MORNING TRAFFIC (Wed, Fri, Sat, Sun) 2018 CrossFit Rusk Gate

Size: px
Start display at page:

Download "MORNING TRAFFIC (Wed, Fri, Sat, Sun) 2018 CrossFit Rusk Gate"

Transcription

1 MORNING TRAFFIC (Wed, Fri, Sat, Sun) 2018 CrossFit Rusk Gate No fees are being collected at the parking booths. Vehicles will be able to free flow passed the booths. This should significantly decrease backups. INBOUND AEC parking staff will be along the drive helping get vehicles into lanes. OUTBOUND AEC staff will have a single exit lane coned off. There is not expected to be much, if any, exit traffic from this gate. All exit traffic must turn right. Deputy should be on E. Rusk Ave. facilitating traffic flow onto the grounds and controlling exit traffic for right turn only. Special Note for Saturday: CrossFit will be running two Badger Coach buses to shuttle athletes to an off-site event. The busses will be using this gate to exit from and return to the grounds. When exiting the grounds, these buses are permitted to turn left onto Rusk Ave. Deputies should facilitate giving these busses priority to get them off the grounds.

2 MORNING TRAFFIC (Wed, Fri, Sat, Sun) 2018 CrossFit Rimrock at Rusk For the most part, traffic can be controlled from the traffic box. Hold southbound traffic on Rimrock Rd at Rusk Ave. as necessarily to allow northbound traffic on Rimrock Rd. to turn left onto Rusk Ave.

3 Signage Barricade VIP ONLY Taxi / Shuttle / Ride Share AEC / CrossFit Staff MORNING TRAFFIC (Wed, Fri, Sat, Sun) 2018 CrossFit South Gate VIP / Ride Share / Taxi / Hotel Shuttle Only No deputies are monitoring this gate or traffic on Rimrock Rd. at this entrance. There is no exit through this gate. There is not access to general parking through this gate. AEC and CrossFit staff will monitor traffic at this entrance on the grounds. CrossFit has been in communication with the major Ride Share, Taxi, and Shuttle services directing them to this entrance. CrossFit will have signs, possibly electronic message boards, at this entrance indicating no general parking and directing special traffic to this entrance. TRAFFIC The left turn lane on northbound Rimrock Rd. leading to the South Gate needs to be open. Barrels need to be out north of this gate blocking the left turn lane into the Main Gate.

4 AEC / CrossFit Staff AEC / CrossFit Staff Taxi / Shuttle / Ride Share MORNING TRAFFIC (Wed, Fri, Sat, Sun) 2018 CrossFit Main Gate No fees are being collected at the parking booths. Vehicles will be able to free flow passed the booths. This should significantly decrease backups. INBOUND AEC parking staff will be along the drive helping get vehicles into lanes. The gate (north side of drive) allowing access into the parking lot in front of the Coliseum will be open. INBOUND RIMROCK RD No left turn for northbound traffic on Rimrock Rd. into the Main Gate. Southbound traffic OUTBOUND AEC staff will have a single exit lane coned off. There is expected to be significant Taxi / Ride Share / Shuttle traffic. All exit traffic must turn right. OUTBOUND RIMROCK RD Southbound traffic on Rimrock Rd. is permitted to continue straight passed the Main Gate.

5 MORNING TRAFFIC (Wed, Fri, Sat, Sun) 2018 CrossFit John Nolen at Rimrock OUTBOUND JOHN NOLEN Use barrels to close the right lane of John Nolen Dr. that goes straight passed Rimrock Rd. That lane ends after the intersection anyway. OUTBOUND JOHN NOLEN We will allow right turns onto Rimrock Rd. Hold this traffic when you are allowing the northbound traffic on John Nolen Dr. to turn left onto Rimrock Rd. MESSAGE BOARD There will be a message board inbound John Nolen Dr. before Rimrock Rd. indicating the Olin Gate is open. INBOUND JOHN NOLEN Hold outbound traffic as necessary to allow the left turn onto Rimrock for inbound traffic. Keeping traffic from backing onto the Beltline is a priority. To avoid merging issues, while allowing traffic inbound John Nolen Dr. traffic to turn left onto Rimrock Rd. also hold outbound John Nolen Dr. traffic turning right onto Rimrock Rd. INBOUND JOHN NOLEN If the Main Gate gets too much pressure or the lot is full, Deputy E. Tilleson will help block the left turn lane on inbound John Nolen Dr. at Rimrock Rd and force all traffic to Olin Ave.

6 MORNING TRAFFIC (Wed, Fri, Sat, Sun) 2018 CrossFit John Nolen Gate Primary role is to monitor back-ups at the gate out onto John Nolen Dr. This assignment is the first to be pulled to assist with other traffic posts (usually John Nolen Dr. at Rimrock Rd. or John Nolen Dr. at Olin Ave.) MESSAGE BOARDS There will be a message board in the island that needs to face outbound John Nolen Dr.

7 MORNING TRAFFIC (Wed, Fri, Sat, Sun) 2018 CrossFit John Nolen at Olin MESSAGE BOARD There will be a message board outbound John Nolen Dr. before the railroad tracks indicating the Olin Gate is open. When inbound John Nolen Dr. traffic trying to turn left onto Olin Ave. starts to back up, hold outbound traffic on John Nolen Dr. If traffic on Olin Ave. gets back up to John Nolen Dr., hold outbound traffic and allow the left turn to make a U-turn back to the John Nolen Gate.

8 MORNING TRAFFIC (Wed, Fri, Sat, Sun) 2018 CrossFit Olin Gate Quann Park (accessed through the Olin Gate) is open to event parking all five days. CrossFit is heavily promoting this parking area. Place the squad / cones in the right lane of outbound Olin Ave. AEC staff will be at the entrance sorting vehicles into two inbound lanes of traffic. Special Note for Friday: There will only be one inbound lane onto the grounds. CrossFit will be using the east side of the entrance drive for an event.

ALTERNATIVE A ONLY. Right Turn Only. BOTH ALTERNATIVES on southbound Mission from 23rd St to 25th St and on northbound Mission from 20th St to 23rd St

ALTERNATIVE A ONLY. Right Turn Only. BOTH ALTERNATIVES on southbound Mission from 23rd St to 25th St and on northbound Mission from 20th St to 23rd St Proposal Detail: 22nd on southbound Mission from on both sides of Mission from to 23rd from at northbound Mission and 22nd St and at at northbound Mission and 23rd St Reconfigure Lanes ONLY No Parking

More information

APS Stratford Project Transportation Analysis Overview. BLPC #20 February 22, 2016

APS Stratford Project Transportation Analysis Overview. BLPC #20 February 22, 2016 APS Stratford Project Transportation Analysis Overview BLPC #20 February 22, 2016 1 1. Key Takeaways 2. TIA A. Document B. Analysis C. Assumptions D. Results Key E. Results AM F. Results PM 3. Key Takeaways

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

PUBLIC INFORMATION MEETING

PUBLIC INFORMATION MEETING PUBLIC INFORMATION MEETING Bridge Rehabilitation Project Project Identification Number 5134.45 NY Route 5 Buffalo Skyway I-190 North Ramp, Pearl Street Ramp Wednesday, April 18, 2018 4:00 p.m. to 7:00

More information

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

MoPac South: Impact on Cesar Chavez Street and the Downtown Network MoPac South: Impact on Cesar Chavez Street and the Downtown Network Prepared by: The University of Texas at Austin Center for Transportation Research Prepared for: Central Texas Regional Mobility Authority

More information

ITEM # 29 DATE: COUNCIL ACTION FORM ROAD CLOSURES FOR RAGBRAI ROUTE BACKGROUND:

ITEM # 29 DATE: COUNCIL ACTION FORM ROAD CLOSURES FOR RAGBRAI ROUTE BACKGROUND: ITEM # 29 DATE: 05-08-18 COUNCIL ACTION FORM SUBJECT: ROAD CLOSURES FOR RAGBRAI ROUTE BACKGROUND: Ames will be an overnight stop for RAGBRAI XLVI from Tuesday, July 24 th, through Wednesday, July 25 th.

More information

The Consultation has now ended.

The Consultation has now ended. The Consultation has now ended. We have received Cabinet Member approval to undertake implementation of the Baker Street Two Way scheme. You are not viewing the most recent documentation. Please visit

More information

Blair/Williamson Intersection Expressed Needs

Blair/Williamson Intersection Expressed Needs Blair/Williamson Intersection Expressed Needs NORTH Blair Street is a barrier for pedestrians and bicycles Relocate Capitol City Trail crossing from Blair Street and John Nolen Drive intersection to Williamson

More information

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018 Tunnel Reconstruction Brooklyn CB 1 August 14, 2018 Reconstructing the Tunnel 2 Service During Tunnel Reconstruction April 2019 through July 2020 3 Projected Cross River Travel Paths of Customers The Service

More information

Iowa State Fair Special Events Management Strategic Plan

Iowa State Fair Special Events Management Strategic Plan Iowa State Fair Special Events Management Strategic Plan April 2010 Prepared for Prepared by Table of Contents 1.0 Introduction... 1 2.0 Key Event Elements... 1 2.1 Event Characteristics and Attendance...

More information

Public Works and Infrastructure Committee. General Manager, Transportation Services

Public Works and Infrastructure Committee. General Manager, Transportation Services STAFF REPORT ACTION REQUIRED Extending the Bay Street Bicycle Lanes Date: May 16, 2013 To: From: Public Works and Infrastructure Committee General Manager, Transportation Services Wards: Toronto Centre

More information

Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School

Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School SCHOOL ROUTE PLAN For MAXEY ELEMENTARY SCHOOL LOCATION 33 ORANGE COUNTY Prepared for:

More information

US 69 RELIEF ROUTE STUDY

US 69 RELIEF ROUTE STUDY US 69 RELIEF ROUTE STUDY Jacksonville, Texas PUBLIC MEETING #2 May 29 th, 2018 Welcome to the public meeting for the US 69 Relief Route Study in Jacksonville. This is the second public meeting for this

More information

Orange Center Elementary School

Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Tunnel Reconstruction South 5 th Street Association October 16, 2018 Tunnel Reconstruction South 5 th Street Association October 16, 2018 Reconstructing the Tunnel 2 Service During Tunnel Reconstruction April 2019 through July 2020 3 Projected Cross River Travel Paths of

More information

2018 K-DAYS RODEO CONTESTANT INFORMATION

2018 K-DAYS RODEO CONTESTANT INFORMATION 2018 K-DAYS RODEO CONTESTANT INFORMATION Welcome to the 2 nd annual K-Days Rodeo. This package contains important information for you as a contestant including, event times, parking, accreditation and

More information

TRB Managed Lanes Conference May 22 24, 2012, Oakland, CA

TRB Managed Lanes Conference May 22 24, 2012, Oakland, CA HOT LLanes and d TTransit i P f Performance TRB Managed Lanes Conference May 22 24, 2012, Oakland, CA Miami UPA Transit Results (2008 2010 Data) Miami UPA Transit Improvements 2 new routes Dade-Broward

More information

Public Meeting. I-35 Corridor from John Kilpatrick Turnpike North to Waterloo Road October 26, 6:00pm Edmond Community Center Auditorium

Public Meeting. I-35 Corridor from John Kilpatrick Turnpike North to Waterloo Road October 26, 6:00pm Edmond Community Center Auditorium Public Meeting I-35 Corridor from John Kilpatrick Turnpike North to Waterloo Road October 26, 2017 @ 6:00pm Edmond Community Center Auditorium Before we get started Please turn off or mute any electronic

More information

Table 1 Traffic and Pedestrian Counts on Lafayette Street

Table 1 Traffic and Pedestrian Counts on Lafayette Street Downtown Salem Transportation Study 2 July 8, 2005 On-street parking is allowed on both sides of Lafayette Street. Cars were parked at the island that separates a pull-out area in front of the school entrance

More information

This memo summarizes the traffic observations around the 2016 WayHome event and offers recommendations for improvements for future events.

This memo summarizes the traffic observations around the 2016 WayHome event and offers recommendations for improvements for future events. Date: To: From: CC: Ryan Howes Burls Creek/Republic Live Kenneth Wersted MTO, OPP, Oro Medonte, Simcoe County Re: ; CM Project No. 115 340 This memo summarizes the traffic observations around the 2016

More information

SECTION 7 INVENTORY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY

SECTION 7 INVENTORY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY SECTION 7 INVEY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY The study corridor includes a total of 19 signalized intersections. Through consultation with Campbell County and the KYTC,

More information

REQUIREMENTS FOR TRAFFIC CONTROL PLAN SUBMISSION

REQUIREMENTS FOR TRAFFIC CONTROL PLAN SUBMISSION REQUIREMENTS FOR TRAFFIC CONTROL PLAN SUBMISSION A draft traffic control plan, consistent with the following applicable conditions, must be included in every permit application submitted to the City of

More information

Some streets and highways will be closed to vehicular traffic during the 2015 Road World Championships. While

Some streets and highways will be closed to vehicular traffic during the 2015 Road World Championships. While Some streets and highways will be closed to vehicular traffic during the 2015 Road World Championships. While some closures last the entire duration of the 2015 Worlds, most will occur daily to accommodate

More information

COURSE MAP

COURSE MAP CHICAGO 2012 URBANATHLON COURSE MAP 1. Plastic Barricades and Police Barricade Combo 2. Cargo Net and Traffic Cones with Poles Combo 3. Police Barricades and Tire Stutter Step Combo 4. Subaru Crawl, Marine

More information

DIRECTIONS TO MCCORMICK PLACE SOUTH BUILDING. Driving Directions. Page. 14

DIRECTIONS TO MCCORMICK PLACE SOUTH BUILDING. Driving Directions. Page. 14 DIRECTIONS TO MCCORMICK PLACE SOUTH BUILDING Public Gates Drop Off/Pick Up: Gate 4 Taxi Drop Off/Pick Up: Gate 4 Shuttle Bus Drop Off/Pick Up: Gates 1 3 * Private Charter Drop Off/Pick Up: Gate 26 (North

More information

Forest Hills Improvement Initiative

Forest Hills Improvement Initiative Forest Hills Improvement Initiative Transportation Action Plan Short Term Recommendations ONLY Final Draft as of April 30, 2008 For Community Review and Feedback Prepared for: The City of Boston Boston

More information

September 20, 2016 L Taraval Rapid Project SFMTA Board of Directors Meeting

September 20, 2016 L Taraval Rapid Project SFMTA Board of Directors Meeting September 20, 2016 L Taraval Rapid Project SFMTA Board of Directors Meeting WHY TARAVAL STREET L TARAVAL PROJECT GOALS 1. Improve state of good repair of our transit system Track and overhead replacement

More information

Local Traffic Management. Tools for local agencies

Local Traffic Management. Tools for local agencies Local Traffic Management Tools for local agencies Overview: How to assess impacts of new road opening How to assess impacts of a large, special event How to manage traffic signal systems Elkhart County

More information

Re. RACQ s Comments on the Miles Platting, Padstow and Logan Road intersection and Padstow and Warrigal Road intersection Planning Study (MPPL)

Re. RACQ s Comments on the Miles Platting, Padstow and Logan Road intersection and Padstow and Warrigal Road intersection Planning Study (MPPL) 31 July 2008 MPPL Planning Study Department of Main Roads Reply Paid 70 SPRING HILL, Qld 4004 Dear Sir/Madam, Re. RACQ s Comments on the Miles Platting, Padstow and Logan Road intersection and Padstow

More information

University Avenue & Farley Avenue/University Bay Drive Area Scenario Base Conditions Multiple concerns

University Avenue & Farley Avenue/University Bay Drive Area Scenario Base Conditions Multiple concerns ped at signalized East of U-Bay North of Campus on Farley Ave./ U-Bay & Westbound Campus North of on Farley Ave./ U-Bay Near VA on MB1: Dual Eastbound Left-Turn Lanes Generally compatible with BRT and

More information

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation Frascati Road and Temple Hill Route Improvements Outline Design Report to Accompany Public consultation September 2013 Background: Dún Laoghaire-Rathdown is committed to providing high quality pedestrian

More information

Reference: Laguna Canyon Road Traffic Conditions Data Collection Summary

Reference: Laguna Canyon Road Traffic Conditions Data Collection Summary Stantec Consulting Services Inc. 38 Technology Drive Suite 100, Irvine CA 92618-5312 September 8, 2017 File: 2073014320 Attention: Mark Trestik, Assistant City Engineer City of Beach Department of Public

More information

Special Event Traffic and Parking Management Plan

Special Event Traffic and Parking Management Plan Villanova University Villanova, PA Special Event Traffic and Parking Management Plan September 2013 13-215 TABLE of CONTENTS I. Introduction and Methods II. Statement of Need Goals for Improvement Comprising

More information

Highway 217 Corridor Study. Phase I Overview Report

Highway 217 Corridor Study. Phase I Overview Report Highway 217 Corridor Study Phase I Overview Report November 3, 24 BACKGROUND AND OVERVIEW Study purpose The Highway 217 Corridor Study is developing multi-modal transportation solutions for traffic problems

More information

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014 Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks Thomas Jefferson Working Group Meeting #6 November 10, 2014 2 3 INTRODUCTION 4 Goal of our work: Identify and assess multi-modal

More information

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 WELCOME Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 MEETING AGENDA 1. Welcome and Introductions 2. Study Progress Update 3. Problem Statement 4. Technical Analysis

More information

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed

More information

Transportation Impacts: Toronto York Spadina Subway Extension

Transportation Impacts: Toronto York Spadina Subway Extension STAFF REPORT ACTION REQUIRED Transportation Impacts: Toronto York Spadina Subway Extension Date: June 6, 2011 To: From: Wards: Reference Number: North York Community Council Director, Transportation Services

More information

Public Meeting #1 Comment Summary

Public Meeting #1 Comment Summary Public Meeting #1 Comment Summary This summary includes comments received on comment forms and during conversations between attendees and project team staff at the February 18, 2016 public open house.

More information

Directions To Institute for Combustion Science And Environmental Technology (ICSET)

Directions To Institute for Combustion Science And Environmental Technology (ICSET) Directions To Institute for Combustion Science And Environmental Technology (ICSET) Street Address: ICSET 2413 Nashville Road Bowling Green, KY 42101 Phone (270) 745-2220 Arriving from the South: Driving

More information

Comment cards and s were received and compiled. Major Concerns/Comments

Comment cards and  s were received and compiled. Major Concerns/Comments Renew Atlanta hosted a business stakeholder open house to discuss the Marietta Street Resurfacing project at. Councilmembers Cleta Winslow and Ivory Lee Young attended the open house, where over 30 businesses

More information

DAFFODIL FESTIVAL 2018 STREET PARADE BANDS & LARGE MARCHING UNITS USING BUSES (SU#5)

DAFFODIL FESTIVAL 2018 STREET PARADE BANDS & LARGE MARCHING UNITS USING BUSES (SU#5) DAFFODIL FESTIVAL 2018 STREET PARADE BANDS & LARGE MARCHING UNITS USING BUSES (SU#5) The Parade will start at: 10:15 a.m. in Tacoma 2:30 p.m. in Sumner 12:45 p.m. in Puyallup 5:00 p.m. in Orting MARCHERS:

More information

Joshua Saak, P.E., PTOE Traffic Design Engineer Ada County Highway District May 23, 2013

Joshua Saak, P.E., PTOE Traffic Design Engineer Ada County Highway District May 23, 2013 Joshua Saak, P.E., PTOE Traffic Design Engineer Ada County Highway District May 23, 2013 Creating Great Streets Through Road Diets and Conversions The Charlotte Experience Topics to Discuss Charlotte s

More information

APPENDIX F SUPPLEMENTAL TRAFFIC DATA

APPENDIX F SUPPLEMENTAL TRAFFIC DATA APPENDIX F SUPPLEMENTAL TRAFFIC DATA Environmental and Planning Consultants 440 Park Avenue South 7th Floor New York, NY 10016 tel: 212 696-0670 fax: 212 213-3191 www.akrf.com Draft Memorandum To: Michael

More information

Winnipeg Walk Bike Projects Downtown Tire Talk - Summary

Winnipeg Walk Bike Projects Downtown Tire Talk - Summary Winnipeg Walk Bike Projects Downtown Tire Talk - Summary Downtown Projected Bike Lane System Connecting The Forks to the Exchange District (Fort Street, Garry Street & The Forks to Assiniboine Connection)

More information

TRAFFIC MANAGEMENT PLAN

TRAFFIC MANAGEMENT PLAN 292 84 140440 TRAFFIC MANAGEMENT PLAN The purpose of the Traffic Management Plan (TMP) is to have established procedures for traffic flow and circulation around the elementary school related to student

More information

LAGUNA BEACH POLICE DEPARTMENT MEMORANDUM

LAGUNA BEACH POLICE DEPARTMENT MEMORANDUM LAGUNA BEACH POLICE DEPARTMENT MEMORANDUM TO: FROM: Christa Johnson, Assistant City Manager Jason C. Kravetz, Captain DATE: January 16, 2015 SUBJECT: Laguna Canyon Road Collision Analysis Within the last

More information

2018 DGPA Volunteer Area Job Descriptions Renewal Job Descriptions

2018 DGPA Volunteer Area Job Descriptions Renewal Job Descriptions 2018 DGPA Volunteer Area Job Descriptions Renewal Job Descriptions Area Assignment Physical Demand Key Rating Scale: 1 (low) 3 (high) RACE WEEKEND AREAS ACCESSIBILITY AMBASSADORS Volunteers will be strategically

More information

Congestion Management Report

Congestion Management Report Congestion Management Report F.E. EVERETT TURNPIKE (NORTH), MERRIMACK Segment Length: 7.0 miles Daily Traffic Volumes: 60,000-69,000 Analysis Period: May 2015 Number of Traffic Signals: 0 Number of travel

More information

SAFE ROUTES TO SCHOOL

SAFE ROUTES TO SCHOOL SAFE ROUTES TO SCHOOL Forest Ridge Elementary School Existing Conditions and ACTION PLAN > Oak Creek - Franklin Joint School District Table of Contents CONTEXT Enrollment Boundaries

More information

Driver Education Ch. 4: Safe Driving Rules & Regulations. Ms. Marx

Driver Education Ch. 4: Safe Driving Rules & Regulations. Ms. Marx Driver Education Ch. 4: Safe Driving Rules & Regulations Ms. Marx Speed Control Speed is one of the most common contributing factors of fatal & other types of accidents School zones, business or residential

More information

TAKOMA METRO STATION

TAKOMA METRO STATION TKOM METRO STTION Traffic nalysis Technical Memorandum Station Planning in Support of Joint evelopment Job No. 13-FQ165-LN-2 November 213 WSHINGTON METROPOLITN RE TRNSIT UTHORITY (WMT) Takoma Metro Station

More information

Cones - Should be placed 15' apart & are used to channel vehicular traffic.

Cones - Should be placed 15' apart & are used to channel vehicular traffic. SAN DIEGO HALF MARATHON SUNDAY, MARCH 13, 2016 SAFETY EQUIPMENT LIST It is your responsibility to obtain safety equipment and see that it is delivered to the appropriate locations at the proper time. Safety

More information

Florida Department of Transportation District Six Project FM # Public Information Meeting Tuesday, July 24, 2018

Florida Department of Transportation District Six Project FM # Public Information Meeting Tuesday, July 24, 2018 Florida Department of Transportation District Six Project FM #432687-1-52-01 Public Information Meeting Tuesday, July 24, 2018 South Florida Express Lanes Network The I-75/SR 826 Palmetto Express Lanes

More information

1. Operate along freeways, either in regular traffic lanes, in high-occupancy vehicle (HOV) lanes, or along the shoulders.

1. Operate along freeways, either in regular traffic lanes, in high-occupancy vehicle (HOV) lanes, or along the shoulders. Most decisions about whether or not to use transit involve time and cost, and most transit services are slower than travel by private vehicle. However, when transit is faster or nearly as fast as travel

More information

Maynooth Traffic Management Plan & Traffic Model

Maynooth Traffic Management Plan & Traffic Model Maynooth Traffic Management Plan & Traffic Model Traffic Survey Report Draft September 6 Designer AECOM Adelphi Plaza George's Street Upper Dún Laoghaire Co.Dublin Client Kildare County Council Aras Cill

More information

PUBLIC AGENDA TRAFFIC SAFETY COMMITTEE. Tuesday, January 12, 2016, 8:45 a.m. Committee Room E, Ground Floor, City Hall Members

PUBLIC AGENDA TRAFFIC SAFETY COMMITTEE. Tuesday, January 12, 2016, 8:45 a.m. Committee Room E, Ground Floor, City Hall Members PUBLIC AGENDA TRAFFIC SAFETY COMMITTEE Tuesday, January 12, 2016, 8:45 a.m. Committee Room E, Ground Floor, City Hall Members Mr. K. Claffey, Chair Ms. C. Janzen, Vice Chair Councillor A. Iwanchuk Sergeant

More information

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3 PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 1 WORK DESCRIPTION 2 WORK DESCRIPTION 3 Install Remove Repair 613 IMPACT ATTENUATOR ACTIVITY DESCRIPTION Repair, install, remove and maintain

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

Traffic Impact Study for Rolling Ridge Redevelopment

Traffic Impact Study for Rolling Ridge Redevelopment Traffic Impact Study for Rolling Ridge Redevelopment Webster Groves, Missouri October 19, 2018 Prepared For: Gershman Commercial Real Estate 150 North Meramec Avenue Suite 500 St. Louis, Missouri 63105

More information

WBA Field Rancho Bernardo HS Band Director Information

WBA Field Rancho Bernardo HS Band Director Information WBA Field Tournament @ Rancho Bernardo HS Band Director Information Contest Date: Saturday, October 31, 2009 Gates Open: Admission: $10 Reserved $7 General Admission/Students/Seniors 5 and under Free Contacts:

More information

Durrance Elementary School

Durrance Elementary School Durrance Elementary School SCHOOL ROUTE PLAN For DURRANCE ELEMENTARY SCHOOL LOCATION 9 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

Co-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department

Co-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department 28 REGIONAL MUNICIPALITY OF OTTAWA-CARLETON MUNICIPALITÉ RÉGIONALE D OTTAWA-CARLETON REPORT RAPPORT Our File/N/Réf. Your File/V/Réf. 25 23-97-R016 DATE 15 April 1997 TO/DEST. FROM/EXP. SUBJECT/OBJET Co-ordinator

More information

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009 Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street

More information

2014 Mobility Assessment Report Functional Planning & Policy Montgomery County Planning Department

2014 Mobility Assessment Report Functional Planning & Policy Montgomery County Planning Department 2014 Mobility Assessment Report Functional Planning & Policy Montgomery County Planning Department Travel Trends National & Local Travel Trends Multi-Modal Monitoring Pedestrian Bikes Bus Rail Future Efforts

More information

ATTACHMENT NO. 11. RRLRT No. 2. Railroad / Light Rail Transit Technical Committee TECHNICAL COMMITTEE: Busway Grade Crossings STATUS/DATE OF ACTION

ATTACHMENT NO. 11. RRLRT No. 2. Railroad / Light Rail Transit Technical Committee TECHNICAL COMMITTEE: Busway Grade Crossings STATUS/DATE OF ACTION ATTACHMENT NO. 11 RRLRT No. 2 TECHNICAL COMMITTEE: TOPIC: Railroad / Light Rail Transit Technical Committee Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014

More information

Thank you for attending

Thank you for attending Improving mobility safety comfort WELCOME Thank you for attending The purpose of this meeting is to: Learn about the project Prioritize potential walking and biking improvements on Snelling Ave Gather

More information

2018 DGPA Volunteer Area Job Descriptions New Member Job Descriptions

2018 DGPA Volunteer Area Job Descriptions New Member Job Descriptions 2018 DGPA Volunteer Area Job Descriptions New Member Job Descriptions Area Assignment Physical Demand Key Rating Scale: 1 (low) 3 (high) RACE WEEKEND AREAS ACCESSIBILITY AMBASSADORS Volunteers will support

More information

Traffic Management and Mitigation Study in the Leslieville Community Transportation Services Division & IBI Group IBI GROUP

Traffic Management and Mitigation Study in the Leslieville Community Transportation Services Division & IBI Group IBI GROUP Traffic Management and Mitigation Study in the Leslieville Community Transportation Services Division & IBI Group IBI GROUP July 18, 2018 Study Background and Objectives Background - Many development projects

More information

1. Places where one road meets or crosses another are called intersections. F

1. Places where one road meets or crosses another are called intersections. F Intersections STUDY GUIDE OR CHAPTER 10 LESSON 1 Basic Intersections A. or each sentence below, circle T if the statement is true and if it is false. Correct each false 1. Places where one road meets or

More information

Signs. signs, signals and road markings. in this chapter

Signs. signs, signals and road markings. in this chapter 3 signs, signals and road markings in this chapter Signs regulatory signs school, playground and crosswalk signs lane use signs turn control signs parking signs reserved lane signs warning signs object

More information

Existing Transportation System

Existing Transportation System < Open for Additional Text Transportation System Existing Transportation System This section describes vehicular transportation associated with Children s. transportation are described in a separate section

More information

Why do you think the chances of a collision are greater at an intersection than at any other point on the roadway?

Why do you think the chances of a collision are greater at an intersection than at any other point on the roadway? UNIT 5 PACKET 1 NAME: HOUR: DATE: NO: Chapter 7 Negotiating Intersections THINK*PAIR*SHARE In a group of 2 to 3 people write down at least 4 things that would require your attention to safely navigate

More information

Unit Six: Driving Faster with More Risk URBAN, SUBURBAN, AND RURAL DRIVING

Unit Six: Driving Faster with More Risk URBAN, SUBURBAN, AND RURAL DRIVING Unit Six: Driving Faster with More Risk URBAN, SUBURBAN, AND RURAL DRIVING What Is The Impact Of Distraction? Objectives For Unit Six Students will be able to describe the skills necessary to What safely

More information

Creating the Future Bruce B Downs Blvd

Creating the Future Bruce B Downs Blvd Creating the Future Bruce B Downs Blvd How things look today May not be how things look in the future. Bruce B Downs PD&E Study 2003 Construction programmed 2009, Palm Springs to Pebble Creek Tampa Rail

More information

I-35 SMART WORK ZONE UPDATE

I-35 SMART WORK ZONE UPDATE I-35 SMART WORK ZONE UPDATE Larry Colclasure, P.E. TxDOT John Habermann, P.E., TTI 2014 Short Course Overview Current scope of I-35 Widening. (South of Salado to Hillsboro) TxDOT is committed to finishing

More information

2019 DGPA Volunteer Area Job Descriptions New Member Job Descriptions

2019 DGPA Volunteer Area Job Descriptions New Member Job Descriptions 2019 DGPA Volunteer Area Job Descriptions New Member Job Descriptions Area Assignment Physical Demand Key Rating Scale: 1 (low) 3 (high) RACE WEEKEND AREAS ACCESSIBILITY AMBASSADORS Volunteers will be

More information

Astoria Boulevard ADA and Station Renewal Track Improvements. February 19, 2019

Astoria Boulevard ADA and Station Renewal Track Improvements. February 19, 2019 Astoria Boulevard ADA and Station Renewal Track Improvements February 19, 2019 Major Scope of Work Replace Street and Platform Stairs Work Description Install Two Street-to-Mezzanine Elevators Install

More information

Joe Rocca P.Eng., Traffic and Asset Management Supervisor. Review for Proposed Kingsway Sports and Entertainment Complex, City of Greater Sudbury

Joe Rocca P.Eng., Traffic and Asset Management Supervisor. Review for Proposed Kingsway Sports and Entertainment Complex, City of Greater Sudbury LETTER REPORT TO: Joe Rocca P.Eng., Traffic and Asset Management Supervisor FROM: Brett Sears and Ubaid Ali, WSP SUBJECT: Review for Proposed Kingsway Sports and Entertainment Complex, City of Greater

More information

Ormsby Place Traffic Calming Pilot Project

Ormsby Place Traffic Calming Pilot Project About the project Traffic shortcutting is an issue in communities, with residents expressing concerns about safety and their quality of life. City Council has heard these concerns, and in response, has

More information

State Road & Tollway Authority Georgia 400 Demolition Project Frequently Asked Questions

State Road & Tollway Authority Georgia 400 Demolition Project Frequently Asked Questions State Road & Tollway Authority Georgia 400 Demolition Project Frequently Asked Questions 1. When will toll collection end? Toll collection is scheduled to end on Friday, November 22, weather permitting.

More information

Marina Loft (DRC 51-R-12)

Marina Loft (DRC 51-R-12) Marina Loft (DRC 51-R-12) traffic study prepared for: Cymbal Development OCtober 2012 Traf Tech October 1, 2012 Mr. Asi Cymbal - President Cymbal Development 3470 North Miami Avenue Upper Suite Miami,

More information

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community Riverside Station A green, transit-oriented community October 6, 2011 TONIGHT S AGENDA: 1. Project Update (5 min.) 2. Master Plan Update (10 min.) 3.Traffic Plan Update (10 min.) Questions & Answers MASTER

More information

Welcome! San Jose Avenue Open House August 25, 2015

Welcome! San Jose Avenue Open House August 25, 2015 Welcome! San Jose Avenue Open House August 25, 2015 Vision Zero The City and County of San Francisco adopted Vision Zero San Francisco Vision Zero High Injury Network as a policy in 2014, committing an

More information

I-95/Temple Avenue Improvements Project Colonial Heights, VA

I-95/Temple Avenue Improvements Project Colonial Heights, VA I-95/Temple Avenue Improvements Project Colonial Heights, VA Pardon Our Dust Informational Meeting February 3, 2016 Harold Dyson, P.E. Construction Manager, Richmond District Tom Heil, P.E. Allan Myers

More information

Highland Park High School Campus Traffic and Parking Study

Highland Park High School Campus Traffic and Parking Study Highland Park High School Campus Traffic and Parking Study February 24, 2015 Eriksson Engineering Associates, Ltd. Prepared for: Township High School District 113 Eriksson Engineering Associates, Ltd.

More information

Controlled. Semi-Controlled PAGE 01 CHAPTER 12 INTERSECTIONS

Controlled. Semi-Controlled PAGE 01 CHAPTER 12 INTERSECTIONS PAGE 01 CHAPTER 12 INTERSECTIONS You will cross many intersections while driving. Intersections are especially dangerous because vehicles are crossing each other s driving path. Many crashes happen at

More information

Meeting Summary Public Information Meeting #1 Warren County Pathway Corridor Project September 27, 2018

Meeting Summary Public Information Meeting #1 Warren County Pathway Corridor Project September 27, 2018 Meeting Summary Public Information Meeting #1 Warren County Pathway Corridor Project September 27, 2018 The first public information meeting for the Warren County Pathway Corridor Project was held on Thursday,

More information

SCHOOL TRAFFIC ASSESSMENT

SCHOOL TRAFFIC ASSESSMENT PK# 2415-17.387 Z178-150 TRAFFIC IMPACT ANLAYSIS: SCHOOL TRAFFIC ASSESSMENT Project: In Dallas, Texas Prepared for: City of Dallas On behalf of: Dallas Independent School District Prepared by: Hunter W.

More information

Why invest in the 1 Street S.W. Corridor?

Why invest in the 1 Street S.W. Corridor? Why invest in the 1 Street S.W. Corridor? This project is an investment in the Beltline Community and Calgary s economy. It is anticipated that The City s investment along this corridor will help with

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

Wesbrook Place Traffic Analysis of Redistributed Dwelling Units

Wesbrook Place Traffic Analysis of Redistributed Dwelling Units Wesbrook Place Traffic Analysis of Redistributed Dwelling Units 1 Summary This report presents an analysis of the changes in traffic volumes in the Wesbrook Place neighbourhood associated with a redistribution

More information

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St)

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St) PROJECT OVERVIEW In 2014, San Francisco adopted Vision Zero as City policy, with a commitment to eliminate all traffic deaths in the City by 2024. nue Project Limits (Lincoln Way to St) Collision data

More information

Volume 1 Traffic Impact Analysis. Texas Odyssey TIA Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. May 23, 2018

Volume 1 Traffic Impact Analysis. Texas Odyssey TIA Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. May 23, 2018 Volume 1 Traffic Impact Analysis Texas Odyssey TIA Dallas, Texas May 23, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064529800 Registered Firm F-928 Traffic Impact Analysis Texas Odyssey

More information

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts Appendix B Environmental Resource Technical Memorandum Assessment on Travel Pattern and Access Impacts TECHNICAL MEMORANDUM ENVIRONMENTAL RE-EVALUATION FOR UNION STATION TO OAK CLIFF DALLAS STREETCAR To:

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Halifax Regional Council September 18, 2018

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Halifax Regional Council September 18, 2018 P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 14.1.6 Halifax Regional Council September 18, 2018 TO: SUBMITTED BY: Mayor Savage and Members of Halifax Regional Council Original Signed Jacques

More information

Capital Beltway HOT Lanes Project

Capital Beltway HOT Lanes Project New Travel Choices Ahead Capital Beltway HOT Lanes Project Update January 2011 Major Milestones Reached in 2010 Project is 55% complete New bridge spans completed at every interchange; Second phase well

More information

Colorado Division of Fire Prevention & Control Driver Operator JPRs (NFPA 1002, 2014 Edition)

Colorado Division of Fire Prevention & Control Driver Operator JPRs (NFPA 1002, 2014 Edition) Colorado Division of Fire Prevention & Control Driver Operator JPRs ( Edition) JPR # Task Initial Certification JPR Requirement: 8 Mandatory Renewal JPR Requirement: 100% of All JPRs (including all subsections)

More information

A number of inferences have been drawn from the observations, each of which is discussed below.

A number of inferences have been drawn from the observations, each of which is discussed below. Technical Memo To: Steve Gramm, Study Advisory Team From: Rick Laughlin Project: I-190/Silver St. CC: Date: 4/4/2011 Job No: RE: Special event observation HDR conducted an observation of special event

More information