RESURFACING AREAS 4 7 LIMITS AND QUANTITY SUMMARY
|
|
- Alexandra Ferguson
- 5 years ago
- Views:
Transcription
1 RESURFACING ARS Skip 2" 1.5" Avg Single Double AMICK WAY DIANE SP1.5/ No stop bar at other stop sign DIANE CT SEMINOLA BLVD END OF ROAD SP1.5/ a 13 ft. stop bar and 25 ft of double yellow is on new pavement. Culde sac. 1, DIANE SEMINOLA BLVD DIANE SP1.5/ ft. of single yellow stripe on new pavement. 80 2, DIANE DIANE AMICK WAY SP1.5/ , DIANE AMICK WAY SUNRISE SP1.5/ " water 1, DIANE SUNRISE RAINBOW SP1.5/ DIANE SUNRISE RAINBOW SP1.5/ ,21 99 DIANE RAINBOW RAINBOW SP1.5/ DIANE RAINBOW RAINBOW SP1.5/ DIANE RAINBOW SUNRISE SP1.5/ DIANE SUNRISE DIANE SP1.5/ " water No stop bar 3 60 LAURA ST FRANGIPANI LN MAHOGANY MSS LAURA ST MAHOGANY HOLLY HILL AVE MSS LAURA ST HOLLY HILL AVE WISTERIA LN MSS ,060 1, PADDOCK WAY BRIDAL PATH SUNDOWN TRL SP1.5/ , RAINBOW DIANE DIANE SP1.5/ " water No stop bars observed 1,51 12 SLEEPY CT START OF ROAD SUNDOWN TRL MSS Cul de sac, No stop bar observed 601 THE SPUR SUNDOWN TRL END OF ROAD SP1.5/ Cul de sac NE TRIPLET SEMINOLA BLVD END OF ROAD MSS X Walk(B): 68 ft., pavement of whole road seems in good cond., Need Camera WINGO END OF ROAD SP1.5/ Rounded end, Not full cul de sac BLUEBELL CASTLE WOOD TER SP1.5/ " well caps Road blocked by emergency gate access to multi fam subdivision. Rounded end. 2, HOLLY HILL AVE LAURA ST SP2.0/ LAURA ST DOGWOOD SP1.5/ , DOGWOOD End of Road (East of Canal) MSS Road not contiguous, separated by canal. 882 End of Road (Eastof Canal) 50 West F End of Road (West of Canal) Poinsettia St MSS POINSETTIA ST SABAL PALM MSS x36 in. 1 SABAL PALM SPANISH MOSS MSS SPANISH MOSS TUMBLEWEED LN MSS TUMBLEWEED LN S US HWY 1-92 MSS x Right arrow, Remaining stripes outside ROW: single yellow 36ft, stop bar 19 ft, X Walk(A) 58 ft. 56 RANCH TRL BRIDAL PATH SURREY RUN MSS " water 30 2,13 SUNRISE DIANE DIANE SP1.5/ " water No stop bar observed 2, Page 1 3/3/201
2 RESURFACING ARS Skip 2" 1.5" Avg Single Double WIL O WIK START OF ROAD SUNDOWN TRL MSS No stop bar, Cul de sac is before end of road. 1,66 WOODSTRM LN BRIDAL PATH SUNDOWN TRL SP1.5/ , BRIDLE PATH SUNDOWN TRL MSS Recommend not treating for 2 to 3 years 2,21 BRIDLE PATH SUNDOWN TRL SURREY RUN MSS BRIDLE PATH SURREY RUN RANCH TRL MSS BRIDLE PATH RANCH TRL SURREY RUN MSS " water 259 BRIDLE PATH SURREY RUN WOODSTRM LN MSS BRIDLE PATH WOODSTRM LN PADDOCK WAY MSS BRIDLE PATH PADDOCK WAY END OF ROAD MSS detector is for Gate to Water Plant WYNDHAM WAY SEMINOLA BLVD BRIDLE PATH SP1.5/ ft. gore, 2 "STOP", 1 Right arrow, 1 Left arrow, Markings outside ROW: X Walk(B) 102 ft, Stop bar 2 ft., 1 8" sewer cap. 2, SUNDOWN TRL BRIDAL PATH LAURA ST SLM's only 5 GEE CREEK CT START OF ROAD GEE CREEK LN MSS Cul de sac, Should be TO Gee Creek Ln 59 5 GEE CREEK LN START OF ROAD OSCEOLA TRL MSS GEE CREEK LN OSCEOLA TRL CALOOSA TRL MSS GEE CREEK LN CALOOSA TRL WO TRL MSS GEE CREEK LN WO TRL OSCEOLA TRL MSS x2 "S" grate 1 8" water GEE CREEK LN OSCEOLA TRL GEE CREEK CT MSS GEE CREEK LN GEE CREEK CT MSS In new pavement: 108 ft double yellow, 220 ft single white, 2 8" water AURORA TIMBERLANE TRL END OF ROAD SP1.5/ COLONY TIMBERLANE TRL TIMBERLANR TRL SP1.5/ This is for both segments of Colony Dr. 1, COLONY TIMBERLANE TRL TIMBERLANE TRL SP1.5/ , COLONY TIMBERLANE TRL END OF ROAD SP1.5/ LAZY END OF ROAD SP1.5/ Cul de sac, Should be FROM Osceola Tr TH ST BELLE AVE SP2.0/ In newer pavement: 1 28x36 grate, 50 ft. double yellow, 11 ft stop bar 1, CALOOSA TRL GEE CREEK LN WETUMPA CT SP1.5/ Should be TO Wetumpa Ct. 1, CALOOSA TRL WETUMPA CT TURTLE MOUND SP1.5/ ETOWAH OSCEOLA TRL END OF ROAD MSS ed Cul de sac LANDMARK LN W LANDS END COLONADES CV MSS LANDMARK LN W COLONADES CV TIMBERLANE TRL MSS LANDMARK LN TIMBERLANE TRL LANDS END SP1.5/ , LANDMARK LN TIMBERLANE TRL LANDS END SP1.5/ , MICANOPY CT OSCEOLA TRL END OF ROAD MSS Page 2 3/3/201
3 RESURFACING ARS Skip 2" 1.5" Avg Single Double TURTLE MOUND TURTLE MOUND TURTLE MOUND OSCEOLA TRL CALOOSA TRL MSS CALOOSA TRL OSCEOLA TRL MSS For both segments of "Caloosa to Osceola" 2,163 CALOOSA TRL OSCEOLA TRL MSS ,02 5 WETUMPA CT CALOOSA TRL END OF ROAD MSS Cul de sac WO TRL GEE CREEK LN WO TRL MSS x2 "S" 1 8" water 3, ,82 5 WO TRL WO TRL OSCEOLA TRL MSS ,30 5 CLOISTERS CV TIMBERLANE TRL END OF ROAD SP1.5/ " water 12 Cul de sac 1, NANTAHALA CT OSCEOLA TRL END OF ROAD MSS Cul de sac OSCEOLA TRL GEE CREEK LN TURTLE MOUND MSS ,36 5 OSCEOLA TRL TURTLE MOUND MICANOPY CT MSS OSCEOLA TRL MICANOPY CT NANTAHALA CT MSS OSCEOLA TRL ETOWAH TURTLE MOUND MSS ,162 5 OSCEOLA TRL TURTLE MOUND WO TRL MSS OSCEOLA TRL WO TRL MSS Should now be TO Osceola Tr bend 66 5 OSCEOLA TRL GEE CREEK LN OSCEOLA TRL MSS ,596 5 OSCEOLA TRL OSCEOLA TRL OSCEOLA TRL MSS OSCEOLA TRL OSCEOLA TRL OSCEOLA TRL MSS ,856 5 OSCEOLA TRL OSCEOLA TRL LAZY MSS OSCEOLA TRL LAZY TIMBERLANE TRL MSS OSCEOLA TRL TIMBERLANE TRL OSCEOLA TRL MSS Should now be from Timberlane Trl to Osceola Trl bend to west. GIS road length is 39 ft BAYOU CROSS ST BAYOU DN 63 Joints failing but can wait a few years 5 BAYOU BAYOU CRESTVIEW DN 255 Joints failing but can wait a few years 5 BAYOU CRESTVIEW LN CROSS ST DN 53 1 Joints failing but can wait a few years 5 BELLE AVE NORTH OF CFE DEVELOPMENT CITY OF CASSELBERRY CITY LIMITS DNE 900 Did not assess. 5 COLONADES CV LANDMARK LN END OF ROAD SP1.5/ " water 11 Cul de sac CRESTVIEW CRESTVIEW LN CROSS ST DN " water 12 Joints failing but can wait a few years 5 CRESTVIEW CROSS ST BAYOU DN 62 2 Joints failing but can wait a few years 5 CRESTVIEW LN CRESTVIEW MSS In new pavement: 9 ft double yellow, 12 ft stop bar, X walk(a): 39 ft CRESTVIEW LN CRESTVIEW BAYOU MSS CROSS ST START OF ROAD DN 20 In new pavement: 25 ft double yellow, 8 ft stop bar, X Walk(A): 26 ft. 2 for Water Rec. Facility Gate 5 CROSS ST CRESTVIEW DN In new pavement: X Walk(A): 1 ft., 1 manhole 5 CROSS ST CRESTVIEW BAYOU DN " Sq. Rec. water 22 Page 3 3/3/201
4 RESURFACING ARS Skip 2" 1.5" Avg Single Double 5 LANDS END LANDMARK LN E SR 3 MSS Outside: 16 ft stop bar, 11 ft. double yellow TIMBERLAND TRL OSCEOLA TRL E SR SLM's only 6 HILL ST NE TRIPLET SEMINOLA BLVD SP2.0/ " water 11 X Walk(C): 3 ft., In new pavement: 95 ft double yellow, 32 ft Stop bar, 1 8" water, 1, X Walk(B): 0 ft , SECRET WAY N LAKE TRIPLET SECRET WAY SP2.0/ X Walk(C): 35 ft SECRET WAY SECRET WAY SECRET WAY CT SP2.0/ , SECRET WAY SECRET WAY CT HIDDEN PINES SP1.5/ , SECRET WAY HIDDEN PINES HIDDEN PINES SP1.5/ SECRET WAY HIDDEN PINES SEMINOLA BLVD SP1.5/ In new pavement: 21 ft stop bar, X Walk(B): 60 ft SECRET WAY CT SECRET WAY END OF ROAD SP1.5/ Road Name should be Secret Way Ct, not Cir ALPEEN N SUNSET VALMORA SP2.0/ BUTTON RD SEMINOLA BLVD SUNSET DN X Walk(B): 50 ft, 8 ft white gore, L arrow x 1, R arrow x 1 6 BUTTON RD SUNSET S US HWY 1-92 DN , Right arrow x 2, Left arrow x, R/Straight/L arrow x 2, X Walk(B): ft.; Need Camera 6 COLOMBO VALMORA THORNBERRY MSS ,29 6 MOCKINGBIRD LN SUNSET END OF ROAD MSS " water 12 Not a cul de sac 1,326 6 OAK PARK PL START OF ROAD N SUNSET MSS " water OAK PARK PL N SUNSET OLD OAK PT MSS ,99 6 OAK PARK PL OLD OAK PT END OF ROAD MSS ,16 6 OAKWOOD SUNSET N TRIPLET LAKE MSS " water 28 X Walk(C): 29 ft. 2,5 6 OLD OAK PT START OF ROAD OAK PARK PL MSS PINE KNOLL CT TALLWOOD END OF ROAD MSS Cul de sac 33 6 SECRET WAY START OF ROAD SECRET WAY SP1.5/ " water SUNSET S EMBREY MOCKINGBIRD LN MSD SUNSET MOCKINGBIRD LN OAKWOOD MSD SUNSET OAKWOOD ALPEEN MSD " water 95 6 SUNSET ALPEEN OAK PARK PL MSD SUNSET OAK PARK PL BUTTON RD MSD " water, 1 8" monitor. well 1,10 In different pavement: X Walk(C): 3 ft, 15 ft stop bar, 0 ft double yellow, 2 8" gas valves. 0 6 TALLWOOD VALMORA PINE KNOLL CT MSS TALLWOOD PINE KNOLL CT THORNBERRY MSS THORNBERRY COLOMBO TALLWOOD MSS ,218 6 VALMORA COLOMBO ALPEEN MSS VALMORA ALPEEN TALLWOOD MSS IVEY RD N TRIPLET LAKE IVEY RD DNE " circle cap Road does not connect, it's part of park, not a through way. Page 3/3/201
5 RESURFACING ARS Skip 2" 1.5" Avg Single Double 6 IVEY RD IVEY RD FRANCES AVE MSS IVEY RD FRANCES AVE SEMINOLA BLVD MSS MELODY LN S US HWY 1-92 END OF ROAD MSS In new (better) pavement: X Walk(B): 55 ft, 16 ft stop bar, 6 ft double yellow. X Walk(A): 3 ft, 1 R arrow, 2 X Walks(C): 6 ft, Not a through way to Quail Pond Cir., stops just past Municipal TRIPLET CT NE TRIPLET END OF ROAD DN Cul de sac 6 TRIPLET LAKE TRIPLET LAKE OAKWOOD DN , Can wait a few years 6 TRIPLET LAKE OAKWOOD SECRET WAY DN TRIPLET LAKE SECRET WAY IVEY RD DN TRIPLET LAKE IVEY RD NE TRIPLET DN 150 1,90 X Walk(C): 25 ft. 0 6 TRIPLET LAKE NE TRIPLET N LOST LAKE LN DN X Walk(C): 22 ft. 0 6 TRIPLET LAKE N LOST LAKE LN DN " water 1, "SCHOOL", X Walk(A): 39 ft. 0 6 N LOST LAKE LN N TRIPLET LAKE NORRIS PL MSS ,66 6 S US HWY 1-92 TRIPLET LAKE INTERSECTION SP2.5/ ,111 AVALON BLVD GUINEVERE LANCELOT WAY MSS " waters 1 1 8" water in concrete gutter dip. 1,9 AVALON BLVD LANCELOT WAY END OF ROAD MSS " water 331 AVALON CT AVALON BLVD END OF ROAD SP1.5/ Cul de sac BENWICK WAY PRINCE PHILIP AVALON BLVD SP1.5/ " water 22 2, CAMELOT WAY S WINTER PARK SP1.5/ Winter Park side split by median, X Walk(A): 56 ft. 1, CORNWALL CT AVALON BLVD END OF ROAD SP1.5/ Cul de sac EXCALIBUR GUINEVERE LANCELOT WAY MSS ,82 0 GALAHAD LANCELOT WAY QUEEN ELAINE SP1.5/ GALAHAD QUEEN ELAINE GUINEVERE SP1.5/ " water 11 2, GUINEVERE ROUNDTABLE SP1.5/ " water GUINEVERE ROUNDTABLE GALAHAD SP1.5/ GUINEVERE GALAHAD LADY SUSAN SP1.5/ GUINEVERE LADY SUSAN EXCALIBUR SP1.5/ ,360, GUINEVERE EXCALIBUR HASTINGS CT SP1.5/ GUINEVERE HASTINGS CT AVALON BLVD SP1.5/ HASTINGS CT GUINEVERE END OF ROAD SP1.5/ " water 12 Cul de sac LADY AMY CANTERBURY CANTERBURY SP1.5/ , LADY SUSAN QUEEN ELAINE GUINEVERE SP1.5/ " water 25 2, LADY SUSAN GUINEVERE LADY SUSAN CT SP1.5/ LADY SUSAN LADY SUSAN CT AVALON BLVD SP1.5/ ,1 116 Page 5 3/3/201
6 RESURFACING ARS Skip 2" 1.5" Avg Single Double LADY SUSAN CT LADY SUSAN END OF ROAD SP1.5/ Cul de sac 1, LANCELOT WAY ROUNDTABLE LANCELOT CT SP1.5/ LANCELOT WAY LANCELOT CT GALAHAD SP1.5/ , LANCELOT WAY GALAHAD QUEEN ELAINE SP1.5/ " water 528 There is an edge cul de sac at 131 Lancelot Way. 6, LANCELOT WAY QUEEN ELAINE EXCALIBUR SP1.5/ LANCELOT WAY EXCALIBUR AVALON BLVD SP1.5/ ,802 1 LANCELOT CT LANCELOT WAY END OF ROAD SP1.5/ " water 13 Cul de sac, There is another edge cul de sac opposite of Lancelot Ct with a 16 ft stop bar. 1, MERLIN CT END OF ROAD SP1.5/ " water 10 Cul de sac 50 PRINCE PHILIP AVALON BLVD BENWICK WAY SP1.5/ , PRINCE PHILIP BENWICK WAY AVALON BLVD SP1.5/ , QUEEN ELAINE QUEEN ELAINE GALAHAD LADY SUSAN MSS ,28 LADY SUSAN LANCELOT WAY MSS Edge cul de sac at 1311 Queen Elaine Dr.,26 33 ROUNDTABLE LANCELOT WAY GUINEVERE SP1.5/ , CANTERBURY AVALON BLVD LADY AMY MSS " water 12 0 CANTERBURY LADY AMY LADY AMY MSS CANTERBURY LADY AMY LADY AMY MSS ,0 CANTERBURY LADY AMY AVALON BLVD MSS ,253 KING ARTHUR CT END OF ROAD MSS Cul de sac 16 CHANEY CHANEY CT DN X Walk(C): 32 ft. CHANEY CHANEY CT END OF ROAD DN Cul de sac CHANEY CT CHANEY END OF ROAD DN Cul de sac S WINTER PARK CAMELOT WAY DN X Walk(A): ft. CAMELOT WAY KING ARTHUR CT DN KING ARTHUR CT MERLIN CT DN MERLIN CT LANCELOT WAY DN LANCELOT WAY GUINEVERE DN GUINEVERE AVALON BLVD DN AVALON BLVD JEFFERSON DN "SCHOOL" JEFFERSON CHANEY DN " water X Walk(B): 30 ft, An additional side X Walk(B) may be affected at school entrance. CHANEY S WINTER PARK DN X Walk(B): 3 ft, 1 L arrow, 1 R arrow, 2 " SCHOOL", Turn lane approx 00 sq.ft., Need camera. 2 burried Page 6 3/3/201
7 RESURFACING ARS Skip 2" 1.5" Avg Single Double TOTALS , , ,299 12"W Crosswalks = 6, ,150 8,192 1,111 90,68 0 6, Miles NM GM NM NM Arrows = 16 Messages = Legend Crosswalk Type A Parallel Bars RPM TONS TONS - 1.5" Avg Mill Depth Crosswalk Type B Ladder Type 1,225 - Mill Depth Asphalt Quantity ( B) Add 5% M3 - " Avg Mill Depth 6" SP1.5 6,82 Tons M - 6" Avg Mill Depth 6" 2.88 SP Tons - Mill Depth Skip 0.00 Repair Areas 15 Tons SP " Overlay Total,65 Tons 8,153 SP " Overlay SP " Overlay MSS - surface Single SP2.5 Asphalt Quantity ( C) 156 Tons MSD - surface Double Total 156 Tons 16 *Avg 1/2" SP Course Full Depth Base Repair (F) M FDOT OBG " SP Layers Partial Depth Repair M3 Page 3/3/201
2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS
CITY OF REDMOND, OREGON 2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS TABLE OF CONTENTS SECTION 1 TRENCHES TITLE 1-1 Utility Trench 1-2 Water Line & Sewer Line Separation 1-3 RR X-ING Single/Joint Use
More informationWest End Connectivity Master Plan
West End Connectivity Master Plan Office of Commissioner Juan C. Zapata District 11 Page 1 of 13 Juan C. Zapata MIAMI- DADE COUNTY COMMISSIONER Introduction I am pleased to announce the West End Connectivity
More informationGeneral Notes. Project No /15/2018 Page 1 of 1
5081 Page 1 of 13 General Notes 5/15/2018 Page 1 of 1 Project No. 82 183-82 KA D 5081-01 0309-19 1 2 Note The contractor is responsible for establishing and maintaining centerline of the traveled way for
More informationFDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017
April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related
More informationFOR LOOP RAMPS-TAPERED DECELERATION LANE
6" WHITE DOTTED LINE: 5 MARK, 20 SKIP 6" WHITE CRYSTAL MONO-DIRECTIONAL MAIN LINE END (EVERY 50 FEET) 50 FEET BEYOND LAST CRYSTAL PAVEMENT MARKER 5 AMBER MONO-DIRECTIONAL 50 FEET BEFORE LAST CRYSTAL PAVEMENT
More informationTRANSPORTATION CONDITIONS AND UTILITIES
CHAPTER 8 TRANSPORTATION CONDITIONS AND UTILITIES The primary transportation factor in the Study Area is the reconstruction of Mall Road itself. The road is currently being rebuilt over two phases into
More informationGeneral Notes. Project No /15/2018 Page 1 of 1
5025 Page 1 of 10 General Notes 5/15/2018 Page 1 of 1 Project No. 82 18-18- 82 KA D 5025-01 0307-19 1 2 Note The contractor is responsible for establishing and maintaining centerline of the traveled way
More informationFDOT Treasure Coast Traffic Impact Report
January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance
More informationWaterford Lakes Small Area Study Report
Waterford Lakes Small Area Study Report Orange County District 4 Prepared for: Orange County Public Works Department Traffic Engineering Division 4200 S. John Young Parkway Orlando, FL 32839-9205 Prepared
More informationCITY OF ROCK ISLAND. 46th Street Reconstruction North of 28th Avenue to 29th Avenue. 29th Avenue Reconstruction 46th Street to 47th Avenue Court
46th Street Reconstruction North of 28th Avenue to 29th Avenue 29th Avenue Reconstruction 46th Street to 47th Avenue Court 47th Street Court Reconstruction 29th Avenue to Cul-de-sac CITY OF ROCK ISLAND
More informationLegislative Update Williamsburg Residency
Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:
More information2018 ROAD MAINTENANCE PROGRAM
2018 ROAD MAINTENANCE PROGRAM John Tiger Anastasi Town of Bethlehem Superintendent of Highways June 27, 2018 AGENDA Why do we maintain our roads? How is the Road Maintenance Plan developed? The process
More informationEngineering Design Criteria & Standard Drawings
Engineering Design Criteria & Standard Drawings (January 2018) APPENDIX A STANDARD DRAWINGS Engineering Design Criteria & Standard Drawings APPENDIX A STANDARD DRAWINGS FOREWORD The Standard Drawings presented
More informationFDOT Broward County Traffic Impact Report November 24 through December 1, 2017
FDOT Broward County Traffic Impact Report November 24 through December 1, 2017 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during
More informationName Roads Station Distance Miles
Name Roads Station Distance Miles Saw Mill to San Mateo 62+00 to 135+00 1.382575758 San Mateo to Alamo 135+00 to 261+50 2.395833333 Alamo to NM 599 261+50 to 305+00 0.823863636 Sidewalk and Curb Only Rabbit
More informationFDOT Treasure Coast Traffic Report
July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationAtwood Avenue Fair Oaks Avenue Cottage Grove Road
Atwood Avenue Fair Oaks Avenue Cottage Grove Road Agenda Purpose Review project scope & goals Present design alternatives Gather feedback Answer Questions Format Open House Presentation Q&A Open House
More informationDeep Creek High. Run Schedule for Run Dch016. BUS # RUN # FIRST PICKUP OPENS AT: 8:40AM :00am CLOSES AT: 3:38PM
Run Schedule for Run Dch016 016 2 8:00am CLOSES AT: 3:38PM 6/19/2017 2836 CAMELOT BLVD 2876 CAMELOT BLVD CAMELOT BLVD & EXCALIBUR ST EXCALIBUR ST & EXCALIBUR CT CAMELOT BLVD & CAMELOT CT SEAN DR & CAMELOT
More information2. TRANSPORTATION ELEMENT.
2. TRANSPORTATION ELEMENT. The purpose of this element is to assist in establishing an adequate transportation system within the City and to plan for future motorized and non-motorized traffic circulation
More informationDeep Creek High. Run Schedule for Run Dch016. BUS # RUN # FIRST PICKUP OPENS AT: 8:40AM :00am CLOSES AT: 3:38PM CAMELOT BLVD & EXCALIBUR ST
Run Schedule for Run Dch016 016 08:00am CLOSES AT: 3:38PM CAMELOT BLVD & EXCALIBUR ST EXCALIBUR ST & EXCALIBUR CT CAMELOT BLVD & CAMELOT CT CAMELOT BLVD & SIR GAWAINE DR SIR GALAHAD DR & CAMELOT BLVD ARCHERY
More informationMISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY
DESIGN DESIGNATION A.A.D.T - XXXX = XXXX V = XX M.P.H PLANS FOR PROPOSED HIGHWAY INDEX OF SHEETS DESCRIPTION TITLE SHEET ----------------------- 1 TYPICAL SECTIONS (TS) (1 SHEET)-- QUANTITIES (QU) (1 SHEET)--------
More informationCITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved
CITY OF $51,829 Median Income 291% Traditionally Underserved 438% Growth from 2010 859% HS/GED 345% Bachelors 27,041 Households 620% Labor Force Lake Okeechobee Delray Beach Palm Beach County Commuter
More informationFDOT Treasure Coast Traffic Impact Report
February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance
More informationFDOT Treasure Coast Traffic Report
July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationUpdated There is no park access points beyond the limit of the phase I work. roadway to be constructed Viewport has been along full limits of the park
The signs will be installed as Temporary signs the color (Orange/White) have been added to the plans. Need to specify color to be used for stripes. Closures that may be in place for extended periods need
More informationFDOT Treasure Coast Traffic Impact Report
September 29, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report September 29 through October 6, 2017 TREASURE COAST Construction and maintenance
More informationCY2017 Summary of STP applications
CY2017 Summary of STP applications Project Sponsor Project Name Project Location Project Description County Line Road Widening Project Indian Ripple Road Reconstruction County Line Road from Willow Run
More informationPavement Management Program
Pavement Management Program Public Works Department January 5, 2016 Chad Butzow, P.E. Deputy Director Field Operation Services Public Works Department Brian Martineau Pavement Manager Public Works Department
More informationCITY OF SOUTH DAYTONA
CITY OF SOUTH DAYTONA FIVE YEAR WORK PLAN for HALF-CENT SALES TAX FY 2020-2025 Table of Contents Executive Summary Purpose of the Work Program... 3 Project List Magnolia Avenue North Roadway, Drainage
More informationFREEWAY, WEAVING LANE, AND SERVICE ROAD CONNECTIONS
EDGE LINE WHITE STOP LINE SERVICE ROAD EDGE LINE 6" X 5 WHITE DOTTED LINE WITH 20 GAPS EDGE LINE 4" WHITE BROKEN LINE EDGE LINE 1/3 Y v SERVICE ROAD Y 900 X ( 5 0 12" SOLID WHITE CHANNELIZING LINE X EDGE
More informationVictoria Park Master Plan
Victoria Park Master Plan Phase I Presented By: ARCHITECTURAL ALLIANCE & HUGHES HUGHES INC. History of Victoria Park Phase I Purpose Inventory of Existing Conditions Identification of Options by Type (for
More informationDistrict 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID
77825 SA US 6/20 14.61/14.59 R Resurface US-6/US-20; perform necessary (Originally PID 76709); UPDATE (9/25/14) added culvert at SA-20-22.50 PID 95861. SSAUS00006**C 14.610 18.450 8,950,000.00 SA US 6/20
More informationFlorida Department of Transportation Daniels Parkway Fort Myers, FL 33913
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update January 3-9, 2019 RICK SCOTT GOVERNOR Florida Department of Transportation
More informationDepartment of Transportation 1500 Monroe Street. FortMyers,FL (239) (239) Fax ROAD WATCH UPDATE. July 19 - July 25, 2018
^Lee County Jt Southwest T:[o ln Onaa Lee County Department of Transportation 1500 Monroe Street FortMyers,FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE July 19 - July 25, 2018 Sanibel Bridge
More informationBicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)
Appendix B Neighborhood Connections Summaries This Appendix is a supplement to the information presented in Chapter 3 Connect People. The Appendix includes a summary or profile for each of the proposed
More informationMISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY
DESIGN DESIGNATION A.A.D.T - = V = M.P.H PLANS FOR PROPOSED HIGHWAY INDE OF SHEETS DESCRIPTION TITLE SHEET ----------------------- 1 TYPICAL SECTIONS (TS) (1 SHEET)-- QUANTITIES (QU) (1 SHEET)--------
More informationSingle Lane Closures, expect delays. Anticipated Schedule: Start Completion Current Stage: August
Bennett Road From Hartwell Rd to Jordan Lake Rd & from Harwood Rd to M-66 Skip paving, wedging, crack seal, & chip seal $97,000 May Bonanza Road Over Tupper Creek Resurface bridge deck and approaches $19,600
More informationLee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update December 13 December 19, 2018 Alico Road Widening from Ben Hill Griffin
More informationbeaufort county school district
Route:007RP2 3:43 pm BROAD RIVER BLVD @ DONALDSON CAMP RD BROAD RIVER BLVD @ RILEY RD 3:51 pm 569 BROAD RIVER BLVD 3:52 pm 649 BROAD RIVER BOULEVARD 3:53 pm BROAD RIVER BLVD @ PLEASANT FARM DR 3:55 pm
More informationLake Waterford Community Association Meeting. November 15, 2016
Lake Waterford Community Association Meeting November 15, 2016 Introduction Staff Introduction Project Overviews - Completed Projects - Pavement Management Program - Pasadena Road Sidewalk Improvements
More informationS/TIP LIST OF PROJECTS
LI OF PROJECTS : October 04, 2018 Page: 1 of 5 Responsible GPA Type Name Limits Length Primary 2017 120683 Berrien Berrien Line Dayton Rd Multiple 2.448 Segments $69,210 $0 $24,742 $93,952 $93,952.00 U
More informationSTOP LIST FOR BUS # 788
STOP LIST FOR BUS # 788 TO SEQUOYAH MIDDLE SCHOOL - SUMMER SANDRA HEADMAN RunID: 028.006 ROBLE DR & CRENSHAW DR 07:16 AM SURREY TR & SUMMERGLEN LN 07:27 AM N CASTLEGATE DR & FILBERT LN 07:30 AM CASTLEGATE
More informationSR 44 from US 441 / SR 500 to SR 44 / Orange Ave.
SR 44 from US 441 / SR 500 to SR 44 / Orange Ave. Financial Project ID: 409870-1-52-01 LAKE COUNTY DESIGN ALTERNATIVE STUDY FOR MULTI-USE PATH Prepared for: FLORIDA DEPARTMENT OF TRANSPORTATION District
More informationKentucky Transportation Center
Kentucky Transportation Center TECHNICAL ASSISTANCE REPORT Forensic Pavement Evaluation for US 31 W, Jefferson County, Kentucky KTC TA-15 02/KH91 14 1F DOI: http://dx.doi.org/10.13023/ktc.ta.2015.02 Author(s):
More informationPine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session
Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session February 20, 2018 Meeting Agenda Study Overview Existing Conditions Access Management Potential Gateway Features
More informationPARADISE VALLEY TRAIL GUIDE
PARADISE VALLEY TRAIL GUIDE 4949 East Lincoln Drive Paradise Valley, AZ 85253 (480) 627-3200 omnihotels.com/montelucia omnihotels.com/montelucia HIKE, RUN & RIDE IN PARADISE VALLEY The beautiful weather
More informationLee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax. ROAD WATCH UPDATE June 15, 2018
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE June 15, 2018 New Update: Landscape: Lee County Department of Transportation
More informationFebruary 11, 2016 TPO Board Presentation
February 11, 2016 TPO Board Presentation SR A1A (Highway A1A) US 192 to SR 404 (Pineda Causeway), Brevard County, Florida Financial Project Number: 428753-1-32-01 Project Limits US 192 to SR 404 (428753-1)
More informationSRTS IMPLEMENTATION COSTS
SRTS IMPLEMENTATION COSTS What Is a Estimate? A cost estimate establishes the anticipated budget required to implement the actions (the improvement projects and programs) identified in your School Travel
More informationRESOLUTION NO. R122216A A RESOLUTION AMENDING THE CITY OF FISHERS TRAFFIC SCHEDULES
RESOLUTION NO. R122216A A RESOLUTION AMENDING THE CITY OF FISHERS TRAFFIC SCHEDULES WHEREAS, the Common Council ( Council ) of the City of Fishers, Hamilton County, Indiana ( City ) meeting in regular
More informationLee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update January 10-16, 2019 Summerlin Road & Colonial Blvd: Lee County DOT will
More informationDr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018
Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 What s Happening The City plans to mill and resurface Dr. M.L.
More informationConnectivity. Tier I (0-5 yrs) 44 Issues, Recommendations & Priorities. LENGTH (ft) APPROX COST NO. NAME & DESCRIPTION. Shared Use Path/ Urban Trail
C1 Whitefish River - Kay Beller Park to BNSF Loop Extend the along the river between 2nd St and Railway St providing a key connection for multiple trail networks. Include a Bike Channel adjacent to stairs
More informationLIHTC Properties in Minnesota's 1st District Satellit. (Timothy Walz - D) Through LIHTC Source: LIHTC
LIHTC Properties in Minnesota's 1st District Satellit LIHTC Source: (Timothy Walz - D) LIHTC e Through 2015 Placed ALTURA 47 GRANDVIEW ALTURA MN 55910 1992 1992 10 10 50% AMGI BANDEL HILLS 5920 BANDEL
More informationPRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT. Existing 10' sidepath Existing 10' sidepath MATCH LINE. Project Number: 310. Drawing Number: 1/1
Existing 10' sidepath Existing 10' sidepath otes: : One signpost with two signs (one facing north, one facing south). Attach to existing light pole 3.04 Existing s ew road edge ew lane lines (yellow) ew
More informationAPPENDIX D COST SUMMARY TABLES
APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to
More informationRestoration Requirements
Restoration Requirements Street Excavation Rules & Regulations Public Works Code Article 2.4 DPW Order 178,940 Regulations Article 2.4 of the Public Works Code requires any person excavating in the Public
More informationMAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report
Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction
More informationINTERSECTION CONTROL NOVEMBER 2018
INTERSECTION CONTROL NOVEMBER 2018 ICE OVERVIEW AGENDA Why ICE? When ICE is Required? Applicability and Process 2 AVAILABLE RESOURCES http://www.fdot.gov/traffic/trafficservices/intersection_operations.shtm
More informationChapter 4: Funding and Implementation
Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,
More informationSouthwestern Elementary
Run Schedule for Run Swe063 063 7:10am CLOSES AT: 2:19PM 4141 AIRLINE BLVD R/S AIRLINE BLVD & BROOKFIELD LN Sherbrooke Apts 12:38:27PM Page 1 of 14 Run Schedule for Run Swe070 070 1 7:05am CLOSES AT: 2:19PM
More informationSTOP LIST FOR BUS # 674
STOP LIST FOR BUS # 674 TO RIVER'S EDGE ELEMENTARY SCHOOL ATENA REAL RunID: 129.001 AM IN - BUS SHOP 05:48 AM BRENDEN DR & COOPER CT 06:33 AM WOOLSEY RD & BRENDEN DR 06:34 AM 13247 WOOLSEY RD 06:35 AM
More informationCITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY
CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY Preliminary Recommendations October 2018 2014 HDR, Inc., all rights reserved. PROJECT BACKGROUND WALKING AUDIT FINDINGS PROPOSED IMPROVEMENT CONCEPTS
More informationLee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE August 30 September 5, 2018 Buckingham Road: Florida Power and Light
More informationEdge Wedge 150 lb/ft 3
Page 1 of 14 Page 2 of 14 6443 OL 4774 Mill 22,098 Edge Wedge (Rock) @ 150 lb/ft 3 Page 3 of 14 Edge Wedge (Rock) @ 150 lb/ft 3 Page 4 of 14 Edge Wedge (Rock) @ 150 lb/ft 3 Page 5 of 14 Page 6 of 14 Page
More information#3-8:35 AM - DUCK POND RD EXT & LISAMY DR (ESE) / DUCK POND RD EXT & LISAMY DR
Run - EHB 23 Girard, Alison 9250 50 min 11.41 mi 22 / 22 Description: EHB INBOUND #1-8:20 AM - OLD CHATHAM RD & KAREN AVE (WNW) / OLD CHATHAM RD & KAREN AVE #2-8:26 AM - FACTORY RD & DEPOT ST (WSW) / Factory
More informationMay 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013
May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationAGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT
May 15, 2018 AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT TYPE OF ITEM: Discussion STATEMENT OF ISSUE The Florida Department of Transportation
More informationProject Update May 2018
Project Update May 2018 Dakota County, in cooperation with the City of Lakeville, is planning to reconstruct 202 nd Street West (County Road 50) from Holyoke Avenue to Cedar Avenue (County Road 23). 202
More informationJames David Site Prep & Underground
ITB 18-12 ASPHALT PAVING, REPAIR, SEALCOATING AND STRIPING; CONCRETE CURBING, AND SIDEWALKS DESCRIPTION 1 Signed Bid: Yes Yes 2 Warranty Statement: 1 yr 1 Yr 3 Years Experience: 42 yrs 20 yrs 4 References
More informationCITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL
ve ha 8t G B A Mantorville Ave N 240th Ave 16th St NE 11th Ave NE K-M HIGH SCHOOL SUNRISE TRAIL TO MANTORVILLE MNTH 57 SUNSET TRAIL TO MANTORVILLE NE PARK 16TH ST NE TRAIL K-M ELEMENTARY SCHOOL K-M MIDDLE
More informationTacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force
1 Tacoma Streets 101 2 Streets Maintenance Overview Type and amount of streets Condition and types of construction Maintenance and repair methods and costs Sample Project Philosophy/Selection Criteria
More informationINTERSECTION WITH RIGHT TURN TAPER
(TYP.) TAPER 4" BROKEN INTERSECTION WITH RIGHT TURN TAPER 4" SOLID WHITE 4" BROKEN ARROW & LEGEND MARKINGS (SEE NOTE 2) INTERSECTION WITH RIGHT TURN LANE Notes: 1. Paint intersection tapers greater than
More informationFDOT Broward County Traffic Report March 2 through March 9, 2018
FDOT Broward County Traffic Report March 2 through March 9, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week of
More informationMEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION
MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie
More informationAPPENDIX L: COST ESTIMATING TOOLS
APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders
More informationOperations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No
Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:
More informationCity of West Des Moines PAVEMENT MANAGEMENT SYSTEM
City of West Des Moines PAVEMENT MANAGEMENT SYSTEM 12/11/2018 Municipal Street Seminar (11-14-2018) JEFF NASH 1 City Background Information: - West Des Moines current census Population is around 66,000
More informationLIST OF PRIORITY PROJECTS 2020/ /35
LIST OF PRIORITY PROJECTS 2020/21-2034/35 Adopted June 10, 2015 Prepared by the Lake~Sumter Metropolitan Planning Organization 1616 South 14th Street Leesburg, FL 34748 This report was financed in part
More informationPre-Construction Meeting
Pre-Construction Meeting Wednesday, March 21 Drop-in from 5 9pm Please visit displays for project information, talk to staff, and ask questions! Edmonton.ca/SouthsideBikeRoutes Objectives & Project Scope
More informationFDOT Broward County Traffic Report April 27 through May 4, 2018
FDOT Broward County Traffic Report April 27 through May 4, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week of
More informationFDOT Broward County Traffic Report June 29, 2018 through July 6, 2018
FDOT Broward County Traffic Report June 29, 2018 through July 6, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week
More informationLee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update December 20, 2018 January 2, 2019 Alva Bridge & Big Carlos Pass Bridge:
More informationFDOT Broward County Traffic Report August 31, 2018 through September 7, Interstate 95
FDOT Broward County Traffic Report August 31, 2018 through September 7, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during
More informationReserve Study Navigation Options
Reserve Study Navigation Options Each of these buttons will navigate you to the corresponding sheet. On each sheet, there is a corresponding button to return to this sheet. Data Pages Reports and Graphs
More informationAgenda Item No. 6C ATTACHMENT 1
ATTACHMENT District Bike Plan Proposed s Hillside Ln Livermore D TAC
More informationCity of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE
Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway
More informationKansas Department of Transportation DISTRICT 2. Project(s): Min: Max:
Page 1 of 13 SECTION: 01 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 025200 REMOVAL OF EXISTING STRUCTURES 4 020100 CONTRACTOR CONSTRUCTION STAKING 5 025602 FIELD OFFICE AND LABORATORY
More informationEXHIBIT A: The list of stop intersections in this exhibit will be added into the Town of Fishers Traffic Schedule
NOTICE OF PUBLIC HEARING TRAFFIC SCHEDULE AMENDMENT The Fishers Town Council will hold a public hearing on July 1 st, 2013, at the Fishers Town Hall, One Municipal Drive, Fishers, Indiana 46038, at 7:00
More informationKansas Department of Transportation DISTRICT 1. Project(s): Max: Min:
Page 1 of 10 SECTION: 01 COMMON ITEMS Cat Alt Set: Cat Alt Member: LCC: 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 070580 FLAGGER (SET PRICE) (1) LS (1) LS 1.000 HOUR 86,800.00000 86,800.00 3,375.50000
More informationFDOT Broward County Traffic Report May 11 through May 18, Interstate 95
FDOT Broward County Traffic Report May 11 through May 18, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week of
More informationMeadow Woods Elementary School
Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete
More information237 Palm Drive second floor. 2/2, furnished. Special assessment , for golf course is paid in full.
Description Contact Information Remodeled condo with a spectacular view of the 14th hole and Gerry Wolff, Owner lake view. Many upgrades, including granite countertops, new 239-719-1109 kitchen cabinets,
More informationNO PARKING ZONE, YELLOW CURB (OPTIONAL) Z 8 20 MIN. 8 Z (SEE SHEET 2) 4" WHITE "X" (TYP.),(OPTIONAL) TYPE I NO PARKING ZONE, YELLOW CURB (OPTIONAL) Z 8 20 20 ALL SPACES 22 MIN., 26 MAX. EACH Z TYPE II
More informationODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)
Bikeways and Enhancements Report for Clermont County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL
More informationADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT
ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT APS and ADA APS is not currently an ADA Standard and is provided at the discretion of the Title II entity APS is recognized in the MnMUTCD, but
More informationSTOP LOCATION FOR ROUTE # 473
STOP LOCATION FOR ROUTE # 473 TO OLIVER ELEMENTARY SCHOOL ZANIKA LAMB Vehicle #:: 781 RunID: 120.009 BIGELOW DR & ELSMERE LN 06:51 AM TOWNSEND WAY & ELSMERE LN 06:52 AM WELTON DR & PIXLEY DR 06:53 AM PIXLEY
More informationFDOT Broward County Traffic Report April 20 through April 27, 2018
FDOT Broward County Traffic Report April 20 through April 27, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week
More informationSAFE SCHOOL WALK ROUTES (SSWR) TASKFORCE ADVISORY COMMITTEE 7 TH MEETING MEETING AGENDA
SAFE SCHOOL WALK ROUTES (SSWR) TASKFORCE ADVISORY COMMITTEE 7 TH MEETING MEETING AGENDA DATE: MONDAY, 5/22/2017 TIME: 6:00 8:00 P.M. LOCATION: CITY HALL, CONFERENCE ROOM #107 Call to Order/Approval of
More informationPUBLIC WORKS DEPARTMENT SIGN AND MARKING PROCEDURES AND GUIDELINES
PUBLIC WORKS DEPARTMENT SIGN AND MARKING PROCEDURES AND GUIDELINES 2015 FORWARD The Revised Code of Washington (RCW) 47.36, Traffic Control Devices, requires the Washington State Department of Transportation
More information