HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

Size: px
Start display at page:

Download "HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:"

Transcription

1 HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October 29, Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers P.O. Box 774, Manotick, ON K4M 1A7 Tel (613) Fax (613)

2 TABLE OF CONTENTS PAGE 1. BACKGROUND Purpose and Scope of Work EXISTING ROADS AND INTERSECTIONS PROPOSED HOTEL EXPANSION Trip Generation TRANSPORTATION IMPACT Background Traffic Volumes Total Traffic Volumes Traffic Analysis Pedestrian, Transit Facilities, and Cycling FINDINGS AND RECOMMENDATIONS APPENDIX LIST OF FIGURES 1.1 SITE LOCATION PLAN ROADWAY LANE ARRANGEMENT PEAK AM AND PM HOUR TRAFFIC COUNTS CONCEPTUAL SITE PLAN PEAK AM AND PM HOUR SITE GENERATED TRIPS PEAK AM AND PM HOUR BACKGROUND TRAFFIC PEAK AM AND PM HOUR BACKGROUND TRAFFIC PEAK AM AND PM HOUR TOTAL TRAFFIC PEAK AM AND PM HOUR TOTAL TRAFFIC LIST OF TABLES 3.1 EXISTING SITE TRIPS TRIP GENERATION RATES SITE GENERATED TRIPS HILTON GARDENS INN ACCESS/ALERT LoS & 95 th Percentile Queue ALERT/THAD JOHNSON LoS & 95 th Percentile Queue ALERT/UPLANDS (LESTER) LoS and Volume/Capacity (v/c) COLLISION SUMMARY UPLANDS/AIRPORT PARKWAY LoS and Volume/Capacity (v/c)... 20

3 HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF 1. BACKGROUND The Hilton Garden Inn Hotel is located at the southwest corner of the intersection of Alert Road and Uplands Drive (Lester Road) in the Gloucester (Airport) Industrial Park which borders the Macdonald-Cartier Ottawa International Airport. The hotel, which was constructed in 2006, has a municipal address of 2400 Alert Road. The existing hotel contains 159 guest rooms, restaurant and convention facilities. The entrance to the hotel is from Alert Road, with a second access point on Thad Johnson Private which provides entering and exiting to the site. Figure 1.1 shows the location of the Hilton Garden Inn Hotel. A Site Plan Application has been prepared which would propose an expansion to the existing hotel. The expansion would include an additional 128 guest rooms and an expansion to the existing restaurant. The expansion is expected to be completed and open to guests by the year The firm of D. J. Halpenny & Associates Ltd. has been retained by Bona Building & Management Co. Ltd., the project management company, to prepare a report for the project. The would examine the impact of the expected additional trips resulting from the expansion of the hotel. 1.1 Purpose and Scope of Work The purpose of the will be to examine the roads and intersections within the study area, and to determine the impact of the site generated trips from the proposed expansion of the Hilton Garden Inn Hotel. The study is required as part of the Site Plan Application for the development. The hotel expansion will consist of additional guest rooms. The clientele of the hotel are typically business people who want to be close to the airport. The hotel has conference facilities which would mainly be used during the weekdays by business people. Due to the location of the hotel and type of clientele, the peak hour traffic is expected to peak during the weekday peak AM and PM hours of the adjacent roads. The actual peak will be determined from traffic counts at the Hotel accesses during the weekday morning and afternoon hours. The analysis years will be at the completion of the hotel expansion in 2014, and five years beyond completion at the year The analysis will examine the operation of the proposed site entrance from Alert Road, the Alert/Thad Johnson intersection, Alert/Uplands intersection, and the Uplands/Airport Pkwy southbound off ramp intersection. The

4 2 FIGURE 1.1 SITE LOCATION PLAN

5 3 report will follow the City of Ottawa guidelines as documented in the Transportation Impact Assessment Guidelines dated October EXISTING ROADS AND INTERSECTIONS The Hilton Garden Inn Hotel is located at 2400 Alert Road. Alert Road is a two lane rural local road with a posted speed limit of 60 km./h. There are no sidewalks along the road. The hotel will have an entrance/exit onto Thad Johnson Private at the south limit of the site. Thad Johnson Private is a two lane road which is the entrance to the Gloucester (Airport) Industrial Park. The road has no exit and terminates at a cul-de-sac at the west limit of the road. Thad Johnson Private has a posted speed limit of 40 km./h. The road has a rural cross section with no sidewalks. The north limit of the hotel site borders Uplands Drive, which changes to Lester Road east of Alert Road. Both Uplands Drive and Lester Road are arterial roads in the vicinity of the hotel site. The roads have a posted speed limit of 60 km./h. Uplands Drive and Lester Road have one westbound lane and two eastbound lanes in the vicinity of the site. The two eastbound lanes are currently being constructed to accommodate the double left turn movement from the intersection of the southbound Airport Parkway off ramp and Uplands Drive. There are no sidewalks along Uplands Drive or Lester Road, but cycling lanes are being constructed within the project limits of the roadway modifications. The hotel has an entrance from Alert Road which is located approximately 95 meters south of the Alert/Uplands intersection. The hotel entrance forms the west approach of the intersection (entrance only), the private entrance to the NRC Centre for Surface Transportation Technology forms the east approach, and Alert Road forms the north and south approaches. The intersection is controlled by a stop sign at the east (westbound) NRC access. There are no exclusive turn lanes at the intersection. Although the Hilton Garden Inn Hotel s access onto Alert Road is signed Entrance Only, the traffic counts did show some vehicles exiting the site onto Alert Road. The intersection of Alert Road and Thad Johnson Private is a T intersection with Alert Road forming the northbound and southbound intersection approaches, and Thad Johnson Private the eastbound stop controlled approach. There are no exclusive turn lanes at the intersection. The intersection of Uplands Drive and Alert Road is controlled by traffic signals with Uplands Drive forming the eastbound approach, Lester Road the westbound approach, Alert Road the northbound approach, and the northbound Airport Parkway on/off ramps the southbound approach. At the time this report was prepared, the City of Ottawa was completing roadway modifications along Uplands Drive between the southbound Airport Parkway on ramp to the west, to a point just east of Alert Road. The roadway modifications comprise of the addition of an eastbound though lane which was required to receive traffic from the double left turn movement which was constructed at the southbound Airport Parkway off ramp. Figure 2.1 shows the lane movements within the study area. The lane configuration for the Alert/Uplands intersection is as follows:

6 4 FIGURE 2.1 ROADWAY LANE ARRANGEMENT

7 5 Northbound Alert Road Approach - Southbound Airport Pkwy Approach - Eastbound Uplands Drive Approach - Westbound Lester Road Approach - One left turn lane One shared through/right lane One left turn lane One through lane One channelized right turn lane One left turn lane One through lane One shared through/right lane One left turn lane One through lane One channelized right turn lane The intersection of Uplands Drive and the southbound Airport Parkway off ramp is located approximately 200 meters west of the Alert/Uplands intersection. The intersection is controlled by traffic signals with Uplands Drive forming the eastbound and westbound approaches and the Airport Parkway off ramp the southbound approach. The City has recently modified the intersection to include a double left turn lane at the southbound off ramp approach. The following is the lane configuration for the intersection which is also shown in Figure 2.1: Southbound Airport Pkwy Approach - Eastbound Uplands Drive Approach - Westbound Uplands Drive Approach - Two left turn lanes One channelized right turn lane Two through lanes One through lane Figure 2.2 shows the existing 2012 weekday peak AM and PM hour traffic counts. 3. PROPOSED HOTEL EXPANSION The existing Hilton Garden Inn Hotel was constructed in 2006 and contains 159 guest rooms in an eight storey building. The hotel also included conference and restaurant facilities. The existing hotel provided 172 parking spaces with an entrance from Alert Road and an entrance/exit from Thad Johnson Private. The owners of the hotel have proposed an expansion to the existing hotel. The area of the site will be approximately hectares (4.908 acres). The expansion will provide an additional 128 guest rooms and an expansion to the existing restaurant. The hotel will have 318 parking spaces which include 4 barrier free parking spaces and 6 spaces in the existing hotel basement. The site will retain the existing hotel entrance from Alert Road and the entrance/exit from Thad Johnson Private. The hotel lands are currently zoned T1A which will support the proposed hotel expansion. The lands surrounding the site are mainly commercial, with the NRC Centre for Surface Transportation Technology to the east of the site, and the Gloucester (Airport) Industrial Park to the south which includes the First Air Freight and Federal Express facilities. The expansion of the hotel is expected to be completed and open for guests by the year Figure 3.1 shows a conceptual site plan of the expansion of the Hilton Garden Inn.

8 6 FIGURE PEAK AM AND PM HOUR TRAFFIC COUNTS

9 7 FIGURE 3.1 CONCEPTUAL SITE PLAN

10 8 3.1 Trip Generation The expected site generated trips from the expansion of the Hilton Garden Inn Hotel was determined using the existing number of guest rooms and site trips entering and exiting the site during the October 10, 2012 peak AM and PM hour traffic counts. The counts determined that for a 159 room hotel, the peak hour trips shown in Table 3.1 occurred between 7:30 and 8:30 AM, and between 4:30 and 5:30 PM. TABLE 3.1 EXISTING SITE TRIPS LAND USE WEEKDAY PEAK AM HOUR WEEKDAY PEAK PM HOUR Total Enter Exit Total Enter Exit 159 Guest Rooms (48%) 41 (52%) (51%) 40 (49%) The actual traffic counts were utilized to determine the trip generation rates for the additional rooms of the expansion. The trip counts would account for the location of the hotel, type of clientele, and use by other modes of transit such as hotel shuttle, taxi, public transit etc. The calculated trip generation rates are shown in Table 3.2. TABLE 3.2 TRIP GENERATION RATES LAND USE Weekday Peak AM hr. TRIP RATES Weekday Peak PM hr. Hilton Garden Inn Hotel 0.50 Trips/Guest Room 0.51 Trips/Guest Room The trips generation rates from Table 3.2 were applied to the 128 room hotel expansion, with the expected site generated trips shown in Table 3.3. TABLE 3.3 SITE GENERATED TRIPS LAND USE WEEKDAY PEAK PM HOUR SATURDAY PEAK HOUR Total Enter Exit Total Enter Exit Hilton Hotel Expansion (48%) 33 (52%) (51%) 32 (49%)

11 9 The Hilton Garden Inn Hotel is located in close proximity to the Macdonald-Cartier Ottawa International Airport. The type of clientele of the hotel is mainly business men and women who want accessibility to the airport, commercial businesses, and access to the downtown area. The distribution of site generated trips was therefore established by examining the volume of traffic from the 2012 traffic counts, the location of commercial districts, and accessibility to roads which lead to/from the downtown area and commercial districts. The study has assumed the following distribution of traffic: To/From the Airport 40% To/From Uplands Drive 20% To/From Lester Road 20% To/From Airport Parkway 20% The study has distributed the expected additional hotel trips presented in Table 3.3 to the above distribution. The weekday peak AM and PM hour site generated trips are shown in Figure TRANSPORTATION IMPACT The study will examine the operation of the hotel entrance and surrounding intersections using the Highway Capacity Software, which utilizes the intersection capacity analysis procedure as documented in the 2010 Highway Capacity Manual. For unsignalized intersections, the level of service of each lane movement is determined as a function of the delay of vehicles at the approach. The following relates the level of service of each lane movement with the expected delay at the approach. LEVEL OF SERVICE DELAY Level of Service A 0-10 sec./vehicle Little or No Delay Level of Service B >10-15 sec./vehicle Short Traffic Delays Level of Service C >15-25 sec./vehicle Average Traffic Delays Level of Service D >25-35 sec./vehicle Long Traffic Delays Level of Service E >35-50 sec./vehicle Very Long Traffic Delays Level of Service F >50 sec./vehicle Extreme Delays - Demand Exceeds Capacity The expected length of queue at the critical lane movements for an unsignalized intersection was determined by the calculation of the 95 th percentile queue at the lane approach. The 95 th percentile queue length is the calculated 95 th greatest queue length out of 100 occurrences at a movement during a 15-minute peak period. The 95 th percentile queue length is a function of the capacity of a movement and the total expected traffic, with the calculated value determining the magnitude of the queue by representing the queue length as fractions of vehicles. For a signalized intersection, the operation or level of service of an intersection is determined from the volume to capacity ratio (v/c) for each lane movement as documented by the City of Ottawa in the Transportation Impact Study Assessment Guidelines, October The following relates the level of service with the volume to capacity ratio at each lane movement.

12 10 FIGURE 3.2 PEAK AM AND PM HOUR SITE GENERATED TRIPS

13 11 LEVEL OF SERVICE VOLUME TO CAPACITY RATIO Level of Service A 0 to 0.60 Level of Service B 0.61 to 0.70 Level of Service C 0.71 to 0.80 Level of Service D 0.81 to 0.90 Level of Service E 0.91 to 1.00 Level of Service F > Background Traffic Volumes The background traffic volumes represent traffic along the surrounding roads which are not associated with the proposed expansion to the Hilton Garden Inn Hotel. The future background traffic volumes were determined for the expected completion of the hotel expansion at the year 2014, and at the year 2019 which represents five years beyond completion. The surrounding area of the site has not experience much new development with the exception of the CE Centre which was opened in Much of the traffic growth along Uplands Drive and Lester Road will be the result of traffic from development south and east of the site as shown in the City of Ottawa Official Plan. Traffic along Alert Road and Thad Johnson Private would essentially remain the same unless new development was to take place. To estimate the growth in background traffic, the study has examined historical traffic counts taken by the City of Ottawa at the intersection of Alert Road and Uplands Drive. The counts taken on July 27, 2000 and August 22, 2012 determined that the annual growth in traffic was approximately 2.65 percent. The study has assumed an annual growth of 2.5 percent for the traffic along Uplands Drive, Lester Road and the on/off ramps of the Airport Parkway. The background traffic along Alert Road and Thad Johnson Private were increased at an annual rate of 1 percent due to little potential development. The following are the growth factors for the background traffic which were applied to the 2012 traffic counts presented in Figure 2.1: To 2014 To Counts at 2.5 % annual growth Counts at 1.0 % annual growth Figure 4.1 shows the expected year 2014 background traffic volumes for the weekday peak AM and PM hours, and Figure 4.2 the year 2019 peak hour background traffic volumes. 4.2 Total Traffic Volumes The total future peak hour traffic volumes including the expected trips from the hotel expansion were determined by the sum of the background traffic volumes (Figure 4.1 for the 2014 volumes and Figure 4.2 for the 2019 volumes) and the expected site generated trips (Figure 3.2). The result would be the expected total 2014 weekday peak AM and PM hour traffic volumes shown in Figure 4.3, and the total 2019 total traffic volumes shown in Figure 4.4.

14 12 FIGURE PEAK AM AND PM HOUR BACKGROUND TRAFFIC

15 13 FIGURE PEAK AM AND PM HOUR BACKGROUND TRAFFIC

16 14 FIGURE PEAK AM AND PM HOUR TOTAL TRAFFIC

17 15 FIGURE PEAK AM AND PM HOUR TOTAL TRAFFIC

18 Traffic Analysis The traffic analysis has been performed for the existing weekday peak AM and PM hour traffic counts and for the expected traffic volumes during the peak hours at the completion of the hotel in 2014, and at the year 2019 which represents five years beyond the completion of the hotel expansion. The has examined the operation of the intersections listed below which will be discussed in detail in the following sections: Hotel Entrance from Alert Road Alert Road and Thad Johnson Private Alert Road and Uplands Drive (Lester Road) Uplands Drive and Airport Parkway Southbound Off Ramp Hilton Gardens Inn Access and Alert Road Intersection The access to the Hilton Gardens Inn Hotel is signed as an Entrance Only from Alert Road. The entrance forms the west approach and the NRC private access the east (westbound) approach. Alert Road forms both the northbound and southbound approaches. The intersection is controlled by a stop sign at the westbound NRC private approach. The 2012 traffic counts determined that all approaches functioned at a Level of Service (LoS) A with the exception of the hotel access. Although the hotel access is signed only as an entrance, some vehicles were observed exiting the site. The delay exiting the site at the hotel access resulted in the hotel approach to function at a LoS B. Table 4.1 summarizes the operation of the intersection with the operational analysis sheets provided in the Appendix as Exhibit 1 for the 2012 peak AM hour and Exhibit 2 for the peak PM hour. TABLE 4.1 HILTON GARDENS INN ACCESS/ALERT LoS & 95 th Percentile Queue Intersection Approach WEEKDAY PEAK AM HR. YEAR (2019) WEEKDAY PEAK PM HR. YEAR (2019) LoS Q 95 (Veh.) LoS Q 95 (Veh.) NB Left/Through/ Alert A A (A) (0.00) A A (A) (0.00) SB Left/Through/ Alert A A (A) (0.04) A A (A) (0.00) WB Left/Through/ NRC Access A A (B) (0.01) A A (A) (0.05) EB Left/Through/ Hilton access * B B * The Hilton access is signed Entrance Only. The 2014 and 2019 analysis has not assigned any traffic exiting at the eastbound movement of this approach.

19 17 For the expected traffic volumes at the year 2014, all approaches functioned at a LoS A during the peak AM and PM hours. The hotel entrance was assumed to be restricted to only traffic entering the site with all hotel trips exiting onto Thad Johnson Private. The Thad Johnson Private hotel access allows traffic to enter and exit the site. The analysis has however, assumed that all traffic entering the site would be from the Alert/Uplands intersection and would access the Alert Road hotel entrance. Table 4.1 summarizes the 2014 operation of the intersection following the completion of the expansion. The operational analysis summary sheets are provided as Exhibits 3 and 4. At the year 2019, the northbound and southbound Alert Road approaches would function at a LoS A during the AM and PM hours. The westbound NRC private access would function at a LoS B during the peak AM hour and a LoS A during the peak PM hour. Table 4.1 summarizes the operation of the intersection with the operational analysis sheets provided as Exhibit 5 for the 2019 peak AM hour and Exhibit 6 for the peak PM hour. Alert Road and Thad Johnson Private Intersection The Alert/Thad Johnson intersection is a T intersection with the Alert Road forming the northbound and southbound approaches, and the Thad Johnson Private approach forming the stop controlled eastbound approach. All trips exiting the hotel site would be onto Thad Johnson Private and to the eastbound approach of the Alert/Thad Johnson intersection. The intersection currently functions at a LoS A at all approaches during the peak AM and PM hours for the 2012 traffic counts. Table 4.2 summarizes the operation of the intersection with the analysis sheets provided in the Appendix as Exhibit 7 for the peak AM hour and Exhibit 8 for the peak PM hour. TABLE 4.2 ALERT/THAD JOHNSON LoS & 95 th Percentile Queue Intersection Approach WEEKDAY PEAK AM HR. YEAR (2019) WEEKDAY PEAK PM HR. YEAR (2019) LoS Q 95 (Veh.) LoS Q 95 (Veh.) NB Left/Through Alert A A (A) (0.00) A A (A) (0.00) EB Left/ Thad Johnson A A (A) (0.45) A A (A) (0.00) At the year 2014 which is when the hotel expansion is expected to be completed, the intersection approaches will continue to function at a LoS A during both the peak AM and PM hours. Table 4.2 summarizes the operation of the intersection with the operational analysis sheets provided as Exhibit 9 and Exhibit 10. At the year 2019, all approaches would function at a LoS A during the peak AM and PM hours. Table 4.2 summarizes the operation of the intersection with the operational analysis sheets provided as Exhibit 11 for the peak AM hour and Exhibit 12 for the peak PM hour. The

20 18 eastbound Thad Johnson Private approach would experience a 95 th percentile queue of 0.45 vehicles during the 2019 peak AM hour. Alert Road and Uplands Drive Intersection The intersection of Alert Road and Uplands Drive is controlled by traffic signals. Uplands Drive forms the eastbound approach, Lester Road the westbound approach, Alert Road the northbound approach, and the northbound Airport Parkway on/off ramps the southbound approach. At the time this report is being prepared, the intersection is being modified to include an additional eastbound Uplands Drive lane. The lane configuration used in the analysis was the modified configuration which is being completed and is shown in Figure 2.1 and discussed in Section 2. of this report. Using the 2012 traffic counts and traffic signal timing plan obtained from the City of Ottawa, all approaches to the intersection functioned at a LoS A during the peak AM and PM hours. Table 4.3 summarizes the operation of the intersection with the operational analysis sheets provided as Exhibit 13 and Exhibit 14. TABLE 4.3 ALERT/UPLANDS (LESTER) LoS and Volume/Capacity (v/c) Intersection Approach WEEKDAY PEAK AM HR. YEAR (2019) WEEKDAY PEAK PM HR. YEAR (2019) LoS v/c LoS v/c EB Left Uplands A A (A) (0.07) A A (A) (0.08) EB Through/ Uplands A A (A) (0.24) A A (A) (0.47) WB Left Lester A A (A) (0.25) A A (A) (0.31) WB Through Lester A A (A) (0.60) A A (A) (0.33) WB Lester A A (B) (0.64) A A (A) (0.22) NB Left Alert A A (A) (0.19) A A (A) (0.27) NB Through/ Alert A A (A) (0.16) A A (A) (0.36) SB Left Airport Parkway A A (A) (0.11) A A (A) (0.36) SB Through Airport Parkway A A (A) (0.08) A A (A) (0.06) Intersection Level of Service A A (A) (0.50) A A (A) (0.44) At the year 2014 when the Hilton Garden Inn Hotel expansion is completed, the intersection will continue to operate at a LoS A during the weekday peak AM and PM hours following an

21 19 adjustment to the peak AM hour signal timing plan. Table 4.3 summarizes the operation of the intersection with the operational analysis sheets provided as Exhibit 15 for the peak AM hour and Exhibit 16 for the peak PM hour. At the year 2019 which represents five years following the completion of the expansion, the Alert/Uplands intersection would function at a LoS A during both the peak AM and PM hours. All movements at the approaches would function at a LoS A as shown in Table 4.3 with the exception of the westbound Lester Road right turn movement which would function at a LoS B during the peak AM hour. The operational analysis sheets are provided in the Appendix as Exhibit 17 and Exhibit 18. Collision data was obtained from the City of Ottawa for the intersection of Alert Road and Uplands Drive (Lester Road). The accident reports were obtained over a three year period between January 1, 2009 and January 1, Table 4.4 summarizes the collision data of reported accidents which determined that during the three year time period, the Alert/Uplands intersection experienced 19 reported collisions. The data would not suggest any requirement for modifications to the intersection to improve safety. The addition of an eastbound Uplands Drive through lane may reduce the number of rear end collisions and possibly some turning movement collisions. The collision data from the City of Ottawa is presented as Exhibit 19 in the Appendix. TABLE 4.4 COLLISION SUMMARY COLLISION DATA Alert Road and Uplands Drive (Lester Road) Intersection Year Rear-End Angular Turning Other Total The Hilton Garden Inn Hotel entrance is located approximately 95 meters from the Alert/Uplands, or a distance of 75 meters from the stop bar at the northbound Alert Road approach and the entrance to the hotel. Using a traffic signal cycle length of 100 seconds, the northbound Alert Road left turn queue would be approximately 28 meters which can be accommodated in the minimum 40 meter left turn lane provided. The northbound Alert Road approach queue would not interfere with the operation of the hotel entrance. Uplands Drive and Southbound Airport Parkway Off Ramp Intersection The intersection of Uplands Drive and the southbound off ramp of the Airport Parkway is located approximately 200 meters west of the Alert/Uplands intersection. The Uplands/Airport Parkway intersection is controlled by traffic signals, with Uplands Drive forming the eastbound

22 20 and westbound approaches, and the Airport Parkway off ramp the southbound approach. The recent roadway modifications of the additional eastbound Uplands Drive through lane was to accommodate the southbound off ramp double left turn movement which has just been completed. The lane configuration is shown in Figure 2.1. The operational analysis for the existing 2012 traffic counts and traffic signal timing plan determined that the intersection currently functions at a LoS A during both the peak AM and PM hours. Table 4.5 shows the operation of the intersection with the analysis sheets provided as Exhibits 20 and 21. TABLE 4.5 UPLANDS/AIRPORT PARKWAY LoS and Volume/Capacity (v/c) Intersection Approach WEEKDAY PEAK AM HR. YEAR (2019) WEEKDAY PEAK PM HR. YEAR (2019) LoS v/c LoS v/c EB Through Uplands A A (A) (0.16) A A (A) (0.30) WB Through Uplands A A (A) (0.57) C C (C) (0.76) SB Left Airport Parkway A A (A) (0.38) A A (B) (0.61) Intersection Level of Service A A (A) (0.52) A B (B) (0.69) At the year 2014 when the hotel expansion is expected to be completed, the overall intersection level of service is expected to operate at a LoS A during the peak AM hour and a LoS B during the peak PM hour following an adjustment to the signal timing. Table 4.5 summarizes the operation of the intersection with the operational analysis sheets provided as Exhibit 22 for the peak AM hour and Exhibit 23 for the peak PM hour. Following an adjustment to the traffic signal timing, the intersection is expected to operate at an overall LoS A during the 2019 peak AM hour with all approaches functioning at a LoS A. During the peak PM hour the intersection is expected to operate at an overall LoS B, with the eastbound approach functioning at a LoS A, the westbound approach at a LoS C, and southbound approach at a LoS B. Table 4.5 shows the operation of the intersection with the analysis sheets provided as Exhibits 24 and Pedestrian, Transit Facilities, and Cycling The existing Hilton Garden Inn Hotel has a pedestrian pathway linking the hotel with a bus stop on the northbound Airport Parkway for Regular Route 97, which travels along the Airport Parkway between the airport and the South Keys transit station. The site has an existing pedestrian path to Alert Road which would give pedestrians access to transit stops for Regular

23 21 Route 99 and Peak Hour Route 204 which travel along Lester Road. The Site Plan also provides a link to a new pathway under construction along the south side of Uplands Drive. There currently are no sidewalks along Uplands Drive or Lester Road. The City of Ottawa Official Plan (Rapid Transit Network) shows a transit line from the Macdonald-Cartier Ottawa International Airport to a north-south transit line which would place the transit route along the south side of Uplands Drive adjacent to the hotel. When the transit route is constructed, a transit station is expected to be constructed in close proximity to the hotel and Gloucester (Airport) Industrial Park. Transit service is expected to be used mainly by employees and may have little impact on the number of peak hour site generated trips. Observations during the traffic counts did observe many trips by the hotel airport shuttle. There are no cycling lanes along Uplands Drive or Lester Road with the exception of the stretch between Alert Road and the off ramp from the Airport Parkway which is currently undergoing roadway modifications. The City of Ottawa zoning By-laws require 22 bicycle parking spaces which will be provided. 5. FINDINGS AND RECOMMENDATIONS There is a proposal for an expansion to the existing Hilton Garden Inn Hotel at 2400 Alert Road. The expansion will comprise of 128 additional guest rooms and an expansion of the existing restaurant. The expansion of the hotel is expected to be completed by the year Staff of the City of Ottawa has requested that a be prepared which would examine the impact of the additional site generated traffic on the surrounding roads and intersections. The is being prepared in support of the Site Plan Application. The findings and recommendations of the study are summarized in the following: 1) The proposed expansion to the hotel would generate 64 new weekday peak AM hour trips and 65 peak PM hour trips. The expected additional trips were determined utilizing the year 2012 traffic counts and number of guest rooms at the existing Hilton Garden Inn Hotel. 2) The Site Plan proposes an Entrance Only access point from Alert Road and an Entrance/Exit access point onto Thad Johnson Private. 3) The hotel entrance from Alert Road would operate at a good level of service at the year The Entrance/Alert intersection would not require any roadway modifications due to the hotel expansion. The expected year 2019 queue from the northbound Alert Road approach to the Alert/Uplands intersection would not interfere with the operation of the hotel entrance.

24 22 4) The intersection of Alert Road and Thad Johnson Private would operate at a good level of service at the year 2019 and would not require any roadway modifications due to the hotel expansion. 5) The intersection of Alert Road and Uplands Drive (Lester Road) is controlled by traffic signals. The City of Ottawa is completing roadway modifications which would comprise of the addition of an eastbound Uplands Drive through lane. The intersection would operate at a good level of service at the year 2019 and would not require any further roadway modifications due to the hotel expansion. 6) The intersection of Uplands Drive and the southbound Airport Parkway off ramp is controlled by traffic signals. The City of Ottawa roadway modifications include the addition of a southbound double left turn lane at the Airport Parkway off ramp, and an additional eastbound Uplands Drive through lane. The intersection would operate at a good level of service at the year 2019 and would not require any further roadway modifications due to the hotel expansion. 7) A Check List is provided in the Appendix as Exhibit 26. Prepared by: David J. Halpenny, P. Eng.

25 23 APPENDIX OPERATIONAL ANALYSIS WORK SHEETS COLLISION SUMMARY TRANSPORTATION BRIEF CHECK LIST

26 24 EXHIBIT 1 YEAR 2012 PEAK AM HOUR ANALYSIS Site Access/Alert HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM Hour Intersection: Alert/Access Analysis Year: October 10, 2012 Project ID: Hilton Garden Inn Expansion East/West Street: Site Access (NRC Access) North/South Street: Alert Road Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration LTR LTR Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement L T R L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) 0 0 Flared Approach: Exists?/Storage No / Yes /1 Lanes Configuration LTR LTR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config LTR LTR LTR LTR v (vph) C(m) (vph) v/c % queue length Control Delay LOS A A A Approach Delay Approach LOS A B

27 25 EXHIBIT 2 YEAR 2012 PEAK PM HOUR ANALYSIS Site Access/Alert HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM Hour Intersection: Alert/Access Analysis Year: October 10, 2012 Project ID: Hilton Garden Inn Expansion East/West Street: Site Access (NRC Access) North/South Street: Alert Road Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration LTR LTR Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement L T R L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) 0 0 Flared Approach: Exists?/Storage No / Yes /1 Lanes Configuration LTR LTR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config LTR LTR LTR LTR v (vph) C(m) (vph) v/c % queue length Control Delay LOS A A A Approach Delay Approach LOS A B

28 26 EXHIBIT 3 YEAR 2014 PEAK AM HOUR ANALYSIS Site Access/Alert HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM Hour Intersection: Alert/Access Analysis Year: Year 2014 Project ID: Hilton Garden Inn Expansion East/West Street: Site Access (NRC Access) North/South Street: Alert Road Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration LTR LTR Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement L T R L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) 0 0 Flared Approach: Exists?/Storage No / / Lanes Configuration LTR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config LTR LTR LTR v (vph) C(m) (vph) v/c % queue length Control Delay LOS A A A Approach Delay 8.9 Approach LOS A

29 27 EXHIBIT 4 YEAR 2014 PEAK PM HOUR ANALYSIS Site Access/Alert HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM Hour Intersection: Alert/Access Analysis Year: Year 2014 Project ID: Hilton Garden Inn Expansion East/West Street: Site Access (NRC Access) North/South Street: Alert Road Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration LTR LTR Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement L T R L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) 0 0 Flared Approach: Exists?/Storage No / / Lanes Configuration LTR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config LTR LTR LTR v (vph) C(m) (vph) v/c % queue length Control Delay LOS A A A Approach Delay 9.3 Approach LOS A

30 28 EXHIBIT 5 YEAR 2019 PEAK AM HOUR ANALYSIS Site Access/Alert HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM Hour Intersection: Alert/Access Analysis Year: Year 2019 Project ID: Hilton Garden Inn Expansion East/West Street: Site Access (NRC Access) North/South Street: Alert Road Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration LTR LTR Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement L T R L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) 0 0 Flared Approach: Exists?/Storage No / / Lanes Configuration LTR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config LTR LTR LTR v (vph) C(m) (vph) v/c % queue length Control Delay LOS A A A Approach Delay 8.9 Approach LOS A

31 29 EXHIBIT 6 YEAR 2019 PEAK PM HOUR ANALYSIS Site Access/Alert HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM Hour Intersection: Alert/Access Analysis Year: Year 2019 Project ID: Hilton Garden Inn Expansion East/West Street: Site Access (NRC Access) North/South Street: Alert Road Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration LTR LTR Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement L T R L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) 0 0 Flared Approach: Exists?/Storage No / / Lanes Configuration LTR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config LTR LTR LTR v (vph) C(m) (vph) v/c % queue length Control Delay LOS A A A Approach Delay 9.3 Approach LOS A

32 30 EXHIBIT 7 YEAR 2012 PEAK AM HOUR ANALYSIS Alert/Thad Johnson HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM Hour Intersection: Alert/Thad Johnson Analysis Year: October 10, 2012 Project ID: Hilton Garden Inn Expansion East/West Street: Thad Johnson Private North/South Street: Alert Road Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration LT TR Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement L T R L T R Volume 68 2 Peak Hour Factor, PHF Hourly Flow Rate, HFR 73 2 Percent Heavy Vehicles 1 1 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / Yes /1 Lanes 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config LT LR v (vph) 0 75 C(m) (vph) v/c % queue length Control Delay LOS A A Approach Delay 9.4 Approach LOS A

33 31 EXHIBIT 8 YEAR 2012 PEAK PM HOUR ANALYSIS Alert/Thad Johnson HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM Hour Intersection: Alert/Thad Johnson Analysis Year: October 10, 2012 Project ID: Hilton Garden Inn Expansion East/West Street: Thad Johnson Private North/South Street: Alert Road Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration LT TR Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement L T R L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles 1 1 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / Yes /1 Lanes 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config LT LR v (vph) C(m) (vph) 1513 v/c % queue length 0.00 Control Delay LOS A Approach Delay 9.5 Approach LOS A

34 32 EXHIBIT 9 YEAR 2014 PEAK AM HOUR ANALYSIS Alert/Thad Johnson HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM Hour Intersection: Alert/Thad Johnson Analysis Year: Year 2014 Project ID: Hilton Garden Inn Expansion East/West Street: Thad Johnson Private North/South Street: Alert Road Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration LT TR Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement L T R L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles 1 1 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / Yes /1 Lanes 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config LT LR v (vph) C(m) (vph) v/c % queue length Control Delay LOS A A Approach Delay 9.6 Approach LOS A

35 33 EXHIBIT 10 YEAR 2014 PEAK PM HOUR ANALYSIS Alert/Thad Johnson HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM Hour Intersection: Alert/Thad Johnson Analysis Year: Year 2014 Project ID: Hilton Garden Inn Expansion East/West Street: Thad Johnson Private North/South Street: Alert Road Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration LT TR Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement L T R L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles 1 1 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / Yes /1 Lanes 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config LT LR v (vph) C(m) (vph) 1512 v/c % queue length 0.00 Control Delay LOS A Approach Delay 9.7 Approach LOS A

36 34 EXHIBIT 11 YEAR 2019 PEAK AM HOUR ANALYSIS Alert/Thad Johnson HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM Hour Intersection: Alert/Thad Johnson Analysis Year: Year 2019 Project ID: Hilton Garden Inn Expansion East/West Street: Thad Johnson Private North/South Street: Alert Road Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration LT TR Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement L T R L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles 1 1 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / Yes /1 Lanes 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config LT LR v (vph) C(m) (vph) v/c % queue length Control Delay LOS A A Approach Delay 9.7 Approach LOS A

37 35 EXHIBIT 12 YEAR 2019 PEAK PM HOUR ANALYSIS Alert/Thad Johnson HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM Hour Intersection: Alert/Thad Johnson Analysis Year: Year 2019 Project ID: Hilton Garden Inn Expansion East/West Street: Thad Johnson Private North/South Street: Alert Road Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration LT TR Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement L T R L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles 1 1 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / Yes /1 Lanes 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config LT LR v (vph) C(m) (vph) 1504 v/c % queue length 0.00 Control Delay LOS A Approach Delay 9.8 Approach LOS A

38 36 EXHIBIT 13 YEAR 2012 PEAK AM HOUR ANALYSIS Alert/Uplands HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Alert/Uplands Period: Peak AM Hour Year: August 22, 2012 Project ID: Hilton Garden Inn Expansion E/W St: Uplands Drive (Lester Road) N/S St: Alert Road SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes LGConfig L TR L T R L TR L T Volume Lane Width RTOR Vol _ Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left P NB Left A Thru P Thru A P A Peds X Peds WB Left P SB Left A Thru P Thru A P Peds X Peds NB EB SB WB Green Yellow All Red Cycle Length: 65.0 secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio _ Eastbound Left L Thru TR Westbound Left L Thru T # R Northbound Left L Thru TR # Southbound Left L Thru T _ Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.33 Total lost time per cycle, L = 9.90 sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.39

39 37 EXHIBIT 14 YEAR 2012 PEAK PM HOUR ANALYSIS Alert/Uplands HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Alert/Uplands Period: Peak PM Hour Year: August 22, 2012 Project ID: Hilton Garden Inn Expansion E/W St: Uplands Drive (Lester Road) N/S St: Alert Road SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes LGConfig L TR L T R L TR L T Volume Lane Width RTOR Vol _ Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left P NB Left A Thru P Thru A P A Peds X Peds X WB Left P SB Left A Thru P Thru A P Peds X Peds X NB EB SB WB Green Yellow All Red Cycle Length: 65.0 secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio _ Eastbound Left L Thru TR # Westbound Left L Thru T R Northbound Left L Thru TR # Southbound Left L Thru T _ Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.35 Total lost time per cycle, L = 3.90 sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.37

40 38 EXHIBIT 15 YEAR 2014 PEAK AM HOUR ANALYSIS Alert/Uplands HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Alert/Uplands Period: Peak AM Hour Year: Year 2014 Project ID: Hilton Garden Inn Expansion E/W St: Uplands Drive (Lester Road) N/S St: Alert Road SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes LGConfig L TR L T R L TR L T Volume Lane Width RTOR Vol _ Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left P NB Left A Thru P Thru A P A Peds X Peds X WB Left P SB Left A Thru P Thru A P Peds X Peds X NB EB SB WB Green Yellow All Red Cycle Length: 65.0 secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio _ Eastbound Left L Thru TR Westbound Left L Thru T # R Northbound Left L # Thru TR Southbound Left L Thru T _ Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.36 Total lost time per cycle, L = 9.90 sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.42

41 39 EXHIBIT 16 YEAR 2014 PEAK PM HOUR ANALYSIS Alert/Uplands HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Alert/Uplands Period: Peak PM Hour Year: Year 2014 Project ID: Hilton Garden Inn Expansion E/W St: Uplands Drive (Lester Road) N/S St: Alert Road SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes LGConfig L TR L T R L TR L T Volume Lane Width RTOR Vol _ Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left P NB Left A Thru P Thru A P A Peds X Peds X WB Left P SB Left A Thru P Thru A P Peds X Peds X NB EB SB WB Green Yellow All Red Cycle Length: 65.0 secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio _ Eastbound Left L Thru TR # Westbound Left L Thru T R Northbound Left L Thru TR # Southbound Left L Thru T _ Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.37 Total lost time per cycle, L = 3.90 sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.40

42 40 EXHIBIT 17 YEAR 2019 PEAK AM HOUR ANALYSIS Alert/Uplands HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Alert/Uplands Period: Peak AM Hour Year: Year 2019 Project ID: Hilton Garden Inn Expansion E/W St: Uplands Drive (Lester Road) N/S St: Alert Road SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes LGConfig L TR L T R L TR L T Volume Lane Width RTOR Vol _ Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left P NB Left A Thru P Thru A P A Peds X Peds X WB Left P SB Left A Thru P Thru A P Peds X Peds X NB EB SB WB Green Yellow All Red Cycle Length: 65.0 secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio _ Eastbound Left L Thru TR Westbound Left L Thru T R # Northbound Left L # Thru TR Southbound Left L Thru T _ Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.42 Total lost time per cycle, L = 9.90 sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.50

43 41 EXHIBIT 18 YEAR 2019 PEAK PM HOUR ANALYSIS Alert/Uplands HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Alert/Uplands Period: Peak PM Hour Year: Year 2019 Project ID: Hilton Garden Inn Expansion E/W St: Uplands Drive (Lester Road) N/S St: Alert Road SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes LGConfig L TR L T R L TR L T Volume Lane Width RTOR Vol _ Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left P NB Left A Thru P Thru A P A Peds X Peds X WB Left P SB Left A Thru P Thru A P Peds X Peds X NB EB SB WB Green Yellow All Red Cycle Length: 65.0 secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio _ Eastbound Left L Thru TR # Westbound Left L Thru T R Northbound Left L Thru TR # Southbound Left L Thru T _ Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.41 Total lost time per cycle, L = 3.90 sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.44

44 42 FIGURE 19 YEAR 2009 T COLLISION REPORT SUMMARY

45 43

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: 1649362 Ontario Inc. c/o Manor Park Management 231 Brittany Drive, Suite D Ottawa ON K1K 0R8 July

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny

More information

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: Orleans Gardens Shopping Centre Inc. 2851 John Street, Suite 1 Markham, ON K3R 5R7

More information

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited.

BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited. BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: 2534189 Ontario Limited April 6, 2018 117-668 TIA Report_2.doc D. J. Halpenny & Associates

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

Signal Warrant Studies

Signal Warrant Studies Signal Warrant Studies Seven Locations Piqua, Ohio December 12, 217 Signal Warrant Studies Seven Locations Piqua, Ohio TABLE OF CONTENTS Executive Summary... 3 Introduction... 5 Study Location... 5 Data

More information

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY 675 Millcreek Drive, Unit 1 Mississauga, Ontario L5N 5M4 T: 416.213.7121 F: 95.89.8499 www.transtech.co TRAFFIC IMPACT STUDY PROPOSED MOSQUE DEVELOPMENT 4269 REGIONAL ROAD 25 TOWN OF OAKVILLE PREPARED

More information

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012 Update for the May 31 st, 2012 Traffic Impact Study Prepared for Broccolini Construction 111-23596-00 September 20 th, 2012 2611 Queensview Drive, Suite 300, Ottawa, Ontario CANADA K2B 8K2 Telephone: 613-829-2800

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Capital Region Council of Governments

Capital Region Council of Governments March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry

More information

APPENDIX C Additional Traffic Data

APPENDIX C Additional Traffic Data APPENDIX C Additional Traffic Data Raleigh and Heiden Properties FEIS F- ATTACHMENT Response.8- Traffic Count WEEKENDPEAK5MINUTECOUNTSPROJECTRaleighandHeidenPropertiesLOCATIONCR6,andCR9DATEFridayAugust6,TIME:PMto6:PM5MinuteTraficCR6SBCR9EBCR6NBSTARTENDleftthrurightTotalleftthrurightTotalleftthrurightTotalleftthrurightTotalGRANDTIMETIME56TAL-------------------:PM:5PM56:5PM:PM666566:PM:5PM685886:5PM:PM555585:PM:5PM5856889:5PM:PM8656:PM:5PM955656885:5PM:PM65986858:PM:5PM66855:5PM:PM69898:PM:5PM895858959:5PM:PM8589:PM:5PM85569:5PM:PM586985:PM:5PM55859565:5PM5:PM886559655:PM5:5PM56699595:5PM5:PM668955:PM5:5PM666856555:5PM6:PM95885-------------------TAL85896959688668

More information

2. Existing Conditions

2. Existing Conditions 2. Existing Conditions The existing traffic and parking conditions on the site and the surrounding area were reviewed based on the study methodology in Section 1.2. 2.1 Existing Land Use The portion of

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

THE LANDMARK AT TALBOT PARK

THE LANDMARK AT TALBOT PARK TRAFFIC IMPACT STUDY FOR THE LANDMARK AT TALBOT PARK IN NORFOLK, VA INTERMODAL ENGINEERING, P.C. OCTOBER, 200 The Landmark at Talbot Park is a proposed redevelopment of the existing apartments along the

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study Traffic Study To: From: James M. Moore, Director of Planning & Building Services, Town of Fairfax David Parisi, PE, TE, Parisi Transportation Consulting Date: October 14, 216 Subject: Victory Village Senior

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

George Street Transportation Impact Study. Paradigm Transportation Solutions Limited

George Street Transportation Impact Study. Paradigm Transportation Solutions Limited George Transportation Impact Study Paradigm Transportation Solutions Limited January 217 Project Summary Project Number 16191 January 217 Client Wastell Homes 5-1895 Blue Heron Drive London ON N6H 5L9

More information

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited 2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief Paradigm Transportation Solutions Limited March 217 March 217 Project: 1627 Diana Vlasic, M.C.I.P., R.P.P Metropolitan Consulting 445 Paletta

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information

Road Conversion Study Plumas Street

Road Conversion Study Plumas Street Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

INTERSECTION OPERATIONAL ANALYSIS AND NECESSARY RECOMMENDATIONS CIVL 440 Project

INTERSECTION OPERATIONAL ANALYSIS AND NECESSARY RECOMMENDATIONS CIVL 440 Project INTERSECTION OPERATIONAL ANALYSIS AND NECESSARY RECOMMENDATIONS CIVL 44 Project INTERSECTION: 16TH AVENUE & EAST MALL FOR AM PEAK HOUR Group Work: Syed Shafaat Ali Shah (2347426) Mohammad Moudud Hasan

More information

List of Exhibits...ii

List of Exhibits...ii One Brickell Traffic Study TABLE OF CONTENTS List of Exhibits...ii EXECUTIVE SUMMARY...1 1. INTRODUCTION...2 1.1 Study Area...2 1.2 Study Objective...5 2. EXISTING TRAFFIC CONDITIONS...6 2.1 Data Collection...6

More information

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama.

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama. Traffic Impact Study Crestline Piggly Wiggly Mountain Brook, Alabama Prepared for: Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama September 214 Revision 1 October 214 Crestline Piggly Wiggly Mountain

More information

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748 City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for oad & Traffic Management Road & Traffic Management R Atlantic Traffic Engineering Specialists Draft Report Traffic Impact Study Superstore, Wal-Mart, and Kent Development Yarmouth, Nova Scotia Prepared

More information

Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property

Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property Prepared for: Premier Gold Mines Limited Prepared by: Stantec Consulting Ltd. November 2014

More information

Troutbeck Farm Development

Troutbeck Farm Development Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com

More information

Michigan Avenue Traffic Study

Michigan Avenue Traffic Study City of Sarnia Michigan Avenue Traffic Study Final Report November 29, 218 B17 SUBMITTED BY CIMA CANADA INC. 4 327 Harvester Road Burlington, ON L7N 3G7 T 289 288-287 F 289 288-285 cima.ca CONTACT Stephen

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina Prepared for Longbranch Development Prepared by January 13, 219 ii Table of Contents Subject Page Signature Page... i Table of Contents...

More information

CPC Parking Lot Riverside Drive. Transportation Brief

CPC Parking Lot Riverside Drive. Transportation Brief CPC Parking Lot 2785 Riverside Drive Transportation Brief Prepared By: NOVATECH Suite 2, 24 Michael Cowpland Drive Ottawa, Ontario K2M P6 7 / 5 / 25 Novatech File: 49 Ref: R-25-22 July 5 th, 25 City of

More information

joint access drive. will be

joint access drive. will be Date: To: From: Subject: June 22, 2015 Bradley Reiner, PE Bowman Consulting David R. Kline, PE, PTOE, Incline Associates Thornton Self-Storage Traffic Analysis (DRAFT) - Thornton, Colorado INTRODUCTION

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

Student Housing Development

Student Housing Development Traffic Impact Study for the proposed Student Housing Development City of Oneonta Otsego County, New York Project No. 3259 December 212 Revised February 13, 212 Prepared For: Newman Development Group,

More information

APPENDIX D. Traffic Impact Study Creighton Manning Engineering, LLP

APPENDIX D. Traffic Impact Study Creighton Manning Engineering, LLP APPENDIX D Traffic Impact Study Creighton Manning Engineering, LLP Traffic Impact Study Catskill Access Evaluation NYS Thruway Exit 21 Town of Catskill, New York CM Project No. 114-232 Prepared For: Greene

More information

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY DECEMBER 2012 READ, VOORHEES & ASSOCIATES TORONTO, ONTARIO Read, Voorhees & Associates

More information

1223 Michael Street, Suite 100, Ottawa, Ontario, K1J 7T2 P: l F: l

1223 Michael Street, Suite 100, Ottawa, Ontario, K1J 7T2 P: l F: l 1223 Michael Street, Suite 100, Ottawa, Ontario, K1J 7T2 P: +1 613.738.4160 l F: +1 613.739.7105 l www.parsons.com City of Ottawa 2017 TIA Guidelines Date July 3, 2018 TIA Screening Form Project 116 York

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY TRAFFIC IMPACT STUDY for the GLEN ELLEN COUNTRY CLUB SENIOR RESIDENTIAL REDEVELOPMENT 84 Millis, Massachusetts Prepared by: McMahon Associates, Inc. Prepared for: Toll Brothers, Inc. August 216 DRAFT

More information

Parking Lot P6C Transportation Impact Assessment

Parking Lot P6C Transportation Impact Assessment Transportation Carleton University Parking Lot P6C Transportation Impact Assessment Prepared by: AECOM 302 1150 Morrison Drive 613 820 8282 tel Ottawa, ON, Canada K2H 8S9 613 820 8338 fax www.aecom.com

More information

Proposed Addition to Pickering Islamic Centre

Proposed Addition to Pickering Islamic Centre TRAFFIC IMPACT STUDY, PARKING STUDY, SITE CIRCULATION REVIEW & TDM PLAN Proposed Addition to Pickering Islamic Centre 265 Brock Road City of Pickering, Ontario Prepared for: Pickering Islamic Centre Masjid

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

APPENDIX E: Transportation Technical Report

APPENDIX E: Transportation Technical Report New Jersey Pennsylvania Lackawanna Cut-Off Passenger Rail Service Reston Project Environmental Assessment APPENDIX E: Transportation Technical Report E.1 Introduction As part of the overall environmental

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 11 Parsippany, NJ 754 862.27.59 PREPARED

More information

ENKA INTERMEDIATE SCHOOL

ENKA INTERMEDIATE SCHOOL TRANSPORTATION IMPACT ANALYSIS Prepared for Buncombe County Schools ENKA INTERMEDIATE SCHOOL Asheville, NC Project Number: 13-71 8/1/13 www.davenportworld.com DAVENlORT Transportation Impact Analysis Enka

More information

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 151714A Table of Contents Table of Contents I. INTRODUCTION... 2 II. EXISTING CONDITIONS... 5 III. 215 EXISTING TRAFFIC CONDITIONS... 6

More information

December 4, Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA Attn: Kathy Marshall. Dear Board Members:

December 4, Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA Attn: Kathy Marshall. Dear Board Members: December 4, 28 Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA 86 Attn: Kathy Marshall RE: RAMSHEAD MERRIMAC, MA Dear Board Members: Bayside Engineering, Inc. has received the MDM Transportation

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

M E M O R A N D U M M:\2017\117036\DATA\CORRESPONDENCE\MEMOS\ WINDSORPARKSURVEY.DOCX

M E M O R A N D U M M:\2017\117036\DATA\CORRESPONDENCE\MEMOS\ WINDSORPARKSURVEY.DOCX M E M O R A N D U M DATE: NOVEMBER 24, 217 TO: FROM: RE: CC: WALLY DUBYK, CITY OF OTTAWA JENNIFER LUONG 126-4 HUNT CLUB ROAD RETIREMENT RESIDENCE TRIP GENERATION NEIL MALHOTRA, JIM BURGHOUT (CLARIDGE HOMES)

More information

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study To: Ms. Susan C. Ryan Spaulding Youth Center 72 Spaulding Road Northfield, NH 03276 Date: September 7, 2017 Project #: 52455.00 From: Robin Bousa Director of Transportation Systems Re: Spaulding Youth

More information

Traffic Study North Shore School District 112

Traffic Study North Shore School District 112 Traffic Study North Shore School District 112 Proposed Expansion of Northwood Junior High School Prepared By: May 1, 2015 1. Introduction Kenig, Lindgren, O Hara, Aboona, Inc. (KLOA, Inc.) has been retained

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /

More information

LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY

LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY Prepared for: Liberty Tree Academy Prepared by: 161 Blake Street, Suite 2 Denver, Colorado 822 Contact: David Kline, PE, PTOE (33)-572-2 On Behalf of: Liberty

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT Prepared by: In Association with: November 2013 EXECUTIVE SUMMARY Patton Township, in partnership

More information

Patuxent Green Golf Course

Patuxent Green Golf Course Patuxent Green Golf Course Laurel, Maryland February 23, 2018 Traffic Impact Analysis Prepared for: ADC Builders Alan Cohen 2701 Tower Oaks Boulevard, Suite 200 Rockville, Maryland 20852 TABLE OF CONTENTS

More information

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM To: Thomas Cummings February 17, 2011 Holbrook Public Works Superintendent From: Re:

More information

Traffic Impact Statement

Traffic Impact Statement Traffic Impact Statement Mixed Use Development, US 41 and Old Trail Drive aka Tide-Starbucks 4900 9 th Street North General Development Site Plan (GDSP) Collier County, FL 10/6/2015 Prepared for: Prepared

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

February 24, 2017 Project #: 20076

February 24, 2017 Project #: 20076 February 24, 217 Project #: 276 Jinde Zhu Washington County Department of Land Use and Transportation 14 SW Walnut Street MS 17 Hillsboro, Oregon 97213 RE: Sunset Ridge Phase 2 Access Report and Zone Change

More information

192 & 196 Bronson Avenue / 31 Cambridge Street

192 & 196 Bronson Avenue / 31 Cambridge Street Bronson Inc. July 213 192 & 196 Bronson Avenue / 31 Cambridge Street TRANSPORTATION BRIEF Prepared by: Study 192 Bronson Type Avenue July 213 Study Transportation Name Brief February 211 TB Check List

More information

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine Draft Study STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine SUBMITTED TO: BANGOR AREA COMPREHENSIVE TRANSPORTATION SYSTEM SUBMITTED BY: I MAY 23, 2017 DRAFT STILLWATER AVENUE STUDY FINAL REPORT Table

More information

The Cape Cod Five Cents Savings Bank

The Cape Cod Five Cents Savings Bank TRAFFIC IMPACT AND ACCESS STUDY The Cape Cod Five Cents Savings Bank Hyannis, Massachusetts PREPARED FOR The Cape Cod Five Cents Savings Bank 19 West Road Orleans, Massachusetts 0263 PREPARED BY 1 Walnut

More information

Public Involvement Meeting Tuesday, June 13, Albany Shaker Road Corridor Study

Public Involvement Meeting Tuesday, June 13, Albany Shaker Road Corridor Study Public Involvement Meeting Tuesday, June 13, 2017 Albany Shaker Road Corridor Study Agenda / Meeting Outline 1. Introduce the project 2. Complete Streets 3. Share/confirm our findings 4. Your Opinion 5.

More information

MEMO DRAFT VIA . Mr. Terry Bailey Foremost Development Company. To: Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink.

MEMO DRAFT VIA  . Mr. Terry Bailey Foremost Development Company. To: Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink. MEMO DRAFT VIA EMAIL To: From: Mr. Terry Bailey Foremost Development Company Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink Date: August 29, 214 Re: Proposed Apartments City of Walled

More information

TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO

TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO APRIL 12, 218 REV. JULY 16, 218 Prepared for: Davis Development 43 Corporate Center Dr Suite 21 Stockbridge, GA 3281 Prepared by: 112

More information

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Figure 1: East West Connector Alignment Alternatives Concept Drawing Page 2 of 9 Figure 1: East West Connector Alignment Alternatives Concept Drawing The Montebello Drive extension will run north south and connect Wilsonville Road to the Boones Ferry Road to Brown Road

More information

CastleGlenn Consultants Inc.

CastleGlenn Consultants Inc. February 1 st, 2010 CastleGlenn Consultants Inc. Engineers, Project Managers & Planners Mr. Kevin Yemm Planning and Land Development Richraft Ltd. 2280 St. Laurent Boulevard Suite 201 Ottawa, Ontario (Tel:

More information

AMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning

AMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning AMEC Earth and Environmental Bovaird Drive Environmental Assessment Traffic Study Final Report August Excellence in Transportation Planning AMEC Earth and Environmental Bovaird Drive Class EA Traffic

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon Traffic Analysis and Design Report NW Bethany Boulevard NW Bronson Road to NW West Union Road Washington County, Oregon May 2011 Table of Contents Table of Contents Section 1 Executive Summary... 2 Section

More information