S.R.: CLASSIFICATION 100 STRAHNET Highway: 0 -Not a STRAHNET hwy 101 Parallel Structure: N -No bridge exists

Size: px
Start display at page:

Download "S.R.: CLASSIFICATION 100 STRAHNET Highway: 0 -Not a STRAHNET hwy 101 Parallel Structure: N -No bridge exists"

Transcription

1 Structum: 59 JDOT SI and A Sheet ame: US, 9 AD 46 OVER JOES ROAD S.R.: 76. SD/FO- -StructurallyDeficient IDETIFICATIO ISPECTIO State: 4 ew Jersey 8 Struc um: 59 9 Frequency: 4 months 9 Inspection Date: 7/4/ ext Inspection: 7/4/ 7 Facility Carried: US, 9 AD 46 9 Location:.5 MI.W.of GEO WASH BRI 9A FC Frequency: A 9A FC Inspection Date: A ext FC Inspection: A 5A Rte.(On/Under): -Route On Structure 5B Rte. Signing Prefix: -U.S. umbered 9B UW Frequency: A 9B UW Inspection Date: A ext UW Inspection: A Hwy 5C Level of Service: -Mainline 5D Rte. umber: 9C SI Frequency: A 9C SI Date: A ext SI: A 5E Directional Suffix: - ot Applicable % Responsibility : A SHD District: - orth County Code: Bergen 4 Place Code: Fort Lee, Bergen Mile Post: mi 6 Feature Intersected : JOES ROAD 6 Latitude: 4d 5'.6" 7 Longitude: 7d 58' 4.96" 98 Border Bridge Code: - ot Applicable (P) 99 Border Bridge umber: Unknown STRUCTURE TYPE AD MATERIALS 46 umber of Approach Spans : 45 umber of Spans Main Unit: 4A/B Main Span Material/Design: -Steel -Stringer/Girder Element Frequency: 4 months Element Inspection Date: 7/4/ ext Elem. Insp. Due: 7/4/ CLASSIFICATIO STRAHET Highway: -ot a STRAHET hwy Parallel Structure: -o bridge exists Direction of Traffic: --way traffic Temporary Structure: Blank 4 Highway System: -On the HS BIS Length: Y - Long Enough Toll Facility: -On free road 6 Functional Class: 4 -Urban Other Princ 7 Historical Significance: 5 -ot eligible for RHP Owner: JDOT Custodian: JDOT CODITIO 58 Deck: 4 -Poor 59 Super: 6 -Satisfactory 6 Sub: 6 -Satisfactory 6 Culvert: -ot applicable 6 Channel/Channel Protection: -ot applicable 7 Deck Type: - Conc..-Cast-in-Place LOAD RATIG AD POSTIG 8A Wearing Surface: -Latex Conc../Similar 65 Inventory Rating Method: - LF Load Factor 6 Operating Rating Method: -LF Load Factor 8B Membrane: 8C Deck Protection: 4A Type of Service On: 4B Type of Service Under: -Highway 66 Inventory Rating: HS7. 64 Operating Rating: HS45. AGE AD SERVICE 4 Posting status: A -Open, no restriction 5 -Highway-pedestrian 8A Lanes on: 4 8B Lanes Under: 9 Detour Length:. mi 9 ADT: 48,55 9 Truck ADT: 4 % Year of ADT: GEOMETRIC DATA Design Load: -Other or Unknown 7 Posting: 5 At/Above Legal Loads APPRAISAL 6A Bridge Rail: -Meets Standards 6C Approach Rail: -Substandard 6B Transition: -Substandard 6D Approach Rail Ends: -Substandard 67 Str. Evaluation: 6 68 Deck Geometry: 5 Above Tolerable 69 Underclearance, Vertical and Horizontal: 4 -Tolerable 48 Length Max Span: 6. ft 49 Structure Length: 64. ft 7 Waterway Adequacy: -ot applicable 7 Approach Alignment: 7-Above Min Criteria 5A Curb/Sdwlk Wdth L: 4.6 ft 5B Curb/Sidewalk Width R: 4.7 ft Width Curb to Curb 5: 58. ft 5 Width Out to Out: Approach Roadway Width: (w/ shoulders) Deck Area: 4,67.5 sq. ft - one - one 7 Year Built: 9 6 Year Reconstructed: Skew: 9. 5 Structure Flared: -o flare 5 Minimum Vertical Clearance Over Bridge: 54A Minimum Vertical Underclearance Reference: 54B Minimum Vertical Underclearance: 55A Minimum Lateral Underclearance Reference R: 58 ft Median: ft H -Hwy beneath struct 4.5 ft H -Hwy beneath struct Closed Med w/barriers Scour Critical: -ot Over Waterway PROPOSED IMPROVEMETS 94 Bridge Cost: $ 75 Type of Work: 95 Roadway Cost: $ 76 Length of Improvment: 96 Total Cost: $ $ 996,86 4 Future ADT: 59,5 97 Year of Cost Estimate: 5 Year of Future ADT: 8 avigation Control: AVIGATIO DATA -/A-o waterway 55B Minimum Lateral Undrclearance R: 5.5 ft 9 Vertical Clearance:. ft 4 Horizontal Clearance:. ft 56 Minimum Lateral Undrclearance L:. ft Pier Protection: ot Applicable 6 Lift Bridge Vertical Clearance: ft ELEMET CODITIO STATE DATA Str Unit Elm/Env Description / P Conc Deck/Rigid Ov (SF) 7/ Open Gird/Enc Stl 5/ R/Conc Abutment / Compressn Joint Seal / Enclosed Bearing / R/Conc Approach Slab Units Total Qty % in Qty. St. % in Qty. St. % in Qty. St. % in 4 Qty. St. 4 % in 5 Qty. St. 5 4,67 % % 4,67 % % % 85 8 % 68 % 7 % % % % 66 % % % % 68 % % 68 % % % % % % % % 5 % 5 5 % 5 % % % JDOT InspectionSIAEnglisho Wed 8// :48:7 (v.) Page of 4

2 Structum: 59 JDOT SI and A Sheet Str Unit Elm/Env Description / Conc Bridge Railing / Other Bridge Railing 58/ Deck Cracking SmFlag 59/ Soffit Smart Flag 5/ Curbs/Walks - Conc 56/ Wingwalls - Abut Units Total Qty % in Qty. St. % in Qty. St. % in Qty. St. % in 4 Qty. St. 4 % in 5 Qty. St % 56 4 % 8 % 5 % % 8 77 % 98 % % % % % % % % % % % % % % 8 % % 8 % % % 9 % 98 7 % 5 % % % JDOT BRIDGE FIELDS Brkey: 59 Inspkey GEERAL COUTER MEASURES (V.) TEMPORARY STRUCTURES (A) Town: (AA) Route: (AD) Admin: Fort Lee Boro +9 (AE) Alt Agency: STRUCTURE AD APPURTEACES (AC) on-inv Feature: (AF) Alt Struct #: (AG) Rail Type: (AH) Rail Height:: (AJ) Slope Protection: (AK) Abutment: (AL) Pier: (AM) Depth of Fill: (AP) Fender System: (AT) Special Material : (AT) Special Material : 47 Concrete Balustrade.8 Full Height -.8 one (AU) Add Struct: (AV) Widen Stru: Material Design st Widen nd Widen FUDIG AD COST (BL) Discretionary: (BM) Fed Job #: BR BIS75 (B) State Job #: 54 (BO) St Maint Cost: (BP) Brdg Demo SCOUR EVALUATIO (FA) FHWA Category: (FB) Stage Date: //9 (FC) Stage Consultant: (FD) Prioritization: (FE) Sufficiency: (FF)Date Stage II //9 (FG) Stage II Consultant: (FH) Crit. Element: (FI) Recommended: (GV) Bridge: (GW) Shoring: (GX) Reports: (GY) Measures: (FJ) Cost: (GZ) Cond Desc: (FK) Installed: (FL) Monitoring Reqd: PROJECT PROGRAMMIG (HB) Bridge List ID: (HC) Consultant (HD) -Cy Insp Contr: STC L (HE) Proceed Date: I //9 II 4/6/4 (HF) State Proj Mgr: MAK BRIDGE OISE BARRIER (HA) Type H HS S - M Misc Material : (CH). : Height : -- : -- PAITIG (GB) Environment: (GR) Last Painting: /9 (GA) Painting Req: FECIG (AQ) Chain Link:. ft (F) Warranted: SIG STRUCTURES (GS) Overhead: (GT) Cantilever: (GU) Fascia Mounted: POSTIGS LOAD RATIGS Inv Opr (BQ) (CA) (BR) (BS) (BT) (BU) (BV) (CB) (CC) (CD) (CE) (CF) (CH) L MISCELLAEOUS (CQ) Bridge List: (BK) Overstress %: (FV) Route Milepost: X (FM) Incident Reprtd: (AO) Utilities: : : : 4: (CR) Off-Route Bridge: (BB) Orphan Bridge: (A) Plan Available: Y (FX) Fed Error Uncorr (FW) Estimated ADT RAILROAD (BC) USRA Code: (CG) Load Type: (BD ) Rail On/Under: (CG) Tons (BD )RRs intersected: (AI) Speed: (BE) Rail Milepost: -.6 JDOT InspectionSIAEnglisho Wed 8// :48:7 (v.) Page of 4

3 Structum: JDOT ISPECTIO FIELDS 59 JDOT SI and A Sheet (V.) GEERAL MISCELLAEOUS REMARKS PAITIG (CI) Cycle umber: 6 (B) Deletion Code: (BF) Deck: : R (GD) Fascia Beam: (CJ) Insp Type: S (BA) Apr Rdwy Cond: 6 : O (GE) Fascia B. Flange: (CK) Inspection Crew: S (CM) Consultant: L (CO) Prev Consultant: A47 (CP) Federal Report: ISPECTIO DATES (AW) Mech/Electrical: //9 (AX) Deck: //9 (AY) Special Testing: //9 (GC) Paint: //9 (AR) Equipment: : : FATIGUE DETAIL (AZ) Location: Location : Location : I-DEPTH PI-HAGER (FR) Consultant: (FS) : P 4: T 5: D (BG) Super: : D : 9 : Z (BH) Sub: : O : C : (BI) Channel (BJ) Culvert (GF) Interior Beam: (GH) Interior B. Flange: (GI) Beam Ends: (GJ) Connections: (GK) Bracings: (GL) Bearings: (GM) Substructure: (G) Above Deck Super: (GO) Railings/Fence: (GP) Remarks : Conc. Encased Steel Stringers. : (AS) Testing: : : FECIG (FO) Pedestrian Traffic: (GQ) Remarks : Bearings-Concealed. : (FT) Combo: (FP) Improvement Cost: $ Thousands (FQ) FCM/Pin-Hngr Insp Date: //9 ROADWAY DATA Bridge Id: SRI 59 (V.) ROADWAY IDETIFICATIO TRAFFIC AD ACCIDETS BI Roadway?: Roadway ame: Item 5A: Item 5B: Item 5C: US, 9 and 46 Item 5D: Item 5E HWY ETWORKS AD SERVICE CLASSIFICATIO Milepost: Base Hwy etwork: Toll Facility: A LRS Inventory Route 6 Functional Class: mi 4 B Subroute o.: TraffDirection: ALTERATE CLASSIFICATIO Strahnet Hwy: Transit Rt: 4 HS System: Emergency 5 Fed. Lands Hwy: Truck Hwy et: School Bus: 8 Lanes : um Median: Road Speed: ADTclass: 9 ADTtotal: Year of ADT: 4 Future ADT: 5 Year of Future ADT: 9 Truck ADTT % : 9 Bypass Length: Detour Speed: CLEARACES Vertical Clearance: 47 Invent Route Horiz Clear: (DJ) Min Vert Undrclr: WIDTHS Appr Rdwy Width: 5 Brdg Rdwy With Curb-Curb: 4 45 mph mi 5 mph ft 9. ft. ft 58 ft 58. ft JDOT InspectionSIAEnglisho Wed 8// :48:7 (v.) Page of 4

4 Structum: ROADWAY DATA 59 JDOT SI and A Sheet Bridge Id: SRI 59 ROADWAY IDETIFICATIO (V.) TRAFFIC AD ACCIDETS BI Roadway?: Roadway ame: Item 5A: Item 5B: Item 5C: Item 5D: Jones Road 5 Item 5E HWY ETWORKS AD SERVICE CLASSIFICATIO Milepost: Base Hwy etwork: Toll Facility: A LRS Inventory Route 6 Functional Class:. mi 9 B Subroute o.: TraffDirection: ALTERATE CLASSIFICATIO Strahnet Hwy: Transit Rt: 4 HS System: Emergency 5 Fed. Lands Hwy: Truck Hwy et: School Bus: 8 Lanes : um Median: Road Speed: ADTclass: 9 ADTtotal: Year of ADT: 4 Future ADT: 5 Year of Future ADT: 9 Truck ADTT % : 9 Bypass Length: Detour Speed: CLEARACES Vertical Clearance: 47 Invent Route Horiz Clear: (DJ) Min Vert Undrclr: WIDTHS Appr Rdwy Width: 5 Brdg Rdwy With Curb-Curb: 5 mph 65. mi 5 mph 4.4 ft.7 ft. ft - ft -. ft JDOT InspectionSIAEnglisho Wed 8// :48:7 (v.) Page 4 of 4

5 Structum: 59 JDOT SI and A Sheet ame: US, 9 AD 46 OVER JOES ROAD S.R.: 76. SD/FO- -StructurallyDeficient IDETIFICATIO ISPECTIO State: 4 ew Jersey 8 Struc um: 59 9 Frequency: 4 months 9 Inspection Date: 7/4/ ext Inspection: 7/4/ 7 Facility Carried: US, 9 AD 46 9 Location:.5 MI.W.of GEO WASH BRI 9A FC Frequency: A 9A FC Inspection Date: A ext FC Inspection: A 5A Rte.(On/Under): -Route On Structure 5B Rte. Signing Prefix: -U.S. umbered 9B UW Frequency: A 9B UW Inspection Date: A ext UW Inspection: A Hwy 5C Level of Service: -Mainline 5D Rte. umber: 9C SI Frequency: A 9C SI Date: A ext SI: A 5E Directional Suffix: - ot Applicable % Responsibility : A SHD District: - orth County Code: Bergen 4 Place Code: Fort Lee, Bergen Mile Post: mi 6 Feature Intersected : JOES ROAD 6 Latitude: 4d 5'.6" 7 Longitude: 7d 58' 4.96" 98 Border Bridge Code: - ot Applicable (P) 99 Border Bridge umber: Unknown STRUCTURE TYPE AD MATERIALS 46 umber of Approach Spans : 45 umber of Spans Main Unit: 4A/B Main Span Material/Design: -Steel -Stringer/Girder Element Frequency: 4 months Element Inspection Date: 7/4/ ext Elem. Insp. Due: 7/4/ CLASSIFICATIO STRAHET Highway: -ot a STRAHET hwy Parallel Structure: -o bridge exists Direction of Traffic: --way traffic Temporary Structure: Blank 4 Highway System: -On the HS BIS Length: Y - Long Enough Toll Facility: -On free road 6 Functional Class: 4 -Urban Other Princ 7 Historical Significance: 5 -ot eligible for RHP Owner: JDOT Custodian: JDOT CODITIO 58 Deck: 4 -Poor 59 Super: 6 -Satisfactory 6 Sub: 6 -Satisfactory 6 Culvert: -ot applicable 6 Channel/Channel Protection: -ot applicable 7 Deck Type: - Conc..-Cast-in-Place LOAD RATIG AD POSTIG 8A Wearing Surface: -Latex Conc../Similar 65 Inventory Rating Method: - LF Load Factor 6 Operating Rating Method: -LF Load Factor 8B Membrane: 8C Deck Protection: 4A Type of Service On: 4B Type of Service Under: -Highway 66 Inventory Rating: HS7. 64 Operating Rating: HS45. AGE AD SERVICE 4 Posting status: A -Open, no restriction 5 -Highway-pedestrian 8A Lanes on: 4 8B Lanes Under: 9 Detour Length:. mi 9 ADT: 48,55 9 Truck ADT: 4 % Year of ADT: GEOMETRIC DATA Design Load: -Other or Unknown 7 Posting: 5 At/Above Legal Loads APPRAISAL 6A Bridge Rail: -Meets Standards 6C Approach Rail: -Substandard 6B Transition: -Substandard 6D Approach Rail Ends: -Substandard 67 Str. Evaluation: 6 68 Deck Geometry: 5 Above Tolerable 69 Underclearance, Vertical and Horizontal: 4 -Tolerable 48 Length Max Span: 6. ft 49 Structure Length: 64. ft 7 Waterway Adequacy: -ot applicable 7 Approach Alignment: 7-Above Min Criteria 5A Curb/Sdwlk Wdth L: 4.6 ft 5B Curb/Sidewalk Width R: 4.7 ft Width Curb to Curb 5: 58. ft 5 Width Out to Out: Approach Roadway Width: (w/ shoulders) Deck Area: 4,67.5 sq. ft - one - one 7 Year Built: 9 6 Year Reconstructed: Skew: 9. 5 Structure Flared: -o flare 5 Minimum Vertical Clearance Over Bridge: 54A Minimum Vertical Underclearance Reference: 54B Minimum Vertical Underclearance: 55A Minimum Lateral Underclearance Reference R: 58 ft Median: ft H -Hwy beneath struct 4.5 ft H -Hwy beneath struct Closed Med w/barriers Scour Critical: -ot Over Waterway PROPOSED IMPROVEMETS 94 Bridge Cost: $ 75 Type of Work: 95 Roadway Cost: $ 76 Length of Improvment: 96 Total Cost: $ $ 996,86 4 Future ADT: 59,5 97 Year of Cost Estimate: 5 Year of Future ADT: 8 avigation Control: AVIGATIO DATA -/A-o waterway 55B Minimum Lateral Undrclearance R: 5.5 ft 9 Vertical Clearance:. ft 4 Horizontal Clearance:. ft 56 Minimum Lateral Undrclearance L:. ft Pier Protection: ot Applicable 6 Lift Bridge Vertical Clearance: ft ELEMET CODITIO STATE DATA Str Unit Elm/Env Description / P Conc Deck/Rigid Ov (SF) 7/ Open Gird/Enc Stl 5/ R/Conc Abutment / Compressn Joint Seal / Enclosed Bearing / R/Conc Approach Slab Units Total Qty % in Qty. St. % in Qty. St. % in Qty. St. % in 4 Qty. St. 4 % in 5 Qty. St. 5 4,67 % % 4,67 % % % 85 8 % 68 % 7 % % % % 66 % % % % 68 % % 68 % % % % % % % % 5 % 5 5 % 5 % % % JDOT InspectionSIAEnglisho Wed 8// :48:7 (v.) Page of 4

6 Structum: 59 JDOT SI and A Sheet Str Unit Elm/Env Description / Conc Bridge Railing / Other Bridge Railing 58/ Deck Cracking SmFlag 59/ Soffit Smart Flag 5/ Curbs/Walks - Conc 56/ Wingwalls - Abut Units Total Qty % in Qty. St. % in Qty. St. % in Qty. St. % in 4 Qty. St. 4 % in 5 Qty. St % 56 4 % 8 % 5 % % 8 77 % 98 % % % % % % % % % % % % % % 8 % % 8 % % % 9 % 98 7 % 5 % % % JDOT BRIDGE FIELDS Brkey: 59 Inspkey GEERAL COUTER MEASURES (V.) TEMPORARY STRUCTURES (A) Town: (AA) Route: (AD) Admin: Fort Lee Boro +9 (AE) Alt Agency: STRUCTURE AD APPURTEACES (AC) on-inv Feature: (AF) Alt Struct #: (AG) Rail Type: (AH) Rail Height:: (AJ) Slope Protection: (AK) Abutment: (AL) Pier: (AM) Depth of Fill: (AP) Fender System: (AT) Special Material : (AT) Special Material : 47 Concrete Balustrade.8 Full Height -.8 one (AU) Add Struct: (AV) Widen Stru: Material Design st Widen nd Widen FUDIG AD COST (BL) Discretionary: (BM) Fed Job #: BR BIS75 (B) State Job #: 54 (BO) St Maint Cost: (BP) Brdg Demo SCOUR EVALUATIO (FA) FHWA Category: (FB) Stage Date: //9 (FC) Stage Consultant: (FD) Prioritization: (FE) Sufficiency: (FF)Date Stage II //9 (FG) Stage II Consultant: (FH) Crit. Element: (FI) Recommended: (GV) Bridge: (GW) Shoring: (GX) Reports: (GY) Measures: (FJ) Cost: (GZ) Cond Desc: (FK) Installed: (FL) Monitoring Reqd: PROJECT PROGRAMMIG (HB) Bridge List ID: (HC) Consultant (HD) -Cy Insp Contr: STC L (HE) Proceed Date: I //9 II 4/6/4 (HF) State Proj Mgr: MAK BRIDGE OISE BARRIER (HA) Type H HS S - M Misc Material : (CH). : Height : -- : -- PAITIG (GB) Environment: (GR) Last Painting: /9 (GA) Painting Req: FECIG (AQ) Chain Link:. ft (F) Warranted: SIG STRUCTURES (GS) Overhead: (GT) Cantilever: (GU) Fascia Mounted: POSTIGS LOAD RATIGS Inv Opr (BQ) (CA) (BR) (BS) (BT) (BU) (BV) (CB) (CC) (CD) (CE) (CF) (CH) L MISCELLAEOUS (CQ) Bridge List: (BK) Overstress %: (FV) Route Milepost: X (FM) Incident Reprtd: (AO) Utilities: : : : 4: (CR) Off-Route Bridge: (BB) Orphan Bridge: (A) Plan Available: Y (FX) Fed Error Uncorr (FW) Estimated ADT RAILROAD (BC) USRA Code: (CG) Load Type: (BD ) Rail On/Under: (CG) Tons (BD )RRs intersected: (AI) Speed: (BE) Rail Milepost: -.6 JDOT InspectionSIAEnglisho Wed 8// :48:7 (v.) Page of 4

7 Structum: JDOT ISPECTIO FIELDS 59 JDOT SI and A Sheet (V.) GEERAL MISCELLAEOUS REMARKS PAITIG (CI) Cycle umber: 6 (B) Deletion Code: (BF) Deck: : R (GD) Fascia Beam: (CJ) Insp Type: S (BA) Apr Rdwy Cond: 6 : O (GE) Fascia B. Flange: (CK) Inspection Crew: S (CM) Consultant: L (CO) Prev Consultant: A47 (CP) Federal Report: ISPECTIO DATES (AW) Mech/Electrical: //9 (AX) Deck: //9 (AY) Special Testing: //9 (GC) Paint: //9 (AR) Equipment: : : FATIGUE DETAIL (AZ) Location: Location : Location : I-DEPTH PI-HAGER (FR) Consultant: (FS) : P 4: T 5: D (BG) Super: : D : 9 : Z (BH) Sub: : O : C : (BI) Channel (BJ) Culvert (GF) Interior Beam: (GH) Interior B. Flange: (GI) Beam Ends: (GJ) Connections: (GK) Bracings: (GL) Bearings: (GM) Substructure: (G) Above Deck Super: (GO) Railings/Fence: (GP) Remarks : Conc. Encased Steel Stringers. : (AS) Testing: : : FECIG (FO) Pedestrian Traffic: (GQ) Remarks : Bearings-Concealed. : (FT) Combo: (FP) Improvement Cost: $ Thousands (FQ) FCM/Pin-Hngr Insp Date: //9 ROADWAY DATA Bridge Id: SRI 59 (V.) ROADWAY IDETIFICATIO TRAFFIC AD ACCIDETS BI Roadway?: Roadway ame: Item 5A: Item 5B: Item 5C: US, 9 and 46 Item 5D: Item 5E HWY ETWORKS AD SERVICE CLASSIFICATIO Milepost: Base Hwy etwork: Toll Facility: A LRS Inventory Route 6 Functional Class: mi 4 B Subroute o.: TraffDirection: ALTERATE CLASSIFICATIO Strahnet Hwy: Transit Rt: 4 HS System: Emergency 5 Fed. Lands Hwy: Truck Hwy et: School Bus: 8 Lanes : um Median: Road Speed: ADTclass: 9 ADTtotal: Year of ADT: 4 Future ADT: 5 Year of Future ADT: 9 Truck ADTT % : 9 Bypass Length: Detour Speed: CLEARACES Vertical Clearance: 47 Invent Route Horiz Clear: (DJ) Min Vert Undrclr: WIDTHS Appr Rdwy Width: 5 Brdg Rdwy With Curb-Curb: 4 45 mph mi 5 mph ft 9. ft. ft 58 ft 58. ft JDOT InspectionSIAEnglisho Wed 8// :48:7 (v.) Page of 4

8 Structum: ROADWAY DATA 59 JDOT SI and A Sheet Bridge Id: SRI 59 ROADWAY IDETIFICATIO (V.) TRAFFIC AD ACCIDETS BI Roadway?: Roadway ame: Item 5A: Item 5B: Item 5C: Item 5D: Jones Road 5 Item 5E HWY ETWORKS AD SERVICE CLASSIFICATIO Milepost: Base Hwy etwork: Toll Facility: A LRS Inventory Route 6 Functional Class:. mi 9 B Subroute o.: TraffDirection: ALTERATE CLASSIFICATIO Strahnet Hwy: Transit Rt: 4 HS System: Emergency 5 Fed. Lands Hwy: Truck Hwy et: School Bus: 8 Lanes : um Median: Road Speed: ADTclass: 9 ADTtotal: Year of ADT: 4 Future ADT: 5 Year of Future ADT: 9 Truck ADTT % : 9 Bypass Length: Detour Speed: CLEARACES Vertical Clearance: 47 Invent Route Horiz Clear: (DJ) Min Vert Undrclr: WIDTHS Appr Rdwy Width: 5 Brdg Rdwy With Curb-Curb: 5 mph 65. mi 5 mph 4.4 ft.7 ft. ft - ft -. ft JDOT InspectionSIAEnglisho Wed 8// :48:7 (v.) Page 4 of 4

2016 UNDERWATER BRIDGE INSPECTION REPORT. 81(ENCHANTED LANE) over CHANNEL. Date of Inspection: Equipment Used: 09/07/2016

2016 UNDERWATER BRIDGE INSPECTION REPORT. 81(ENCHANTED LANE) over CHANNEL. Date of Inspection: Equipment Used: 09/07/2016 2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # 27A34 81(ENCHANTED LANE) over CHANNEL DISTRICT: Metro COUNTY: Hennepin CITY/TOWNSHIP: Shorewood STATE: Minnesota Date of Inspection: Equipment Used: 09/07/2016

More information

PED (OLD TWNS RD) over OTTER TAIL RIVER

PED (OLD TWNS RD) over OTTER TAIL RIVER 2016 UDERWATER BRIDGE ISPECTIO REPORT BRIDGE # L0885 PED (OLD TWS RD) over OTTER TAIL RIVER DISTRICT: District 4 COUTY: Otter Tail CITY/TOWSHIP: MAIE STATE: Minnesota Date of Inspection: Equipment Used:

More information

2016 UNDERWATER BRIDGE INSPECTION REPORT. CR 52 over CALDWELL BROOK. Date of Inspection: Equipment Used: 06/04/2016. County Highway Agency

2016 UNDERWATER BRIDGE INSPECTION REPORT. CR 52 over CALDWELL BROOK. Date of Inspection: Equipment Used: 06/04/2016. County Highway Agency 2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # 91725 CR 52 over CALDWELL BROOK DISTRICT: District 1 COUNTY: Koochiching CITY/TOWNSHIP: T - 151 R - 27 STATE: Minnesota Date of Inspection: Equipment Used:

More information

An Overview: 5000 MW Ultramega Solar Park at Dholera. For the positive response to Expression of Interest (EoI)

An Overview: 5000 MW Ultramega Solar Park at Dholera. For the positive response to Expression of Interest (EoI) An Overview: 5000 MW Ultramega Solar Park at Dholera For the positive response to Expression of Interest (EoI) Outline Location Plant Capacity. Status of the project Modalities of implementation of Solar

More information

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 10 over POMME DE TERRE RIVER. Date of Inspection: Equipment Used: 06/18/2016. County Highway Agency

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 10 over POMME DE TERRE RIVER. Date of Inspection: Equipment Used: 06/18/2016. County Highway Agency 2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # 75501 CSAH 10 over POMME DE TERRE RIVER DISTRICT: District 4 COUNTY: Stevens CITY/TOWNSHIP: DARNEN STATE: Minnesota Date of Inspection: Equipment Used:

More information

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 14 over BUTLER CREEK. Date of Inspection: Equipment Used: 06/21/2016. County Highway Agency

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 14 over BUTLER CREEK. Date of Inspection: Equipment Used: 06/21/2016. County Highway Agency 2016 UDERWATER BRIDGE ISPECTIO REPORT BRIDGE # 25534 CSAH 14 over BUTLER CREEK DISTRICT: District 6 COUTY: Goodhue CITY/TOWSHIP: LEO STATE: Minnesota Date of Inspection: Equipment Used: 06/21/2016 Owner:

More information

Premium Report 27/07/2017

Premium Report 27/07/2017 TABL O COTT Images...1 Length Diagram...4 Pitch Diagram...5 Area Diagram...6 otes Diagram...7 Penetrations Diagram...8 Report ummary...9 MAURMT In this 3D model, facets appear as semi-transparent to reveal

More information

Recommended Alternatives

Recommended Alternatives 62 Corridor Improvements As part of the Washington Street Corridor Study, improvement recommendations were developed to address vehicle, pedestrian, bicycle and transit transportation needs within the

More information

Culvert Safety Inspection Report

Culvert Safety Inspection Report Culvert Safety Inspection Report Facility Federal Structure ID Inspector Name Agency/Consultant Inspection Date LEGEND Haggerty Rd (South) N/A RL/JF GLEG 1/26/2016 9 New Feature Latitude Longitude Struc

More information

windpro WP A15-Lingewaard WTGs Shadow receptor-input

windpro WP A15-Lingewaard WTGs Shadow receptor-input SHADOW - Main Result Calculation: SHADOW calculation (5 x V150 @ 166m, +LT CORR, NO MITIGATION) Maximum distance for influence Calculate only when more than 20 % of sun is covered by the blade Please look

More information

BRIDGE REPLACEMENT AND REHABILITATION PROGRAM

BRIDGE REPLACEMENT AND REHABILITATION PROGRAM BRIDGE REPLACEMENT AND REHABILITATION PROGRAM INTRODUCTION An integral element of the City's transportation infrastructure is a network of bridges designed to carry vehicular, railroad, light rail, pedestrian,

More information

Geometric Style Die Head Chasers

Geometric Style Die Head Chasers Geometric Style Die Head Chasers REGULAR EXTENDED OFFSET REGULAR STYLE "K" STYLE "K" ESSENTIALS: The following pages list Geometric style die head chasers in many popular diameter and pitch combinations.

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

Non-Motorized Overpass at SR 5/US1

Non-Motorized Overpass at SR 5/US1 Non-Motorized Overpass at SR 5/US1 And SR 97/SW th Street (Bird Road) Executive Summary March 9, 17 Prepared By: MARLIN Engineering Inc 17 NW th Avenue, Ste. 1 Plantation, FL 33313 P: 35.77.7575 www.marlinengineering.com

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

Appendix A Crane Placement, Outrigger Pad, and Shoring Figures

Appendix A Crane Placement, Outrigger Pad, and Shoring Figures Appendix A Crane Placement, Outrigger Pad, and Shoring Figures Appendix B Field Data and Inspection Report PONTIS Reporting http://highway.odot.state.or.us/cf/pontis/index.cfm?fuseaction=act_bridge...

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

Are We There Yet? IPv6 as Related to GDP per Capita. By Alain Durand November 28 th,` 2016

Are We There Yet? IPv6 as Related to GDP per Capita. By Alain Durand November 28 th,` 2016 Are We There Yet? as Related to By Alain Durand November 28 th,` 2016 Quesons for this Study: I. Where are we across the globe with adoption? a. Is deployed uniformly? b. Is there a rich country/poor country

More information

SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN

SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN Table of Contents Page No 1A.1 GENERAL...1 1A.1.1 DESIGN CONTROLS...1 1A.2 MAINLINE ROADWAYS...4 1A.2.1 ROADWAY DESIGNATION...4 1A.2.2 DESIGN SPEED...4 1A.2.3

More information

BOWRAP BOWLING LEAGUE FIXTURE GENERATION

BOWRAP BOWLING LEAGUE FIXTURE GENERATION BOWRAP BOWLING LEAGUE FIXTURE GENERATION Version 2.1 Ross Kavanagh secretary@cgleague.co.uk 2012 Ross Kavanagh and David Sanderson Contents Introduction... 2 Basic principles... 2 Planning a season...

More information

Goodyear Polyglas Tire Date Coding

Goodyear Polyglas Tire Date Coding Goodyear Polyglas Tire Date Coding M A R C U S A N G H E L R I C K S A U V E Ever wonder what the date code is on your Goodyear tires and if they are original? This article is written to answer that, and

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Airport Circle Elimination, CR 563, 646 S9820 Intersection, operational, and safety improvements at the intersection of Tilton Road (CR 563) and Delilah Road (CR 646) will include elimination of the circle,

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

Bridge Design Preliminary Bridge Design Example 1 / 6 Spring 2012 updated 1/27/2012

Bridge Design Preliminary Bridge Design Example 1 / 6 Spring 2012 updated 1/27/2012 Bridge Design Preliminary Bridge Design Example 1 / 6 Perform a preliminary design for a bridge on a state highway over a large creek in rural Alabama. Produce a construction layout drawing showing profile

More information

STUDY PROCESS & SCHEDULE

STUDY PROCESS & SCHEDULE STUDY PROCESS & SCHEDULE Route Centennial Bridge Study KDOT Project No. -52 KA-3229-01 STUDY OVERVIEW STUDY SCHEDULE The Kansas Department of Transportation (KDOT) has identified a future need to replace

More information

GEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION

GEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION TABLE 1A CG-6 CURB AND GUTTER SECTION HORIZONTAL AND VERTICAL CONTROLS CURB AND GUTTER ROADWAYS MAXIMUM 3:1 CUT OR FILL SLOPE CURVE DATA MIN. SIGHT DISTANCE PROJECTED TRAFFIC VOLUME (ADT) MIN. DESIGN SPEED

More information

CE 535, Spring 2002 Preliminary Design Example 1 / 6

CE 535, Spring 2002 Preliminary Design Example 1 / 6 CE 535, Spring 2002 Preliminary Design Example 1 / 6 Perform a preliminary design for a bridge on a state highway over a large creek in rural Alabama. Produce a construction layout drawing showing profile

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

Geometric Design Tables

Geometric Design Tables Design Manual Chapter 5 - Roadway Design 5C - Geometric Design Criteria 5C-1 Geometric Design Tables A. General The following sections present two sets of design criteria tables - Preferred Roadway Elements

More information

section 4 Existing Conditions, Issues, and Options

section 4 Existing Conditions, Issues, and Options section 4 Existing Conditions, Issues, and Options 4.0 Existing Conditions, Issues, and Options This section analyzes each segment of the corridor on a street to street basis. Each segment is discussed

More information

US Route 24 Eastbound (Quincy Memorial Bridge) Over the Mississippi River

US Route 24 Eastbound (Quincy Memorial Bridge) Over the Mississippi River Purpose and Need March 2015 US Route 24 Eastbound (Quincy Memorial Bridge) Over the Mississippi River Adams County - Quincy, IL Marion County, MO Region 4 District 6 Table of Contents I. Purpose of the

More information

Gerald P. Oliveto, P.E. George Franz NJDOT

Gerald P. Oliveto, P.E. George Franz NJDOT Gerald P. Oliveto, P.E. George Franz NJDOT Bridge preservation is defined as actions or strategies that prevent, delay or reduce deterioration of bridges or bridge elements, restore the function of existing

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2) October 2004 REVISIONS (2) Chapter 11 HORIZONTAL ALIGNMENT SUPERELEVATION DEVELOPMENT 11.3(2) Chapter 12 VERTICAL ALIGNMENT VERTICAL CURVES PASSING SIGHT DISTANCE 12.5(2) VERTICAL CURVES STOPPING SIGHT

More information

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County. SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i July 25, 2016 6. HIGHWAY MATTERS A. PLAN PROJECT UPDATES Attached for your reference please find project updates on ongoing VDOT construction projects

More information

ABC D BC ecision Ma ion trix

ABC D BC ecision Ma ion trix ABC Decision Matrix Presenters Timothy D. Fields, P.E. Transportation Principal Engineer Bridge Consultant Design Ashley Heredia Transportation Engineer II Bridge Design 1 Connecticut DOT s ABC Decision

More information

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP DRAFT NOT FINAL (Note: document was not finalized due to an eastbound stopping site distance design issue that requires more detailed bridge and roadway design considerations. This discussion starts on

More information

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II) Presentation to the CNRC Board of Directors Regular Meeting March 11, 2015 1 Agenda Preferred Alternate Refinement for University Avenue, 3rd Street, and Beverly Avenue Intersection Improvements validate

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,

More information

FOR HISTORICAL REFERENCE ONLY

FOR HISTORICAL REFERENCE ONLY To: From: Subject: Electronic Distribution Recipients MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No. 12-14-B-03 December 18, 2012 Jon M. Chiglo, P.E. Division

More information

SOLUTIONS TO TUTORIAL EXAMPLES CHAPTER 13

SOLUTIONS TO TUTORIAL EXAMPLES CHAPTER 13 SOLUTIONS TO TUTORIAL EXAMPLES CHAPTER 13 Note: The reader may find these solutions easier to follow if he/she marks the forces on a diagram of the frame as he/she proceeds through the calculations. Question

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. L0885 TWP NO. 970 OVER THE OTTER TAIL RIVER DISTRICT 4 - OTTER TAIL COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

PLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION

PLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION Page 1 of 6 RECOMMENDED PRACTICES PART SECTION SUB-SECTION HIGHWAY SIGNS GENERAL General Proper positioning of signs is an important element in the overall control of traffic within a roadway network.

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. L0885 TWP NO. 970 OVER THE OTTER TAIL RIVER DISTRICT 4 - OTTER TAIL COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

Sign Designs and Markings Manual (TEM 295-2) Page 8-3

Sign Designs and Markings Manual (TEM 295-2) Page 8-3 Sign Designs and Markings Manual (TEM 295-2) Page 8-3 TEMPORARY TRAFFIC CONTROL SIGNS INDEX Regulatory Signs R1-1 STOP R1-2 YIELD R1-2a TO ONCOMING TRAFFIC R2-1 SPEED LIMIT R2-H2a VEHICLES OVER 4 TONS

More information

ERIE COUNTY, NEW YORK (ALL JURISDICTIONS)

ERIE COUNTY, NEW YORK (ALL JURISDICTIONS) VOLUME 2 OF 5 ERIE COUNTY, NEW YORK Erie County Community Name Community Number Community Name Community Number Community Name Community Number Akron, Village of 361553 Depew, Village of 360236 Newstead,

More information

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS 2011 Edition - Revision 2 Page 275 Section 2G.01 Scope CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS 01 Preferential lanes are lanes designated for special traffic uses such as high-occupancy vehicles

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Revised December 2013 2013 by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2013-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

Designing with the Railroad

Designing with the Railroad Designing with the Railroad 23 CFR 646.214 (b)(2) requires that crossings be evaluated when they are within limits or near terminus of Federally Funded project. Some rough numbers for planning: Active

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present

More information

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES April 1, 2017 WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES Table of Contents

More information

PEM-EX-C. Figure: PEM-EX-C*A*G. ka054000en; Rev. 2.7 J

PEM-EX-C. Figure: PEM-EX-C*A*G. ka054000en; Rev. 2.7 J PEM-EX-C J2013329 Figure: PEM-EX-C*A*G Robust and safe pressure transducer for general mining applications In combination with a Kirchgaesser multi channel signal converter and display unit COMBA-EX or

More information

Bridge Failures in Alberta

Bridge Failures in Alberta Introduction Bridge Failures in Alberta Bridges are inspected for three primary reasons safety of bridge system maintenance of bridges management of bridge system Inventory or management of the system

More information

General Notes. Project No /15/2018 Page 1 of 1

General Notes. Project No /15/2018 Page 1 of 1 5081 Page 1 of 13 General Notes 5/15/2018 Page 1 of 1 Project No. 82 183-82 KA D 5081-01 0309-19 1 2 Note The contractor is responsible for establishing and maintaining centerline of the traveled way for

More information

TRB/AASHTO Geometric Design Research Efforts Supplemental Information

TRB/AASHTO Geometric Design Research Efforts Supplemental Information TRB/AASHTO Geometric Design Research Efforts Supplemental Information Status Report on Ongoing Projects Wed, June 14, 3:45 pm - 4:45 pm Overview The TRB Committee on Geometric Design (AFB10) is seeking

More information

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans. 4.1 GENERAL This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans. These Roadway Standards are for new construction and modification

More information

Sept 23, 2014 LAB MANUAL

Sept 23, 2014 LAB MANUAL Sept 23, 2014 LAB MANUAL 1000.0 1000 STANDARD PRACTICES 1000.1 CALCULATIONS and FORMS Throughout this manual there are test calculation procedures. These calculations are provided so that a technician

More information

Duke Street (Route 236) Over I Bridge Plan & Elevation

Duke Street (Route 236) Over I Bridge Plan & Elevation Duke Street (Route 236) Over I-395 - ridge Plan & Elevation ity of Alexandria Exist. sign structure supports on bridge fascia to be removed in 395 express lanes project Abutment A Sta. 102+03.02 E 41-1"

More information

03/16 BD-5114AC 14 TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143

03/16 BD-5114AC 14 TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143 5 YEAR TIP LET LIST DIVISION 14 Let (B) TIP Sub No. Div County Let Type Description 10/14 I-5512 14 Division Design Raleigh Let (DDRL) I-40 REHABILITATE TUNNELS 15, 17, AND 104 12/14 W-5214M 14 Division

More information

Business Access and Associated Benefits Provided by Roundabouts

Business Access and Associated Benefits Provided by Roundabouts Business Access and Associated Benefits Provided by Roundabouts MTJ Roundabout Engineering Mark Johnson, PE 608.238.5000 www.mtjengineering.com ITE Rapid City July 1 st 2014 ROUNDABOUT ANALYSIS, PLANNING,

More information

SERVICE INSTRUCTION.

SERVICE INSTRUCTION. 652 Oliver Street Williamsport, PA. 17701 U.S.A. Telephone +1 (800) 258-3279 U.S. and Canada (Toll Free) Telephone +1 (570) 323-6181 (Direct) Facsimile +1 (570) 327-7101 Email Technicalsupport@lycoming.com

More information

CHAPTER 1 GENERAL DESIGN

CHAPTER 1 GENERAL DESIGN CHAPTER 1 GENERAL DESIGN 1.0 INTRODUCTION The purpose of this Manual is to provide its users with the current, uniform procedures and guidelines for the application and design of safe, convenient, efficient

More information

Route 47 (North Main Street) Reconstruction

Route 47 (North Main Street) Reconstruction TOWN OF SUNDERLAND Route 47 (North Main Street) Reconstruction Presented by Lou Rabito, P.E. Presented to Town of Sunderland June 11, 2018 Project Overview MassDOT Project No. 607245 Resurfacing and Related

More information

2.0 LANE WIDTHS GUIDELINE

2.0 LANE WIDTHS GUIDELINE 2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated

More information

Design of Suburban Highways

Design of Suburban Highways Design of Suburban Highways by David L. Heavey, P.E. TABLE OF CONTENTS Introduction...3 Design Speed, Posted Speed and Operating Speed...4 Median Types...5 Raised Medians...9 Common Suburban Roadway Typical

More information

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT PROJECT NO. 093 MA 199 H 5807 01C FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENI HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT (INTERSECTION IMPROVEMENT) US 93/US 60 FINAL PROJECT ASSESSMENT April

More information

CERAMIC CHIP CAPACITORS

CERAMIC CHIP CAPACITORS CERAMIC CHIP CAPACIORS C0G (NP0), X7R, X5R, Z5U and Y5V Dielectrics 10, 16, 25, 50, 100 and 200 Volts Standard End Metalization: in-plate over nickel barrier Available acitance olerances: ±0.10 pf; ±0.25

More information

DRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA

DRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA DRAFT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA August 8, 2006 DRAFT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA Prepared for: City of Highland 27215 Baseline Highland, California 92346

More information

DESIGN EXCEPTION MANUAL

DESIGN EXCEPTION MANUAL DESIGN EXCEPTION MANUAL 2004 U.S. Customary English Units DESIGN EXCEPTION PROCEDURE A. General When conditions warrant, a design exception may be granted for a project design that proposes one or more

More information

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones

More information

Mortal Kombat: Tournament Edition Krypt Guide Versoion 1.1, released

Mortal Kombat: Tournament Edition Krypt Guide Versoion 1.1, released Mortal Kombat: Tournament Edition Krypt Guide Versoion 1.1, released 06.11.2008 For GameBoy Advance Written by Atanas Dimitrov (webmaster@mksecrets.net) Mortal Kombat Secrets http://www.mksecrets.net 1

More information

General Notes. Project No /15/2018 Page 1 of 1

General Notes. Project No /15/2018 Page 1 of 1 5025 Page 1 of 10 General Notes 5/15/2018 Page 1 of 1 Project No. 82 18-18- 82 KA D 5025-01 0307-19 1 2 Note The contractor is responsible for establishing and maintaining centerline of the traveled way

More information

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID 77825 SA US 6/20 14.61/14.59 R Resurface US-6/US-20; perform necessary (Originally PID 76709); UPDATE (9/25/14) added culvert at SA-20-22.50 PID 95861. SSAUS00006**C 14.610 18.450 8,950,000.00 SA US 6/20

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Camden County Bus Purchase Project ID Numbers: D0601 / 068082 In the DVRPC region, a combination of fixed route, subscription, and demand responsive transit services are provided in Camden County by Senior

More information

How Might Connected Vehicles and Autonomous Vehicles Influence Geometric Design? October 10, 2017

How Might Connected Vehicles and Autonomous Vehicles Influence Geometric Design? October 10, 2017 How Might Connected Vehicles and Autonomous Vehicles Influence Geometric Design? October 10, 2017 Overview Design Vehicle Design Driver Potential Geometric Impacts of Autonomous Vehicles Connected Vehicles

More information

DIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143

DIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143 TIP 5 YEAR LET LIST Let (B) TIP Sub County Let Type Description 05/15 B-5554 Division POC Let (DPOC) REPLACE BRIDGE #73 OVER NORTH FORK FRENCH BROAD RIVER ON NC215 05/15 B-5555 Division POC Let (DPOC)

More information

Alleviate Traffic Congestion and Improve Operational Reliability of the Route 17 Corridor

Alleviate Traffic Congestion and Improve Operational Reliability of the Route 17 Corridor Project Purpose PURPOSE AND NEED STATEMENT Route 17 Bottleneck Project, MP 10.19 to 12.04 Alternatives Analysis and Preliminary Engineering Borough of Maywood, Township of Rochelle Park, and Borough of

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Manual Notice Archive by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2009-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

SECTION VII ROADWAY AND SITE IMPROVEMENTS

SECTION VII ROADWAY AND SITE IMPROVEMENTS SECTION VII ROADWAY AND SITE IMPROVEMENTS TOC-VII.1 of 4 TABLE OF CONTENTS ROADWAY AND SITE IMPROVEMENTS No. Title I-1 Alley Intersection (Commercial Areas) I-2 Valley Gutter For 90 Intersection I-3 Typical

More information

TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE Page 1 / 4 Certificate number: 23445/A0 BV File number: AP 4160 Product code: 4440I This certificate is not valid when presented without the full attached schedule composed of 7 sections www.veristar.com

More information

The Year Ahead: Virginia Department of Transportation Northern Virginia District

The Year Ahead: Virginia Department of Transportation Northern Virginia District The Year Ahead: Virginia Department of Transportation Northern Virginia District Nicholas J. Roper, P.E. District Project Development Engineer Phone: (703)259-1953 Email: nicholas.roper@vdot.virginia.gov

More information

Information for File # SEW

Information for File # SEW Information for File #2014-02744-SEW Applicant: Minnesota Department of Transportation (MnDOT), District 3; c/o Mr. Robert Nibbe Corps Contact: Sarah Wingert, U.S. Army Corps of Engineers, 180 5 th Street

More information

Traffic Control Inspection Checklist Segment:

Traffic Control Inspection Checklist Segment: Traffic Control Inspection Checklist Segment: Simon Contractors Simon Contractors Originator: Description Reviewed by: Initials Date Distribution: Traffic Quality Manager, Site Assistant Traffic Manager

More information

CERAMIC CHIP CAPACITORS

CERAMIC CHIP CAPACITORS CERAMIC CHIP CAPACIORS C0G (NP0), X7R, X5R, Z5U and Y5V Dielectrics 10, 16, 25, 50, 100 and 200 Volts Standard End Metalization: in-plate over nickel barrier Available acitance olerances: ±0.10 pf; ±0.25

More information

H8 Signs, Supports and Poles

H8 Signs, Supports and Poles Alberta Infrastructure and Transportation Roadside Design Guide November 2007 H8 Signs, Supports and Poles H8.1 Introduction This section identifies the appropriate roadside safety treatment for signs,

More information

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

Weymouth - Abington Route 18 Widening and Reconstruction Project File No Weymouth - Abington Route 18 Widening and Reconstruction Project File No. 601630 PROJECT LOCATION Project Limit Previously Completed Signalized Intersections (Typical) Route 18 Widening Bridge No. W-32-013

More information

SECTION A-1-GEOMETRIC DESIGN STANDARDS

SECTION A-1-GEOMETRIC DESIGN STANDARDS APPENDIX A SECTION A-1-GEOMETRIC DESIGN STANDARDS Introduction... A-1 Flexibility In Design... A-1 Secondary Project Improvements... A-2 Roadway Width... A-3 Design Speed (V)... A-3 Operating Speed...

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL THE FUTURE OF THE TXDOT ROADWAY DESIGN MANUAL Kenneth Mora, P.E. (Design Division) 10/10/2017 Table of contents 1 2 Reduction in FHWA design controlling criteria Innovative Intersection Guidance 3-7 8-42

More information

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them? Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy

More information

District Construction Projects

District Construction Projects District 7 2014 Construction Projects Ohio Department of Transportation District 7 AUG-116/197-8.22/5.10 Auglaize County Projects 2014 AUG-65-13.19 AUG-VAR AUG-196-4.15 AUG-67-3.45 AUG-VAR AUG-Heritage

More information

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS Locating the components of a traffic control signal is not an exact science; many factors influence the location of the components. These factors include: lane widths, radii, pedestrian curb ramp requirements,

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 58506 CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO.

More information

N.Y. / REGION INFRASTRUCTURE Going Up! A Bridge Makes Way for Bigger Ships

N.Y. / REGION INFRASTRUCTURE Going Up! A Bridge Makes Way for Bigger Ships N.Y. / REGION INFRASTRUCTURE Going Up! A Bridge Makes Way for Bigger Ships By KATE ASCHERMARCH 21, 2014 Advertisement When it opened in 1931, the Bayonne Bridge with its parabolic arch connecting Staten

More information

Paul Vraney Bureau of Project Development 02/11/2016

Paul Vraney Bureau of Project Development 02/11/2016 Paul Vraney Bureau of Project Development 02/11/2016 ADA background & alterations definition Design considerations Provide sufficient layout data Curb ramp selection Maximum curb ramp and gutter slopes

More information

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA Addendum Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 800-272-8772 This material is based upon work supported by

More information

(This page left intentionally blank)

(This page left intentionally blank) (This page left intentionally blank) 2011 Edition - Revision 1 Page 553 Section 5A.01 Function CHAPTER 5A. GENERAL 01 A low-volume road shall be defined for this Part of the Manual as follows: A. A low-volume

More information

Field guide for Accessible Public Rights-of-Way Edition

Field guide for Accessible Public Rights-of-Way Edition Field guide for Accessible Public Rights-of-Way 2017 Edition CONTENTS PEDESTRIAN FACILITIES IN THE PUBLIC RIGHT-OF-WAY Pedestrian access routes 3 Components 3 Continuous width 3 Median and pedestrian refuge

More information