1 2016 UDERWATER BRIDGE ISPECTIO REPORT BRIDGE # L0885 PED (OLD TWS RD) over OTTER TAIL RIVER DISTRICT: District 4 COUTY: Otter Tail CITY/TOWSHIP: MAIE STATE: Minnesota Date of Inspection: Equipment Used: 07/27/2016 Owner: County Highway Agency Inspected By: Schroeder, Brian Report Written By: Brian Schroeder Report Reviewed By: Final Report Date:

2 TABLE OF COTETS PAGE UMBER UDERWATER SUMMARY 3 UDERWATER ISPECTIO 4 UDERWATER ISPECTIO PROCEDURES 6 STRUCTURE IVETORY 7 ELEMETS 8 PICTURES 11 FIGURE 1 16 FIGURE 2 17

3 UDERWATER ISPECTIO REPORT SUMMARY The substructure units inspected at Bridge o. L0885, the East and West Abutments, and the Center Pier, were found to be in good condition. Since the 1997 inspection, the bridge has been closed to vehicular traffic and is only used as a pedestrian walkway. Both abutments have been rehabilitated with the concrete surfaces smooth and sound with no notable deficiencies. ew caissons were placed at the center pier. The channel was firm and bottom appeared stable with no evidence of significant scour. ISPECTIO FIDIGS (A) The center pier consists of two new caissons (welded) and bracing which matches the geometry of the original construction. (B) The abutments and wingwalls have been rehabilitated with concrete overlay on the faces and bearing seats. RECOMMEDATIOS (A) Reinspect the submerged substructure units underwater at the normal maximum recommended (BIS) interval of sixty (60) months. Contractor: Contractor Job umber: Ayres Associates & Collins Engineers, Inc. 9687

4 UDERWATER ISPECTIO 1. BRIDGE DATA Bridge #: Feature Intersected: Facility Carried: District: County: L0885 OTTER TAIL RIVER PED (OLD TWS RD) District Otter Tail Bridge Description: The superstructure consists of two steel pony truss spans supporting a timber deck. The superstructure is supported by two reinforced concrete abutments and a center pier consisting of two steel shell caissons. The abutment foundation information was not available, and no design drawings were provided. The bridge is oriented in an east/west direction, and a dam is located approximately 20 feet downstream. 2. ISPECTIO DATA Professional Engineer/Team Leader: Inspection Diver: Date of Underwater Inspection: Weather Conditions: Underwater Visibility (feet): Waterway Velocity (ft/sec): Brian K. Schroeder, P.E. Brian K. Schroeder, P.E. 07/27/2016 Sunny, 81 F SUBSTRUCTURE ISPECTIO DATA Substructure(s) Inspected: East Abutment, West Abutment, and Center Pier General Shape: The Center Pier consists of two concrete filled steel shell caissons tied together with two horizontal steel diaphragms, one each above and below water, and two angle braces. The reinforced concrete abutments each consist of a breastwall and two wingwalls. Stone masonry retaining walls extend from the north wingwalls along both banks. Maximum Water Depth at Substructure(s) Inspected (feet): WATERLIE DATUM Water Level Reference: Waterline Elevation (feet): Description: The top of the steel cap on the north caisson of the Center Pier The waterline was approximately 6.2 feet below the reference. 5. BIS CODIG IFORMATIO (Minnesota specific codes are used for 92B and 113) Item 60: Substructure: Item 61: Channel and Channel Protection: Item 62: Culvert: Code: Code: Code: 7 8

5 Item 92B: Underwater Inspection: Item 113: Scour Critical Bridge: Code: Code: Y 48 07/2016 I Bridge is scour critical because abutment or pier foundation is rated as unstable due to observed scour at bridge site. Yes X o (Mark your selection with an X) 6. STRUCTURAL ELEMET CODITIO RATIG Conditions ELEM # Element Description Quantity Unit CS1 CS2 CS3 CS4 202 Steel Column 2 EA Reinforced Concrete Abutment 53 LF Scour 1 EA 1

6 UDERWATER ISPECTIO ISPECTIO PROCEDURES The routine underwater inspection of Bridge L0885 ( Pedestrian Path (Old Towns Road) over the Otter Trail River) was completed on July, 27, The underwater inspection was conducted from shore. The inspection was conducted by a team consisting of a PE-Diver with a valid MnDOT Team leader certification, a backup diver and a dive tender. The inspection utilized commercial dive equipment and techniques (SSA and/or SCUBA) in accordance with OSHA regulations. Profiles were taken along the upstream and downstream faces of the bridge and around the periphery of substructure units to determine the presence, location and area of scour. The bridge elements inspected consisted of two reinforced concrete abutments and two concrete filled steel shell caissons tied together with two horizontal steel diaphragms. The abutment foundation information was not available, and no design drawings were provided. Inspection procedures followed FHWA guidance and the MnDOT Bridge and Structure Inspection Program Manual with channel bottom probing to search for foundations. The routine underwater inspection frequency is recommended to remain at 60 months based on those findings and risk factors. Also, inspection procedures should continue to follow the above approach and standard guidance with 100% Level I and 10% Level II intensity efforts.

7 Minnesota Structure Inventory Report Bridge ID: L0885 PED (OLD TWS RD) over OTTER TAIL RIVER Date: 08/12/ G E E R A L + + R O A D W A Y + + I S P E C T I O + Agency Br. o. Crew Bridge Match ID (TIS) 0 Userkey 96 District 04 County Otter Tail Route Sys umber Functionally Obsolete City Sect., Twp., Range Latitude ' '' Control Section (TH Only) Status Longitude ' Custodian Owner Main Span Type 3 - Steel Median Width On Bridge Main Span Design Main Span Detail Appr. Span Type Appr. Span Design Appr. Span Detail Skew 0 Culvert Type Barrel Length Cantilever ID MAI: 2 Main Span Length Structure Length 02 - Low Truss Appr. Guardrail 0 - SUBSTADARD G - PRATT + M I S C. B R I D G E D A T A + GR Termini 0 - SUBSTADARD umber of Spans APPR: 0 TOTAL: 60.2 Deck Width (Out-to-Out) 15.8 Deck Material Wear Surf Type Wear Surf Install Year Wear Course/Fill Depth Deck Membrane Deck Rebars Deck Rebars Install Year Structure Area (Out-to-Out) 1950 sq. Roadway Area (Curb-to-Curb) Sidewalk Width 50A. Lt 0.00 Curb Height 0.1 MI W OF JCT CSAH 45 Level of Service 0 - OE OF THE BELOW W Roadway Type Lt 8 - Wood or Timber 7 - Wood or Timber one '' Reference Point 02 - County Highway Agency 02 - County Highway Agency 50B. Rt Rt Structure Flared Parallel Structure Field Conn. ID Abutment Foundation (Material/Type) Pier Foundation (Material/Type) Historic Status 0 - UKOW 3 - STEEL 0 - UKOW Underwater Y 60 Pinned Asbly. Spec. Feat avigation Control sq. Detour Length Year Painted Painted Area Posted Load Traffic 0 - o flare 1 - Pinned 2 - Eligible for ational Register + P A I T + Bridge Railing 0 - SUBSTADARD - o parallel structure GR Transition 1 - COC Frac. Critical 3 - Bridge Closed (Type R11-2A) 0 - ot Required Horizontal 0 - ot Required 0.58 Vertical Unsound Paint % 0 - one + B R I D G E - ot Applicable + I + W A T E R W A Y + Drainage Area (sq. mi.) Waterway Opening (sf.) 1150 Pier Protection Posting Rating Date 2/1/ SUBSTADARD D E P T H I S P. + VEH: 3 SEMI: Y/ Freq Date 24 05/01/ /27/ o nav. control on Overweight Permit Codes Rail Type Lt 32 Rt 32 A - /A B - /A C - /A sq. av. Clr. () av. Vert. Lift Bridge Clear. () Primer Type 0 - Other - non 3309 M Scour Code Finish Type Roadway ame or Description Township MAIE PED OW PART OF PARK Desc. Loc. BMU Agreement Year Built 1907 Maint. Area Roadway O/U Key Lanes Route On Structure 0 - Highway traffic not carried On - Off System 0 - OFF Roadway Width Legislative District 10A Vertical Clearance Potential ABC 2 - /A Max. Vert. Clear. Service On 3 - Pedestrian-bicycle Appr. Surface Width Service Under + S T R U C T U R E + HCADT M Year Reconstructed 2012 Functional Class FHWA Year Reconstructed M Temporary Status Bridge Plan Location Date Opened to Traffic 0 - O PLA If Divided + R D W Y Horizontal Clear. Lateral Clearance 5 - Waterway Bridge Roadway Width mi. O 0 UDER ADT L - Other (Unknown) S I G S + Structurally Deficient Sufficiency Rating -2 Routine Inspection Date 12/23/2015 Routine Inspection Frequency 12 Inspector ame + B I Design Load Operating Rating Schroeder, Brian A - Open C O D I T I O Deck 6 Unsound Superstructure 7 Deck % Underclearances Waterway Adequacy 6 Approach Alignment YEAR ADTT 0 D I M E S I O S + B-EB % SB-WB Substructure Channel 8 Culvert + B I Structure Evaluation Deck Geometry Vert. 0.0 Horiz. I - LOW RISK Year C A P A C I T Y R A T I G S PEDESTRIA 8 - PEDESTRIA, R A T I G S + Inventory Rating 8 - PEDESTRIA, A P P R A I S A L R A T I G S + + S A F E T Y F E A T U R E S + DBL:

8 01/13/2017 Inspector: CO Bridge MIESOTA BRIDGE ISPECTIO REPORT BRIDGE L0885 County: City: Township: Section: 35 Township: 134 Range: 41W Maint. Area: Span Type: 3 - Steel 10 - Truss - Thru List: Otter Tail MAIE BI Deck: 6 Super: 7 Sub: 7 Chan: 8 Culv: Appraisal Ratings - Approach: Required Bridge Signs - Load Posting: PED (OLD TWS RD) OVER OTTER TAIL RIVER Waterway: 6 Horizntal: Location: Route: Control Section: 3 - Bridge Closed (Type R11-2A) 0 - ot Required 0.1 MI W OF JCT CSAH 45 Length: Local Agency Bridge br.: Open, Posted, Closed: M Scour Code: Traffic: Vertical: Ref. Pt.: A - Open I - LOW RISK 0 - ot Required - ot Applicable Deck Width: Rdwy. Area/ Pct. Unsnd: Paint Area/ Pct. Unsnd: Culvert: Postings: 3 /A 15.8 sq. / % sq. / % Unofficial Structurally Deficient Unofficial Functionally Obsolete Unofficial Sufficiency Rating ELEM BR ELEMET AME REPORT TYPE ISP. DATE QUATITY CS 1 CS 2 CS 3 CS 4 Timber Deck 07/27/ SF Underwater otes: Deck is rotting due to moisture. [2012] Deck replaced under S.P [2015] Majority of the timber planks are slightly warped and twisted SF Steel Stringer 07/27/ LF Underwater otes: Stringers have severe loss of section. Pack rust appearing along tops of stringers. [2012] Stringers replaced under S.P LF Steel Protective Coating Underwater 07/27/ SF otes: [2016] Migrator assumed quantity of 999 SF and estimated the condition states. 999 SF Steel Truss 07/27/ LF Underwater 239 LF otes: Bottom Chord otes: Truss very old. Tension members not carrying load. Severe paint deterioration. Hanger assembly throughout bottom chord is bending in compression [2012] Replaced all bottom cord members under S.P Top Chord otes: Truss very old. Tension members not carrying load. Severe paint deterioration. SE and W ends have holes rusted through top flange. [2012] Upper members were salvaged and rehabilitated with new pins and nuts installed under S.P [2015] Some areas of light rusting showing through paint. Fracture Critical Smart Flag otes: Do ot Remove. See in-depth report for location of F/C members Steel Protective Coating Underwater 07/27/ SF otes: [2016] Migrator assumed quantity of 999 SF and estimated the condition states. 999 SF Steel Floor Beam 07/27/ LF Underwater 112 LF otes: Beams rusted at end connections. Floor beams between piers is severly rusted at South end. Section loss estimated at 60% Other floor beams corroded at ends also.south end of floor beam between piers section loss estimated at 70% as of [2012] Floor beams were salvaged and rehabilitated under S.P Steel Protective Coating Underwater 07/27/ SF otes: [2016] Migrator assumed quantity of 999 SF and estimated the condition states. 999 SF

9 BRIDGE L0885 PED (OLD TWS RD) OVER OTTER TAIL RIVER ELEM BR ELEMET AME REPORT TYPE ISP. DATE QUATITY CS 1 CS 2 CS 3 CS 4 Steel Column 07/27/ EA Underwater 2 EA otes: Appears that S caisson may be settling. Apparent dip between spans. Caissons appear to be moving. Movement is being monitored. [2012] Caissons replaced under S.P Steel Protective Coating Underwater 07/27/ SF otes: [2016] Migrator assumed quantity of 999 SF and estimated the condition states. 999 SF Reinforced Concrete Abutment 07/27/ LF Underwater 53 LF otes: [2016] Migrator added 20 LF to abutment quantity to account for wingwalls (CS1:20 CS2:0 CS3:0 CS4:0). Severe cacking and spalling both abutments. [2012] Abutments were rehabilitated (Shotcrete) under S.P Wingwall notes: [2012] Replaced under S.P Steel Pier Cap 07/27/ LF Underwater otes: [2012] Replaced under S.P LF Steel Protective Coating Underwater 07/27/ SF otes: [2016] Migrator assumed quantity of 999 SF and estimated the condition states. 999 SF Fixed Bearing 07/27/ EA Underwater otes: [2012] Bearings were rehabilitated under S.P EA Reinforced Concrete Approach Slab 07/27/ SF Underwater 3960 SF otes: [2016] Migrator assumed an approach slab length of 20FT and used the inventory quantity of 99FT for the width. Metal Bridge Railing 07/27/ LF Underwater otes: Light weight railing badly bent caused from pier settling. Light surface rust throughout railing. [2012] Railing replaced under S.P LF Steel Protective Coating Underwater 07/27/ SF otes: [2016] Migrator assumed CS1 and a quantity of 999 SF. 999 SF Critical Deficiencies or Safety Hazards 07/27/ EA Underwater otes: O CRITICAL FIDIGS OBSERVED DURIG THE LAST ISPECTIO. 1 EA Steel Section Loss 07/27/ EA Underwater otes: Section loss appearing throughout structure. [2012] Structure rehabilitated under S.P EA Scour 07/27/ EA Underwater otes: R - Scour critical. Monitoring required. 1 EA

10 BRIDGE L0885 PED (OLD TWS RD) OVER OTTER TAIL RIVER ELEM BR ELEMET AME REPORT TYPE ISP. DATE QUATITY CS 1 CS 2 CS 3 CS 4 Other Bridge Signing 07/27/ EA Underwater 1 EA Slopes & Slope Protection 07/27/ EA Underwater otes: Major undermining of grouted riprap at SW corner. [2012] Slopes repaired under S.P EA Deck & Approach Drainage 07/27/ EA Underwater 1 EA Sidewalk, Curb, & Median 07/27/ EA Underwater otes: [2012] Curb replaced under S.P EA Miscellaneous Items 07/27/ EA Underwater 1 EA Protected Species 07/27/ EA Underwater otes: Use this element to track the presence of protected species living on this structure. 1 EA General otes: 58. Deck BI: 36A. Brdg Railings BI: Ownership changed as per County Board of Commissioners meeting June 19, [2012] S.P (Rehab bridge project) [June 2013] per County's request, structure marked 'A-Open'. [2012] Bridge rehabilitated under S.P [2015] Majority of the timber planks are slightly warped and twisted. 36B. Transitions BI: 36C. Appr Guardrail BI: 36D. Appr Guardrail Terminal BI: 59. Superstructure BI: 60. Substructure BI: [2012] Bridge rehabilitated under S.P [2012] Bridge rehabilitated under S.P Channel BI: 62. Culvert BI: 71. Waterway Adeq BI: 72. Appr Roadway Alignment BI: Inventory otes: [2012] Bridge rehabilitated under S.P Bridge is only open to pedestrians. [2012] S.P (Rehab bridge project) Inspector's Signature Reviewer's Signature

11 Pictures Photo 1 - View Center Pier, Looking orthwest. Photo 2 - View West Abutment, Looking West.

12 Pictures Photo 3 - View Center Pier, Looking East. Photo 4 - View East Abutment, Looking East.

13 Pictures Photo 5 - View Structure, Looking orth. Photo 6 - View Structure, Looking Southwest.

14 Pictures Photo 7 - View Upstream, Looking South. Photo 8 - View Downstream, Looking orth.

15 Pictures Photo 9 - Typical condition at waterline.

16 Page 16 of 17

17 Page 17 of 17

2016 UNDERWATER BRIDGE INSPECTION REPORT. 81(ENCHANTED LANE) over CHANNEL. Date of Inspection: Equipment Used: 09/07/2016

2016 UNDERWATER BRIDGE INSPECTION REPORT. 81(ENCHANTED LANE) over CHANNEL. Date of Inspection: Equipment Used: 09/07/2016 2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # 27A34 81(ENCHANTED LANE) over CHANNEL DISTRICT: Metro COUNTY: Hennepin CITY/TOWNSHIP: Shorewood STATE: Minnesota Date of Inspection: Equipment Used: 09/07/2016

More information

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 14 over BUTLER CREEK. Date of Inspection: Equipment Used: 06/21/2016. County Highway Agency

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 14 over BUTLER CREEK. Date of Inspection: Equipment Used: 06/21/2016. County Highway Agency 2016 UDERWATER BRIDGE ISPECTIO REPORT BRIDGE # 25534 CSAH 14 over BUTLER CREEK DISTRICT: District 6 COUTY: Goodhue CITY/TOWSHIP: LEO STATE: Minnesota Date of Inspection: Equipment Used: 06/21/2016 Owner:

More information

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 10 over POMME DE TERRE RIVER. Date of Inspection: Equipment Used: 06/18/2016. County Highway Agency

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 10 over POMME DE TERRE RIVER. Date of Inspection: Equipment Used: 06/18/2016. County Highway Agency 2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # 75501 CSAH 10 over POMME DE TERRE RIVER DISTRICT: District 4 COUNTY: Stevens CITY/TOWNSHIP: DARNEN STATE: Minnesota Date of Inspection: Equipment Used:

More information

2016 UNDERWATER BRIDGE INSPECTION REPORT. CR 52 over CALDWELL BROOK. Date of Inspection: Equipment Used: 06/04/2016. County Highway Agency

2016 UNDERWATER BRIDGE INSPECTION REPORT. CR 52 over CALDWELL BROOK. Date of Inspection: Equipment Used: 06/04/2016. County Highway Agency 2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # 91725 CR 52 over CALDWELL BROOK DISTRICT: District 1 COUNTY: Koochiching CITY/TOWNSHIP: T - 151 R - 27 STATE: Minnesota Date of Inspection: Equipment Used:

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. L0885 TWP NO. 970 OVER THE OTTER TAIL RIVER DISTRICT 4 - OTTER TAIL COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. L0885 TWP NO. 970 OVER THE OTTER TAIL RIVER DISTRICT 4 - OTTER TAIL COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 6391 CSAH NO. 33 OVER THE MINNESOTA RIVER DISTRICT 8 - LAC QUI PARLE COUNTY OCTOBER 22, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 58551 CSAH NO. 41 OVER THE KETTLE RIVER DISTRICT 1 PINE COUNTY JULY 28, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO MSAS 123 (2 ND AVE. SW) OVER THE CANNON RIVER CITY OF FARIBAULT, RICE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO MSAS 123 (2 ND AVE. SW) OVER THE CANNON RIVER CITY OF FARIBAULT, RICE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 66546 MSAS 123 (2 ND AVE. SW) OVER THE CANNON RIVER CITY OF FARIBAULT, RICE COUNTY SEPTEMBER 13, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO B WABASHA STREET SOUTH BOUND (MASA 235 SB)

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO B WABASHA STREET SOUTH BOUND (MASA 235 SB) UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 62555B WABASHA STREET SOUTH BOUND (MASA 235 SB) OVER THE MISSISSIPPI RIVER CITY OF ST. PAUL OCTOBER 31, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 66513 14 th STREET (MSAS NO. 103) OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

UNDERWATER BRIDGE INSPECTION REPORT METRO DISTRICT - ANOKA COUNTY

UNDERWATER BRIDGE INSPECTION REPORT METRO DISTRICT - ANOKA COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 02545 CR NO. 116 OVER THE RUM RIVER METRO DISTRICT - ANOKA COUNTY SEPTEMBER 9, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 101 OVER THE MINNESOTA RIVER DISTRICT 8 - REDWOOD COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 101 OVER THE MINNESOTA RIVER DISTRICT 8 - REDWOOD COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7149 CSAH NO. 101 OVER THE MINNESOTA RIVER DISTRICT 8 - REDWOOD COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC.

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 58506 CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO.

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 6391 CSAH NO. 33 OVER THE MINNESOTA RIVER DISTRICT 8 - LAC QUI PARLE COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 9 OVER THE BLUE EARTH RIVER DISTRICT 7 - BLUE EARTH COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 9 OVER THE BLUE EARTH RIVER DISTRICT 7 - BLUE EARTH COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 07542 CSAH NO. 9 OVER THE BLUE EARTH RIVER DISTRICT 7 - BLUE EARTH COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7635 CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY JUNE 18, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 133 OVER A DITCH ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 133 OVER A DITCH ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7780 CSAH 133 OVER A DITCH ST. LOUIS COUNTY SEPTEMBER 27, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO.

More information

Non-Motorized Overpass at SR 5/US1

Non-Motorized Overpass at SR 5/US1 Non-Motorized Overpass at SR 5/US1 And SR 97/SW th Street (Bird Road) Executive Summary March 9, 17 Prepared By: MARLIN Engineering Inc 17 NW th Avenue, Ste. 1 Plantation, FL 33313 P: 35.77.7575 www.marlinengineering.com

More information

Culvert Safety Inspection Report

Culvert Safety Inspection Report Culvert Safety Inspection Report Facility Federal Structure ID Inspector Name Agency/Consultant Inspection Date LEGEND Haggerty Rd (South) N/A RL/JF GLEG 1/26/2016 9 New Feature Latitude Longitude Struc

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

Gerald P. Oliveto, P.E. George Franz NJDOT

Gerald P. Oliveto, P.E. George Franz NJDOT Gerald P. Oliveto, P.E. George Franz NJDOT Bridge preservation is defined as actions or strategies that prevent, delay or reduce deterioration of bridges or bridge elements, restore the function of existing

More information

Information for File # SEW

Information for File # SEW Information for File #2014-02744-SEW Applicant: Minnesota Department of Transportation (MnDOT), District 3; c/o Mr. Robert Nibbe Corps Contact: Sarah Wingert, U.S. Army Corps of Engineers, 180 5 th Street

More information

US Route 24 Eastbound (Quincy Memorial Bridge) Over the Mississippi River

US Route 24 Eastbound (Quincy Memorial Bridge) Over the Mississippi River Purpose and Need March 2015 US Route 24 Eastbound (Quincy Memorial Bridge) Over the Mississippi River Adams County - Quincy, IL Marion County, MO Region 4 District 6 Table of Contents I. Purpose of the

More information

BRIDGE REPLACEMENT AND REHABILITATION PROGRAM

BRIDGE REPLACEMENT AND REHABILITATION PROGRAM BRIDGE REPLACEMENT AND REHABILITATION PROGRAM INTRODUCTION An integral element of the City's transportation infrastructure is a network of bridges designed to carry vehicular, railroad, light rail, pedestrian,

More information

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00) General Info Number: PROJECT NO. 43-18-02 Description: BRIDGE DECK REPAIR AND REHABILITATION PERRYSBURG-HOLLAND ROAD OVER THE OHIO TURNPIKE, M.P. 59.0 HESSVILLE ROAD OVER THE OHIO TURNPIKE, M.P. 84.4 LUCAS

More information

S.R.: CLASSIFICATION 100 STRAHNET Highway: 0 -Not a STRAHNET hwy 101 Parallel Structure: N -No bridge exists

S.R.: CLASSIFICATION 100 STRAHNET Highway: 0 -Not a STRAHNET hwy 101 Parallel Structure: N -No bridge exists Structum: 59 JDOT SI and A Sheet ame: US, 9 AD 46 OVER JOES ROAD S.R.: 76. SD/FO- -StructurallyDeficient IDETIFICATIO ISPECTIO State: 4 ew Jersey 8 Struc um: 59 9 Frequency: 4 months 9 Inspection Date:

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the

More information

UNDERWATER INSPECTION REPORT DOUBLE CORRUGATED METAL PIPE CULVERT HAWTHORN ROAD OVER RICE CREEK (PELKEY LAKE) MORRISON COUNTY

UNDERWATER INSPECTION REPORT DOUBLE CORRUGATED METAL PIPE CULVERT HAWTHORN ROAD OVER RICE CREEK (PELKEY LAKE) MORRISON COUNTY UNDERWATER INSPECTION REPORT DOUBLE CORRUGATED METAL PIPE CULVERT HAWTHORN ROAD OVER RICE CREEK (PELKEY LAKE) MORRISON COUNTY OCTOBER 25, 2012 PREPARED FOR MORRISON COUNTY PUBLIC WORKS BY COLLINS ENGINEERS,

More information

Bridge Failures in Alberta

Bridge Failures in Alberta Introduction Bridge Failures in Alberta Bridges are inspected for three primary reasons safety of bridge system maintenance of bridges management of bridge system Inventory or management of the system

More information

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00) General Info Number: PROJECT NO. 43-19-03 Description: BRIDGE DECK REPAIR AND REHABILITATION OHIO TURNPIKE RAMP OVER STATE ROUTE 420 M.P. 71.4, SOUTH BILLMAN ROAD OVER OHIO TURNPIKE M.P. 75.2, WOOD AND

More information

State DOT - Bridge Inspection Manual Part II Course No. SE0117 PDH: 10

State DOT - Bridge Inspection Manual Part II Course No. SE0117 PDH: 10 State DOT - Bridge Inspection Manual Part II Course No. SE0117 PDH: 10 In order to obtain credit for this course, the following steps listed below should be followed: (1) Log into MyCE Account & purchase

More information

***PROJECT NO AWARDED TO E.S. WAGNER VIA RESOLUTION NO ON JANUARY 19, 2016***

***PROJECT NO AWARDED TO E.S. WAGNER VIA RESOLUTION NO ON JANUARY 19, 2016*** General Info Number: PROJECT NO. 43-16-03 Description: Deadline: BRIDGE DECK REPLACEMENT AND REHABILITATION, CLIFTON-GUNN ROAD OVER OHIO TURNPIKE M.P. 21.4, RUEGER-SHETLER ROAD OVER OHIO TURNPIKE M.P.

More information

PLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION

PLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION Page 1 of 6 RECOMMENDED PRACTICES PART SECTION SUB-SECTION HIGHWAY SIGNS GENERAL General Proper positioning of signs is an important element in the overall control of traffic within a roadway network.

More information

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (13-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (13-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.

More information

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (17-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (17-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.

More information

FOR HISTORICAL REFERENCE ONLY

FOR HISTORICAL REFERENCE ONLY To: From: Subject: Electronic Distribution Recipients MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No. 12-14-B-03 December 18, 2012 Jon M. Chiglo, P.E. Division

More information

FLAGLER BEACH PIER POST INCIDENT SAFETY INSPECTION HURRICANE IRMA SEPTEMBER 15-17, 2017

FLAGLER BEACH PIER POST INCIDENT SAFETY INSPECTION HURRICANE IRMA SEPTEMBER 15-17, 2017 LOGAN DIVING & SALVAGE 2815 SAINT JOHNS BLUFF JACKSONVILLE, FLORIDA 32246 TEL: (904) 731-0000 FAX: (904) 731-5493 MARINE SPECIALTY CONTRACTOR FL SCC131151014 FLAGLER BEACH PIER POST INCIDENT SAFETY INSPECTION

More information

Perched Box Caisson Overview. January 2014

Perched Box Caisson Overview. January 2014 Perched Box Caisson Overview January 2014 Why perched box caissons? Perched box caissons are used to construct the portion of the river piers that will support the steel arch spans Construction can occur

More information

Designing with the Railroad

Designing with the Railroad Designing with the Railroad 23 CFR 646.214 (b)(2) requires that crossings be evaluated when they are within limits or near terminus of Federally Funded project. Some rough numbers for planning: Active

More information

ABC D BC ecision Ma ion trix

ABC D BC ecision Ma ion trix ABC Decision Matrix Presenters Timothy D. Fields, P.E. Transportation Principal Engineer Bridge Consultant Design Ashley Heredia Transportation Engineer II Bridge Design 1 Connecticut DOT s ABC Decision

More information

Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope

Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope Design Overview Section 4 Standard Plans for Design Fall, 2017 Ann Johnson, PE Services Brady Rutman, SRF Consulting Group Overview Design Basics Recommendations: The Zone System Driveway Crossings Pedestrian

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

ADA PRESENTATION (CURB RAMPS)

ADA PRESENTATION (CURB RAMPS) ADA PRESENTATION (CURB RAMPS) ACECNJ/NJDOT/FHWA DESIGN SUMMIT Warren Howard New Jersey Department of Transportation May 21, 2013 ADA Curb Ramps NJDOT wants curb ramps to be designed & constructed properly

More information

Smoothing Out the Bumpy Road Ahead

Smoothing Out the Bumpy Road Ahead Julie Hannah, P.E. Technical Services and Asset Management May 11, 2017 Smoothing Out the Bumpy Road Ahead Nationwide D = Poor, At Risk Conditions & Capacity Pavement Condition & Congestion Nationwide

More information

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department) To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

BARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S

BARRIER OFFSET 0 A 6 6 A 12 12 A 26 A 26 3A OR 4A L OR S * ** L OR S L OR S ACCEPTABLE (TCB) TYPES AND ANCHORING DETAILS BASED ON UNDERLYING SURFACE TYPE AND BARRIER OFFSET FROM DROP-OFF BARRIER OFFSET UNDERLYING SURFACE 0" A 6" 6" A 12" 12" A 26" A 26" TCB TYPE DETAIL TCB TYPE

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS GUIDE TO STREAM CROSSINGS (Revised February,2005) CULVERTS, BRIDGES, AND FORDS Culverts, bridges, and fords are all methods used to cross-streams. Culverts are the most common stream crossing structure.

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

Paul Vraney Bureau of Project Development 02/11/2016

Paul Vraney Bureau of Project Development 02/11/2016 Paul Vraney Bureau of Project Development 02/11/2016 ADA background & alterations definition Design considerations Provide sufficient layout data Curb ramp selection Maximum curb ramp and gutter slopes

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Revised December 2013 2013 by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2013-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

STUDY PROCESS & SCHEDULE

STUDY PROCESS & SCHEDULE STUDY PROCESS & SCHEDULE Route Centennial Bridge Study KDOT Project No. -52 KA-3229-01 STUDY OVERVIEW STUDY SCHEDULE The Kansas Department of Transportation (KDOT) has identified a future need to replace

More information

ADA Operations Contact Info

ADA Operations Contact Info Intro ADA Operations Contact Info Todd Grugel ph: 651-366-3531 email: todd.grugel@state.mn.us Joe Zilka ph: 651-366-3311 email: joseph.zilka@state.mn.us Harvey Unruh ph: 651-216-2912 email: harvey.unruh@state.mn.us

More information

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design Yes No N/A Design Requirements I. GENERAL DESIGN GUIDELINES Chapter 11. Culverts and Bridges A. Culvert design is in accordance with the Culverts chapter of Volume 2 of the UDFCD Manual for additional

More information

ADA on Construction. Guidance for Section C Plan Preparers

ADA on Construction. Guidance for Section C Plan Preparers ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize

More information

Underwater Inspection of Bridges Overview of a Statewide Program

Underwater Inspection of Bridges Overview of a Statewide Program 8 TRANSPORTATION RESEARCH RECORD 268 Underwater Inspection of Bridges Overview of a Statewide Program R. RICHARD AVENT AND MARSHALL D. WHITMER III A comprehensive statewide underwater bridge inspection

More information

Accommodating Pedestrians in the Work Zone

Accommodating Pedestrians in the Work Zone Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,

More information

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems CHAPTER 8 STAKING STAKING Correct staking of traffic control signal or lighting systems is critical to the appropriate placement of system components. 8.1 Traffic Control Signal Systems Locating the components

More information

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

Trans-Canada Highway 1 RW Bruhn Bridge Replacement Trans-Canada Highway 1 RW Bruhn Bridge Replacement May 2016 RW Bruhn Bridge Project Objectives Improve safety, traffic flow and movement of goods Improve safety for pedestrians and cyclists Replace the

More information

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS Locating the components of a traffic control signal is not an exact science; many factors influence the location of the components. These factors include: lane widths, radii, pedestrian curb ramp requirements,

More information

Existing conditions of each bridge and repair plan are presented in Table

Existing conditions of each bridge and repair plan are presented in Table 2.2.2.5 Drainage Structure (1) Bridge Along the concerned section of this project road, there are 4 constructed bridges. The carriageway widths of existing bridges are designed to fit with existing road

More information

Annex E Bridge Pier Protection Plan

Annex E Bridge Pier Protection Plan Annex E Bridge Pier Protection Plan Table E1 Bridge Types and Locations Table E2 Flow Conditions For River Sections Figure E1 Bridge Abutment Protection Figure E2 Bridge Pier Protection Figure E3 Central

More information

Driveway Design Criteria

Driveway Design Criteria Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Manual Notice Archive by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2009-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

SPECIAL LAUNCHING METHODS

SPECIAL LAUNCHING METHODS CHAPTER 18 SPECIAL LAUNCHING METHODS Special launching methods are needed when a restricted site prevents normal roller layout and launching by the standard skeleton launchingnose method. Space on either

More information

section 4 Existing Conditions, Issues, and Options

section 4 Existing Conditions, Issues, and Options section 4 Existing Conditions, Issues, and Options 4.0 Existing Conditions, Issues, and Options This section analyzes each segment of the corridor on a street to street basis. Each segment is discussed

More information

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2) October 2004 REVISIONS (2) Chapter 11 HORIZONTAL ALIGNMENT SUPERELEVATION DEVELOPMENT 11.3(2) Chapter 12 VERTICAL ALIGNMENT VERTICAL CURVES PASSING SIGHT DISTANCE 12.5(2) VERTICAL CURVES STOPPING SIGHT

More information

Le Sueur County, MN Tuesday, December 13, 2016 Board Meeting

Le Sueur County, MN Tuesday, December 13, 2016 Board Meeting Le Sueur County, MN Tuesday, December 13, 216 Board Meeting Item 8 1:15 a.m. Darrell Pettis, County Administrator / Engineer RE: Final CSAH 3 RE: CSAH 29 Speed Zone Study RE: 4H Utilities RE: Lake Jefferson

More information

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP DRAFT NOT FINAL (Note: document was not finalized due to an eastbound stopping site distance design issue that requires more detailed bridge and roadway design considerations. This discussion starts on

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

ADA Training Standard Plans

ADA Training Standard Plans ADA Training Standard Plans SCREEN READABLE VERSION IS IN THE MAKING AND WILL BE MADE AVAILABLE SOON 2018 MnDOT 2 Standard Plans 2017 Overview Overview PROWAG and Curb Ramp Basics Curb Ramp Types ADA Curb

More information

FENCE RENTAL, PURCHASE, INSTALLATION, SUPPLIES & SERVICE - REQUIREMENTS CONTRACT INVITATION FOR BID PRICE SHEET ATTACHMENT E

FENCE RENTAL, PURCHASE, INSTALLATION, SUPPLIES & SERVICE - REQUIREMENTS CONTRACT INVITATION FOR BID PRICE SHEET ATTACHMENT E IT IS NOT ANTICIPATED THAT ONE COMPANY CAN PROVIDE ALL GROUPS, PLEASE PROVIDE PRICING ONLY ON THE GROUPS YOU CAN PROVIDE SERVICES FOR. This document is to be used by the Bidder to specify proposed Rates.

More information

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT APS and ADA APS is not currently an ADA Standard and is provided at the discretion of the Title II entity APS is recognized in the MnMUTCD, but

More information

New two-lane bridge to replace the existing structure spanning the Maple River just south of the Village s central business district

New two-lane bridge to replace the existing structure spanning the Maple River just south of the Village s central business district New two-lane bridge to replace the existing structure spanning the Maple River just south of the Village s central business district Rehabilitate the old bridge Convert to a nonmotorized trail Restore

More information

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County. SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i July 25, 2016 6. HIGHWAY MATTERS A. PLAN PROJECT UPDATES Attached for your reference please find project updates on ongoing VDOT construction projects

More information

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable

More information

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES April 1, 2017 WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES Table of Contents

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study Houston, TX Technical Memorandum April 15 th, 2009 Prepare by: 2950 North Loop West, Ste. 900 Houston, TX 77092

More information

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them? Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy

More information

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

Weymouth - Abington Route 18 Widening and Reconstruction Project File No Weymouth - Abington Route 18 Widening and Reconstruction Project File No. 601630 PROJECT LOCATION Project Limit Previously Completed Signalized Intersections (Typical) Route 18 Widening Bridge No. W-32-013

More information

Department of Public Works Office of Disability Affairs February 23, 2017 Presented by Mark Zwoyer, PE

Department of Public Works Office of Disability Affairs February 23, 2017 Presented by Mark Zwoyer, PE ADA Ramp Construction Department of Public Works Office of Disability Affairs February 23, 2017 Presented by Mark Zwoyer, PE Agenda Opening Statements/Welcome PROWAG, ADAAG, INDOT and DPW Standards Inspector

More information

RECOMMENDATION: 1) that the existing Traffic Bridge be replaced with a modern steel truss bridge as outlined in this report;

RECOMMENDATION: 1) that the existing Traffic Bridge be replaced with a modern steel truss bridge as outlined in this report; E) Traffic Bridge Needs Assessment and Functional Planning Study Final Report (File: CK 6050 8; IS 6332 24; and IS 6050 2) RECOMMENDATION: 1) that the existing Traffic Bridge be replaced with a modern

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities Approved: Policy: 20-004(P) Responsible Office: Planning Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities I. POLICY STATEMENT: This policy

More information

SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN

SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN Table of Contents Page No 1A.1 GENERAL...1 1A.1.1 DESIGN CONTROLS...1 1A.2 MAINLINE ROADWAYS...4 1A.2.1 ROADWAY DESIGNATION...4 1A.2.2 DESIGN SPEED...4 1A.2.3

More information

force tension suspension bridge anchorage cables compression caissons Towers deck

force tension suspension bridge anchorage cables compression caissons Towers deck Before bridges in New York City existed, people relied on the waterways to get around and transport goods. The Brooklyn Bridge was the first steel-wire suspension bridge to be built in the world. A suspension

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Airport Circle Elimination, CR 563, 646 S9820 Intersection, operational, and safety improvements at the intersection of Tilton Road (CR 563) and Delilah Road (CR 646) will include elimination of the circle,

More information

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:

More information

Appendix A Crane Placement, Outrigger Pad, and Shoring Figures

Appendix A Crane Placement, Outrigger Pad, and Shoring Figures Appendix A Crane Placement, Outrigger Pad, and Shoring Figures Appendix B Field Data and Inspection Report PONTIS Reporting http://highway.odot.state.or.us/cf/pontis/index.cfm?fuseaction=act_bridge...

More information

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD Appendix T CCMP 3.3.4 TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD 3.3.4 Trail Traffic and Transportation Design Multi-use trails have certain design standards, which vary depending on the agency that

More information

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID 77825 SA US 6/20 14.61/14.59 R Resurface US-6/US-20; perform necessary (Originally PID 76709); UPDATE (9/25/14) added culvert at SA-20-22.50 PID 95861. SSAUS00006**C 14.610 18.450 8,950,000.00 SA US 6/20

More information

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL AFTER MARCH 1, 2012 ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL 400.1 Description. This item shall govern for all excavation required for the construction of all structures, except pipe or box sewers for

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Outlet Structures T-12

Outlet Structures T-12 Description This section provides guidance and details for outlet structures for use primarily with BMPs utilizing sedimentation, (i.e., extended detention basins (EDBs), retention ponds, and constructed

More information

SECTION VII ROADWAY AND SITE IMPROVEMENTS

SECTION VII ROADWAY AND SITE IMPROVEMENTS SECTION VII ROADWAY AND SITE IMPROVEMENTS TOC-VII.1 of 4 TABLE OF CONTENTS ROADWAY AND SITE IMPROVEMENTS No. Title I-1 Alley Intersection (Commercial Areas) I-2 Valley Gutter For 90 Intersection I-3 Typical

More information

Willamette River Transit Bridge. Portland - Milwaukie Light Rail Willamette River Bridge Citizen Advisory Committee

Willamette River Transit Bridge. Portland - Milwaukie Light Rail Willamette River Bridge Citizen Advisory Committee Portland - Milwaukie Light Rail Willamette River Bridge Citizen Advisory Committee 05.21.09 Bridge Type Status Update Bicycle Pedestrian Path Width Bridge Type Status Update WRBAC Recommendation: Cable

More information