JINGLE POT ROAD (2300 BLOCK) CULVERT UPGRADES

Size: px
Start display at page:

Download "JINGLE POT ROAD (2300 BLOCK) CULVERT UPGRADES"

Transcription

1 JINGLE POT ROA (3 BLOCK) CULVERT UPGRAES STOBART R 38 & 39 JINGLE POT R L B PL 59 PROJECT LOCATION JINGLE POT R STOBART R L 3 PL MILL R PANORAMA VIE R ASHLEE R JINGLE POT R HOLLAN R SHEET JINGLE POT R - EST CULVERTS SHEET 4 SHEET 3 JINGLE POT R - EAST CULVERTS 43 JINGLE POT R L A PL VIP JINGLE POT R L A PL VIP & 36 JINGLE POT R L B PL VIP JINGLE POT R L PL 59 KEY PLAN :5 SHEET No. RAING No. TITLE 893 COVER SHEET KEY PLAN, LOCATION PLAN AN NOTES 894 EST CULVERTS PLAN AN PROFILE EAST ROA CULVERT PLAN, PROFILE AN ETAILS EAST ITCH CULVERT PLAN AN PROFILE VEGETATION RESTORATION PLAN AT NORTH EN OF EAST CULVERT LOCATION PLAN :5 GENERAL. ALL CONSTRUCTION TO BE IN ACCORANCE ITH CITY OF NANAIMO MANUAL OF ENGINEERING STANARS AN SPECIFICATIONS (MoESS).. ALL LOCATIONS AN OF EISTING UTILITIES SHON ARE APPROIMATE ONLY AN SHOUL BE CONFIRME BY USE OF A PIPE LOCATOR AN MANUAL IGGING. ALL OR ANY STRUCTURES NOT NECESSARILY SHON. 3. COORINATES ARE GROUN LEVEL (UTM NA 83 ITH COMBINE SCALE FACTOR OF /.99965) AN ALL ARE TO GEOETIC ATUM. 4. LOCATION OF SERVICE CONNECTIONSTO BE ETERMINE ON SITE UNLESS OTHERISE SHON. 5. ANY ALTERNATIVES TO SPECIFIE MATERIALS OR APPURTENANCES TO BE APPROVE BY THE CITY ENGINEER PRIOR TO CONSTRUCTION. 6. THE LOCATIONS OF EISTING SERVICES ARE APPROIMATE AN SHALL BE CONFIRME IN THE FIEL BY THE CONTRACTOR PRIOR TO CONSTRUCTION. EISTING AN PROPOSE SERVICES MAY REQUIRE AJUSTMENT HERE CONFLICT OCCURS. THE ENGINEER SHALL BE NOTIFIE OF ANY CONFLICT. 7. TRENCHING ETAIL TO BE AS CITY OF NANAIMO STANAR G T-. TRAVELLE AREA BACKFILL TO BE IMPORT GRANULAR MATERIAL COMPACTE TO MINIMUM 95% MOIFIE PROCTOR ENSITY, UNLESS OTHERISE APPROVE BY THE ENGINEER. 8. ASPHALT RESTORATION TO BE AS CITY OF NANAIMO STANAR G T-4 OR T-4A PERMANENT PAVEMENT RESTORATION. 9. ALL ISTURBE AREAS TO BE RESTORE TO EISTING CONITION OR BETTER. ATERMAIN. MINIMUM COVER OVER ATERMAIN TO BE.m.. ALL ATERMAIN JOINTS ITHIN 3.m HORIZONTAL OR.45m VERTICAL OF SANITARY OR STORM RAIN MAINS TO BE PROTECTE BY SHRINK RAP OR PETROLATUM TAPE. 3. MINIMUM CLEARANCE BETEEN PROPOSE CONCRETE CULVERTS AN RE-PROFILE ATERMAINS IS.45m. 4. ATERMAIN ORKING PRESSURE IS 69 kpa ( psi) AN ATERMAIN TEST PRESSURE IS 35 kpa (5 psi). 5. PRESSURE TESTS, CHLORINATION, AN BACTERIOLOGICAL TESTING TO CITY OF NANAIMO STANAR SPECIFICATIONS. 6. MAIMUM JOINT EFLECTION TO BE EGREE. CULVERT. TYPE I TRENCH BEING AN BACKFILL FOR CULVERTS.. ROA PAVEMENT THICKNESS 75-mm FROM GEOTECHNICAL ASSESSMENT (SP, MAY 7). 3. CULVERTS SIZE TO ACCOMMOATE % FLO INCREASE UE TO CLIMATE CHANGE. 4. FISH PASSAGE CRITERIA ETERMINE FROM FISH STREAM CROSSING GUIEBOOK, (MFLNRO SEPTEMBER ). ENVIRONMENTAL. SECTION AN FO APPROVALS ARE REQUIRE.. ALL ORK TO BE ONE IN ACCORANCE ITH THE ENVIRONMENTAL MANAGEMENT PLAN (JINGLE POT ROA CULVERT REPLACEMENTS, EI INC., NOVEMBER 7). 3. CONSTRUCTION TO BE IN ACCORANCE ITH SECTION CONITIONS AN FOLLO THE FISH STREAM CROSSING GUIEBOOK AN LAN EVELOPMENT GUIELINES FOR PROTECTION OF AQUATIC HABITAT. 4. ALL CONSTRUCTION TO OCCUR URING RY EATHER ITHIN FISHERIES INO (JULY - SEPTEMBER 5). 5. ENVIRONMENTAL ORK PLAN TO BE PROVIE AT PRE-CONSTRUCTION MEETING FOR APPROVAL BY CITY/ENVIRONMENTAL MONITOR AN IN-PLACE PRIOR TO CONSTRUCTION. 6. ALL MACHINERY TO BE CLEAN, FREE OF LEAKS AN IN GOO MECHANICAL CONITION. REFUELING OF ALL MACHINES TO BE OUTSIE OF ESTABLISHE SETBACKS. 7. ALL CONCRETE ORK MUST BE ISOLATE FROM ATER FOR A MINIMUM OF 48 HOURS AS CEMENT AN CONCRETE ARE TOIC TO AQUATIC HABITAT. 8. MINIMIZE ISTURBANCE TO VEGETATION AN CREEK CHANNEL TO THE AREA ONLY REQUIRE TO PERFORM THE ORK. 9. ANY TREE CLEARING URING THE PERIO OF MARCH TO AUGUST 3 SHALL BE PRECEEE BY A BIR NEST SITE SURVEY. I S S U E F O R T E N E R CoN G No. SHEET No. Eng File No. 5..C686

2 GRAVEL / Ø AC 45mm EPTH, TO EL.4 MIN REGRAE & IEN EISTING CHANNEL AS SHON FOR 75Ø EST ROA CULVERT, SEE PLAN THIS G.7 4. JINGLE POT R BH7-4 GRAVEL / PRO ECO-LITE HEAALL SERIES 3 PLAN - EST ITCH CULVERT REMOVE AN ISPOSE OFF-SITE EISTING 375Ø CONC CULVERT AN HEAALLS +4 45Ø CONC 45mm EPTH, TO EL.4 MIN PRO ECO-LITE HEAALL SERIES 3, c/w INLET GRATE HEAALL STRUCTURE LANGLEY 4-5, c/w INLET GRATE & GUAR RAIL INSTALL ASPHALT RAINAGE SPILLAY AT THE LO POINT SEE EST ITCH CULVERT, THIS G VERTICALLY REALIGN EISTING ATERMAIN UNER NE CULVERT ITH: Ø R4 PVC 4-Ø 45% BENS, HxH +4 -Ø COUPLINGS RESTRAIN AN RAP ALL JOINTS th spk.397 BH7-4 REMOVE EISTING 75Ø CSP CULVERT AN ISPOSE OFF-SITE. BACKFILL ITH IMPORTE GRANULAR FILL COMPACTE TO 95% MOIFIE PROCTOR ENSITY, AN RESTORE ROA GRAVELS. YELLO LINE REMOVE AN EISTING FENCE AS REQUIRE 75Ø CONC JINGLE POT R PAINTLINES BH7-3 PLAN - EST ROA CULVERT HITE LINE +35 VIP538 HEAALL STRUCTURE LANGLEY 4-5, c/w GUAR RAIL 45mm EPTH, TO EL.4 MIN GRAE CHANNEL TO TO MATCH EISTING ITCH BACKFILL EISTING CHANNEL ITH ECAVATE NATIVE MATERIAL AS IRECTE BY ENGINEER : BH 7-4 EISTING GROUN AT ROA CENTRELINE mm-asphalt SAN-FILL, COMPACT SOME GRAVEL & FINES SILT, SOFT, BLUE/GREY, CLAYEY INTER. PLASTICITY, ORGANIC EISTING ITCH PROFILE.5: HORIZ : VERT SLOPE, MA PRO ECO-LITE HEAALL SERIES 3 75Ø EST ROA CULVERT REGRAE ITCH TO SUIT NE CULVERTS RESTORE RIVEAY ITH mm OF CLEAR, CRUSHE GRAVEL EISTING GROUN OVER CULVERT PRO ECO-LITE HEAALL SERIES 3, c/w INLET GRATE REGRAE ITCH TO SUIT NE CULVERT YEAR HEAATER EL.3 Q =.9m 3 /s YEAR HEAATER EL.64 Q =.43m 3 /s HEAALL STRUCTURE LANGLEY 4-5, c/w INLET GRATE & GUARRAILS E EGE PAVE E CENTRE LINE EISTING GROUN E HITE LINE E FENCE RO.5: HORIZ : VERT SLOPE, MA HEAALL STRUCTURE LANGLEY 4-5, c/w GUARRAILS BH 7-3 GRAVEL-FILL, ENSE ORGANIC SILT FIRM, BLACK SANY, GRAVEL NON PLASTIC, OO EBRIS COMPACT TO ENSE, GREY/BRON SAN, TRACE OF GRAVEL CLASS RIPRAP 45mm EPTH 45Ø EST ITCH CULVERT E INV: UNKNON REGRAE & IRECT FLO TO THE EISTING CHANNEL SILT, SOFT BLUE/GREY, CLAYEY SOME SAN, INTERMEIATE PLASTICITY, TRACE ORGANICS Z:\PROJECT_686\ ESIGN\RAINGS\~CURRENT\686-JINGLEPOT STM ROA CLASS RIPRAP 45mm EPTH NON-OVEN GEOTETILE BETEEN APPROVE SUBGRAE & PIPE BEING MATERIAL.m - 45Ø CONC C76 - CLASS III NON-OVEN GEOTETILE BETEEN RIPRAP & SUB-GRAE,. OVERLAP m FOR SEAMS +5 + CLASS RIPRAP 45mm EPTH OVERECAVATE TO SUITABLE GROUN AS IRECTE BY GEOTECHNICAL ENGINEER. BACKFILL ITH IMPORTE GRANULAR MATERIAL COMPACTE TO 95% MOIFIE PROCTOR ENSITY CONTRACTOR TO FIEL VERIFY LOCATION OF EISTING ATERMAIN & RE-ALIGN UNER CULVERT. ONE FULL PIPE LENGTH TO BE CENTRE UNER NE CULVERT mm MIN NON-OVEN GEOTETILE BETEEN APPROVE SUBGRAE & PIPE BEING MATERIAL 3.5m - 75Ø CONC C76 - CLASS III -3.4% RIRPAP CLASS 45mm EPTH COMPACT TO ENSE, GREY/BRON SAN, SOME FINES & GRAVEL NON-OVEN GEOTETILE BETEEN RIPRAP & SUB-GRAE,. OVERLAP m FOR SEAMS 9H6397 IN FRONT OF EL:.5 JINGLEPOT & MILL R JINGLEPOT & HOLLAN I S S U E F O R T E N E R ISSUE FOR TENER CL 3 % ESIGN CL 8-3- ISSUE FOR MINISTRY SECTION APPROVAL AN VIHA PERMIT CL % ESIGN REVIE CL No. ate esign by rawn by CL CL ate : Vert. : Consult.wg Sheet of 5 Eng File No. 5..C686 wg No. 894 JINGLE POT ROA (3 BLOCK) CULVERT UPGRAES EST CULVERTS PLAN AN PROFILE

3 JINGLE POT ROA VIP538 L 3 PL 59 FOR EAST ITCH CULVERT, SEE SHEET 4 REMOVE EISTING HYRANT, LEA AN VALVE AN ISPOSE OFF-SITE FIRE HYRANT ASSEMBLY AS PER CoN ST -5 FOR EAST ITCH, SEE SHEET 4 VERTICALLY REALIGN EISTING ATERMAIN UNER NE CULVERT ITH: Ø R4 PVC 4-Ø 45% BENS, HxH -Ø COUPLINGS RESTRAIN AN RAP ALL JOINTS FH V MH + PP 9Ø CSP 6Ø CSP. MIN BH7- Ø AC Ø AC 35Ø CONC REMOVE EISTING 9Ø CSP CULVERT & HEAALL. ISPOSE OFF-SITE MAINTAIN EISTING RAINAGE SPILLAYS BH7- PLAN - EAST ROA CULVERT YELLO LINE Ø - GATE VALVE HxF TO CoN ST -6 PAINTLINES HITE LINE GRAVEL SHOULER FENCE REMOVE EISTING ABANONE CULVERT & ISPOSE OFF-SITE. APPROIMATE LOCATION SHON BASE ON GPR SCAN. CULVERT ASSUME TO BE CSP REMOVE AN EISTING FENCE AS REQUIRE 34 STOBART R.5 CLASS 5 RIPRAP, 45mm EPTH, TO EL.7 MIN REGRAE & IENING THE EISTING CHANNEL AS SHON, SEE PROFILE FOR ETAILS BUIL RIFFLE CREST ACROSS STREAM ITH LARGE IAMETER ROCK, USING PROGRESSIVELY SMALLER IAMETER ROCK ONSTREAM. FILL VOIS ITH FISH HABITAT GRAVEL +3.5m PIPE SECTION 35Ø CONC PIPE FISH HABITAT GRAVEL, SEE PROFILE FOR ETENT LO FLO CHANNEL (THALEG) NOTCH, ALTERNATE SIES NOTE: UNLESS NOTE OTHERISE, ALL IMENSIONS ARE UNCHANGE FROM STOCK LANGLEY CONCRETE 6-8 HEAALL STRUCTURE 5mm BACKALL CORE FOR 35Ø CONC PIPE HEAALL STRUCTURE LANGLEY 6-8 MOIFIE :5 YEAR HEAATER EL.4 Q =.4m 3 /s CONCRETE HEAALL STRUCTURE LANGLEY 6-8 MOIFIE, SEE ETAIL THIS G EISTING GROUN E E CENTRE LINE E HITE LINE E EGE PAVE E FENCE RO CONCRETE HEAALL STRUCTURE LANGLEY 6-8 MOIFIE, SEE ETAIL THIS G BH 7- SAN-FILL 3mm PLAN 5mm THICK CONC BAFFLE SIE OF EACH.5m PIPE SECTION YEAR HEAATER EL.9 Q =.5m 3 /s ORGANIC SILT FIRM/STIFF, BLACK, SANY, SOME GRAVEL ET, NON PLASTIC, OO EBRIS ±4. 3mm 75mm TOP OF GRAVEL CHANNEL INLET EL.m FISH CHANNEL BAFFLE, SEE ETAIL THIS G PERMANENT ATER LEVEL EL.5m TOP OF GRAVEL CHANNEL OUTLET EL.m TOP OF RIFFLE EL.5m ATER TABLE MAY /7 EISTING GROUN SILT, STIFF, BRON, SOME SAN, FINES mm CHAMFER ALL EPOSE EGES 5mm 35Ø CONC PIPE 5mm THICK CONC BAFFLE ALTERNATE THE NOTCHES Z:\PROJECT_686\ ESIGN\RAINGS\~CURRENT\686-JINGLEPOT STM ROA CONTRACTOR TO FIEL VERIFY LOCATION OF EISTING ATERMAIN & RE-ROUTE UNER CULVERT. ONE FULL PIPE LENGTH TO BE CENTRE UNER NE CULVERT E INV: UNKNON + 45mm ABANONE CULVERT INV: UNKNON ETENT OF FISH HABITAT GRAVEL, AS PER CoN SECTION 4.6 OF THE MoESS 3.5m - 35Ø CONC C76 - CLASS III BOTTOM OF POOL EL.5m NON-OVEN GEOTETILE BETEEN RIPRAP & SUB-GRAE,. OVERLAP m FOR SEAMS SAN, COMPACT TO ENSE GREY/BRON, FINES, GRAVEL GREY, SILTY, ET 54mm FISH CHANNEL BAFFLE ETAIL :5 SECTION 5-M 3 SPACING CENTRE IN BAFFLE 3mm LONG mm EMBEMENT : 9H6397 IN FRONT OF EL:.5 JINGLEPOT & MILL R JINGLEPOT & HOLLAN I S S U E F O R T E N E R ISSUE FOR TENER CL 3 % ESIGN CL 8-3- ISSUE FOR MINISTRY SECTION APPROVAL AN VIHA PERMIT CL % ESIGN REVIE CL No. ate esign by rawn by CL CL ate : Vert. : Consult.wg Sheet 3 of 5 Eng File No. 5..C686 wg No. 895 JINGLE POT ROA (3 BLOCK) CULVERT UPGRAES EAST ROA CULVERT PLAN, PROFILE AN ETAILS

4 REMOVE EISTING CONCRETE BAG MANHOLE AN ISPOSE OFF-SITE JINGLE POT R FOR 35Ø EST ROA CULVERT, SEE SHT 3 REMOVE EISTING 9Ø CSP CULVERT AN HEAALL AN ISPOSE OFF-SITE RETAIN EISTING RAINAGE SPILLAY AN GRAE TO ITCH REMOVE EISTING 45Ø CSP CULVERT AN HEAALLS AN ISPOSE OFF-SITE REMOVE EISTING 6Ø CSP CULVERT AN HEAALL AN ISPOSE OFF-SITE INFILL EISTING ITCH V BH7-45Ø CSP 6Ø CSP MH 9Ø CSP PRO-ECO LITE HEAALL SERIES 3 c/w INLET GRATE SIGN GRAVEL / 35 & 36 JINGLE POT 45mm EPTH, TO EL.4 MIN +4 45Ø CULVERT PRO-ECO LITE HEAALL SERIES 3 FH REGRAE & IEN THE EISTING CHANNEL AS SHON.5 +6 CLASS 5 RIPRAP, 45mm EPTH, TO EL.7 MIN PP PLAN - EAST ITCH CULVERT PRO-ECO LITE HEAALL SERIES 3, c/w INLET GRATE RESTORE RIVEAY ITH mm OF CLEAR, CRUSHE GRAVEL FINISHE GRAE OVER PROPOSE CULVERT EISTING GROUN AT ROA CENTRELINE EISTING GROUN ITCH PROFILE.5 HORIZ : VERT SLOPE, MA FOR 35Ø EST ROA CULVERT & HEAALL, SEE SHT 3 BH 7- REGRAE EISTING ITCH & INSTALL RIPRAP, CLASS (MIN m LENGTH & 45mm EPTH) PRO-ECO LITE HEAALL SERIES 3 SAN-FILL COMPACT, POORLY GRAE, FINES, GRAVEL REGRAE ITCH TO SUIT NE CULVERTS SILT, STIFF, BRON, CLAYEY INTERMEIATE PLASTICITY CLASS 5 RIPRAP 45mm EPTH NON-OVEN GEOTETILE BETEEN APPROVE SUBGRAE & PIPE BEING MATERIAL NON-OVEN GEOTETILE BETEEN RIPRAP & SUB-GRAE,. OVERLAP m FOR SEAMS SAN, ENSE, BRON, SILTY SOME GRAVEL, COBBLES Z:\PROJECT_686\ ESIGN\RAINGS\~CURRENT\686-JINGLEPOT STM ROA OVERECAVATE TO SUITABLE GROUN AS IRECTE BY GEOTECHNICAL ENGINEER. BACKFILL ITH IMPORTE GRANULAR MATERIAL COMPACTE TO 95% MOIFIE PROCTOR ENSITY.m - 45Ø CONC C76 - CLASS III -.% : 9H6397 IN FRONT OF EL:.5 JINGLEPOT & MILL R JINGLEPOT & HOLLAN I S S U E F O R T E N E R ISSUE FOR TENER CL 3 % ESIGN CL 8-3- ISSUE FOR MINISTRY SECTION APPROVAL CL % ESIGN REVIE CL No. ate esign by rawn by CL CL ate : Vert. : Consult.wg Sheet 4 of 5 Eng File No. 5..C686 wg No. 896 JINGLE POT ROA (3 BLOCK) CULVERT UPGRAES EAST ITCH CULVERT PLAN AN PROFILE

5 VEGETATION RESTORATION. ECEPT FOR ANY LIVE STAKES THAT ARE USE, THE MINIMUM POT SIZE FOR ALL TREES AN SHRUBS SHALL BE GALLON.. AT LEAST % OF ALL TREES PLANTE SHALL BE 5-GALLON POT SIZE 3. NO MORE THAN 5% OF ALL SHRUBS PLANTE SHALL BE LIVE STAKES. 4. TO PROVIE IVERSITY, AT LEAST THREE SPECIES OF TREES AN TO SPECIES OF SHRUBS SHALL BE PLANTE. 5. UNLESS OTHERISE SPECIFIE, ALL TREES TO BE PLANTE AT AN AVERAGE SPACING INTERVAL OF.5 M (INCLUING SPACING FROM TREES ITHIN AJACENT FORESTE AREA). TREES TO BE SPACE OUT EVENLY THROUGHOUT THE AREA. RIP-RAPPE CHANNEL APPROIMATE AREA OF VEGETATION RESTORATION (m x m) 6. UNLESS OTHERISE SPECIFIE, ALL SHRUBS TO BE PLANTE AT AN AVERAGE SPACING INTERVAL OF M (INCLUING SPACING FROM TREES/SHRUBS ITHIN AJACENT FORESTE AREA). 7. ALL TREES AN SHRUBS TO BE PLANTE IN APPROPRIATE MICROSITES AS MUCH AS POSSIBLE IN CONSIERATION OF SOIL MOISTURE AN SUN EPOSURE. IT ILL ALSO BE IMPORTANT TO GIVE ROOM TO EISTING NATIVE PLANTS ITHIN AN AJACENT TO THE SITE. 8. ACTUAL PLANTING LOCATIONS AN TOTAL NUMBER OF TREES, SHRUBS AN FERNS INSTALLE TO BE IRECTE BY A REGISTERE PROFESSIONAL BIOLOGIST. 9. ALL TREES AN SHRUBS TO BE PLANTE SUCH THAT THE LEVEL OF THE SOIL FROM THE POT IS APPROIMATELY CM BELO THE AJACENT SOIL ELEVATION. SOIL ECAVATE TO CREATE A HOLE FOR EACH PLANT SHALL THEN BE USE TO COVER THE SURFACE OF THE POTTING SOIL (TO PREVENT POTTING SOIL FROM RYING OUT OR BECOMING OVERSATURATE).. ALL TREES AN SHRUBS TO BE PLANTE BETEEN SEPTEMBER 3 AN NOVEMBER 5, 8. TOP OF SLOPE COE SPACING BOTANICAL NAME COMMON NAME PLANTNG HEIGHT r.5m Alnus rubra Red Alder.4m Mp.5m Acer macrophyllum Big Leaf Maple.4m FENCE Cw.5m Thuja plicata estern Red Cedar.8m RUBUSPE m Rubus spectablis Salmonberry Gallon Pot CONCRETE HEAALL 35Ø CONCRETE CULVERT SAMBRAC5 m Sambucus racemosa Costal Red Elderberry Gallon Pot var. arborescens POLYMUN m Polystichum munitum Sword Fern Gallon Pot VEGETATION RESTORATION PLAN :5 Z:\PROJECT_686\ ESIGN\RAINGS\~CURRENT\686-JINGLEPOT STM :5 3m 9H6397 IN FRONT OF EL:.5 JINGLEPOT & MILL R JINGLEPOT & HOLLAN I S S U E F O R T E N E R ISSUE FOR TENER CL % ESIGN CL 8-3- ISSUE FOR MINISTRY SECTION APPROVAL CL No. ate esign by rawn by CL CL ate :5 Consult.wg Eng File No. wg No. Vert. Sheet 5 of 5 5..C JINGLE POT ROA (3 BLOCK) CULVERT UPGRAES VEGETATION RESTORATION PLAN AT NORTH SIE OF EAST CULVERT

ENGINEERING FIRM OF RECORD COMPANY REPRESENTATIVE PROJECT MANAGER AND ENGINEERING LEAD INDIAN HILL SENIOR LIFESTYLE CENTER YONKERS, NY

ENGINEERING FIRM OF RECORD COMPANY REPRESENTATIVE PROJECT MANAGER AND ENGINEERING LEAD INDIAN HILL SENIOR LIFESTYLE CENTER YONKERS, NY ENGINEERING FIRM OF RECORD COMPANY REPRESENTATIVE JULI A LANGEIS ANTHONY FITZGERALD OSVALDO ZEQO TYLER ALBERT TITLE PROJECT MANAGER AND ENGINEERING LEAD PROJECT ENGINEER AND SITE PLANNNG PROJECT ENGINEER

More information

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS STANDARD DRAWINGS TABLE OF CONTENTS

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS STANDARD DRAWINGS TABLE OF CONTENTS 001-099 100-199 200-299 Stormwater 300-399 400-499 500-599 600-699 700-799 800-899 Miscellaneous Sewers and Drains Streets Water Structures Earthwork Street Lighting and Traffic Signals Landscape and Irrigation

More information

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By: FINAL REPORT Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County Submitted By: Del Norte County Community Development Department Yonkers Creek Migration Barrier Removal Project

More information

Old Woodward Ave & W Maple Road. Streetscape Design Presentation February 2, 2017

Old Woodward Ave & W Maple Road. Streetscape Design Presentation February 2, 2017 Old Woodward Ave & W Maple Road Streetscape esign Presentation February 2, 2017 Revisions To The esign Concept Per The City Commission 2 Add planted medians to Old Woodward Ave center turn lane; Hamilton

More information

LOK-BOLT AS. Mechanical Anchors GENERAL INFORMATION SECTION CONTENTS. Sleeve Anchor

LOK-BOLT AS. Mechanical Anchors GENERAL INFORMATION SECTION CONTENTS. Sleeve Anchor General Information Mechanical s GENERAL INFORMATION LOK-BOLT AS Sleeve PRODUCT DESCRIPTION The Lok-Bolt AS is an all-steel pre-assemble single unit sleeve anchor which is esigne for use in concrete or

More information

Stevens Creek Corridor

Stevens Creek Corridor O F F I C E O F T H E D I R E C T O R O F P U B L I C W O R K S Stevens Creek Corridor Creek Restoration Project Volume Three Project Update: Creek Photos, Before & After BY GAIL SEEDS - PROJECT MANAGER,

More information

SUNDERLAND SAFE ROADS SCOPING STUDY SUNDERLAND STP BP14(21) TOWN OF SUNDERLAND, VT January 29, 2016

SUNDERLAND SAFE ROADS SCOPING STUDY SUNDERLAND STP BP14(21) TOWN OF SUNDERLAND, VT January 29, 2016 SUNDERLAND SAFE ROADS SCOPING STUDY SUNDERLAND STP BP14(1) TOWN OF SUNDERLAND, VT January 9, 016 Submitte to: Town of Sunerlan 104 Mountain View Roa Sunerlan, VT 0550 An James Sullivan, Director Bennington

More information

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS CITY OF REDMOND, OREGON 2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS TABLE OF CONTENTS SECTION 1 TRENCHES TITLE 1-1 Utility Trench 1-2 Water Line & Sewer Line Separation 1-3 RR X-ING Single/Joint Use

More information

GENERAL LEGEND 12"CMP

GENERAL LEGEND 12CMP PLANS FOR X-REFS: west branch_ci FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\A.1 COVER PLOTTED: Monday, July 23, 212 2:44:13 PM OLIPHANT STREET

More information

Systems and Components

Systems and Components new LINEAR SYSTEMS AND COMPONENTS SELF-ALIGNING LINEAR BEARINGS & PILLOW BLOCKS TM LINEAR SYSTEMS AND COMPONENTS TECHNICAL INTRODUCTION 29-228 PRECISION HARDENED AND GROUND SHAFTING 240-243 Linear Ball

More information

Project Completion Abstract Fish Passage Activity ( Engineering Activities)

Project Completion Abstract Fish Passage Activity ( Engineering Activities) Project Completion Abstract Fish Passage Activity ( Engineering Activities) SUBMIT COMPLETED FORM TO DISTRICT MANAGER AND FIA ADMINISTRATOR AFTER PROJECT COMPLETION SECTION A GENERAL INFORMATION Recipient:

More information

Depth Optimization of Designed New Ferry Berth

Depth Optimization of Designed New Ferry Berth International Journal on Marine Navigation an Safety of Sea Transportation olume Number 4 December 2007 Depth Optimization of Designe New Ferry Berth S. Gucma & S. Jankowski Maritime University of Szczecin,

More information

RB 4700 Commercial & Industrial Regulator

RB 4700 Commercial & Industrial Regulator RB 4700 Commercial & Inustrial Regulator The RB 4700 regulator is esigne for use in inustrial an istribution applications such as istrict station an heating plants, an for inustrial customers. DESCRIPTION

More information

JAP Additional Information Sheet

JAP Additional Information Sheet JAP Additional Information Sheet Block 15: Purpose and Need The USACE purpose of the project is to provide a safe and reliable whitewater park for the recreational public in a city park, which will provide

More information

Big Spring Creek Habitat Enhancement and Fishery Management Plans

Big Spring Creek Habitat Enhancement and Fishery Management Plans Big Spring Creek Habitat Enhancement and Fishery Management Plans November 5, 2012 Big Spring Events and Activities Center Newville, PA Charlie McGarrell Regional Habitat Biologist Pennsylvania Fish and

More information

The valves are used in combination with AMV(E) 130/140, AMV(E) 130H/140H and AMV(E) 13 SU actuators. DN k VS

The valves are used in combination with AMV(E) 130/140, AMV(E) 130H/140H and AMV(E) 13 SU actuators. DN k VS Description VZ 2 VZ 3 VZ 4 VZ valves provie a high quality, cost effective solution for the control of hot an/or chille water for fan coil units, small reheaters, an recoolers in temperature control systems.

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS GUIDE TO STREAM CROSSINGS (Revised February,2005) CULVERTS, BRIDGES, AND FORDS Culverts, bridges, and fords are all methods used to cross-streams. Culverts are the most common stream crossing structure.

More information

The valves are used in combination with AMV(E) 130/140, AMV(E) 130H/140H and AMV(E) 13 SU actuators. DN k VS

The valves are used in combination with AMV(E) 130/140, AMV(E) 130H/140H and AMV(E) 13 SU actuators. DN k VS Description VZ 2 VZ 3 VZ 4 VZ valves provie a high quality, cost effective solution for the control of hot an/or chille water for fan coil units, small reheaters, an recoolers in temperature control systems.

More information

MODELLING ANCILLARIES: WEIR COEFFICIENTS

MODELLING ANCILLARIES: WEIR COEFFICIENTS WaPUG USER NOTE No 27 MODELLING ANCILLARIES: WEIR COEFFICIENTS David Balmforth, MWH 1. SCOPE This user note gives advice on the choice of coefficient for overflo eirs and orifices hen modelling storm seage

More information

Minam Curve. Project Location OR82: Minam Curve Project Wallowa Lake Hwy No. 010 (OR 82) Umatilla. Wallowa

Minam Curve. Project Location OR82: Minam Curve Project Wallowa Lake Hwy No. 010 (OR 82) Umatilla. Wallowa 31.99 29 W AL LO W A LA KE 3 3.98 82 Minam Curve Umatilla Union County: Union USGS Quad: Minam TRS: T1N, R41E, Sections 6 and 7 OREGON EPARTMENT OF TRANSPORTATION 1:24, ISCLAIMER:.25.5.5 X:\Projects\OR82_Minam_Curve_and_Slope_Stabilization_KN\OR82_Minam_Curve_KN1747\Environmental\maps

More information

5213 PHYSICIAN'S WAY, KYLE, TX SWIMMING POOL SHOP DRAWINGS

5213 PHYSICIAN'S WAY, KYLE, TX SWIMMING POOL SHOP DRAWINGS SWIMMING POOL SHOP RAWINGS JOB SITE LOCATION LEGEN LINE TYPES: ELECTRICAL - BON WIRE ELECTRICAL CONUIT POOL WALL (SHOTCRETE) STEEL REINFORCEMENT (REBAR) POOL SUCTION LINES POOL RETURN LINES WATER LINE

More information

PORT ST. LUCIE UTILITY SYSTEMS DEPARTMENT FLUSHING REPORT

PORT ST. LUCIE UTILITY SYSTEMS DEPARTMENT FLUSHING REPORT FLUSHING REPORT Project Name: : of Record: Date of Inspection: Date Gallons Minutes Gallons Location of Test Per Minute Flushed Flushed Number of pigs used:. Total Gallons Flushed Number of pigs retreived:.

More information

Products no longer available

Products no longer available Technical ata sheet R7..R Open-close ball valves, 3-way, with flange PN 6 for open an close col an warm water systems for switching functions on the water sie an 2-point controls in air-hanling an heating

More information

METROLINA PARK CHARLOTTE, NORTH CAROLINA

METROLINA PARK CHARLOTTE, NORTH CAROLINA ABBREVIATIONS SITE CLTWATER TRACKING# 048 VICINITY MAP SHEET INEX April 4, 08 - :5pm By: JWissler P:\509 Project Runway\wg\509 C00 COVERdwg C EXISTING CONITIONS C EMOLITION PLAN C0 PRELIMINARY SUBIVISION

More information

For latest prices and delivery to your door visit MyTub Ltd

For latest prices and delivery to your door visit MyTub Ltd Technical ata sheet A6H / A6S Shut-off valves with clips, PN 6 / PN / PN 6, with manual overrie in open an close col an warm water systems for switching heating an cooling machines on an off Overview of

More information

Products no longer available

Products no longer available Technical ata sheet R7..R haracterize control valves, 3-way, with flange PN 6 for open an close col an warm water systems for moulating control on the water sie of air-hanling an heating systems air bubble-tight

More information

CLEANING, INSPECTION, AND TESTING OF SEWERS

CLEANING, INSPECTION, AND TESTING OF SEWERS CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and

More information

Consult with manufacturers concerning permeation of the pipe walls, jointing materials, valve seats, etc.

Consult with manufacturers concerning permeation of the pipe walls, jointing materials, valve seats, etc. Design Manual Chapter 4 - Water Mains 4C - Facility Design 4C-1 Facility Design A. General Water mains and appurtenances, including hydrants and valves, should be provided along all streets including connections

More information

Great Lakes Stream Crossing Inventory Instructions

Great Lakes Stream Crossing Inventory Instructions Great Lakes Stream Crossing Inventory Instructions This document is a guide to completing the Stream Crossing Data Sheet (2/28/11 version). Careful attention to this guidance will ensure consistent crossing

More information

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER 0400-52-06 DRILLING WELLS TABLE OF CONTENTS 0400-52-06-.01 Drilling Equipment 0400-52-06-.03 Casingheads 0400-52-06-.02 Blowout Prevention

More information

VWP CONSTRUCTION INSPECTION REPORT. Project Name: Berkmar Drive Extension Locality: Albemarle County Inspector: ERM

VWP CONSTRUCTION INSPECTION REPORT. Project Name: Berkmar Drive Extension Locality: Albemarle County Inspector: ERM VWP CONSTRUCTION INSPECTION REPORT Inspection Date: August 22, 2016 VWP Permit No. 15-1268 SPGP RO Project Name: Berkmar Drive Extension Locality: Albemarle County Inspector: ERM Impacts: PFO PEM PSS POW

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

Stephens Creek Culvert Replacement. CAC April 28, 2010

Stephens Creek Culvert Replacement. CAC April 28, 2010 Stephens Creek Culvert Replacement CAC April 28, 2010 1 Top of Bank Willamette Moorage Park Existing Culverts 50 ft Greenway Setback 200 ft Greenway Setback Existing Macadam Bay Access Stephens Creek Existing

More information

Blakely Island, N Thatcher Bay. Restoration Recommendation: Rank Score (total score)

Blakely Island, N Thatcher Bay. Restoration Recommendation: Rank Score (total score) Soft Shore Protection/Structure Removal Blueprint for San Juan County Forage Fish Beaches Appendix 2: Recommendations for sites scoring below the top ten, sorted by island (east to west) Blakely Island,

More information

Exposed geomembrane covers: Part 2 - geomembrane restraint

Exposed geomembrane covers: Part 2 - geomembrane restraint Expose geomembrane covers: Part 2 - geomembrane restraint By Gregory N. Richarson, Ph.D., P.E., principal of GN Richarson an Assoc. In the previos Designer s Form, esign proceres were presente to evalate

More information

Driveway Design Criteria

Driveway Design Criteria Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved

More information

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable

More information

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8 Seventeenth Statewide Conference on Local Bridges Culvert Design An Overview of the NYS Highway Design Manual Chapter 8 Tuesday, October 25, 2011 Training Session: Culvert Design, Analysis - talk 2 Presented

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

191 m. 50 m 50 m 50 m 1 C38 STEEL BOX BEAM UNDER DECK 3 C38 VIEWING PLATFORM

191 m. 50 m 50 m 50 m 1 C38 STEEL BOX BEAM UNDER DECK 3 C38 VIEWING PLATFORM N TABLED INTERSECTION 1.2mØ IER ROOSED TOE OF BANK RAM LENGTH m (AROX) EXISTING TOE OF BANK EXISTING TO OF BANK ROOSED TO OF BANK 41 m 1 C38 UNDER DECK RAM LENGTH 70m (AROX) m m m VIEING LATFORM 3 C38

More information

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS Project Name: SAWS Water Job No.: CSJ No. (if applicable): Date: AWS Consultant: PROJECT INFORMATION N/A Yes No Joint Bid (COSA/TxDOT) N/A Yes

More information

SECTION 3 STREET DESIGN

SECTION 3 STREET DESIGN 3.01 GENERAL SECTION 3 STREET DESIGN For purposes of geometric and structural design, streets shall be classified according to the following table. The City Engineer will determine the class of all proposed

More information

GAIT PARAMETER ADAPTATION TO ENVIRONMENTAL PERTURBATIONS IN QUADRUPEDAL ROBOTS

GAIT PARAMETER ADAPTATION TO ENVIRONMENTAL PERTURBATIONS IN QUADRUPEDAL ROBOTS May 25, 27 13:6 WSPC - Proceeings Trim Size: 9in x 6in clawar7 1 GAIT PARAMETER ADAPTATION TO ENVIRONMENTAL PERTURBATIONS IN QUADRUPEDAL ROBOTS E. GARCIA, J. ESTREMERA, P. GONZALEZ DE SANTOS an M. ARMADA

More information

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

Eastern Brook Trout Joint Venture Annual Report The Nature Conservancy 2013

Eastern Brook Trout Joint Venture Annual Report The Nature Conservancy 2013 Eastern Brook Trout Joint Venture Annual Report The Nature Conservancy 2013 2013 Annual Performance Report Enhancing Connectivity in the Ash-Black Rock Sub-basin of the West Branch Narraguagus River. Project

More information

CDBG HANDICAP RAMPS 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION SHEET NO.

CDBG HANDICAP RAMPS 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION SHEET NO. CDBG HANDICAP RAMPS PROJECT NO. 1 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION 1 TITLE SHEET 2 SUMMARY OF QUANTITIES 3-4 DETAS 5-23

More information

STREAM CLASSIFICATION AND MAPPING. Prepared For. MacMillan Bloedel Ltd. Menzies Bay Division BOX 6000, Campbell River V9W 5E1.

STREAM CLASSIFICATION AND MAPPING. Prepared For. MacMillan Bloedel Ltd. Menzies Bay Division BOX 6000, Campbell River V9W 5E1. STREAM CLASSIFICATION AND MAPPING OF STREAMS IN MENZIES AND OYSTER BAY Prepared For MacMillan Bloedel Ltd. Menzies Bay Division BOX 6000, Campbell River V9W 5E1 September 1998 a a North Island Biological

More information

Project Report for Marsh Creek and Albion River Instream Fish Barrier Removal Flynn Creek Road, CR 135, M.P. 8.1 and 8.3

Project Report for Marsh Creek and Albion River Instream Fish Barrier Removal Flynn Creek Road, CR 135, M.P. 8.1 and 8.3 Project Report for Marsh Creek and Albion River Instream Fish Barrier Removal Flynn Creek Road, CR 135, M.P. 8.1 and 8.3 Project Title: Marsh Creek and Albion River Instream Fish Barrier Removal, Flynn

More information

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Culvert Design for Low and High Gradient Streams in the Midwest Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Overview Culvert Design Considerations Hydraulic Terms Culvert Impacts Low

More information

Type overview. Technical data. Safety notes

Type overview. Technical data. Safety notes Technical ata sheet hange-over ball valve, 3-way, Flange, PN 6 For close col an warm water systems For switching functions on the water sie an 2-point controls in air hanling units an heating systems ir

More information

-FRU FREEZE RESISTANT WATER VALVE COOLERS SYSTEM

-FRU FREEZE RESISTANT WATER VALVE COOLERS SYSTEM I N S TA L L AT I O N / I MN SA TA I N TL EL NAT AIN OC N E / MI AN IS NT RE UN CA TN I CO E N SI N S T R U C T I O N S INSTALLATION INSTRUCTIONS FOR -FRU OPTION Important: Read all instructions and refer

More information

SWIMMING POOLS, SPAS & HOT TUBS. This hand out is for REFERENCE ONLY. For more details see specific code sections.

SWIMMING POOLS, SPAS & HOT TUBS. This hand out is for REFERENCE ONLY. For more details see specific code sections. Village of Vernon Hills Community Development Department 290 Evergreen Drive, Vernon Hills, IL 60061 Phone 847-367-3704 - Fa 847-367-2541 http:// www.vernonhills.org SWIMMING POOLS, SPAS & HOT TUBS This

More information

Firth Creek Habitat Enhancement Project 1993

Firth Creek Habitat Enhancement Project 1993 Firth Creek Habitat Enhancement Project 1993 A. R. Langston December 1993 PWFWCP Report No. 77 The Peace/Williston Fish & Wildlife Compensation Program is a cooperative venture of BC Hydro and the provincial

More information

Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA

Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA TOPICS COVERED Aquatic Organism Passage (AOP) Benefits of AOP Crossings

More information

FIGURES APPENDIX A SYMBOL SAMPLING DESCRIPTION Location of sample obtained in general accordance with ASTM D 1586 Standard Penetration Test with recovery Location of sample obtained using thin-wall

More information

LESER Global Standard Tightness Test. Content

LESER Global Standard Tightness Test. Content LESER Global Stanar Page 1/29 Content 1 Purpose... 1 2 Scope... 1 3 References... 1 4 Introuction... 2 5 Test Proceures at LESER... 3 6 Test Equipment at LESER... 3 7 Seat tightness test proceure, Test

More information

VPPC02, VPPC08 3-way proportional pressure control valve, electronic closed loop control

VPPC02, VPPC08 3-way proportional pressure control valve, electronic closed loop control VPPC, VPPC -ay proportional pressure control valve, > > Nominal diameter,, flange version G/ > > Visual function display (optional) > > Compact and lighteight design > > Field bus capable as part of a

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS

San Antonio Water System Standard Specifications for Construction ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS 841.1 DESCRIPTION: This item shall consist of hydrostatic testing operations, of water mains in accordance with these specifications. 841.2 MATERIALS: The materials

More information

PROPOSAL. PROPOSAL OF, a corporation a

PROPOSAL. PROPOSAL OF, a corporation a PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction and Invitations to Bidders, the undersigned

More information

22. Specialty Valves.

22. Specialty Valves. 22. Specialty Valves. a. Types of Specialty Valves. 1) Use of the following specialty valves is covered in this section: Altitude Valve, Pressure Reducing Valve, Pressure Relief Valve, Swing Check Valve,

More information

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 Plum Creek Floodwater Retarding Structure No. 6 is located in an area of Kyle, Texas, that is currently

More information

BARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S

BARRIER OFFSET 0 A 6 6 A 12 12 A 26 A 26 3A OR 4A L OR S * ** L OR S L OR S ACCEPTABLE (TCB) TYPES AND ANCHORING DETAILS BASED ON UNDERLYING SURFACE TYPE AND BARRIER OFFSET FROM DROP-OFF BARRIER OFFSET UNDERLYING SURFACE 0" A 6" 6" A 12" 12" A 26" A 26" TCB TYPE DETAIL TCB TYPE

More information

CHAPTER 5 CULVERT DESIGN

CHAPTER 5 CULVERT DESIGN CHAPTER 5 CULVERT DESIGN HYDRAULICS OF CULVERTS There are two major types of culvert flow: 1) flow with inlet control, and 2) flow with outlet control. For each type, different factors and formulas are

More information

INSTALLATION INSTRUCTIONS FOR GRT75-PF-RFS PET FOUNTAIN

INSTALLATION INSTRUCTIONS FOR GRT75-PF-RFS PET FOUNTAIN INSTALLATION INSTRUCTIONS FOR GRT75-PF-RFS PET FOUNTAIN Important: Read all instructions and refer to local codes prior to installation. l Local soil conditions may require more gravel for drainage. l

More information

MEMORANDUM. TNC Fisher Slough Final Design and Permitting Subject: DRAFT Technical Memorandum: Levee Emergency Spillway Design

MEMORANDUM. TNC Fisher Slough Final Design and Permitting Subject: DRAFT Technical Memorandum: Levee Emergency Spillway Design MEMORANUM TNC Fisher Slough Final esign and Permitting Subject: RAFT Technical Memorandum: Levee Emergency Spillway esign To: From: Internal Memorandum For Record Yen Hsu Chen (Tetra Tech) avid Cline (Tetra

More information

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS. 7E-12 Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures Sediment Basin BENEFITS Flow Control Erosion Control Sediment Control Runoff Reduction Flow Diversion

More information

SECTION PRESSURE TESTING OF PIPING

SECTION PRESSURE TESTING OF PIPING SECTION 15044 PRESSURE TESTING OF PIPING PART 1 - GENERAL 1.01 DESCRIPTION A. Scope of Work: This section specifies the leakage and pressure testing of piping. B. Testing Records: PART 2 - PRODUCTS 2.01

More information

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax Instructions: For a driveway access permit, fill in sections 1, 2, 3 and 4, and the appropriate drawings and sign. For a Utility access, fill in sections 1, 2, 3 and 5, and figures 1 and 3. Prepare a detailed

More information

INFILTRATION PRACTICE MAINTENANCE INSPECTION FORM

INFILTRATION PRACTICE MAINTENANCE INSPECTION FORM Facility Number: Date: Time: Subdivision Name: Watershed: Weather: Inspector(s): Date of Last Rainfall: Amount: Inches Streets: Mapbook Location: GPS Coordinates: Property Classification: Residential 9

More information

CITY OF ROSEVILLE DESIGN STANDARDS

CITY OF ROSEVILLE DESIGN STANDARDS CITY OF ROSEVILLE DESIGN STANDARDS Section 1 Purpose and Definitions 1-1 Purpose PD 1 1-2 Design Practice PD 1 1-3 Definitions PD 1 Section 2 General Requirements 2-1 Plans by an Appropriate Engineer GR

More information

Swimming Pool Requirements Packet

Swimming Pool Requirements Packet Plot Plans shall indicate the following: Drawn to an appropriate scale with pool depths shown and dimensions to other structures Have an engineer address any surcharge loads on the pool or from the pool

More information

General Safety Notes for Chain Slings (Grade 50/60) Last revised: January 2018

General Safety Notes for Chain Slings (Grade 50/60) Last revised: January 2018 General Safety Notes for Chain Slings (Grae 50/60) Last revise: January 2018 Ketten Wäler GmbH Chain Technology Gewerbegebiet 5 83093 Ba Enorf, Germany Fon +49 (0)80 53-20 29-10 Fax +49 (0)80 53-20 29-31

More information

Pressure Compensating (PC) Spray Stakes

Pressure Compensating (PC) Spray Stakes N E T A F I M U S A Pressure Compensating (PC) Spray Stakes Automated Watering Systems for Large Container Production Improve Plant Quality and Conserve Resources 1 or More Good Reasons to Choose Netafim

More information

TECHNICAL MEMORANDUM 002 EMORANNO. 001

TECHNICAL MEMORANDUM 002 EMORANNO. 001 TECHNICAL MEMORANDUM 002 EMORANNO. 001 To: Jack Synder, P.E. EES Consulting From: Mort McMillen, P.E. Paul Larson, SE Date: October 13, 2010 Project: Cc: Taylor Bowen Subject: Technical Memorandum (TM)

More information

RLRC COMMUNITIES EAST GRAND FORKS AREA CHARACTER THE RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE EAGLE POINT BOAT LAUNCH DESIGN

RLRC COMMUNITIES EAST GRAND FORKS AREA CHARACTER THE RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE EAGLE POINT BOAT LAUNCH DESIGN AREA CHARACTER THE RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE EAGLE POINT BOAT LAUNCH DESIGN DESIGN DETAILS 135 AREA CHARACTER East Grand Forks a city of 7,501 people is located across the

More information

Culvert Safety Inspection Report

Culvert Safety Inspection Report Culvert Safety Inspection Report Facility Federal Structure ID Inspector Name Agency/Consultant Inspection Date LEGEND Haggerty Rd (South) N/A RL/JF GLEG 1/26/2016 9 New Feature Latitude Longitude Struc

More information

Process Name Material Handling/MSD Prevention Program

Process Name Material Handling/MSD Prevention Program CNM WAY PROCESS CNM Process Name Material Hanling/MSD Prevention Program (04/10/2018 Revision) Overview of Material Hanling/MSD Prevention Program Purpose: To provie a safe an healthy working environment

More information

Massachusetts Stream Crossing Case Studies

Massachusetts Stream Crossing Case Studies Massachusetts Stream Crossing Case Studies Amy Singler Associate Director, River Restoration Program Carrie Banks River Continuity Coordinator Case Studies: Public Benefits: Movement of goods and people

More information

DESIGN CRITERIA DIVISION 4900 TRAFFIC SIGNALS

DESIGN CRITERIA DIVISION 4900 TRAFFIC SIGNALS DESIGN CRITERIA DIVISION 4900 TRAFFIC SIGNALS 4901 GENERAL: These criteria shall be adhered to for the design of all publiclyfinanced or privately-financed traffic signal systems to be installed in the

More information

APPENDIX J HYDROLOGY AND WATER QUALITY

APPENDIX J HYDROLOGY AND WATER QUALITY APPENDIX J HYDROLOGY AND WATER QUALITY J-1 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed / Preliminary Creek Constructed Natural Channel Culvert J-2 Preliminary

More information

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES 3 4 5 6 7 8 9 0 3 APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES Kissimmee River Vol December 005 Version Draft 4 3 4 5 6 7 8 9 0 3 4 5 6 7 8 9 0 3 4 5 6 7 8 9 30 3 3 33 34 35 36 37 38 39 40 4 4 43

More information

Site Diary Campus Drive Relocation Project. Noboru Togawa. Presented to: Dr. Pitt Construction Site Erosion Control

Site Diary Campus Drive Relocation Project. Noboru Togawa. Presented to: Dr. Pitt Construction Site Erosion Control Site Diary Campus Drive Relocation Project by Presented to: Dr. Pitt Construction Site Erosion Control Department of Civil, Construction, and Environmental Engineering The University of Alabama Tuscaloosa,

More information

Installation Guide. buoy.ai

Installation Guide. buoy.ai Installation Guide buoy.ai Notes In the Box Buoy unit Battery and Charger assembly 3/4 meter couplings (2) Rubber gaskets (6) Also included: Buoy Quick Start Guide Buoy Installation Guide Buoy sticker

More information

SITE WATER UTILITY DISTRIBUTION PIPING

SITE WATER UTILITY DISTRIBUTION PIPING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe and fittings for potable water line and fire water line. 2. Valves and Valve Boxes 3. Fire Hydrants. 4. Tapping Sleeves and Valves. 5. Air Release

More information

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL AFTER MARCH 1, 2012 ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL 400.1 Description. This item shall govern for all excavation required for the construction of all structures, except pipe or box sewers for

More information

City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS

City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS R-1 Alternate Pavement Structures Sep/16 R-2 No Drawing Jan/17 R-2A Typical Cross Sections for Granular

More information

PROTECTIVE HOSES. HYDRA Stripwound hoses for optoelectronics, laser procedures, medical technology or the pharmaceutical and food industry.

PROTECTIVE HOSES. HYDRA Stripwound hoses for optoelectronics, laser procedures, medical technology or the pharmaceutical and food industry. PROTECTIVE HOSES HYRA Stripwoun hoses for optoelectronics, laser proceures, meical technology or the pharmaceutical an foo inustry. Witzenmann-Speck GmbH Werner-Siemens-Str. 2 29 Kieselbronn, Germany Phone

More information

EXTENT OF OBSERVATION

EXTENT OF OBSERVATION scanned for KRIS THE RESOURCES AGENCY OF CALIFORNIA Department of Fish and Game STREAM SURVEY Date: May 25 and 31, 1977. NAME: Unnamed Stream (Tributary to Sonoma Creek) COUNTY: Sonoma. STREAM SECTION:

More information

RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method KT-56)

RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method KT-56) 5.9.56 RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method ) 1. SCOPE This test covers preparation of specimens and measurement of the change of tensile strength resulting

More information

City of Lockport Above Ground Pool Regulations

City of Lockport Above Ground Pool Regulations Location: City of Lockport Above Ground Pool Regulations Pool to be at least 6 feet from both rear and side lot lines, but not in any easements. If located on a corner lot, pool must be located behind

More information

Ontario Ministry of Transportation (MTO) Restoring Fish Passage to a Tributary of the Saugeen River

Ontario Ministry of Transportation (MTO) Restoring Fish Passage to a Tributary of the Saugeen River Ontario Ministry of Transportation (MTO) Restoring Fish Passage to a Tributary of the Saugeen River 2017 Transportation Association of Canada Environmental Achievement Award Nomination Submission Prepared

More information

Kentucky Transportation Center

Kentucky Transportation Center Kentucky Transportation Center TECHNICAL ASSISTANCE REPORT Forensic Pavement Evaluation for US 31 W, Jefferson County, Kentucky KTC TA-15 02/KH91 14 1F DOI: http://dx.doi.org/10.13023/ktc.ta.2015.02 Author(s):

More information

Steelhead Society of BC. Thompson River Watershed Restoration and Enhancement Project #4 Nicola River Bank Stabilization and Enhancement Project

Steelhead Society of BC. Thompson River Watershed Restoration and Enhancement Project #4 Nicola River Bank Stabilization and Enhancement Project Steelhead Society of BC Presents: Thompson River Watershed Restoration and Enhancement Project #4 Nicola River Bank Stabilization and Enhancement Project Application for Funding December 2013 1.0 BACKGROUND

More information

CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS

CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS Trench Backfill Utility Trench Paving Backfill and Embedment TB 1 HDPE, SRHDPE & PVC Storm Drain Pipe Only (Nonrigid) Bedding and Backfill TB2 Deep Cut

More information

General Instructions

General Instructions This manual must be left with the pool owner Pool Component Installation SECTION 1 Manual General Instructions Safety Rules For Pool Owners Gibraltar Oval Pools Part No. 1920585 rev. 0 Your pool contains

More information

Rue des Trappistes Culvert Replacement and Road Reconstruction PUBLIC ENGAGEMENT SUMMARY October 2017

Rue des Trappistes Culvert Replacement and Road Reconstruction PUBLIC ENGAGEMENT SUMMARY October 2017 Rue des Trappistes Culvert Replacement and Road Reconstruction PUBLIC ENGAGEMENT SUMMARY October 2017 Background The culvert at Rue des Trappistes and Westendorf Coulee needs to be replaced as it is at

More information

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd.

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd. Indiana LTAP Road Scholar Core Course #10 Culvert Drainage Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd. Objectives Review culvert shapes, end sections, and materials

More information

help make your spa installation a success Commissioned by Caldera Spas

help make your spa installation a success Commissioned by Caldera Spas 9tips to help make your spa installation a success Commissioned by Caldera Spas Simple planning makes a better spa As spa owners ourselves we know what needs to happen to ensure a hot tub is installed

More information

Shoreline Erosion Control Failures and How To Avoid Them

Shoreline Erosion Control Failures and How To Avoid Them 2008 Illinois Lake Management Association Shoreline Erosion Control Failures and How To Avoid Them by: Hank Sutton, President, Lake Rip Rap, Inc. www.lakeriprap.com - www.macoupinboats.com Setting the

More information