit to Work 5 Personal Protection Equipment 6 HSE Communication 7 Workplace
More informationSASOL LIFE SAVING RULES (LSRs)
SASOL LIFE SAVING RULES (LSRs) Zero harm by following Life Saving Rules Adhere to fall protection requirements at all times when WORKING AT HEIGHTS Obey all traffic rules while driving and walking for
More informationISS Safety Rules. Make safety second nature
ISS Safety Rules Make safety second nature 2 ISS SAFETY RULES ISS SAFETY RULES 3 INTRODUCTION We are a company driven by close to 500,000 strong people spread across 77 countries around the globe. And
More informationStaff Contractors. Public. Staff Contractors
1. Vehicle movements In conjunction with the vehicle driver, venue management and the client, our staff should ensure the safe parking of vehicles for loading and unloading purposes. Depending upon circumstances
More informationSafety is a priority at Vault Pipelines.
Safety is a priority at Vault Pipelines. At Vault Pipelines we believe that every incident is preventable and that every task can be completed safely and efficiently. We will achieve this through our cultural
More informationJOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible)
Page 1 of 6 How to use the Assessment Charts 1. Determine the Likelihood on the Qualitative Assessment Process Chart (pick a letter applicable to the task). 2. Determine the Consequence on the Qualitative
More informationA MESSAGE FROM THE MD
A MESSAGE FROM THE MD The Life Saving Rules set out clear and simple dos and don ts covering activities with the highest potential safety risk and apply to all employees and contractors. The best-performing
More informationContractor / Exhibitor Handbook
Contractor / Exhibitor Handbook Health and Safety This booklet outlines the basic rules that must be followed by contractors and other visitors working on Live Promotions Events sites. The contractors
More informationNew Hire Safety Orientation. Welcome to Flexicrew, our number one priority is you and your safety.
New Hire Safety Orientation Welcome to Flexicrew, our number one priority is you and your safety. 1 New Employee Responsibilities As a contract worker with Flexicrew Staffing, I understand by signing this
More informationSafe Work Procedure for installation of external cladding
Safe Work Procedure for installation of external cladding This procedure has been formulated to cover safe systems of work for the installation of external cladding. This instruction will be used to reduce
More informationQUEENSLAND UNIVERSITY OF TECHNOLOGY
QUEENSLAND UNIVERSITY OF TECHNOLOGY SITE SPECIFIC SAFETY MANAGEMENT PLAN FOR SAMFORD HOUSE SAMFORD ECOLOGICAL RESEARCH FACILITY SAMFORD VALLEY 2007 Dylan Randall SN: 06305466 dylan.randall@student.qut.edu.au
More informationResponsibilities / Accountability
Responsibilities / Accountability What we will cover Brief history of OPP safety program OPP s commitment to safety Safety responsibilities Accountability for safety Employee expectations History of Safety
More informationSECURITY ARRANGEMENTS
Security Arrangements :: 43 7 SECURITY ARRANGEMENTS 7.1 INTRODUCTION The precautions taken to prevent the possibility of accidents is called Security Arrangements. In this lesson you will know about the
More informationSAFE WORK METHOD STATEMENT Part B
SAFE WORK METHOD STATEMENT Part B SWMS No.: 01 WORK ACTIVITY DESCRIPTION: Door Installation All FORESEEABLE OHS & ENVIRONMENTAL HAZARDS & RISKS ASSOSSIATED WITH THE WORKS MUST BE ASSESSED & ALLOCATED CONTROLS
More informationSAFE WORK METHOD STATEMENT
SAFE WORK METHOD STATEMENT WATER PUMP - PETROL Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES
More informationWorking at Height - MEWPS & Ladders. Your company details Address Tel: Fax: Mobile:
Project/Contract Contractor Site Address Project Start Date Expected Duration Projected Completion Date Your company details Address Tel: Fax: Mobile: Document Author Authorised by Name Title Signature
More informationWorking safely in an engineering environment
Unit 001 Working safely in an engineering environment Level: 2 Credit value: 5 NDAQ number: 500/9514/6 Unit aim This unit covers the skills and knowledge needed to prove the competences required to work
More informationThe purpose of this document is to establish the procedures for accident prevention and investigation at (Insert Company Name) jobsites.
CORPORATE SAFETY MANUAL ENVIRONMENTAL, HEALTH AND SAFETY STANDARDS TITLE: Document Number: * Issue Date: Revision Date: * 1 Purpose The purpose of this document is to establish the procedures for accident
More informationAppendix 4C - Sample SWMS Trenching
Appendix 4C - Sample SWMS Trenching SAFE WORK METHOD STATEMENT SWMS Reference : Insert document number : Version A Date : Workplace / Project : Company Address: Work Activity / Job / Task or Process :
More informationModule: Permit to work System
Module: Permit to work System Aim: To know about best practice of PTW. It is a procedure designed to ensure that work is carried out in the safest possible way by considering the potential hazards and
More informationSafety Plan for Sole Proprietors
Safety Plan for Sole Proprietors SAFETY POLICY Safety Policy for (Company Name) It is the policy of that safety is a number one priority and to provide as safe a workplace as possible for all of our colleagues
More informationSurface exploration drilling
Checklist Surface exploration drilling This checklist is intended to assist employers to identify common hazards and manage risks associated with surface exploration drilling. June 2017 Background In surface
More informationList all key terms and acronyms used in the procedure, and their definitions.
Purpose The purpose of this procedure is to provide guidelines for electrical safety in general within Seqwater in compliance with the Electrical Safety Act 2002, Industry Codes of Practice, Regulations,
More informationEMPLOYEE SAFETY HANDBOOK
EMPLOYEE SAFETY HANDBOOK HSE Department Al Rumela شمس الرميلة/ Sun Policy Al Rumela شمس الرميلة/ Sun is committed to a policy to reduce and eliminate of all undesired events that could be resulting in
More informationDUIMERING CONCRETE FORMING INC. Health and Safety Policy Manual
DUIMERING CONCRETE FORMING INC. Health and Safety Policy Manual DUIMERING CONCRETE FORMING INC. Health and Safety Policy Assignment of Responsibility: Supervisors; All Employees and Others; Personal Employing
More informationOccupational Health Safety and Welfare. Our Policy
Occupational Health Safety and Welfare Our Policy OCUPATIONAL HEALTH AND SAFETY POLICY Management of QI Electrical Services is committed to ensuring, as far as responsibly practicable, that all employees
More informationSITE SPECIFIC SAFETY PLAN (SSSP)
SITE SPECIFIC SAFETY PLAN (SSSP) This plan shall be completed and reviewed with the Corporate Safety Department before work commences. Completed plans shall be maintained and kept on site with the project
More informationSTReSS Laboratory Safety Training Memorandum
STReSS Laboratory Safety Training Memorandum STReSS Laboratory October 3, 2013 Introduction This memo outlines the policy regarding safety, safety gear, clothing requirements, crane operation, and hydraulic
More informationWork Activity (e.g. Road Work): Work Location:.
Working with Cranes Work Activity (e.g. Road Work): Work Location:. GENERAL INFORMATION Hinchinbrook Shire Council Lannercost Street Ingham Qld, 4850 ABN 46 291 971 168 Ph: 47764610 All personnel conducting
More informationWe also ask our subcontractors and partners to. At EHS Support we re passionate about safety. The. ensure the safey of themselves, their coworkers and
Golden Rules of Safety July 2014 EHS Support s commitment to environmental, health, At EHS Support we re passionate about safety. The We also ask our subcontractors and partners to ensure the safey of
More informationSite Induction Document & Site Rules
Event Name Venue Site Induction Document & Site Rules The 18 th Annual Meeting of the European Society for Pediatric Dermatology QEII Centre London, Britten (Third Floor) & Westminster Rooms (Fourth Floor)
More informationMeuangvang Development Co.LTD Standard Working Procedure 058 Use of Hydraulic Torqueing Devices
1. Application To provide a standard work procedure for as required in accordance with Meuangvang Development Co Ltd Safety Management Program 2. Revision Schedule Rev # Old Section Ref New Section Ref
More informationHealth and Safety Program Inspections
POLICY: It is CPP s policy to maintain a program of safety inspections. The objective of this program is to control and mitigate hazards in the workplace and worksite. All CPP s facilities and worksites
More informationWORK METHOD STATEMENT STRUCTURAL STEEL
ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone
More informationReporting, Recording & more Walking Working Surfaces Local Emphasis Program Your Questions
Reporting, Recording & more Walking Working Surfaces Local Emphasis Program Your Questions As of January 1, 2015, employers must report the following to OSHA: All work-related fatalities within 8 hours
More informationAccident/Incident Reporting and Investigation Procedures
Accident/Incident Reporting and Investigation Procedures Policy reference Workplace Health and Safety Policy Procedure reference Workplace Health and Safety Risk Assessment Procedures Procedure It is imperative
More informationEHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010)
(Ref. SOP QMS-080; EHS-010) Form-445 Inspected by: Date of inspection Date of Report Report # Pages Area Manager: Area Inspected: General This EHS Workplace Inspection was conducted by: Scope of the Inspection:
More informationOriginal Date of Issue: 04/09
POLICIES AND PROCEDURES DEPARTMENT: Environmental Health and Safety SUBJECT: Electrical Safety Program Original Date of Issue: 04/09 Reviewed 12/2011 Revised 12/2011 BACKGROUND ELECTRIC SHOCK It is well
More informationCompany Health and Safety Policy
Company Health and Safety Policy LDM Installers Ltd. Document reference: H&SP0B5-00 Document by: Radu N. Lupsa Date: 25.08.2010 Review date: 25.02.2011 36 CASTLEVIEW GARDENS, LONDON, IG1 3QB. TEL/FAX:
More informationYou must NOT touch any equipment unless you are authorised to work on or with that equipment and you have followed correct safety procedures.
SYDNEY TOWN HALL 1 HIRER & CONTRACTOR SAFETY FACT SHEET Issue 2 September 2013 www.sydneytownhall.com.au City of Sydney - Venue Management will provide and maintain a safe working environment for the health,
More informationMethod Statement. Method Statement Details. Signatures. Emergency Contact Details 1/5
Highway Traffic Safety Ltd Lakeside House, 1 Furzeground Way Stockley Business Park Heathrow London UB11 1BD Tel: 02071 111655 Method Statement Method Statement Details Method statement number 4 Method
More informationUniversity College Dublin Machinery/Equipment Risk Assessment Template
1. General Information Name of Person(s) carrying out assessment and their position Principal Investigator / Supervisor / Head of School or Unit (Person responsible for ensuring safety) Date of assessment
More informationSAFE WORK METHOD STATEMENT
SAFE WORK METHOD STATEMENT EXCAVATION OR TRENCHING Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES
More informationHow severely could the risk hurt someone? Low/Insignificant First aid
Safe Work Method Statement No: WMS-0 Task: Line Marking This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd Authorised
More informationWork At Heights Toolkit. for Supervisors
Work At Heights Toolkit for Supervisors For Supervisors How to use this toolkit? The toolkit aims to provide information for supervisor to communicate one topic a day to workers. Pictures are for illustration
More information"SAFETY ORIENTATION IN CONSTRUCTION ENVIRONMENTS"
PRESENTER'S GUIDE "SAFETY ORIENTATION IN CONSTRUCTION ENVIRONMENTS" Part of the Construction Safety Kit Series Quality Safety and Health Products, for Today... and Tomorrow OUTLINE OF MAJOR PROGRAM POINTS
More informationJob Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS)
Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS) Part 1: Project and Task Identification Process: Initiators of JSEAs are responsible for consulting the Project Supervisor,
More informationMcKay Moore Drainage Ltd. Health and Safety Policy
McKay Moore Drainage Ltd Health and Safety Policy Table of Contents 1) Health & Safety Policy 2) Hazard Identification 3) Hazard Management 4) Training 5) Site Induction 6) Monitoring and Review 7) Site
More informationHow severely could the risk hurt someone? Low/Insignificant First aid
Safe Work Method Statement No: WMS-0 Task: Operate Diesel Road Saw This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd
More informationSWMS No 012 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6
Samark North Qld Pty Ltd SWMS SWMS No 0 Samark North Qld Pty Ltd ABN : 99 08 98 87 Electrical Contractors License C37 Page of 6 Safe Work Method Statement Title: SWMS:0 INSTALLING LIGHT POLES Work Method
More informationSCOUTS AUSTRALIA NSW
SCOUTS AUSTRALIA NSW Contractor Health and Safety Handbook 2 Scouts Australia NSW Contractor Safety Handbook v 5.0 Frebruary 2018 Contents... 2 Contractor Health and Safety Handbook... 2 Revisions... 2
More informationHow severely could the risk hurt someone? Low/Insignificant First aid
Safe Work Method Statement No: WMS-02 Task: Concreting, Formwork and Steel Fixing This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia)
More informationSafe Work Method Statement
TE CONTROLLED COPY OF TIS DOCUMENT IS ON TE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR TE DATE AT TE BOTTOM OF TE PAGE. Title Dogging of Crane General Loading and Unloading SWMS No. 20 Authorized
More informationNew Employee Safety Orientation. Session Objectives. Session Objectives (cont.)
New Employee Safety Orientation Session Objectives Understand your role in safety and security Get safety information Identify and report safety hazards Prevent and respond to fires Respond to accidents
More informationWINDMILL (pre-start) HAZARD INSPECTION CHECKLIST
Windmill Hazard Inspection Checklist WINDMILL (pre-start) HAZARD INSPECTION CHECKLIST Authorised by: LOCATION OF INSPECTION...... Inspected By (1)........... (2)..... PRINT PRINT Signature (1):. (2)....
More informationOSHA 30 Syllabus. Laborers Training School. Time: 40 hours. Maximum Class Size: 30. Prerequisites: None
Time: 40 hours Maximum Class Size: 30 Prerequisites: None Course Description: The 40-hour OSHA Outreach Training Program provides training for workers and employers on the recognition, avoidance, abatement,
More informationSafety at Work. Rules for Staying Alive
Safety at Work Rules for Staying Alive Safety at Work Rules for Staying Alive Introduction The purpose of Dana Gas Rules For Staying Alive is to address the key causes of deaths in our industry. These
More informationSUBCONTRACTOR SAFETY ORIENTATION PACKET
SUBCONTRACTOR SAFETY ORIENTATION PACKET Safety Orientation Policy and Training Safety Policy Statement and Responsibilities 10/13/2011 Page 1 of 18 7617 Freedom Way Fort Wayne, Indiana 46818 www.wagner-meinert.com
More informationWIRE ROPE PULLING MACHINE
WIRE ROPE PULLING MACHINE Spare parts list and exploded view Specifications Dimensions Item No. 0.8T 1.6T 3.2T 5.4T Rated Capacity kg 800 1600 3200 Rated Forward Handpower N 343 441 441 Rated Forward Travel
More information"SAFETY ORIENTATION IN CONSTRUCTION ENVIRONMENTS"
MAJOR PROGRAM POINTS "SAFETY ORIENTATION IN CONSTRUCTION ENVIRONMENTS" Part of the "CONSTRUCTION SAFETY KIT" Series Quality Safety and Health Products, for Today...and Tomorrow OUTLINE OF MAJOR PROGRAM
More informationContractor handbook. Purpose
Page no: 1 / 6 Contractor handbook Purpose Mitie aims to ensure that the highest levels of performance are achieved by all persons working for us or on our behalf. We require the same level of performance
More informationSAFE SYSTEM OF WORK PLAN (SSWP)
SAFE SYSTEM OF WORK PLAN (SSWP) BUILDING AND MONUMENT MAINTENANCE Safe System of Work Plan (SSWP) Guidelines The Safe System of Work Plan (SSWP) complements the Safety Statement required under the Safety,
More informationCOWRA PISTOL CLUB INCORPORATED Range Standing Orders
These Range Standing Orders are written to ensure all Club members, Spectators, Visitors, Contractors and others are aware of the rules that apply to all Cowra Pistol Club Ranges and facilities. Please
More informationNZQA registered unit standard 1178 version 7 Page 1 of 6
Page 1 of 6 Title Follow safe practices in an electrical workplace Level 2 Credits 3 Purpose This unit standard covers general safety practices for workers in the electrical and related industries. People
More informationDEPARTMENT OF THEATRE AND DANCE CALIFORNIA STATE UNIVERSITY, FULLERTON
DEPARTMENT OF THEATRE AND DANCE CALIFORNIA STATE UNIVERSITY, FULLERTON SCENIC LAB SAFETY PROCEDURES (CPAC 154) 1. POLICY The Department Scenic Lab is a facility, which supports courses in scenic design
More information7 Hazard assessment 8 Worker participation 9 Hazard elimination and control
This document is a guideline only. Employers have a responsibility of assessing all applicable occupational health and safety legislation, for the tasks they are performing. Businesses in this industry