Safety Risk Assessment Hand and Power Tools

Size: px
Start display at page:

Download "Safety Risk Assessment Hand and Power Tools"

Transcription

1 One Direct aintenance td Persons at (Groups) Assessor Appointment Tel. No. Description of Task or Activity A One Direct employees ark Bloxidge H&S anager Use of hand and power tools B Contractors/Sub contractors C Tenants D embers of the public Work Type Review Date Routine July 2019 Severity Probability evel Existing evel Additional Required evel added 1) Use of hand tools Cuts and abrasions, flying objects A,B,C,D S F H 1) All tools to be maintained in good condition 2) Tools to only be used for the task intended in line any manufactures instructions 3) All tools to be inspected by the user prior to use 1,2,3,4,5) Condition and appropriate use of hand tools to be checked during H&S inspections 6) PPE to be issued, recorded, monitored and replaced where appropriate 4) All tools to be appropriately stored to avoid damage 5) All damaged tools to be removed from use immediately 6) Appropriate PPE to be supplied and worn as identified T = Tolerable, = ow, = edium, H = High, N = Intolerable Page 1

2 One Direct aintenance td Severity Probability evel Existing evel Additional Required evel added 7) Prevent use of tools by unauthorised persons 2) Use of power tools Cuts and abrasions, flying objects, entanglement A,B,C,D S F H 1) All tools to be maintained in good condition 2) Tools to only be used for the task intended in line any manufactures instructions 3) All tools to be inspected by the user prior to use 1,2,3,4,5,6,7,8,9,13,14) Condition and appropriate use of hand tools to be checked during H&S inspections 11) PPE to be issued, recorded, monitored and replaced where appropriate 4) All tools to be guarded as per manufacturer s instructions 5) Guards to be inspected regularly 6) All tools to be covered under an appropriate PAT schedule 7) All tools to be battery powered or 110V 8) Ensure that all cables are secured to avoid trip hazards 9) Ensure dust extraction is fitted to all tools if required T = Tolerable, = ow, = edium, H = High, N = Intolerable Page 2

3 One Direct aintenance td Severity Probability evel Existing evel Additional Required evel added 10) Prevent use of tools by unauthorised persons, to include tenants and members of the public 11) Appropriate PPE to be supplied and worn as identified 12) Allow sufficient space to work safely 13) All tools to be appropriately stored to avoid damage 14) All damaged tools to be removed from use immediately 3) anual Handling A,B,C,D S F H 1) Operatives are trained and competent in the task 1) Document operative training and competence Sprains and strains, impact injury, lacerations 2) Safety footwear to be worn at all times 3) Gloves available for use where required to prevent splinters and pinch injuries 2,3) PPE to be issued, recorded, monitored and replaced where appropriate 4) Ensure correct resources are allocated as required 4) Resources available for team lifts where appropriate 1,2,3,4,5) See SRA for manual handling T = Tolerable, = ow, = edium, H = High, N = Intolerable Page 3

4 One Direct aintenance td Severity Probability evel Existing evel Additional Required evel added 4) Tools on Hire A,B,C,D S F H 1) Ensure that tools are hired from a reputable supplier 2) Ensure that tools are supplied appropriate testing, maintenance and inspection documentation 3) Ensure that manufactures user manuals are supplied tools 5) Noise Exposure to high levels leading to occupational hearing loss A,B,C,D S P H 1) ost work is restricted to short duration 2) Use self-dampening tools where available 3) Appropriate PPE to be supplied and worn as identified 1) Noise monitoring to be carried out for tasks and equipment that fall outside the scope of short duration 2) Hearing protection to be worn for all equipment that exceeds levels of 85db 6) Hand arm vibration Exposure to occupational injuries to blood vessels, nerves and joints A S P H 1) Tools built in HAV dampener protection to be used where available 2) Gloves to be worn when using tools that generate vibration or impact 1,2) HAV questionnaires to be completed for all operatives, any existing conditions or new symptoms to be referred to occupational health advisor T = Tolerable, = ow, = edium, H = High, N = Intolerable Page 4

5 One Direct aintenance td Severity Probability evel Existing evel Additional Required evel added 7) Slips, trips and falls Trips on trailing cables or materials, Falls from height A,B,C,D S P H 1) All cables to be taped down, covered or attached at a high level to prevent trip hazards 2) All materials and waste to be tidy or removed from site to maintain good housekeeping standards and prevent trip hazards 1,2) To be monitored during H&S inspections 2) Regular waste collections to take place in order to prevent build-up of waste on site 3) Appropriate controls to be implemented for all working at height to prevent falls 8) Injury to others Injury to others as a result of work activities including tenants and members of the public A,B,C,D O 1) Ensure work areas in communal areas are appropriately cordoned off and safety signage is in place 2) When working in occupied properties ensure that tenant is aware of works being under taken and any associated risks T = Tolerable, = ow, = edium, H = High, N = Intolerable Page 5

6 One Direct aintenance td Personal Protective Equipment required (PPE): Icon Glossary HARD HAT HAND PROTECTION SAFETY VISOR HIGH VIZ SAFETY FOOTWEAR DUST ASK EYE PROTECTION EAR PROTECTION Protective Clothing T = Tolerable, = ow, = edium, H = High, N = Intolerable Page 6

7 One Direct aintenance td Contingency Plan Item No Occurrence Contingency/Action 1 Unauthorised entry to working area. Violence and aggression / public access to restricted work area 2 Electricity failure / flood / pipe leak / striking cable / pipework ighting failure / water in premises / electrocution 1) Aggressive behaviour / damage to access equipment 1) Work would cease. Unauthorised visitors asked to leave One Direct supervisor informed. Emergency services called if required. 2) one working procedure in place. 1) Severance of services / lighting failure. 1) Work would cease and client would be informed by One Direct Supervisor so remedial work can be carried out in order for the work to re-start. 3 Poor communication / lack of contact between direct labour and subcontractors Poor standards / work being carried out in an inappropriate manner 1) Poor standard of work / low customer satisfaction / violent and aggressive behaviour from customer 1) One Direct supervisor to keep all parties informed of work procedures and standards, H&S inspections to take place. 4 Disturbance of asbestos containing materials Exposure to asbestos related illness 1) ack of appropriate asbestos information supplied for the property / task 2) Failure to comply asbestos procedures 1) Implement emergency asbestos procedure. T = Tolerable, = ow, = edium, H = High, N = Intolerable Page 7

Safety Risk Assessment Carpentry

Safety Risk Assessment Carpentry One Direct aintenance td Persons at (Groups) Assessor Appointment Tel. No. Description of Task or Activity A One Direct employees ark Bloxidge H&S anager 0208 821 5197 General carpentry activities including,

More information

Safety Risk Assessment Driving Grey Fleet Vehicles

Safety Risk Assessment Driving Grey Fleet Vehicles One Direct Maintenance td Persons at (Groups) Assessor Appointment Tel. No. Description of Task or Activity A One Direct employees Mark Bloxidge H&S Manager 0208 821 5197 One Direct staff driving their

More information

Safety Risk Assessment Roofing Works / Surveying / Inspections

Safety Risk Assessment Roofing Works / Surveying / Inspections One Direct aintenance td Persons at (Groups) Assessor Appointment Tel. No. Description of Task or Activity A One Direct employees ark Bloxidge H&S anager 0208 821 5197 One Direct Operatives accessing roof

More information

Safety Risk Assessment Working at Height: Mobile Tower Scaffold

Safety Risk Assessment Working at Height: Mobile Tower Scaffold Persons at (Groups) Assessor Appointment Tel. No. Description of Task or Activity A One Direct employees Mark Bloxidge H&S Manager 0208 821 5197 Working at height from Mobile Tower B Contractors/Sub contractors

More information

University College Dublin Machinery/Equipment Risk Assessment Template

University College Dublin Machinery/Equipment Risk Assessment Template 1. General Information Name of Person(s) carrying out assessment and their position Principal Investigator / Supervisor / Head of School or Unit (Person responsible for ensuring safety) Date of assessment

More information

Risk Assessment Form (Qualitative)

Risk Assessment Form (Qualitative) Assessment Form (Qualitative) Project / ocation:..d.a.s WATERS Contract No: RA & Issue No: 008 Prepared by:.r.smit Date: 10/10/16 Signature: ACTIVITY DESCRIPTION: Person (s) at risk: General Ground works

More information

Method Statement Author

Method Statement Author Plan Bee Limited 3.3 Etna Industrial estate Clamp Road Motherwell Scotland ML2 7XQ Tel: 01698580572 Method Statement Method Statement Details Method Statement Number 7 Method Statement Date Monday 3rd

More information

FIRE HYDRANT TESTING METHOD STATEMENT.

FIRE HYDRANT TESTING METHOD STATEMENT. SUBJECT: TASK: FIRE HYDRANT INSPECTION & TESTING. 1. Location....1 2. The Scope of Works.... 1 3. Description of Task.... 1 4. Access & Egress to & from Work Area.... 2 5. Safety Hazard Identification....

More information

Pre-control risk estimate. Likelihood Risk

Pre-control risk estimate. Likelihood Risk Activity Consequence s mitigation measures Site Access & Egress Slips, trips & falls al injury by falling. Sprains & broken bones. Site operatives 3 4 12 Ensure access to site is kept clear of plant &

More information

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS Section J How to develop safety elements for project safety management system 1. Once the project management has developed or adopted a safety policy, it needs to develop safety elements to meet the objectives

More information

Potential hazards People at risk and how? Actions already in place Further action required Action by

Potential hazards People at risk and how? Actions already in place Further action required Action by Risk Assessment Flat Roof Repair Prepared by Oracle Managed Services For: BAM FM On: 24/02/2017 Review date: N/A Potential hazards People at risk and how? Actions already in place Further action required

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT WATER PUMP - PETROL Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT AUGER / POST HOLE DIGGER Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

COSHH Hazardous Substances Health & Safety Management Standard Issue 2 (September, 2010)

COSHH Hazardous Substances Health & Safety Management Standard Issue 2 (September, 2010) COSHH Hazardous Substances Health & Safety Management Standard Issue 2 (September, 2010) Introduction This document contains corporate standards and guidance on the management of risks arising from the

More information

TUDOR PARK EDUCATION TRUST. Working at Heights and Risk Assessment

TUDOR PARK EDUCATION TRUST. Working at Heights and Risk Assessment TUDOR PARK EDUCATION TRUST Working at Heights and Risk Assessment Person(s) responsible for updating the policy: Chief Executive Officer Date Approved: Board of Directors on 7 July 2016 Period of Review:

More information

Potential risk of injury to staff

Potential risk of injury to staff Register Fire, Earthquake - other Emergencies Manual Handling and Repetitive Work Repetitive, Forceful Work Poor Housekeeping Not Wearing PPE (Personal Protective Equipment) Potential risk of injury to

More information

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO LOW LEVEL LIGHT UNITS

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO LOW LEVEL LIGHT UNITS PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO LOW LEVEL LIGHT UNITS Project: Insert Client Repair/ Replacement of low level light units/ low level

More information

Personal Protective Equipment

Personal Protective Equipment Personal Protective Equipment General This section addresses eye, face, head, hand and foot protection. respiratory and hearing protection. Separate programs exist for Employees will be provided personal

More information

Personal Protective Equipment

Personal Protective Equipment Policies & Procedures Personal Protective Equipment Internal Procedure: PPE Effective Date: 7-30-18 Last Modified: 7-30-18 Approved By: Todd Barnette Purpose To establish requirements for a Personal Protective

More information

Personal Protective Equipment

Personal Protective Equipment Northland Community & Technical College June 1, 2017 Personal Protective Equipment Safety Officer Cory Feller Chemical Hygiene Officer Kristel Kizer Telephone: 218-683-8633 1 Personal Protective Equipment

More information

ADRAIN SAFETY MANAGEMENT LTD. MCN Ltd RISK ASSESSMENT SHEET

ADRAIN SAFETY MANAGEMENT LTD. MCN Ltd RISK ASSESSMENT SHEET Description of task: ADRAIN SAFETY MANAGEMENT LTD. MCN Ltd SHEET Manual Handling of Loads Number of operatives Exposed : 4-6 Operatives 1. Muscle strains/ sprains/torn ligaments 2. Fractures from dropped

More information

HAZARD RECOGNITION EVALUATION and CONTROL

HAZARD RECOGNITION EVALUATION and CONTROL What is a hazard? HAZARD RECOGNITION EVALUATION and CONTROL Hazard - a dangerous object, event, behaviour or condition (in the workplace) which has the potential to cause injury, illness or property damage.

More information

West Midlands Police Risk Assessment Form

West Midlands Police Risk Assessment Form Assessment Form Assessment Subject/Area: Tasks associated with the execution of warrants URN (PU/001) etc): 01/2013 Assessed By: Assessment Date: 21/09/13 Review Date: September 2014 Assessor Responsibility

More information

Important Safety Information Enclosed

Important Safety Information Enclosed Important Safety Information Enclosed ShedBoss Safety Pack NOTE: ENSURE YOUR CONSTRUCTION CREW RECEIVES THIS PACK TO COMPLY WITH SAFE WORK AUSTRALIA CODE OF PRACTICE www.shedboss.com.au Important Safety

More information

SAFE WORK METHOD STATEMENT Part B

SAFE WORK METHOD STATEMENT Part B SAFE WORK METHOD STATEMENT Part B SWMS No.: 01 WORK ACTIVITY DESCRIPTION: Door Installation All FORESEEABLE OHS & ENVIRONMENTAL HAZARDS & RISKS ASSOSSIATED WITH THE WORKS MUST BE ASSESSED & ALLOCATED CONTROLS

More information

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors Appendix 1 Health & Safety Declaration, Roles and Responsibilities Each exhibitor and Informa appointed contractor must complete the Health and Safety Declaration form provided below to confirm they have

More information

The Sample Company Pty Ltd

The Sample Company Pty Ltd Job Safety and Environmental Analysis (JSEA) / Safe Work Method Statement (SWMS) Part 1: Project and Task Identification Process Initiators of SWMSs are responsible for consulting the Project Supervisor,

More information

TASK DAY RISK ASSESSMENT FORM

TASK DAY RISK ASSESSMENT FORM TASK DAY RISK ASSESSMENT FORM Assessment date Location and Activity details: Site Address Step One - Identify the activity and hazards Consider the activity or work area and identify if any of the hazards

More information

Manual Handling Procedure

Manual Handling Procedure Manual Handling Procedure Table of Contents 1 Purpose... 3 2 Scope... 3 3 Definitions... 3 4 Responsibilities... 3 4.1 Managers And Supervisors... 3 4.2 Workers (Employees, Contractors And Visitors)...

More information

HEALTH & SAFETY POLICY. Mitigation Policy: Training, including safety awareness training for employees required to work at height.

HEALTH & SAFETY POLICY. Mitigation Policy: Training, including safety awareness training for employees required to work at height. HEALTH & SAFETY POLICY ACEC INVESTMENTS LIMITED The construction industry accident fatality rate stands at more than double that of all sector average more minor accidents are almost incalculably more.

More information

RISK ASSESSMENT Installation of electrically operated service lifts (non passenger type)

RISK ASSESSMENT Installation of electrically operated service lifts (non passenger type) RISK ASSESSMENT 2011 WALLINGTON LIFT MAINTENANCE CO LTD Installation of electrically operated service lifts (non passenger type) 1 1 L a k e s i d e, W a l l i n g t o n, S u r r e y, S M 6 7 J Y T e l

More information

QUEENSLAND UNIVERSITY OF TECHNOLOGY

QUEENSLAND UNIVERSITY OF TECHNOLOGY QUEENSLAND UNIVERSITY OF TECHNOLOGY SITE SPECIFIC SAFETY MANAGEMENT PLAN FOR SAMFORD HOUSE SAMFORD ECOLOGICAL RESEARCH FACILITY SAMFORD VALLEY 2007 Dylan Randall SN: 06305466 dylan.randall@student.qut.edu.au

More information

B S Glass Ltd Safety procedures- outsourced Workplaces

B S Glass Ltd Safety procedures- outsourced Workplaces B S Glass Ltd Jan 17 B S Glass Ltd Safety procedures- outsourced Workplaces Index - - - - - - - - Page No On Site safety - - - - - - - - - - - - - - - - - - - Content 3. 1.00 Health and Safety Mission

More information

Risk Assessment. Appendix A contains

Risk Assessment. Appendix A contains Risk Assessment Department The Cockpit Risk Assessment number AM/09/01 Date. 1 st July 01 Review due date 0 th July 01 Activity Maintenance and support service working Location The Cockpit Name of Assessor/s

More information

Main Activity Hazard Rating Hazard Controls CLW Policy/Procedure

Main Activity Hazard Rating Hazard Controls CLW Policy/Procedure Job Hazard Analysis Position: Employment Direct Support Professional Completed by: Health & Safety Committee Date: November 11, 2016 Main Activity Hazard Rating Hazard Controls CLW Policy/ Providing Support

More information

CONSTRUCTSAFE TIER 1 HEALTH AND SAFETY COMPETENCY TEST FRAMEWORK

CONSTRUCTSAFE TIER 1 HEALTH AND SAFETY COMPETENCY TEST FRAMEWORK CONSTRUCTSAFE TIER 1 HEALTH AND SAFETY COMPETENCY TEST FRAMEWORK ConstructSafe Project Team March 2018 Version 1.3 1 Table of Contents 1. Introduction... 3 2. Candidate minimum required knowledge... 3

More information

Risk assessment. Assessment details. Task. Introduction. Please complete the form as fully and accurately as you can. Assessors job title

Risk assessment. Assessment details. Task. Introduction. Please complete the form as fully and accurately as you can. Assessors job title Risk assessment Introduction Please complete the form as fully and accurately as you can. Assessment details Name of organisation Assessor's name Assessors job title Any Company John Smith Manager Date

More information

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE.

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE. TE CONTROLLED COPY OF TIS DOCUMENT IS ON TE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR TE DATE AT TE BOTTOM OF TE PAGE. Title Using Angle Grinders SWMS No. 8 Authorized and email Signed by the

More information

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA RECOMMENDED ADDITIONAL CONTROLS TASK / ACTIVITY/ EQUIPMENT/ FACILITY HAZARDS UNWANTED EVENT MINIMUM CONTROLS REQUIRED RISK NO. LIKELI-HOOD CONSE-QUENCE RISK VALUE Project Risk Assessment Page 1 of 16 All

More information

THICKNESSER RISK ASSESSMENT (U003ra)

THICKNESSER RISK ASSESSMENT (U003ra) Task Being Carried Out: Area: Persons at Risk: Operation of T500 Thicknesser Brindle Mill Operatives, Maintenance engineers Description of Equipment: Wadkin T500 Thicknesser Serial No.: T500 82240 (Machine

More information

HSP18 Personal Protective Equipment

HSP18 Personal Protective Equipment Procedure Index Section Title 1 Introduction 2 What is Personal Protective Equipment (PPE) 3 What the Regulations require 4 Assessing the suitability of PPE 5 Thames Water minimum standards for PPE 6 General

More information

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010)

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010) (Ref. SOP QMS-080; EHS-010) Form-445 Inspected by: Date of inspection Date of Report Report # Pages Area Manager: Area Inspected: General This EHS Workplace Inspection was conducted by: Scope of the Inspection:

More information

Print this activity then complete it and keep it as evidence in your folder, or portfolio.

Print this activity then complete it and keep it as evidence in your folder, or portfolio. Workplace hazards Workplace Learning and Assessment Activity Workplace Learning and Assessment Activity Print this activity then complete it and keep it as evidence in your folder, or portfolio. Hazard

More information

Date Issued: November 2011 Revision Date: December 2012 Review Date: December 2015 Revision #

Date Issued: November 2011 Revision Date: December 2012 Review Date: December 2015 Revision # SUNCOR ENERGY PRODUCTS DISTRIBUTION TERMINAL OPERATING MANUAL STANDARD OPERATING PROCEDURE MAINTENANCE TASKS Date Issued: November 2011 Revision Date: December 2012 Review Date: December 2015 Revision

More information

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS Project: (insert Client) Replacement/ Repair of high level light units/ high

More information

To comply with the OHS Act, the responsible manager must carry out and document the following:

To comply with the OHS Act, the responsible manager must carry out and document the following: Owner: Manager Health, Wellbeing and Safety Last Update: 10 January 2018 Contents 1. Purpose... 1 2. Minimum Compliance Requirements... 1 3. Definitions... 2 4. Legislative requirements under the OHS Act

More information

COGPOLY39 Meet safety, health and environmental requirements in the workplace

COGPOLY39 Meet safety, health and environmental requirements in the workplace Meet safety, health and environmental requirements in the workplace Overview This unit is for those with responsibilities for meeting safety, health and environment requirements in the workplace. It is

More information

Safe Work Procedure for installation of external cladding

Safe Work Procedure for installation of external cladding Safe Work Procedure for installation of external cladding This procedure has been formulated to cover safe systems of work for the installation of external cladding. This instruction will be used to reduce

More information

SUPPLIER HEALTH AND SAFETY. Supporting a healthy and safe working environment for our people and customers

SUPPLIER HEALTH AND SAFETY. Supporting a healthy and safe working environment for our people and customers SUPPLIER HEALTH AND SAFETY Supporting a healthy and safe working environment for our people and customers Document Template Control Prepared by Georgina East May 2017 Date Approved by May 2017 Mark Beder

More information

Health, Safety and Welfare Policy

Health, Safety and Welfare Policy Health, Safety and Welfare Policy This Policy is prepared in accordance with section 2(3) the Health and Safety at work etc. Act 1974, with the intention of promoting a safe working environment that will,

More information

How severely could the risk hurt someone? Low/Insignificant First aid

How severely could the risk hurt someone? Low/Insignificant First aid Safe Work Method Statement No: WMS-02 Task: Concreting, Formwork and Steel Fixing This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia)

More information

Environmental Health & Safety Policy Manual

Environmental Health & Safety Policy Manual Environmental Health & Safety Policy Manual Issue Date 8/24/2009 Updated: 5/8/2018 Policy # EHS-400.03 Personal Protective Equipment 1.0 PURPOSE: In order to protect the health of employees and students,

More information

Section 5: Hazard Identification ( version)

Section 5: Hazard Identification ( version) Section 5: Hazard Identification (2010.06.16 version) 5.1 Introduction Purpose The hazard assessment process is a system to identify health hazards, occupational factors or illnesses, arising in and from

More information

Safe Work Method Statement

Safe Work Method Statement Company Name: Safe Work Method Statement Site Address: Other Details: Contractor: Activity/Trade: Electrician Date: TASKS List the tasks required to perform the activity in sequence carried out. Entry

More information

Safe High Pressure Water Washing (HPWW) Requirement

Safe High Pressure Water Washing (HPWW) Requirement Safe High Pressure Water Washing (HPWW) Requirement Index Page Introduction 3 Flow chart of process steps 4-5 Responsibilities 6 Risk assessment process 7-9 Job safety analyses considerations 10-11 Compliance

More information

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading Instructions for the Use of the Excel Spreadsheet There are Three tabs at the bottom of this worksheet Instructions tab is the one you are reading H&S Plan Tab The Plan Tab is the front cover pages of

More information

75 Years of Health and Safety Guidance

75 Years of Health and Safety Guidance H&S Guide: 60 Working Risks Personal Protective Equipment Personal Protective Equipment (also known as PPE) Employers have duties concerning the provision and use of personal protective equipment at work.

More information

PERSONAL PROTECTIVE EQUIPMENT

PERSONAL PROTECTIVE EQUIPMENT 13.0 The purpose of this program is to ensure that, where applicable, the appropriate and necessary personal protective equipment (PPE) is selected and provided to employees to protect from illness or

More information

responsible present? Y/N (When all controls are in place risk will be reduced). Extension tables are used when cutting large sheet materials

responsible present? Y/N (When all controls are in place risk will be reduced). Extension tables are used when cutting large sheet materials Technologies - No.54 Woodworking Bench Circular Saw (List additional hazards, risks and s particular to your school using the blank template no.69) azards Is the What is the Risk rating Controls Is this

More information

Method Statement. Method Statement Details. Signatures. Emergency Contact Details 1/5

Method Statement. Method Statement Details. Signatures. Emergency Contact Details 1/5 Highway Traffic Safety Ltd Lakeside House, 1 Furzeground Way Stockley Business Park Heathrow London UB11 1BD Tel: 02071 111655 Method Statement Method Statement Details Method statement number 4 Method

More information

Health & Safety Contractor rules

Health & Safety Contractor rules Health & Safety Contractor rules Contents 1. Introduction... 1 2. The legal bit explaining our terminology... 1 2.1 Legal requirements... 1 3. Our health and safety requirements... 1 3.1 Access to BT premises...

More information

TOOL BOX TALK NO3. Use of P.P.E

TOOL BOX TALK NO3. Use of P.P.E Combined Technical Solutions Ltd TOOL BOX TALK NO3. Use of P.P.E OBJECTIVE: Why PPE is important and why it should be looked after Personal Protective Equipment is intended to protect you from risks, which

More information

HS329 Risk Management Procedure

HS329 Risk Management Procedure HS329 Risk Management Procedure Work Health and Safety Act 2011 Policy hierarchy link Work Health and Safety Regulation 2011 Work Health and Safety Policy Code of Practice How to Manage Work Health and

More information

Health and Safety Policy Statement ENVILLE GOLF CLUB LIMITED

Health and Safety Policy Statement ENVILLE GOLF CLUB LIMITED Health and Safety Policy Statement ENVILLE GOLF CLUB LIMITED 2017 Index 1. General statement of health and safety 2. Organisation 3. Scope 4. Responsibilities 5. Management 6. Risk assessments 7. Tools

More information

Main Activity Hazard Rating Hazard Controls CLW Policy/Procedure Providing support to People who have challenging needs

Main Activity Hazard Rating Hazard Controls CLW Policy/Procedure Providing support to People who have challenging needs Job Hazard Analysis Position: Ventures Completed by: Health & Safety Committee Date: February 19, 2015 Main Activity Hazard Rating Hazard Controls CLW Policy/ Providing support to People who have challenging

More information

NUS Safety & Health Guidelines Procedure No: OSHE/SOP/GL/08

NUS Safety & Health Guidelines Procedure No: OSHE/SOP/GL/08 Page: Page 1 of 5 Prepared By Approved By Review Date Swapan Kanti Biswas Dr Peck Thian Guan 1.0 OBJECTIVE The objective of this document is to provide guidance on the selection and use of (PPE). This

More information

PERSONAL PROTECTIVE EQUIPMENT PROGRAM INTERNAL AND EXTERNAL PAGE: 1 DEPARTMENT: ALL OF: 5

PERSONAL PROTECTIVE EQUIPMENT PROGRAM INTERNAL AND EXTERNAL PAGE: 1 DEPARTMENT: ALL OF: 5 INTERNAL AND EXTERNAL PAGE: 1 1.0 OBJECTIVE The Federal Occupational Safety and Health Administration (OSHA) requirements for personal protective equipment (PPE) are presented in 29 CFR 1910.132 General

More information

Two Main Risks Associated with Foundry Work

Two Main Risks Associated with Foundry Work Two Main Risks Associated with Foundry Work WHAT IS OCCUPATIONAL HYGIENE? Occupational Hygiene? Occupational Hygiene? NO! Occupational Hygiene? Occupational Hygiene? NO! OCCUPATIONAL HYGIENE is the discipline

More information

Recognition, Evaluation, and Control of Hazards

Recognition, Evaluation, and Control of Hazards Recognition, Evaluation, and Control of Hazards Latest revised date: October 26, 2011 Page 1 of 8 1.0 Introduction Memorial University has established a system for the recognition, evaluation, and control

More information

A Health and Safety Tip Sheet for School Maintenance Staff. Did you know? Step 1. Identify job hazards. Step 2. Work towards solutions

A Health and Safety Tip Sheet for School Maintenance Staff. Did you know? Step 1. Identify job hazards. Step 2. Work towards solutions INSPECTION Health and CHECKLIST Safety Committees MAINTAINING SAFETY: A Health and Safety Tip Sheet for School Maintenance Staff 1 Maintenance and facilities staff members keep schools operational, safe,

More information

Workplace Safety Inspection Sheet

Workplace Safety Inspection Sheet Workplace Safety Inspection Sheet Record all details of a safety inspection carried out at your workplace 1 of 2 Date and Time of Inspection:... Area or workplace inspected:... Name(s) and signature(s)

More information

PLANT/EQUIPMENT/ASSET HAZARD REPORT

PLANT/EQUIPMENT/ASSET HAZARD REPORT Asset Description: EL-08001-011 : Harrison 550 CNC Lathe Large Sale Type For what use is this asset being sold? Re-Use þ Spare Parts Scrap Note 1: Assets are sold only for the use indicated. Any other

More information

Contractor handbook. Purpose

Contractor handbook. Purpose Page no: 1 / 6 Contractor handbook Purpose Mitie aims to ensure that the highest levels of performance are achieved by all persons working for us or on our behalf. We require the same level of performance

More information

Leicester City Council Health & Safety Risk Assessment Form Ref:

Leicester City Council Health & Safety Risk Assessment Form Ref: Division/Section: Bridges Team Work Activity: Structural Repairs Activity Location: 8 Minehead Street, Leicester Persons Affected: Manager: Date of Assessment: Property Occupiers and Site Operatives Abul

More information

The NEC Group, Birmingham - RISK ASSESSMENT

The NEC Group, Birmingham - RISK ASSESSMENT RISK Provide a description of the item or work activity that is likely to cause harm below. Provide a description of who could be exposed to the hazard(s). Provide information regarding the existing measures

More information

Mobile Training Unit (MTU)

Mobile Training Unit (MTU) Mobile Training Unit (MTU) The MTU provides a convenient way of meeting training requirements by bringing a range of short duration health & safety and operative training onsite. Through the MTU, employees

More information

HAZARD REGISTER CONSTRUCTION R E M E M B E R, T H E N U M B E R 1 H A Z A R D I S Y O U FREEPHONE:

HAZARD REGISTER CONSTRUCTION R E M E M B E R, T H E N U M B E R 1 H A Z A R D I S Y O U FREEPHONE: HAZARD REGISTER CONSTRUCTION R E M E M B E R, T H E N U M B E R 1 H A Z A R D I S Y O U FREEPHONE: 0800 555 339 WWW.HAZARDCO.COM Monitoring 01 General Use Heavy Machinery Demolition Excavation Construction

More information

WHS OHS HAZARD REGISTER (SITE AND OFFICE OPERATIONS)

WHS OHS HAZARD REGISTER (SITE AND OFFICE OPERATIONS) WHS 017 - WHS 017 Hazard Register - Version 5.0 April 20 Doc No: WHS 017 Effective Date: 04/04/20 1 WORKING WITH EARTHMOVING PLANT/ TRUCKS/SITE VEHICLES COLLISIONS OTHER PLANT EQUIPMENT SITE VEHICLES PERSONNELL

More information

Temporary load-bearing support for structural alterations or repairs

Temporary load-bearing support for structural alterations or repairs CRITICAL NOTE This document only becomes a Safe Work Method Statement where the High Risk Construction Work section of this document is completed Company: ABN: Contact Person: Ph: Project/Site: Principal

More information

Western Power Safe Work Method Statement Task details

Western Power Safe Work Method Statement Task details Western Power Safe Work ethod Statement Task details Description Substation aintenance D 10721527 Approved by anager, Work Practices Review team SWS Development Approval date October 2015 Qualifications/icences

More information

BHC-P-07.2 Health Hazards in Construction

BHC-P-07.2 Health Hazards in Construction BHC-P-07.2 Health Hazards in Construction Contents 1.0 Purpose 2.0 Scope 3.0 Definitions 4.0 Main requirements 5.0 Guidance documents and references 6.0 Appendices Revision Register Date Version Description

More information

RISK ASSESSMENT AND HAZARD CONTROL

RISK ASSESSMENT AND HAZARD CONTROL Title: Risk Assessment & Hazard Control Effective Date: 11/17/2014 Control Number: THG_0056 Revision Number: Date: Annual Review Completed: 5/13/2015 RISK ASSESSMENT AND HAZARD CONTROL CONTENTS I. INTRODUCTION

More information

Risk Assessment In accordance with the Management of Health and Safety Regulations 1999

Risk Assessment In accordance with the Management of Health and Safety Regulations 1999 Ref No 6.1 Task of Assessor Job Title Litter Picking on and around Streets and Highways Below 40mph Simon Foley Location Quality Health and Environmental Manager Bath Signature Issue Date 15 th July 2015

More information

SCOPE OF WORK, SAFETY METHOD STATEMENT & RISK ASSESSMENT

SCOPE OF WORK, SAFETY METHOD STATEMENT & RISK ASSESSMENT SCOPE OF WORK, SAFETY METHOD STATEMENT & RISK ASSESSMENT Prepared for:- Date:- Work Scheduled:- SCOPE OF WORK Carry out installation of flow meters / pressure sensors. Installation of flow meter procedure

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT EXCAVATION OR TRENCHING Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

ASSOCIATED DOCUMENTS:

ASSOCIATED DOCUMENTS: Medtronic ENT Rev. C Ref. 9.0 Page 1 of 5 1.0 PURPOSE: 1.1. The personal protective equipment (PPE) program is provided to decrease exposure to job-related hazards. This program identifies responsibilities,

More information

Working safely in an engineering environment

Working safely in an engineering environment Unit 001 Working safely in an engineering environment Level: 2 Credit value: 5 NDAQ number: 500/9514/6 Unit aim This unit covers the skills and knowledge needed to prove the competences required to work

More information

PERSONAL PROTECTIVE EQUIPMENT

PERSONAL PROTECTIVE EQUIPMENT C H A P T E R 9 PERSONAL PROTECTIVE EQUIPMENT 9.1. General Personal protective equipment (PPE) when properly used and maintained saves lives and reduces injury and illness. PPE includes equipment for eyes,

More information

New Licensed Asbestos Manager Training

New Licensed Asbestos Manager Training TRAINING SYLLABUS LICENSED WORK WITH ASBESTOS New Licensed Asbestos Manager Training This unit has twenty-three learning outcomes. 1. Recognise the types, uses and risks of asbestos containing materials

More information

Material Lift Risk and Hazard Management

Material Lift Risk and Hazard Management Material Lift Risk and Hazard Management Models GH 3.8 Safe 136 kg Maximum 3.80 m GH5.6 Working 113 kg Lifting 5.60 m LL Load (kg) 91 kg Height (m) 1.70 m GL-4 227 kg 1.80 m GL-8 181 kg 3.06 m GL-10 159

More information

Hazard Identification and Risk Assessment Form. Risk Assessment

Hazard Identification and Risk Assessment Form. Risk Assessment Identification and Form Tool & Machine Work General Various (including potential fatalities) All staff complete safety induction programme at the start of the module. instructed in safe operation of each

More information

OFFICE OF STATE HUMAN RESOURCES

OFFICE OF STATE HUMAN RESOURCES OFFICE OF STATE HUMAN RESOURCES NUMBER: PPE-1 TOTAL PAGES: 8 SUBJECT: Personal Protective Equipment Program Effective Date: Revision Date: Revision #: RELATED LEGISLATION: The purpose of this program is

More information

WADKIN OVER HEAD ROUTER RISK ASSESSMENT (U002ra)

WADKIN OVER HEAD ROUTER RISK ASSESSMENT (U002ra) Task Being Carried Out: Area: Persons at Risk: Operation of Over Head Router Brindle Mill Operatives, Maintenance engineers Description of Equipment: Wadkin Over Head Router Serial No.: LS 3891 Location

More information

Specific Safety Legislation/Codes of Practice/Australian Standards applicable to this JSA (Tick those applicable).

Specific Safety Legislation/Codes of Practice/Australian Standards applicable to this JSA (Tick those applicable). OCCUPATIONAL HEALTH & SAFETY MANUAL Section OHS-005, Job Safety Analysis SCORESBY, VIC 3179 GEELONG, VIC 3218 MALAGA, WA 6090 DUDLEY PARK, SA 5008 MANSFIELD, QLD 4122 NORTH ROCKS, NSW, 2641 ACT 2609 LAVINGTON,

More information

Risk Assessment Visitors Centre Ben Ainslie Racing. Author: James Haworth. Date: 10/05/2016

Risk Assessment Visitors Centre Ben Ainslie Racing. Author: James Haworth. Date: 10/05/2016 Assessment Visitors Centre Ben Ainslie Racing Author: James Haworth Date: 10/05/2016 Review Date: 01/05/2017 Contents CONTENTS... 2 AUTHOR CONTROL... 3 RISK ASSESSMENT REFERENCES... 5 RISK ASSESSMENT MATRIX...

More information

Kennards Hire Building I, 22 Powers Road Seven Hills. NSW 2147

Kennards Hire Building I, 22 Powers Road Seven Hills. NSW 2147 Safety Audit / Risk Assessment Of Hino 2 Tonne Dutro Tipper Kennards Hire Building I, 22 Powers Road Seven Hills. NSW 2147 Mark Zimmer Unit 3, 16 Herbert St, Equipment manager Artarmon. NSW 2064 Ph: (02)

More information

HAZARDOUS SUBSTANCE AND DANGEROUS GOODS

HAZARDOUS SUBSTANCE AND DANGEROUS GOODS The Barro Group is committed to continuously improving the management and standards of Occupational Health and Safety. This commitment extends to minimising exposure of employees, contractors, visitors

More information

Safe Work Method Statement

Safe Work Method Statement Title Skid Steer Operation (Bobcat) SWMS No. 14 Authorized and email Signed by the (Managing Director / CEO / Partner / Proprietor) on Date 01/08 /2016 Safe Work Procedure for the Work:- Yes No Employees

More information

SUMBSE01 - SQA Code HC85 04 Apply health and safety and environmental legislation in the building services engineering sector

SUMBSE01 - SQA Code HC85 04 Apply health and safety and environmental legislation in the building services engineering sector Overview This standard is about establishing and maintaining working practices and procedures across a specified range of installation and/or maintenance activities that give consideration to health and

More information

JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible)

JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible) Page 1 of 6 How to use the Assessment Charts 1. Determine the Likelihood on the Qualitative Assessment Process Chart (pick a letter applicable to the task). 2. Determine the Consequence on the Qualitative

More information