2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 10 over POMME DE TERRE RIVER. Date of Inspection: Equipment Used: 06/18/2016. County Highway Agency
|
|
- Jonas Lang
- 5 years ago
- Views:
Transcription
1 2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # CSAH 10 over POMME DE TERRE RIVER DISTRICT: District 4 COUNTY: Stevens CITY/TOWNSHIP: DARNEN STATE: Minnesota Date of Inspection: Equipment Used: 06/18/2016 Owner: County Highway Agency Inspected By: Forsyth, Roy Report Written By: Roy Forsyth Report Reviewed By: Final Report Date:
2 TABLE OF CONTENTS PAGE NUMBER UNDERWATER SUMMARY 3 UNDERWATER INSPECTION 4 UNDERWATER INSPECTION PROCEDURES 6 STRUCTURE INVENTORY 7 ELEMENTS 8 PICTURES 11 DRAWINGS 14
3 UNDERWATER INSPECTION REPORT SUMMARY The substructure units inspected at Bridge No , Piers 1 through 3, and East and West Abutments, were found to be generally in good to satisfactory condition with no defects of structural significance observed. All of the timber piles were generally solid and in good condition with only light weathering allowing up to 1/8 inch awl penetration. Minor outer shell delaminations with up to 1/2 inch thickness were noted on all piles, between 1 foot above and 1 foot below the waterline. Several of the pile braces exhibited splits through the fastener, up to 2 inches wide and 5 feet long, at the pile to brace connection. Overall, the channel bottom configuration consisted of 2 feet diameter rocks, random cobbles, and sandy gravel.. INSPECTION FINDINGS (A) All of the timber piles of the inspected substructure units were solid with light weathering allowing up to 1/8 inch awl penetration. Additionally, between 1 foot below and 1 foot above the waterline, the timber piles exhibited minor outer shell delaminations with 1/4 inch to 1/2 inch thickness. (B) There was an up to 2 inch wide gap in wall planking of the West Abutment backwall, located near the waterline. (C) Splits through the brace-to-pile fastener, up to 2 inches wide and 5 feet long, were noted on several braces of Piers 1 through 3. (D) Channel bottom material around Piers 1 and 3 consisted of up to 2 foot diameter rock with randomly scattered cobbles allowing no probe rod penetration. (E) The channel bottom material around Pier 2 consisted of sandy gravel with 6 inch diameter and smaller cobbles allowing negligible probe rod penetration. RECOMMENDATIONS (A) The deficient cross bracing connections should be restored/repaired during routine bridge maintenance. Until corrected, monitor the cross bracing deterioration and cracking, and if found to be progressing to a more detrimental condition that would threaten the lateral stability of the bridge, corrective measures would be warranted at that time. (B) Reinspect the submerged substructure units at the normal maximum recommended (NBIS) interval of sixty (60) months. Contractor: Contractor Job Number: Collins Engineers, Inc Page 3 of 15
4 UNDERWATER INSPECTION 1. BRIDGE DATA Bridge #: Feature Intersected: Facility Carried: District: County: POMME DE TERRE RIVER CSAH 10 District Stevens Bridge Description: The superstructure consists of four spans of timber beams supported by two timber abutments and three timber pile bent piers. The substructure units are designated as West Abutment, Piers 1 through 3 and East Abutment. 2. INSPECTION DATA Professional Engineer/Team Leader: Inspection Diver: Date of Underwater Inspection: Weather Conditions: Underwater Visibility (feet): Waterway Velocity (ft/sec): Roy A. Forsyth Marc Stern 06/18/2016 Sunny, 80 F 6 in. None/Negligible 3. SUBSTRUCTURE INSPECTION DATA Substructure(s) Inspected: West and East Abutments and Piers 1 through 3 General Shape: Each pier consists of a timber cap supported by ten driven timber piles with timber cross bracing. Each abutment has bulkhead timber wall planking and is supported by nine driven timber piles. Maximum Water Depth at Substructure(s) Inspected (feet): WATERLINE DATUM Water Level Reference: Waterline Elevation (feet): Description: The top of bent cap at the upstream end of Pier 1. Assumed Elevation of feet The waterline was approximately 5.6 feet below reference. 5. NBIS CODING INFORMATION (Minnesota specific codes are used for 92B and 113) Item 60: Substructure: Item 61: Channel and Channel Protection: Item 62: Culvert: Item 92B: Underwater Inspection: Code: Code: Code: Code: 6 8 Y 48 06/2016 Page 4 of 15
5 Item 113: Scour Critical Bridge: Code: I Bridge is scour critical because abutment or pier foundation is rated as unstable due to observed scour at bridge site. Yes X No (Mark your selection with an X) 6. STRUCTURAL ELEMENT CONDITION RATING Conditions ELEM # Element Description Quantity Unit CS1 CS2 CS3 CS4 216 Timber Abutment 95 LF Timber Piling 48 EA Scour 1 EA 1 Page 5 of 15
6 UNDERWATER INSPECTION INSPECTION PROCEDURES The routine underwater inspection of Bridge (CSAH 10 over the Pomme de Terre River) was completed on June 18, The underwater inspection was conducted from shore. The inspection was conducted by a team consisting of a PE-Diver with a valid MnDOT Team leader certification, a backup diver and a dive tender. The inspection utilized commercial dive equipment and techniques (SSA and/or SCUBA) in accordance with OSHA regulations. Profiles were taken along the upstream and downstream faces of the bridge and around the periphery of substructure units to determine the presence, location and area of scour. The bridge elements inspected consisted of 2 timber abutments with 9 timber piles each and 3 timber piers consisting of 10 timpber piles each. According to the bridge inventory or design drawings, West and East Abutments and Piers 1 through 3 were founded on timber pilings. Inspection procedures followed FHWA guidance and the MnDOT Bridge and Structure Inspection Program Manual with channel bottom probing to search for bottom of foundations. The routine underwater inspection frequency is recommended to remain at a maximum of 60 months based on those findings and risk factors. Also, inspection procedures should continue to follow the above approach and standard guidance with 100% Level I and 10% Level II intensity efforts. Page 6 of 15
7 Bridge ID: Minnesota Structure Inventory Report CSAH 10 over POMME DE TERRE RIVER Date: 07/28/ G E N E R A L + + R O A D W A Y + + I N S P E C T I O N + Agency Br. No. Crew Bridge Match ID (TIS) 0 Userkey 115 District 04 County Stevens Route Sys 04 - CSAH Number 10 Functionally Obsolete City Sect., Twp., Range Main Span Type 7 - Timber Median Width On Bridge Main Span Design Main Span Detail Appr. Span Type Appr. Span Design Appr. Span Detail Skew 0 Culvert Type Barrel Length Cantilever ID MAIN: 4 Main Span Length Structure Length 09 - Slab Span Number of Spans APPR: 0 TOTAL: 26.0 Deck Width (Out-to-Out) 29.6 Deck Material Wear Surf Type Wear Surf Install Year 2002 Wear Course/Fill Depth Deck Membrane Deck Rebars Deck Rebars Install Year Structure Area (Out-to-Out) 2605 sq. Roadway Area (Curb-to-Curb) Sidewalk Width 50A. Lt 0.00 Curb Height 0.7 MI E OF JCT TH9 Level of Service 1 - MAINLINE N - 42W Roadway Type Latitude ' '' Control Section (TH Only) Status Lt 8 - Wood or Timber 6 - Bituminous None + M I S C. Structure Flared Parallel Structure Field Conn. ID Abutment Foundation (Material/Type) Pier Foundation (Material/Type) Historic Status 4 - PILE BENT 2 - TIMBER 4 - PILE BENT Underwater 60 Pinned Asbly. Spec. Feat Navigation Control Year Painted 2540 sq. Traffic 50B. Rt Rt Painted Area Primer Type Posted Load B R I D G E D A T A No flare 5 - Not eligible + P A I N T + Bridge Railing 1 - MEETS STANDARDS N - No parallel structure GR Transition Appr. Guardrail GR Termini 2 - TIMBER Frac. Critical 2 - Vehicle & Semi (Type R12-5) 0 - Not Required Horizontal 1 - Object Markers 0.00 Vertical Unsound Paint % Finish Type 0 - None + B R I D G E 2-2-way traffic Longitude ' 5.73 '' Reference Point Custodian Owner 02 - County Highway Agency 02 - County Highway Agency Roadway Name or Description Township DARNEN CSAH 10 Desc. Loc. BMU Agreement Year Built 1967 MN Year Reconstructed FHWA Year Reconstructed MN Temporary Status Bridge Plan Location Date Opened to Traffic Maint. Area Roadway O/U Key Detour Length 6.0 mi. Lanes Route On Structure On - Off System 1 - ON Roadway Width Legislative District 11A Vertical Clearance Potential ABC 2 - N/A Max. Vert. Clear. Service On 5 - Highway-pedestrian Appr. Surface Width Service Under 3 - COUNTY + S T R U C T U R E + HCADT Functional Class If Divided + R D W Y Horizontal Clear. Lateral Clearance ON 2 UNDER ADT 5 - Waterway Bridge Roadway Width YEAR 2008 N - Not Applicable + I N + W A T E R W A Y + Drainage Area (sq. mi.) Waterway Opening (sf.) 1000 Pier Protection Posting Rating Date 07/27/ SUBSTANDARD 0 - SUBSTANDARD 0 - SUBSTANDARD D E P T H I N S P. + Y/N Freq Date 06/18/ No nav. control on VEH: 34 SEMI: 40 DBL: 40 Overweight Permit Codes Rail Type Lt 01 Rt 01 A N - N/A B N - N/A C N - N/A sq. ADTT 07 - Rural - Major Collector 28.0 S I G N S + Structurally Deficient Sufficiency Rating 89.3 Routine Inspection Date 11/24/2015 Routine Inspection Frequency 24 Inspector Name + N B I Nav. Clr. () Nav. Vert. Lift Bridge Clear. () MN Scour Code Design Load Operating Rating Forsyth, Roy P - Posted for Load C O N D I T I O N Deck 6 Unsound Superstructure 6 Deck % Underclearances Waterway Adequacy Approach Alignment 8 0 D I M E N S I O N S + NB-EB % SB-WB Substructure Channel 8 Culvert + N B I Structure Evaluation 6 Deck Geometry In place and functioning Vert. 0.0 Horiz. 0.0 I - LOW RISK Year C A P A C I T Y R A T I N G S Other/Unknown 2 - HS TRUCK R A T I N G S Inventory Rating 2 - HS TRUCK N N N A P P R A I S A L R A T I N G S + N + S A F E T Y F E A T U R E S + Page 7 of 15
8 09/14/2016 Inspector: CO Bridge MINNESOTA BRIDGE INSPECTION REPORT BRIDGE County: City: Township: Section: 12 Township: 124N Range: 42W Maint. Area: Span Type: 7 - Wood or Timber 1 - Slab List: Stevens DARNEN NBI Deck: 6 Super: 6 Sub: 6 Chan: 8 Culv: N Appraisal Ratings - Approach: Required Bridge Signs - Load Posting: CSAH 10 OVER POMME DE TERRE RIVER 8 Waterway: 8 Horizntal: Location: Route: Control Section: 2 - Vehicle & Semi (Type R12-5) 1 - Object Markers 0.7 MI E OF JCT TH CSAH 10 Ref. Pt.: Local Agency Bridge Nbr.: Open, Posted, Closed: MN Scour Code: Traffic: Vertical: P - Posted for Load I - LOW RISK 0 - Not Required N - Not Applicable Length: Deck Width: Rdwy. Area/ Pct. Unsnd: 2540 sq. / % Paint Area/ Pct. Unsnd: Culvert: N/A sq. / % Postings: Unofficial Structurally Deficient Unofficial Functionally Obsolete Unofficial Sufficiency Rating 89.3 N N ELEM NBR ELEMENT NAME REPORT TYPE INSP. DATE QUANTITY CS 1 CS 2 CS 3 CS 4 Timber Slab 07/28/ SF Underwater Notes: [2016] Migrator assumed CS SF Wearing Surfaces Underwater 07/28/ SF Notes: Added 3" overlay to deck. [2015] Moderate cracking SF Timber Stringer 07/28/ LF Underwater Notes: [2015] Minor splitting and decay. 505 LF Timber Floor Beam 07/28/ LF Underwater Notes: prevoiusly quantity 1, measured 4 beams at 31 feet. [2015] Minor splitting and decay. 124 LF Timber Abutment 07/28/ LF Underwater 135 LF Notes: [2016] Migrator added 40 LF to abutment quantity to account for wingwalls (CS1:0 CS2:40 CS3:0 CS4:0) East abutment has not moved. [2015] Minor splitting and decay. [2016] Underwater Inspection - There was a 2 inch wide by 6 feet long horizontal gap in the West Abutment bulkhead timber planking, located at the waterline. Wingwall notes: Small amount of erosion at NE wingwall Needs fill at the NE wingwall Filled behind NE wingwall. Need some fill behind NW wingwall NW wingwall needs to be stabilized on backside, is scheduled for this summer Possibilities for fill behind NW wingwall still being considered Work order to add riprap in front of NW wingwall. Timber Pile 07/28/ EA Underwater 60 EA Notes: 2006? - Northernmost column on west line had been pushed out by ice or debris from under pier cap. Maintenance crew pulled column back into place. No major structural damage noticed. [2015] Minor splitting and decay. [2016] Underwater Inspection - Splits through the brace-to-pile fastener, up to 2 inches wide and 5 feet long, were noted on several braces of Piers 1 through 3. Page 8 of 15
9 BRIDGE CSAH 10 OVER POMME DE TERRE RIVER ELEM NBR ELEMENT NAME REPORT TYPE INSP. DATE QUANTITY CS 1 CS 2 CS 3 CS 4 Timber Pier Cap 07/28/ LF Underwater 230 LF Notes: Ice moved the middle upstream pier, timber was only supported by half straightened and repaired. [2015] Upstream end of center pier is split in half. Metal Bridge Railing 07/28/ LF Underwater Notes: [2016] Migrator assumed metal rail/timber post combination type rail. [2015] Moderate weathering, minor splitting Guard rail NE corner was damaged, no structural damage. 178 LF Steel Protective Coating Underwater 07/28/ SF Notes: [2016] Migrator assumed CS1 and a quantity of 999 SF. 999 SF Timber Bridge Railing 07/28/ LF Underwater Notes: [2015] Moderate weathering, minor splitting. 198 LF [2016] Migrator assumed metal rail/timber post combination type rail. Post spacing assumed to be 5LF, each post 1LF. [2015] Moderate weathering, minor splitting. Critical Deficiencies or Safety Hazards 07/28/ EA Underwater Notes: NO CRITICAL FINDINGS OBSERVED DURING THE LAST INSPECTION. 1 EA Bituminous Approach Roadway 07/28/ EA Underwater Notes: Added 3" overlay Bituminous approach was overlayed in summer. Filled pothole in bituminous roadway approach. [2015] NW and NE corners have settled, appears to be a drainage issue. 2 EA Scour 07/28/ EA Underwater 890 Load Posting or Vertical Clearance Underwater Signing Notes: [2016] Structure requires a vertical clearance sign or load posting sign. 07/28/ EA EA Other Bridge Signing 07/28/ EA Underwater 1 EA Slopes & Slope Protection 07/28/ EA Underwater 1 EA Deck & Approach Drainage 07/28/ EA Underwater Notes: Use this element to rate the condition, function, and adequacy of the drainage system. 1 EA Page 9 of 15
10 BRIDGE CSAH 10 OVER POMME DE TERRE RIVER ELEM NBR ELEMENT NAME REPORT TYPE INSP. DATE QUANTITY CS 1 CS 2 CS 3 CS 4 Sidewalk, Curb, & Median 07/28/ EA Underwater Notes: Curb was hit by snowplow, no damage of consequence. [2015] NE corner has impact damage from a plow truck, occurred in the winter of EA Protected Species 07/28/ EA Underwater Notes: Use this element to track the presence of protected species living on this structure. 1 EA General Notes: 58. Deck NBI: No new notes Same as previous Inspected via boat this year, water depth 7+' 9.5' deepest in channel. Bikepath was added in 1978 being the most northern part of bridge. The existing wingwalls were also extended at the same time. Some tie cross timbers need to be replaced, the work is scheduled. Need to schedule a load rating review All necessary repairs were completed in summer of 08. Underwater inspection was also completed. Load rating was reevaluated because of overlay in Conditions unchanged. noticed slight sagging in timber decking. 36A. Brdg Railings NBI: 36B. Transitions NBI: 36C. Appr Guardrail NBI: 36D. Appr Guardrail Terminal NBI: 59. Superstructure NBI: 60. Substructure NBI: Minor splitting and decay. Minor splitting and decay. 61. Channel NBI: 62. Culvert NBI: 71. Waterway Adeq NBI: 72. Appr Roadway Alignment NBI: Inventory Notes: Inspector's Signature Reviewer's Signature Page 10 of 15
11 Pictures Photo 2 - View of West Abutment, looking northwest. Photo 3 - View of East Abutment, looking east. Page 11 of 15
12 Pictures Photo 4 - View of Pier 1, looking northeast. Photo 5 - View of Pier 2, looking east. Page 12 of 15
13 Pictures Photo 6 - View of Pier 3, looking west. Page 13 of 15
14 Page 14 of 15
15 Page 15 of 15
2016 UNDERWATER BRIDGE INSPECTION REPORT. 81(ENCHANTED LANE) over CHANNEL. Date of Inspection: Equipment Used: 09/07/2016
2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # 27A34 81(ENCHANTED LANE) over CHANNEL DISTRICT: Metro COUNTY: Hennepin CITY/TOWNSHIP: Shorewood STATE: Minnesota Date of Inspection: Equipment Used: 09/07/2016
More information2016 UNDERWATER BRIDGE INSPECTION REPORT. CR 52 over CALDWELL BROOK. Date of Inspection: Equipment Used: 06/04/2016. County Highway Agency
2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # 91725 CR 52 over CALDWELL BROOK DISTRICT: District 1 COUNTY: Koochiching CITY/TOWNSHIP: T - 151 R - 27 STATE: Minnesota Date of Inspection: Equipment Used:
More informationPED (OLD TWNS RD) over OTTER TAIL RIVER
2016 UDERWATER BRIDGE ISPECTIO REPORT BRIDGE # L0885 PED (OLD TWS RD) over OTTER TAIL RIVER DISTRICT: District 4 COUTY: Otter Tail CITY/TOWSHIP: MAIE STATE: Minnesota Date of Inspection: Equipment Used:
More information2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 14 over BUTLER CREEK. Date of Inspection: Equipment Used: 06/21/2016. County Highway Agency
2016 UDERWATER BRIDGE ISPECTIO REPORT BRIDGE # 25534 CSAH 14 over BUTLER CREEK DISTRICT: District 6 COUTY: Goodhue CITY/TOWSHIP: LEO STATE: Minnesota Date of Inspection: Equipment Used: 06/21/2016 Owner:
More informationUNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 58551 CSAH NO. 41 OVER THE KETTLE RIVER DISTRICT 1 PINE COUNTY JULY 28, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,
More informationUNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 6391 CSAH NO. 33 OVER THE MINNESOTA RIVER DISTRICT 8 - LAC QUI PARLE COUNTY OCTOBER 22, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY
More informationUNDERWATER BRIDGE INSPECTION REPORT METRO DISTRICT - ANOKA COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 02545 CR NO. 116 OVER THE RUM RIVER METRO DISTRICT - ANOKA COUNTY SEPTEMBER 9, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 133 OVER A DITCH ST. LOUIS COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7780 CSAH 133 OVER A DITCH ST. LOUIS COUNTY SEPTEMBER 27, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO.
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO MSAS 123 (2 ND AVE. SW) OVER THE CANNON RIVER CITY OF FARIBAULT, RICE COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 66546 MSAS 123 (2 ND AVE. SW) OVER THE CANNON RIVER CITY OF FARIBAULT, RICE COUNTY SEPTEMBER 13, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION
More informationUNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. L0885 TWP NO. 970 OVER THE OTTER TAIL RIVER DISTRICT 4 - OTTER TAIL COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,
More informationUNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. L0885 TWP NO. 970 OVER THE OTTER TAIL RIVER DISTRICT 4 - OTTER TAIL COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 58506 CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO.
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7635 CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY JUNE 18, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 66513 14 th STREET (MSAS NO. 103) OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,
More informationUNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 6391 CSAH NO. 33 OVER THE MINNESOTA RIVER DISTRICT 8 - LAC QUI PARLE COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 9 OVER THE BLUE EARTH RIVER DISTRICT 7 - BLUE EARTH COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 07542 CSAH NO. 9 OVER THE BLUE EARTH RIVER DISTRICT 7 - BLUE EARTH COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO B WABASHA STREET SOUTH BOUND (MASA 235 SB)
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 62555B WABASHA STREET SOUTH BOUND (MASA 235 SB) OVER THE MISSISSIPPI RIVER CITY OF ST. PAUL OCTOBER 31, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 101 OVER THE MINNESOTA RIVER DISTRICT 8 - REDWOOD COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7149 CSAH NO. 101 OVER THE MINNESOTA RIVER DISTRICT 8 - REDWOOD COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC.
More informationUNDERWATER INSPECTION REPORT DOUBLE CORRUGATED METAL PIPE CULVERT HAWTHORN ROAD OVER RICE CREEK (PELKEY LAKE) MORRISON COUNTY
UNDERWATER INSPECTION REPORT DOUBLE CORRUGATED METAL PIPE CULVERT HAWTHORN ROAD OVER RICE CREEK (PELKEY LAKE) MORRISON COUNTY OCTOBER 25, 2012 PREPARED FOR MORRISON COUNTY PUBLIC WORKS BY COLLINS ENGINEERS,
More informationCulvert Safety Inspection Report
Culvert Safety Inspection Report Facility Federal Structure ID Inspector Name Agency/Consultant Inspection Date LEGEND Haggerty Rd (South) N/A RL/JF GLEG 1/26/2016 9 New Feature Latitude Longitude Struc
More informationInformation for File # SEW
Information for File #2014-02744-SEW Applicant: Minnesota Department of Transportation (MnDOT), District 3; c/o Mr. Robert Nibbe Corps Contact: Sarah Wingert, U.S. Army Corps of Engineers, 180 5 th Street
More informationFY 2006 TRANSPORTATION CAPITAL PROGRAM
Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported
More informationUS Route 24 Eastbound (Quincy Memorial Bridge) Over the Mississippi River
Purpose and Need March 2015 US Route 24 Eastbound (Quincy Memorial Bridge) Over the Mississippi River Adams County - Quincy, IL Marion County, MO Region 4 District 6 Table of Contents I. Purpose of the
More informationGerald P. Oliveto, P.E. George Franz NJDOT
Gerald P. Oliveto, P.E. George Franz NJDOT Bridge preservation is defined as actions or strategies that prevent, delay or reduce deterioration of bridges or bridge elements, restore the function of existing
More informationFLAGLER BEACH PIER POST INCIDENT SAFETY INSPECTION HURRICANE IRMA SEPTEMBER 15-17, 2017
LOGAN DIVING & SALVAGE 2815 SAINT JOHNS BLUFF JACKSONVILLE, FLORIDA 32246 TEL: (904) 731-0000 FAX: (904) 731-5493 MARINE SPECIALTY CONTRACTOR FL SCC131151014 FLAGLER BEACH PIER POST INCIDENT SAFETY INSPECTION
More informationPaul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)
To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,
More informationFY 2005 TRANSPORTATION CAPITAL PROGRAM
Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the
More informationWYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways
WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to
More informationAttached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.
SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i July 25, 2016 6. HIGHWAY MATTERS A. PLAN PROJECT UPDATES Attached for your reference please find project updates on ongoing VDOT construction projects
More informationNon-Motorized Overpass at SR 5/US1
Non-Motorized Overpass at SR 5/US1 And SR 97/SW th Street (Bird Road) Executive Summary March 9, 17 Prepared By: MARLIN Engineering Inc 17 NW th Avenue, Ste. 1 Plantation, FL 33313 P: 35.77.7575 www.marlinengineering.com
More informationDISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (13-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual
DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.
More informationFOR HISTORICAL REFERENCE ONLY
To: From: Subject: Electronic Distribution Recipients MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No. 12-14-B-03 December 18, 2012 Jon M. Chiglo, P.E. Division
More informationBRIDGE REPLACEMENT AND REHABILITATION PROGRAM
BRIDGE REPLACEMENT AND REHABILITATION PROGRAM INTRODUCTION An integral element of the City's transportation infrastructure is a network of bridges designed to carry vehicular, railroad, light rail, pedestrian,
More informationSmoothing Out the Bumpy Road Ahead
Julie Hannah, P.E. Technical Services and Asset Management May 11, 2017 Smoothing Out the Bumpy Road Ahead Nationwide D = Poor, At Risk Conditions & Capacity Pavement Condition & Congestion Nationwide
More informationState DOT - Bridge Inspection Manual Part II Course No. SE0117 PDH: 10
State DOT - Bridge Inspection Manual Part II Course No. SE0117 PDH: 10 In order to obtain credit for this course, the following steps listed below should be followed: (1) Log into MyCE Account & purchase
More informationSECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN
SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN Table of Contents Page No 1A.1 GENERAL...1 1A.1.1 DESIGN CONTROLS...1 1A.2 MAINLINE ROADWAYS...4 1A.2.1 ROADWAY DESIGNATION...4 1A.2.2 DESIGN SPEED...4 1A.2.3
More informationWYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)
WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION
More informationCHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems
CHAPTER 8 STAKING STAKING Correct staking of traffic control signal or lighting systems is critical to the appropriate placement of system components. 8.1 Traffic Control Signal Systems Locating the components
More information(Revised February,2005) CULVERTS, BRIDGES, AND FORDS
GUIDE TO STREAM CROSSINGS (Revised February,2005) CULVERTS, BRIDGES, AND FORDS Culverts, bridges, and fords are all methods used to cross-streams. Culverts are the most common stream crossing structure.
More informationDesign Criteria. Design Criteria
F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road
More informationDESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP
DRAFT NOT FINAL (Note: document was not finalized due to an eastbound stopping site distance design issue that requires more detailed bridge and roadway design considerations. This discussion starts on
More informationSTAKING TRAFFIC CONTROL SIGNAL SYSTEMS
Locating the components of a traffic control signal is not an exact science; many factors influence the location of the components. These factors include: lane widths, radii, pedestrian curb ramp requirements,
More informationKentucky s Surface Transportation System
Kentucky s Surface Transportation System ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit
More informationChapter 11. Culverts and Bridges Design Checklist for Culvert Design
Yes No N/A Design Requirements I. GENERAL DESIGN GUIDELINES Chapter 11. Culverts and Bridges A. Culvert design is in accordance with the Culverts chapter of Volume 2 of the UDFCD Manual for additional
More informationDesigning with the Railroad
Designing with the Railroad 23 CFR 646.214 (b)(2) requires that crossings be evaluated when they are within limits or near terminus of Federally Funded project. Some rough numbers for planning: Active
More informationLe Sueur County, MN Tuesday, December 13, 2016 Board Meeting
Le Sueur County, MN Tuesday, December 13, 216 Board Meeting Item 8 1:15 a.m. Darrell Pettis, County Administrator / Engineer RE: Final CSAH 3 RE: CSAH 29 Speed Zone Study RE: 4H Utilities RE: Lake Jefferson
More informationSTUDY PROCESS & SCHEDULE
STUDY PROCESS & SCHEDULE Route Centennial Bridge Study KDOT Project No. -52 KA-3229-01 STUDY OVERVIEW STUDY SCHEDULE The Kansas Department of Transportation (KDOT) has identified a future need to replace
More informationAnnex E Bridge Pier Protection Plan
Annex E Bridge Pier Protection Plan Table E1 Bridge Types and Locations Table E2 Flow Conditions For River Sections Figure E1 Bridge Abutment Protection Figure E2 Bridge Pier Protection Figure E3 Central
More informationRoadway Design Manual
Roadway Design Manual Manual Notice Archive by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2009-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective
More informationBridge Failures in Alberta
Introduction Bridge Failures in Alberta Bridges are inspected for three primary reasons safety of bridge system maintenance of bridges management of bridge system Inventory or management of the system
More informationPLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION
Page 1 of 6 RECOMMENDED PRACTICES PART SECTION SUB-SECTION HIGHWAY SIGNS GENERAL General Proper positioning of signs is an important element in the overall control of traffic within a roadway network.
More informationChapter 9 Maintenance
Chapter 9: 9-1.0 Introduction Maintenance The maintenance of bikeways is closely linked to bicyclists safety and the preservation of the bikeway function and investment. Poor maintenance, resulting in
More informationExisting conditions of each bridge and repair plan are presented in Table
2.2.2.5 Drainage Structure (1) Bridge Along the concerned section of this project road, there are 4 constructed bridges. The carriageway widths of existing bridges are designed to fit with existing road
More informationS.R.: CLASSIFICATION 100 STRAHNET Highway: 0 -Not a STRAHNET hwy 101 Parallel Structure: N -No bridge exists
Structum: 59 JDOT SI and A Sheet ame: US, 9 AD 46 OVER JOES ROAD S.R.: 76. SD/FO- -StructurallyDeficient IDETIFICATIO ISPECTIO State: 4 ew Jersey 8 Struc um: 59 9 Frequency: 4 months 9 Inspection Date:
More informationDriveway Design Criteria
Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved
More informationBridge Design Preliminary Bridge Design Example 1 / 6 Spring 2012 updated 1/27/2012
Bridge Design Preliminary Bridge Design Example 1 / 6 Perform a preliminary design for a bridge on a state highway over a large creek in rural Alabama. Produce a construction layout drawing showing profile
More information3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN
maintenance, and erosion. Stability is required to maintain the integrity of the pavement structure, and a slope stability analysis should be conducted for cuts and fills greater than 15 feet. For lower
More informationAppendix B Existing ADOT Data Parameters
Appendix B Existing ADOT Data Parameters Appendix 08/04/03 HPMS by Item Number All records 1 Year of Submittal 2 State Code 3 English or Metric Reporting Units 4 County Code 5 Section Identification (ID)
More informationPROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT
PROJECT NO. 093 MA 199 H 5807 01C FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENI HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT (INTERSECTION IMPROVEMENT) US 93/US 60 FINAL PROJECT ASSESSMENT April
More informationWork Zone Traffic Safety
Work Zone Traffic Safety Summary The Hazard: death or serious injury from being struck by vehicles or equipment in work zones. Who is at risk: streets/highways, utilities and other public works department
More informationEast Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study
East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study Houston, TX Technical Memorandum April 15 th, 2009 Prepare by: 2950 North Loop West, Ste. 900 Houston, TX 77092
More informationDISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (17-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual
DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.
More informationOctober 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)
October 2004 REVISIONS (2) Chapter 11 HORIZONTAL ALIGNMENT SUPERELEVATION DEVELOPMENT 11.3(2) Chapter 12 VERTICAL ALIGNMENT VERTICAL CURVES PASSING SIGHT DISTANCE 12.5(2) VERTICAL CURVES STOPPING SIGHT
More informationAlberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999
Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,
More informationABC D BC ecision Ma ion trix
ABC Decision Matrix Presenters Timothy D. Fields, P.E. Transportation Principal Engineer Bridge Consultant Design Ashley Heredia Transportation Engineer II Bridge Design 1 Connecticut DOT s ABC Decision
More informationPoor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns
Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement
More informationDESIGN EXCEPTION MANUAL
DESIGN EXCEPTION MANUAL 2004 U.S. Customary English Units DESIGN EXCEPTION PROCEDURE A. General When conditions warrant, a design exception may be granted for a project design that proposes one or more
More informationADA Operations Contact Info
Intro ADA Operations Contact Info Todd Grugel ph: 651-366-3531 email: todd.grugel@state.mn.us Joe Zilka ph: 651-366-3311 email: joseph.zilka@state.mn.us Harvey Unruh ph: 651-216-2912 email: harvey.unruh@state.mn.us
More informationUnderwater Inspection of Bridges Overview of a Statewide Program
8 TRANSPORTATION RESEARCH RECORD 268 Underwater Inspection of Bridges Overview of a Statewide Program R. RICHARD AVENT AND MARSHALL D. WHITMER III A comprehensive statewide underwater bridge inspection
More informationFigure 3B-1. Examples of Two-Lane, Two-Way Marking Applications
Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones
More informationKDOT Access Management Policy (AMP)
KDOT Access Management Policy (AMP) (January 2013 Edition) Errata KDOT intends to correct these errors during the next revision to the Policy. Corrections are denoted in red text with a solid line through
More informationGeometric Design Tables
Design Manual Chapter 5 - Roadway Design 5C - Geometric Design Criteria 5C-1 Geometric Design Tables A. General The following sections present two sets of design criteria tables - Preferred Roadway Elements
More informationMEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9
MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates
More informationRoadway Design Manual
Roadway Design Manual Revised December 2013 2013 by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2013-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective
More informationNew two-lane bridge to replace the existing structure spanning the Maple River just south of the Village s central business district
New two-lane bridge to replace the existing structure spanning the Maple River just south of the Village s central business district Rehabilitate the old bridge Convert to a nonmotorized trail Restore
More informationAccess Management Standards
Access Management Standards Section 1: Application of Access Standards This chapter describes the Department's access management standards for access connections on the county roadway system. The standards
More informationPROPOSING A NEW PORTABLE DEVICE FOR BRIDGE SCOUR INSPECTION
PROPOSING A NEW PORTABLE DEVICE FOR BRIDGE SCOUR INSPECTION KISEOK KWAK Senior Researcher, Geotech. Eng. Res. Dept., Korea Institute of Construction Technology, 2311 Daehwa-dong, Ilsan-gu, Koyang City,
More informationWORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES
WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES April 1, 2017 WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES Table of Contents
More informationTRAFFIC CONTROL DEVICES FOR LOW VOLUME ROADS
PART 5. TRAFFIC CONTROL DEVICES FOR LOW VOLUME ROADS TABLE OF CONTENTS Chapter 5A. GENERAL Page Section 5A.1 Function............................................................... 5A-1 5A.2 Application............................................................
More information(This page left intentionally blank)
(This page left intentionally blank) 2011 Edition - Revision 1 Page 553 Section 5A.01 Function CHAPTER 5A. GENERAL 01 A low-volume road shall be defined for this Part of the Manual as follows: A. A low-volume
More informationOverview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?
Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy
More informationIntroduction to Roadway Design
Chapter Introduction to Roadway Design 1 This chapter lays the foundation for the Roadway Design course. You examine the roadway design workflow and the completed drawing files and review the project scope,
More informationADOT Maintenance Data Collection Guide
ADOT Maintenance Data Collection Guide January 1, 2009 Prepared for Arizona Department of Transportation Prepared by Jani Demaree and Cambridge Systematics, Inc. 100 CambridgePark Drive, Suite 400 ADOT
More informationINDEX. Geometric Design Guide for Canadian Roads INDEX
Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines
More informationCITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL
ve ha 8t G B A Mantorville Ave N 240th Ave 16th St NE 11th Ave NE K-M HIGH SCHOOL SUNRISE TRAIL TO MANTORVILLE MNTH 57 SUNSET TRAIL TO MANTORVILLE NE PARK 16TH ST NE TRAIL K-M ELEMENTARY SCHOOL K-M MIDDLE
More informationINDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:
INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.
More informationDesign of Suburban Highways
Design of Suburban Highways by David L. Heavey, P.E. TABLE OF CONTENTS Introduction...3 Design Speed, Posted Speed and Operating Speed...4 Median Types...5 Raised Medians...9 Common Suburban Roadway Typical
More informationAppendix A Crane Placement, Outrigger Pad, and Shoring Figures
Appendix A Crane Placement, Outrigger Pad, and Shoring Figures Appendix B Field Data and Inspection Report PONTIS Reporting http://highway.odot.state.or.us/cf/pontis/index.cfm?fuseaction=act_bridge...
More informationSPECIAL LAUNCHING METHODS
CHAPTER 18 SPECIAL LAUNCHING METHODS Special launching methods are needed when a restricted site prevents normal roller layout and launching by the standard skeleton launchingnose method. Space on either
More informationAppendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD
Appendix T CCMP 3.3.4 TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD 3.3.4 Trail Traffic and Transportation Design Multi-use trails have certain design standards, which vary depending on the agency that
More informationSECTION VII ROADWAY AND SITE IMPROVEMENTS
SECTION VII ROADWAY AND SITE IMPROVEMENTS TOC-VII.1 of 4 TABLE OF CONTENTS ROADWAY AND SITE IMPROVEMENTS No. Title I-1 Alley Intersection (Commercial Areas) I-2 Valley Gutter For 90 Intersection I-3 Typical
More informationADA PRESENTATION (CURB RAMPS)
ADA PRESENTATION (CURB RAMPS) ACECNJ/NJDOT/FHWA DESIGN SUMMIT Warren Howard New Jersey Department of Transportation May 21, 2013 ADA Curb Ramps NJDOT wants curb ramps to be designed & constructed properly
More informationAmerican Railway Engineering and Maintenance of Way Association Letter Ballot. Draft
American Railway Engineering and Maintenance of Way Association Letter Ballot 1. Committee and Subcommittee: Committee 5 Track Subcommittee 9 Road Crossings 2. Letter Ballot Number: 05-17-16 3. Assignment:
More informationTopic No January 2000 Manual on Uniform Traffic Studies Revised July Chapter 8 GAP STUDY
Chapter 8 8.1 PURPOSE GAP STUDY (1) The Gap Study is used to determine the size and the number of gaps in the vehicular traffic stream for unsignalized intersections and access points, pedestrian studies,
More informationTrans-Canada Highway 1 RW Bruhn Bridge Replacement
Trans-Canada Highway 1 RW Bruhn Bridge Replacement May 2016 RW Bruhn Bridge Project Objectives Improve safety, traffic flow and movement of goods Improve safety for pedestrians and cyclists Replace the
More informationSummary of HEC 18, Evaluating Scour at Bridges FHWA NHI Should really follow HEC 18, but this summary will get you the main points.
Summary of HEC 18, Evaluating Scour at Bridges FHWA NHI 01-001 Should really follow HEC 18, but this summary will get you the main points. 1: Determine scour analysis variables 2: Analyze long-term bed
More informationPerched Box Caisson Overview. January 2014
Perched Box Caisson Overview January 2014 Why perched box caissons? Perched box caissons are used to construct the portion of the river piers that will support the steel arch spans Construction can occur
More informationDesign Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope
Design Overview Section 4 Standard Plans for Design Fall, 2017 Ann Johnson, PE Services Brady Rutman, SRF Consulting Group Overview Design Basics Recommendations: The Zone System Driveway Crossings Pedestrian
More informationChapter 8 Chapter 8 VEHICLE GAP STUDY PURPOSE VEHICLE GAP STUDY (FIGURE 8-1)
Chapter 8 Chapter 8 Formatted: Heading 1 VEHICLE GAP STUDY 5.48.18.1 PURPOSE (1) The Vehicle Gap Study (Form No. 750-020-08) is used to determine the size and the number of gaps in the vehicular traffic
More informationDriving Indiana s Economic Growth
Driving Indiana s Economic Growth IRI/PCR/RUT Field Verification Kumar P. Dave Manager, Road & Pavement Asset Management & Programming, INDOT 03-06-2012 Organization Chart Pavement Division, INDOT David
More information