API SC 6 SUBCOMMITTEE ON VALVE AND WELLHEAD EQUIPMENT TASK/WORK GROUP STATUS REPORT. 6D/6DSS TG02 on Revisions & Corrections FEBRUARY 8, 2011
|
|
- May Morton
- 5 years ago
- Views:
Transcription
1 API SC 6 SUBCOMMITTEE ON VALVE AND WELLHEAD EQUIPMENT TASK/WORK GROUP STATUS REPORT 6D/6DSS TG02 on Revisions & Corrections FEBRUARY 8, 2011 TABLE OF CONTENTS 1. SCOPE OF WORK PREVIOUS STATUS REPORT DATE MEMBERSHIP MAJOR ISSUES AND DATES FUTURE WORK PROGRAM FUTURE MEETING DATES RESOURCE NEEDS SCOPE OF WORK Review and maintain API Spec 6D/6DSS for revisions and correction to meet industry needs. Also interface the mirror ISO documents ISO 14313/14723 to harmonize API Spec 6D/6DSS as much as possible. 2. PREVIOUS STATUS REPORT DATE Previous status report on 6D/6DSS TG was issue June 25, 2010 in Washinton, D.C. during the API 2010 Summer E&P Stanards Conference. TG meetings January 19th 7 20th, MEMBERSHIP TABLE 3-1: TASK/WORK GROUP MEMBERS -25 Name Company Roy Benefield FMC Roy.benefield@embarqmail.com Morg Bruck Marathon mmbruck@marathonpetroleum.com -1-
2 John Fowler Online Resources Roy Edwards Streamflo Rick Faircloth Cameron Austin Freeman Halliburton Engin Gulgun IS Valves Mike Feeley ConocoPhillips John Icenhower Flowserve Rodger L. Lawson ExxonMobil Mark Lewandoski SPX Mike Miller Dril-Quip Dave Mefford Cameron Donald H. Monroe Consultant George A. Moran Consultant Charles Partridge Hedwedge Valve Ed Pearson Cameron G. Ravindran Audco-India Jean Michel Rivereau TOTAL Bob Schmidt Hackney Ladish Larry Skoda Chevron Tom Slimmon Alliance Pipeline Stephen Smith Aramco Services Henry Wong FMC Robert T.J Appleby ExxonMobil 4. MAJOR ISSUES AND DATES API 6D Specification for pipeline valve issued the following Errata s. ERRATA 5, NOVEMEBR 10, 2010 includes Errata 1,2,3,4 see attached. API 6DSS Specification for pipeline valve issued the following Errata s. ERRATA 2, NOVEMEBR 10, 2010 includes Errata 1, see attached. 5. FUTURE WORK PROGRAM 6D has two new work items on their work plan at this time. -2-
3 Annex- I see attached. This annex provides the Requirements for Extended Hydrostatic Shell Test duration and Records Retention for Valves in Jurisdictional Pipeline Systems. This is an informative Annex and can be requested by the pipeline owner or operator to be performed in additional to the standard API 6D pressure testing activities. The 6D ballot was closed ballot was closed in November Negative votes. A TG meeting was held January 19 th, members of the 6DTG along (2) of voter who cast negative ballot. After lengthy discussion and contact the negative commenter s the entire 6D TG member it was agreed to draw the negative vote and re-ballot the annex-i as modified. Ballot # 2243 has been issue for a 6 week ballot. Annex J This annex provides for Quality Specification Level (QSL) for pipeline valves. The three (3) QSL address extended hydrostatic/pneumatic testing, NDE on selected components and required documentation to be provided. As special TG was formed from members of the 6D TG to work on this issue. 1 st meeting was held June 2010 to develop the 1 st draft and the final meeting was held January 20 th, 2011 to finalize the Annex. The 6D TG has recommended that the attached DRAFT Annex J be issued for formal ballot. 6. FUTURE MEETINGS DATES Next meeting planned for 6D TG will be in early April 2011 to review API RP6DR and API 6FA. Additionally we will hold a 6DTG meeting during the Summer Standards conference in San Francisco, Ca. June 29 th, RESOURCE NEEDS No resource needs at this time. -3-
4 Date of Issue: November 2010 Affected Publication: API Specification 6D/ISO 14313, Specification for Pipeline Valves, 23rd Edition, April 2008 ERRATA 5 (Includes Errata 1, Errata 2, Errata 3, and Errata 4) These errata correct editorial errors in the 23rd Edition of API Spec 6D. Page 2, Section 3, Normative references, replace: ASME B , Pipe Flanges and Flanged Fittings : NPS 1/2 through 24 ASME B , Pipe Flanges and Flanged Fitting: NPS 1/2 through 24 and ASME B , Gas Transmission and Distribution Piping Systems ASME B , Gas Transmission and Distribution Piping Systems Page 3, Section 3, Normative references, replace: ASME Boiler and Pressure Vessel Code Section VIII: Rules for Construction of Pressure Vessels Division 2: Alternative Rules ASME Boiler and Pressure Vessel Code Section VIII: Rules for Construction of Pressure Vessels Division : Alternative Rules Page 34, Table 4, under subheading PN 50 (class 300), for DN 150 (NPS 6): replace the value of 457 in the column Raised face (A) 403 such that the line reads: Page 36, Table 4, under subheading PN 420 (class 2500), line for DN 65 (NPS 2 1 /2): replace the value of 540 in the column Ring joint 514 such that the line reads: /
5 Page 41, Section 7.7.2, replace: ASME B ASME B and Figures 14 and 15 Figures I-4 and I-5 Page 45, Section , second sentence, replace: ASME Code Section VIII, Division 2, Part AD-132 ASME Code Section VIII, Division , Part AD-132 Page 49, Section 9.3, Note, delete: by agreement Page 49, Section 9.4, second paragraph, second sentence, add: pipe pups to valve after Repairs of fabrication welds On page 51, draw: Section Gauge range Renumber: (from Addendum 1) as Page 63, Section B.3.3, replace: 0,55 MPa ± 00,7 MPa 0,55 MPa ± 0,07 MPa On page 64, add to the end of Section B.4.2 Acceptance criteria shall be per the requirements of On page 66, add to the end of Section B.10 Acceptance criteria shall be per the requirements of
6 On page 66, add to the end of Section B.11 Acceptance criteria shall be per the requirements of On page 66, add to the end of Section B.12 Acceptance criteria shall be per the requirements of Page 71, Table D.1, beginning of last box, replace: Other requirements Other requirements Page 71, Table D.1, after ISO (all parts)? Yes No add the following line: If yes, specify % mass fraction of H 2 S ; ph ; % mass fraction of chlorides ; temperature 3
7 Date of Issue: November 2010 Affected Publication: API Specification 6DSS, Specification for Subsea Pipeline Valves, Second Edition, December 2009 ERRATA 2 (includes Errata 1) Page 56, Table A.2, the entry for in the Acceptance column should read: Forgings: ASME BPVC Section VIII, DIV UF 55 (Angle-Beam) ASME B , Appendix IV (Straight -Beam) Plate: ASTM A578/A578M-07, acceptance standard level B Page 56, Table A.2, the entries for RT1 and RT3 in the Method column for casting should read: ASME BPVC 2007, Article 2
8 Annex I (informative) API Regional Annex Requirements for Extended Hydrostatic Shell Test duration and Records Retention for Valves in Jurisdictional Pipeline Systems. I.1 General: This annex provides a recommended practice pertaining to valves used in jurisdictional pipeline systems. Valves used in transportation of natural and other gas and hazardous liquids or carbon dioxide by pipeline are usually regulated by the national governments of the countries in which the pipeline is located. This annex specifies the requirements for extended hydrostatic shell testing that shall be performed by the manufacturer if specified by the purchaser. This annex also specifies the test records to be provided to the purchaser and record retention requirements. I.2. Hydrostatic shell testing requirements: The hydrostatic shell test shall be in accordance 11.1 and 11.3 of this specification a test duration of four (4) hours, unless otherwise agreed. I.2.1 Test record requirements: Test records shall contain the following as a minimum and be provided to the purchaser: I I I I I The name of the manufacturer, name of the organization that performs testing (if other than the valve manufacturer), the identification of the individual responsible for performing the test, date, time and location of test. Serial number, size, class and end connection. Test medium (fluid) used. The beginning, ending, and actual test pressure and temperature readings, unless otherwise agreed. The test duration. I A chart recording or digital record of the pressure. I I I I.2.2 I I.2.3 I Any significant variations in pressure or temperature for the particular test. Any leaks or failures and their disposition. Certificates of calibration for all instrumentations used in the test, such as pressure transducers, pressure gauges, temperature devices and chart recorders: Minimum requirements for pressure transducers, pressure gauges, temperature devices and chart recorders: Pressure transducers, pressure gauges, temperature devices and chart recorders shall be calibrated in accordance section 10 of this specification, but at an interval not greater than 12 months. Record retention requirement: Test records in I.2.1 shall be shall be provided to the purchaser and maintained by the manufacturer in accordance section15 of this specification, unless otherwise agreed.
9 Annex J- DRAFT 1-REV-2 January 2011 (Infomative) Quality Specification Level (QSL) for pipeline valves. J.0 General This annex specifies three quality levels (QSL) for pipeline valves. The specific QSL shall be performed by the manufacturer when specified by the purchaser. J.1 Hydrostatic/Pneumatic testing Table J.1 defines the test requirements for QSL-1, QSL2 and QSL3. All QSL -3 hydrostatic test shall be chart recorded. Table J.1 Pressure testing requirements Quality Specification Level High Pressure Shell 1.5 times the rated pressure per 11.3 High pressure Seat Test@ 1.1 times the rated pressure per 11.4 Low pressure air seat test at 80psi per B.3.3 Type II QSL-1 Standard Test Standard Test 1 test required. QSL-2 2-tests required After 1st test reduce pressure to zero and repeat test. 2-tests each seat required After 1st test reduce pressure to zero and repeat test. 2 tests each seat required.reduce pressure to zero between each cycle QSL-3 3- tests are required.reduce pressure to zero between each test. 3 -tests each seat are required.reduce pressure to zero between each test. 3 tests each seat are required.reduce pressure to zero between each test. Test 1 & 3 shall have test duration as specified in Table 10 Test 1 & 3 shall have test duration as specified in Table 11 Test 1 & 3 shall have test duration as specified in Table 11 The 2nd-test shall have an extended duration of 4-times that stated in Table 10.. The 2nd-test shall have an extended duration of 4-times that stated in Table 11. The 2nd-test shall have an extended duration of 4-times that stated in Table 11. J.2 Specification of quality levels for NDE Table J.2 specifies the NDE requirements for QSL- 2 and QSL-3. MT = MAGNETIC PARTICLE TESTING (Surface NDE) / RT = X-RAY EXAMINATION (Volumetric NDE), PT = DYE PENETRANT TESTING (Surface NDE)/ UT = ULTRASONIC TESTING (Volumetric NDE)/ VT = VISUAL INSPECTION Note : No NDE requirements are specified for QSL-1
10 Table J.2 NDE requirements Part Body or,closures and end connections or Bonnet or cover or Gland housing QSL- 2 QSL-3 Cast Forged Plate Cast Forged Plate RT1 a RT1 a, f UT1 g Welding ends b RT3 or UT4 Stem or shaft c, g N/A RT3 or UT4 N/A N/A N/A Trunnion d, g Or Trunnion/bearing plates UT1 Bolting-pressure containing N/A N/A N/A Seals Gaskets VT4 VT4 N/A Pressure cap RT3 or UT4 RT3 or UT4 Ball or gate h MT1 or Plug or clapper disc c, g RT3 or UT4 MT1 or MT1 or Clapper disc arm UT4 Seat rings c, g Seat springs VT4 VT4 Pressure-containing welds VT3 RT2 or UT3 MT1 VT3 RT2 or UT3 Reinforcement and stiffening welds VT4 VT4 Fillet and attachment welds to pressure-containing parts Pipe pup to valve welds or Pipe pups e VT3 VT3 RT2 MT1 VT3 VT3 RT2 Corrosion resistannt over;ay VT4 VT4 UT3
11 Part QSL-2 QSL-3 Cast Forged Plate Cast Forged Plate Plating VT4 VT4 Hardfacing VT4 VT4 Sealing surfaces MT2 or PT2 MT2 or PT2 NOTE 1 See Table S.3 for specification of the examinations referred to in this table. NOTE 2 N/A means that the manufacturer is not allowed to use this material form for that specific part NOTE 3 ALL THE NDE ACTIVITIES LISTED ABOVE FOR A SPECIFIC PRODUCT FORM OR FORMS SHALL BE CONDUCTED a b c d e f g RT1 may be replaced by UT4 by agreement. NDE back 50 mm from weld end. MT/PT to be performed prior to coating, plating or overlay. Trunnion may be pressure-containing or pressure-controlling, depending on design type. If the trunnion is a pressurecontaining part then the requirements for body apply. NDE requirements of pipe pups shall be established by agreement. RT1 plus UT1 may be replaced by RT3. Requirements for examination of bar material shall be as for forgings J.3 Specification of tests Table J.3 specifies the extent, method and acceptance criteria for each of the tests referred to in Table J.2.
12 Table J.3 Extent, method and acceptance criteria of NDE examination Examination NDE Extent Method Acceptance RT1 RT casting Critical areas per ASME B16.34 RT2 RT weldments 100 % where practicable Article 2 Article 2 ASME Section VIII Div.1, Appendix 7 ASME Section VIII Div. 1, UW51 (linear indications); ASME Section VIII Div.1, Appendix 4 (round indications) RT3 RT casting 100 % Article 2 ASME Section VIII Div. 1, Appendix 7 UT1 UT casting Remaining areas not covered by RT1 Article 5 (direct and shear wave) ASTM A 609/A 609M, Table 2, Quality Level 2 UT forging and plate All surfaces Article 5 Forgings : ASME Section VIII Div. 1-UF 55 for angle bean & ASME B16.34 for straight beam. Plate: ASTM A578/A578M Acceptance standard level B UT3 UT weldments 100 % Article 5 (direct and shear wave); Article 23 ASME Section VIII Div. 1, Appendix 12; ASTM A 578/A 578M UT overlay 100 % ASTM A578/A 578M Acceptance standard level C UT4 casting 100 % Article 5 ASTM A 609/A 609M, Table 2, Quality Level 1 MT1 MT 100 % accessible surfaces MT2 MT 100 % sealing surfaces PT 100 % accessible surfaces PT2 PT 100 % sealing surfaces Article 7 Article 7 Article 6 Article 6 ASME Section VIII Div.1, Appendix 6 No rounded or linear indications ASME Section VIII Div. 1, Appendix 8 No rounded or linear indications VT casting All surfaces MSS SP-55 Type 1 none acceptable; Type 2 to 12 A and B VT forging and plate All surfaces As required by ASTM product specification VT3 VT weldments All surfaces Article 9 As required by ASTM product specification All pressure-containing welds shall have complete joint penetration. Undercut shall not reduce the thickness in the area (considering both sides) to below the minimum thickness. Surface porosity and exposed slag are not permitted on or in 45 mm of seating surfaces. VT4 VT weldments and others All surfaces Article 9 No visible defects
13 J.4 Documentation Table J.4 specifies the final assembly documentation requirements for QSL-1, QSL-2, and QSL-3. Table J.4 Documentation requirements Quality Specification Level Required documentation to be sent the valve(-s) QSL-1 Certificate of conformance to this specification and QSL Pressure test report, (including pressure, test duration, test medium and acceptance criteria) Material test reports on all pressure containing parts. For sour service valves, certificate of conformance to ANSI/NACE MR0175/ISO ; QSL-2 QSL-3 Hardness test report on pressure-containing parts for sour service valves Certificate of conformance to this specification and QSL Pressure test report, (including pressure, test duration, test medium and acceptance criteria) Material test reports on all pressure containing parts. For sour service valves, certificate of conformance to ANSI/NACE MR0175/ISO ; NDE records Installation, operation and maintenance instructions/manuals; General arrangements drawings; Cross-sectional assembly drawings parts/materials list Hardness test report on pressure-containing parts Hardness test report on pressure-controlling parts Heat treatment records including times and temperatures. Certificate of conformance to this specification and QSL Pressure test report, (including pressure, test duration, test medium, and acceptance criteria) including copy of chart recorder used on pressure test Calibration certificates on pressure test equipment used (e.g. pressure guages, transducers and chart recorders) Material test reports on all pressure containing and pressure controlling parts. For sour service valves, certificate of conformance ANSI/NACE MR0175/ISO NDE records General arrangements drawings; Cross-sectional assembly drawings parts list and materials list; ;Installation, operation and maintenance instructions/manuals;
Annex G (normative) Requirements for Nondestructive Examination
Purchase API Spec online at http://www.techstreet.com/api Annex G (normative) G.1 General Requirements for Nondestructive Examination This annex specifies the requirements for NDE that shall be performed
More informationTechnical Standard. API6D Ball & Plug Valve. Inspection & Test Procedure
Technical Standard API6D Ball & Plug Valve Inspection & Test Procedure 1 Scope This standard provides specific inspection items to be performed on all ball & plug valves. The valves shall be provided with
More informationAmerican Petroleum Institute Purchasing Guidelines Purchase API Spec 6DSS online at
Purchase API Spec online at www.api.org/publications 7.2 Pressure and temperature ratings The nominal pressure (PN) class or the ASME rating class shall be used for the specification of the required pressure
More informationPIP PNE00012 Piping Examination and Leak Test Guide
October 2017 Piping PIP PNE00012 Piping Examination and Leak Test Guide PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has
More informationSTANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL)
STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL) TEE (HOT TAPPING MATERIAL) S-04-02-040 Page 1 of 7 1.0 SCOPE This specification covers the basic requirements for the design, manufacture and supply
More information3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II
3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II 306M User Manual English Version Use for company in Europe who will place the product on the market, please
More informationDate of Issue: July 2016 Affected Publication: API Specification 16C, Choke and Kill Equipment, Second Edition, March 2015 ADDENDUM 1
Date of Issue: July 2016 Affected Publication: API Specification 16C, Choke and Kill Equipment, Second Edition, March 2015 ADDENDUM 1 Page 16, Section 4.6, delete the entire section and renumber all subsequent
More informationTelefon (+45) Telefax (+45)
Uni-Valve A /S VENTILER & INSTRUMENTER Telefon (+45) 43 43 82 00 Telefax (+45) 43 43 74 75 mail@uni-valve.com www.uni-valve.com UNI-S83 / S84 3/4-way ball valve Installation and Operating manual 3/4-WAY
More informationTHE PROCESS OF JOINT INTEGRITY
BOLTED JOINTS A.333 THE PROCESS OF JOINT INTEGRITY To assist in managing a process, ask yourself the following questions: why, what, who, and how? Why do we need a Flange Joint Integrity program? This
More informationSpilt body Flange ball valve. TC-205MFF-PN1640 User Manual English Version. Document No: TC-205MFF-PN1640.Ur-manual. Date: 2007/04/2617. Version: 1.
Spilt body Flange ball valve TC-205MFF-PN1640 Series PED Category I,II TC-205MFF-PN1640 User Manual English Version Use for company in Europe who will place the product on the market, please amend which
More informationCERTIFICATION OF COMPLIANCE OF THE USER S DESIGN SPECIFICATION
CERTIFICATION OF COMPLIANCE OF THE USER S DESIGN SPECIFICATION I, the undersigned, being experienced and competent in the applicable field of design related to pressure vessel requirements relative to
More informationBODY OF KNOWLEDGE API-510 PRESSURE VESSEL INSPECTOR CERTIFICATION EXAMINATION
BODY OF KNOWLEDGE API-510 PRESSURE VESSEL INSPECTOR CERTIFICATION EXAMINATION May and September, 2017 and January 2018 (Replaces May 2016) API Authorized Pressure Vessel Inspectors must have a broad knowledge
More informationPibiviesse High Performance Control Ball Valve
Pibiviesse High Performance Control Ball Valve Sizes 2 to 48 Pressure rating up to ANSI 2500# Anti-cavitation and low noise trim available High turndown High rangeability Unique self-cleaning effect Single
More informationAPI-510 PRESSURE VESSEL INSPECTOR
BODY OF KNOWLEDGE API-510 PRESSURE VESSEL INSPECTOR CERTIFICATION EXAMINATION July 2013 (Replaces July 2012) API Authorized Pressure Vessel Inspectors must have a broad knowledge base relating to maintenance,
More informationACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS
ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS TSSA GUIDE FOR SURVEY TEAMS The Technical Standards and Safety Authority Boilers and Pressure Vessels Safety Division 3300 Bloor Street West 14th Floor,
More informationLeak testing of Valves. Standards for acceptable Rates of Valve Leakage
Leak testing of Valves Standards for acceptable Rates of Valve Leakage American Petroleum Institute (API) The API standard 598: Valve Inspection and Testing, covers the testing and inspection requirements
More informationValve Inspection & Testing
Inspection & Testing in accordance with API 598 Valve Inspection & Testing Shell Test (Body Hydro Test): - Each valve shall be tested in accordance with ASME B 16.34 for ASME valves. Shell test pressure
More informationPressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"
F. INTERPRETATION OF THE ESSENTIAL SAFETY REQUIREMENTS ON MANUFACTURING Guideline F-01 Guideline related to: Annex 1 Section 3.1.2 According to section 3.1.2 (permanent joining) of Annex I, the third party
More informationINTRODUCTION CONTENTS PAGE
INTRODUCTION DAFRAM S.p.A., founded in 1956, was the first company to manufacture floating ball valves in Italy. The long experience gathered during its more than 50 years of activity ensures that DAFRAM
More informationASME BOILER CODE WEEK AND PRESSURE VESSEL CODE WEEK May 5-10, 2019 Grand and Little America Hotels, Salt Lake City, Utah
ASME BOILER CODE WEEK AND PRESSURE VESSEL CODE WEEK May 5-10, 2019 Grand and Little America Hotels, Salt Lake City, Utah ***The schedule is subject to change. Please pick up the most updated schedule onsite***
More informationUn-Pressurized Orefice Fittings FIO EZ. Parts List and Operation Instructions TECHNICAL MANUAL. Dn 2-6 Class Lbs
Un-Pressurized Orefice Fittings FIO EZ Parts List and Operation Instructions TECHNICAL MANUAL Dn 2-6 Class 150-600 Lbs US US 2 FIO EZ - MT 108-US - 05-2016 FIO EZ Important Instructions US Pietro Fiorentini
More informationInstallation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914
Installation, Operating and Maintenance Instructions V914 Cast Iron Flanged Swing Check Valve V914 THE PRESSURE EQUIPMENT DIRECTIVE 97/23/EC and CE MARKING The Pressure Equipment Regulations 1999 (SI 1999/2001)
More informationStandard Pneumatic Test Procedure Requirements for Piping Systems
the pressure equipment safety authority Standard Pneumatic Test Procedure Requirements for Piping Systems AB-522 Edition 2, Rev. 1 Issued 2016-10-24 Table of Contents FOREWORD... 1 1.0 INTRODUCTION...
More informationBALL VALVE ASSEMBLY AND MAINTENANCE PROCEDURE. REF. DOC.MMM900N Rev.1 March 2014 SERIES M DIN / ANSI. Page 1 of 17
SERIES M DIN / ANSI Page 1 of 17 REVIEW CONTROL PROCEDURE REF.DOC.MMM900N REV. DATE CARRIED OUT BY APPROVED BY DESCRIPTION 0 12/05/2013 E.Hidalgo J.Tejedor Initial Edition 1 27/03/2014 D.Grau J.Tejedor
More informationSpring Loaded Safety Valves
Translated English of Chinese Standard: GB/T12243-2005 Translated by: www.chinesestandard.net Wayne Zheng et al. Email: Sales@ChineseStandard.net GB ICS 23.060.01 J 16 NATIONAL STANDARD OF THE PEOPLE S
More informationMaterials : Forged carbon steel A105N
Certificate 3.1 Size : Ends : Min Temperature : Max Temperature : DN 15 to 50 (NPS 1/2" to 2") Flanges RF CLASS 150 (PN20) - 29 C + 425 C Max Pressure : 20 Bars Specifications : Rising non rotating stem
More informationHigh Pressure Iron (HPI) Recertification Guidelines & Procedures
Page 1 of 5 HPI Shop 6201 Andrews Hwy Odessa, Tx 79762 Ph: 432-362-1818 Fx: 432-362-3118 Howard Supply Company www.howard-supply.com High Pressure Iron (HPI) Recertification Guidelines & Procedures Page
More informationFULL QUALITY ASSURANCE CERTIFICATE
FULL QUALITY ASSURANCE CERTIFICATE Certificate No.: 12072-2018-CE-IND-ACCREDIA Initial date: 18 April, 2002 Validity: 30 January, 2018 to 29 January, 2021 This certificate consists of 5 pages This is to
More informationLEAKAGE ACCEPTANCE RATES COMPARISON METAL & SOFT SEATED VALVES ISO 5208/API 598/API 6D/MSS SP-61/FCI 70-2
ADELAIDE BRISBANE PERTH LEAKAGE ACCEPTANCE RATES COMPARISON METAL & SOFT SEATED VALVES ISO 5208/API 598/API 6D/MSS SP-61/FCI 70-2 TESTING & LEAKAGE RATES OVERVIEW From an engineering point of view, almost
More informationEvent Time Event Name Meeting Room Sunday, January Monday, January
Event Time Event Name Meeting Room Sunday, January 25 2015 Opens @ 12:00 PM - 06:00 PM Registration Opens @ 12:00 PM - 06:00 PM ASME Office 01:00 PM - 03:00 PM CNC Task Group on NQA-1 Part II Checklist
More informationROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6
Sub Section INDEX Page Number 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6 6. INSTALLATION AND OPERATION 6 7. MAINTENANCE 8 8. REPAIR 9 9. ASSEMBLY 10 10.
More informationPipeline Systems PIP PLSMV004 Carbon Steel Globe Valve Descriptions
November 2017 Pipeline Systems PIP PLSMV004 Carbon Steel Globe Valve Descriptions PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice
More informationIndustrial valves Pressure testing of metallic valves
INTERNATIONAL STANDARD ISO 5208 Fourth edition 2015-06-15 Industrial valves Pressure testing of metallic valves Robinetterie industrielle Essais sous pression des appareils de robinetterie métalliques
More informationBALL VALVE ASSEMBLY AND MAINTENANCE PROCEDURE FOR LCV BALL VALVES REF. DOC. MMM LCVE Rev.0 July 2010 SERIES SFF & SFR.
SERIES SFF & SFR SFF / SFR EN/ANSI/ASME/API/BS/NF SFF EN/DIN/BS/NF Page 1 of 16 REVIEW CONTROL PROCEDURE REF.: DOC. MMM LCVE REV. DATE CARRIED OUT BY APPROVED BY DESCRIPTION 0 19/07/2010 J. Rubio J.Tejedor
More informationWHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual
WHEATLEY SERIES 500 SWING CHECK VALVE STANDARD INTEGRAL SEAT & OPTIONAL REMOVABLE SEAT 2" FP - 6" FP 150# - 1500# 8" FP - 12" FP 150# - 900# API 6D and B16.34 2" FP - 4" FP 5000# DRILLING PRODUCTION VALVE
More informationWHEATLEY Series 500 Swing Check Valve
Document Number: TC003001-13 Revision: 02 WHEATLEY Series 500 Swing Check Valve Installation, Operation, and Maintenance Manual TABLE OF CONTENTS BILL OF MATERIALS...3 SCOPE...5 INSTALLATION AND OPERATION
More informationVALVE MANUFACTURERS ASSOCIATION API 622 API 624
VALVE MANUFACTURERS ASSOCIATION API 622 API 624 Written by Rich Davis Manager Business Development Western Hemisphere & China Flexitallic L.P., Deer Park, Texas Presented By: Steve Butler, Shell Global
More informationMSC Guidelines for Independent Fuel Tanks
References: Contact Information a. 46 CFR 58.50 (Independent Fuel Tanks) b. 46 CFR 119.440 (Independent Fuel Tanks) c. 46 CFR 182.440 (Independent Fuel Tanks) C. J. Robuck, LCDR, Chief, Engineering Division
More informationQUALITY ASSURANCE SPECIFICATION NONDESTRUCTIVE EXAMINATION PAGE 1 OF 7
QUALITY ASSURANCE SPECIFICATION REVISION: 0 DATE: 08/29/14 NONDESTRUCTIVE EXAMINATION PAGE 1 OF 7 1.0 Purpose The purpose of this specification is to establish the minimum quality assurance requirements
More informationCURI Pierside Stainless Diesel Tank
Mechanical Integrity Report for the CURI Pierside Stainless Diesel Tank at 208 North Palmetto Boulevard Clemson, South Carolina 29631 Inspection: 26 September 2012 Prepared by: George E. Matthews, E.I.T.
More informationHYDROSTATIC LEAK TEST PROCEDURE
This information is proprietary and shall not be disclosed outside your organization, nor shall it be duplicated, used or disclosed for purposes other than as permitted under the agreement with Kinetics
More informationASME Boiler & Pressure Vessel Code Analysis of the 1497 MHz High-Current Cryomodule Helium Vessel
1.0 Introduction ASME Boiler & Pressure Vessel Code Analysis of the 1497 MHz High-Current Cryomodule Helium Vessel Katherine Wilson 28 May 2007 To minimize the hazards associated with vacuum and pressure
More informationPIP PNSMV004 Carbon Steel Globe Valve Descriptions
February 2015 Piping PIP PNSMV004 Carbon Steel Globe Valve Descriptions PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has
More informationRegulated Oil and Gas Companies under National Energy Board Jurisdiction
File 185-A000-41 8 August 2003 Regulated Oil and Gas Companies under National Energy Board Jurisdiction Dear Sir / Madam: Guidance Notes for Pressure Equipment under National Energy Board Jurisdiction
More informationWATER MADE EASY MARINE ENERGY MUNICIPAL INDUSTRIAL
Capital Controls Series 71V3000 The Series 71V3000 electrically-heated vaporizer automatically vaporizes and superheats liquid chlorine, sulfur dioxide or ammonia at a rate controlled by the gas feed system.
More informationNBIC Committee Action Block
NBIC Committee Action Block Subject File Number Change of Service NB 08 0321 (Inspec) NB 08 0320 (Install) NB 08 0322 (R & A) Prop. on Pg. Proposal Explanation Part 2: Add a new Supplement 9, Requirements
More informationContents. 1. Non Destructive Testing Requirements. 2. Non Destructive Testing Methods Magnetic Particle Examination
1 Contents 1. Non Destructive Testing Requirements 2. Non Destructive Testing Methods Magnetic Particle Examination 3. Non Destructive Testing Methods Dye Penetrant Examination 4. Non Destructive Testing
More informationSUPPLY OF ISOLATION AND APPLIANCE VALVES PTS - ISOLATION BALL VALVE
PTS - ISOLATION BALL VALVE 2 30.06.17 Issued for Corrigendum#1 AS ADE GS 1 12.04.17 Issued for Tender AS AD GS 0 06.03.17 Issued for Client s Comments AS AD GS Rev. Date Subject of revision Author Checked
More informationSUPPLY OF ISOLATION AND APPLIANCE VALVES PTS - APPLIANCE BALL VALVE
PTS - APPLIANCE BALL VALVE 2 30.06.17 Issued for Tender AS ADE GS 1 12.04.17 Issued for Tender AS AD GS 0 06.03.17 Issued for Client s Comments AS AD GS Rev. Date Subject of revision Author Checked Approved
More informationASSE International Product (Seal) Listing Program. ASSE Performance Requirements for Air Valve and Vent Inflow Preventer
ASSE International Product (Seal) Listing Program ASSE 1063-2016 Performance Requirements for Air Valve and Vent Inflow Preventer Manufacturer: Contact Person: E-mail: Address: Laboratory: Laboratory File
More informationThis document is a preview generated by EVS
INTERNATIONAL STANDARD ISO 16148 Second edition 2016-04-15 Gas cylinders Refillable seamless steel gas cylinders and tubes Acoustic emission examination (AT) and follow-up ultrasonic examination (UT) for
More informationBall Float Steam Trap UNA 43 PN 16/CL 125/JIS 10K UNA 46 PN 40/CL 150/CL 300/JIS 10K/JIS 20K DN 80, 100, 150, 3", 4", 6"
Data Sheet 819584-00 Issue Date: 01/17 Ball Float Steam Trap UNA 43 PN 16/C 125/JIS 10K UNA 46 PN 40/C 150/C 300/JIS 10K/JIS 20K DN 80, 100, 150, 3", 4", 6" UNA 43 hl, UNA 46 hl UNA 43 v, UNA 46 v with
More informationSECTION BUTTERFLY VALVES
SECTION 15112 BUTTERFLY VALVES PART 1 GENERAL 1.01 SUMMARY A. All butterfly valves shall be of the tight closing, rubber seated type and fully comply with the latest revision of AWWA Standard C504, Class
More informationSPECIFICATIONS - DETAILED PROVISIONS Section Butterfly Valves C O N T E N T S
SPECIFICATIONS - DETAILED PROVISIONS Section 15103 - Butterfly Valves C O N T E N T S PART 1 - GENERAL... 1 1.01 REQUIREMENT... 1 1.02 VALVE MANUFACTURER... 1 1.03 GUARANTEE... 1 PART 2 - PRODUCT... 1
More informationASYBCO 90 O ELBOW LONG RADIUS O.D. I.D.
90 O ELBOW LONG RADIUS Standard weight Extra strong Schedule 160 Double extra strong ASTM A-234 ASME / ANSI B16.9 Carbon and ferritic alloy steel Produced from X-rayed, stress-relieve welded pipe. Welds
More informationCast iron swing check valve. BS EN 12334:2001 PN16
Cast iron swing check valve. BS EN 12334:2001 PN16 V914 Size Pattern No. Pack 1 Qty Pack 2 Qty Code Barcode Price ( ) ex VAT 65mm V914 1 0 15378 5022050079664 223.32 80mm V914 1 0 15379 5022050079824 247.60
More informationMSS STANDARD PRACTICE SP-61 This MSS Standard Practice was developed under the consensus of the MSS Technical Committee 114 and the MSS Coordinating C
MSS SP-61-2009 Pressure Testing of Valves Standard Practice Developed and Approved by the Manufacturers Standardization Society of the Valve and Fittings Industry, Inc. 127 Park Street, NE Vienna, Virginia
More informationCLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.
Page 1 of 7 CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD 1. SCOPE 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems. 1.2 The piping system as used herein is
More informationNotice for Pressure Special Equipment Manufacture Licensing
AQSIQ Notice No.151 (2012) Notice for Pressure Special Equipment Manufacture Licensing To further enhance the implementation of the manufacture licensing system to imported pressure special equipment,
More informationWelcome to the LESER Seminar, Taipei 28. June Design_of_safety_relief_valves_250804_Cal
Welcome to the LESER Seminar, Taipei 28. June 2006 1 Design of safety relief valves 2 Design of safety valves Target Classification of Pressure Relief Devices General design of Safety Relief valves 3 Design
More informationMaterials : Forged carbon steel A350 LF2
Size : Ends : Min Temperature : Max Temperature : DN 15 to 50 (NPS 1/2" to 2") Female - Female NPT, Socket Welding - 46 C + 425 C Max Pressure : 250 Bars (Class 1500) Specifications : Rising rotating stem
More information2018 Exploration & Production Winter Standards Meeting January 22-26, 2018 Hyatt Regency San Antonio San Antonio, Texas
2018 Exploration & Production Winter Standards Meeting January 22-26, 2018 Hyatt Regency San Antonio San Antonio, Texas www.api.org Current as of November 29, 2017 Subject to change Final program distributed
More informationSpecification for Choke and Kill Equipment
Specification for Choke and Kill Equipment API SPECIFICATION THIRD EDITION, XXXX 2018 DRAFT 1 Choke and Kill Equipment 1 Scope This specification establishes the minimum requirements for the design and
More informationContents. LWN edition:
Contents 2.1 Introduction...2.1-1 2.2 Loading Principle...2.2-1 2.3 Primary / Secondary Pressure Zone...2.3-1 2.3.1 Nominal Sizes Inlet and Outlet...2.3-2 2.3.2 Angle Type Body...2.3-2 2.4 Vessel Connections...2.4-1
More informationRules for the Installation, Inspection and Testing of Air Reservoirs (Other than on Locomotives)
Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on Locomotives) December 5, 1994 TM Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on
More informationPipeline Systems PIP PLSC0019 Specification for Pressure Testing HDPE Plastic Pipeline Systems
November 2017 Pipeline Systems PIP PLSC0019 Specification for Pressure Testing HDPE Plastic Pipeline Systems PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry
More informationModel PIV UL/FM Post Indicator Valve. Maintenance and Operation Manual UL/FM Post Indicator Valve Configuration AWWA C515
Model 2010 -PIV UL/FM Post Indicator Valve Maintenance and Operation Manual UL/FM Post Indicator Valve Configuration AWWA C515 2 LAYOUT AND SITING At the design stage, it should be considered where valves
More informationInstallation, Operation and Maintenance Manual for Back Pressure Regulator
Installation, Operation and Maintenance Manual for Back Pressure Regulator Model 8860 2009 Groth Corporation IOM-8860 Rev. B 12541 Ref. ID: 95565 Page 2 of 13 Table of Contents I. INTRODUCTION 3 II. DESIGN
More informationINSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS 2-4 REDUCED PORT/ FULL PORT (5700/6700) ANSI CLASS 150/300/600/900/1500/2500 TRUNNION BALL VALVES
PBV-USA,Inc. 12735 Dairy Ashford. Stafford, Texas USA 77477 281-340-5400; 800-256-6193 FAX: 281-340-5499 INDUSTRIAL BALL VALVES IM0 69 April 2001 Rev 9 INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS
More informationAPI 510: Pressure Vessel Inspection Code (API Exam Preparation Training)
An Intensive 2-Week Training Course API 510: Pressure Vessel Inspection Code (API Exam Preparation Training) Maintenance, Inspection, Rating, Repair and Alteration 11-22 Aug 2019, Dubai 07-MAY-18 This
More informationMSC Guidelines for Pressure Vessels
References: a. 46 CFR Part 54 Pressure Vessels S. T. Brady, CDR, Chief, Engineering Division b. ASME Boiler and Pressure Vessel Code (BPVC), Section VIII, Division 1, (1998 Edition) c. Navigation and Inspection
More informationPROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES
NB16 0603 NR Task Group 1 9 16 1. One update by NR task group page 3: 7/17/19 2. Two updates to S6.1 and S6.3 on page 1: 7/19/17 SUPPLEMENT 6 PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES
More informationSECTION PRESSURE TESTING OF PIPING
SECTION 15044 PRESSURE TESTING OF PIPING PART 1 - GENERAL 1.01 DESCRIPTION A. Scope of Work: This section specifies the leakage and pressure testing of piping. B. Testing Records: PART 2 - PRODUCTS 2.01
More informationType Testing of Rising Stem Valves Equipped with Graphite Packing for Fugitive Emissions
Type Testing of Rising Stem Valves Equipped with Graphite Packing for Fugitive Emissions 1 Scope This standard specifies the requirements and acceptance criteria (100 ppmv) for fugitive emission type testing
More informationWELCOME to CAUx Local India 2018
WELCOME to CAUx Local India 2018 Flange Design In Detail Prepared by Sachin Pol and Fauzan Badiwale Some Typical Flange Images 3 Some Typical Gasket Images 4 Flange Design As Per ASME Sec.VIII Div.1 Mandatory
More informationSerie 06-M6. Swing wafer check valve. made in. Application fields. Check valves E U R O P E WATER CONDITIONING INDUSTRY
Swing wafer check valve BRANDONI made in E U R O P E Application fields WATER CONDITIONING INDUSTRY HEATING 38 www.brandoni.it The valves in series 06 are swing wafer check valves, manufactured in accordance
More informationGuided Wave Testing (GWT)
Guided Wave Testing (GWT) Use of guided wave testing for the detection and monitoring of corrosion under insulation Peter Philipp Independent GWT consultant Level 3 GUL Level 3 PCN GWT BINDT-ICorr. - 12/05/2013
More information6.6 Relief Devices. Introduction
6.6 Relief Devices Introduction Relief devices are used to help prevent a catastrophic failure of equipment and/or minimize the effects of any unanticipated or uncontrolled events. As such, relief devices
More informationLiquefied gas cargo tanks and process pressure vessels
.1 -.3 Liquefied gas cargo tanks and process pressure vessels.1 General.1.1 The present texts give the general principles which are applied by Classification Societies for approval and survey of the relevant
More informationEngineering Data Sheet
Page 1 of 6 CE MARKING AND THE PRESSURE EQUIPMENT DIRECTIVE 97/23/EC Valves must be installed into a well designed system and it is recommended that the system be inspected in accordance with the appropriate
More informationProcess Industry Practices Pipeline Systems
September 2013 Process Industry Practices Pipeline Systems PIP PLX03CS5S01 Pipeline Systems, ASME B31.8 Material Specification Inside Production, Well Site Facility, Class 300, Carbon Steel, 0.03125" (1/32
More informationSubpart E. Pressure Testing
Subpart E Pressure Testing 195.300 Scope This subpart prescribes minimum requirements for pressure testing of steel pipelines. However, this subpart does not apply to movement of pipe covered by 195.424.
More informationMaterials : Carbon steel ASTM A216 WCB
Certificate 3.1 Size : Ends : Min Temperature : Max Temperature : DN 50 to DN 400 ( NPS 2" to 16" ) Flanges R.F. Class 150 (PN20) - 29 C + 425 C Max Pressure : 20 Bars Specifications : Removable stainless
More informationIndustrial valves Isolating valves for low-temperature applications Part 1: Design, manufacturing and production testing
BSI Standards Publication NO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAW Industrial valves Isolating valves for low-temperature applications Part 1: Design, manufacturing and production
More informationAPPENDIX 1. PART 10: Leak Detection Inspector, Level 1, 2 and 3 CERTIFICATION SCHEME FOR PERSONNEL. 3 rd Edition, February 2016
CERTIFICATION SCHEME FOR PERSONNEL Document No. CSWIP-ISO-NDT-11/93-R Requirements for the Certification of Personnel Engaged in Non- Destructive Testing in accordance with the requirements of BS EN ISO
More informationSCA Series Inverted Bucket Steam Traps
0770050/5 IM-P077-06 ST Issue 5 SCA Series Inverted Bucket Steam Traps Installation and Maintenance Instructions 1. General safety information 2. General product information 3. Installation 4. Commissioning
More informationADVANTAGES DESCRIPTION MECHANICAL FITTINGS AND DIMENSIONS
03304 Float Gauge: Level measurement Application: LNG tanks Level 03304 E 1 ADVANTAGES - High level accuracy - Local mechanical counter read out. - High reliability - Suitable for 12 and 8 still well.
More informationContents. 1. General information BROEN BALLOMAX Steel Ball Valves Approvals Quality Management...2
Contents 1. General information...2 1.1 BROEN BALLOMAX Steel Ball Valves...2 1.2 Approvals...2 1.3 Quality Management...2 2. Preoperational Instructions and Precautions...2 3. Plates...3 4. Transport and
More informationDUPLEX TECHNICAL INFORMATION FABRICATED DUPLEX STRAINERS
DUPLEX STRAINER TECHNICAL INFORMATION - 119 - SCREEN OPENINGS 100 Mesh - 30% O.A. 0.006 Openings 80 Mesh - 36% O.A. 0.008 Openings 60 Mesh - 38% O.A. 0.010 Openings 40 Mesh - 41% O.A. 0.016 Openings 30
More informationNAVSEA STANDARD ITEM. 2.2 T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods
NAVSEA STANDARD ITEM ITEM NO: 009-53 DATE: 29 JUL 2011 CATEGORY: II 1. SCOPE: 1.1 Title: Bolted Bonnet Steam Valve; repair (shop) 2. REFERENCES: 2.1 S9086-CJ-STM-010/CH-075, Fasteners 2.2 T9074-AS-GIB-010/271,
More informationOutline for Safety Performance Supervisory Inspection of Boiler and Pressure Vessel Products
Outline for Safety Performance Supervisory Inspection of Boiler and Pressure Vessel Products Appendix 1 Supervisory Inspection Rule for Safety Performance of Boiler and Pressure Vessel Products Published
More informationSpecification for Choke and Kill Equipment
Specification for Choke and Kill Equipment API SPECIFICATION THIRD EDITION, XXXX 2018 DRAFT 1 Choke and Kill Equipment 1 Scope This Specification identifies requirements for the performance, design, materials,
More informationGREIG FILTERS, INC. OPERATION MANUAL
GREIG FILTERS, INC. OPERATION MANUAL MODEL DCFH 3P 15/3 100 S4 DOE/222 DUAL CARTRIDGE FILTER HOUSING TABLE OF CONTENTS I. INTRODUCTION II. CARTRIDGE FILTER HOUSING UNIT A. OPERATION B. INSTALLATION C.
More informationMaterials : Forged carbon steel A105N
Size : Ends : Min Temperature : Max Temperature : DN 15 to 50 (NPS 1/2" to 2") Socket Welding -29 C + 425 C Max Pressure : 250 Bars (Class 1500) Specifications : Rising stem (OS&Y) Welded bonnet Full bore
More informationNOTICE REGARDING CODE CASES OF THE ASME B31 CODE FOR PRESSURE PIPING
NOTICE REGARDING CODE CASES OF THE ASME B31 CODE FOR PRESSURE PIPING All B31 Code Cases in effect as of September 1, 007 will remain available for use unless annulled by the B31 Standards Committee. B31
More informationISO INTERNATIONAL STANDARD. Cryogenic vessels Pressure-relief accessories for cryogenic service Part 1: Reclosable pressure-relief valves
INTERNATIONAL STANDARD ISO 21013-1 First edition 2008-06-15 Cryogenic vessels Pressure-relief accessories for cryogenic service Part 1: Reclosable pressure-relief valves Récipients cryogéniques Dispositifs
More informationInstallation, operation & maintenance manual - original version
Installation, operation & maintenance manual - original version AVK gate valves for water and wastewater Series 01, 02, 06, 12, 15, 18, 20, 26, 32, 33, 36, 38, 50, 55 and 636 COPYRIGHT AVK GROUP A/S 2018
More informationPV4 and PV6 Piston Valves
1181250/1 IM-P118-05 ST Issue 1 PV4 and PV6 Piston Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning 5. Operation 6.
More informationReply 2: See Reply 1.
LAST UPDATED: APRIL, 2018 Ed Section Question Answer 3rd 5.5.2 Background: Section 5.5.2 calls out the design verification testing requirements for blowout preventers. It only points to Section 5.7. i.e.,
More informationBall Float Steam Trap UNA 45 MAX, UNA 46 MAX, UNA 46A MAX PN 40/Class 300 DN 40, 50, 65
Data Sheet 819346-02 Issue Date: 05/17 Ball Float Steam Trap UNA 45 MAX, UNA 46 MAX, UNA 46A MAX PN 40/Class 300, 50, 65 UNA 45hl MAX, UNA 46hl MAX, UNA 46Ahl MAX UNA 45v MAX with cover for mounting electrode
More information