2 Introductions District Alders Bidar-Sielaff, D5 Ellingson, D13 Phair, D20 Schmidt, D11 Solomon, D10 City Project Staff Brian Smith, P.E. Anthony Fernandez, P.E. David Dryer, P.E.

3 Project Description Lighting Project: Southwest Commuter Trail Project Budget: $250,000-$300,000 Project Limits: Assessments: Breese Terrace to South Beltline Hwy None Last met in December Where we discussed.

4 Usage (Avg Weekday by month) Wheeled Users JAN FEB MAR APR MAY JUN JUL AUG SEPT OCT NOV DEC Data collected 2010/2011. Machine Count Sta. #5005 just W of Breese Source: City of Madison Traffic Engineering Division

5 Usage 2500 Daily Total For August Daily Total Data Machine Count Sta. #5005 just W of Breese Source: City of Madison Traffic Engineering Division

6 Usage 300 Weekday Wheeled Traffic by Hour August :30-8: :50-6:20 50 About 200 users In hours of darkness 0 Data Aug Machine Count Sta. #5005 just W of Breese Source: City of Madison Traffic Engineering Division

7 Why Light? There are generally two reasons why a lighting project is initiated: 1) Lighting to address crime; for example we receive frequent requests from neighborhoods and MPD to address criminal behavior with additional light, or 2) Lighting for street or path safety. For example Local streets are routinely lit based on City policy, crashes do not need to be present before a street is lit. This project is proposed under no. 2---to improve path usefulness and user safety. The Path is a very highly used transportation and Recreational corridor.

8 Why Light? Additional Light will provide improved visibility along the path. Lights illuminate path obstructions and debris and provides vertical illumination of walkers and cyclists. Path users will be more visible as other users approach. Improve visibility of walkers---peds are not required to provide a light

9 Why Light? Why don t bicyclists light the path? SS Law requires bicycles have a white, front light that is visible 500 ft away. Plus a red rear reflector visible from all distances from 50 to 500 feet The law does not require bicyclist s lights to illuminate the road. The light Is intended to increase the cyclists visibility.

10 Proposed Presented at December 2011meeting: Light the path ---using 20 ft black pole Standard street light pole is 30 ft high Use of standard 20 pole allows for efficiencies in purchasing, storage and replacement Shorter poles/bollards increase cost need more to light an area, need more light fixtures, need more energy, requires more maintenance --increases cost, doesn t provide vertical illumination desired.

11 Pole and Fixture Council Crest (Initial pole and fixture)

12 Proposed (Initial) 53 Watt LED, special Type 2 w/backlight control Benefits of LEDs Higher color rendering, increased illuminance uniformity More efficient, use less energy Longer lifespan Less maintenance/relamping Produce directional light Doesn t produce ultraviolet light which attracts insects

13 Propose Lighting the path ---using 20 ft poles with spacing of about 210 to 230 ft Brittingham: 230 ft, 25 ft MH on concrete pole Marsh View: 230 ft, 20 ft MH on black pole SW Path (South of Beltline): 180 to 205 ft, 25 ft MH on concrete pole Starkweather: 200 ft, 25 foot MH on concrete pole Wingra (Olin to Beld): 220 ft, 25 ft MH on concrete pole Yahara (Johnson-E. Wash): 185 feet, 20 ft MH on black pole Circuit is capable of being controlled by time clock.

14 Pole Layout

15 Pole Layout

16 Revisions From the initial (December) public meeting we heard Light too bright, too cold, too blue Poles too high, will be able to see LEDs from below grade Project too expensive Project does not provide continuous light Concerns about light pollution, glare and light trespass Consider bollards for lighting From later public comments received to the City website: Path is seen as a sensitive environmental corridor Dark Skies perspective (night sky visibility) Educate path users to light themselves

17 Response Light too bright, too cold, too blue We went to work with our LED manufacturer Initial light output--6.6 Lux* Revised and reduced light output--3.7 Lux* 4300 degree K down to 3000 degree K Result in warmer light. Engineered louvers added which also decrease light intensity as well as spillage

18 BEFORE Moonlight AFTER

19 Response Poles too high, will be able to see LED lights below. Light trespass concerns. Can we reduce pole height? Poles are already much shorter than standard Street light pole. Shorter poles increase cost, requiring more poles to do the job, more fixtures, increased energy, maintenance, and siting issues, plus costs to maintain and stock non-standard equipment. The newly engineered louvers have reduced the visibility of the LEDs, also act to reduce the light intensity and further tightened the light output pattern.

20 LED Fixture with Louvers Fixture on test pole, and does not represent the pole recommended For the project.

21 Response The Project is too expensive $ 250,000 in capital funds have been identified for 2012 and can be reauthorized for 2013 if the Council supports. Project cost is already less expensive than a comparable project because underground work has already been completed.

22 Response The Project does not provide continuous light While the State DOT may recommend that all paths be lit continuously, Madison Staff do not share the one-size fits all recommendation. Most Madison paths are not lit continuously. Continuous lighting increases cost tremendously requiring many additional poles and fixtures. Continuous lighting is contrary to objections we receive where people want less light on projects.

23 Response light pollution, glare and light trespass LED lights are preferred because of their ability to steer light where needed. Further modifications staff made with the reduced wattage fixture and with the engineered louvers we find even less light trespass and glare. All the fixtures are full-cut off and International Dark Skies Compliant

24 Response Use Bollards Bollards have been used in Madison in the past and have not been found to meet the needs of path users. Bollards do not provide the vertical illumination desired. Bollards are prone to vandalism and expensive to maintain. Because bollards are spaced so tightly together project costs increase dramatically. There are also costs associated with maintaining and stocking non-standard equipment. More equipment for the plow jeeps to strike.

25 Response The SW Path is a sensitive environmental corridor Certainly the path is a wonderful treed corridor, yet it is a transportation corridor. The Path runs within State owned railroad corridor purchased from the Illinois Central Railroad. It is not mapped by City Planning nor the Dane County Regional Plan Commission as an Environmental corridor or E-way. Funds to build the path were provided by the FHWA as A transportation enhancement project. Transportation was and is its primary purpose.

26 Response Dark Sky concerns The fixture is a full cut-off fixture. It is a low wattage, well engineered down light. This is not some 200 Watt Glare bomb/wall pack from Menards. Educate path users to light themselves Certainly education is desirable however it does not address the overall problem of encouraging the use of a valued transportation corridor nor does it address those folks who chose not to follow rules or norms of behavior.

27 Next: Web Opinions and Path User Survey

28 Website Comment Tally December 2011 to 7/19 about 300+ comments received 36% comments in support of lighting --39% note safety as reason to support 64% comments expressing opposition 30% note environmental corridor concerns as reason to oppose 29% note cost as reason to oppose 14% note glare or light trespass concerns

29 Path User Survey Path user survey conducted July 10, AM and 2-6 PM 562 people responded

30 Path User Survey How did Path users identify themselves the day of the survey? People noted they used the path for: Commuting or transportation 432 (45%) Active Recreation (exercise) 381 (39%) Passive Recreation (relaxation/nature obs.) 153 (16%)

31 Path User Survey How often do people use the path? Frequent (Once or more per day) 334 responses (59%) Regularly (Several times/day) 194 responses (34.3%) Infrequently 38 responses (6.7%)

32 Path User Survey Of our 562 users 181 (32.2%) people noted favoring light 200 (35.6%) people noted as possibly favoring light 171 (30.4%) people noted as not favoring light 7 (1.25%) people noted both favoring and possibly favoring light 1 (0.18%) person noted not favoring and possibly favoring light 2 (0.36%) no answer

33 Path User Survey Opinion on lighting by user type Commuters 153 support; 134 oppose; 151 possibly support Active Recreation 132 support; 116 oppose; 139 possibly support Passive Recreation 46 support; 60 oppose; 51 possibly support

34 Path User Survey Opinion on lighting by user frequency Frequent Users 108 support; 119 oppose; 111 possibly support Regular Users 67 support; 49 oppose; 80 possibly support Infrequent Users 16 support; 4 oppose; 18 possibly support

35 Path User Survey Would you use the Path more if lit? 89 people responded considerably more often 194 people responded somewhat more often 219 people responded- Not at all or less often 38 people responded Same amount of usage 22 people no answer

36 Path User Survey Do you have a headlight? 394 people responded Yes 153 responded No

37 Presentation will be posted to the City s website. Site can be accessed at:

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun Jul

More information

Wisconsin 511 Traveler Information Annual Usage Summary January 3, Wisconsin 511 Phone Usage ( )

Wisconsin 511 Traveler Information Annual Usage Summary January 3, Wisconsin 511 Phone Usage ( ) Wisconsin 511 Traveler Information 211 Annual Usage Summary January 3, 212 Overall to-date Summary 36 months of operation 1,16,63 total calls the 1 Million mark was passed on December 3, 212 3,627,527

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton

More information

2017 North Texas Regional Bicycle Opinion Survey

2017 North Texas Regional Bicycle Opinion Survey 2017 North Texas Regional Bicycle Opinion Survey Sustainable Development Program Kevin Kokes, AICP Public Meetings April, 2018 North Central Texas Council of Governments MPO for the Dallas-Fort Worth Region

More information

FOR RELEASE: FRIDAY, MARCH 30 AT 5 AM

FOR RELEASE: FRIDAY, MARCH 30 AT 5 AM Interviews with 1,014 adult Americans conducted by telephone by ORC International on March 24-25, 2012. The margin of sampling error for results based on the total sample is plus or minus 3 percentage

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, November 10, 2016 5:30 to 7 P.M. Festival Foods 810 E. Washington

More information

Utility Debt Securitization Authority 2013 T/TE Billed Revenues Tracking Report

Utility Debt Securitization Authority 2013 T/TE Billed Revenues Tracking Report Utility Debt Securitization Authority 2013 T/TE Billed Revenues Tracking Report Billing Budgeted Billed Dollar Percent Month Revenues Revenues Variance Variance Jan 2018 11,943,180.68 12,697,662.47 754,481.79

More information

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II) Presentation to the CNRC Board of Directors Regular Meeting March 11, 2015 1 Agenda Preferred Alternate Refinement for University Avenue, 3rd Street, and Beverly Avenue Intersection Improvements validate

More information

City of Wilsonville 5 th Street to Kinsman Road Extension Project

City of Wilsonville 5 th Street to Kinsman Road Extension Project City of Wilsonville 5 th Street to Kinsman Road Walking Tour & Neighborhood Workshop Summary Report Public Outreach Overview On July 18 th, 2017, the City of Wilsonville hosted a neighborhood walking tour

More information

Mark Malone, P.E. SD DOT

Mark Malone, P.E. SD DOT Mark Malone, P.E. SD DOT SD10 Grading & Surfacing From 8 th Ave W to 8 th Ave E 1 mile plus transition lengths Complete Urban Reconstruction Grading, C&G, Storm Sewer, Sidewalk, Concrete Surfacing Railroad

More information

Illuminating San Diego

Illuminating San Diego Illuminating San Diego San Diego in the Dark Ages If you take an evening stroll in the cities of Los Angeles or Phoenix, you may notice a major difference from San Diego: well-lit streets. San Diego is

More information

Bicycle Friendly Niagara Falls

Bicycle Friendly Niagara Falls Bicycle Friendly Niagara Falls STAKEHOLDER COMMITTEE MEETING 2 SUPPORTED BY THE OATH COMMUNITY FUND AT THE COMMUNITY FOUNDATION FOR GREATER BUFFALO Develop a Bicycle Master Plan to document the city s

More information

Enhancing Day And Night Visibility For Cyclists

Enhancing Day And Night Visibility For Cyclists Enhancing Day And Night Visibility For Cyclists Being seen can literally save your life! This is, of course, critical for riding at night but it can also make a huge difference during the day especially

More information

2012 Capital Budget Capital Improvement Program

2012 Capital Budget Capital Improvement Program 2012 Capital Budget Capital Improvement Program Agency Name: Eng. - Bicycle and Pedestrian Agency Number: 53L Capital Budget Future Year Estimates Project Name 2012 2013 2014 2015 2016 2017 1 Bikeways

More information

Traffic Safety Plan Traffic Safety Plan 2015

Traffic Safety Plan Traffic Safety Plan 2015 Traffic Safety Plan 2015 Purpose Airdrie s last Traffic Safety Plan was created in 2011. The 2015 Traffic Safety Plan is a revised model of the traffic operations for the City of Airdrie. The purpose of

More information

Plant City Bicycle and Pedestrian Master Plan. Project Update March 2, 2017

Plant City Bicycle and Pedestrian Master Plan. Project Update March 2, 2017 Plant City Bicycle and Pedestrian Master Plan Project Update March 2, 2017 NOV Project Kickoff DEC/ JAN FEB/ MAR Plan Review/Field Work Public Meeting/Coordination Meetings Develop Draft Plan APR/ MAY

More information

City Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting

City Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting City Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting Monday, January 28, 2013 7:30 PM, City Hall Norman Cox, PLA, ASLA. Ann Arbor, Michigan. www.greenwaycollab.com Community

More information

Monroe Street Reconstruction

Monroe Street Reconstruction Total participants: 45+ Monroe Street Reconstruction Cross Section Workshop Notes September 29, 2016, Wingra School Workshop Orientation, Technical and Functional Considerations: The workshop began with

More information

Summary of bicycle helmet law results in Western Australia

Summary of bicycle helmet law results in Western Australia Summary of bicycle helmet law results in Western Australia * All graphs, charts and tables presented in this document are scanned directly from reports published by Western Australia government departments,

More information

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY DRAFT PLAN City Council Meeting August 14, 2017 STUDY AREA Sedgwick Corridor State Route 160, principal arterial with Class 3 access management designation, commuter and freight route, connection to SR

More information

FOR RELEASE: TUESDAY, DECEMBER 11 AT 4 PM

FOR RELEASE: TUESDAY, DECEMBER 11 AT 4 PM Interviews with 1,002 adult Americans conducted by telephone by Opinion Research Corporation on December 6-9, 2007. The margin of sampling error for results based on the total sample is plus or minus 3

More information

Hard Shoulder Running is a valuable tool July 14, Dean H. Gustafson, PE, PTOE State Operations Engineer VDOT Operations Division

Hard Shoulder Running is a valuable tool July 14, Dean H. Gustafson, PE, PTOE State Operations Engineer VDOT Operations Division Hard Shoulder Running is a valuable tool July 14, 2016 Dean H. Gustafson, PE, PTOE State Operations Engineer VDOT Operations Division Virginia 2 VDOT s Statewide Operations Program Operations Statistics

More information

Off-Road Facilities Part 1: Shared Use Path Design

Off-Road Facilities Part 1: Shared Use Path Design Off-Road Facilities Part 1: Shared Use Path Design Presentation by: Eric Mongelli, P.E. Tom Huber October 9, 2012 FOLLOW THE CONVERSATION ON TWITTER Toole Design Group is live tweeting this webinar @tooledesign

More information

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL August 23 STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL performed by Lee E. Harris, Ph.D., P.E. Consulting

More information

SRTS IMPLEMENTATION COSTS

SRTS IMPLEMENTATION COSTS SRTS IMPLEMENTATION COSTS What Is a Estimate? A cost estimate establishes the anticipated budget required to implement the actions (the improvement projects and programs) identified in your School Travel

More information

95 Express Annual Operations Report: Fiscal Year

95 Express Annual Operations Report: Fiscal Year 95 Express Annual Operations Report: Fiscal Year 2014-2015 General The 95 Express Program completed its sixth full Fiscal Year of operations in June 2015. For the FDOT, its Fiscal Year (FY) is from July

More information

4 Goals, Objectives & Actions

4 Goals, Objectives & Actions Chapter4 4 This chapter presents goals, objectives, and recommended actions to support the vision of making Overland Park a safer and easier place to ride a bicycle. 35 4.1 Recommendations Structure The

More information

Engineering - Bicycle and Pedestrian

Engineering - Bicycle and Pedestrian Capital Improvement Plan Project Summary # Bikeways Program 781,000 860,000 900,000 933,000 933,000 933,000 # Cannonball Path 1,200,000-780,000 - - - # Capital City Trail - 70,000 - - 910,000 - # Goodman

More information

Bicycle Crashes. Number of Bike Crashes. Total Bike Crashes. are down 21% and severe bike crashes down 8% since 2013 (5 years).

Bicycle Crashes. Number of Bike Crashes. Total Bike Crashes. are down 21% and severe bike crashes down 8% since 2013 (5 years). Bicycle Crashes The City of Fort Collins is well known for its bike culture, and there is a strong focus on encouraging increased riding. Bike safety is an important component of supporting these efforts.

More information

City of Madison: 2017 Capital Budget Capital Improvement Plan

City of Madison: 2017 Capital Budget Capital Improvement Plan Capital Improvement Plan Project Summary Bikeways Program 779,000 751,000 630,000 670,000 703,000 703,000 Cannonball Path 210,000 - - 730,000 - - Cap City Trail 1,140,000-360,000 - - 910,000 Ice Age Junction

More information

FEASIBILITY STUDY DANBURY BRANCH ELECTRIFICATION PROJECT

FEASIBILITY STUDY DANBURY BRANCH ELECTRIFICATION PROJECT FEASIBILITY STUDY DANBURY BRANCH ELECTRIFICATION PROJECT PROJECT UPDATE FOR THE NEW MILFORD RAIL RESTORATION SOCIETY OCTOBER 28, 2003 PROJECT UPDATE FOR THE NEW MILFORD RAIL SERVICE RESTORATION SOCIETY

More information

KC Scout Kansas City s Bi-State Transportation Management Center

KC Scout Kansas City s Bi-State Transportation Management Center KC Scout Kansas City s Bi-State Transportation Management Center Operations Report May 216 This report contains statistical and operational data of activities at the Scout TMC for the period Sunday, May

More information

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process Bicycle Transportation Plan Summary Madison Urban Area and Dane County Introduction September 2000 Bicycling is an important mode of transportation in the Madison urban area and countywide that is available

More information

FLETCHER AVENUE PEDESTRIAN AND BICYCLIST BEHAVIOR CHANGE FORMATIVE RESEARCH PROJECT

FLETCHER AVENUE PEDESTRIAN AND BICYCLIST BEHAVIOR CHANGE FORMATIVE RESEARCH PROJECT FLETCHER AVENUE PEDESTRIAN AND BICYCLIST BEHAVIOR CHANGE FORMATIVE RESEARCH PROJECT EXTENT OF CHANGES IN PEDESTRIAN AND BICYCLIST ATTITUDES AND BEHAVIORS DIRECTLY AFTER A COMPLETE STREETS PROJECT IN FLORIDA

More information

PROPOSED HIGH STREET TRAFFIC CALMING PLAN

PROPOSED HIGH STREET TRAFFIC CALMING PLAN PROPOSED HIGH STREET TRAFFIC CALMING PLAN Pottstown Borough has conducted two studies in recent years to revitalize its downtown area and make its main street, High Street, safer and more attractive for

More information

Ben Timerson, MnDOT Erik Minge, SRF Consulting Group Greg Lindsey, University of Minnesota

Ben Timerson, MnDOT Erik Minge, SRF Consulting Group Greg Lindsey, University of Minnesota Ben Timerson, MnDOT Erik Minge, SRF Consulting Group Greg Lindsey, University of Minnesota 2050 Vision Minnesota Go Multimodal transportation system maximizes the health of people, the environment and

More information

Strategies for Sharing the Road with Other Users

Strategies for Sharing the Road with Other Users Idaho Driver Education and Training Strategies for Sharing the Road with Other Users M15-1 Sharing the Road Introduction Idaho law requires motorists to operate their vehicles in a careful and prudent

More information

Richmond-Adelaide Cycle Tracks

Richmond-Adelaide Cycle Tracks Public Drop-In Event Richmond-Adelaide Cycle Tracks June 25, 2018 12:00 p.m. 3:00 p.m. 4:30 p.m. 7:30 p.m. Metro Hall, Rotunda 55 John Street 1 Purpose of Event In Scope Communicate an update about the

More information

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities Approved: Policy: 20-004(P) Responsible Office: Planning Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities I. POLICY STATEMENT: This policy

More information

Increased Onboard Bicycle Capacity Improved Caltrain s Performance in 2009

Increased Onboard Bicycle Capacity Improved Caltrain s Performance in 2009 Increased Onboard Bicycle Capacity Improved Caltrain s Performance in 2009 February 4, 2010 Prepared by: BIKES ONboard Project San Francisco Bicycle Coalition Prepared by the San Francisco Bicycle Coalition

More information

Arlington Public Schools Abingdon Elementary School Site Evaluation Preliminary Transportation Findings

Arlington Public Schools Abingdon Elementary School Site Evaluation Preliminary Transportation Findings Arlington Public Schools Abingdon Elementary School Site Evaluation Preliminary Transportation Findings Arlington County Public Facilities Review Committee (PFRC) November 19, 2014 SAN ANTONIO-BEXAR COUNTY

More information

Design Considerations for Complete Streets. The Kiewit Center for Infrastructure and Transportation

Design Considerations for Complete Streets. The Kiewit Center for Infrastructure and Transportation Design Considerations for Complete Streets Objective Provide design geometrics and features that accommodate balanced operations of bicycles, pedestrians and vehicles on a complete street Cul-de-sacs,

More information

LENOX AVENUE TRAFFIC STUDY

LENOX AVENUE TRAFFIC STUDY LENOX AVENUE TRAFFIC STUDY A NEIGHBOR-LED SAFE STREETS INITIATIVE Public Forum - August 10, 2016 WHO WE ARE: Mark Grady Ron Charles Alison McInerney - Objective: A holistic long term solution to the existing

More information

Railroad-Highway Grade Crossing Analysis for Corridor Planning Projects

Railroad-Highway Grade Crossing Analysis for Corridor Planning Projects Railroad-Highway Grade Crossing Analysis for Corridor Planning Projects Word Count: 4,305 Submission Date: August 1, 2015 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 1420 South

More information

Time of Change We Are Growing We Are An Attractive Place To Live We Are Age Diverse + Living Longer 50000 40000 30000 20000 10000 0 2010 Census Job Density Housing Sheds Transit Sheds The Project FUNDING

More information

2014 Fishers Trail Count

2014 Fishers Trail Count 2014 Fishers Trail Count July 2014 Table of Contents Introduction...1 Trail Count Locations...3 Ellipse Parkway at Holland Drive...4 Lantern Road at Sunblest Boulevard...5 126th Street at Cumberland Road...6

More information

d+80% d+77% d+55% d+7% d+6% d+18%

d+80% d+77% d+55% d+7% d+6% d+18% Q1: On average during the summer months, how often do you use a bicycle? This question approximates Question 27 from the 2012 NHTSA Attitudes and Behavior survey: On average, during the summer months,

More information

Tampa Bay. Pedestrian Safety Skills

Tampa Bay. Pedestrian Safety Skills Tampa Bay Pedestrian Safety Skills Today s Presentation After this session, attendees should be able to: Describe the grassroots WalkWise Pedestrian Safety Campaign Understand why pedestrian fatalities

More information

Monterey Road Complete Streets

Monterey Road Complete Streets Monterey Road Complete Streets Complete Street Objectives Improve livability and economic vitality Enhance pedestrian environment Accommodate bicyclists safely Reduce noise and air pollution Create attractive,

More information

2018 HR & PAYROLL Deadlines

2018 HR & PAYROLL Deadlines th (by payment date) EPAF 3rd PARTY FEEDS WTE Approval 2018 HR & PAYROLL s Normal Payroll day s 2017 B1-26 3 * 13-Dec-17 15-Dec-17 n/a n/a n/a 28-Dec-17 29-Dec-17 11:00 AM 16-Dec-2017 29-Dec-2017 JAN 2018

More information

6/14/2013 VIA . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814

6/14/2013 VIA  . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814 6/14/2013 VIA EMAIL Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd RE: Sacramento Natural Foods Co-Op (P13-025) Dear Mr. Compton: WALKSacramento appreciates

More information

Laurier Segregated Bike Lane Pilot Project July 2013 update

Laurier Segregated Bike Lane Pilot Project July 2013 update Laurier Segregated Bike Lane Pilot Project July 2013 update Presentation Overview Background Pilot Monitoring Results Mitigation Recommendations Next Steps Laurier 2 Background Laurier Avenue Segregated

More information

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Eliminate on-street parking where it will allow for a dedicated bus only lane % Traffic Dashboard Priorities Survey Responses Introduction 1) Are you familiar with bus rapid transit (BRT)? a. No, BRT is new to me. 597 23.5% b. I ve heard of BRT, but I don t know much about it. 1,136

More information

Monroe Street Reconstruction Business Focus Group Notes July 18, 2016, HotelRED

Monroe Street Reconstruction Business Focus Group Notes July 18, 2016, HotelRED Monroe Street Reconstruction Business Focus Group Notes July 18, 2016, HotelRED Total participants: 31 Focus Group Conversation #1: During this exercise, participants talked in small table groups in response

More information

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018 Advancing Transportation Choices in Des Moines MPO Environmental Roundtable January 9, 2018 Presented by Jennifer McCoy, PE, PTOE City Traffic Engineer Agenda Des Moines Area Transportation Planning Connect

More information

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1 Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1 June 8, 2017 Meeting Agenda Study Overview Community Survey Existing Conditions Access Management Potential Safety Countermeasures Potential

More information

Hennepin County Bicycle and Pedestrian Planning

Hennepin County Bicycle and Pedestrian Planning Hennepin County Bicycle and Pedestrian Planning 1 Value of bicycle and sidewalk systems Safety Livability Mobility Health Personal Finances Economic Sustainability Clean Air Recreation Parking and congestion

More information

Wellington Exempted Village School District SAFE ROUTES TO SCHOOL TRAVEL PLAN January 2014

Wellington Exempted Village School District SAFE ROUTES TO SCHOOL TRAVEL PLAN January 2014 Wellington Exempted Village School District SAFE ROUTES TO SCHOOL TRAVEL PLAN January 2014 OHIO SAFE ROUTES TO SCHOOL WELLINGTON EXEMPTED VILLAGE SCHOOL DISTRICT TRAVEL PLAN SECTION 1: WELLINGTON EXEMPTED

More information

Active Transportation Rail to River Corridor. Community Meeting - Segment A

Active Transportation Rail to River Corridor. Community Meeting - Segment A Active Transportation Rail to River Corridor Community Meeting - Segment A June 29, 2017 Tonight s Agenda > Open House (30 min) > Welcome / Project Overview > Presentation of 30% Design Refinements > Next

More information

City of Dallas Standards and Guidelines for Traffic Control and Safety Treatments at Trail-Road Crossings

City of Dallas Standards and Guidelines for Traffic Control and Safety Treatments at Trail-Road Crossings City of Dallas Standards and Guidelines for Traffic Control and Safety Treatments at Trail-Road Crossings Prepared by Max Kalhammer Senior Planner (Bicycle Coordinator) Strategic Planning Division Department

More information

General Design Factors

General Design Factors Chapter 3: 3-1.0 Introduction General Design Factors Mn/DOT s goals include encouraging and accommodating safe bicycling. From a design perspective, these goals are achieved by first having an understanding

More information

1 PEW RESEARCH CENTER

1 PEW RESEARCH CENTER 1 SEPTEMBER 2018 POLITICAL SURVEY FINAL TOPLINE SEPTEMBER 18-24, 2018 N=1,754 RANDOMIZE Q.1 AND Q.2 BLOCK Q.1 All in all, are you satisfied or dissatisfied with the way things are going in this country

More information

Guidelines for Pedestrian Treatments at Uncontrolled Locations January 18, 2018

Guidelines for Pedestrian Treatments at Uncontrolled Locations January 18, 2018 Est. Dec. 2014 Guidelines for Pedestrian Treatments at Uncontrolled Locations January 18, 2018 Presented by: Kyle Armstrong, Illinois DOT Yan Qi, Southern Illinois University Webinar Logistics Duration

More information

FOR THE LIFE OF YOUR BUILDING

FOR THE LIFE OF YOUR BUILDING City of Coon Rapids Year 2 Measurement & Verification Report February 2013 FOR THE LIFE OF YOUR BUILDING 6900 Wedgwood Commerce Centre Suite 480 Maple Grove, MN 55311 763.767.0304 FAX 763.392.6462 Contents

More information

WELCOME. City of Eden Prairie West 70 th Street

WELCOME. City of Eden Prairie West 70 th Street WELCOME City of Eden Prairie West 70 th Street Project Schedule Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug >>> May WEST SEGMENT Concept Plan Fall 2014 Plan Development Winter 2014 Summer 2015 Construction

More information

Riverside Drive Complete Streets Project 3 rd Community Meeting. March 26, 2015

Riverside Drive Complete Streets Project 3 rd Community Meeting. March 26, 2015 Riverside Drive Complete Streets Project 3 rd Community Meeting March 26, 2015 Providing Feedback Sign-In with contact information for future updates Complete questionnaire provided tonight Complete comment

More information

Chapter 3.9 Timbercrest Elementary School. Volusia County MPO. November 2008

Chapter 3.9 Timbercrest Elementary School. Volusia County MPO. November 2008 Chapter 3.9 Timbercrest Elementary School Deltona, FL Volusia County MPO November 2008 Volusia County MPO School Bicycle and Pedestrian Review Study, Phase 3B School Summary Timbercrest Elementary School

More information

Environment and Public Works Committee Presentation

Environment and Public Works Committee Presentation Mixed Use Centers Complete Streets Guidelines Project Environment and Public Works Committee Presentation December 10, 2008 Project Objectives: Conduct an inter-departmental and agency process to study

More information

MnDOT. City of Zumbrota. Goodhue County

MnDOT. City of Zumbrota. Goodhue County MnDOT City of Zumbrota Goodhue County Downtown Zumbrota about 1908 MHS Photograph Collection, Postcard ca. 1925 MHS Photograph Collection, Postcard ca. 1908 MN 58 Subarea Study Guides short- through long-term

More information

FOR THE LIFE OF YOUR BUILDING

FOR THE LIFE OF YOUR BUILDING City of Coon Rapids Year 1 Measurement & Verification Report January 2012 FOR THE LIFE OF YOUR BUILDING 8451 Xerxes Ave. North Brooklyn Park, MN 55444 763.767.0304 FAX 763.767.6147 Contents 1. EXECUTIVE

More information

September 2018 FY Key Performance Report

September 2018 FY Key Performance Report September 20 FY 2019 - Key Performance Report Management Notes: The information in this report is based on the FY 2019 Operating Budget, adopted by the Board on June 11, 20. RT s farebox recovery ratio

More information

RE: City of Portland Request to Experiment with HAWK/Bike signal

RE: City of Portland Request to Experiment with HAWK/Bike signal October 4, 2005 Regina S. McElroy, Director Office of Transportation Operations HOTO Room 3401 400 7 th Street, S.W. Washington, D.C. 20590 RE: City of Portland Request to Experiment with HAWK/Bike signal

More information

A review of 2015 fatal collision statistics as of 31 December 2015

A review of 2015 fatal collision statistics as of 31 December 2015 A review of fatal collision statistics as of 31 December This report summarises the main trends in road fatalities that have emerged in. This has been prepared by the Road Safety Authority following analysis

More information

For Information Only. Pedestrian Collisions (2011 to 2015) Resolution. Presented: Monday, Apr 18, Report Date Tuesday, Apr 05, 2016

For Information Only. Pedestrian Collisions (2011 to 2015) Resolution. Presented: Monday, Apr 18, Report Date Tuesday, Apr 05, 2016 Presented To: Operations Committee For Information Only Pedestrian Collisions (0 to 0) Presented: Monday, Apr 8, 06 Report Date Tuesday, Apr 0, 06 Type: Correspondence for Information Only Resolution For

More information

Children s expectations and beliefs toward the relative safety of riding bicycles at night

Children s expectations and beliefs toward the relative safety of riding bicycles at night Children s expectations and beliefs toward the relative safety of riding bicycles at night William J. Vigilante, Jr. a and Raymond W. Lim b a Robson Forensic Inc., Lancaster, PA b Psychology Department,

More information

PUBLIC MEETINGS. Please see the City of Geneva Public Meeting Guide for more information regarding City Council and Committee of the Whole meetings.

PUBLIC MEETINGS. Please see the City of Geneva Public Meeting Guide for more information regarding City Council and Committee of the Whole meetings. PUBLIC MEETINGS Citizens are welcome and encouraged to attend all City of Geneva public meetings. Public meeting guests are also urged to participate in any of the City s many public meetings that take

More information

Central Oregon Intergovernmental Council

Central Oregon Intergovernmental Council Central Oregon Intergovernmental Council Regional Transit Master Plan (RTMP) Technical Advisory Committee Kick-Off Meeting May 16, 2012 Meeting Agenda Project Orientation Presentation of Survey Results

More information

Hennepin County Transportation Department

Hennepin County Transportation Department Hennepin County Transportation Department Complete Streets Design and Implementation Prepared for the Complete Streets Task Force Craig Twinem, P.E. Design Division Manager Tom Johnson, P.E. Transportation

More information

Rochester Downtown Bicycle Study 2009

Rochester Downtown Bicycle Study 2009 Rochester Downtown Bicycle Study 2009 Relationship of ROCOG Long Range Transportation Plan to Rochester Comprehensive Plan Regional Long Range Transportation Plan (LRTP) is prepared under the auspices

More information

b. APGR 385-4, APG Safety and Occupational Health (SOP) Program, 15 Feb 07.

b. APGR 385-4, APG Safety and Occupational Health (SOP) Program, 15 Feb 07. DEPARTMENT OF THE ARMY U.S. ARMY INSTALLATION MANAGEMENT COMMAND U.S. ARMY GARRISON ABERDEEN PROVING GROUND 4510 BOOTHBY HILL AVENUE ABERDEEN PROVING GROUND MARYLAND 21005-5001 I MAP-SO REPLY TO ATTENTION

More information

Topsham, ME. September 20, A Joint Project of the Maine Department of Transportation and the Bicycle Coalition of Maine

Topsham, ME. September 20, A Joint Project of the Maine Department of Transportation and the Bicycle Coalition of Maine Topsham, ME September 20, 2017 A Joint Project of the Maine Department of Transportation and the Bicycle Coalition of Maine Agenda Welcome: Intros, Agenda, Using Clicker Tech Perceptions and Realities

More information

PEDESTRIAN ACCOMMODATIONS DPS 201 AT ROUNDABOUTS

PEDESTRIAN ACCOMMODATIONS DPS 201 AT ROUNDABOUTS PEDESTRIAN ACCOMMODATIONS DPS 201 AT ROUNDABOUTS WHY THEY WORK FOR PEDESTRIANS IF DESIGNED CORRECTLY Separated sidewalks direct peds to crosswalks Splitter island Slow speed exit Truck apron Crosswalk

More information

July 2015 Sept Cork City Pedestrian Counter Report

July 2015 Sept Cork City Pedestrian Counter Report July 2015 Sept 2015 Cork City Pedestrian Counter Report Disclaimer Cork City Council has produced this report based on information extracted from our Pedestrian Counter Monitoring System. Although care

More information

City of Cape Coral Traffic Calming. City Council May 16,

City of Cape Coral Traffic Calming. City Council May 16, City of Cape Coral Traffic Calming City Council May 16, 2016 1 In This Presentation Why Traffic Calming? What is Traffic Calming? Examples Traffic Calming in the City of Cape Coral How to develop a Traffic

More information

Financial Project ID No(s).: and ETDM No(s).: and 14181

Financial Project ID No(s).: and ETDM No(s).: and 14181 Palm Beach Metropolitan Planning Organization (MPO) Presentation I-95 at Boynton Beach Boulevard Interchange and I-95 at Gateway Boulevard Interchange Project Development and Environment Study Palm Beach

More information

Best Southwest Transportation Committee. North Central Texas Council of Governments Transportation Department

Best Southwest Transportation Committee. North Central Texas Council of Governments Transportation Department Best Southwest Transportation Committee North Central Texas Council of Governments Transportation Department The The Regional Regional Veloweb Veloweb Review Review NCTCOG Bicycle and Pedestrian Program

More information

Bicycle and Pedestrian Plans and Improvements

Bicycle and Pedestrian Plans and Improvements Bicycle and Pedestrian Plans and Improvements Presented to the City Council By Randle Harwood, Planning and Development, and Richard Zavala, Parks and Community Services September 24, 2013 Purpose Review

More information

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final

More information

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013 Sunnybrae Elementary School Walking and Bicycling Audit JUNE 2013 San Mateo-Foster City School District C/CAG City/County Association of Governments of San Mateo County SUNNYBRAE ELEMENTARY SCHOOL WALKING

More information

May 2018 FY Key Performance Report

May 2018 FY Key Performance Report May 20 FY 20 - Key Performance Report Management Notes: The information in this report is based on the FY 20 Operating Budget, Amendment 2, adopted by the Board on January 22, 20. RT s farebox recovery

More information

Traffic Signs and Markings. Instructor: Dr. Yahya Sarraj Associate Prof. Of Transportation

Traffic Signs and Markings. Instructor: Dr. Yahya Sarraj Associate Prof. Of Transportation and Markings Instructor: Dr. Yahya Sarraj Associate Prof. Of Transportation Definition; A traffic sign is defined as a device mounted on a fixed or portable support whereby a specific message is conveyed

More information

Citizen Advocacy. VISION ZERO IN HILLSBOROUGH COUNTY TODAY

Citizen Advocacy.   VISION ZERO IN HILLSBOROUGH COUNTY TODAY Citizen Advocacy http://www.tampabay.com/news/publicsafety/accidents/car-bus-crash-kills-one/441282 VISION ZERO IN HILLSBOROUGH COUNTY TODAY Does Vision Zero Make Sense Here? Traffic Deaths per 100,000

More information

KC Scout Kansas City s Bi-State Transportation Management Center

KC Scout Kansas City s Bi-State Transportation Management Center KC Scout Kansas City s Bi-State Transportation Management Center Operations Report August- 215 This report contains statistical and operational data of activities at the Scout TMC for the period Saturday,

More information

Project Status Report

Project Status Report Appendix A: Project Status Report Municipal Streetlight Redesign and Policy Development, Lebanon, NH Upper Valley Lake Sunapee Regional Planning Commission 10 Water Street, Suite 225 Lebanon, NH 03766

More information

MASTER BICYCLE AND PEDESTRIAN PLAN

MASTER BICYCLE AND PEDESTRIAN PLAN WELCOME! PLEASE FEEL FREE TO REVIEW THE EXHIBITS THE PRESENTATION WILL BEGIN AT 6:00 PM VILLAGE OF NORTHBROOK MASTER BICYCLE AND PEDESTRIAN PLAN DRAFT EXISTING CONDITIONS REPORT AND PUBLIC MEETING WELCOME!

More information

I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAM

I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAM I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAM NEW HAVEN - EAST HAVEN - BRANFORD, CT STATE PROJECT NO. 92-55 Record of Decision Transit and Transportation System Management (TSM) Components

More information

FEDERAL HIGHWAY ADMINISTRATION APPLICATION

FEDERAL HIGHWAY ADMINISTRATION APPLICATION FEDERAL HIGHWAY ADMINISTRATION APPLICATION REQUEST FOR PERMISSION TO EXPERIMENT WITH A BICYCLE BOX INTERSECTION TREATMENT Submitted by: City of Columbus Department of Public Service Date: June 26, 2009

More information

1. Discussion of Police Hiring Practices regarding Criminal Offences (30 min) 2. Street Lighting Master Plan Consultants Presentation (1 Hour)

1. Discussion of Police Hiring Practices regarding Criminal Offences (30 min) 2. Street Lighting Master Plan Consultants Presentation (1 Hour) South Salt Lake City Council Work Meeting Public notice is hereby given that the South Salt Lake City Council will hold a Work Meeting on Wednesday, April 18, 2018 in the City Council Chambers, 220 East

More information

JULY 2013 RIDERSHIP REPORT MTA METRO-NORTH RAILROAD EXECUTIVE SUMMARY

JULY 2013 RIDERSHIP REPORT MTA METRO-NORTH RAILROAD EXECUTIVE SUMMARY Ridership Report JULY 2013 RIDERSHIP REPORT MTA METRO-NORTH RAILROAD EXECUTIVE SUMMARY July July 2013 Total MNR System Ridership was 7.346 million vs. 7.439 million in July 2012, a decrease of 92,959 passengers

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meeting Stakeholder Interviews Data Collection Design Principles Tool Box Recommendations Schedule Moving Forward North

More information