1 TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO APRIL 12, 218 REV. JULY 16, 218 Prepared for: Davis Development 43 Corporate Center Dr Suite 21 Stockbridge, GA 3281 Prepared by: 112 Lincoln Street Denver, CO 823 Ph: Harris Kocher Smith Project No

2 TABLE OF CONTENTS I. EXECUTIVE SUMMARY... 3 II. INTRODUCTION... 3 A. Project Overview... 3 B. Purpose of Study... 4 C. Study Area... 4 III. EXISTING CONDITIONS... 4 A. Existing Traffic Volumes... 4 B. Existing Roadway System... 4 IV. BACKGROUND TRAFFIC... 6 A. Background Traffic Volumes... 6 B. Background Traffic Operational Analysis... 6 V. PROJECT DEVELOPMENT... 7 A. Trip Generation... 7 B. Trip Distribution... 7 C. Trip Assignment... 7 VI. TOTAL TRAFFIC... 8 VII. PROJECT ANALYSIS... 8 A. Operational Analysis... 8 B. Queuing Analysis... 9 LIST OF TABLES Table 1: Trip Generation... 7 Table 2: Queue Analysis and Storage Requirements...1 Table 3: Summary of Recommendations Table 4: Summary of Results Intersection Capacity Analysis...11 Page 1 of 11

3 FIGURES 1 Vicinity Map 2 Conceptual Plan Existing Traffic Volumes 4 22 Background Traffic Volumes 5 24 Background Traffic Volumes Existing Traffic Operational Conditions 7 22 Background Traffic Operational Conditions 8 24 Background Traffic Operational Conditions 9 Site-Generated Trip Distribution 1 Site-Generated Trip Assignment Total Traffic Volumes Total Traffic Volumes Total Traffic Operational Conditions Total Traffic Operational Conditions APPENDIX A APPENDIX B 218 EXISTING TRAFFIC VOLUME COUNTS INTERSECTION CAPACITY ANALYSIS WORKSHEETS Page 2 of 11

4 I. EXECUTIVE SUMMARY Davis Development is proposing to develop the 1.39 ac property in the southwest quadrant of the intersection of Castle Pines Parkway and Lagae Rd in the city of Castle Pines, CO. The parcel is currently undeveloped. The proposed development is named and will consist of a multi-family apartment development with a maximum of 28 dwelling units. Access to the proposed development is proposed to be through two access points: a new ¾-movement (left-in/right-in/right-out) intersection on Castle Pines Parkway, and on the project s east property line, the addition of the west approach in alignment with the existing Lagae Rd / King Soopers west driveway creating a full-movement, two-way stop-controlled intersection. The current intersection of Lagae/King Soopers is a threelegged T intersection. The proposed project is projected to generate 1,132 daily vehicle trips of which approximately 71 will be generated during the AM peak hour and approximately 9 will be generated during the PM peak hour. The signalized intersection of Castle Pines Parkway / Lagae Rd operates in 218 with acceptable service levels and is projected to operate at acceptable service levels in 22 with the addition of the traffic from the development. The intersection is projected to operate with unacceptable service levels in 24 without (or with) traffic from the development. The proposed ¾-movement intersection on Castle Pines Parkway is projected to operate with acceptable service levels in 22 and 24. The north driveway of King Soopers on Castle Pines Parkway is projected to operate with unacceptable service levels in 24 without (or with) traffic from the development. The King Soopers West Driveway and Lagae Rd intersection is projected to have eastbound and westbound movements operate with unacceptable service levels in 24 without (or with) traffic from the development. The Lagae Road and Mira Vista Lane roundabout is projected to operate with acceptable service levels in 24 without (or with) traffic from the development. Based on the analyses contained in this traffic study it is concluded that the study-area roadway system can accommodate the proposed development with the recommended access improvements with negligible impact on the study-area roadway system. II. INTRODUCTION A. Project Overview Davis Development is proposing to develop the 1.39 ac property in the southwest quadrant of the intersection of Castle Pines Parkway and Lagae Rd in the City of Castle Pines, CO. The parcel is currently undeveloped. The proposed development is named and will consist of a multi-family apartment development with a maximum of 28 dwelling units. The subject property is bounded on the north by Castle Pines Parkway, on the west by Page 3 of 11

5 residential development, on the south by undeveloped land, on the east by Lagae Rd. The parcel is situated within the jurisdictional limits of the City of Castle Pines in the state of Colorado. Access to the proposed development is proposed to be through two access points: a new ¾-movement (left-in/right-in/right-out) intersection on Castle Pines Parkway, and on the project s east property line, the addition of the west approach in alignment with the existing Lagae Rd / King Soopers west driveway creating a full-movement, two-way stop-controlled intersection. The current intersection of Lagae/King Soopers is a threelegged T intersection. B. Purpose of Study The purpose of this study is to evaluate the impact of the vehicular trips projected to be generated by the proposed development on the nearby intersections and roadway system. The study includes 218, 22 (year of anticipated build-out), and 24 analysis horizons. This traffic study was prepared in accordance with Douglas County Roadway Design and Construction Standards as adopted by the City of Castle Pines and as discussed with City of Castle Pines engineering personnel and/or representatives. C. Study Area The study area encompasses the existing roadway system in the vicinity of the project site. Specifically, the following existing intersections are evaluated: Castle Pines Parkway / Lagae Road (signalized) Castle Pines Parkway / King Soopers North Driveway (right-in/right-out) Lagae Road / King Soopers West Driveway (full movement, two-way stop-controlled) Lagae Road / Mira Vista Lane (roundabout) III. EXISTING CONDITIONS A. Existing Traffic Volumes Existing (218) peak-hour intersection turning-movement traffic-volume counts were collected for this study at the following intersections in March, 218: Castle Pines Parkway / Lagae Road Castle Pines Parkway / King Soopers North Driveway Lagae Road / King Soopers West Driveway Lagae Road / Mira Vista Lane A summary of the existing (218) peak-hour intersection turning-movement traffic volume counts and 24-hour directional-traffic volume counts are graphically illustrated in Figure 3. Detailed traffic-volume-count data are provided in Appendix A. B. Existing Roadway System Page 4 of 11

6 The existing transportation network in the vicinity of the subject property is graphically illustrated in Figure 1. The following narrative provides a description of the study-area roadways and associated intersections as they exist in 218: Study Area Roadways: Castle Pines Parkway in the area of the site is an east-west four-lane Minor Arterial roadway as classified in the Douglas County 23 Transportation Plan that allows connectivity between the City of Castle Pines and I-25. On both directions of travel on the roadway there are 11-foot lanes, curb and gutter on both sides, a detached sidewalk, and a painted shoulder that could be used as a bike lane. There is a raised center median. The posted speed limit is 4 mph. Lagae Road functions as a north-south minor collector roadway and is classified as a Collector in the Douglas County 23 Transportation Plan. Between the existing King Soopers west driveway and Castle Pines Parkway the roadway section consists of two 11 -wide through travel lanes in each direction with curb and gutter and a raised center median and attached sidewalk. South of the King Soopers west driveway the section is 4-5 lanes of asphalt or concrete with curb and gutter and attached sidewalk. The posted speed limit is 3 mph. Mira Vista Lane/Hyland Hills Road functions as a collector roadway providing connectivity primarily between American Academy (K-8, hours 8:5 AM 3:35 PM) and Lagae Rd and Castle Pines Parkway. The roadway section consists of asphalt with curb and gutteras two westbound lanes and one eastbound lane. Study Area Intersections: Castle Pines Parkway / Lagae Road (signalized) The Castle Pines Parkway / Lagae Road intersection is a four-legged intersection operating under actuated-coordinated signalized control. The east leg of the intersection has one protected-permitted left-turn lane, two through lanes, and one right-turn lane on the westbound approach and three eastbound departure lanes. The west leg of the intersection has one permitted left-turn lane, two through lanes, and one right-turn lane on the eastbound approach and two westbound departure lanes. The north leg of the intersection has one permitted left-turn lane, one through lane and one right-turn lane on the southbound approach and one northbound departure lane. The south leg of the intersection has one permitted left-turn lane, one through lane and one right-turn lane on the northbound approach and two southbound departure lanes. Castle Pines Parkway / King Soopers North Driveway the Castle Pines Parkway / King Soopers North Driveway intersection is a right-in/right-out intersection. The east leg of the intersection has two through lanes on the westbound approach and three eastbound departure lanes. The west leg of the intersection has two through lanes, and one rightturn lane on the eastbound approach and three westbound departure lanes. The south leg of the intersection has one right-turn lane on the northbound approach and one southbound departure lane. Lagae Road / King Soopers West Driveway - the Lagae Road / King Soopers West Driveway intersection is a three-legged T stop-controlled intersection with stop-control on the westbound approach. The east leg of the intersection has one left-turn lane and one right-turn lane on the westbound approach and one eastbound departure lane. The north leg of the intersection has two through lanes, and one left-turn lane on the southbound approach and two northbound departure lanes. The south leg of the intersection has one shared through/right-turn lane on the northbound approach and two southbound departure lanes. Page 5 of 11

7 Lagae Road / Mira Vista Lane (Hyland Hills Road) is a roundabout. The west leg of the intersection has two eastbound approach lanes and two westbound departure lanes. The north leg of the intersection has three southbound approach lanes and two northbound departure lanes. The south-to-west right-turn movement is a free movement separated from the roundabout by a raised median. The south leg of the intersection has two northbound approach lanes and two southbound departure lanes. IV. BACKGROUND TRAFFIC A. Background Traffic Volumes Background traffic and forecasts for the 22 and 24 analysis horizons were developed for this study utilizing traffic volume counts collected in March, 218 and the following: For the purposes of this study it is assumed that the subject parcel will be fully developed by 22 with a maximum of 28 dwelling units. For the purposes of this study it is assumed that peak-hour distribution of background intersection approach traffic (left turn, through, right turn) will remain constant through the 22 and 24 analysis horizons. The Douglas County 23 Transportation Plan dated November, 29 shows traffic volumes growing.3% per year on Castle Pines Parkway. However, communication was received from Castle Pines engineering personnel directing 2.% to be used for annual volume increases to calculate 22 and 24 traffic volumes for all roadways in the study area. Figures 4 and 5 graphically illustrate the projected background-traffic volumes for the 22 and 24 analysis horizons, respectively. B. Background Traffic Operational Analysis In order to establish a base condition in which to evaluate the impact of the traffic generated by the proposed development on the study-area intersections, peak-hour capacity analyses were performed for the 218 existing, and the 22 and 24 background traffic conditions. These analyses utilized the methodologies contained in the Highway Capacity Manual 21 (HCM) employing Synchro 8. software and resulted in a qualitative measure of the operational characteristics of the intersection described by a letter designation ranging from A to F known as Level of Service (LOS). LOS A represents ideal free flow operating conditions, whereas LOS F represents excessive congestion and delay. Unsignalized intersection capacity analysis reports a LOS designation for each impeded intersection movement. Signalized intersection capacity analysis reports the overall LOS designation for the intersection as well as for each lane group and approach. LOS D is considered the minimum acceptable standard of operation. The intersection of Castle Pines/Lagae has construction plans on file at the city to modify the intersection, including: adding lanes and queue storage to WB L and NB L; adding queue storage to WB R; new traffic signals and phasing (all LTs will be protected-only). These conditions are referred to as the Build condition in the operational analyses. Both the existing conditions and the Build condition are analyzed and presented in the Operational Analysis section. Page 6 of 11

8 The following study-area intersections were analyzed for 218 existing traffic analysis and the 22 and 24 analysis horizon background-traffic conditions: Castle Pines Parkway / Lagae Road (Existing conditions plus Build condition) Castle Pines Parkway / King Soopers North Driveway Lagae Road / King Soopers West Driveway Lagae Road / Mira Vista Lane The results of these background traffic operational analyses are summarized graphically for the 218 existing, 22 background and 24 background analysis horizons in Figures 6, 7, and 8, respectively. A summary of the results of the intersection capacity analyses is provided in Table 4 and detailed Synchro 8. software intersection capacity analysis reports in Appendix B. V. PROJECT DEVELOPMENT A. Trip Generation The trip-generation projection for the proposed development was estimated utilizing the publication Trip Generation, 1 th Edition, Institute of Transportation Engineers. Estimates of total daily traffic volume and AM and PM peak-hour traffic volumes were calculated. Trip-generation reductions due to transportation demand management or transit use were not considered. See Table 1 below. The proposed project is projected to generate 1,132 daily vehicle trips of which approximately 71 will be generated during the AM peak hour and approximately 9 will be generated during the PM peak hour. B. Trip Distribution TABLE 1 CASTLE PINES APARTMENTS MULTI-FAMILY DEVELOPMENT Trip Generation Land Use Intensity ITE Daily AM Peak Hour (vph) PM Peak Hour (vph) Code (vpd) Total %In %Out In Out Total %In %Out In Out Multi-Family Housing (Mid Rise) 3-1 floors 28 DU % 74% % 39% Notes: 1. Trip Generation Projections are based on ITE Trip Generation, 1th Edition 2. Intensity of land use is a maximum 28 DU The distribution of the estimated vehicle trips generated by the land uses for this study was established based on the current and projected future traffic patterns on the surrounding transportation system, efficiency of access to the principal transportation corridors serving the area, and the potential trip origins/destinations for the proposed land use for the subject property. Figure 9 graphically illustrates the project-generated trip-distribution patterns for the development. C. Trip Assignment The vehicular traffic volumes estimated to be generated by the proposed development were assigned to the study-area roadways and intersections utilizing the trip-distribution analysis Page 7 of 11

9 described above. Figure 1 graphically illustrates the site-generated traffic assignment for the development. VI. TOTAL TRAFFIC Total-traffic forecast for the 22 analysis scenario was computed by combining the 22 background-traffic volumes with the associated projected site-generated traffic volumes. Totaltraffic forecast for the 24 analysis scenario was computed by combining the 24 background-traffic volumes with the associated projected site-generated traffic volumes. Figures 11 and 12 graphically illustrate the total-traffic forecasts for the study-area intersections for the 22 and 24 analysis horizons, respectively. VII. PROJECT ANALYSIS A. Operational Analysis To evaluate the impact of the proposed land uses for the subject property on the study-area roadway system, peak-hour intersection capacity analyses for total-traffic conditions were performed for the 22 and 24 analysis horizons at each of the study-area intersections listed below: 1. Castle Pines Parkway / North Access this new ¾-movement intersection is proposed to provide left-in/right-in/right-out access between Castle Pines Apartments and Castle Pines Parkway. The intersection is proposed to be constructed as an intersection with stop-control on the northbound approach. The existing east leg (Castle Pines Parkway) will have one westbound left-turn lane added in the existing median with 5 minimum queue storage (or city design standard minimum length) and a 12:1 taper. The existing west leg (Castle Pines Parkway) will have the outside eastbound through lane changed to a shared through/right-turn lane. The south leg will have one new stop-controlled right-turn lane with 5 minimum queue storage on the northbound approach and one southbound departure lane. 2. Castle Pines Parkway / Lagae Road (Existing conditions plus Build condition) 3. Castle Pines Parkway / King Soopers North Driveway 4. Lagae Road / King Soopers West Driveway / East Access - this intersection is proposed to be modified to provide access between the Castle Pines Apartments and Lagae Road. The existing east leg (King Soopers West) will have the westbound left-turn lane modified to a shared left-turn/through lane with the existing 12 queue storage. The new west leg () will have one eastbound shared left-turn/through/right-turn lane with 5 minimum queue storage and one westbound departure lane. The south leg will have one existing northbound through lane modified to a shared left-turn/through lane. The north leg will have one existing southbound through lane modified to a shared right-turn/through lane. 5. Lagae Road / Mira Vista Lane roundabout. A narrative of the summary of the analysis and comparison to background traffic conditions for the 22 and 24 analysis horizons is provided below. The results of the total-traffic operational analysis are summarized graphically for the 22 and 24 analysis horizons in Figure 13 and 14, respectively. A summary of the results of the intersection capacity analysis is provided in Table 4 and detailed Synchro 8. software intersection capacity analysis reports in Appendix D. Page 8 of 11

10 Study-Area Intersections Summary of Results: Castle Pines Parkway / North Access the proposed Castle Pines Parkway / North Access ¾-movement intersection is projected to have the two impeded movements operate at LOS C or better during the AM and PM peak-hour periods under total-traffic conditions for the 22 and 24 analysis horizons under the proposed two-way stop-controlled intersection control. Castle Pines Parkway / Lagae Road Under the existing laneage conditions, the Castle Pines Parkway / Lagae Road intersection is projected to operate at LOS F/C during the AM/PM peak-hour periods under background-traffic and total-traffic conditions for the 24 analysis horizon under the existing Signalized Control. Several lane groups are projected to operate at LOS E or F in 24. The effect of the additional traffic from the development is projected to have negligible effect on the operations of the intersection. In the Build condition (creating dual WB L, dual NB L, all LTs to be protected-only, and adding queue storage to WB L, WB R, NB L): The overall intersection is projected to operate at LOS F/E during the AM/PM peak-hour periods under background-traffic and total-traffic conditions for the 24 analysis horizon. Several lane groups are projected to operate at LOS E or F in 24. Signal timing may be modified by the city to adjust if necessary. The effect of the additional traffic from the development is projected to have negligible effect on the operations of the intersection. Castle Pines Parkway / King Soopers North Driveway The Castle Pines Parkway / King Soopers North Driveway intersection is anticipated to have the impeded NB R operate at LOS B during the AM and PM peak-hour periods under background-traffic and total-traffic conditions for the 22 analysis horizon under the existing two-way stopcontrolled intersection control. In 24, the impeded NB R is projected to operate at LOS E in both the background and total traffic conditions. Lagae Road / King Soopers West Driveway / East Access The existing Lagae Road / King Soopers West Driveway will have the Castle Pines Apartments East Access added making it a full-movement four-legged intersection. It is anticipated to have all impeded movements operate at LOS D or better during the AM and PM peak-hour periods under background-traffic and total-traffic conditions for the 22 analysis horizons under two-way stop-controlled intersection control. In 24, the WB lane groups are projected to operate at LOS E or F. In 24, the EB L/T/R is projected to operate at LOS E. Lagae Road / Mira Vista Lane The Lagae Road / Hyland Hills Road roundabout is anticipated to have all impeded movements operate at LOS B or better during the AM and PM peak-hour periods under total-traffic conditions for the 22 and 24 analysis horizons under the existing roundabout intersection design. B. Queuing Analysis A queuing analysis was conducted to determine the requirements for queue storage for restricted-movements at the study-area intersections. The queuing analysis was based on HCM analysis using Synchro 8. to calculate vehicle-storage requirements. Other analysis parameters include 95 th -percentile queue, and a design-vehicle length of 25 feet. All existing queue storage lengths are projected to generally be adequate for 24 Background and Total AM and PM peak-hour traffic with the exception of WB L and NB R movements. Page 9 of 11

11 INTERSECTION TABLE 2 QUEUE ANALYSIS HIGHWAY CAPACITY MANUAL 21 (HCM) METHOD EXISTING STORAGE (FT) INTERSECTION CONTROL 218 EXISTING TRAFFIC QUEUE LENGTH (FT) 95TH % AM PEAK PM PEAK 22 BACKGROUND TRAFFIC QUEUE LENGTH (FT) 95TH % 1. CASTLE PINES PARKWAY / NORTH DRIVEWAY - TWSC a WB L b NB R CASTLE PINES PARKWAY / LAGAE RD - SIGNALIZED a EB L (Perm) b EB L (Prot) c EB R d WB L (Prot/Perm) e WB L (Prot) dual f WB R g NB L (Perm) h NB L (Prot) dual i NB R j SB L (Perm) k SB L (Prot) l SB R CASTLE PINES PARKWAY / KING SOOPERS NORTH - TWSC a NB R LAGAE RD / KING SOOPERS WEST / EAST DRIVEWAY - TWSC a EB L/T/R b WB L c WB L/T d WB R e SB L LAGAE RD / HYLAND HILLS RD - ROUNDABOUT a EB L b NB L c SB L NOTES: 1 Vehicle Length = 25 feet AM PEAK PM PEAK 22 TOTAL TRAFFIC QUEUE LENGTH (FT) 95TH % AM PEAK PM PEAK 24 BACKGROUND TRAFFIC QUEUE LENGTH (FT) 95TH % AM PEAK PM PEAK 24 BACKGROUND TRAFFIC BUILD QUEUE LENGTH (FT) 95TH % AM PEAK PM PEAK 24 TOTAL TRAFFIC QUEUE LENGTH (FT) 95TH % AM PEAK PM PEAK 24 TOTAL TRAFFIC BUILD QUEUE LENGTH (FT) 95TH % AM PEAK PM PEAK Page 1 of 11

12 TABLE 3 Summary of Recommendations Intersection Recommendations Responsible Timing Castle Pines Parkway/ Castle Pines Apartments North Driveway Castle Pines Parkway / Lagae Road Castle Pines Parkway / King Soopers North Driveway Lagae Road / King Soopers West Driveway / Castle Pines Apartments East Driveway Lagae Road / Mira Vista Lane The developer of the proposed project will construct this ¾-movement left-in/right-in/right-out intersection. The proposed new south leg of this intersection will include one northbound right-turn lane with 5 vehicle queue storage and one southbound departure lane. The existing east approach will have one westbound left-turn lane added within the existing raised median with minimum 5 vehicle queue storage (or city design minimum). The west approach will have one eastbound through lane changed to a shared through/right-turn lane. The intersection will have stop-sign control on the northbound right-turn-only approach. Developer Before opening of Castle Pines Apartments No changes recommended N.A. N.A. No changes recommended N.A. N.A. The developer of the proposed project will construct the west leg of this intersection and make other minor modifications as outlined below. The proposed new west leg will include one eastbound left/through/right-turn lane with 5 minimum vehicle queue storage (or city design standard minimum) and one westbound departure lane. The existing east approach will have one westbound left-turn lane changed to a shared leftturn/through lane utilizing the existing 12 queue storage. The north leg will have one southbound through lane changed to a shared through/right-turn lane. The south leg will have the northbound through/right-turn lane changed to a shared left/through/right-turn lane. The intersection will have stop-sign control on the eastbound and westbound approaches. Developer Before opening of Castle Pines Apartments No changes recommended. N.A. N.A. TABLE 4 Summary of Results - Intersection Capacity Analysis INTERSECTION INTERSECTION CONTROL 218 EXISTING TRAFFIC LEVEL OF SERVICE AM PEAK LOS PM PEAK LOS 22 BACKGROUND TRAFFIC 1. CASTLE PINES PARKWAY & NORTH DRIVEWAY TWSC a WB L B A C B - - b NB R B B C B CASTLE PINES PARKWAY & LAGAE RD SIGNALIZED a EB L (Perm) C C C C C C C C - - C C - - b EB L (Prot) E F - - E F c EB T C C D C D C F D F E F D F F d EB R C C C C C C C C D D C C D D e WB L (Prot/Perm) D B D B D B F E - - F E - - f WB L (Prot) F F - - F F g WB T B B B B B B B B D D B B D D h WB R A B A B A B B B C C B A C C i NB L (Perm) C C C C C C D D - - D D - - j NB L (Prot) F E - - F E k NB T C C C C C C C C C C C C C C l NB R C C C C C C E C F C E C F C m SB L (Perm) C C C C C C D C - - D C - - n SB L (Prot) F E - - F E o SB T C C C C C C C C C C C C C C p SB R C C C C C C C C C C C C C C q INTERSECTION C C C C C C F C F E F C F E 3. CASTLE PINES PARKWAY / KING SOOPERS NORTH TWSC a NB R B B B B B B E B - - E B LAGAE RD & KING SOOPERS WEST/EAST DRIVEWAY TWSC a EB L/T/R C C D E - - b WB L B C B C - - D E c WB L/T C C E F - - d WB R B B B B B B C B - - B B - - e NB L/T/R A A A A - - f SB L A A A A A A A A - - B A LAGAE RD / MIRA VISTA LANE ROUNDABOUT a EB L/R A A A A A A B A - - B A - - b NB L/T A A A A A A B A - - B A - - LEVEL OF SERVICE AM PEAK LOS PM PEAK LOS 22 TOTAL TRAFFIC LEVEL OF SERVICE AM PEAK LOS PM PEAK LOS 24 BACKGROUND TRAFFIC LEVEL OF SERVICE AM PEAK LOS PM PEAK LOS 24 BACKGROUND TRAFFIC BUILD LEVEL OF SERVICE AM PEAK LOS PM PEAK LOS 24 TOTAL TRAFFIC LEVEL OF SERVICE AM PEAK LOS PM PEAK LOS 24 TOTAL TRAFFIC BUILD LEVEL OF SERVICE AM PEAK LOS PM PEAK LOS Page 11 of 11

13 CHARTER OAKS DR BEVERLY BLVD CASTLE PINES PKWY VILLAGE SQUARE TERR PROJECT SITE YORKSHIRE DR MIRA VISTA LN LAGAE RD I-25 4/1/218 PER CITY COMMENTS

14 CASTLE PINES PKWY LAGAE RD MIRA VISTA LANE 4/1/218 PER CITY COMMENTS

15 32(39) 45(9) 137(62) 18(21) 556(739) 331(233) (791) 58(55) 9(97) KING SOOPERS NORTH CASTLE PINES PKWY 2 296(14) 15(1) PROJECT SITE 66(22) 842(577) 162(115) LAGAE RD 432(154) 183(244) 61(174) 4 47(185) 22(5) KING SOOPERS WEST 467(214) 36(23) 68(131) 47(77) 5 MIRA VISTA LN 345(135) 21(11) 33(3) 162(1) LEGEND 1 INTERSECTION NUMBER ##(##) AM(PM) PEAK HR VOLUME EXISTING ROADWAY SITE BOUNDARY 4/1/218 PER CITY COMMENTS

16 33(41) 47(9) 142(64) 19(22) 578(769) 344(242) (823) 6(57) 94(11) KING SOOPERS NORTH CASTLE PINES PKWY 2 38(146) 16(1) PROJECT SITE 69(23) 876(6) 168(12) LAGAE RD 449(16) 19(254) 63(181) 4 49(192) 23(52) KING SOOPERS WEST 486(223) 37(24) 71(136) 423(8) 5 MIRA VISTA LN 359(14) 22(11) 34(3) 168(14) LEGEND 1 INTERSECTION NUMBER ##(##) AM(PM) PEAK HR VOLUME EXISTING ROADWAY SITE BOUNDARY 4/1/218 PER CITY COMMENTS

17 CASTLE PINES PKWY 69(14) 49(6) 211(95) 28(32) 856(1138) 51(359) (1218) 89(85) 139 (149) 2 PROJECT SITE 12(34) 1297(889) 249(177) LAGAE RD 665(237) 94(268) 282(376) 23(15) 456(216) 4 72(285) 34(77) KING SOOPERS NORTH KING SOOPERS WEST 719(33) 55(35) 627(119) 15(22) 5 MIRA VISTA LN 531(28) 32(17) 51(5) 249(154) LEGEND 1 INTERSECTION NUMBER ##(##) AM(PM) PEAK HR VOLUME EXISTING ROADWAY SITE BOUNDARY 4/1/218 PER CITY COMMENTS

18 C(C) C(C) C(C) A(B) B(B) D(B) 3 c(b) CASTLE PINES PKWY 4 PROJECT SITE C(C) C(C) C(C) C(C) 2 LAGAE RD C(C) 3 a(a) C(C) C(C) 4 b(b) c(c) KING SOOPERS NORTH KING SOOPERS WEST 5 25 MIRA VISTA LN a(a) LEGEND a(a) 1 INTERSECTION NUMBER #### POSTED SPEED LIMIT EXISTING ROADWAY PROPOSED ROADWAY SITE BOUNDARY STOP SIGN TRAFFIC SIGNAL # ROUNDABOUT SIGNALIZED INTERSECTIONS A(A) LANE GROUP LOS AM(PM) A(A) INTERSECTION LOS AM(PM) UNSIGNALIZED INTERSECTIONS a(a) LANE GROUP LOS am(pm) 4/1/218 PER CITY COMMENTS

19 C(C) C(C) C(C) A(B) B(B) D(B) 3 b(b) CASTLE PINES PKWY 4 C(C) 2 C(C) C(C) C(C) PROJECT SITE C(C) D(C) C(C) LAGAE RD 3 a(a) 4 b(b) b(c) KING SOOPERS NORTH KING SOOPERS WEST 5 25 a(a) MIRA VISTA LN a(a) LEGEND 1 INTERSECTION NUMBER #### POSTED SPEED LIMIT EXISTING ROADWAY PROPOSED ROADWAY SITE BOUNDARY STOP SIGN TRAFFIC SIGNAL # ROUNDABOUT SIGNALIZED INTERSECTIONS A(A) LANE GROUP LOS AM(PM) A(A) INTERSECTION LOS AM(PM) UNSIGNALIZED INTERSECTIONS a(a) LANE GROUP LOS am(pm) 4/1/218 PER CITY COMMENTS

20 C(C) C(C) F(E) C(C) D(D) F(F) F(E) 2 C(C) F(C) E(F) F(E) D(D) LAGAE RD F(E) 3 C(C) C(C) D(C) B(B) B(B) F(E) 3 e(b) PROJECT SITE CASTLE PINES PKWY 4 F(C) 2 D(D) C(C) E(C) PROJECT SITE C(C) F(D) C(C) LAGAE RD 3 a(a) 4 c(b) d(e) KING SOOPERS NORTH KING SOOPERS WEST 5 b(a) 25 MIRA VISTA LN b(a) LEGEND 1 INTERSECTION NUMBER #### POSTED SPEED LIMIT EXISTING ROADWAY PROPOSED ROADWAY SITE BOUNDARY STOP SIGN TRAFFIC SIGNAL # ROUNDABOUT SIGNALIZED INTERSECTIONS A(A) LANE GROUP LOS AM(PM) A(A) INTERSECTION LOS AM(PM) UNSIGNALIZED INTERSECTIONS a(a) LANE GROUP LOS am(pm) 4/1/218 PER CITY COMMENTS

21 7% 3 4% KING SOOPERS NORTH 15% CASTLE PINES PKWY % 3% 15% 15% 4% 55% PROJECT SITE LAGAE RD 3% 4 1% KING SOOPERS WEST 5% 5% 5 MIRA VISTA LN LEGEND 1 INTERSECTION NUMBER XX% DIRECTIONAL DISTRIBUTION OF SITE GENERATED TRIPS EXISTING ROADWAY PROPOSED ROADWAY SITE BOUNDARY 4/1/218 PER CITY COMMENTS

22 29(19) 3 8(22) 6(17) 36(25) KING SOOPERS NORTH CASTLE PINES PKWY 8(5) 8(22) 2 3(8) 1 PROJECT SITE 29(19) 8(5) 8(5) LAGAE RD 6(17) 4 2(6) 1(3) KING SOOPERS WEST 5(4) 3(2) 16(11) 3(2) 5 1(3) MIRA VISTA LN LEGEND 1 INTERSECTION NUMBER A(A) DIRECTIONAL ASSIGNMENT OF SITE GENERATED TRIPS EXISTING ROADWAY PROPOSED ROADWAY SITE BOUNDARY 4/1/218 PER CITY COMMENTS

23 33(41) 47(9) 142(64) 19(22) 586(791) 35(259) (848) 6(57) 94(11) CASTLE PINES PKWY 69(23) 95(619) 168(12) LAGAE RD 316(151) 16(1) 198(259) KING SOOPERS NORTH 8(22) (718) 3(8) 1 29(19) PROJECT SITE 6(17) 449(16) 63(181) 4 49(192) 2(6) 23(52) 1(3) 486(223) KING SOOPERS WEST 37(24) 16(11) 5(4) 3(2) 426(82) 71(136) 5 MIRA VISTA LN 36(143) 22(11) 34(3) 168(14) LEGEND 1 INTERSECTION NUMBER ##(##) AM(PM) PEAK HR VOLUME EXISTING ROADWAY PROPOSED ROADWAY SITE BOUNDARY 4/1/218 PER CITY COMMENTS

24 69(14) 49(6) 211(95) 28(32) 864(116) 516(376) 3 218(1243) 89(85) 139(149) 8(22) 2 CASTLE PINES PKWY 1648(11) 3(8) 1 29(19) PROJECT SITE 12(34) 1326(98) 249(177) LAGAE RD 6(17) 665(237) 94(268) 29(381) 23(15) 464(221) 4 72(285) 2(6) 34(77) KING SOOPERS NORTH 1(3) 719(33) KING SOOPERS WEST 55(35) 16(11) 5(4) 3(2) 63(121) 15(22) 5 MIRA VISTA LN 532(211) 32(17) 51(5) 249(154) LEGEND 1 INTERSECTION NUMBER ##(##) AM(PM) PEAK HR VOLUME EXISTING ROADWAY PROPOSED ROADWAY SITE BOUNDARY 4/1/218 PER CITY COMMENTS

25 C(C) C(C) C(C) A(B) B(B) D(B) 3 b(b) CASTLE PINES PKWY 4 1 b(b) b(a) PROJECT SITE C(C) D(C) C(C) C(C) 2 C(C) LAGAE RD 3 a(a) C(C) C(C) 4 b(b) c(c) KING SOOPERS NORTH KING SOOPERS WEST a(a) c(c) 5 25 MIRA VISTA LN a(a) LEGEND 1 INTERSECTION NUMBER #### POSTED SPEED LIMIT EXISTING ROADWAY PROPOSED ROADWAY SITE BOUNDARY STOP SIGN TRAFFIC SIGNAL # a(a) ROUNDABOUT SIGNALIZED INTERSECTIONS A(A) LANE GROUP LOS AM(PM) A(A) INTERSECTION LOS AM(PM) UNSIGNALIZED INTERSECTIONS a(a) LANE GROUP LOS am(pm) 4/1/218 PER CITY COMMENTS

26 C(C) C(C) F(E) C(C) D(D) F(F) 2 F(E) C(C) F(C) E(F) F(F) D(D) LAGAE RD F(E) 3 D(C) B(A) B(B) F(E) 3 e(b) PROJECT SITE C(C) C(C) CASTLE PINES PKWY 4 1 c(b) c(b) PROJECT SITE C(C) F(D) C(C) F(C) 2 C(C) D(D) LAGAE RD 3 b(a) E(C) 4 b(b) e(f) a(a) KING SOOPERS NORTH KING SOOPERS WEST d(e) 5 25 MIRA VISTA LN b(a) LEGEND 1 INTERSECTION NUMBER #### POSTED SPEED LIMIT EXISTING ROADWAY PROPOSED ROADWAY SITE BOUNDARY STOP SIGN TRAFFIC SIGNAL # b(a) ROUNDABOUT SIGNALIZED INTERSECTIONS A(A) LANE GROUP LOS AM(PM) A(A) INTERSECTION LOS AM(PM) UNSIGNALIZED INTERSECTIONS a(a) LANE GROUP LOS am(pm) 4/1/218 PER CITY COMMENTS

27 APPENDIX A 218 EXISTING TRAFFIC VOLUME COUNTS

28 9 (33) Peak Hour - All Vehicles Location: 1 KING SOOPERS N ACCESS & CASTLE PINES PKWY AM Date and Start Time: Tuesday, March 6, 218 Peak Hour: Peak 15-Minutes: 7:3 AM - 8:3 AM 8:15 AM - 8:3 AM Peak Hour - Pedestrians/Bicycles on Crosswalk CASTLE PINES PKWY (1,56) ,345 (2,312) 1, (1,56) N W.82 E.78 S 1,377 (2,356) W N S E CASTLE PINES PKWY KING SOOPERS N ACCESS (18) (152) Note: Total study counts contained in parentheses. Traffic Counts Interval Start Time CASTLE PINES PKWY CASTLE PINES PKWY KING SOOPERS N ACCESS Eastbound Westbound Northbound Southbound U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right Total Rolling Pedestrain Crossings Hour West East South North 7: AM ,5 7:15 AM ,12 7:3 AM ,337 7:45 AM ,232 8: AM ,965 8:15 AM :3 AM :45 AM Count Total 2, , ,97 Peak Hour 1, ,337

29 (33) Peak Hour - All Vehicles (277) (146) LAGAE RD Location: 2 LAGAE RD & CASTLE PINES PKWY AM Date and Start Time: Tuesday, March 6, 218 Peak Hour: Peak 15-Minutes: 7:3 AM - 8:3 AM 8:15 AM - 8:3 AM Peak Hour - Pedestrians/Bicycles on Crosswalk 2 CASTLE PINES PKWY (1,297) ,7 162 (1,987) W N.93 S E (1,56) , (2,294) CASTLE PINES PKWY W 2 N S E LAGAE RD (729) (696) Note: Total study counts contained in parentheses. Traffic Counts Interval Start Time CASTLE PINES PKWY CASTLE PINES PKWY LAGAE RD LAGAE RD Eastbound Westbound Northbound Southbound U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right Total Rolling Pedestrain Crossings Hour West East South North 7: AM ,359 7:15 AM ,48 7:3 AM ,683 7:45 AM , : AM , :15 AM :3 AM :45 AM Count Total , , Peak Hour ,

30 (33) Peak Hour - All Vehicles (734) (73) LAGAE RD Location: 3 LAGAE RD & KING SOOPERS WEST ACCESS AM Date and Start Time: Tuesday, March 6, 218 Peak Hour: Peak 15-Minutes: 7:15 AM - 8:15 AM 7:45 AM - 8: AM Peak Hour - Pedestrians/Bicycles on Crosswalk W 432 N.66 S E (144) (222) KING SOOPERS WEST ACC ESS N W E S LAGAE RD (64) (678) Note: Total study counts contained in parentheses. Traffic Counts Interval Start Time Eastbound KING SOOPERS WEST Westbound ACCESS LAGAE RD Northbound LAGAE RD Southbound U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right Total Rolling Pedestrain Crossings Hour West East South North 7: AM ,24 7:15 AM ,67 7:3 AM ,29 7:45 AM : AM :15 AM :3 AM :45 AM Count Total ,556 Peak Hour ,67

31 (33) Peak Hour - All Vehicles (613) (685) LAGAE RD Location: 4 LAGAE RD & MIRAVISTA LN AM Date and Start Time: Tuesday, March 6, 218 Peak Hour: Peak 15-Minutes: 7:15 AM - 8:15 AM 7:45 AM - 8: AM Peak Hour - Pedestrians/Bicycles on Crosswalk MIRAVISTA LN (483) (46) W N.61 S E MIRAVISTA LN (). () W N S E LAGAE RD (195) (344) Note: Total study counts contained in parentheses. Traffic Counts Interval Start Time MIRAVISTA LN MIRAVISTA LN LAGAE RD LAGAE RD Eastbound Westbound Northbound Southbound U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right Total Rolling Pedestrain Crossings Hour West East South North 7: AM ,18 7:15 AM ,37 7:3 AM :45 AM : AM :15 AM :3 AM :45 AM Count Total ,363 Peak Hour ,37

32 97 (33) Peak Hour - All Vehicles Location: 1 KING SOOPERS N ACCESS & CASTLE PINES PKWY PM Date and Start Time: Tuesday, March 6, 218 Peak Hour: Peak 15-Minutes: 4: PM - 5: PM 4:3 PM - 4:45 PM Peak Hour - Pedestrians/Bicycles on Crosswalk CASTLE PINES PKWY (1,921) (1,476) (1,921) N W.89 E.94 S 888 (1,565) W N S E CASTLE PINES PKWY KING SOOPERS N ACCESS (12) (191) Note: Total study counts contained in parentheses. Traffic Counts Interval Start Time CASTLE PINES PKWY CASTLE PINES PKWY KING SOOPERS N ACCESS Eastbound Westbound Northbound Southbound U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right Total Rolling Pedestrain Crossings Hour West East South North 4: PM ,893 4:15 PM ,877 4:3 PM ,877 4:45 PM ,774 5: PM ,695 5:15 PM :3 PM :45 PM Count Total 1, , ,588 Peak Hour ,893

33 (33) Peak Hour - All Vehicles (218) (128) LAGAE RD Location: 2 LAGAE RD & CASTLE PINES PKWY PM Date and Start Time: Tuesday, March 6, 218 Peak Hour: Peak 15-Minutes: 4:3 PM - 5:3 PM 4:3 PM - 4:45 PM Peak Hour - Pedestrians/Bicycles on Crosswalk 1 CASTLE PINES PKWY (1,961) 1, (1,317) W N.91 S E (1,931) (1,47) CASTLE PINES PKWY W 1 N S E LAGAE RD (63) (723) Note: Total study counts contained in parentheses. Traffic Counts Interval Start Time CASTLE PINES PKWY CASTLE PINES PKWY LAGAE RD LAGAE RD Eastbound Westbound Northbound Southbound U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right Total Rolling Pedestrain Crossings Hour West East South North 4: PM ,19 4:15 PM ,192 4:3 PM ,211 4:45 PM ,93 5: PM , :15 PM :3 PM :45 PM Count Total 46 1, , ,189 1 Peak Hour ,211 1

34 (33) Peak Hour - All Vehicles (636) (72) LAGAE RD Location: 3 LAGAE RD & KING SOOPERS WEST ACCESS PM Date and Start Time: Tuesday, March 6, 218 Peak Hour: Peak 15-Minutes: 4: PM - 5: PM 4:3 PM - 4:45 PM Peak Hour - Pedestrians/Bicycles on Crosswalk W 154 N.96 S E (449) (394) KING SOOPERS WEST ACC ESS N W E S LAGAE RD (36) (389) Note: Total study counts contained in parentheses. Traffic Counts Interval Start Time Eastbound KING SOOPERS WEST Westbound ACCESS LAGAE RD Northbound LAGAE RD Southbound U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right Total Rolling Pedestrain Crossings Hour West East South North 4: PM :15 PM :3 PM :45 PM : PM :15 PM :3 PM :45 PM Count Total ,474 Peak Hour

35 77 1 (33) Peak Hour - All Vehicles (364) (381) LAGAE RD Location: 4 LAGAE RD & MIRAVISTA LN PM Date and Start Time: Tuesday, March 6, 218 Peak Hour: Peak 15-Minutes: 4: PM - 5: PM 4: PM - 4:15 PM Peak Hour - Pedestrians/Bicycles on Crosswalk MIRAVISTA LN (128) (28) W N.85 S E MIRAVISTA LN (). () N W E S LAGAE RD (255) (192) Note: Total study counts contained in parentheses. Traffic Counts Interval Start Time MIRAVISTA LN MIRAVISTA LN LAGAE RD LAGAE RD Eastbound Westbound Northbound Southbound U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right Total Rolling Pedestrain Crossings Hour West East South North 4: PM :15 PM :3 PM :45 PM : PM :15 PM :3 PM :45 PM Count Total Peak Hour

36 APPENDIX B NTERSECTION CAPACITY ANALYSIS WORKSHEETS

37 Lanes and Geometrics 2: Lagae Rd & Castle Pines Pkwy 4/9/218 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) Lane Width (ft) Grade (%) % % % % Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Intersection Summary Area Type: Other P:\17125\Traffic\2nd Submittal\Synchro\218 Existing AM.syn Page 1

38 HCM 21 Signalized Intersection Summary 2: Lagae Rd & Castle Pines Pkwy 4/9/218 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) Number Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Adj No. of Lanes Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(95%),veh/ln LnGrp Delay(d),s/veh LnGrp LOS C C C D B A C C C C C C Approach Vol, veh/h Approach Delay, s/veh Approach LOS C C C C Timer Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 21 Ctrl Delay 27.7 HCM 21 LOS C Notes User approved ignoring U-Turning movement. P:\17125\Traffic\2nd Submittal\Synchro\218 Existing AM.syn Page 2

39 Lanes and Geometrics 3: King Soopers North & Castle Pines Pkwy 4/9/218 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Ideal Flow (vphpl) Lane Width (ft) Grade (%) % % % Storage Length (ft) Storage Lanes 1 1 Taper Length (ft) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Intersection Summary Area Type: Other P:\17125\Traffic\2nd Submittal\Synchro\218 Existing AM.syn Page 4

40 HCM 21 TWSC 3: King Soopers North & Castle Pines Pkwy 4/9/218 Intersection Int Delay, s/veh.5 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h Conflicting Peds, #/hr Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Major1 Major2 Minor1 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver - - *832 - *157 *556 Stage *525 - Stage *581 - Platoon blocked, % Mov Cap-1 Maneuver - - *832 - *157 *556 Mov Cap-2 Maneuver *157 - Stage *525 - Stage *581 - Approach EB WB NB HCM Control Delay, s 12.9 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) * HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS B - - A - HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity $: Delay exceeds 3s +: Computation Not Defined *: All major volume in platoon P:\17125\Traffic\2nd Submittal\Synchro\218 Existing AM.syn Page 5

41 Lanes and Geometrics 4: Lagae Rd & King Soopers West 4/9/218 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Ideal Flow (vphpl) Lane Width (ft) Grade (%) % % % Storage Length (ft) 2 Storage Lanes Taper Length (ft) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Intersection Summary Area Type: Other P:\17125\Traffic\2nd Submittal\Synchro\218 Existing AM.syn Page 6

42 HCM 21 TWSC 4: Lagae Rd & King Soopers West 4/9/218 Intersection Int Delay, s/veh 1.3 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver * Stage 1 * Stage 2 * Platoon blocked, % Mov Cap-1 Maneuver * Mov Cap-2 Maneuver * Stage 1 * Stage 2 * Approach WB NB SB HCM Control Delay, s HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS - - B B A - HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity $: Delay exceeds 3s +: Computation Not Defined *: All major volume in platoon P:\17125\Traffic\2nd Submittal\Synchro\218 Existing AM.syn Page 7

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY

LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY Prepared for: Liberty Tree Academy Prepared by: 161 Blake Street, Suite 2 Denver, Colorado 822 Contact: David Kline, PE, PTOE (33)-572-2 On Behalf of: Liberty

More information

joint access drive. will be

joint access drive. will be Date: To: From: Subject: June 22, 2015 Bradley Reiner, PE Bowman Consulting David R. Kline, PE, PTOE, Incline Associates Thornton Self-Storage Traffic Analysis (DRAFT) - Thornton, Colorado INTRODUCTION

More information

Syracuse University University Place Road Closure

Syracuse University University Place Road Closure Transportation Impact Study for the proposed Syracuse University University Place Road Closure City of Syracuse, Onondaga County, NY March 216 Project No. 3613 Prepared For: Syracuse University Office

More information

February 8, Ms. Jamie Jun, Esq. Fromhold Jaffe & Adams 789 East Lancaster Avenue, Suite 220 Villanova, PA 19085

February 8, Ms. Jamie Jun, Esq. Fromhold Jaffe & Adams 789 East Lancaster Avenue, Suite 220 Villanova, PA 19085 WWW.TRAFFICPD.COM February 8, 2016 Ms. Jamie Jun, Esq. Fromhold Jaffe & Adams 789 East Lancaster Avenue, Suite 220 Villanova, PA 19085 Re: Kohelet Yeshiva School Lower Merion Township, Montgomery County,

More information

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study Traffic Study To: From: James M. Moore, Director of Planning & Building Services, Town of Fairfax David Parisi, PE, TE, Parisi Transportation Consulting Date: October 14, 216 Subject: Victory Village Senior

More information

February 24, 2017 Project #: 20076

February 24, 2017 Project #: 20076 February 24, 217 Project #: 276 Jinde Zhu Washington County Department of Land Use and Transportation 14 SW Walnut Street MS 17 Hillsboro, Oregon 97213 RE: Sunset Ridge Phase 2 Access Report and Zone Change

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

Alfred Street Baptist Church (301 Alfred Street) Supplemental Traffic Analysis Based on Comments Received at Meeting on November 16, 2016

Alfred Street Baptist Church (301 Alfred Street) Supplemental Traffic Analysis Based on Comments Received at Meeting on November 16, 2016 To: Cc: From: Re: Subject: Ravindra Raut City of Alexandria, VA Bob Garbacz Katye North City of Alexandria, VA Larry Sefcik Grady Vaughan, EIT Wells + Associates, Inc. (31 Alfred Street) Supplemental Traffic

More information

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama.

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama. Traffic Impact Study Crestline Piggly Wiggly Mountain Brook, Alabama Prepared for: Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama September 214 Revision 1 October 214 Crestline Piggly Wiggly Mountain

More information

George Street Transportation Impact Study. Paradigm Transportation Solutions Limited

George Street Transportation Impact Study. Paradigm Transportation Solutions Limited George Transportation Impact Study Paradigm Transportation Solutions Limited January 217 Project Summary Project Number 16191 January 217 Client Wastell Homes 5-1895 Blue Heron Drive London ON N6H 5L9

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

Michigan Avenue Traffic Study

Michigan Avenue Traffic Study City of Sarnia Michigan Avenue Traffic Study Final Report November 29, 218 B17 SUBMITTED BY CIMA CANADA INC. 4 327 Harvester Road Burlington, ON L7N 3G7 T 289 288-287 F 289 288-285 cima.ca CONTACT Stephen

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

MEMO DRAFT VIA . Mr. Terry Bailey Foremost Development Company. To: Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink.

MEMO DRAFT VIA  . Mr. Terry Bailey Foremost Development Company. To: Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink. MEMO DRAFT VIA EMAIL To: From: Mr. Terry Bailey Foremost Development Company Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink Date: August 29, 214 Re: Proposed Apartments City of Walled

More information

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748 City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 11 Parsippany, NJ 754 862.27.59 PREPARED

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012 Update for the May 31 st, 2012 Traffic Impact Study Prepared for Broccolini Construction 111-23596-00 September 20 th, 2012 2611 Queensview Drive, Suite 300, Ottawa, Ontario CANADA K2B 8K2 Telephone: 613-829-2800

More information

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY Prepared for: City of Thornton And Colorado Department of Transportation Prepared by: 11 Blake Street, Suite 2 Denver, Colorado 822 Contact: Brian Bern, PE, PTOE

More information

Student Housing Development

Student Housing Development Traffic Impact Study for the proposed Student Housing Development City of Oneonta Otsego County, New York Project No. 3259 December 212 Revised February 13, 212 Prepared For: Newman Development Group,

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

ENKA INTERMEDIATE SCHOOL

ENKA INTERMEDIATE SCHOOL TRANSPORTATION IMPACT ANALYSIS Prepared for Buncombe County Schools ENKA INTERMEDIATE SCHOOL Asheville, NC Project Number: 13-71 8/1/13 www.davenportworld.com DAVENlORT Transportation Impact Analysis Enka

More information

Travel Demand Management Plan

Travel Demand Management Plan Travel Demand Management Plan Linden Corner at 43 rd Street & Upton Avenue South AUTHORIZED PROPERTY REPRESENTATIVE: By Dated: Mark Dwyer Linden Hills Redevelopment, LLC 4632 Washburn Avenue South Minneapolis,

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: 1649362 Ontario Inc. c/o Manor Park Management 231 Brittany Drive, Suite D Ottawa ON K1K 0R8 July

More information

Technical Memo. Steve Gramm, SDDOT. RE: Phase 1, Task 100: Baseline Analysis. To: From: Steve Hoff, HDR Engineering, Inc.

Technical Memo. Steve Gramm, SDDOT. RE: Phase 1, Task 100: Baseline Analysis. To: From: Steve Hoff, HDR Engineering, Inc. Technical Memo To: Steve Gramm, SDDOT From: Steve Hoff, Engineering, Inc. Project: I-190/Silver Street Study CC: Date: 6//010 Job No: DOT Contract 41044, Order PD-0-09 RE: Phase 1, Task 100: Baseline Analysis

More information

STRATEGY 4 INC Mainway, City of Burlington. [ Month Year ] Project No.: TRAFFIC IMPACT AND PARKING STUDY APRIL 2018

STRATEGY 4 INC Mainway, City of Burlington. [ Month Year ] Project No.: TRAFFIC IMPACT AND PARKING STUDY APRIL 2018 STRATEGY 4 INC. TRAFFIC IMPACT AND PARKING STUDY 3257 Mainway, City of Burlington Project No.: 27-675 APRIL 28 [ Month Year ] April 7, 28 Reference No. 27-675 Mr. Jeff Kenny Strategy 4 Inc. 262 Bristol

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

Prepared for Lutheran Services Carolinas. Project Number: /07/2017. Trinity Landing. New Hanover County, NC

Prepared for Lutheran Services Carolinas. Project Number: /07/2017. Trinity Landing. New Hanover County, NC Prepared for Lutheran Services Carolinas Project Number: 16273 4/7/217 Trinity Landing New Hanover County, NC Trinity Landing Transportation Impact nalysis Prepared for Lutheran Services Carolinas New

More information

February 13, Mr. Chuck Marshall Stewart's Shops Corp. PO Box 435 Saratoga Springs, NY 12866

February 13, Mr. Chuck Marshall Stewart's Shops Corp. PO Box 435 Saratoga Springs, NY 12866 February 13, 2017 Mr. Chuck Marshall Stewart's Shops Corp. PO Box 435 Saratoga Springs, NY 12866 Re: Modified Entrance Layout - Revised Traffic Assessment and Sight Distance Analysis Proposed Stewart's

More information

4. Include the associated years anticipated for the short term and long term analysis in the

4. Include the associated years anticipated for the short term and long term analysis in the 2nd DE Review SM ROCHA, LLC responses to City comments are provided within. 8. Trip distribution is displayed in Figure 6. Distribution assumes SFA and commercial traffic combined for most conservative

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

FAIRFIELD - RYAN S CORNER TRAFFIC IMPACT ANALYSIS LOUDOUN COUNTY, VIRGINIA

FAIRFIELD - RYAN S CORNER TRAFFIC IMPACT ANALYSIS LOUDOUN COUNTY, VIRGINIA FAIRFIELD - RYAN S CORNER TRAFFIC IMPACT ANALYSIS LOUDOUN COUNTY, VIRGINIA Submitted on behalf of: Fairfield Residential Prepared by: Wells + Associates, Inc. 1420 Spring Hill Road, Suite 00 McLean, Virginia

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY 675 Millcreek Drive, Unit 1 Mississauga, Ontario L5N 5M4 T: 416.213.7121 F: 95.89.8499 www.transtech.co TRAFFIC IMPACT STUDY PROPOSED MOSQUE DEVELOPMENT 4269 REGIONAL ROAD 25 TOWN OF OAKVILLE PREPARED

More information

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for: TRAFFIC IMPACT STUDY For Creekside Thornton, Colorado August 215 November 215 Revised: August 216 Prepared for: Jansen Strawn Consulting Engineers 45 West 2 nd Avenue Denver, Colorado 8223 Prepared by:

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT Prepared by: In Association with: November 2013 EXECUTIVE SUMMARY Patton Township, in partnership

More information

Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property

Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property Prepared for: Premier Gold Mines Limited Prepared by: Stantec Consulting Ltd. November 2014

More information

Intersection Control Evaluation

Intersection Control Evaluation Intersection Control Evaluation Trunk Highway 33 at Interstate 35 Ramps Cloquet, Carlton County, Minnesota S.P. 98-5 Minnesota Department of Transportation District June 27 SRF. 6 934 Table of Contents

More information

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015 Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative

More information

Multnomah County Courthouse Relocation. Transportation Alternatives Analysis Technical Memorandum: FINAL

Multnomah County Courthouse Relocation. Transportation Alternatives Analysis Technical Memorandum: FINAL Multnomah County Courthouse Relocation Portland, Oregon Transportation Alternatives Analysis Technical Memorandum: FIL Prepared for Multnomah County Facilities and Property Management Division 41 N Dixon

More information

Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) Final Report

Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) Final Report Consultant Services for Updating Intersections Operations to Accommodate Bi-Directional Cycle Tracks Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) January 30, 2014 Consultant

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

Appendices. Appendix J: Traffic Study

Appendices. Appendix J: Traffic Study Appendices Appendix J: Traffic Study The Platinum Triangle Subsequent EIR The Planning Center Appendices This page intentionally left blank. The Platinum Triangle Subsequent EIR The Planning Center TRAFFIC

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY TRAFFIC IMPACT STUDY for the GLEN ELLEN COUNTRY CLUB SENIOR RESIDENTIAL REDEVELOPMENT 84 Millis, Massachusetts Prepared by: McMahon Associates, Inc. Prepared for: Toll Brothers, Inc. August 216 DRAFT

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: Orleans Gardens Shopping Centre Inc. 2851 John Street, Suite 1 Markham, ON K3R 5R7

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

Road Conversion Study Plumas Street

Road Conversion Study Plumas Street Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

Signal Warrant Studies

Signal Warrant Studies Signal Warrant Studies Seven Locations Piqua, Ohio December 12, 217 Signal Warrant Studies Seven Locations Piqua, Ohio TABLE OF CONTENTS Executive Summary... 3 Introduction... 5 Study Location... 5 Data

More information

NO BUILD TRAFFIC OPERATIONS

NO BUILD TRAFFIC OPERATIONS 3. 23 NO BUILD TRAFFIC OPERATIONS This section addresses the operations of the transportation system and details how it would be expected to function under year 23 No Build conditions with the projected

More information

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM To: Thomas Cummings February 17, 2011 Holbrook Public Works Superintendent From: Re:

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff Arterial Traffic Analysis Some critical concepts Prepared by Philip J. Tarnoff Agenda Fundamentals Signal timing concepts Actuated signal controllers Developing timing plans Types of signal control First

More information

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny

More information

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA April 217 T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA Submitted

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

T$- RIB Endineering, ac

T$- RIB Endineering, ac T$- RIB Endineering, ac..' Transportation Endineerimg Solutions Transportation Impact Study Vineyard-Goldelm Fort Collins, Colorado February 2016 Vineyard-Goldelm Transportation Impact Study Fort Collins,

More information

2. Existing Conditions

2. Existing Conditions 2. Existing Conditions The existing traffic and parking conditions on the site and the surrounding area were reviewed based on the study methodology in Section 1.2. 2.1 Existing Land Use The portion of

More information

S. Johnston (IBI Group)

S. Johnston (IBI Group) IBI GROUP 100 175 Galaxy Boulevard Toronto ON M9W 0C9 Canada tel 416 679 1930 fax 416 675 4620 ibigroup.com Memorandum To/Attention Project File Date October 15, 2013 From A. Ortlieb Project No 24RX12.0246.00

More information

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis MEMORANDUM Transportation Bill Troe, AICP Jason Carbee, AICP 12120 Shamrock Plaza Suite 300 Omaha, NE 68154 (402) 334-8181 (402) 334-1984 (Fax) To: Project File Date: Subject: Solberg Avenue / I-229 Grade

More information

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams. Technical Memorandum TRFFIC IMPCT STUDY RIDLEY ROD CONVENIENCE STORE Southampton County, V Prepared for: Mr. David Williams By: Charles Smith, P.E., PTOE EPR Charlottesville, V July 2014 1 TBLE OF CONTENTS

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY DECEMBER 2012 READ, VOORHEES & ASSOCIATES TORONTO, ONTARIO Read, Voorhees & Associates

More information

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /

More information

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM To: Martha White, Natick Town Administrator February 17, 2011 Eric Nascimento, MassDOT

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building

SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building State University of New York at Albany City of Albany,

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

Kanata North Catholic Elementary School

Kanata North Catholic Elementary School December 216 Kanata North Catholic Elementary School Transportation Brief SITE Potential Future Development Trillium Woods Prepared for: Bryden Martel Architects Inc Prepared by: KANATA NORTH CATHOLIC

More information

4.0 TRANSPORTATION SYSTEMS

4.0 TRANSPORTATION SYSTEMS Transportation Systems 4.0 TRANSPORTATION SYSTEMS This chapter examines the impacts of the Central Corridor Extension on existing roadways and traffic operations and discusses the transit service, operations,

More information

APPENDIX D. Traffic Impact Study Creighton Manning Engineering, LLP

APPENDIX D. Traffic Impact Study Creighton Manning Engineering, LLP APPENDIX D Traffic Impact Study Creighton Manning Engineering, LLP Traffic Impact Study Catskill Access Evaluation NYS Thruway Exit 21 Town of Catskill, New York CM Project No. 114-232 Prepared For: Greene

More information

Traffic Study North Shore School District 112

Traffic Study North Shore School District 112 Traffic Study North Shore School District 112 Proposed Expansion of Northwood Junior High School Prepared By: May 1, 2015 1. Introduction Kenig, Lindgren, O Hara, Aboona, Inc. (KLOA, Inc.) has been retained

More information

6060 North Central Expressway Mixed-Use Site Dallas, Texas

6060 North Central Expressway Mixed-Use Site Dallas, Texas Volume 1 Traffic Impact Analysis 6060 North Central Expressway Mixed-Use Site Dallas, Texas April 30, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #063238300 Registered Firm F-928 Traffic

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

Queensgate Drive Corridor Traffic Study

Queensgate Drive Corridor Traffic Study January 2015 Prepared for: City of Richland Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington 99336 Table of Contents Introduction and Background... 1 Existing

More information

DRAFT Davidson Elementary School Expansion Transportation Impact Analysis

DRAFT Davidson Elementary School Expansion Transportation Impact Analysis DRAFT Davidson Elementary School Expansion Transportation Impact Analysis Prepared for: Town of Davidson 216 S. Main Street Davidson, NC 28036 Prepared by: Stantec Consulting Services Inc. 2127 Ayrsley

More information