1 NEW LARGO PROJECT FEL3 FEASIBILITY STUDY of STAGE 2: RE-ALIGNMENT OF ROAD R545 for ANGLO AMERICAN THERMAL COAL SEMANE PROJECT NUMBER: 102NLG019 REPORT NUMBER: RPT0012 DATE: March 2012 REVISION NUMBER: B PHASE: 2 & 3 1 st Floor, 88 Marshall Street Johannesburg, 2001 PO Box Marshalltown, 2107 Republic of South Africa Telephone Nº: (011) Facsimile Nº: (011) corporate@semane.co.za
2 REPORT CONTROL SHEET AUTHOR/S NAME DESIGNATION SIGNATURE DATE R Pyke Senior Engineer APPROVAL NAME DESIGNATION SIGNATURE DATE R Couto Director B van Zyl P Rajlal DISTRIBUTION NAME DOCUMENT TYPE ADDRESS CHANGE HISTORY DATE REVISION NO. DESCRIPTION 21/02/2012 A Original submission 08/03/2012 B Alternative alignments, traffic circle added Final R545 design report compressed.doc Page 2 of 34
3 TABLE OF CONTENTS EXECUTIVE SUMMARY BACKGROUND RELEVANT STUDIES AND DISCUSSIONS APPLICABLE STANDARDS HORIZONTAL ALIGNMENT VERTICAL ALIGNMENT ENVIRONMENTAL ISSUES TRAFFIC ISSUES INTERSECTIONS Major Intersections Minor Intersections (Farm accesses) PROPERTY ACQUISITION FENCING ROAD TRAFFIC SIGNS AND ROAD MARKING DRAINAGE GEOTECHNICAL PAVEMENT DESIGN EARTHWORKS BALANCE EXISTING AND PROPOSED SERVICES CONSTRUCTABILITY EXISTING R545 (BETWEEN WILGE TOWNSHIP AND N12 FREEWAY) CONCLUSIONS RECOMMENDATIONS Final R545 design report compressed.doc Page 3 of 34
4 LIST OF TABLES Table 1: New Horizontal Alignment for R Table 2: New Vertical Alignment for R Table 3: Existing Farm Roads Crossing the Proposed R Table 4: Future Farm Access Intersections Table 5: Major Storm-water Crossings of the R Table 6: Overhead Power Transmission Line Crossings Table 7: Condition of existing Road R545 (December 2011) LIST OF FIGURES Figure 1: R545 Horizontal Alignment & Alternatives... 8 Figure 2: Layout of Modern Roundabout APPENDIX A Layout Drawing Final R545 design report compressed.doc Page 4 of 34
5 EXECUTIVE SUMMARY Anglo American Thermal Coal (Pty) Ltd plans to develop the New Largo Coal Mine near the Kusile Power Station. The existing Provincial Road 545 passes through the proposed mining area and this section of the R545 will have to be re-aligned to the east to accommodate the planned mining operations. Relevant Environmental, Traffic and Geotechnical investigations were undertaken during the project and the findings of these studies were taken into consideration in the design of the planned re-alignment of the R545. Several routes for the R545 were investigated. The following constraints impact on the planned horizontal alignment: The road should be re-aligned on property controlled by Anglo American (wherever possible); The road should clear the 500m blasting zone for the new mine; The road should, as far as possible, avoid environmentally sensitive areas; The new road alignment should minimize the impact on existing services (e.g. overhead power lines). At it s northern end, the R545 should intersect the existing road at a point opposite the new access road for the Kusile Power Station, which is currently under construction. The road is designed for a design speed of 100 km/hr and the requirements for the planned horizontal and vertical alignments have been achieved. Standard Details of the Mpumulanga Department of Public Works, Roads and Transport were used for the design. Road signs and road marking are in accordance with the South African Road Traffic Signs Manual (SARTSM). Storm water drainage was designed to accommodate a storm with a 20 year recurrence interval. The condition of the southern section of the existing R545 was surveyed and assessed and rehabilitation measures were proposed. Final R545 design report compressed.doc Page 5 of 34
6 1. BACKGROUND Anglo American Thermal Coal (Pty) Ltd plans to develop the New Largo Coal Mine near the Kusile Power Station, which is currently under construction in Mpumulanga. The existing road R545 (also referred to as D686) crosses the proposed mining area. The mining operation will undermine a section of the existing road, which will be closed to traffic. The existing Road R545 provides a north-south link between the N4 in the north and the N12 in the south and provides direct access to these two freeways via access interchanges. Due to the significance of the R545 in the local road network, it will be necessary to retain the R545 by constructing a new section of road to bypass the proposed mining area. The re-alignment of Road R545 forms part of the Stage 2 development of the New Largo Mine. It is anticipated that the construction of this bypass will be completed by mid year RELEVANT STUDIES AND DISCUSSIONS Various alternative routes for the re-alignment of the R545 were investigated by Jeffares and Green Consulting Engineers in consultation with relevant stakeholders. A report on the alternative routes was prepared in May An investigation was undertaken by Synergistics Environmental Services to identify the environmentally sensitive areas in the vicinity of the proposed route and to determine the environmental constraints that should be imposed on the proposed alignment of the R545. As part of this study an investigation into the impact of the proposed developments in the New Largo area on the traffic predicted to use the R545, was undertaken by WSP SA Civil and Structural Engineers (Pty) Ltd. The study was documented in the report entitled S0403/TRA/00: New Largo Colliery Traffic Impact Assessment Report (Version 0) prepared in August This report proposed the upgrading of several existing intersections to accommodate the predicted future traffic. Discussions were held with officials of the Mpumulanga Department of Public Works, Roads and Transport in order to obtain their input on the proposed new alignment of the R545. Final R545 design report compressed.doc Page 6 of 34
7 A Geotechnical investigation of the existing soil conditions along the route for the re-aligned section of the R545 was undertaken. Soil samples were collected and were tested at a materials laboratory. The findings of the investigation were documented in a report entitled Geotechnical Report for New Largo Colliery R545 Road Deviation numbered RPT0013 Based on the findings of these studies and discussions and taking into consideration the merits and constraints of the various alternative alignments, a route passing to the east of the mining area was finally accepted and approved in principle. 3. APPLICABLE STANDARDS The road was designed in accordance with the Standard Details of the Mpumulanga Department of Public Works, Roads and Transport. The design speed for the road is 100 km/hr and the standard Road Reserve width is 40 metre. 4. HORIZONTAL ALIGNMENT Several alternative horizontal alignments were considered before finalizing the route of the realigned section of Road R545. -This final alignment was determined subject to the following constraints: The road should be re-aligned on property controlled by Anglo American (wherever possible); The road should clear the 500m blasting zone for the new mine; The road should, as far as possible, avoid environmentally sensitive areas; The new road alignment should minimize the impact on existing services (e.g. overhead power lines). At it s northern end, the R545 should intersect the existing road at a point opposite the new access road for the Kusile Power Station, which is currently under construction. The selected alignment of the R545, as Approved in Principle by the Mpumulanga Department of Public Works, Roads and Transport, is shown in blue in the accompanying Figure 1. This Final R545 design report compressed.doc Page 7 of 34
8 Figure also shows the alternative horizontal alignments for R545 that were considered (marked in red and green as Option B and Option C). N Kusile Road Kusile Power Station Mining Area Alternative alignments Existing R545 Re-aligned R545 Mining Area Existing R545 Alternative alignments Figure 1: R545 Horizontal Alignment & Alternatives Final R545 design report compressed.doc Page 8 of 34
9 The final horizontal alignment for the R545 was based on Version 6 of the Mining Plan for the New Largo Mine. However this alignment is appropriate for either Mining Plan 6 or Mining Plan 7. For a 100 km/hr design speed, the minimum permissible radius for a horizontal curve is specified as 350 metre (with a desirable minimum horizontal curve radius of 600 metre). Horizontal curves should not be less than 300 metre in length. The details of the horizontal curves for the new alignment are summarized in the following Table 1: Table 1: New Horizontal Alignment for R545 Horizontal Curve No Radius (metres) Length of Curve (metres) As can be seen from this table, all the horizontal curves exceed the above-mentioned minimum requirements (i.e. horizontal radius exceeds 350 metre and curve length exceeds 300 metre). The following photographs show the hilly topography at the northern end of the re-alignment: Final R545 design report compressed.doc Page 9 of 34
10 Photo 1: View of hill at northern end of route in direction of road (facing east) Photo 2: Route 10.00km (left) to 7.00km (right) along ridge (facing north) Final R545 design report compressed.doc Page 10 of 34
11 Photo 3: Route 14.00km on van der Heever Farm (facing west with Wilge Power Station in the background) Photo 4: Southern tie-in of proposed R545 to existing R545 (facing west with Wilge Township in background) Final R545 design report compressed.doc Page 11 of 34
12 5. VERTICAL ALIGNMENT For a 100 km/hr design speed, the minimum K value for a crest vertical curve is specified as 62; the minimum for a sag vertical curve is 37. The desirable minimum length of a vertical curve specified as 180 metre. Details of the horizontal curves for the re-alignment are summarized in the following Table 2: Table 2: New Vertical Alignment for R545 Vertical Curve No Vertical Curve K-value of curve Length Sag (37 min) Crest (62 min) (metres) As can be seen from this table, all the vertical curves proposed comply with the abovementioned requirements. Final R545 design report compressed.doc Page 12 of 34
13 Generally gradients are less than 4% with four exceptions: Section 0.25km to 0.53km (6.3%); Section 1.48km to 1.73km (6.5%); Section 5.38km to 5.41km (4.9%); Section 7.58km to 8.03km (4.2%). Due to the relatively short lengths of steep gradient, it is proposed that climbing lanes should not be provided. 6. ENVIRONMENTAL ISSUES The route for road R545 crosses several environmentally sensitive areas and these areas were avoided wherever possible. These environmentally sensitive areas are shown on the accompanying Drawing No CED At the northern end of the re-alignment, the R545 is aligned to bypass to the north of the occurrence of the environmentally-sensitive Frithia Flowers. The section of R545 between km and km has been shifted northwards out of Anglo American property onto Portion 26 of Roodepoortjie 326 JR, to avoid the environmentally sensitive stream on the adjacent property. 7. TRAFFIC ISSUES A Traffic Impact Study, which assesses the impact of mining and other industrial development in the area, was prepared by WSP SA Civil and Structural Engineers (Pty) Ltd. This study predicts the future traffic on the R545 and proposes the upgrading of intersections on the R545 to accommodate this traffic. In terms of this report, the following existing intersections should be upgraded and traffic signals installed to accommodate the predicted traffic flows: The southern ramp terminal at the N12/R545 interchange; The northern ramp terminal at the N12/R545 interchange. Final R545 design report compressed.doc Page 13 of 34
14 The study proposes that a traffic circle should be constructed at the northern end of the proposed re-alignment of the R545 at it s intersection with the new Kusile Road. 8. INTERSECTIONS 8.1 Major Intersections At the northern end the re-aligned R545 will tie to the existing road at a T-junction, where it intersects with the new Kusile Road. A large number of turning movements are anticipated at this intersection and a large number of these will be right turns across opposing traffic. From a traffic safety perspective, it is proposed that a Modern Roundabout type traffic circle should be constructed at this new intersection. This type of intersection is particularly effective in handling opposed right turning traffic safely. Traffic analysis undertaken in the Traffic Study prepared by WSP Engineers shows that a traffic circle will accommodate the predicted traffic volumes with minimal delay. International experience indicates that Modern Roundabouts can be expected to operate with a higher degree of traffic safely than a normal intersection. The roundabout should have an internal diameter of 80 metres and the width of the circulating roadway should be 10 metres wide. Depending on the proposed phasing of the mining operation, it may be necessary to initially construct all four approaches, although in the longer term the southern approach will become redundant and will be closed to traffic. The layout of the proposed Modern Roundabout is shown in the accompanying Error! Reference source not found.. Final R545 design report compressed.doc Page 14 of 34
15 Existing R545 New Kusile Road Re-aligned R545 Existing R545 (to be closed) Figure 2: Layout of Modern Roundabout At it s southern end, the re-aligned section of Road R545 will tie into the existing road (which is 7.4m wide), via an 800 metre radius horizontal curve. The existing western approach on the R545 (from Wilge Township) will be closed to traffic and a new T-junction will be constructed on the outside of the curve at 14.57km to accommodate traffic on R545 from the west. This junction will include an exclusive right turn lane and 80 metre long acceleration/deceleration tapers. 8.2 Minor Intersections (Farm accesses) From a road safety aspect, farm accesses on the proposed R545 should generally be spaced at minimum intervals of 500 to 600 metre, although closer spacing can be considered in specific instances. Farm accesses should, wherever possible, be located opposite each other to form a normal intersection on the R545. However, it is important that there should be adequate sight Final R545 design report compressed.doc Page 15 of 34
16 distance at all farm accesses. Intersections are generally not permitted on curves with a radius less than 1 500m. Existing farm access roads cross the proposed route for the R545 at the following locations: Table 3: Existing Farm Roads Crossing the Proposed R545 Distance Remarks 0.22km Close existing road and divert to new access at 0.28km 1.10km Close existing road 1.60km Construct new access at existing farm road crossing 2.34km Construct new access at existing farm road crossing 2.84km Close existing road 3.68km Construct new access at existing farm road crossing 5.21km Construct new access at existing farm road crossing 5.95km Construct new access at existing farm road crossing 7.08km Close existing road 7.22km Construct new access at existing farm road crossing 8.63km Close existing road 9.14km Construct new access at existing farm road crossing 10.09km Construct new access at existing farm road crossing km New deviated farm access 11.74km Close existing road 13.31km New junction with deviated school road 13.75km Construct new access 14.58km New junction with existing R545 Not all these existing farm roads will require direct access to the R545 in the future and the total number of intersections can be reduced substantially. Many of these existing roads cross the proposed R545 at a location which is not suitable for a safe intersection, due to factors such as restricted sight distance, located on horizontal curve or located in cutting etc. Suitable farm access locations were determined and adjacent farm roads were consolidated to restrict the number of intersections. Meetings were held with a representative of the farmers to confirm that the proposed farm access intersections were acceptable for their needs. Final R545 design report compressed.doc Page 16 of 34
17 Farm access intersections that are designed in accordance with the Mpumulanga Standard Detail Drawing MTP 3/1 (Typical Farm Road Junctions) are to be provided at the following locations on the R545: Table 4: Future Farm Access Intersections Distance Farm Portion Owner 0.28km Portion 5 Eenzaamheid 534 JR Witbank Brickworks 1961 (Pty) Ltd? 1.60km RE Honingkrantz 536 JR Anglo 2.34km RE Honingkrantz 536 JR Anglo 3.68km RE Honingkrantz 536 JR Anglo 5.22km RE Honingkrantz 536 JR Anglo 5.95km RE Honingkrantz 536 JR Anglo 7.22km RE Honingkrantz 536 JR Anglo 9.14km Portion 23/1 Roodepoortje 326 JS Anglo 10.09km RE/1 Roodepoortje 326 JS JH Roos 11.18km Portion 24/1 Roodepoortje 326 JS JE Strick 13.75km Portion 29 Vlakfontein 569 JR JC vd Heever Access to the existing school road (major farm access road) is to be provided at 13.30km. This access should be in accordance with Mpumulanga Standard Detail Drawing MTP 3/3 (T-junction of numbered district gravel road with tarred single carriageway roads). The following photograph shows the existing school road: Final R545 design report compressed.doc Page 17 of 34
18 Photo 5: Existing school road on van der Heever Farm (facing north-east) 9. PROPERTY ACQUISITION The majority of the route for the proposed re-alignment of Road R545 crosses property that is either controlled by or owned by Anglo American. The following sections of the R545 road servitude cross property that is privately-owned and will have to be acquired by Anglo American: Distance 0.0km to 1.22km (Eenzaamheid 534 JR); Distance 12.57km to 13.20km (A. Harriet & Kie -Portion 26 Roodepoortje 326 JS); Distance 13.20km to 14.80km (J C vd Heever Portion 29 Vlakfontein 569 JR). 10. FENCING Fencing will be required to demarcate the full extent of the proposed road reserve (on both sides of the road). Final R545 design report compressed.doc Page 18 of 34
19 Stock-proof fencing (1.2 metre high), should comply with the details in the latest version of the Standard Drawing MTP 11/1 prepared by the Mpumulanga Department of Public Works, Roads and Transport. 11. ROAD TRAFFIC SIGNS AND ROAD MARKING Road Traffic Signs and Road Markings comply with the latest edition of the South African Road Traffic Signs Manual (SARTSM) and are indicated on the drawings. No passing road markings are based on passing sight distance requirements. 12. DRAINAGE Drainage catchment areas were identified and storm-water run-off calculations are based on a storm with a 20 year recurrence interval in accordance with Provincial Road requirements. Major storm-water drainage crossings are located at: Table 5: Major Storm-water Crossings of the R545 Distance Description 2.01km 2x1500x1500 box culverts 3.18km 2x2400x1500 box culverts 4.50km to 4.80km 3x2100x2100 box culverts 7.30km 3x3600x1500 box culverts 9.41km 3x2100x1500 box culverts 12.58km 4x3600x2400 box culverts All open drains should be concrete lined when the longitudinal slope exceeds 2%. 13. GEOTECHNICAL Soil samples were taken at 250 metre centres along the proposed alignment for the new road. Test pits were excavated using a TLB and profiled. The results of the investigation are documented in a separate report entitled Geotechnical Report for New Largo Colliery R545 Road Deviation numbered RPT0013. Final R545 design report compressed.doc Page 19 of 34
20 The predominant transported soil along the route was identified as silty sand colluvium, which is generally loose up to a depth of 1.5m to 2.2m, thereafter becoming medium dense. Silty sand layers containing medium and coarse gravels and the pebbles and cobbles consisting equally of rounded sandstones and angular very hard rock quartzite with occasional slate fragments are generally encountered. Fifty six test pits were excavated along the route, of which twenty seven bulk samples and four small samples were sent to a commercial soils laboratory for testing. Thirteen samples were classified as G7, four samples as G8, four samples as G9, four samples as G10 and two samples did not classify. No suitable sources of borrow material for road layer works were identified. Twenty eight samples had low heave potential and three samples had low to medium heave potential indicating that no heaving problems are expected. Generally the material is not of good quality and is not suitable for use in road pavement layers. The most suitable material located (of G7 quality) is between 6 500km and 8 500km. Two existing borrow areas on Anglo American property were investigated. Both borrow areas have sandy coarse gravels. The same material is still available in the area of test pits NLR31 to NLR33 and these materials classify as G7. The available G7 borrow materials are only suitable for use as road subgrade or general fill. At the time of the field investigation it was estimated that approximately m 3 of G7 material was still available. However, two 25 ton excavators were loading trucks in the southern borrow area, to transport the material to the Kusile site and the existing supply is rapidly being depleted. The Geotechnical Report recommends that materials used for all road layers should be imported, with the exception of the in-situ materials of G7 and better. However the possibility of using a blended material for fill (50/50 mix with slag) should be investigated. Final R545 design report compressed.doc Page 20 of 34
21 14. PAVEMENT DESIGN The road pavement design, as specified by the Mpumulanga Department of Public Works, Roads and Transport is: Double Seal 19.0/9.5 Surface treatment; 150mm Basecourse (G1) compacted to 88% of apparent density; 150mm Stabilized Upper Subbase (G5 or G6) compacted to 97% of mod. AASHTO density; 150mm Lower Subbase (G5 or G6) compacted to 97% of mod. AASHTO density; 150mm Selected Subgrade (G7) compacted to 93% of mod. AASHTO density: Fill compacted in 150mm layers to 93% of mod. AASHTO density: Roadbed - rip and re-compact with 6 passes of 10 ton vibrating roller. The proposed pavement design is detailed on Drawing No CED EARTHWORKS BALANCE The total volume of cut for the re-aligned section of R545 is m 3. A volume of m 3 is required for bulk earthworks (fill). Assuming a 10% bulking factor, there will be an excess of m 3 of cut material to be spoiled. Calculations were based on 1:1.5 cut slopes (assuming no hard material). If hard material is proved, these cut slopes can be steepened and the quantity of excess cut material will reduce accordingly. 16. EXISTING AND PROPOSED SERVICES 16.1 Electrical Overhead power transmission lines cross the proposed route for the R545 at the following locations: Table 6: Overhead Power Transmission Line Crossings Distance Description Remarks 0.70km Existing 132kV Eskom Pylon to be re-located 1.32km Existing 132 kv Eskom Pylon to be re-located 1.42km Proposed 400kV Eskom Duhva-Minerva New line to suit road planning 8.97km Existing 400 kv Eskom Line to be de-commissioned 11.15km Existing 132kV Eskom Pylon to be re-located 13.40km to 14.00km Existing low voltage Line to be re-located Final R545 design report compressed.doc Page 21 of 34
22 Photo 6: Existing overhead power transmission lines from 13.00km (facing north) 16.2 Water No water pipe crossings of the R545 were identified Sewerage No sewerage pipe crossings of the R545 were identified Telephone Lines There are overhead telephone lines along the existing R545. These telephone lines will be cut off by the proposed mining operation and will need to be re-located along the new section of the R545. The existing telephone lines along the farm access (school) road will have to be relocated (13.40km to 14.00km) Service Ducts Service ducts are provided across the new R545 at locations indicated on the drawings. Final R545 design report compressed.doc Page 22 of 34
23 17. CONSTRUCTABILITY The construction of the re-aligned section of the R545 will not impact on the operation of the existing road R545, except at the northern and southern tie-ins to the existing road, where temporary deviations will be required. These temporary road deviations will be constructed in accordance with standard road deviation layout drawings. The rehabilitation of the southern section of existing R545 between Wilge Township and the N12 interchange will have a significant impact on traffic on R545. To minimize this impact it is proposed that construction should be undertaken in half-widths. Adequate traffic accommodation measures and road signage will be required for road safety. 18. EXISTING R545 (BETWEEN WILGE TOWNSHIP AND N12 FREEWAY) Certain sections of the existing R545 between the southern tie-in and the N12 freeway are in poor condition and will require rehabilitation. A detailed survey of the condition of the existing R545 road surface was undertaken during December 2011 and the results are summarized in the following Table 7: Table 7: Condition of existing Road R545 (December 2011) Distance* Remarks (km) Zero Centre line of N12 freeway Crocodile crack down centre line 0.9 Subsidence in west lane 1.1 T - junction Phola township - potholes 1.7 Surface damaged by burning tyres used as road blocks 2.1 Surface damaged by burning tyres used as road blocks 2.15 Service crossing subsidence Potholes x subsidences in eastern lane 3.1 Crack on centre-line 3.2 Potholes 3.5 Potholes 3.55 Intersection to Waste Water Treatment Works 3.9 Potholes 4.2 Patches with missing stone chips Final R545 design report compressed.doc Page 23 of 34
24 Distance* Remarks (km) 4.5 Truter Farm access - surface breaking up for 60 m (photos 7 & 8). 4.8 Subsidence in west lane 4.9 Gouge marks Poor repairs - cracking. (photos 9 to 13). 5.4 Subsidence in west lane 5.6 Poor repairs - cracking. (photo 14). 5.9 Transverse cracks over 100 m length. (photo 15). 6 Potholes 6.0 onwards Transverse cracks - potholes starting. (photo 16). 6.6 Bad heaving. section (photos 17 to 20). 6.8 Badly damaged (photos 21 & 22) 6.9 Intersection. 7 Water course 7.2 Shops. Entire length Shoulders broken away at odd intervals. * Note distances are measured from 0km (at N12 Interchange) to 7.2km (at Wilge shops) The condition of the damaged sections of the existing road R545 can be seen in the following series of photographs (Photos 7 to 22) taken during December Photo 7: Existing R545 near Truter farm access (facing west) Final R545 design report compressed.doc Page 24 of 34
25 Photo 8: Edge damage on existing R545 near Truter farm access (facing west) Photo 9: Poor repair on existing R545 (facing east) Final R545 design report compressed.doc Page 25 of 34
26 Photo 10: Close up view of poor repair on existing R545 Photo 11: Poor repair on existing R545 Final R545 design report compressed.doc Page 26 of 34
27 Photo 12: Poor repair on existing R545 Photo 13: Close up view of poor repair on existing R545 Final R545 design report compressed.doc Page 27 of 34
28 Photo 14: Poor repair on existing R545 Photo 15: Transverse cracks & potholes on existing R545 Final R545 design report compressed.doc Page 28 of 34
29 Photo 16: Transverse cracks & potholes starting on existing R545 Photo 17: Potholes in wheel path on existing R545 Final R545 design report compressed.doc Page 29 of 34
30 Photo 18: Crocodile cracking on existing R545 Photo 19: Cracks & Potholes on existing R545 Final R545 design report compressed.doc Page 30 of 34
31 Photo 20: Cracks & Potholes on existing R545 Photo 21: Existing R545 south of Wilge Township (facing west) Final R545 design report compressed.doc Page 31 of 34
32 Photo 22: Existing R545 with Wilge Township in background (facing west) 19. CONCLUSIONS The selection of a suitable route for the re-aligned section of the R545 Provincial Road is subject to major constraints due to both mining operations and also environmental issues. The selected route alignment complies with the relevant provincial standards while minimizing the impact on the major environmentally sensitive areas. The proposed new intersection at the northern end of the re-alignment of the R545 will need to accommodate a high proportion of vehicular turning movements, which include a large number of heavy vehicles, due to the development of the Kusile Power Station and the New Largo Coal Mine. A properly designed Modern Roundabout type traffic circle is well suited to accommodate vehicular turns safely and in particular right turns across opposing traffic with minimal delay. It is proposed that this type of intersection should be constructed at this junction between the re-aligned R545 and the Kusile Road. Final R545 design report compressed.doc Page 32 of 34
33 Sections of the pavement of the southern part of existing Road R545 are currently in poor condition and need to be rehabilitated. The traffic report indicates that there will be a need to upgrade the existing ramp terminals at the N12 / R545 interchange. Re-marking of existing traffic lanes is required and there is a possible need to install traffic signals at these intersections in the future. The potential need for traffic signals should be confirmed by the results of detailed turning movement traffic surveys. 20. RECOMMENDATIONS It is recommended that: The re-aligned section of the R545 is approved for further more detailed investigation during the next phase of the project. Consideration should be given to the need for rehabilitating the sections of distressed pavement on the existing R545 (south) Additional detailed turning movement counts should be undertaken to determine whether traffic signals are required at specific intersections A modern roundabout type traffic circle be constructed at the northern end of the R545 realignment at the Kusile Road intersection. Final R545 design report compressed.doc Page 33 of 34
34 APPENDIX A LAYOUT DRAWING Final R545 design report compressed.doc Page 34 of 34
Vertical Alignment. Concepts of design & guidelines Computing elevations along vertical curves Designing vertical curves
Vertical Alignment Concepts of design & guidelines Computing elevations along vertical curves Designing vertical curves Flat terrain You can select smooth horizontal alignment and smooth vertical alignment
More informationNATIONAL ROAD 3: KEEVERSFONTEIN TO WARDEN (DE BEERS PASS SECTION) CHAPTER 3: DESCRIPTION OF THE PROJECT
NATIONAL ROAD 3: KEEVERSFONTEIN TO WARDEN (DE BEERS PASS SECTION) CHAPTER 3: DESCRIPTION OF THE PROJECT 3. DESCRIPTION OF THE PROJECT This Chapter presents a description of the De Beers Pass Route (DBPR)
More informationDesign Criteria. Design Criteria
F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road
More information2017 Temporary traffic control guidelines for pedestrians. v.2
2017 Temporary traffic control guidelines for pedestrians v.2 Temporary Traffic Control Guidelines for Pedestrians (2017) The safety and mobility of pedestrians, cyclists and motorists must be considered
More informationMUTCD Part 6G: Type of Temporary Traffic Control Zone Activities
MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities 6G.01 Typical Applications Each temporary traffic control (TTC) zone is different. Many variables, such as location of work, highway type,
More informationRecommended Roadway Plan Section 2 - Land Development and Roadway Access
Recommended Roadway Plan Section 2 - Land Development and Roadway Access SECTION 2 Land Development and Roadway Access 2.1 Land Use and Access Management The Federal Highway Administration (FHWA) defines
More informationSECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN
SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN Table of Contents Page No 1A.1 GENERAL...1 1A.1.1 DESIGN CONTROLS...1 1A.2 MAINLINE ROADWAYS...4 1A.2.1 ROADWAY DESIGNATION...4 1A.2.2 DESIGN SPEED...4 1A.2.3
More informationWYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways
WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to
More informationDesigning and Benchmarking Mine Roads for Safe and Efficient Haulage. Roger Thompson Alex Visser
Designing and Benchmarking Mine Roads for Safe and Efficient Haulage Roger Thompson Alex Visser Departments of Mining and Civil & Bio-systems Engineering University of Pretoria, South Africa Aim of Presentation
More informationAlberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999
Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,
More informationWYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)
WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION
More information3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN
maintenance, and erosion. Stability is required to maintain the integrity of the pavement structure, and a slope stability analysis should be conducted for cuts and fills greater than 15 feet. For lower
More informationROUNDABOUTS/TRAFFIC CIRCLES
GENERAL 1. Description This standard identifies minimum requirements that shall be met for Roundabouts and Neighborhood Traffic Circles in the design and construction of elements for Arlington County Horizontal
More informationSECTION 3 STREET DESIGN
3.01 GENERAL SECTION 3 STREET DESIGN For purposes of geometric and structural design, streets shall be classified according to the following table. The City Engineer will determine the class of all proposed
More informationCity of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS
SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable
More information1.3.4 CHARACTERISTICS OF CLASSIFICATIONS
Geometric Design Guide for Canadian Roads 1.3.4 CHARACTERISTICS OF CLASSIFICATIONS The principal characteristics of each of the six groups of road classifications are described by the following figure
More informationAccess requests to County streets and roadways are processed through one of the following methods:
13.1 GENERAL APPLICATION PROCESS Access requests to County streets and roadways are processed through one of the following methods: A. Planned Developments may set general locations for access points.
More informationAppendix D Stage 1 Road Safety Audit
N2 Monaghan Town to Emyvale Road Improvements Part 8 Application Description of Proposed Development Appendi D N2 Monaghan Town to Emyvale, County Monaghan Proposed Pavement and Minor Improvement Scheme
More informationRAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings
RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings Location: Crossing No. Date of On-Site Inspection: (Day) / / (Night) / / Weather: CHECKLIST 5. - GENERAL TOPICS Level of control
More informationReadington Road (C.R. 637) Construction
Public Information Meeting Thursday, August 2, 2012 Readington Road (C.R. 637) Construction from Dreahook Road to Harlan School Road Branchburg Township, Somerset County Readington Township, Hunterdon
More informationAccess Management Standards
Access Management Standards Section 1: Application of Access Standards This chapter describes the Department's access management standards for access connections on the county roadway system. The standards
More information11 CHECKLISTS Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT
11 CHECKLISTS 11.1 Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT 1.1 General topics 1. Scope of project; function; traffic mix 2. Type and degree of access to property and developments
More informationRoadway Design Manual
Roadway Design Manual Manual Notice Archive by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2009-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective
More informationDriveway Design Criteria
Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved
More informationRoundabouts along Rural Arterials in South Africa
Krogscheepers & Watters 0 0 Word count: 00 text + figures = 0 equivalent words including Title and Abstract. Roundabouts along Rural Arterials in South Africa Prepared for: rd Annual Meeting of Transportation
More informationList of Display Boards
List of Display Boards Welcome Introduction Municipal Class Environmental Assessment (EA) Process Need and Justification for an Interchange Alternatives for Evaluation Vertical and Horizontal Alignments
More informationTraffic Control Inspection Checklist Segment:
Traffic Control Inspection Checklist Segment: Simon Contractors Simon Contractors Originator: Description Reviewed by: Initials Date Distribution: Traffic Quality Manager, Site Assistant Traffic Manager
More informationCOUNTY ROAD 22 HORSESHOE VALLEY ROAD. Municipal Class Environmental Assessment. simcoe.ca
OCTOBER 2014 Municipal Class Environmental Assessment COUNTY ROAD 22 HORSESHOE VALLEY ROAD Project A Truck Climbing Lanes Project B Intersection Improvements simcoe.ca CORPORATE COMMUNICATIONS DEPARTMENT
More informationA5.1 Permitted activities
Section A5 Transportation A5.1 Permitted activities A5.1.1 Activities within roads Note: Refer to Section D for the definition of road (a) Any activity associated with the movement of traffic and the functioning
More informationGeometric Design Tables
Design Manual Chapter 5 - Roadway Design 5C - Geometric Design Criteria 5C-1 Geometric Design Tables A. General The following sections present two sets of design criteria tables - Preferred Roadway Elements
More informationOctober 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)
October 2004 REVISIONS (2) Chapter 11 HORIZONTAL ALIGNMENT SUPERELEVATION DEVELOPMENT 11.3(2) Chapter 12 VERTICAL ALIGNMENT VERTICAL CURVES PASSING SIGHT DISTANCE 12.5(2) VERTICAL CURVES STOPPING SIGHT
More information10 SHERFORD Town Code
Key Fixes (Ref: Masterplan Book, section 4a. Land Use Budget and Key Fixes ) The Town Plan designs and allocates buildings, streets and spaces as accurately as possible in the understandable absence of
More informationINTERSECTIONS AT GRADE INTERSECTIONS
INTERSECTIONS 1 AT GRADE INTERSECTIONS INTERSECTIONS INTERSECTIONS = INTERRUPTED FACILITIES Definitions and key elements An intersection is defined as an area where two or more roadways join or cross.
More informationThis Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.
4.1 GENERAL This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans. These Roadway Standards are for new construction and modification
More informationIH 20 RANGER HILL PUBLIC MEETING
IH 20 RANGER HILL PUBLIC MEETING AUGUST 25, 2015 IH 20, Eastland County, TX CSJ 0007-06-084 IH 20 from 3.5 mi. East of LP 254 to SH 16 (Ranger Hill) August 25, 2015 Agenda Introductions Purpose of the
More informationPaul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)
To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,
More informationCHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS
2011 Edition - Revision 2 Page 275 Section 2G.01 Scope CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS 01 Preferential lanes are lanes designated for special traffic uses such as high-occupancy vehicles
More informationDETECTABLE WARNING SURFACES SHALL BE PROVIDED AT THE FOLLOWING LOCATIONS ON PEDESTRIAN ACCESS ROUTES:
GENERAL NOTES: CURB NOTES: 5'-0" MIN 5'-0" 5'-0" MIN 1. 2. THESE SHEETS ARE IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT (ADA), AND THE REQUIREMENTS OF THE 2011 PROPOSED ACCESSIBILITY GUIDELINES
More informationFigure 3B-1. Examples of Two-Lane, Two-Way Marking Applications
Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones
More informationA plan for improved motor vehicle access on Railroad Avenue in Provincetown
A plan for improved motor vehicle access on Railroad Avenue in Provincetown February 2011 A plan for improved motor vehicle access on Railroad Avenue in Provincetown INTRODUCTION AND PROBLEM IDENTIFICATION
More informationJoshua Jester, E.I., Florida Department of Transportation, District One
MEMORANDUM To: From: Joshua Jester, E.I., Florida Department of Transportation, District One Michael Garau, P.E., Kimley-Horn and Associates, Inc. Date: October 5, 2018 Subject: at Gulfstream Avenue Intersection
More informationENGINEERING STANDARD FOR GEOMETRIC DESIGN OF ROADS AND STREETS ORIGINAL EDITION MAR. 1996
ENGINEERING STANDARD FOR GEOMETRIC DESIGN OF ROADS AND STREETS ORIGINAL EDITION MAR. 1996 This standard specification is reviewed and updated by the relevant technical committee on Dec. 2000(1) and July.
More information4.1 INTRODUCTION 4.1 ROAD SAFETY
CHAPTER 4. ROAD SAFETY 4.1 INTRODUCTION High volumes of traffic travel at speed on national roads. Working on or close to the road surface can be very dangerous. Routine maintenance staff need to develop
More informationMNDOT PAVEMENT DESIGN MANUAL
MNDOT PAVEMENT DESIGN MANUAL Chapter 6 Ramps, Shoulders, Turn Lanes & Miscellaneous Pavements MnDOT Pavement Engineer Date Contents Introduction... 1 600 Ramps and Loops... 1 610 - Shoulders... 2 620 -
More informationNOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG
NOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG NOT TO SCALE PUBLIC WORKS STANDARD DETAILS SIDEWALK RAMPS DATE: MARCH 2013 FILE NAME: SIDEWALK RAMPS.DWG NOT
More informationReview of Guidelines for Cycleway Safety Fencing
Review of Guidelines for Cycleway 1.0 PURPOSE 1.1 This document is meant to provide a review of available reference documents for determining appropriate fencing requirements for cycleway paths and shared
More informationPENNDOT HPMS DATA COLLECTION GUIDE. Bureau of Planning and Research Transportation Planning Division April 2016 (Updated March 2018)
PENNDOT HPMS DATA COLLECTION GUIDE Bureau of Planning and Research April 2016 (Updated March 2018) State Street Dauphin County NOTES INTRODUCTION The purpose of this document is to provide you with some
More information10.0 CURB EXTENSIONS GUIDELINE
10.0 CURB EXTENSIONS GUIDELINE Road Engineering Design Guidelines Version 1.0 March 2017 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services
More information91
90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 As previously depicted in Exhibit 4-J, vehicular accidents are shown along Forrester Road. The contributing factors may be due to its current two
More informationSECTION TRAFFIC REGULATIONS
SECTION 01550 TRAFFIC REGULATIONS PART 1 - GENERAL 1.01 OBJECTIVES A. The Contractor shall provide for safe movement of vehicular, bicycle and pedestrian traffic, including persons with disabilities in
More informationGRAVEL ROAD MAINTENANCE PLAN FOR THE TRANSPORT OF SOLAR ENERGY EQUIPMENT FROM CAPE TOWN TO THE ALEXANDER BAY AREA
GRAVEL ROAD MAINTENANCE PLAN FOR THE TRANSPORT OF SOLAR ENERGY EQUIPMENT FROM CAPE TOWN TO THE ALEXANDER BAY AREA C2589C/MP-REP-001 Rev 1 GRAVEL ROAD MAINTENANCE PLAN APRIL 2015 PREPARED FOR: PREPARED
More informationPENNDOT HPMS DATA COLLECTION GUIDE
PENNDOT HPMS DATA COLLECTION GUIDE Bureau of Planning and Research April 2016 (Updated September 2017) State Street Dauphin County INTRODUCTION The purpose of this document is to provide you with some
More informationTransportation Engineering
Transportation Engineering For Civil Engineering By www.thegateacademy.com Syllabus Syllabus for Transportation Engineering Transportation Infrastructure: Highway Alignment and Engineering Surveys; Geometric
More informationSwamp Road Residents Study
Swamp Road Residents Study SRRG Meeting with PennDot and Elected Officials Newtown and Wrightstown, PA April 25, 2008 Newtown Township Section of Swamp Road Limited Public Funds No reconstruction of a
More informationFOR HISTORICAL REFERENCE ONLY
To: From: Subject: Electronic Distribution Recipients MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No. 12-14-B-03 December 18, 2012 Jon M. Chiglo, P.E. Division
More informationDUNBOW ROAD FUNCTIONAL PLANNING
DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report
More informationAccess Management in the Vicinity of Intersections
Access Management in the Vicinity of Intersections FHWA-SA-10-002 Technical Summary Photo: Ralph Bentley (used with permission) 0 Access Management is: The design, implementation and management of entry
More informationTRAFFIC SIGNAL WARRANT STUDY
TRAFFIC SIGNAL WARRANT STUDY 5 th STREET & ENCHANTED PINES DRIVE JANUARY 2013 TRAFFIC OPERATIONS ENGINEERING SERVICES/PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS INTERSECTION LOCATION MAP ii INTRODUCTION
More informationDESIGN BULLETIN #66/2010
DESIGN BULLETIN #66/2010 Highway Geometric Design Guide Chapter B, Climbing Lane Warrants for Two Lane Undivided and Four Lane Divided Highways - Revised Summary This Design Bulletin is being issued as
More informationNEIGHBOURHOOD TRAFFIC COMMITTEE POLICY AND PROCEDURE
The City of Vaughan 2141 Major Mackenzie Drive Vaughan, Ontario Canada L6A 1T1 Tel (905) 832-2281 NEIGHBOURHOOD TRAFFIC COMMITTEE POLICY AND PROCEDURE REVISED JUNE 2010 APPLICABILITY The Neighbourhood
More informationField guide for Accessible Public Rights-of-Way Edition
Field guide for Accessible Public Rights-of-Way 2015 Edition BRIEFING MEMO SUBJECT: Department of Justice/Department of Transportation Joint Technical Assistance on Title II of the Americans with Disabilities
More informationROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax
Instructions: For a driveway access permit, fill in sections 1, 2, 3 and 4, and the appropriate drawings and sign. For a Utility access, fill in sections 1, 2, 3 and 5, and figures 1 and 3. Prepare a detailed
More informationJohannesburg Roads Agency. A-Z Traffic Calming Guide
Johannesburg Roads Agency A-Z Traffic Calming Guide Table of Contents The Role of a Traffic Engineer... 2 JRA s Traffic Engineering Department s Responsibilities:... 2 Traffic Engineering Enquiries...
More informationRoad Markings. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew
Road Markings Lecture Notes in Transportation Systems Engineering Prof. Tom V. Mathew 1 Overview The essential purpose of road markings is to guide and control traffic on a highway. They supplement the
More informationPolicy Statement. Objective. Context. References and Supporting Documentation
Policy Statement Subject Placement of Distribution Poles Along Roads With Speed Limits Not Exceeding 70km/h Approved by Robert Rogerson Signature & Date Distribution Standards and Policy Manager Authorised
More informationINDEX. Geometric Design Guide for Canadian Roads INDEX
Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines
More informationAccess Management Guidelines February 2013 THE CITY OF
Access Management Guidelines February 2013 THE CITY OF Table of Contents Introduction 2 Review and Approval Process 5 Technical Guidelines 9... 10... 12 3. Separation Distance: Non-Signalized All-Turns
More informationHospital Link Project Project Update September 2017
Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important
More informationGWINNETT COUNTY DEPARTMENT OF TRANSPORTATION
GWINNETT COUNTY DEPARTMENT OF TRANSPORTATION 1 of 7 June 20, 2007 GENERAL: The following guidelines shall be used in the determination of the requirement for left turn lanes for development projects and
More informationOff-road Trails. Guidance
Off-road Trails Off-road trails are shared use paths located on an independent alignment that provide two-way travel for people walking, bicycling, and other non-motorized users. Trails specifically along
More informationAccommodating Pedestrians in the Work Zone
Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,
More informationCounty of Greenville South Carolina. Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program
County of Greenville South Carolina Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program (rev) August 2008 I. PURPOSE The potential negative impacts from vehicular traffic
More informationSUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES
SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES (These notes are guidelines only and must not be included in the Contract Documents). 1. SCOPE These Notes are guidelines
More informationIntroduction Methodology Study area and data collection Results and recommendation Conclusion References
Introduction Methodology Study area and data collection Results and recommendation Conclusion References It is formal procedure for assessing accident potential and safety performance in the provision
More informationTo position power poles a safe distance from the road to minimise the likelihood of being accidentally hit by vehicles.
Policy Statement Subject Placement of Rigid Distribution Poles Along Roads With Speed Limits Exceeding 70KM/H Approved by Robert Rogerson Signature & Date Distribution Standards and Policy Manager Authorised
More informationSITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE
LANDSLIDE RISK ASSESSMENT SOUTHERN REGION SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE LEGAL LOCATION: LSD 4-3-21-4 W5M and 1-4-21-4 W5M REFERENCE LOCATION ALONG HIGHWAY The slide area is located between
More information(HIGHWAY GEOMETRIC DESIGN -1)
LECTURE HOUR-19 TE-1(10CV56) UNIT-3 (HIGHWAY GEOMETRIC DESIGN -1) Width of carriage way: Width of the carriage way or the width of the pavement depends on the width of the traffic lane and number of lanes.
More informationMACKA S SAND PTY LTD
MACKA S SAND PTY LTD ROAD SAFETY AUDIT STAGE 2 PRELIMINARY DESIGN OF CHANNELISED INTERSECTION OF ACCESS ROAD TO TO PROPOSED SAND MINING DEVELOPMENT AT LOT 218, D.P. 1044608, WILLIAMTOWN AND NELSON BAY
More informationAlberta Highway 881. Corridor Management Plan. Session Forum 1 - Highways. Tri-Party Transportation Conference Moving Alberta Into the Future
Tri-Party Transportation Conference Moving Alberta Into the Future Alberta Highway 881 Corridor Management Plan Lac La Biche to Anzac Session Forum 1 - Highways March 2017 INTRODUCTION + 241 km long, 2
More informationThe procedures to be followed in undertaking Non-Emergency work depend on the degree of traffic disruption caused by the work.
APPENDIX G TRAFFIC CONTROL GUIDELINES FOR UTILITY WORK WITHIN ROADWAY RIGHTS- OF-WAY JUNE 2001 Scope of Guidelines These traffic control guidelines cover work performed by utility companies and/or their
More information2.0 LANE WIDTHS GUIDELINE
2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated
More informationIntroduction to Roadway Design
Chapter Introduction to Roadway Design 1 This chapter lays the foundation for the Roadway Design course. You examine the roadway design workflow and the completed drawing files and review the project scope,
More informationWELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.
WELCOME - PTH 1 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, 11 4:00 P.M. - 8:00 P.M. PROJECT STUDY AREA 1 Wenzel Street PR 2 Pritchard Farm Farm Road Road McGregor Farm
More informationTruck Climbing Lane Traffic Justification Report
ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:
More informationRIGHT TURNS AT INTERSECTIONS: ARE THERE ALTERNATIVES?
RIGHT TURNS AT INTERSECTIONS: ARE THERE ALTERNATIVES? R.C. Pyke, J.D. Sampson and K.G. Schmid Stewart Scott International, P O Box 784506, Sandton, 2146 TTT Africa, P.O.Box 109, Sunninghill, G.D.P.T.R.W,
More informationCTH M HIGHWAY PROJECT CTH Q to STH 113
CTH M HIGHWAY PROJECT CTH Q to STH 113 PUBLIC INFORMATIONAL MEETING #3 Wednesday, May 25, 2005 Town of Westport Administration Building 5387 Mary Lake Road 6:00 p.m. to 8:00 p.m. PUBLIC INFORMATIONAL MEETING
More informationTRAFFIC STUDY GUIDELINES Clarksville Street Department
TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two
More informationTRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES
TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES APPLICATION Delineation devices are used to warn and alert motorists of hazards created by work activities in or near the travelled way and to guide and direct
More informationImproving Road Safety for North Eastern State Roads of India A Case Study
Improving Road Safety for North Eastern State Roads of India A Case Study North Eastern States Portugal Debasis Chakrabarty, Transportation Engineer Key figures of North Eastern States Road Project Total
More informationAGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive
AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell
More informationTrans-Canada Highway 1 RW Bruhn Bridge Replacement
Trans-Canada Highway 1 RW Bruhn Bridge Replacement May 2016 RW Bruhn Bridge Project Objectives Improve safety, traffic flow and movement of goods Improve safety for pedestrians and cyclists Replace the
More informationFORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION
FORM 901.3.A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION The following information is required from all applicants directly or indirectly accessing any collector or arterial road or as otherwise
More informationADA on Construction. Guidance for Section C Plan Preparers
ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize
More informationRoad Safety Audit training course. Motorways - safety issues of the motorway design
Road Safety Audit training course Motorways - safety issues of the motorway design Jesper Mertner, Road safety auditor, COWI A/S 1 ROAD SAFETY AUDITING COURSE Content 1. Safety 2. Cross sections 3. Horizontal
More information(This page left intentionally blank)
(This page left intentionally blank) 2011 Edition - Revision 1 Page 553 Section 5A.01 Function CHAPTER 5A. GENERAL 01 A low-volume road shall be defined for this Part of the Manual as follows: A. A low-volume
More informationTonight is for you. Learn everything you can. Share all your ideas.
Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.
More informationFREEWAY WORK ZONE SPEED MODEL DOCUMENTATION
APPENDIX B FREEWAY WORK ZONE SPEED MODEL DOCUMENTATION B-1 APPENDIX B FREEWAY WORK ZONE SPEED MODEL DOCUMENTATION B.1 INTRODUCTION This software can be used for predicting the speed of vehicles traveling
More informationTraffic Management Guidelines for Structure Rehabilitation Projects
, Traffic Management Guidelines for Structure Rehabilitation Projects February 2009 1 Purpose & Background These guidelines were prepared in order to assist the Regional Structural Office in determining
More informationLIST OF FIGURES Figure Title
TABLE OF CONTENTS Table of Contents... 1 List of Figures... 2 44-1A Critical Length of Grade for Trucks... 3 44-1B Critical Length of Grade for Recreational Vehicles... 3 44-1C Measurement for Length of
More informationRoundabout Design 101: Principles, Process, and Documentation
Design 101: Principles, Process, and Documentation Part 1 March 7, 2012 Well designed roundabouts should minimize accidents, delay and costs for everyone using the intersection. This session covers the
More information