NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

Size: px
Start display at page:

Download "NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:"

Transcription

1 NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony Corvinelli & Mr. Maurice Lemieux P.O. Box 580 Russell, ON K4R 1E7 March 29, Report_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers P.O. Box 774, Manotick, ON K4M 1A7 - Tel (613) Fax (613)

2 TABLE OF CONTENTS PAGE 1. INTRODUCTION Scope of Work ROADWAY NETWORK PROPOSED SUBDIVISION Trip Generation Trip Distribution TRANSPORTATION IMPACT Background Traffic Volumes Total Traffic Volumes Traffic Analysis FINDINGS AND RECOMMENDATIONS APPENDIX LIST OF FIGURES 1.1 SITE LOCATION PLAN WEEKDAY PEAK AM AND PM HOUR TRAFFIC COUNTS CONCEPTUAL SITE PLAN WEEKDAY PEAK AM AND PM HOUR SITE GENERATED TRIPS PEAK AM AND PM HOUR BACKGROUND TRAFFIC PEAK AM AND PM HOUR BACKGROUND TRAFFIC PEAK AM AND PM HOUR TOTAL TRAFFIC PEAK AM AND PM HOUR TOTAL TRAFFIC LIST OF TABLES 3.1 TRIP GENERATION RATES PEAK HOUR SITE TRIPS GENERATED SITE ACCESS/ST-PIERRE INTERSECTION LoS & Delay SITE ACCESS/BLAIS INTERSECTION LoS & Delay ST-PIERRE/DIGNARD INTERSECTION LoS & Delay NOTRE-DAME/BLAIS INTERSECTION - LoS & Delay... 17

3 NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY 1. INTRODUCTION The New York Central Park Subdivision is located on hectares of vacant land north of Notre-Dame Street and east of St-Pierre Road in the Town of Embrun. The subdivision will be a mix of a condominium/apartment complex and townhouse units, with one street through the residential development providing access onto St-Pierre Road to the northwest and to Blais Street to the southeast of the development. The subdivision is expected to be constructed in one phase which would progress in accordance with house sales with completion of the subdivision expected by the year The location of the subdivision is shown in Figure 1.1. The developer of the subdivision has retained the firm of D. J. Halpenny & Associates Ltd. to prepare a report in support of the Draft Plan of Subdivision Application. The study will address the impact of site related traffic at full build-out of the development on the adjacent roads and key intersections, and recommend intersection modifications if required due to the development of the site. 1.1 Scope of Work The scope of the is to examine key intersections which would be impacted by the traffic generated by the proposed subdivision. The study area will comprised of the analysis of the site access points onto St-Pierre Road and Blais Street, and the adjacent intersections of St-Pierre/Dignard and Notre-Dame/Blais. The intersection of Notre-Dame Street and St-Pierre Road (St. Marie Road) is controlled by traffic signals with exclusive turn lanes which provide a high capacity for traffic for the intersection. With the site assigning a small number of trips to the intersection, the impact of the site on the operation of the intersection would be minor and therefore the intersection was not analyzed in the study. The analysis will be conducted for the 2018 traffic counts which were taken by the consultant at the St-Pierre/Dignard and Notre-Dame/Blais intersections, and would use the existing lane geometry and traffic controls. The analysis will also be conducted at the intersections and at the site accesses to St-Pierre Road and Blais Street at build-out of the subdivision in 2028 and at the year 2033 which represents five years beyond full development of the subdivision. The time period for the study was taken as the weekday peak AM and PM hours of the adjacent streets which is when both the proposed subdivision and the background traffic volumes on the adjacent streets would be the highest.

4 2 FIGURE 1.1 SITE LOCATION PLAN

5 3 2. ROADWAY NETWORK The development will have a westerly access onto St-Pierre Road. St-Pierre Road is a two lane arterial road which connects Notre-Dame Street to the south and St. Guillaume Road to the north at a location close to the 417 interchange. The roadway has a rural cross section with no sidewalks at the proposed subdivision access point. A sidewalk has been constructed along the west side of the road between the Recreational Trail and Notre-Dame Street. The posted speed limit is 50 km./h. in the vicinity of the site, which increases to 80 km./h. approximately 680 m north of the site. The south-easterly access would connect to Blais Street. Blais Street would be classified as a collector road with a rural cross section and no sidewalks along the road. Blais Street connects to Notre-Dame Street and extends northeast to access residential lands. This report labels Blais Street as a north-south road. The speed limit is posted at 50 km./h. Notre-Dame Street is a two lane east-west arterial road. The road is under the jurisdiction of the Prescott and Russell United Counties as County Road 3. The road is a two lane urban road with pedestrian sidewalks along both sides of the roadway. The speed limit is posted at 50 km./h. The intersection of St-Pierre Road and Dignard Street is located approximately 110 m south of the site s proposed St-Pierre Road access intersection. The intersection is controlled by all-way stop signs with St-Pierre Road forming the northbound and southbound approaches, Dignard Street the westbound approach, and Olympic Street the eastbound approach. All approaches comprise of a single lane providing shared left/through/right turn movements. The intersection of Notre-Dame Street and Blais Street is located approximately 30 m south of the site s proposed Blais Street access intersection. The intersection is a T intersection with Notre-Dame Street forming the eastbound and westbound approaches, and Blais Street the southbound stop controlled approach. The intersection has the following lane configuration: Southbound Approach (Blais Street) One shared left/right turn lane Eastbound Approach (Notre-Dame Street) One through lane One exclusive left turn lane Westbound Approach (Notre-Dame Street) One shared through/right lane Figure 2.1 shows the 2018 weekday peak AM and PM hour traffic counts taken by the consultant on March 21, 2018 at the St-Pierre/Dignard (Olympic) intersection, and on February 14, 2018 at the Notre-Dame/Blais intersection. The 15 minute peak time period traffic counts are provided in the Appendix as Exhibit 1 for the St-Pierre/Dignard (Olympic) intersection and Exhibit 2 for the Notre-Dame/Blais intersection. 3. PROPOSED SUBDIVISION The New York Central Park Subdivision is will be located on hectares of vacant land east of St-Pierre Road and north of Notre-Dame Street in the Town of Embrun. The subdivision will back onto the north limit of the New York Central Recreational Trail.

6 4 FIGURE WEEKDAY PEAK AM AND PM HOUR TRAFFIC COUNTS

7 5 The subdivision proposes 32 townhouse units and 186 apartment units located along a single roadway connecting to St-Pierre Road to the west and Blais Street to the east. The land is currently zoned R1A-h Village Residential, but will require a zoning amendment to allow a higher density of residential units. The surrounding area consists of residential development comprising of single family homes and townhouse units. The New York Central Park Subdivision will be constructed in accordance with market demand, with an expected build-out within 10 years by the year Figure 3.1 shows a conceptual site plan of the subdivision. 3.1 Trip Generation The New York Central Park Subdivision will consist of a combination of 32 townhouses and 186 apartments for a total of 218 residential units. The expected trips from the site were determined utilizing the trip generation statistical data published in the Institute of Transportation Engineers (ITE) document, Trip Generation. Both the townhouse and apartment uses utilized the same trip rate documented in the ITE publication as the Residential Condominium/Townhouse land use. With the subdivision development consisting of residential homes, the time period which would experience the highest volume of site trips would be the weekday peak AM and PM hours when residents are travelling to and from work. Table 3.1 presents the ITE average trip generation rates for the residential units during the weekday peak AM and PM hours of the adjacent roads. The ITE trip generation rates were used to determine the number of peak AM and PM hour site generated trips for the 218 townhouse and apartment units. Table 3.2 presents the number of peak hour site generated trips at full development of the subdivision. TABLE 3.1 TRIP GENERATION RATES TRIP GENERATION RATE LAND USE Peak AM Hr. Peak PM Hr. Residential Condominium/Townhouse (ITE 230) 0.44 T/Unit 0.52 T/Unit TABLE 3.2 PEAK HOUR SITE TRIPS GENERATED TRIPS PEAK AM HR. PEAK PM HR. TOTAL ENTER EXIT TOTAL ENTER EXIT Townhouse & Apartment Use (17%) 80 (83%) (67%) 37 (33%)

8 6 FIGURE 3.1 CONCEPTUAL SITE PLAN

9 7 The Town of Embrun does not have a municipal public transit system. A private bus line has been contracted to provide three daily peak hour express routes to downtown Ottawa from Embrun. The study has not accounted for any reduction in trips from the private bus service as the use would result in a minor impact on the number of site generated trips. The study has therefore assumed that trips would be made by private automobile either to its destination or to the nearest park and ride lot (8 km.) to access OC Transpo bus service. 3.2 Trip Distribution The distribution of expected site generated trips entering and exiting the development were determined by examining the traffic patterns from 2018 traffic counts at the St-Pierre/Dignard and Notre-Dame/Blais intersections, and the 2013 count at the Notre-Dame/St-Pierre intersection which were all taken by the consultant. The trip distribution also examined the existing residential development and travel routes within the community. The trip distribution for the site was proportioned to the following: Figure 3.2 shows the expected weekday peak AM and PM hour site generated trips for the total development of the New York Central Park Subdivision which is expected by the year TRANSPORTATION IMPACT The study will examine the operation of the two site access points onto St-Pierre Road and Blais Street, and the St-Pierre/Dignard and Notre-Dame/Blais intersections. The analysis will use the

10 8 FIGURE 3.2 WEEKDAY PEAK AM AND PM HOUR SITE GENERATED TRIPS

11 9 Highway Capacity Software, which utilizes the intersection capacity analysis procedure as documented in the Highway Capacity Manual For unsignalized intersections, the level of service of each lane movement is determined as a function of the delay of vehicles at the approach. The following relates the level of service of each lane movement with the expected delay at the approach. LEVEL OF SERVICE DELAY Level of Service A 0-10 sec./vehicle Little or No Delay Level of Service B >10-15 sec./vehicle Short Traffic Delays Level of Service C >15-25 sec./vehicle Average Traffic Delays Level of Service D >25-35 sec./vehicle Long Traffic Delays Level of Service E >35-50 sec./vehicle Very Long Traffic Delays Level of Service F >50 sec./vehicle Extreme Delays Demand Exceeds Capacity The expected length of queue at the critical lane movements for an unsignalized intersection was determined by the calculation of the 95 th percentile queue at the lane approach. The 95 th percentile queue length is the calculated 95 th greatest queue length out of 100 occurrences at a movement during a 15-minute peak period. The 95 th percentile queue length is a function of the capacity of a movement and the total expected traffic, with the calculated value determining the magnitude of the queue by representing the queue length as fractions of vehicles. 4.1 Background Traffic Volumes The background traffic volumes along the surrounding roads would represent the expected traffic volumes which would not include the trips from the New York Central Park Subdivision. The background traffic was determined for the expected build-out of the subdivision in 2028, and for the year 2033 which represents five years beyond build-out. The growth in traffic was examined along St-Pierre Road and Notre-Dame Street by comparing 2013 and 2018 peak hour traffic counts. The counts determined that there was negligible growth during the peak AM and PM hours along St-Pierre Road between 2013 and During the same five year time period there was negligible growth during the peak AM hour along Notre-Dame Street, but counts showed that during the peak PM hour there was an annual increase 1.8 percent in the eastbound direction and 6.1 percent in the westbound direction. The study has therefore assumed an annual compounded growth along St-Pierre Road, Notre-Dame Street and Blais Street of 2.0 percent. This growth rate was applied to all approaches at the Notre-Dame/Blais intersection, and to the St-Pierre Road through movements at the St-Pierre/Dignard intersection. This increase in growth should account for future development of the Ste-Marie Hamlet Subdivision which is approximately 50 percent complete. In addition to the 2.0 percent annual growth, the background traffic has also included trips from the Leclair Homes subdivision which is beginning construction and will have one access point onto St-Pierre Road north of the site. The background traffic will include trips for 71 single family homes and 72 semi-detached units. The trips were determined using the ITE trip rates. Figure 4.1 shows the expected 2028 background volume of traffic and Figure 4.2 the 2033 traffic which represents five years beyond build-out.

12 10 FIGURE WEEKDAY PEAK AM AND PM HOUR BACKGROUND TRAFFIC

13 11 FIGURE WEEKDAY PEAK AM AND PM HOUR BACKGROUND TRAFFIC

14 Total Traffic Volumes The total expected weekday peak AM and PM hour traffic for the years examined in the study were determined by the addition of the expected site generated trips from the subdivision which are shown in Figure 3.2, and the 2028 background traffic which is shown in Figure 4.1 and the 2033 background traffic shown in Figure 4.2. The result is the expected total traffic volumes which will be examined in the study. Figure 4.3 shows the expected 2028 total volume of traffic and Figure 4.4 the 2033 total volume of traffic. 4.3 Traffic Analysis The traffic analysis has examined the operation of the site accesses onto St-Pierre Road and Blais Street as well as the St-Pierre/Dignard and Notre-Dame/Blais intersections to determine if there would be any need for intersection modifications due to the development of the subdivision. The time period for the analysis would be the weekday peak AM and PM hours of the adjacent roads. The results of the analysis are discussed in detail in the following sections: Site Access and St-Pierre Road Intersection The proposed access onto St-Pierre Road will be a T intersection where the Site Access will form the westbound stop controlled approach and St-Pierre Road will form the northbound and southbound approaches. The posted speed limit along St-Pierre Road is 50 km./h. A left turn lane warrant analysis was conducted for the southbound St-Pierre Road approach utilizing the procedure from the Ministry of Transportation Ontario (MTO) document, Geometric Design Standards for Ontario Highways. The warrant analysis determined that an exclusive left turn lane was not required during either the peak AM or PM hour. The warrant analysis is provided in the Appendix as Exhibit 3. The intersection was therefore analyzed for the following lane configuration: Northbound St-Pierre Road - One shared through/right lane Southbound St-Pierre Road - One shared left/through lane Westbound Site Access - One shared left/right turn lane The operational analysis for the expected 2028 traffic determined that both the westbound Site Access left/right turn movement and southbound St-Pierre Road left/through movement functioned at a Level of Service (LoS) A during both the peak AM and PM hours. Table 4.1 summarizes the operation of the intersection with the analysis sheets provided as Exhibit 4 for the 2028 peak AM hour and Exhibit 5 for the peak PM hour. The intersection would continue to operate with all approaches functioning at a LoS A during both the 2033 peak AM and PM hours. Table 4.1 summarizes the operation of the intersection with the analysis sheets provided as Exhibit 6 for the 2033 peak AM hour and Exhibit 7 for the peak PM hour. The 95 th percentile queue at the southbound St-Pierre Road shared left/through lane is 0.1 vehicles during the 2033 peak PM hour, and the 95 th percentile queue at the westbound Site Access approach is 0.2 vehicles during the 2033 peak AM hour.

15 13 FIGURE WEEKDAY PEAK AM AND PM HOUR TOTAL TRAFFIC

16 14 FIGURE WEEKDAY PEAK AM AND PM HOUR TOTAL TRAFFIC

17 15 TABLE 4.1 SITE ACCESS/ST-PIERRE INTERSECTION LoS & Delay Intersection Approach WEEKDAY PEAK AM HR. YEAR 2028 (2033) WEEKDAY PEAK PM HR. YEAR 2028 (2033) LoS Delay (sec.) LoS Delay (sec.) WB Left/Right Site Access A (A) 9.4 (9.5) A (A) 9.4 (9.5) SB Left/Through St-Pierre A (A) 7.5 (7.6) A (A) 7.6 (7.6) Site Access and Blais Street Intersection The Site Access/Blais intersection will be a T intersection with the Site Access forming the stop controlled eastbound approach and Blais Street the northbound and southbound approaches. The intersection is approximately 30 m north of the Notre-Dame/Blais intersection. All approaches to the intersection will consist of a single lane with shared turning movements. The operational analysis determined that all approaches to the intersection would operate at a LoS A during the 2028 peak AM and PM hours. Table 4.2 summarizes the operation of the intersection with the analysis sheets provided as Exhibit 8 for the 2028 peak AM hour and Exhibit 9 for the peak PM hour. TABLE 4.2 SITE ACCESS/BLAIS INTERSECTION LoS & Delay Intersection Approach WEEKDAY PEAK AM HR. YEAR 2028 (2033) WEEKDAY PEAK PM HR. YEAR 2028 (2033) LoS Delay (sec.) LoS Delay (sec.) EB Left/Right Site Access A (A) 9.6 (9.7) A (A) 9.6 (9.7) NB Left/Through Blais A (A) 7.7 (7.7) A (A) 7.8 (7.8) For the expected 2033 peak AM and PM hour traffic, all approaches would continue to operate at a LoS A. Table 4.2 summarizes the operation of the intersection with the analysis sheets provided as Exhibit 10 and Exhibit 11 for the 2033 peak AM and PM hour traffic. The 95 th percentile queue at the eastbound Site Access approach is 0.2 vehicles during the peak AM hour and 0.1 vehicles at the northbound Blais Street approach during the peak PM hour. The northbound Blais Street left turn movement into the site may periodically experience a slightly longer queue during the peak PM hour due to the queuing of vehicles at the southbound approach to the Notre-Dame/Blais intersection which may extend temporarily past the Site Access.

18 16 St-Pierre Road and Dignard Street (Olympic Street) Intersection The intersection of St-Pierre Road and Dignard Street is an all-way stop controlled intersection located approximately 110 m south of the proposed site access onto St-Pierre Road. St-Pierre Road forms the northbound and southbound approaches to the intersection, Dignard Street the westbound approach, and Olympic Street the eastbound approach. All approaches to the intersection consist of one lane with shared left/through/right turn movements. Using the 2018 traffic counts, all approaches to the intersection functioned at a LoS A during both the peak AM and PM hours, with Table 4.3 summarizing the operation of the intersection. The analysis sheets are provided as Exhibit 12 and Exhibit 13. TABLE 4.3 ST-PIERRE/DIGNARD INTERSECTION LoS & Delay Intersection Approach WEEKDAY PEAK AM HR. YEAR (2033) WEEKDAY PEAK PM HR. YEAR (2033) LoS Delay (sec.) LoS Delay (sec.) EB Left/Through/Right Olympic A A (A) (7.5) A A (A) (7.6) WB Left/Through/Right Dignard A A (A) (7.4) A A (A) (7.9) NB Left/Through/Right St-Pierre A A (A) (8.0) A A (A) (8.2) SB Left/Through/Right St-Pierre A A (A) (7.9) A A (A) (8.7) For the expected 2028 traffic all approaches to the intersection would operate at a LoS A. Table 4.3 summarizes the operation of the intersection with the analysis sheets provided as Exhibit 14 for the peak AM hour and Exhibit 15 for the peak PM hour. At the year 2033 the intersection is expected to operate well with all approaches functioning at a LoS A. During the peak AM hour the eastbound and westbound approaches would experience a 95 th percentile queue of 0.1 vehicles and the northbound and southbound St-Pierre Road approaches a queue of 0.5 vehicles. During the peak PM hour the 95 th percentile queue would be 0.1 vehicles at the eastbound and westbound approaches, 0.7 vehicles at the northbound approach and 1.1 vehicles at the southbound St-Pierre Road approach. The analysis sheets are provided as Exhibits 16 and 17. Notre-Dame Street and Blais Street Intersection The intersection of Notre-Dame Street and Blais Street is a T intersection with Notre-Dame Street forming the eastbound and westbound approaches, and Blais Street forming the stop controlled southbound approach. The southbound Blais Street approach and westbound Notre- Dame Street approach consist of a single lane approach with shared turning movements. The

19 17 eastbound Notre-Dame Street approach consists of one through lane and one exclusive left turn lane. The 2018 traffic counts determined that during both the peak AM and PM hour, the eastbound Notre-Dame Street left turn movement functioned at a LoS A and the southbound Blais Street approach at a LoS B. Table 4.4 summarizes the operation of the intersection with the analysis sheets provided as Exhibit 18 and Exhibit 19. TABLE 4.4 NOTRE-DAME/BLAIS INTERSECTION LoS & Delay Intersection Approach WEEKDAY PEAK AM HR. YEAR (2033) WEEKDAY PEAK PM HR. YEAR (2033) LoS Delay (sec.) LoS Delay (sec.) EB Left Notre-Dame A A (A) (8.6) A A (B) (10.6) SB Left/Right Blais B C (C) (17.9) B D (E) (44.6) For the expected 2028 peak AM hour traffic, the eastbound Notre-Dame Street left turn lane would function at a LoS A and southbound Blais Street left/right turn lane at a LoS C. During the peak PM hour the Notre-Dame Street left turn lane would continue to function at a LoS A, but with increasing background traffic along Notre-Dame Street the southbound Blais Street left/right turn movement would function at a LoS D. Table 4.4 summarizes the operation of the intersection with the analysis sheets provided as Exhibits 20 and 21. At five years beyond build-out of the subdivision in 2033, the eastbound Notre-Dame Street left turn lane would continue to function at a LoS A and southbound Blais Street left/right turn lane at a LoS C. During the peak PM hour the Notre-Dame Street left turn lane would function at a LoS A but with further increasing traffic along Notre-Dame Street the southbound Blais Street approach would function at a LoS E with an average approach delay of 44.6 seconds. The 95 th percentile queue at the eastbound Notre-Dame Street left turn movement would be 0.3 vehicles during the peak AM hour, and the 95 th percentile queue at the southbound Blais Street approach would be 6.6 vehicles during the peak PM hour. During the peak PM hour the southbound Blais Street queue may temporarily extend to block access to the subdivision at the Site Access intersection resulting in a slight delay for traffic entering and exiting the subdivision from Blais Street. Table 4.4 summarizes the operation of the intersection with the analysis sheets provided as Exhibit 22 for the peak AM hour and Exhibit 23 for the peak PM hour. A traffic signal warrant analysis was completed utilizing the expected 2033 volume of traffic. The analysis determined that the intersection met 50 percent of the warrants for the installation of traffic control signals, therefore traffic signals would not be required at the year A copy of the traffic signal warrant analysis is provided as Exhibit 24.

20 18 5. FINDINGS AND RECOMMENDATIONS The owners of hectares of vacant land north of Notre-Dame Street and east of St-Pierre Road in the Town of Embrun have proposed the development of a 218 home subdivision which will be a mix of townhouse and apartment units. The subdivision will contain one internal street which will connect to St-Pierre Road to the northwest and Blais Street to the southeast. The subdivision is expected to be completed by the year The analysis was completed for the weekday peak AM and PM hours for the 2018 traffic counts at the existing St-Pierre/Dignard and Notre-Dame/Blais intersections, and at the 2028 completion of the subdivision at the existing intersections and at the proposed site accesses onto St-Pierre Road and Blais Street. The analysis also examined the impact of the subdivision trips at the year 2033 which represents five years beyond build-out of the subdivision. The report is being prepared in support of the Draft Plan of Subdivision Application. The findings and recommendations of the study are summarized in the following: 1) The proposed development will generate 96 new trips during the weekday peak AM hour and 113 trips during the peak PM hour. The trips would be distributed onto St-Pierre Road to the west and Blais Street to the east. 2) The subdivision would have two site access points. Below is the lane configuration and operational analysis results for each of the site accesses: St-Pierre/Site Access Intersection Northbound St-Pierre Road Southbound St-Pierre Road Westbound Site Access One shared through/right lane One shared left/through lane One shared left/right turn lane The intersection would operate at an acceptable level of service with no roadway modifications to St-Pierre Road. The intersection would be controlled by a stop sign installed at the westbound Site Access approach. Blais/Site Access Intersection Northbound Blais Street Southbound Blais Street Eastbound Site Access One shared left/through lane One shared through/right lane One shared left/right turn lane The intersection would operate at an acceptable level of service with no roadway modifications to Blais Street. The intersection would be controlled by a stop sign installed at the eastbound Site Access approach. 3) The following are two existing intersections in close proximity to the proposed New York Central Park Subdivision which were analyzed to determine if intersection

21 19 modifications would be required due to the development of the New York Central Park Subdivision site. Below is the lane configuration and operational analysis results for each of the intersections: St-Pierre/Dignard (Olympic) Intersection Northbound St-Pierre Road Southbound St-Pierre Road Eastbound Olympic Street Westbound Dignard Street One shared left/through/right lane One shared left/through/right lane One shared left/through/right lane One shared left/through/right lane The intersection is an all-way stop controlled intersection with all approaches operating at an acceptable level of service with no roadway modifications required to the intersection. Notre-Dame/Blais Intersection Southbound Blais Street Eastbound Notre-Dame Street Westbound Notre-Dame Street One shared left/right turn lane One through lane One exclusive left turn lane One shared through/right lane The intersection is a T intersection with a stop sign installed at the southbound Blais Street approach. All approaches operated at an acceptable level of service with no roadway modifications required to either Notre-Dame Street or Blais Street. A traffic signal warrant analysis determined that traffic signals would not be warranted by the year ) The subdivision site would contain sufficient parking at both the townhouse units and apartment units to ensure that parking would not spill-over onto St-Pierre Road or Blais Street. Prepared by: David J. Halpenny, P. Eng.

22 20 APPENDIX TRAFFIC COUNTS LEFT TURN LANE WARRANT ANALYSIS OPERATIONAL ANALYSIS WORK SHEETS TRAFFIC SIGNAL WARRANT ANALYSIS

23 21 EXHIBIT 1 ST-PIERRE ROAD/DIGNARD STREET (OLYMPIC STREET) March 21, 2018 All Vehicles Time Period Northbound Southbound Eastbound Westbound LT ST RT LT ST RT LT ST RT LT ST RT Total 07:00 07: :15 07: :30 07: :45 08: :00 08: :15 08: :30 08: :45 09: :00 16: :15 16: :30 16: :45 17: :00 17: :15 17: :30 17: :45 18: Truck & Bus Traffic Time Period Northbound Southbound Eastbound Westbound LT ST RT LT ST RT LT ST RT LT ST RT Total 07:00 07: :15 07: :30 07: :45 08: :00 08: :15 08: :30 08: :45 09: :00 16: :15 16: :30 16: :45 17: :00 17: :15 17: :30 17: :45 18:

24 22 EXHIBIT 2 NOTRE-DAME STREET AND BLAIS STREET COUNTS February 14, 2018 All Vehicles Time Period Northbound Southbound Eastbound Westbound LT ST RT LT ST RT LT ST RT LT ST RT Total 07:00 07: :15 07: :30 07: :45 08: :00 08: :15 08: :30 08: :45 09: :00 16: :15 16: :30 16: :45 17: :00 17: :15 17: :30 17: :45 18: Truck & Bus Traffic Time Period Northbound Southbound Eastbound Westbound LT ST RT LT ST RT LT ST RT LT ST RT Total 07:00 07: :15 07: :30 07: :45 08: :00 08: :15 08: :30 08: :45 09: :00 16: :15 16: :30 16: :45 17: :00 17: :15 17: :30 17: :45 18:

25 23 EXHIBIT 3 YEAR 2033 LEFT TURN LANE WARRANTS Site Access/St-Pierre Road

26 24 EXHIBIT 4 YEAR 2028 PEAK AM HOUR TOTAL TRAFFIC Site Access/St-Pierre Road

27 25 EXHIBIT 5 YEAR 2028 PEAK PM HOUR TOTAL TRAFFIC Site Access/St-Pierre Road

28 26 EXHIBIT 6 YEAR 2033 PEAK AM HOUR TOTAL TRAFFIC Site Access/St-Pierre Road

29 27 EXHIBIT 7 YEAR 2033 PEAK PM HOUR TOTAL TRAFFIC Site Access/St-Pierre Road

30 28 EXHIBIT 8 YEAR 2028 PEAK AM HOUR TOTAL TRAFFIC Site Access/Blais Street

31 29 EXHIBIT 9 YEAR 2028 PEAK PM HOUR TOTAL TRAFFIC Site Access/Blais Street

32 30 EXHIBIT 10 YEAR 2033 PEAK AM HOUR TOTAL TRAFFIC Site Access/Blais Street

33 31 EXHIBIT 11 YEAR 2033 PEAK PM HOUR TOTAL TRAFFIC Site Access/Blais Street

34 32 EXHIBIT 12 YEAR 2018 PEAK AM HOUR TOTAL TRAFFIC St-Pierre/Dignard (Olympic)

35 33 EXHIBIT 13 YEAR 2018 PEAK PM HOUR TOTAL TRAFFIC St-Pierre/Dignard (Olympic)

36 34 EXHIBIT 14 YEAR 2028 PEAK AM HOUR TOTAL TRAFFIC St-Pierre/Dignard (Olympic)

37 35 EXHIBIT 15 YEAR 2028 PEAK PM HOUR TOTAL TRAFFIC St-Pierre/Dignard (Olympic)

38 36 EXHIBIT 16 YEAR 2033 PEAK AM HOUR TOTAL TRAFFIC St-Pierre/Dignard (Olympic)

39 37 EXHIBIT 17 YEAR 2033 PEAK PM HOUR TOTAL TRAFFIC St-Pierre/Dignard (Olympic)

40 38 EXHIBIT 18 YEAR 2018 PEAK AM HOUR TOTAL TRAFFIC Notre-Dame/Blais

41 39 EXHIBIT 19 YEAR 2018 PEAK PM HOUR TOTAL TRAFFIC Notre-Dame/Blais

42 40 EXHIBIT 20 YEAR 2028 PEAK AM HOUR TOTAL TRAFFIC Notre-Dame/Blais

43 41 EXHIBIT 21 YEAR 2028 PEAK PM HOUR TOTAL TRAFFIC Notre-Dame/Blais

44 42 EXHIBIT 22 YEAR 2033 PEAK AM HOUR TOTAL TRAFFIC Notre-Dame/Blais

45 43 EXHIBIT 23 YEAR 2033 PEAK PM HOUR TOTAL TRAFFIC Notre-Dame/Blais

46 44 EXHIBIT 24 TRAFFIC SIGNAL WARRANT ANALYSIS Notre-Dame/Blais Intersection

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny

More information

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: 1649362 Ontario Inc. c/o Manor Park Management 231 Brittany Drive, Suite D Ottawa ON K1K 0R8 July

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: Orleans Gardens Shopping Centre Inc. 2851 John Street, Suite 1 Markham, ON K3R 5R7

More information

BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited.

BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited. BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: 2534189 Ontario Limited April 6, 2018 117-668 TIA Report_2.doc D. J. Halpenny & Associates

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY DECEMBER 2012 READ, VOORHEES & ASSOCIATES TORONTO, ONTARIO Read, Voorhees & Associates

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

AMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning

AMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning AMEC Earth and Environmental Bovaird Drive Environmental Assessment Traffic Study Final Report August Excellence in Transportation Planning AMEC Earth and Environmental Bovaird Drive Class EA Traffic

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748 City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY TRAFFIC IMPACT STUDY for the GLEN ELLEN COUNTRY CLUB SENIOR RESIDENTIAL REDEVELOPMENT 84 Millis, Massachusetts Prepared by: McMahon Associates, Inc. Prepared for: Toll Brothers, Inc. August 216 DRAFT

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

CastleGlenn Consultants Inc.

CastleGlenn Consultants Inc. February 1 st, 2010 CastleGlenn Consultants Inc. Engineers, Project Managers & Planners Mr. Kevin Yemm Planning and Land Development Richraft Ltd. 2280 St. Laurent Boulevard Suite 201 Ottawa, Ontario (Tel:

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited 2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief Paradigm Transportation Solutions Limited March 217 March 217 Project: 1627 Diana Vlasic, M.C.I.P., R.P.P Metropolitan Consulting 445 Paletta

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina Prepared for Longbranch Development Prepared by January 13, 219 ii Table of Contents Subject Page Signature Page... i Table of Contents...

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

2016 Church Street Access Study. 100 Clinton Square 126 North Salina Street, Suite 100 Syracuse, NY

2016 Church Street Access Study. 100 Clinton Square 126 North Salina Street, Suite 100 Syracuse, NY 2016 Church Street Access Study 100 Clinton Square 126 North Salina Street, Suite 100 Syracuse, NY 13202 www.smtcmpo.org Syracuse Metropolitan Transportation Council Final Report February 23, 2016 This

More information

COMMITTEE RECOMMENDATIONS. That Council approve:

COMMITTEE RECOMMENDATIONS. That Council approve: 4. MODIFICATIONS TO INNES ROAD (REGIONAL ROAD 30) AND TENTH LINE ROAD (REGIONAL ROAD 47) TO ACCOMMODATE THE DEVELOPMENT OF THE TRINITY COMMONS SHOPPING CENTRE COMMITTEE RECOMMENDATIONS That Council approve:

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

Proposed Addition to Pickering Islamic Centre

Proposed Addition to Pickering Islamic Centre TRAFFIC IMPACT STUDY, PARKING STUDY, SITE CIRCULATION REVIEW & TDM PLAN Proposed Addition to Pickering Islamic Centre 265 Brock Road City of Pickering, Ontario Prepared for: Pickering Islamic Centre Masjid

More information

Capital Region Council of Governments

Capital Region Council of Governments March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry

More information

THE LANDMARK AT TALBOT PARK

THE LANDMARK AT TALBOT PARK TRAFFIC IMPACT STUDY FOR THE LANDMARK AT TALBOT PARK IN NORFOLK, VA INTERMODAL ENGINEERING, P.C. OCTOBER, 200 The Landmark at Talbot Park is a proposed redevelopment of the existing apartments along the

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc. Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6

More information

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY Prepared for: City of Thornton And Colorado Department of Transportation Prepared by: 11 Blake Street, Suite 2 Denver, Colorado 822 Contact: Brian Bern, PE, PTOE

More information

APPENDIX D Traffic Impact Study (Draft Report)

APPENDIX D Traffic Impact Study (Draft Report) ENVIRONMENTAL IMPACT ASSESSMENT (EIA) REGISTRATION, TRAFFIC IMPACT STUDY (DRAFT REPORT), AND WATER SUPPLY SOURCE ASSESSMENT (WSSA): CAMPING PLAGE ABOITEAU BEACH, CAP-PELÉ, NB APPENDIX D (Draft Report)

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

George Street Transportation Impact Study. Paradigm Transportation Solutions Limited

George Street Transportation Impact Study. Paradigm Transportation Solutions Limited George Transportation Impact Study Paradigm Transportation Solutions Limited January 217 Project Summary Project Number 16191 January 217 Client Wastell Homes 5-1895 Blue Heron Drive London ON N6H 5L9

More information

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study To: Ms. Susan C. Ryan Spaulding Youth Center 72 Spaulding Road Northfield, NH 03276 Date: September 7, 2017 Project #: 52455.00 From: Robin Bousa Director of Transportation Systems Re: Spaulding Youth

More information

Grant Avenue Streetscape

Grant Avenue Streetscape REPORT TYPE GOES HERE Grant Avenue Streetscape PREPARED FOR City of Manassas 9027 Center Street Manassas, VA 20110 PREPARED BY 8300 Boone Boulevard Suite 700 Vienna, Virginia 22182 571.389.8121 July 31,

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

Troutbeck Farm Development

Troutbeck Farm Development Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com

More information

Parking Lot P6C Transportation Impact Assessment

Parking Lot P6C Transportation Impact Assessment Transportation Carleton University Parking Lot P6C Transportation Impact Assessment Prepared by: AECOM 302 1150 Morrison Drive 613 820 8282 tel Ottawa, ON, Canada K2H 8S9 613 820 8338 fax www.aecom.com

More information

MASER ASSOCIATES. Engineers Planners Surveyors TRAFFIC IMPACT ANALYSIS FOR PROPOSED RESIDENTIAL MULTI-FAMILY SEA GULL VILLAGE TOWNSHIP OF COLTS NECK

MASER ASSOCIATES. Engineers Planners Surveyors TRAFFIC IMPACT ANALYSIS FOR PROPOSED RESIDENTIAL MULTI-FAMILY SEA GULL VILLAGE TOWNSHIP OF COLTS NECK 000 MASER ASSOCIATES Engineers Planners Surveyors TRAFFIC IMPACT ANALYSIS FOR PROPOSED RESIDENTIAL MULTI-FAMILY DEVELOPMENT SEA GULL VILLAGE TOWNSHIP OF COLTS NECK MONMOUTH COUNTY Prepared By: Richard

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information

South Street Campus Lands Development. City of London TRANSPORTATION IMPACT ASSESSMENT

South Street Campus Lands Development. City of London TRANSPORTATION IMPACT ASSESSMENT South Street Campus Lands Development City of London TRANSPORTATION IMPACT ASSESSMENT TW1387 South Street Campus Lands Development City of London TRANSPORTATION IMPACT ASSESSMENT May 2013 South Street

More information

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:

More information

84-88 Columbia Street West Waterloo, Ontario Transportation Impact Study. Paradigm Transportation Solutions Limited

84-88 Columbia Street West Waterloo, Ontario Transportation Impact Study. Paradigm Transportation Solutions Limited 84-88 Columbia Street West Waterloo, Ontario Transportation Impact Study Paradigm Transportation Solutions Limited June 217 Project Summary Project Number 15255 June 217 Client Masri O Inc. Architects

More information

2. Existing Conditions

2. Existing Conditions 2. Existing Conditions The existing traffic and parking conditions on the site and the surrounding area were reviewed based on the study methodology in Section 1.2. 2.1 Existing Land Use The portion of

More information

Road Conversion Study Plumas Street

Road Conversion Study Plumas Street Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education

More information

May 5, 2009 File:

May 5, 2009 File: MMM Group Limited Suite 600 1455 West Georgia Street Vancouver, BC V6G 2T3 t: 604-685-9381 f: 604-683-8655 www.mmm.ca May 5, 2009 File: 50-09001-007 1420 1055 West Hastings Street Vancouver, BC V6E 2E9

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY 675 Millcreek Drive, Unit 1 Mississauga, Ontario L5N 5M4 T: 416.213.7121 F: 95.89.8499 www.transtech.co TRAFFIC IMPACT STUDY PROPOSED MOSQUE DEVELOPMENT 4269 REGIONAL ROAD 25 TOWN OF OAKVILLE PREPARED

More information

Co-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department

Co-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department 28 REGIONAL MUNICIPALITY OF OTTAWA-CARLETON MUNICIPALITÉ RÉGIONALE D OTTAWA-CARLETON REPORT RAPPORT Our File/N/Réf. Your File/V/Réf. 25 23-97-R016 DATE 15 April 1997 TO/DEST. FROM/EXP. SUBJECT/OBJET Co-ordinator

More information

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998 R1500 : Traffic Safety at 25 Avenue and 128 Street Intersection Corporate NO: R1500 Report COUNCIL DATE: May 25, 1998 REGULAR COUNCIL TO: Mayor & Council DATE: April 27, 1998 FROM: General Manager, Engineering

More information

FINAL Albertville Business Park AUAR Update Traffic Study

FINAL Albertville Business Park AUAR Update Traffic Study FINAL Albertville Business Park AUAR Update Traffic Study Prepared for City of Albertville, MN July 20, 2017 SRF No. 10060.00 Table of Contents Introduction... 1 Existing Conditions... 1 Data Collection...

More information

Simons Run Corridor Study

Simons Run Corridor Study Simons Run Corridor Study Campbell County & City of Lynchburg, Virginia Prepared on: September 30, 2014 Prepared for: Central Virginia Metropolitan Planning Organization 277 Bendix Road, Suite 500 Virginia

More information

TECHNICAL MEMORANDUM. Kevin Even, P.E. Village Engineer and Public Works Director Village of Waunakee. From: Kevin Wehner, P.E. KL Engineering, Inc.

TECHNICAL MEMORANDUM. Kevin Even, P.E. Village Engineer and Public Works Director Village of Waunakee. From: Kevin Wehner, P.E. KL Engineering, Inc. TEHIL MEMORUM To: Kevin Even, P.E. Village Engineer and Public Works irector Village of Waunakee 400 King James Way, uite 200 Madison, Wisconsin 3719 608-663-1218 www.klengineering.com From: Kevin Wehner,

More information

Fieldgate. Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton

Fieldgate. Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton Fieldgate Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton September 214 September 23 214 Ms Debbie Pacchiarotti Our

More information

FINAL REPORT Traffic Analysis Report Port Coquitlam Recreation Complex Port Coquitlam, BC

FINAL REPORT Traffic Analysis Report Port Coquitlam Recreation Complex Port Coquitlam, BC FINAL REPORT Traffic Analysis Report Port Coquitlam Recreation Complex Port Coquitlam, BC Howes Technical Advantage Ltd. This report was prepared by Howes Technical Advantage Ltd. for the City of Port

More information

3.2.2 Proposed Road Network within Phase 1B Lands

3.2.2 Proposed Road Network within Phase 1B Lands 3.2.2 Proposed Road Network within Phase 1B Lands Figure 3.1 also shows the proposed road network within the Premier Gateway Phase 1B Employment Area lands, which features two collector roads providing

More information

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine Draft Study STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine SUBMITTED TO: BANGOR AREA COMPREHENSIVE TRANSPORTATION SYSTEM SUBMITTED BY: I MAY 23, 2017 DRAFT STILLWATER AVENUE STUDY FINAL REPORT Table

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /

More information

MEMORANDUM. Our project study area included the following locations:

MEMORANDUM. Our project study area included the following locations: MEMORANDUM Date: To: From: Subject: Najib O. Habesch Nick M. Fomenko, PE, PTOE Bushnell Park North Traffic Assessment BETA Project #: 4461 As part of our contract to undertake the design of the Bushnell

More information

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT Prepared by: In Association with: November 2013 EXECUTIVE SUMMARY Patton Township, in partnership

More information

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION 5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION Having held a public hearing, that Council approve the preliminary designs

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report Traffic Study of Fuller Street, Cady Street, West Street and West Avenue Final Report July 2005 Prepared for: Town of Ludlow Prepared by: Pioneer Valley Planning Commission 26 Central Street West Springfield,

More information

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT November 2016 TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT & Aspinwall Borough, Sharpsburg Borough & O Hara Township, Allegheny County, Pennsylvania Prepared for: Riverfront

More information

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for: TRAFFIC IMPACT STUDY For Creekside Thornton, Colorado August 215 November 215 Revised: August 216 Prepared for: Jansen Strawn Consulting Engineers 45 West 2 nd Avenue Denver, Colorado 8223 Prepared by:

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

Corporation of the Town of Oakville. December 16, 2013

Corporation of the Town of Oakville. December 16, 2013 Corporation of the Town of Oakville Transportation Impact Analysis and Parking Study for Proposed Secondary School, Oakville Draft Final Report Submitted by: HDR Corporation 100 York Boulevard, Suite 300

More information

Meadowlake Ranch Traffic Impact Analysis (LSC #184600) August 27, 2018

Meadowlake Ranch Traffic Impact Analysis (LSC #184600) August 27, 2018 LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210 Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsctrans.com Website: http://www.lsctrans.com Traffic

More information

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014 Page: 1 of 8 1 POLICY 1.01 The City shall follow all of the specifications in the Manual of Uniform Traffic Control Devices for Canada, prepared by the National Committee of Uniform Traffic Control, and

More information

APPENDIX E: Transportation Technical Report

APPENDIX E: Transportation Technical Report New Jersey Pennsylvania Lackawanna Cut-Off Passenger Rail Service Reston Project Environmental Assessment APPENDIX E: Transportation Technical Report E.1 Introduction As part of the overall environmental

More information

Marina Loft (DRC 51-R-12)

Marina Loft (DRC 51-R-12) Marina Loft (DRC 51-R-12) traffic study prepared for: Cymbal Development OCtober 2012 Traf Tech October 1, 2012 Mr. Asi Cymbal - President Cymbal Development 3470 North Miami Avenue Upper Suite Miami,

More information

1. Provide a dedicated westbound approach bus lane at the intersection;

1. Provide a dedicated westbound approach bus lane at the intersection; 3. MODIFICATIONS AT HIGHWAY 417 WESTBOUND OFF-RAMP/PINCREST ROAD - PUBLIC HEARING COMMITTEE RECOMMENDATIONS Having held a public hearing, that Council approve the preliminary design for the proposed modifications