1 TRAFFIC IMPACT STUDY, PARKING STUDY, SITE CIRCULATION REVIEW & TDM PLAN Proposed Addition to Pickering Islamic Centre 265 Brock Road City of Pickering, Ontario Prepared for: Pickering Islamic Centre Masjid Usman June 217

2

3 June 8, 217 Mr. Mohammed Naeem Pickering Islamic Centre 265 Brock Road Pickering, ON Re: Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON - Traffic Impact and Parking Study, Site Circulation Review and Transportation Demand Management Plan Dear Mr. Naeem, TRANS-PLAN is pleased to submit this Traffic Impact and Parking Study, Site Circulation Review and Transportation Demand Management Plan in support of a Zoning By-law Amendment and Site Plan Application for a proposed addition to the Pickering Islamic Centre, located at 265 Brock Road in the City of Pickering, Ontario. The development proposal includes a three-storey addition with a building increase from 1,724 sq.m. of gross floor area (GFA) to 4,886 sq.m. of GFA. The proposed parking supply is 16 spaces (115 spaces on the surface and 45 spaces with the construction of a new parking deck). Our traffic impact study findings indicate that the proposed addition could be accommodated by introducing signal timing adjustments at two signalized intersections at Brock Road with Major Oaks Road and with Finch Avenue. Usman Road, as an opened road allowance, and the residential development at the rear of the site are also incorporated in our study. Our parking study includes a review of the parking requirements based on the City of Pickering Zoning Bylaw. Peak parking demands of the site, during Friday early afternoon prayers, is expected to be just under 3 spaces, while the proposed parking supply is 16 spaces; however, the surge in parking demands is very brief, and as typical with the operation of mosques, parking would also occur in the parking aisles (on a vehicle last in, first out basis), as to not impact roadway operations and designated on-site fire routes. Some on-street parking would also continue to occur on the adjacent street, Usman Road, during this time. A Transportation Demand Management plan is also provided, outlining measures to encourage fewer single-occupant auto trips to and from the site and to encourage other travel modes. Sincerely, Anil Seegobin, P.Eng. Partner, Engineer Trans-Plan Transportation Inc. Transportation Consultants

4

5 Table of Contents Transmittal Letter Table of Contents 1. INTRODUCTION SITE LOCATION & EXISITNG CONDITIONS PROPOSED DEVELOPMENT EXISTING CONDITIONS Road Network Traffic Counts Transit Service FUTURE BACKGROUND CONDITIONS Background Growth Rate Planned Background Developments Planned Roadway and Transit Improvements Horizon Years SITE TRAFFIC Traffic Survey Methodology Survey Results of Existing Site Traffic Site Trip Generation for the Proposed Addition Trip Distribution and Assignment FUTURE TOTAL TRAFFIC CONDITIONS Future Walk Trips & Pedestrian Crossing CAPACITY AND VEHICLE QUEUING ANALYSIS PARKING STUDY Parking Requirements, City of Pickering Zoning By-law Parking Survey Methodology Parking Survey Results Future Parking Demands for School and Prayer Hall Uses Allocation of Residual Parking Demands during Friday Prayers Durham Region Bus Rapid Transit (BRT) & HOV lanes TRANSPORTATION DEMAND MANAGEMENT PLAN i

6 11. SITE CIRCULATION REVIEW CONCLUSIONS Traffic Impact Study Parking Study Transportation Demand Management Plan Site Circulation Review Appendix A Turning Movement Counts and Signal Timing Plans Appendix B Background Traffic Information Appendix C Pickering Islamic Centre Site Survey Results Appendix D Capacity and Queue Analysis Sheets Appendix E Level of Service Definitions Appendix F City of Pickering Zoning By-law Parking Requirements Excerpts & Parking Survey Results Appendix G Transportation Demand Management Plan Documents List of Tables Table 1 Current Uses, School and Prayer Hall... 2 Table 2 - Site Statistics, Existing and Future Uses... 3 Table 3 Intersection Turning Movement Count Details... 5 Table 4 Transit Service in the Study Area... 6 Table 5 Background Developments in the Study Area... 6 Table 6 - Summary of Existing Auto Trip Generation and Passenger Drop-offs / Pick-ups of Students... 9 Table 7 - Summary of Walk Trips and Pedestrian Crossing... 1 Table 8 - Trip Generation of Place of Worship... 1 Table 9 Site Trip Generation of the School Table 1 - Combined Trip Generation of Place of Worship and School Uses Table 11 - Capacity Analysis Results Table 12 - Vehicle Queue Analysis Results Table 13 Parking Requirements (City of Pickering Zoning By-law) and Supply Table 14 - Parking Survey Results, Peak Demands Table 15 Future Parking Demand of School... 2 Table 16 - Bicycle Parking Requirements ii

7 List of Figures Figure 1 Site Location Figure 2 Site Plan Figure 3 Existing Study Area Roadway Characteristics Figure 4 Existing Traffic Volumes, Weekday AM, Midday and PM Peak Hours... 3 Figure 5 Study Area Transit Service Figure Background Traffic Volumes, Weekday AM, Midday and PM Peak Hours Figure 7 Site Traffic Assignment, Weekday AM, Midday and PM Peak Hours Figure Total Traffic Volumes, Weekday AM, Midday and PM Peak Hours Figure 9 Spillover Parking Locations Figure 1 Review of Vehicles Parking on the Aisle Figure 11 School Bus Student Drop-off / Pick-up (Inbound) Figure 12 School Bus Student Drop-off / Pick-up (Outbound) Figure 13 Waste Collection Vehicle Site Circulation (Inbound) Figure 14 Waste Collection Vehicle Site Circulation (Outbound)... 4 Figure 15 Review of Passenger Vehicles Parking Manoeuvres iii

8

9 Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON 1. INTRODUCTION Trans-Plan has been retained by Pickering Islamic Centre to complete a transportation study for a proposed three-storey addition to the current building (school and prayer hall use) located at 265 Brock Road in the City of Pickering, Ontario. This assessment includes the following studies and tasks: Traffic Impact Study a review and assessment of the existing road network a review of the existing and future pedestrian safety along Brock Road related to the site an assessment of boundary road operations under future background conditions, including a review of traffic growth, area developments and proposed transportation improvements in the study area an assessment of the impact of site-generated traffic on the study area intersections and proposed boundary roadway connections under future traffic conditions recommendations to mitigate any identified traffic impacts on the boundary roadways, resulting from the proposed development Parking Study a review of site parking supply and requirements based on the City of Pickering s current Zoning Bylaw a review of the existing site parking demand and the estimated future parking demand of the site recommendations to accommodate the existing and future parking demand Transportation Demand Management a review of existing and future transportation demand management (TDM) opportunities near the study area recommendation of various TDM measures for the site to encourage a reduction in single-occupant auto trips and auto parking demands Site Circulation Review a review of the on-site circulation for school bus drop-offs / pick-ups, waste collection operations and parking manoeuvres for passenger vehicles Prior to commencing this study, Transportation and Planning staff at the City of Pickering and at the Region of Durham were contacted to discuss the scope and methodology and were provided with a study Terms of Reference. This report follows Durham Region Traffic Impact Study Guidelines, October 211. Comments were received from the Region of Durham and the City of Pickering and were incorporated in our study. 2. SITE LOCATION & EXISITNG CONDITIONS The site, shown in Figure 1, is located at 265 Brock Road, Pickering, and is an Islamic school and a place of worship / prayer hall, known as the Pickering Islamic Centre (PIC). The site is located approximately 2 metres (m) south of Major Oaks Road, on the east side of Brock Road. 1

10 Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON Surrounding land uses in the study area are mainly residential developments along Brock Road. Other land uses include a place of worship, school and a commercial plaza north of the site. South of the site along Brock Road, there is the Brock Ridge Community Park and a few commercial uses. The current details for the school and prayer hall, including catchment area (approximate boundary area served), programs and hours of operation, are summarized in Table 1. Table 1 Current Uses, School and Prayer Hall Elementary School Catchment Area Pickering, western parts of Ajax, and some eastern parts of Scarborough Grades Junior Kindergarten (JK) to 6 Schedule: Weekdays, 8:15am to 3:3pm; grades JK to 6 Peak Day / Period of Activity Catchment Area Attendees Prayer Times Peak Day / Period of Activity Friday (Girls School), 6:pm to 9:pm; ages 6 to 15 Saturday (Boys School), 1:3am to 1:3pm; ages 5 to 17 Weekday start / dismissal periods (8:15am and 3:3pm) Prayer Hall Regional: Pickering, western parts of Ajax, and some eastern parts of Scarborough For students, staff and additional worshippers 6:45am, 12:45pm (or approx. 1:45pm), 4:pm (or approx. 3:pm), 6:pm and 8:pm (for approximately 2 minutes in duration each) Friday afternoon prayers (12:45pm and 4:pm) The existing Pickering Islamic Centre contains approximately 1,724 sq.m. of gross floor area (GFA). Access to the site is provided via two driveways: a right-in / out driveway at the west limit of the site, at Brock Road, just north of Usman Road, and a full-moves driveway at the south limit of the site, at Usman Road. The existing parking supply is approximately 62 spaces for the combined school and prayer hall uses. 3. PROPOSED DEVELOPMENT The proposed site plan, prepared by Khalil U. Syed Architect, is shown in Figure 2. The proposed threestorey addition includes the following: Building increase from approximately 1,724 to 4,886 sq.m. of GFA Construction of a new parking deck, with a total parking supply of 16 spaces for the site Increase from 2 to 21 classrooms (including a daycare room, kindergarten room and computer lab as classrooms) Slight increase in the worship area size from approximately 299 to 347 sq.m. of GFA A parking structure is proposed at the rear of the property at the north-east corner (with 1,528 sq.m. of GFA). A right-out only access is proposed on Brock Road and a full moves access is proposed to be 2

11 Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON maintained on Usman Road. The site statistics of the existing and future building and operations is shown in Table 2. Table 2 - Site Statistics, Existing and Future Uses Existing Future Horizon Year No. of Storeys 2 3 Building Size [GFA] (excludes parking deck) 1, , Parking Supply (spaces) ~62 16 Barrier Free (spaces) 2 6 Elementary School Enrollment (students) 72 3 (within next 5 to 1 years) 42 (building capacity) Classrooms: 2 21 (incl. daycare room, kindergarten room and computer lab) Staff: Teachers 8 21 Administration 1 to 2 5 School Buses: Large Small 1 to 2 Prayer Hall Worship Area (GFA) Person Capacity (@ 1.2 sq.m. of GFA per worshipper) Islamic School: The Islamic school accommodates Junior Kindergarten to grade 6 students. The school currently has 72 students and is planned to increase to approximately 3 students (within a five- to ten-year horizon after the addition is completed). The school is operational on weekdays, with a start time of 8:15am and a dismissal time of 3:3pm. Additional classes for students (with smaller enrollment sizes compared to regular daytime school programs) are available on Fridays and Saturdays. The Friday class runs from 6:pm to 9:pm, for girls, ages 6 to 15, and the Saturday class runs from 1:3am and 1:3pm, for boys, ages 5 to 17. Place of Worship: The place of worship holds prayers throughout the week, with Friday being the busiest day of the week. The typical prayer times last for approximately 15 to 2 minutes in duration and occur five times per day, at 3

12 Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON approximately 6:3am, 2:pm, 3:pm, 6:pm and 8:pm. Prayer times are subject to changes based on the time of year (lunar calendar) and daylight savings time. The Friday prayers held in the afternoon, at approximately 1:45pm in the spring, typically has the most attendees visiting the place of worship, with a total of approximately 367 persons in attendance (to be discussed further in Section 6, Site Traffic). 4. EXISTING CONDITIONS 4.1 Road Network The boundary roadways located in the study area are described as follows: Brock Road (Highway 1) is a major arterial road (Type "A" Arterial) under the jurisdiction of the Region of Durham that generally runs in a north-south direction, with four travel lanes: two per direction. A two way centre left turn lane is provided from Dellbrook Avenue to Major Oaks Road, while a raised concrete centre median spans from Major Oaks Road to Finch Avenue (with a median break at Usman Road to permit southbound left turns). The posted speed limit on Brock Road is 6 km/h in the vicinity of the site. Finch Avenue (Highway 37) is a minor arterial road (Type "B" Arterial) under the jurisdiction of the Region of Durham that generally runs in an east-west direction, with two travel lanes. The roadway continues west into the Scarborough District of the City of Toronto. The posted speed limit on Finch Avenue is 6 km/h. Dellbrook Avenue is a local road under the jurisdiction of the City of Pickering that generally runs in an east-west oriented direction, with two travel lanes, terminating at Brock Road, with a plaza on the east leg. The roadway continues west to Valley Farm Road. The posted speed limit on Dellbrook Avenue is 4 km/h. Major Oaks Road is a local road under the jurisdiction of the City of Pickering. Major Oaks Road connects to Brock Road as an east-west oriented road and curves to a north-south orientation approximately 5m west of Brock Road. The roadway has two travel lanes and has a posted speed limit of 4 km/h. Usman Road is a local road under the jurisdiction of the City of Pickering and services the Pickering Islamic Centre as well as future residential development to the east (the road allowance is currently unassumed). Usman Road forms a crescent shape to connect with Brock Road at two intersection points: at Major Oaks Road, north leg, signalized intersection, and just south of Major Oaks Road, south leg, sidestreet stop controlled. Usman Road has two travel lanes and has an assumed speed limit of 4 km/h. 4.2 Traffic Counts To determine existing operating conditions in the study area, Trans-Plan conducted a site visit and conducted Turning Movement Counts (TMCs) where counts were not readily available or current from the Region s database. The count hours chosen coincide with the morning school arrival period, the busier early afternoon Friday prayer times and the afternoon school dismissal period at the PIC. A summary of the count date, count hours and peak hours obtained for each intersection counted is shown in Table 3. Detailed TMC data and current signal timing plans provided by Durham Region are provided in Appendix A. 4

13 Brock Road at Finch Avenue Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON Table 3 Intersection Turning Movement Count Details Intersection Source Count Date Count Hours Peak Hours Trans- 7:am - 9:3am 7:45am - 8:45am Plan 12:pm - 14:pm 1:pm - 2:pm Brock Road at Pickering Islamic Centre Access Brock Road at Major Oaks Road Brock Road at Usman Road Brock Road at Dellbrook Avenue Trans- Plan Trans- Plan Trans- Plan Trans- Plan Tues. March 28, 217 Fri. March 24, 217 Fri. March 24, 217 Fri. March 24, 217 Tues. March 28, :pm - 18:3pm 7:am - 9:3am 12:pm - 14:pm 15:pm - 18:3pm 7:am - 9:3am 12:pm - 14:pm 15:pm - 18:3pm 7:am - 9:3am 12:pm - 14:pm 15:pm - 18:3pm 7:am - 9:3am 12:pm - 14:pm 15:pm - 18:3pm 3:15pm - 4:15pm 7:45am - 8:45am 1:pm - 2:pm 3:15pm - 4:15pm 7:45am - 8:45am 1:pm - 2:pm 3:15pm - 4:15pm 7:45am - 8:45am 1:pm - 2:pm 3:15pm - 4:15pm 7:3am - 8:3am 12:pm - 1:pm 4:45pm - 5:45pm The existing traffic volumes along Brock Road were also reviewed for consistency of upstream and downstream traffic volumes, based on turning movement volumes at the intersections, and were balanced where appropriate. The existing traffic volumes for the weekday morning (AM), midday (MD) and afternoon (PM) peak hours are shown in Figure Transit Service The site is served by Durham Region Transit (DRT), connecting transit riders to major locations including the Pickering Golf Club and the Pickering GO Station. DRT operates the following bus routes within the study area: Route 111, East Pickering generally runs along Pickering Parkway, Finch Avenue and Dixie Road, connecting riders between Pickering Parkway Terminal and the communities of Maple Ridge, William Dunbar, Bainebridge/Southview and Valley Farm. The route operates at a frequency of 2 minutes during the weekdays and 3 minutes on the weekends. The nearest stop close to the site is located at Brock Road and Finch Avenue, approximately 4m south of the site. Route 112, Brock is mainly a north-south transit route operating generally along Bayly Street and Brock Road, connecting riders from Pickering GO Station and DRT Pulse to Zents Drive in the north. The route operates at a frequency of 15 minutes during the weekdays and 3 minutes during the weekend. The nearest stop is located on Brock Road at the entrance of the Brock Ridge Community Park, approximately 12m south of the site (and bus stops were previously located in front of the PIC, west of Major Oaks Road, prior to construction of the subdivision in the area, which would likely be replaced afterwards). Route 199, Claremont generally runs along Brock Road, connecting transit riders between the Pickering Parkway Terminal to the Claremont community. Route 199 runs on Fridays only and services the community of Claremont. This route shares a bus stop with Route 112 in the vicinity of the site. Details for each route and nearest bus stops to the site are shown in Table 4. Figure 5 shows the transit provided within the study area. 5

14 Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON Table 4 Transit Service in the Study Area Route No. Nearest Bus Stop to the Site East Pickering 111 Brock 112 Brock Road and Finch Avenue Brock Road at the entrance of Brock Ridge Community Park Claremont 199 Same as Route 112 Source: Durham Region Transit website Approximate Service Times Approximate Peak Service Frequency (min) Weekdays Weekends AM PM SAT 6:5 22:35 7:5 22: :29 22:5 7:26 22: :25 9:53 13:3 13:55 N/A N/A N/A N/A 5. FUTURE BACKGROUND CONDITIONS Future background traffic volumes were based on a review of planned developments and future traffic volume growth in the study area. Planned roadway improvements are also reviewed in this section. 5.1 Background Growth Rate Analysis of historical AADT data obtained from the Durham Region database resulted in inconclusive rates, with the analysis provided in Appendix B. Based on discussion with Regional staff, a two percent (compounded) growth rate per annum, for a seven-year period (five years after full build-out, assumed in year 219), was recommended due to new developments in Duffin Heights and Seaton (located near Brock Road and Highway 47, to the north of the site). This growth rate was applied to the study roadways to determine future background traffic volumes. 5.2 Planned Background Developments Based on a review of the development applications of the City of Pickering and discussions with City staff, there are three notable background developments in the study area planned and currently under construction within the study horizon. These future developments are listed in Table 5. Table 5 Background Developments in the Study Area No. Location Development Application and Land Use Description Brock Road, Pickering, located at the southeast corner Residential Townhouses: 59 units Completion of site possibly by late 218 of Brock Road and Usman Road (south leg) 2 29 Duberry Drive, Pickering Residential Single Family Homes: 4 units Completion of site possibly by Brock Road, Pickering Residential Townhouses and Single Family Homes: 119 units Currently under construction 6

15 Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON Estimates of site traffic generation and assignment of volumes for each development are provided in Appendix B. The above noted developments have been incorporated into our analysis of future background traffic conditions. 5.3 Planned Roadway and Transit Improvements The Usman Road, at the east leg of the Major Oaks Road and Brock Road intersection, is currently unassumed; however, based on our field visit to review the percent completion of build-out of the development, the intersection (all approaches, including the east leg) is expected available to the public by year 219. As per discussions with Durham Region and City of Pickering staff, Brock Road is to be widened to six lanes with the outer lanes (one lane per direction) dedicated for High Occupancy Vehicles (HOV) and bus rapid transit (BRT) for high-frequency transit service. The implementation of the widening is not expected until after 226 (which is outside of our study horizon). 5.4 Horizon Years As per discussions with Durham Region, with opening day presumed to occur in year 219, a five-year planning horizon thereafter (year 224) was assessed. The future background traffic volumes for the 224 horizon year, for the weekday morning (AM), midday (MD) and afternoon (PM) peak hours are shown in Figure SITE TRAFFIC 6.1 Traffic Survey Methodology Detailed traffic surveys were conducted at the property to determine the existing traffic generated by the school and the place of worship. The vast majority of persons attending the PIC arrive by auto (considering the Regional draw). The school mainly generates auto trips during the school student arrival period (before and up to 8:15am) to drop-off children and during the school dismissal period (before and after 3:3pm) to pick-up children. The place of worship generates peak auto trips before and after afternoon prayer times (2:pm and 3:pm). Based on discussions with staff at the PIC, Friday afternoon prayers are typically the busiest day and time period of the week. Surveys were conducted by Trans-Plan on Friday March 24, 217 (which was a typical day of operations). Details of the survey methodology is provided as follows: Recorded the number of vehicles (volumes of autos) entering and exiting the site at the driveway(s) at 15-minute intervals during the peak periods Recorded the number of vehicles that dropped-off / picked-up students during the arrival and dismissal times of the school Counted the number of attendees entering the building during the prayer times of 2:pm (~1:45pm) and 3:pm Noted persons that parked off-site at Usman Road or at the neighbouring subdivision to the west (i.e. on-street) and at the Brock Ridge Community Park parking lot (crossing Brock Road) to attend prayers 7

16 Made general observations of on-site operations and circulation Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON 6.2 Survey Results of Existing Site Traffic The detailed survey results can be found in Appendix C and are further summarized in Table 6. Auto Trip Rates The site trips of the school was expressed vehicles as per student, where there are 72 students currently enrolled at the school (which was consistent with our observations). The place of worship trip rates were expressed vehicles as per attendee for the prayer sessions. The 2:pm prayer held approximately 367 attendees. Vehicles entered the site from around 1:pm to attend the 2:pm prayer. Some attendees parked their vehicle outside of the site; these attendees were also included in our trip rates. After the 2:pm prayer, the majority of the attendees left the site; however, a portion of these attendees stayed for the 3:pm prayer. Additionally, after the 3:pm prayer, some attendees would remain to pick up their children from the Islamic school, which dismissed shortly after prayers ended. The student attendees were recorded separately to determine the school auto trip rates. The 3:pm prayer held approximately 172 attendees (not including the attendees picking up students). The trips rates were obtained for the weekday AM, MD and PM peak hours and the average two-way trip rates was: Weekday AM peak hour:.89 trips per student Weekday MD peak hour (2:pm prayer time):.83 trips per attendee Weekday PM peak hour (3:pm prayer time): 1.4 trips per attendee and.97 trips per student (which were combined to determine total site trips) Auto Passenger Drop-offs / Pick-ups The vast majority of parents / guardians parked their vehicle at the parking lot on-site and dropped-off / picked up their children at the entrance of the school. The duration of drop-offs was approximately 5 minutes on average. Approximately 35 vehicles were observed during the peak one-hour student drop-off and pick-up (school arrival and dismissal) periods (unrelated to prayer hall traffic). Approximately 12 vehicular drop-offs and 7 vehicular pick-ups occurred during the peak 5-minute period for school activity. All students were observed to arrive or depart the site by vehicle. The 3:pm prayers ended before the 3:3pm school dismissal period. The majority of attendees at the 3:pm prayers exited the site, therefore, allowing for ample parking availability on the property for parents / guardians to park and pick up students during the 3:3pm school dismissal period. 8

17 Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON Table 6 - Summary of Existing Auto Trip Generation and Passenger Drop-offs / Pick-ups of Students Peak Hour No. of Vehicle Volumes (peak hour) Drop-offs (vehicles) Start Time Students In Out Two-way Peak 1-hr Peak 5-min 8:am; 72 School Volumes Arrival Trip Rate No. of Vehicle Volumes (peak hour) Attendees In Out Two-way 367* 1:pm Volumes Prayers Trip Rate No. of Vehicle Volumes (peak hour) Attendees In Out Two-way 172* 2:45pm Volumes Prayers Trip Rate No. of Vehicle Volumes (peak hour) Pick-ups (vehicles) Students In Out Two-way Peak 1-hr Peak 5-min 3:3pm; 72 School Volumes Dismissal Trip Rate Note: (*) Includes attendees that parked outside of the site and walked to prayer hall. Attendees (Pedestrians) Crossing at Brock Road Attendees were required to find alternative parking locations when the site was unable to accommodate demands during the Friday afternoon prayers. Attendees parked at the Brock Ridge Community Park, the vacant lot at the southeast corner of Brock Road and Usman Road (south leg), the presentation centre located north of the site, and at the residential neighbourhood on the west side of Brock Road. The volume of attendees that parked off-site, walked from their parked vehicles and crossed at Brock Road to attend the prayer hall were recorded. Table 7 includes the number of crossings at the signalized intersection of Brock Road at Major Oaks Road / Usman Road (i.e. protected crossings) and at the mid-block on Brock Road, between Finch Avenue and Major Oaks Road (i.e. unprotected crossings). There were no walk trips and / or crossing along Brock Road observed during the school morning arrival and afternoon dismissal periods, given that students arrived / departed by auto drop-offs and pick-ups onsite. 9

18 Table 7 - Summary of Walk Trips and Pedestrian Crossing Event 2:pm Prayers 3:pm Prayers Peak Time Peak Walk Trips Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON Pedestrian Crossings at Brock Road Crossing at Crossing at the Major Oaks Road Midblock of Brock Road (signalized) (unprotected) 1:45pm :pm The results indicate that 42 attendees crossed the mid-block of Brock Road (south of Major Oaks Road) against traffic to attend the Friday afternoon prayers at 2:pm (recorded on Friday March 24, 217). Similarly, 12 attendees crossed the mid-block of Brock Road against traffic to attend the Friday afternoon prayers at 3:pm. It was noted, however, that all illegal crossings at the midblock were by adults. 6.3 Site Trip Generation for the Proposed Addition Site trips were generated separately for the individual uses at the PIC: the prayer hall and the school components, and combined where appropriate. Place of Worship Auto site trips generated for the place of worship is expected to be similar to the existing trip generation, given the modest proposed increase to the prayer hall and given that any growth would be offset by the increase in walk trips, seeing as some attendees would live in area, at the future residential development to the east of Usman Road. The site trip generation for the prayer hall component of the PIC is shown in Table 8. Table 8 - Trip Generation of Place of Worship Midday Peak Hour PM Peak Hour Land Use 367 Attendees 172 Attendees IN OUT TOTAL IN OUT TOTAL Place of Worship Distribution 83% 17% 1% 34% 66% 1% Rate Trips The place of worship generates approximately 35 two-way trips in the weekday MD peak hour (during early afternoon prayers) and 241 two-way trips in the weekday PM peak hour (during mid-afternoon prayers). Islamic School The additional school trips were generated using the trip rates determined from our traffic survey results. The student enrollment is planned to increase from 72 students to approximately 3 students in the fiveto ten-year horizon. Among the 3 students, approximately 3 students are assumed to be bussed. Furthermore, approximately 2 students are assumed to walk to the school from the future residential development east of Usman Road. Teachers and administrative staff are expected to drive to the site and 1

19 Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON were also incorporated into the trip generation estimates for the school. The site trip generation for the weekday school component of the PIC is shown in Table 9. Table 9 Site Trip Generation of the School Trip Type Number of Persons Morning School Peak Hour (8:am to 9:am) Afternoon School Peak Hour (3:pm to 4:pm; coincides with 3:pm prayer time) IN OUT TOTAL IN OUT TOTAL Students Auto Drop-off / Pick-up 25 Trips School Bus Trips Walking Trips Total Staff Teachers 21 Trips Administrative Staff Total Total School Auto Trips 25 Rate Trips The school is expected to generate approximately 222 new two-way trips in the weekday AM peak hour with a trip rate of.89 trips per student. The 222 two-way trips include 192 student drop-offs auto trips, 4 school bus trips and 26 staff auto trips. During the weekday PM peak hour, the school is expected to generate approximately 243 new two-way trips with a trip rate of.97 trips per student. The 243 two-way trips include 213 student pick-up auto trips, 4 school bus trips and 26 staff auto trips. Additionally, there are 2 walk trips expected to occur in the weekday AM peak hour and weekday PM peak hour. Given that the Friday afternoon (3:pm) prayer time and the weekday PM school peak hour (afternoon dismissal) overlap, the site traffic was combined to obtain an estimated total of 484 (241 school prayer hall) two-way peak hour auto trips in the Friday (mid) afternoon peak hour. The combined site trips for the place of worship and for the school are summarized in Table 1. Table 1 - Combined Trip Generation of Place of Worship and School Uses Trip Type AM Peak Hour MD Peak Hour PM Peak Hour IN OUT TOTAL IN OUT TOTAL IN OUT TOTAL Place of Worship Site Trips School Site Trips Total Site Trips Trip Distribution and Assignment Site trips were distributed and assigned to / from the boundary roadways and the subject site using the existing traffic patterns obtained from our traffic counts. Major travel routes such as the Highway 41 and Kingston Road and general observations from the site survey were considered in the distribution and assignment. 11

20 Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON The existing traffic volume percent split along Brock Road is approximately 3 percent northbound / 7 percent southbound in the weekday AM peak hour and approximately 55 percent northbound / 45 percent southbound in the weekday MD and PM peak hours. The site traffic assignments for the horizon year for the weekday AM, MD and PM peak hours are shown in Figure FUTURE TOTAL TRAFFIC CONDITIONS Site traffic volumes were added to the future background traffic volumes to obtain future total traffic volumes for the peak hours. The future total traffic volumes for the year 224 weekday AM, MD and PM peak hours are shown in Figure 8. The peak hours assessed are summarized as follows: Weekday AM 7:45am to 8:45am; roadway traffic volumes plus school morning arrival period Weekday MD 2:pm to 3:pm; roadway traffic volumes plus Friday 2:pm prayer time Weekday PM 3:pm to 4:pm; roadway traffic volumes plus Friday 3:pm prayer time and school afternoon dismissal period 7.1 Future Walk Trips & Pedestrian Crossing As noted in existing conditions, attendees were required to park at alternative parking areas due to insufficient parking within the site. Attendees crossed the midblock of Brock Road between Major Oaks Road and Finch Avenue after parking at the Brock Ridge Community Park and the residential neighbourhood west of Brock Road to get to the site. Due to safety concerns, it is recommended that PIC staff direct pedestrians to either cross at the intersection of Major Oaks Road or Finch Avenue. The future increase to the parking supply (proposed parking deck), as part of the building addition, is expected to reduce the occurrences of spillover parking (compared to existing conditions), as discussed further in Section 9. Therefore, the volume of (unprotected) midblock crossings to attend prayers is expected to be reduced after the proposed addition. If some spillover parking occurs to the west side of Brock Road, it is recommended that PIC staff inform attendees that pedestrians should cross Brock Road at nearby signalized locations located at Major Oaks Road or at Finch Avenue. 8. CAPACITY AND VEHICLE QUEUING ANALYSIS A capacity and queuing analysis was performed for the study area intersections and site driveway using Synchro and SimTraffic analysis software. The capacity and vehicle queue analysis results of the weekday AM, MD and PM peak hours are shown in Table 11 and Table 12 respectively. Capacity Analysis Sheets and Level of Service (LOS) definitions are provided in Appendix D and Appendix E, respectively. The vehicle queuing analyses were completed based on SimTraffic simulation runs to determine whether queues would exceed available storage lengths of turn lanes. 12

21 Signal Timing Adjustments: Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON Signal timing was optimized for some of the signalized intersection under future background and future total conditions for the weekday AM, MD and PM peak hour to accommodate increased traffic volumes. However, the existing intersection cycle lengths for the intersections were maintained. The summary of the signal timing adjustments is listed below: Major Oaks Road / Usman Road & Brock Road Weekday AM peak hour: provide an advance northbound left turn phase Weekday MD and PM peak hours: increase green-time for east-west phase Finch Avenue & Brock Road Weekday AM peak hour: slight increase to green time for north-south through phase Weekday PM peak hour: slight increase to green time for east-west through phase and slight increase to green time for advance northbound left turn phase Capacity Analysis Thresholds: The Durham Region Traffic Impact Study Guidelines state that a level of service (LOS) of D or better in urban areas is considered acceptable. Additionally, a volume-to-capacity (v/c) ratio above.9 is generally considered critical. The results of the capacity analysis and queuing analysis are summarized in this section for each intersection: Brock Road & Dellbrook Avenue Under existing conditions, the intersection operates at an overall good LOS of A with minimal delays for all weekday AM, MD and PM peak hours. For all periods, the eastbound and westbound movements operate at an acceptable LOS of C and D. Under future 224 total conditions, weekday AM peak hour, the intersection is expected to operate at an overall good LOS of B, with minimal delays of 11 seconds. In the weekday MD and PM peak hours, the intersection is expected to operate similarly to the existing conditions, with an overall good LOS of A. For all periods, the eastbound and westbound movements would continue to operate at an acceptable LOS of C and D. The 95th percentile vehicle queues of all the approaches are expected to be contained within the available storage lengths provided. Brock Road & Major Oaks Road / Usman Road (North Leg) Under existing conditions, weekday AM peak hour, the intersection operates at an overall good LOS of B, with minimal delays of 13 seconds. The intersection operates with reserve capacity, with a volume-tocapacity (v/c) ratio of.54 in the weekday AM peak hour. The intersection, in the weekday MD and PM peak hours, operates at a good overall LOS of A, with minimal delays. For all periods, the eastbound and westbound movements operate at an acceptable LOS of C and D. Under future 224 conditions (when the connection at Usman Road is open to the public), with minor signal timing adjustments, the intersection is expected to operate at a good overall LOS of B, with minimal to 13

22 Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON average delays of up to 2 seconds in the weekday AM peak hour. In the weekday MD peak hour, the intersection is expected to operate similarly to the existing conditions, at a good overall LOS of A. In the weekday PM peak hour, the intersection is expected to operate at a good overall LOS of B, with minimal delays of 17 seconds. For all periods, the eastbound and westbound movements would continue to operate at an acceptable LOS of C and D. Under future conditions, the modelled 95th percentile vehicle queue lengths are contained within the available storage lengths provided at the intersection, except for the northbound left turn movement in the weekday PM peak hour (73m queues vs. 67m storage); however, additional storage is provided within the centre lane. Brock Road at Site Access (Existing Right-in / out; Future Right-out Only) Under existing conditions, the site access operates at a good LOS of B with a delay of up to 14 seconds during the weekday AM and MD peak hours. The site access, in the weekday PM peak hour, operates at an acceptable LOS of C with a minimal delay of 2 seconds. Under future 224 total conditions, the site access is expected to operate similarly as the existing conditions. The vehicle queues exiting the driveway is expected be approximately 28m (~4 vehicles), which would be contained within the driveway throat length. Usman Road at Site Access (Full-moves) Under existing conditions, the site access operates at a good LOS of A, with minimal delays, for southbound traffic exiting the development. Under future 224 total conditions, the site access is expected to operate at a good LOS of A to B with minimal delays of up to 12 seconds, for southbound traffic exiting the development. The site traffic queue is expected to be approximately 25m (~4 vehicles) and is expected to be contained within the site. Brock Road & Usman Road (South Leg) Under existing conditions, the (unsignalized, westbound left turn restricted) intersection operates at an overall good LOS of B, with delays of up to 13 seconds or less in the weekday AM, MD and PM peak hours. Under future 224 total conditions, the intersection would continue to operate at an overall good LOS of B. The southbound left approach is expected to operate at a LOS of B in the weekday AM and MD peak hours, and at an acceptable LOS of C in the weekday PM peak hour. The 95 th percentile vehicle queues for the westbound right turning movement are expected to be approximately 9m (~2 vehicles) and are not expected to block the upstream site driveway for the PIC at Usman Road. Similarly, the southbound left turn queues are expected to be contained within the available 6m storage length for the movement. 14

23 Brock Road & Finch Avenue Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON Under existing conditions, the intersection operates at an overall good LOS of B with minimal overall delays of up to 17 seconds during each of the weekday AM, MD and PM peak hours. The eastbound and westbound movements operate at an acceptable LOS of C to D, with average delays of 31 to 47 seconds. Under future 224 background traffic conditions, in the weekday AM peak hour, the intersection is expected to operate at an overall acceptable LOS of C, with an overall v/c ratio of.89. The southbound through / right movement is expected to operate at an acceptable LOS of C, but with a v/c of.94. Under future 224 total traffic conditions, weekday AM peak hour, with the addition of site traffic, the v/c ratio increases slightly from a v/c of.89 to.91 and the southbound through / right movement increases slightly from a v/c of.94 to.98. Given that the operations of the intersection southbound through movements at the arterial road intersection is related to background traffic growth, this is expected to be addressed by area-wide public transportation improvements, including the planned HOV lanes on Brock Road within the study area, planned for year 226. Under future 224 background and total traffic conditions, in the weekday MD peak hour, the intersection is expected to operate at an overall acceptable LOS of B with an overall v/c ratio of.47 to.5, operating with reserve capacity. Under future 224 background and total traffic conditions, in the weekday PM peak hour, the intersection is expected to operate at an overall acceptable LOS of C with an overall v/c ratio of.82. The northbound left turn lane, 95th percentile vehicle queues, may exceed the available storage under future 224 total traffic conditions (33m storage vs. 77m queues in the weekday PM peak hour); however, the taper lane (providing a full centre lane width for an additional 4m) allows for additional vehicles to store. From our SimTraffic results, queues clear after each cycle. The 95th percentile vehicle queues for all other turn lanes are expected to be contained within the storage lengths provided. 15

24 Table 11 - Capacity Analysis Results Intersection Individual Movement Existing Conditions Future 224 Background Conditions AM Peak Hour MD Peak Hour PM Peak Hour AM Peak Hour MD Peak Hour PM Peak Hour Future 224 Total Conditions AM Peak Hour MD Peak Hour PM Peak Hour V/C Delay LOS V/C Delay LOS V/C Delay LOS V/C Delay LOS V/C Delay LOS V/C Delay LOS V/C Delay LOS V/C Delay LOS V/C Delay LOS (sec.) (sec.) (sec.) (sec.) (sec.) (sec.) (sec.) (sec.) (sec.) Brock Road & Dellbrook Avenue.46 9 A.21 6 A.39 6 A B.23 6 A.47 7 A B.26 6 A.47 7 A Eastbound Left D D D D.3 42 D D D.3 42 D D Eastbound Through/Right D.5 4 D.5 38 D D.6 39 D.6 37 D D.6 39 D.6 37 D Westbound Left/Through/Right.1 34 C. 39 D.2 37 D.1 33 C. 39 D.2 37 D.1 33 C. 39 D.2 37 D Northbound Left.18 5 A.14 3 A.3 4 A.28 8 A.17 3 A.46 7 A.31 9 A.19 3 A.46 7 A Northbound Through/Right.22 4 A.21 3 A.38 4 A.27 5 A.22 3 A.44 4 A.28 5 A.23 3 A.44 4 A Southbound Left.3 3 A. A. A.4 4 A. A. A.4 4 A. A. A Southbound Through/Right.45 5 A.2 2 A.28 3 A.54 7 A.21 3 A.37 4 A.57 8 A.26 3 A.37 4 A Brock Road & Major Oaks Road / Usman Road B.26 9 A.54 8 A B.33 9 A B.76 2 B.4 1 A B Eastbound Left/Through.11 3 C D D.15 3 C.17 3 C C.15 3 C.14 3 C C Eastbound Right D D D D.12 3 C C D C C Westbound Left/Through/Right.1 29 C.9 35 C D C.21 3 C C C C C Northbound Left B.29 3 A.61 5 A B.37 4 A C C.43 4 A C Northbound Through/Right.25 6 A.24 3 A.45 4 A.29 6 A.27 4 A.64 1 A.3 6 A.28 4 A.64 1 A Southbound Left.1 5 A.1 5 A. 5 A.2 8 A.5 6 A B.2 9 A.5 7 A B Southbound Through/Right.55 8 A.25 6 A.35 7 A B.28 8 A C B.34 8 A C Brock Road & Usman Road Westbound Right 1 B 13 B 12 B 11 B 12 B 1 A 11 B 12 B 1 A Northbound Through B A A B A A A A A Northbound Right B A A B A A A A A Southbound Left 9 A 11 B 12 B 9 A 11 B 18 C 1 A 13 B 18 C Southbound Through B A A B A A A A A Brock Road & Finch Avenue.7 17 B B B C B C C.5 16 B C Eastbound Left/Through D.7 44 D D D D D D.78 5 D D Eastbound Right D C C D C C D C C Westbound Left/Through/Right C.5 31 C.9 31 C C.5 31 C.9 29 C C.5 31 C.9 29 C Northbound Left B.33 6 A.55 9 A D.43 7 A D D.45 7 A D Northbound Through/Right.23 5 A.35 7 A.51 9 A.28 5 A.34 7 A B.29 6 A.4 8 A B Southbound Left.1 7 A.1 9 A.2 9 A.1 8 A.1 9 A.5 13 B.1 8 A.1 1 A.5 13 B Southbound Through/Right B B B C B C C B C Brock Road & Site Access (Right-in / Right-out) Westbound Right 11 B 14 B 2 C 11 B 15 B 23 C Northbound Through/Right A A A Nrothbound Through A A A Southbound Through A A A A A A Usman Road & Full Moves Site Access Eastbound Left / Through 7 A 7 A 7 A 5 A 6 A 5 A Westbound Through / Right A A A A A A Southbound Left / Right 8 A 9 A 9 A 1 A 11 B 12 B

25 Table 12 - Vehicle Queue Analysis Results Intersection 95th Percentile Vehicle Queue(m) Available Storage Individual Movement [Taper Length] (m) 224 Future Total Traffic Conditions AM Peak Hour MD Peak Hour PM Peak Hour Brock Road & Dellbrook Avenue Eastbound Left 26 [26] Eastbound Through/Right Westbound Left/Through/Right Northbound Left Northbound Through Northbound Through/Right Southbound Left 75 8 Southbound Through Southbound Through/Right Brock Road & Major Oaks Road / Usman Road Eastbound Left/Through Eastbound Right Westbound Left/Through/Right Northbound Left 67 [7] Northbound Through Northbound Through/Right Southbound Left 6 [74] Southbound Through Southbound Through/Right Brock Road & Usman Road Westbound Right Northbound Through - Northbound Right 15 [77] 7 8 Southbound Left 61 [4] Southbound Through - Brock Road & Finch Avenue Eastbound Left/Through Eastbound Right Westbound Left/Through/Right Northbound Left 33 [4] Northbound Through Northbound Through/Right Southbound Left 16 [38] 5 19 Southbound Through Southbound Through/Right Brock Road & Site Access (Right-out only) Westbound Right Northbound Through - Southbound Through - Usman Road & Full Moves Site Access Eastbound Left / Through 55 4 Westbound Through / Right 55 Southbound Left / Right

26 Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON 9. PARKING STUDY A parking study was conducted to determine the current and future parking demands of the PIC and to compare the demand with the proposed parking supply and Zoning By-law requirements for parking. The existing site currently has a parking supply of 62 spaces and the proposed parking supply after the addition is 16 spaces (115 on surface parking and 45 spaces on the parking deck). 9.1 Parking Requirements, City of Pickering Zoning By-law The parking requirements for the PIC are based on the City of Pickering Zoning By-law, Section , and are shown in Table 13, in comparison to the parking supply. Source information is provided in Appendix F. Table 13 Parking Requirements (City of Pickering Zoning By-law) and Supply Land Use Site Statistics Parking Rate Parking Required Parking Supply (spaces) (spaces) Place of Worship 289 Person Capacity 1 space per 4 person capacity Staff 1 space per staff 26 Private School 42 Student Capacity 1 space per 1 students 42 Total Source: City of Pickering Zoning By-law, Section In summary, the parking requirement is 141 spaces and the proposed parking supply is 16 spaces, which indicates an overall surplus of 19 spaces for the site. However, given that Friday afternoon prayers are a busy time period with typically higher than usual parking demands, parking surveys were conducted at the property to gain a better understanding. 9.2 Parking Survey Methodology Details of the parking survey conducted by Trans-Plan are as follows: Conducted on Friday March 24, 217 during the school arrival (from 8:am to 9:pm) / dismissal periods and during the afternoon prayers (from 12:pm to 4:pm). Recorded parking demand (number of spaces occupied) at the site was recorded at 15-minute intervals Recorded student drop-offs and pick-ups by auto at the school were recorded separately from the attendees of the place of worship. Noted spillover parking to the adjacent roadways (on-street parking), to vacant lots, to the neighbourhood on the west side of Brock Road and to the Brock Ridge Community Park, were recorded at 15-minute intervals. 9.3 Parking Survey Results The locations of where the spillover parking occurred are shown in Figure 9. 18

27 Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON The survey results, showing the peak parking demand of the site and the spill over parking peak demand is summarized in Table 14. The detailed survey results are shown in tabular form in Appendix F. Table 14 - Parking Survey Results, Peak Demands Peak Parking Demand (spaces) Time Spillover Parking (Peak Neighbourhood Subject 15-min at West Side of Site Interval) Brock Road Event School Arrival 2:pm Prayers 3:pm Prayers School Dismissal 3:pm Prayers & School Dismissal 8:3AM & 8:45AM Usman Road & Vacant Lot Brock Ridge Community Park Parking Lot of Residential Presentation Centres Total Spillover Parking 1 1 2:15PM :15PM The site peak parking demand of the school and place of worship are summarized as follows: The school peak parking demand during the morning school arrival period was 1 spaces occupied, occurring at 8:3am & 8:45am. The vast majority of parents / guardians parked their vehicle in the parking lot and walked their children to the entrance of the school. The parking rate for school uses is calculated to be.14 spaces occupied per student (1 spaces / 72 student enrollment). The Friday 2:pm prayers had a peak parking demand total of 296 spaces occupied, occurring at 2:15pm. The site accommodated 133 spaces within the lot (with vehicles parked illegally in the parking aisles). The parking spillover was 163 spaces. When parking at the site reached capacity, attendees for the prayer hall parked at the various aforementioned locations off-site. The Friday 3:pm prayers and school dismissal period had a combined peak parking demand of 16 spaces occupied, occurring at 3:15pm. The site accommodated 146 spaces within the lot (123 spaces related to prayer hall traffic and 23 spaces related to school traffic). The parking spillover was 14 spaces. The parking rate for school uses is calculated to be.32 spaces occupied per student (23 spaces / 72 student enrollment). It was generally observed that attendees were guided by PIC staff to park along some of the driveway aisles. Staff limited the number of vehicles parking at the site to provide room for vehicles to leave the site after prayer. A number of parents / guardians of students who attended the 3:pm prayer picked up their children afterwards for the 3:3pm school dismissal. Total 19

28 Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON 9.4 Future Parking Demands for School and Prayer Hall Uses Parking demands generated by the school use is expected to increase after the addition, with the student enrollment increasing from 72 to 3 students (but accounting for approximately 5 the 3 students arriving by school bus or walking to school from the new residential development nearby). The existing parking rate during school arrival was recorded to be.14 spaces per student and the school dismissal parking rate was.32 spaces per student. The rates were applied to the expected number of students that would be dropped-off / picked-up by a parent / guardian with a vehicle. Table 15 shows the anticipated future parking demands for the school uses. Table 15 Future Parking Demand of School Existing Parking Demand Future Parking Demand Parking Demand Rate Parking Demand Parking Demand Students Students (spaces) (spaces) School.14 spaces per Student 1 35 Arrival School.32 spaces per Student 23 8 Dismissal The school uses are expected to have a peak parking demands of 35 spaces during the morning school arrival period and 8 spaces during afternoon school dismissal period. The peak parking demand for the site during the Friday 3:pm prayers and the afternoon school dismissal period, combined, is estimated to be 217 spaces: 137 spaces occupied for the prayer hall uses (as previously shown in Table 14) and 8 spaces occupied for school uses. By comparison The Friday 2:pm prayers would continue to have the highest parking demand at 296 spaces (as previously shown in Table 14) and is the critical parking demand for the site. 9.5 Allocation of Residual Parking Demands during Friday Prayers The proposed parking supply of 16 spaces is deficient by 136 spaces when compared to the parking demand during the Friday 2:pm prayers; however, the deficiency is short-term, lasting about 2 minutes on a Friday early afternoon (prior to the roadway weekday PM peak hour and when visitor parking demands on-street in the neighbourhood would typically be lower). PIC staff currently direct traffic within the site to park within the driving aisles within the site to remedy the current parking situation. Vehicles would therefore enter and exit in a last in first out (LIFO) method to ensure that parking occurs in an orderly manner. Consequently, the site plan was reviewed to determine the number of vehicles able to park within the drive aisles without blocking the designated fire route or impacting roadway traffic on Brock Road, as illustrated in Figure 1. The drive aisles could fit approximately 46 vehicles, which would result in a residual short-term spillover parking demand of approximately 9 spaces. Attendees for the prayers could park on local roads for a short duration on Fridays, provided that they adhere to the City of Pickering Traffic and Parking By-law 664/5. Vehicles are permitted to park on the street for up to 3 hours and should not block residential driveways and / or fire hydrants. In close proximity of the site, approximately 37 on-street spaces (3 spaces on Usman Road and 7 spaces on Jade Street) 2

29 Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON are available. It is noteworthy that a number of residents in the future subdivision are anticipated to also attend prayers at the PIC. A portion of the excess parking demand of approximately 53 spaces could continue to be accommodated (on a short-term basis on Fridays for the 2 minute duration) at the Brock Ridge Community Park. Additionally, future transit improvements and TDM measures, as discussed in the following section, may encourage a reduction in parking demands for Friday afternoon prayers. 9.6 Durham Region Bus Rapid Transit (BRT) & HOV lanes The future widening of Brock Road (from four the six lanes) for dedicated HOV lanes and BRT would promote alternative forms of transportation for the attendees and could potentially reduce parking demands at the site. The improvements are expected to be implemented sometime after 226. A Transportation Demand Management (TDM) plan was prepared to go into more details of alternative modes of transportation to help encourage a reduction in traffic and parking demand at the site. 1. TRANSPORTATION DEMAND MANAGEMENT PLAN A TDM plan is provided as part of the proposed addition to the PIC in an effort to assist minimize congestion, improve air quality, reduce greenhouse gas emissions, reduce parking demand, and improve public health in the long-term. This TDM plan for the PIC proposed building addition, along with the Durham Region transportation policies and initiatives for the surrounding road network, will help provide the public greater choice, incentives and opportunities to choose travel modes other than single-occupant vehicles. Our proposed TDM plan for the site is outlined as follows: Transit Increasing public transit use has many benefits such as protecting the environment, reducing traffic congestion on Regional roads, providing convenience, saving energy, strengthening communities and improving liveability. The site is currently well served by transit with DRT buses operating along Brock Road at service frequencies of at least approximately 15 to 2 minutes in the weekday AM, MD and PM peak hours, respectively. Transit stops are located south of the site near the community park, approximately a two minute walk from the subject site. The BRT is to be implemented on Brock Road in 226 and it will be supplemented with a HOV lane to maintain a high frequency of 5 to 1 minute headways. The BRT would encourage attendees, staff and teachers to consider transit as an alternative from driving. To encourage attendees and staff at the site to travel by transit, they should be provided with DRT information packages containing route maps, schedules and other useful information. Cycling Encouraging more people to cycle would result in taking more cars off the road during peak hours, helping to reduce traffic congestion, and is more environmentally friendly. 21

30 Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON Within the study area, there are available multi-use pathways (MUP) for cyclists and pedestrians along both sides of Brock Road. The MUPs provide added safety for cyclists by reducing auto and cycle conflicts. To encourage more cycle trips to / from the site, bicycle parking spaces, provided at convenient locations near PIC main entrance, would be beneficial. The bicycle parking rates provided in the Draft Pickering City Centre Zoning By-law was reviewed to determine the appropriate number of bicycle spaces recommended. Although the site is not located in the City Centre, the bicycle rates are to be used as a guide to the number of bicycle spaces to be provided. Table 16 shows the results of the analysis and Appendix G provides the excerpt of the Zoning By-law. Table 16 - Bicycle Parking Requirements Land Use Non-Residential Uses: Place of Worship and School Gross Floor Area Source: Draft Pickering City Centre Zoning By-law, Section 3.9 Bicycle Parking Rate Bicycle Parking Requirements 4,886 sq.m. Greater of 2 or 1 space per 5 sq.m. 1 spaces Based on the Draft Pickering City Centre Zoning By-law, the site would require 1 bicycle spaces (bike racks) on-site. The bicycle parking spaces could be utilized by attendees for prayers, staff and students. The provision of bicycle parking would further encourage a reduction in parking demand for the site. Walking As mentioned, MUPs are provided along both sides of Brock Road. The study area intersections also contain either a sidewalk or multi-use pathways. The site plan provides a sidewalk connection to the multiuse pathway along Brock Road. A crosswalk crossing Usman Road is delineated and sidewalks are also provided along Usman Road adjacent to the site. Carpooling To help reduce travel by single-occupant automobiles, attendees, staff and teachers are encouraged to carpool, if applicable. Parents of students could also consider setting up a carpool for their children with other parents. Carpooling will allow attendees, staff and teachers to utilize the future HOV lanes along Brock Road. Attendees, staff and teachers should be encouraged to join programs such as the Durham Smart Commute and seek opportunities to carpool, where practicable. Smart Commute is one of a network of local transportation management associations (TMA s) across the GTA-Hamilton delivering TDM programs and services. A travel information package should be provided to new staff and teachers of the site that includes information for Smart Commute and other variety of carpool options. 22

31 Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON 11. SITE CIRCULATION REVIEW A site circulation review was completed using AutoTurn vehicle turning template software for design vehicles that include a school bus, waste collection vehicle and passenger vehicles. Details of the site circulation review for each vehicle type is provided in this section: Small School Buses The school is expected to have two small school buses to pick up students. Figure 11 shows a school bus entering the site through at the Usman Road access parking at the edge of the curb near the daycare. Figure 12 shows the bus exiting via the right-out only site access. Waste Collection Vehicles A waste bin is located at the east side of the site at the south side of the parking deck. Figure 13 shows a waste collection vehicle entering the site and driving to towards the bins. Waste collection is expected to occur outside of school and prayer times at the site. Figure 14 shows the waste collection vehicle exiting the site through the full moves site access on Usman Road. Passenger Vehicles Figure 15 shows passenger vehicles parking on surface parking spaces and the spaces on the parking deck with no major issues; however, some minor red-line modifications are shown in Figure 15, for the parking deck and surface parking under the deck, for passenger vehicles to enter / exit the stalls at the end of the parking aisles. Our site circulation review for each design vehicle reviewed indicates that school buses, waste collection vehicles and passenger vehicles are able to circulate without incident. 12. CONCLUSIONS This traffic impact and parking study, TDM plan and site circulation review for the proposed addition to the PIC, located at 265 Brock Road in the City of Pickering, is summarized as follows: 12.1 Traffic Impact Study The proposed addition to the PIC includes a building expansion from two to three stories, with a planned increase from 1,724 to 4,886 sq.m. of GFA. The number of classrooms is planned to increase from 2 to 21, to accommodate an increased enrollment from 72 to 3 students. The prayer hall worship area is planned to increase slightly from 299 to 347 sq.m. of GFA. Parking at the site would be accommodated by a parking deck, which would increase the supply from approximately 62 spaces to 16 spaces. The proposed access scheme for the site is a full-moves access at Usman Road and a right-out only access at Brock Road. Traffic ultimately heading southbound on Brock Road to Finch Avenue would access the signalized intersection of Brock Road at Major Oaks Road / Usman Road, which is expected to be open to the public (i.e. the east leg of the intersection) prior to the building addition (i.e. year 219). The Region of Durham planned improvements in the study area include a widening from 4 to 6 lanes along Brock Road, with the outer lanes operating as HOV and BRT lanes. The 23

32 Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON implementation of the widening is expected to occur around year 226 (just outside of our study horizon year for the PIC). Existing site traffic was surveyed and student drop-offs / pick-ups were recorded on a typical Friday during the school morning arrival and dismissal periods and during afternoon prayers, occurring around 2:pm and 3:pm. It was noted that the afternoon school dismissal period coincides with the Friday afternoon 3:pm prayer time. However, the site peaked during Friday afternoon 2:pm prayers, where approximately 367 attendees arrived, generating a parking demand of 296 vehicles. From our review of pedestrian crossings on Brock Road, approximately 42 attendees crossed at the mid-block (unprotected, against traffic) of Brock Road (opposite the PIC) for the Friday 2:pm prayer time and 12 attendees crossed in a similar fashion for the Friday 3:pm prayer time. Only adult (not children) attendees were observed to cross at the mid-block. Nevertheless, these occurrences are expected to reduce as the on-site parking supply is increased (and with some reliance for on-street parking at Usman Road on the east side of Brock Road for the short duration of 2 minutes on a Friday afternoon). PIC staff should direct pedestrians to cross at the signalized intersections along Brock Road, including Major Oaks Road or Finch Avenue to address these safety concerns. Minor signal timing adjustments are proposed for the intersections of Brock Road with Major Oaks Road / Usman Road (north leg), and with Finch Avenue to accommodate future traffic volumes. The existing cycle lengths of the intersections were maintained. All intersections are expected to operate at good to acceptable levels of service, with minimal to average delays, under future year 224 total traffic conditions; however, for the intersection of Brock Road and Finch Avenue, in the weekday AM peak hour, the v/c ratio is expected to be.89 in future background conditions and increases slightly to.91 in future total conditions. The southbound through / right movement increases slightly from a v/c of.94 to.98 when comparing future background and total conditions. Given that the operations of the intersection southbound through movements at the arterial road intersection is mainly related to background traffic growth, this is expected to be addressed by area-wide public transportation improvements, including the aforementioned planned HOV and BRT lanes on Brock Road within the study area. The proposed addition to the PIC is not expected to have any significant impact on the roadway network based on our capacity and queue analysis results. The proposed development could be accommodated within the existing road network (subsequent to the full completion of the Brock Road and Major Oaks Road / Usman Road intersection) Parking Study A total parking supply of 16 spaces (115 on surface spaces and 45 spaces on the parking deck) is proposed on-site. Based on the City of Pickering Zoning By-law for parking requirements, a total of 141 spaces is required of the site, which is met by the proposed supply of 16 spaces, with a surplus of 19 spaces. Given that parking demands are typically busier during Friday afternoon prayer times for an Islamic place of worship, parking surveys were conducted. 24

33 Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON - A peak parking demand of approximately 1 spaces occurred during school arrival, which resulted in a parking rate of.14 spaces per student (1 spaces / 72 students enrolled). - The Friday 2:pm prayers had a parking demand of approximately 296 spaces (133 spaces on-site and 163 spaces of spillover parking). - The 3:pm prayer had a parking demand of approximately 147 spaces (123 spaces onsite and 14 spaces of spillover parking). - The school dismissal had a peak parking demand of approximately 23 spaces with a parking rate of.32 spaces per student (23 spaces / 72 students enrolled). The school, after the proposed addition, is estimated to have a peak parking demand of 35 spaces during the morning school arrival period and 8 spaces during the afternoon school dismissal period. The combined peak parking demand of the site during the Friday 3:pm prayers and afternoon school dismissal period is estimated to be 217 spaces. The Friday 2:pm prayers would continue to have the highest peak parking demand for the day, at approximately 296 spaces. A number of worshippers may live in the future residential development to the east of the site (and therefore, walk to prayers), which would likely offset and increased activity due to the modest planned increase to the prayer hall worship area size, as part of the building addition). As is typical with places of worship that see a brief surge in parking demands, attendees could park within the driveway aisles to remedy the parking demand during the Friday 2:pm prayers without impacting the designated on-site fire route and roadway operations. The driveway aisles of the site could accommodate approximately 46 vehicles. PIC staff should continue to marshal traffic entering and exiting during Friday afternoon prayers. Attendees could potentially park on the street along Usman Road (for the short approximate 2- minute duration of the Friday afternoon prayer times) provided that they adhere to the City of Pickering Traffic and Parking By-law 664/5. Future road widening of Brock Road with outer lanes dedicated to HOV lanes and BRT would provide alternative modes of transportation for attendees at the prayer hall and for school staff or parents / guardians dropping off students by auto. The future parking traffic demand therefore has the potential to be reduced from the noted auto parking demand estimates Transportation Demand Management Plan To accommodate the existing site and the proposed addition, the following TDM recommendations are proposed: The site is well served by transit and the future HOV lanes and BRT will provide more frequent transit service along Brock Road to help reduce traffic demand. Provide attendees and staff with a TDM package including information such as maps and schedules of transit service and maps of cycling routes and pedestrian trails / walkways in the study area. A total of 5 or more bicycle parking spaces (cycle racks) are recommended near the entrance of the building. Brock Road has multi-use pathways for both pedestrians and cyclist and the proposed pedestrian connections to the site would accommodate alternative modes of travel. 25

34 Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON Information on carpool programs such as Smart Commute Durham, should be provided to attendees and staff to encourage carpooling. The future HOV lanes provide incentives for attendees and / or staff to carpool to the site Site Circulation Review Vehicle turning templates show that a school bus and waste collection vehicle can safely circulate the site with no issues. Passenger vehicles are able to park on the parking spaces of the surface parking and the parking deck and circulate the site without conflict; however, some minor red-line modifications are shown for passenger vehicles to enter / exit the stalls at the end of the parking aisles on the parking deck and surface parking under the deck. Respectfully submitted, Anil Seegobin, P.Eng. Partner, Engineer Trans-Plan Transportation Inc. Transportation Consultants 26

35 Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON Figure 1 Site Location SITE Source: Google Maps 27

36 Figure 2 - Site Plan

37 TRAFFIC IMPACT STUDY Proposed Addition to Pickering Islamic Centre 265 Brock Road, City of Pickering, Ontario Figure 3: Existing Study Area Roadway Characteristics 6 Dellbrook Avenue 4 1 Pine Ridge Garden Gallery Access Major Oaks Road Pickering Islamic Centre Access (Right in / Right out) SITE Full Moves Site Access Usman Road Finch Avenue 6 5 Brock Road 6 LEGEND Traffic Signal Stop Sign 6 Posted Speed Limit Lane Configuration Schematic; Not To Scale

38 TRAFFIC IMPACT STUDY Proposed Addition to Pickering Islamic Centre 265 Brock Road, City of Pickering, Ontario Figure 4: Existing Traffic Volumes, Weekday AM, Midday and PM Peak Hours Dellbrook Avenue Pine Ridge Garden Gallery Access Major Oaks Road Usman Road Pickering Islamic Centre Access (Right-in / Right-out) SITE Full Moves Site Access Usman Road Finch Avenue LEGEND Brock Road xx xx xx Traffic Signal Stop Sign AM / MID / PM Peak Hour Schematic; Not To Scale

39 Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON Figure 5 Study Area Transit Service SITE Source: Durham Region Transit Map 31

40 TRAFFIC IMPACT STUDY Proposed Addition to Pickering Islamic Centre 265 Brock Road, City of Pickering, Ontario Figure 6: 224 Background Traffic Volumes, Weekday AM, Midday and PM Peak Hours Dellbrook Avenue Pine Ridge Garden Gallery Access Major Oaks Road Usman Road Pickering Islamic Centre Access (Right-out only) SITE Full Moves Site Access Usman Road Finch Avenue LEGEND Brock Road xx xx xx Traffic Signal Stop Sign AM / MID / PM Peak Hour Schematic; Not To Scale

41 TRAFFIC IMPACT STUDY Proposed Addition to Pickering Islamic Centre 265 Brock Road, City of Pickering, Ontario Figure 7: Site Traffic Assignment, Weekday AM, Midday and PM Peak Hours Dellbrook Avenue 59 Pine Ridge Garden Gallery Access Major Oaks Road Usman Road Pickering Islamic Centre Access (Right-out only) 3 6 SITE Full Moves Site Access Usman Road Finch Avenue Brock Road xx xx xx LEGEND Traffic Signal Stop Sign AM / MID / PM Peak Hour Schematic; Not To Scale

42 TRAFFIC IMPACT STUDY Proposed Addition to Pickering Islamic Centre 265 Brock Road, City of Pickering, Ontario Figure 8: 224 Total Traffic, Weekday AM, Midday and PM Peak Hours Dellbrook Avenue Pine Ridge Garden Gallery Access Major Oaks Road Usman Road Pickering Islamic Centre Access (Right-out only) SITE Full Moves Site Access Usman Road Finch Avenue LEGEND Brock Road xx xx xx Traffic Signal Stop Sign AM / MID / PM Peak Hour Schematic; Not To Scale

43 Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON Figure 9 Spillover Parking Locations PARKING LOT (RESIDENTIAL PRESENTATION CENTRE) NEIGHBOUR- HOOD WEST SIDE OF BROCK ROAD SITE USMAN ROAD AND VACANT LOT COMMUNITY PARK Source: Google Maps 35

44

45

46

47

48

49

50 Traffic Impact & Parking Study, Circulation Review & TDM Plan Proposed Addition to Pickering Islamic Centre 265 Brock Road, Pickering, ON APPENDICES Appendix A Turning Movement Counts and Signal Timing Plans Appendix B Background Traffic Information Appendix C Pickering Islamic Centre Site Survey Results Appendix D Capacity and Queue Analysis Sheets Appendix E Level of Service Definitions Appendix F City of Pickering Zoning By-law Parking Requirements Excerpts & Parking Survey Results Appendix G Transportation Demand Management Plan Documents 42

51 APPENDIX A Turning Movement Counts

52 Turning Movement Count Diagram Intersection: Brock Road at Dellbrook Avenue Intersection ID: Municipality: Pickering, Ontario Date: Tuesday March 28, 217 AM Peak Hour: 7:3 to 8:3 MD Peak Hour: 12: to 13: Brock Road Brock Road North Total 1572 East Total 49 North Total 789 East Total 5 North Entering 167 Cyclists East Entering 16 North Entering 432 Cyclists East Entering 4 North Receiving 55 Truck 5 43 East Receiving 33 North Receiving 357 Truck 5 34 East Receiving 1 North Peds Cars East Peds North Peds 34 Cars East Peds 71 DellBrook Avenue DellBrook Avenue West Total South Total 1698 West Total South Total 866 West Entering South Entering 56 West Entering 87 3 South Entering 395 West Receiving 92 South Receiving 1192 West Receiving 89 South Receiving 471 West Peds 1 South Peds 1 West Peds 34 South Peds 12 PM Peak Hour: 16:45 to 17:45 Total 8-Hour Count Brock Road Brock Road North Total 1593 East Total 47 North Total 9128 East Total 289 North Entering 564 Cyclists East Entering 31 North Entering 4519 Cyclists East Entering 112 North Receiving 129 Truck 4 2 East Receiving 16 North Receiving 469 Truck East Receiving 177 North Peds 2 Cars East Peds 2 North Peds 44 Cars East Peds 78 DellBrook Avenue DellBrook Avenue West Total South Total 1716 West Total South Total 996 West Entering South Entering 1118 West Entering South Entering 4961 West Receiving 192 South Receiving 598 West Receiving 844 South Receiving 4945 West Peds 2 South Peds West Peds 58 South Peds 15

53 Turning Movement Count Diagram Intersection: Brock Road at Major Oaks Road Intersection ID: Municipality: Pickering, Ontario Date: Friday March 24, 217 AM Peak Hour: 7:45 to 8:45 MD Peak Hour: 13: to 14: Brock Road Brock Road North Total 1564 East Total 9 North Total 166 East Total 44 North Entering 181 Cyclists East Entering 2 North Entering 58 Cyclists East Entering 16 North Receiving 483 Truck East Receiving 7 North Receiving 558 Truck 19 East Receiving 28 North Peds Cars East Peds North Peds 1 Cars East Peds 5 Major Oaks Road Major Oaks Road West Total South Total 1913 West Total South Total 141 West Entering South Entering 564 West Entering South Entering 745 West Receiving 12 South Receiving 1349 West Receiving 21 South Receiving 665 West Peds South Peds West Peds 8 South Peds 53 PM Peak Hour: 15:15 to 16:15 Total 8-Hour Count Brock Road Brock Road North Total 1713 East Total 5 North Total 1424 East Total 165 North Entering 64 Cyclists East Entering 23 North Entering 5224 Cyclists East Entering 73 North Receiving 173 Truck 1 31 East Receiving 27 North Receiving 52 Truck East Receiving 92 North Peds 1 Cars East Peds 6 North Peds 6 Cars East Peds 17 Major Oaks Road Major Oaks Road West Total South Total 2218 West Total South Total 1383 West Entering South Entering 138 West Entering South Entering 6472 West Receiving 332 South Receiving 838 West Receiving 1473 South Receiving 6611 West Peds 6 South Peds 7 West Peds 44 South Peds 62

54 Turning Movement Count Diagram Intersection: Brock Road at Pickering Islamic Centre Access Intersection ID: Municipality: Pickering, Ontario Date: Friday March 24, 217 AM Peak Hour: 7:45 to 8:45 MD Peak Hour: 13: to 14: Brock Road Brock Road North Total 1874 East Total 34 North Total 1411 East Total 48 North Entering 1314 Cyclists East Entering 27 North Entering 657 Cyclists East Entering 11 North Receiving 56 Truck 26 East Receiving 7 North Receiving 754 Truck 23 East Receiving 37 North Peds Cars 1288 East Peds 16 North Peds Cars 634 East Peds 117 Pickering Islamic Pickering Islamic West Total South Total 1854 West Total South Total 1438 West Entering 37 South Entering 54 West Entering 27 South Entering 781 West Receiving South Receiving 1314 West Receiving 1 South Receiving 657 West Peds South Peds West Peds South Peds 1 PM Peak Hour: 15:15 to 16:15 Total 8-Hour Count Brock Road Brock Road North Total 2291 East Total 149 North Total 1318 East Total 341 North Entering 899 Cyclists East Entering 122 North Entering 669 Cyclists 1 East Entering 234 North Receiving 1392 Truck 36 East Receiving 27 North Receiving 6499 Truck 212 East Receiving 17 North Peds Cars 863 East Peds 94 North Peds 2 Cars 6396 East Peds 272 Pickering Islamic Pickering Islamic West Total South Total 2196 West Total South Total West Entering 31 South Entering 1297 West Entering 23 South Entering 6373 West Receiving South Receiving 899 West Receiving 1 South Receiving 669 West Peds South Peds West Peds South Peds 1

55 Turning Movement Count Diagram Intersection: Brock Road at Usman Road Intersection ID: Municipality: Pickering, Ontario Date: Friday March 24, 217 AM Peak Hour: 7:45 to 8:45 MD Peak Hour: 13: to 14: Brock Road Brock Road North Total 1895 East Total 4 North Total 1455 East Total 238 North Entering 1351 Cyclists East Entering 3 North Entering 661 Cyclists East Entering 43 North Receiving 544 Truck 31 East Receiving 37 North Receiving 794 Truck 27 East Receiving 195 North Peds Cars East Peds North Peds 6 Cars East Peds 62 Usman Road Usman Road West Total South Total 1899 West Total South Total 1491 West Entering 39 South Entering 563 West Entering 29 South Entering 888 West Receiving South Receiving 1336 West Receiving 2 South Receiving 63 West Peds South Peds West Peds South Peds 16 PM Peak Hour: 15:15 to 16:15 Total 8-Hour Count Brock Road Brock Road North Total 221 East Total 88 North Total 1312 East Total 548 North Entering 94 Cyclists East Entering 82 North Entering 6711 Cyclists 1 East Entering 141 North Receiving 1297 Truck 37 East Receiving 6 North Receiving 649 Truck 235 East Receiving 47 North Peds 7 Cars East Peds 22 North Peds 16 Cars East Peds 96 Usman Road Usman Road West Total South Total 2119 West Total South Total 1316 West Entering 33 South Entering 1218 West Entering 214 South Entering 6535 West Receiving South Receiving 91 West Receiving 3 South Receiving 6571 West Peds South Peds 5 West Peds South Peds 24

56 Turning Movement Count Diagram Intersection: Brock Road & Finch Avenue Intersection ID: Municipality: Pickering, Ontario Date: Tuesday March 28, 217 AM Peak Hour: 7:45 to 8:45 MD Peak Hour: 13: to 14: Brock Road Brock Road North Total 272 East Total 44 North Total 1192 East Total 21 North Entering 1443 Cyclists East Entering 29 North Entering 552 Cyclists East Entering 11 North Receiving 629 Truck 9 48 East Receiving 15 North Receiving 64 Truck 2 39 East Receiving 1 North Peds 1 Cars East Peds 1 North Peds Cars East Peds 1 Finch Avenue Finch Avenue West Total South Total 2166 West Total South Total 1378 West Entering South Entering 659 West Entering South Entering 697 West Receiving South Receiving 157 West Receiving South Receiving 681 West Peds 5 South Peds 2 West Peds 7 South Peds 2 PM Peak Hour: 15:15 to 16:15 Total 8-Hour Count Brock Road Brock Road North Total 269 East Total 55 North Total 753 East Total 19 North Entering 11 Cyclists 1 East Entering 25 North Entering 4283 Cyclists 2 East Entering 112 North Receiving 168 Truck 4 1 East Receiving 3 North Receiving 277 Truck East Receiving 78 North Peds Cars 92 3 East Peds North Peds 3 Cars East Peds 3 Finch Avenue Finch Avenue West Total South Total 45 West Total South Total 793 West Entering South Entering 215 West Entering South Entering 347 West Receiving South Receiving 235 West Receiving South Receiving 4856 West Peds 16 South Peds 1 West Peds 5 South Peds 7

57

58

59

60 APPENDIX B Background Traffic Information

61 AADT Growth Calculation Review of Traffic Volume Growth on Brock Road north of Finch Avenue Year AADT xy x^2 Growth by Annual (vehicles) Linear Growth Regression Rate , , , % E Source: Durham Region Transportation Studies and Data AADT Program events 3 m -67 b

62 Background Site Trip Generation 265 Brock Road Background Developments Dev Brock Road, Pickering, Proposed Residential Development Dwelling Size AM Peak Hour MIDDAY Peak Hour PM Peak Hour Type (Units) In Out Total In Out Total In Out Total Residential Condominium 59 Distribution 17% 83% 1% 67% 33% 1% 67% 33% 1% & Townhouses Equation Ln(T)=.8Ln(X)+.26 Ln(T)=.82Ln(X)+.32 ITE Code 23 Rate Trips Total Trips Dev 2-29 Duberry Drive, Pickering, Proposed Residential Development Dwelling Size AM Peak Hour MIDDAY Peak Hour PM Peak Hour Type (Units) In Out Total In Out Total In Out Total Single Homes 4 Dir. Distr. 25% 75% 1% 63% 37% 1% 63% 37% 1% ITE Code 21 Equation T =.7 (X) Ln(T)=.9Ln(X)+.51 Rate Trips Total Trips Dev Brock Road, Pickering, Proposed Residential Development Dwelling Size AM Peak Hour MIDDAY Peak Hour PM Peak Hour Type (Units) In Out Total In Out Total In Out Total Residential Condominium 59 Distribution 17% 83% 1% 67% 33% 1% 67% 33% 1% & Townhouses Equation Ln(T)=.8Ln(X)+.26 Ln(T)=.82Ln(X)+.32 ITE Code 23 Rate Trips Single Homes 6 Dir. Distr. 25% 75% 1% 63% 37% 1% 63% 37% 1% ITE Code 21 Equation T =.7 (X) Ln(T)=.9Ln(X)+.51 Rate Trips Total Trips

63 TRAFFIC IMPACT STUDY Proposed Addition to Pickering Islamic Centre 265 Brock Road, City of Pickering, Ontario Dev 1: 255 Brock Road, Proposed Residential Development 3 5 Dellbrook Avenue 1 Pine Ridge Garden Gallery Access Major Oaks Road Usman Road Pickering Islamic Centre Access (Right-out only) 3 6 SITE Full Moves Site Access Usman Road Finch Avenue LEGEND Brock Road 17 xx xx xx Traffic Signal Stop Sign AM / MID / PM Peak Hour Schematic; Not To Scale

64 TRAFFIC IMPACT STUDY Proposed Addition to Pickering Islamic Centre 265 Brock Road, City of Pickering, Ontario Dev 2: 29 Duberry Drive, Proposed Residential Development 4 9 Dellbrook Avenue 3 Pine Ridge Garden Gallery Access Major Oaks Road 3 Usman Road Pickering Islamic Centre Access (Right-out only) 3 7 SITE Full Moves Site Access Usman Road Finch Avenue LEGEND Brock Road 15 xx xx xx Traffic Signal Stop Sign AM / MID / PM Peak Hour Schematic; Not To Scale

65 TRAFFIC IMPACT STUDY Proposed Addition to Pickering Islamic Centre 265 Brock Road, City of Pickering, Ontario Dev 3: 295 Brock Road, Proposed Residential Development 15 2 Dellbrook Avenue 4 Pine Ridge Garden Gallery Access Major Oaks Road Usman Road Pickering Islamic Centre Access (Right-out only) 3 7 SITE Full Moves Site Access Usman Road 5 Finch Avenue LEGEND Brock Road 38 xx xx xx Traffic Signal Stop Sign AM / MID / PM Peak Hour Schematic; Not To Scale

66 APPENDIX C Pickering Islamic Centre Site Survey Results

67 School & Place of Worship Observation Survey Location: Pickering Islamic Centre Date and Day of Week: Friday March 24, 217 Start and End Times: 7:3am-8:5am, 12:3pm-2:15pm & 2:45pm-3:55pm Weather: Light Showers, 11 C Surveyors: Tyrone D. & Paulo I. Peak Hour - :5 Time Period (5 mins) Place of Worship Attendees Attendees School Drop Off / Pick Up in Lot Vehicles Students 7:3 AM 7:35 AM 7:4 AM 2 3 7:45 AM 7:5 AM 7:55 AM 8: AM 1 3 8:5 AM 3 4 8:1 AM 5 7 8:15 AM :2 AM :25 AM 1 2 8:3 AM 5 9 8:35 AM 1 1 8:4 AM 4 6 8:45 AM 8:5 AM 4 4 Place of Worship Attendees on Usman Road Attendees Pedestrians along Brock Road & Crossing Brock Road Attendees Attendees Crossing at Attendees Crossing at 12:3 PM 1 12:35 PM 2 12:4 PM :45 PM :5 PM 1 12:55 PM : PM :5 PM :1 PM :15 PM :2 PM 22 1:25 PM 11 1:3 PM 25 1:35 PM :4 PM 14 1:45 PM 4 1:5 PM :55 PM 25 2: PM 7 2:5 PM :1 PM 3 2:15 PM 1 2:45 PM :5 PM :55 PM : PM :5 PM :1 PM :15 PM :2 PM :25 PM :3 PM :35 PM 2 2 3:4 PM 5 3 3:45 PM 2 1 3:5 PM 1 4 3:55 PM 1 1

68 APPENDIX D Capacity and Queue Analysis Summary Sheets

69 Lane Group EBL EBT WBT NBL NBT SBL SBT Volume (vph) Turn Type Perm Perm Perm Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 3.% 3.% 3.% 7.% 7.% 7.% 7.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode None None None Max Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS D C A A A A A Approach Delay Approach LOS C A A A Cycle Length: 1 Actuated Cycle Length: 9.1 Natural Cycle: 6 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.67 Intersection Signal Delay: 8.4 Intersection LOS: A Intersection Capacity Utilization 64.6% ICU Level of Service C Splits and Phases: 1: Dellbrook Avenue & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) 12% % 1% % % % 2% 8% % % 4% 13% Turn Type Perm Perm Perm Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c c.34 v/s Ratio Perm v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service D D C A A A A Approach Delay (s) Approach LOS D C A A HCM Average Control Delay 9.2 HCM Level of Service A HCM Volume to Capacity ratio.46 Actuated Cycle Length (s) 9. Sum of lost time (s) 11.9 Intersection Capacity Utilization 64.6% ICU Level of Service C c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 2

70 Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT Volume (vph) Turn Type Perm Perm Perm Perm Perm Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 34.% 34.% 34.% 34.% 34.% 66.% 66.% 66.% 66.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode None None None None None Max Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS C D C C A A A Approach Delay Approach LOS D C A A Cycle Length: 1 Actuated Cycle Length: 89.1 Natural Cycle: 8 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.76 Intersection Signal Delay: 13.3 Intersection LOS: B Intersection Capacity Utilization 7.8% ICU Level of Service C Splits and Phases: 2: Major Oaks Road & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) 3% % 2% % % % 4% 8% 2% 5% 2% 15% Turn Type Perm Perm Perm Perm Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm.2 c.14. c.37. v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service C D C B A A A Approach Delay (s) Approach LOS D C A A HCM Average Control Delay 12.6 HCM Level of Service B HCM Volume to Capacity ratio.59 Actuated Cycle Length (s) 89.1 Sum of lost time (s) 11.1 Intersection Capacity Utilization 7.8% ICU Level of Service C c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 4

71 Movement WBL WBR NBT NBR SBL SBT Volume (veh/h) Sign Control Stop Free Free Grade % % % Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 166 px, platoon unblocked.8 vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p queue free % cm capacity (veh/h) Direction, Lane # WB 1 NB 1 NB 2 SB 1 SB 2 Volume Total Volume Left Volume Right 29 8 csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS B Approach Delay (s) Approach LOS B Average Delay.1 Intersection Capacity Utilization 43.7% ICU Level of Service A Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement WBL WBR NBT NBR SBL SBT Volume (veh/h) Sign Control Stop Free Free Grade % % % Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) px, platoon unblocked.8 vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p queue free % cm capacity (veh/h) Direction, Lane # WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3 Volume Total Volume Left 16 Volume Right 3 24 csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS B A Approach Delay (s) Approach LOS B Average Delay.1 Intersection Capacity Utilization 43.3% ICU Level of Service A Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 6

72 Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT Volume (vph) Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 28.% 28.% 28.% 28.% 28.% 14.% 72.% 58.% 58.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Recall Mode None None None None None None Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS D B C B A A B Approach Delay Approach LOS C C A B Cycle Length: 1 Actuated Cycle Length: 91.5 Natural Cycle: 8 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.76 Intersection Signal Delay: 15.9 Intersection LOS: B Intersection Capacity Utilization 77.6% ICU Level of Service D Splits and Phases: 5: Finch Avenue & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c.5.17 c.45 v/s Ratio Perm c v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service D D C B A A B Approach Delay (s) Approach LOS D C A B HCM Average Control Delay 16.6 HCM Level of Service B HCM Volume to Capacity ratio.7 Actuated Cycle Length (s) 91.4 Sum of lost time (s) 15.5 Intersection Capacity Utilization 77.6% ICU Level of Service D c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 8

73 Movement EBL EBT WBT WBR SBL SBR Volume (veh/h) 22 3 Sign Control Free Free Stop Grade % % % Peak Hour Factor Hourly flow rate (vph) 24 3 Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) px, platoon unblocked vc, conflicting volume 48 vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol 48 tc, single (s) tc, 2 stage (s) tf (s) p queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 SB 1 Volume Total 24 3 Volume Left 24 Volume Right 3 csh Volume to Capacity.1.. Queue Length 95th (m).4..1 Control Delay (s) Lane LOS A A Approach Delay (s) Approach LOS A Average Delay 7.4 Intersection Capacity Utilization 13.3% ICU Level of Service A Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Lane Group EBL EBT WBT NBL NBT SBT Volume (vph) Turn Type Perm Perm Protected Phases Permitted Phases 4 2 Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 3.% 3.% 3.% 7.% 7.% 7.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode None None None Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS D A A A A A Approach Delay Approach LOS B A A A Cycle Length: 1 Actuated Cycle Length: 9.4 Natural Cycle: 55 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.22 Intersection Signal Delay: 3.3 Intersection LOS: A Intersection Capacity Utilization 61.9% ICU Level of Service B Splits and Phases: 1: Dellbrook Avenue & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 1

74 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Confl. Bikes (#/hr) 1 Heavy Vehicles (%) 19% % 3% % % % % 9% % % 8% 19% Turn Type Perm Perm Perm Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot.. c v/s Ratio Perm c.2.11 v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service D D D A A A Approach Delay (s) Approach LOS D D A A HCM Average Control Delay 5.5 HCM Level of Service A HCM Volume to Capacity ratio.21 Actuated Cycle Length (s) 91.6 Sum of lost time (s) 11.9 Intersection Capacity Utilization 61.9% ICU Level of Service B c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT Volume (vph) Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 29.% 29.% 29.% 29.% 29.% 1.% 71.% 61.% 61.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Recall Mode None None None None None None Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS D B C A A A A Approach Delay Approach LOS B C A A Cycle Length: 1 Actuated Cycle Length: 85.1 Natural Cycle: 65 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.54 Intersection Signal Delay: 6.1 Intersection LOS: A Intersection Capacity Utilization 64.4% ICU Level of Service C Splits and Phases: 2: Major Oaks Road & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 3

75 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) % % 1% % % % 2% 4% 13% % 4% % Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c v/s Ratio Perm c c.2. v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service D D C A A A A Approach Delay (s) Approach LOS D C A A HCM Average Control Delay 8.5 HCM Level of Service A HCM Volume to Capacity ratio.26 Actuated Cycle Length (s) 85.1 Sum of lost time (s) 8.4 Intersection Capacity Utilization 64.4% ICU Level of Service C c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement WBL WBR NBT NBR SBL SBT Volume (veh/h) Sign Control Stop Free Free Grade % % % Peak Hour Factor Hourly flow rate (vph) Pedestrians 117 Lane Width (m) 3.8 Walking Speed (m/s) 1.2 Percent Blockage 1 Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 166 px, platoon unblocked.96 vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p queue free % cm capacity (veh/h) Direction, Lane # WB 1 NB 1 NB 2 SB 1 SB 2 Volume Total Volume Left Volume Right 11 4 csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS B Approach Delay (s) Approach LOS B Average Delay.1 Intersection Capacity Utilization 32.3% ICU Level of Service A Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 5

76 Movement WBL WBR NBT NBR SBL SBT Volume (veh/h) Sign Control Stop Free Free Grade % % % Peak Hour Factor Hourly flow rate (vph) Pedestrians 62 Lane Width (m) 4.8 Walking Speed (m/s) 1.2 Percent Blockage 7 Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) px, platoon unblocked.99 vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p queue free % cm capacity (veh/h) Direction, Lane # WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3 Volume Total Volume Left 64 Volume Right csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS B B Approach Delay (s) Approach LOS B Average Delay.8 Intersection Capacity Utilization 3.7% ICU Level of Service A Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT Volume (vph) Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 31.% 31.% 31.% 31.% 31.% 11.% 69.% 58.% 58.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Recall Mode None None None None None None Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS D A C A A B B Approach Delay Approach LOS C C A B Cycle Length: 1 Actuated Cycle Length: 92.2 Natural Cycle: 65 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.7 Intersection Signal Delay: 12.4 Intersection LOS: B Intersection Capacity Utilization 63.6% ICU Level of Service B Splits and Phases: 5: Finch Avenue & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 7

77 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Confl. Bikes (#/hr) 1 Heavy Vehicles (%) 5% 1% 3% 25% % % 3% 5% 14% % 8% 3% Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot.3 c.24.2 v/s Ratio Perm c v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service D C C A A A B Approach Delay (s) Approach LOS D C A B HCM Average Control Delay 13.8 HCM Level of Service B HCM Volume to Capacity ratio.42 Actuated Cycle Length (s) 92.2 Sum of lost time (s) 12.5 Intersection Capacity Utilization 63.6% ICU Level of Service B c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement EBL EBT WBT WBR SBL SBR Volume (veh/h) Sign Control Free Free Stop Grade % % % Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) px, platoon unblocked vc, conflicting volume 296 vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol 296 tc, single (s) tc, 2 stage (s) tf (s) p queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 SB 1 Volume Total Volume Left 148 Volume Right 46 csh Volume to Capacity.9..5 Queue Length 95th (m) Control Delay (s) Lane LOS A A Approach Delay (s) Approach LOS A Average Delay 7.8 Intersection Capacity Utilization 17.5% ICU Level of Service A Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 9

78 Lane Group EBL EBT WBT NBL NBT SBT Volume (vph) Turn Type Perm Perm Protected Phases Permitted Phases 4 2 Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 3.% 3.% 3.% 7.% 7.% 7.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode None None None Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS D A A A A A Approach Delay Approach LOS B A A A Cycle Length: 1 Actuated Cycle Length: 88.4 Natural Cycle: 6 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.38 Intersection Signal Delay: 4.7 Intersection LOS: A Intersection Capacity Utilization 67.9% ICU Level of Service C Splits and Phases: 1: Dellbrook Avenue & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Confl. Bikes (#/hr) 1 Heavy Vehicles (%) 8% % 1% % % % % 1% 6% % 4% 1% Turn Type Perm Perm Perm Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot.. c.3.22 v/s Ratio Perm c.4.24 v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service D D D A A A Approach Delay (s) Approach LOS D D A A HCM Average Control Delay 6.2 HCM Level of Service A HCM Volume to Capacity ratio.39 Actuated Cycle Length (s) 89.6 Sum of lost time (s) 11.9 Intersection Capacity Utilization 67.9% ICU Level of Service C c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 2

79 Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT Volume (vph) Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 29.% 29.% 29.% 29.% 29.% 1.% 71.% 61.% 61.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Recall Mode None None None None None None Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS D B C A A A A Approach Delay Approach LOS B C A A Cycle Length: 1 Actuated Cycle Length: 85.2 Natural Cycle: 65 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.59 Intersection Signal Delay: 6.8 Intersection LOS: A Intersection Capacity Utilization 7.9% ICU Level of Service C Splits and Phases: 2: Major Oaks Road & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) 15% % 3% % % % 3% 2% % % 5% 5% Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c v/s Ratio Perm c c.42. v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service D D D A A A A Approach Delay (s) Approach LOS D D A A HCM Average Control Delay 8.4 HCM Level of Service A HCM Volume to Capacity ratio.54 Actuated Cycle Length (s) 85.2 Sum of lost time (s) 8.4 Intersection Capacity Utilization 7.9% ICU Level of Service C c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 4

80 Movement WBL WBR NBT NBR SBL SBT Volume (veh/h) Sign Control Stop Free Free Grade % % % Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 166 px, platoon unblocked.91 vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p queue free % cm capacity (veh/h) Direction, Lane # WB 1 NB 1 NB 2 SB 1 SB 2 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS C Approach Delay (s) Approach LOS C Average Delay 1. Intersection Capacity Utilization 51.1% ICU Level of Service A Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement WBL WBR NBT NBR SBL SBT Volume (veh/h) Sign Control Stop Free Free Grade % % % Peak Hour Factor Hourly flow rate (vph) Pedestrians 22 Lane Width (m) 4.8 Walking Speed (m/s) 1.2 Percent Blockage 2 Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p queue free % cm capacity (veh/h) Direction, Lane # WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3 Volume Total Volume Left 3 Volume Right 89 3 csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS B B Approach Delay (s) Approach LOS B Average Delay.4 Intersection Capacity Utilization 46.2% ICU Level of Service A Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 6

81 Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT Volume (vph) Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 31.% 31.% 31.% 31.% 31.% 11.% 69.% 58.% 58.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Recall Mode None None None None None None Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS D A C B A B B Approach Delay Approach LOS C C A B Cycle Length: 1 Actuated Cycle Length: 93.6 Natural Cycle: 65 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.75 Intersection Signal Delay: 14.2 Intersection LOS: B Intersection Capacity Utilization 75.3% ICU Level of Service D Splits and Phases: 5: Finch Avenue & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Confl. Bikes (#/hr) 1 1 Heavy Vehicles (%) 4% 1% 5% 12% % % 1% 3% 6% 25% 4% 4% Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c v/s Ratio Perm c c.33.1 v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service D C C A A A B Approach Delay (s) Approach LOS D C A B HCM Average Control Delay 15. HCM Level of Service B HCM Volume to Capacity ratio.57 Actuated Cycle Length (s) 93.6 Sum of lost time (s) 9.3 Intersection Capacity Utilization 75.3% ICU Level of Service D c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 8

82 Movement EBL EBT WBT WBR SBL SBR Volume (veh/h) 3 82 Sign Control Free Free Stop Grade % % % Peak Hour Factor Hourly flow rate (vph) 3 89 Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) px, platoon unblocked vc, conflicting volume 7 vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol 7 tc, single (s) tc, 2 stage (s) tf (s) p queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 SB 1 Volume Total 3 89 Volume Left 3 Volume Right 89 csh Volume to Capacity...9 Queue Length 95th (m) Control Delay (s) Lane LOS A A Approach Delay (s) Approach LOS A Average Delay 9. Intersection Capacity Utilization 15.1% ICU Level of Service A Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Lane Group EBL EBT WBT NBL NBT SBL SBT Volume (vph) Turn Type Perm Perm Perm Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 3.% 3.% 3.% 7.% 7.% 7.% 7.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode None None None Max Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS D D A A A A A Approach Delay Approach LOS D A A A Cycle Length: 1 Actuated Cycle Length: 92.1 Natural Cycle: 6 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.73 Intersection Signal Delay: 1.9 Intersection LOS: B Intersection Capacity Utilization 72.9% ICU Level of Service C Splits and Phases: 1: Dellbrook Avenue & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 1

83 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) 12% % 1% % % % 2% 8% % % 4% 13% Turn Type Perm Perm Perm Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c c.38 v/s Ratio Perm v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service D D C A A A A Approach Delay (s) Approach LOS D C A A HCM Average Control Delay 1.9 HCM Level of Service B HCM Volume to Capacity ratio.56 Actuated Cycle Length (s) 92.1 Sum of lost time (s) 11.9 Intersection Capacity Utilization 72.9% ICU Level of Service C c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT Volume (vph) Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 34.% 34.% 34.% 34.% 34.% 9.% 66.% 57.% 57.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Recall Mode None None None None None None Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS C C C C A B B Approach Delay Approach LOS C C A B Cycle Length: 1 Actuated Cycle Length: 89.6 Natural Cycle: 8 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.8 Intersection Signal Delay: 18.3 Intersection LOS: B Intersection Capacity Utilization 79.2% ICU Level of Service D Splits and Phases: 2: Major Oaks Road & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 3

84 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) 3% % 2% % % % 4% 8% 2% 5% 2% 15% Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c.4.19 c.42 v/s Ratio Perm.3 c v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service C D C B A A B Approach Delay (s) Approach LOS D C A B HCM Average Control Delay 18.1 HCM Level of Service B HCM Volume to Capacity ratio.73 Actuated Cycle Length (s) 89.6 Sum of lost time (s) 14.1 Intersection Capacity Utilization 79.2% ICU Level of Service D c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement WBL WBR NBT NBR SBL SBT Volume (veh/h) Sign Control Stop Free Free Grade % % % Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) px, platoon unblocked.67 vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p queue free % cm capacity (veh/h) Direction, Lane # WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3 Volume Total Volume Left 1 Volume Right csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS B A Approach Delay (s) Approach LOS B Average Delay.1 Intersection Capacity Utilization 51.7% ICU Level of Service A Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 5

85 Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT Volume (vph) Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 28.% 28.% 28.% 28.% 28.% 1.% 72.% 62.% 62.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Recall Mode None None None None None None Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS D D C D A A C Approach Delay Approach LOS D C B C Cycle Length: 1 Actuated Cycle Length: 93.9 Natural Cycle: 9 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.94 Intersection Signal Delay: 27. Intersection LOS: C Intersection Capacity Utilization 88.4% ICU Level of Service E Splits and Phases: 5: Finch Avenue & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) 6% % 5% 19% 2% % 9% 7% 38% % 4% 5% Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c.6.2 c.56 v/s Ratio Perm.1 c v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service D D C D A A C Approach Delay (s) Approach LOS D C B C HCM Average Control Delay 26.4 HCM Level of Service C HCM Volume to Capacity ratio.89 Actuated Cycle Length (s) 93.8 Sum of lost time (s) 15.5 Intersection Capacity Utilization 88.4% ICU Level of Service E c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 7

86 Lane Group EBL EBT WBT NBL NBT SBT Volume (vph) Turn Type Perm Perm Protected Phases Permitted Phases 4 2 Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 3.% 3.% 3.% 7.% 7.% 7.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode None None None Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS D A A A A A Approach Delay Approach LOS B A A A Cycle Length: 1 Actuated Cycle Length: 89.5 Natural Cycle: 55 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.24 Intersection Signal Delay: 3.5 Intersection LOS: A Intersection Capacity Utilization 61.9% ICU Level of Service B Splits and Phases: 1: Dellbrook Avenue & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Confl. Bikes (#/hr) 1 Heavy Vehicles (%) 19% % 3% % % % % 9% % % 8% 19% Turn Type Perm Perm Perm Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot.. c v/s Ratio Perm c.2.13 v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service D D D A A A Approach Delay (s) Approach LOS D D A A HCM Average Control Delay 5.7 HCM Level of Service A HCM Volume to Capacity ratio.23 Actuated Cycle Length (s) 9.6 Sum of lost time (s) 11.9 Intersection Capacity Utilization 61.9% ICU Level of Service B c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 2

87 Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT Volume (vph) Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 4.% 4.% 4.% 4.% 4.% 1.% 6.% 5.% 5.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Recall Mode None None None None None None Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS C B C A A A A Approach Delay Approach LOS B C A A Cycle Length: 1 Actuated Cycle Length: 74 Natural Cycle: 65 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.54 Intersection Signal Delay: 6.9 Intersection LOS: A Intersection Capacity Utilization 65.1% ICU Level of Service C Splits and Phases: 2: Major Oaks Road & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) % % 1% % % % 2% 4% 13% % 4% % Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c v/s Ratio Perm.2.1 c.2 c.24.3 v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service C C C A A A A Approach Delay (s) Approach LOS C C A A HCM Average Control Delay 8.9 HCM Level of Service A HCM Volume to Capacity ratio.33 Actuated Cycle Length (s) 74. Sum of lost time (s) 8.4 Intersection Capacity Utilization 65.1% ICU Level of Service C c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 4

88 Movement WBL WBR NBT NBR SBL SBT Volume (veh/h) Sign Control Stop Free Free Grade % % % Peak Hour Factor Hourly flow rate (vph) Pedestrians 62 Lane Width (m) 4.8 Walking Speed (m/s) 1.2 Percent Blockage 7 Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p queue free % cm capacity (veh/h) Direction, Lane # WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3 Volume Total Volume Left 3 Volume Right 1 48 csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS B B Approach Delay (s) Approach LOS B Average Delay.1 Intersection Capacity Utilization 33.1% ICU Level of Service A Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT Volume (vph) Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 31.% 31.% 31.% 31.% 31.% 11.% 69.% 58.% 58.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Recall Mode None None None None None None Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS D A C A A B B Approach Delay Approach LOS C C A B Cycle Length: 1 Actuated Cycle Length: 92.8 Natural Cycle: 65 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.72 Intersection Signal Delay: 13.1 Intersection LOS: B Intersection Capacity Utilization 63.5% ICU Level of Service B Splits and Phases: 5: Finch Avenue & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 6

89 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Confl. Bikes (#/hr) 1 Heavy Vehicles (%) 5% 1% 3% 25% % % 3% 5% 14% % 8% 3% Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c v/s Ratio Perm c c.25. v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service D C C A A A B Approach Delay (s) Approach LOS D C A B HCM Average Control Delay 14.6 HCM Level of Service B HCM Volume to Capacity ratio.47 Actuated Cycle Length (s) 92.8 Sum of lost time (s) 9.3 Intersection Capacity Utilization 63.5% ICU Level of Service B c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Lane Group EBL EBT WBT NBL NBT SBT Volume (vph) Turn Type Perm Perm Protected Phases Permitted Phases 4 2 Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 3.% 3.% 3.% 7.% 7.% 7.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode None None None Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS D A A A A A Approach Delay Approach LOS B A A A Cycle Length: 1 Actuated Cycle Length: 87.7 Natural Cycle: 7 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.45 Intersection Signal Delay: 5.5 Intersection LOS: A Intersection Capacity Utilization 72.% ICU Level of Service C Splits and Phases: 1: Dellbrook Avenue & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 1

90 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Confl. Bikes (#/hr) 1 Heavy Vehicles (%) 8% % 1% % % % % 1% 6% % 4% 1% Turn Type Perm Perm Perm Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm c.5 c.36 v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service D D D A A A Approach Delay (s) Approach LOS D D A A HCM Average Control Delay 6.7 HCM Level of Service A HCM Volume to Capacity ratio.47 Actuated Cycle Length (s) 88.8 Sum of lost time (s) 11.9 Intersection Capacity Utilization 72.% ICU Level of Service C c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT Volume (vph) Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 54.% 54.% 54.% 54.% 54.% 15.% 46.% 31.% 31.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Recall Mode None None None None None None Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS C A C C B B C Approach Delay Approach LOS A C B C Cycle Length: 1 Actuated Cycle Length: 65.9 Natural Cycle: 8 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.77 Intersection Signal Delay: 17.2 Intersection LOS: B Intersection Capacity Utilization 83.6% ICU Level of Service E Splits and Phases: 2: Major Oaks Road & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 3

91 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) 15% % 3% % % % 3% 2% % % 5% 5% Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c v/s Ratio Perm.3.3 c.14 c.34.6 v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service C C C C A B C Approach Delay (s) Approach LOS C C B C HCM Average Control Delay 16.9 HCM Level of Service B HCM Volume to Capacity ratio.71 Actuated Cycle Length (s) 65.8 Sum of lost time (s) 8.4 Intersection Capacity Utilization 83.6% ICU Level of Service E c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement WBL WBR NBT NBR SBL SBT Volume (veh/h) Sign Control Stop Free Free Grade % % % Peak Hour Factor Hourly flow rate (vph) Pedestrians 22 Lane Width (m) 4.8 Walking Speed (m/s) 1.2 Percent Blockage 2 Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p queue free % cm capacity (veh/h) Direction, Lane # WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3 Volume Total Volume Left 116 Volume Right csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS A C Approach Delay (s) Approach LOS A Average Delay.8 Intersection Capacity Utilization 51.9% ICU Level of Service A Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 5

92 Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT Volume (vph) Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 33.% 33.% 33.% 33.% 33.% 13.% 67.% 54.% 54.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Recall Mode None None None None None None Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS E B C D B B C Approach Delay Approach LOS C C B C Cycle Length: 1 Actuated Cycle Length: 95.8 Natural Cycle: 8 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.84 Intersection Signal Delay: 22.4 Intersection LOS: C Intersection Capacity Utilization 87.1% ICU Level of Service E Splits and Phases: 5: Finch Avenue & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Confl. Bikes (#/hr) 1 1 Heavy Vehicles (%) 4% 1% 5% 12% % % 1% 3% 6% 25% 4% 4% Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c v/s Ratio Perm c c.46.2 v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service D C C D B B C Approach Delay (s) Approach LOS D C B C HCM Average Control Delay 22.8 HCM Level of Service C HCM Volume to Capacity ratio.82 Actuated Cycle Length (s) 95.8 Sum of lost time (s) 9.3 Intersection Capacity Utilization 87.1% ICU Level of Service E c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 7

93 Lane Group EBL EBT WBT NBL NBT SBL SBT Volume (vph) Turn Type Perm Perm Perm Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 3.% 3.% 3.% 7.% 7.% 7.% 7.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode None None None Max Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS D D A B A A A Approach Delay Approach LOS D A A A Cycle Length: 1 Actuated Cycle Length: 92.5 Natural Cycle: 6 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.73 Intersection Signal Delay: 11.3 Intersection LOS: B Intersection Capacity Utilization 72.9% ICU Level of Service C Splits and Phases: 1: Dellbrook Avenue & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) 12% % 1% % % % 2% 8% % % 4% 13% Turn Type Perm Perm Perm Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c c.4 v/s Ratio Perm v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service D D C A A A A Approach Delay (s) Approach LOS D C A A HCM Average Control Delay 11.2 HCM Level of Service B HCM Volume to Capacity ratio.59 Actuated Cycle Length (s) 92.5 Sum of lost time (s) 11.9 Intersection Capacity Utilization 72.9% ICU Level of Service C c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 2

94 Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT Volume (vph) Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 34.% 34.% 34.% 34.% 34.% 9.% 66.% 57.% 57.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Recall Mode None None None None None None Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS C D D C A B B Approach Delay Approach LOS C D B B Cycle Length: 1 Actuated Cycle Length: 9.2 Natural Cycle: 8 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.8 Intersection Signal Delay: 2.4 Intersection LOS: C Intersection Capacity Utilization 83.3% ICU Level of Service E Splits and Phases: 2: Major Oaks Road & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) 3% % 2% % % % 4% 8% 2% 5% 2% 15% Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c.5.2 c.44 v/s Ratio Perm.3 c v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service C D C C A A B Approach Delay (s) Approach LOS D C A B HCM Average Control Delay 19.6 HCM Level of Service B HCM Volume to Capacity ratio.76 Actuated Cycle Length (s) 9.1 Sum of lost time (s) 14.1 Intersection Capacity Utilization 83.3% ICU Level of Service E c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 4

95 Movement WBL WBR NBT NBR SBL SBT Volume (veh/h) Sign Control Stop Free Free Grade % % % Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 166 px, platoon unblocked.64 vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p queue free % cm capacity (veh/h) Direction, Lane # WB 1 NB 1 NB 2 SB 1 SB 2 Volume Total Volume Left Volume Right 37 csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS B Approach Delay (s) Approach LOS B Average Delay.1 Intersection Capacity Utilization 57.% ICU Level of Service B Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement WBL WBR NBT NBR SBL SBT Volume (veh/h) Sign Control Stop Free Free Grade % % % Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) px, platoon unblocked.65 vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p queue free % cm capacity (veh/h) Direction, Lane # WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3 Volume Total Volume Left 72 Volume Right 2 68 csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS B A Approach Delay (s) Approach LOS B Average Delay.3 Intersection Capacity Utilization 53.6% ICU Level of Service A Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 6

96 Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT Volume (vph) Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 28.% 28.% 28.% 28.% 28.% 1.% 72.% 62.% 62.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Recall Mode None None None None None None Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS D D C D A A D Approach Delay Approach LOS D C B D Cycle Length: 1 Actuated Cycle Length: 94.2 Natural Cycle: 1 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.98 Intersection Signal Delay: 31.3 Intersection LOS: C Intersection Capacity Utilization 9.3% ICU Level of Service E Splits and Phases: 5: Finch Avenue & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) 6% % 5% 19% 2% % 9% 7% 38% % 4% 5% Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c.6.21 c.58 v/s Ratio Perm.11 c v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service D D C D A A C Approach Delay (s) Approach LOS D C B C HCM Average Control Delay 3.8 HCM Level of Service C HCM Volume to Capacity ratio.91 Actuated Cycle Length (s) 94.2 Sum of lost time (s) 15.5 Intersection Capacity Utilization 9.3% ICU Level of Service E c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 8

97 Movement EBL EBT WBT WBR SBL SBR Volume (veh/h) Sign Control Free Free Stop Grade % % % Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 SB 1 Volume Total Volume Left Volume Right 7 csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS A A Approach Delay (s) Approach LOS A Average Delay 7.1 Intersection Capacity Utilization 21.3% ICU Level of Service A Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Lane Group EBL EBT WBT NBL NBT SBT Volume (vph) Turn Type Perm Perm Protected Phases Permitted Phases 4 2 Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 3.% 3.% 3.% 7.% 7.% 7.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode None None None Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS D A A A A A Approach Delay Approach LOS B A A A Cycle Length: 1 Actuated Cycle Length: 89.5 Natural Cycle: 55 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.25 Intersection Signal Delay: 3.5 Intersection LOS: A Intersection Capacity Utilization 62.5% ICU Level of Service B Splits and Phases: 1: Dellbrook Avenue & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 1

98 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Confl. Bikes (#/hr) 1 Heavy Vehicles (%) 19% % 3% % % % % 9% % % 8% 19% Turn Type Perm Perm Perm Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot...18 c.21 v/s Ratio Perm c.2.15 v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service D D D A A A Approach Delay (s) Approach LOS D D A A HCM Average Control Delay 5.5 HCM Level of Service A HCM Volume to Capacity ratio.26 Actuated Cycle Length (s) 9.6 Sum of lost time (s) 11.9 Intersection Capacity Utilization 62.5% ICU Level of Service B c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT Volume (vph) Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 4.% 4.% 4.% 4.% 4.% 1.% 6.% 5.% 5.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Recall Mode None None None None None None Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS C B C A A A A Approach Delay Approach LOS B C A A Cycle Length: 1 Actuated Cycle Length: 74.5 Natural Cycle: 65 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.55 Intersection Signal Delay: 7.8 Intersection LOS: A Intersection Capacity Utilization 65.7% ICU Level of Service C Splits and Phases: 2: Major Oaks Road & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 3

99 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) % % 1% % % % 2% 4% 13% % 4% % Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c v/s Ratio Perm.2.2 c.4 c.27.3 v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service C C C A A A A Approach Delay (s) Approach LOS C C A A HCM Average Control Delay 9.5 HCM Level of Service A HCM Volume to Capacity ratio.4 Actuated Cycle Length (s) 74.5 Sum of lost time (s) 8.4 Intersection Capacity Utilization 65.7% ICU Level of Service C c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement WBL WBR NBT NBR SBL SBT Volume (veh/h) Sign Control Stop Free Free Grade % % % Peak Hour Factor Hourly flow rate (vph) Pedestrians 117 Lane Width (m) 3.8 Walking Speed (m/s) 1.2 Percent Blockage 1 Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 166 px, platoon unblocked.92 vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p queue free % cm capacity (veh/h) Direction, Lane # WB 1 NB 1 NB 2 SB 1 SB 2 Volume Total Volume Left Volume Right 25 csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS B Approach Delay (s) Approach LOS B Average Delay.2 Intersection Capacity Utilization 34.7% ICU Level of Service A Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 5

100 Movement WBL WBR NBT NBR SBL SBT Volume (veh/h) Sign Control Stop Free Free Grade % % % Peak Hour Factor Hourly flow rate (vph) Pedestrians 62 Lane Width (m) 4.8 Walking Speed (m/s) 1.2 Percent Blockage 7 Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p queue free % cm capacity (veh/h) Direction, Lane # WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3 Volume Total Volume Left 141 Volume Right csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS B B Approach Delay (s) Approach LOS B Average Delay 1. Intersection Capacity Utilization 36.9% ICU Level of Service A Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT Volume (vph) Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 31.% 31.% 31.% 31.% 31.% 11.% 69.% 58.% 58.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Recall Mode None None None None None None Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS E A C A A B B Approach Delay Approach LOS C C A B Cycle Length: 1 Actuated Cycle Length: 94.4 Natural Cycle: 65 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.78 Intersection Signal Delay: 14.3 Intersection LOS: B Intersection Capacity Utilization 67.8% ICU Level of Service C Splits and Phases: 5: Finch Avenue & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 7

101 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Confl. Bikes (#/hr) 1 Heavy Vehicles (%) 5% 1% 3% 25% % % 3% 5% 14% % 8% 3% Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c v/s Ratio Perm c c.26. v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service D C C A A A B Approach Delay (s) Approach LOS D C A B HCM Average Control Delay 15.6 HCM Level of Service B HCM Volume to Capacity ratio.5 Actuated Cycle Length (s) 94.4 Sum of lost time (s) 9.3 Intersection Capacity Utilization 67.8% ICU Level of Service C c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement EBL EBT WBT WBR SBL SBR Volume (veh/h) Sign Control Free Free Stop Grade % % % Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 SB 1 Volume Total Volume Left Volume Right 3 csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS A B Approach Delay (s) Approach LOS B Average Delay 6.2 Intersection Capacity Utilization 26.% ICU Level of Service A Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 9

102 Lane Group EBL EBT WBT NBL NBT SBT Volume (vph) Turn Type Perm Perm Protected Phases Permitted Phases 4 2 Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 3.% 3.% 3.% 7.% 7.% 7.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode None None None Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS D A A A A A Approach Delay Approach LOS B A A A Cycle Length: 1 Actuated Cycle Length: 87.7 Natural Cycle: 7 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.45 Intersection Signal Delay: 5.5 Intersection LOS: A Intersection Capacity Utilization 72.% ICU Level of Service C Splits and Phases: 1: Dellbrook Avenue & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Confl. Bikes (#/hr) 1 Heavy Vehicles (%) 8% % 1% % % % % 1% 6% % 4% 1% Turn Type Perm Perm Perm Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm c.5 c.36 v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service D D D A A A Approach Delay (s) Approach LOS D D A A HCM Average Control Delay 6.7 HCM Level of Service A HCM Volume to Capacity ratio.47 Actuated Cycle Length (s) 88.8 Sum of lost time (s) 11.9 Intersection Capacity Utilization 72.% ICU Level of Service C c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 2

103 Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT Volume (vph) Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 54.% 54.% 54.% 54.% 54.% 15.% 46.% 31.% 31.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Recall Mode None None None None None None Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS C A C C B B C Approach Delay Approach LOS A C B C Cycle Length: 1 Actuated Cycle Length: 65.9 Natural Cycle: 8 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.77 Intersection Signal Delay: 17.2 Intersection LOS: B Intersection Capacity Utilization 83.6% ICU Level of Service E Splits and Phases: 2: Major Oaks Road & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) 15% % 3% % % % 3% 2% % % 5% 5% Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c v/s Ratio Perm.3.3 c.14 c.34.6 v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service C C C C A B C Approach Delay (s) Approach LOS C C B C HCM Average Control Delay 16.9 HCM Level of Service B HCM Volume to Capacity ratio.71 Actuated Cycle Length (s) 65.8 Sum of lost time (s) 8.4 Intersection Capacity Utilization 83.6% ICU Level of Service E c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 4

104 Movement WBL WBR NBT NBR SBL SBT Volume (veh/h) Sign Control Stop Free Free Grade % % % Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 166 px, platoon unblocked.76 vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p queue free % cm capacity (veh/h) Direction, Lane # WB 1 NB 1 NB 2 SB 1 SB 2 Volume Total Volume Left Volume Right 137 csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS C Approach Delay (s) Approach LOS C Average Delay 1. Intersection Capacity Utilization 54.6% ICU Level of Service A Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement WBL WBR NBT NBR SBL SBT Volume (veh/h) Sign Control Stop Free Free Grade % % % Peak Hour Factor Hourly flow rate (vph) Pedestrians 22 Lane Width (m) 4.8 Walking Speed (m/s) 1.2 Percent Blockage 2 Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p queue free % cm capacity (veh/h) Direction, Lane # WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3 Volume Total Volume Left 116 Volume Right csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS A C Approach Delay (s) Approach LOS A Average Delay.8 Intersection Capacity Utilization 51.9% ICU Level of Service A Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 6

105 Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT Volume (vph) Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) 33.% 33.% 33.% 33.% 33.% 13.% 67.% 54.% 54.% Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Recall Mode None None None None None None Max Max Max Act Effct Green (s) Actuated g/c Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS E B C D B B C Approach Delay Approach LOS C C B C Cycle Length: 1 Actuated Cycle Length: 95.8 Natural Cycle: 8 Control Type: Semi Act-Uncoord Maximum v/c Ratio:.84 Intersection Signal Delay: 22.4 Intersection LOS: C Intersection Capacity Utilization 87.1% ICU Level of Service E Splits and Phases: 5: Finch Avenue & Brock Road Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Confl. Bikes (#/hr) 1 1 Heavy Vehicles (%) 4% 1% 5% 12% % % 1% 3% 6% 25% 4% 4% Turn Type Perm Perm Perm pm+pt Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c v/s Ratio Perm c c.46.2 v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service D C C D B B C Approach Delay (s) Approach LOS D C B C HCM Average Control Delay 22.8 HCM Level of Service C HCM Volume to Capacity ratio.82 Actuated Cycle Length (s) 95.8 Sum of lost time (s) 9.3 Intersection Capacity Utilization 87.1% ICU Level of Service E c Critical Lane Group Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page 8

106 Movement EBL EBT WBT WBR SBL SBR Volume (veh/h) Sign Control Free Free Stop Grade % % % Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 SB 1 Volume Total Volume Left Volume Right 15 csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS A B Approach Delay (s) Approach LOS B Average Delay 7.9 Intersection Capacity Utilization 31.2% ICU Level of Service A Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON Synchro 7 - Report Trans-Plan Page Movement EB EB WB NB NB NB SB SB SB Directions Served L TR LR L T TR L T TR Maximum Queue (m) Average Queue (m) th Queue (m) Link Distance (m) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (m) Storage Blk Time (%) 1 2 Queuing Penalty (veh) 1 1 Movement EB EB WB NB NB NB SB SB SB Directions Served LT R LTR L T TR L T TR Maximum Queue (m) Average Queue (m) th Queue (m) Link Distance (m) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (m) Storage Blk Time (%) 6 Queuing Penalty (veh) Movement WB Directions Served R Maximum Queue (m) 15. Average Queue (m) th Queue (m) 13.5 Link Distance (m) 72.5 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (m) Storage Blk Time (%) Queuing Penalty (veh) Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON SimTraffic Report Trans-Plan Page 1

107 Movement WB SB Directions Served R L Maximum Queue (m) Average Queue (m) th Queue (m) Link Distance (m) 47.5 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (m) 61. Storage Blk Time (%) Queuing Penalty (veh) Movement EB EB WB NB NB NB SB SB SB Directions Served LT R LTR L T TR L T TR Maximum Queue (m) Average Queue (m) th Queue (m) Link Distance (m) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (m) Storage Blk Time (%) Queuing Penalty (veh) Movement SB Directions Served LR Maximum Queue (m) 16.6 Average Queue (m) th Queue (m) 13.9 Link Distance (m) 33.9 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (m) Storage Blk Time (%) Queuing Penalty (veh) Network wide Queuing Penalty: 134 Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON SimTraffic Report Trans-Plan Page Movement EB EB WB NB NB NB SB SB Directions Served L TR LR L T TR T TR Maximum Queue (m) Average Queue (m) th Queue (m) Link Distance (m) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (m) Storage Blk Time (%) Queuing Penalty (veh) Movement EB EB WB NB NB NB SB SB SB Directions Served LT R LTR L T TR L T TR Maximum Queue (m) Average Queue (m) th Queue (m) Link Distance (m) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (m) Storage Blk Time (%) Queuing Penalty (veh) Movement WB Directions Served R Maximum Queue (m) 9.2 Average Queue (m) th Queue (m) 12.1 Link Distance (m) 72.5 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (m) Storage Blk Time (%) Queuing Penalty (veh) Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON SimTraffic Report Trans-Plan Page 1

108 Movement WB NB SB Directions Served R R L Maximum Queue (m) Average Queue (m) th Queue (m) Link Distance (m) 47.3 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (m) Storage Blk Time (%) Queuing Penalty (veh) Movement EB EB WB NB NB NB SB SB Directions Served LT R LTR L T TR T TR Maximum Queue (m) Average Queue (m) th Queue (m) Link Distance (m) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (m) 33. Storage Blk Time (%) Queuing Penalty (veh) 11 6 Movement EB SB Directions Served LT LR Maximum Queue (m) Average Queue (m) th Queue (m) Link Distance (m) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (m) Storage Blk Time (%) Queuing Penalty (veh) Network wide Queuing Penalty: 18 Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON SimTraffic Report Trans-Plan Page Movement EB EB WB NB NB NB SB SB Directions Served L TR LR L T TR T TR Maximum Queue (m) Average Queue (m) th Queue (m) Link Distance (m) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (m) Storage Blk Time (%) 1 1 Queuing Penalty (veh) 1 3 Movement EB EB WB NB NB NB SB SB SB Directions Served LT R LTR L T TR L T TR Maximum Queue (m) Average Queue (m) th Queue (m) Link Distance (m) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (m) Storage Blk Time (%) Queuing Penalty (veh) Movement WB Directions Served R Maximum Queue (m) 34.4 Average Queue (m) th Queue (m) 27.8 Link Distance (m) 72.5 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (m) Storage Blk Time (%) Queuing Penalty (veh) Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON SimTraffic Report Trans-Plan Page 1

109 Movement WB NB SB Directions Served R R L Maximum Queue (m) Average Queue (m) th Queue (m) Link Distance (m) 45.5 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (m) Storage Blk Time (%) Queuing Penalty (veh) 1 Movement EB EB WB NB NB NB SB SB SB Directions Served LT R LTR L T TR L T TR Maximum Queue (m) Average Queue (m) th Queue (m) Link Distance (m) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (m) Storage Blk Time (%) Queuing Penalty (veh) Movement SB Directions Served LR Maximum Queue (m) 36. Average Queue (m) th Queue (m) 24.6 Link Distance (m) 31.4 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (m) Storage Blk Time (%) Queuing Penalty (veh) Network wide Queuing Penalty: 145 Proposed Addition to Pickering Islamic Centre, 265 Brock Road, Pickering, ON SimTraffic Report Trans-Plan Page 2

110 APPENDIX E Level of Service Definitions

111

112

113 APPENDIX F City of Pickering Zoning By-law Parking Requirements Excerpts & Parking Survey Results

114

115 Parking Demand Survey Location: Pickering Islamic Centre Date and Day of Week: Friday March 24, 217 Start and End Times: 7:3am-8:45am, 12:3pm-2:15pm & 2:45pm-3:45pm Parking Supply: 62 spaces Weather: Light Showers, 11 C Surveyors: Tyrone D. & Paulo I. :15 Peak Interval - Time Parking Demand Parking Demand at Parking Demand at Parking Demand at Parking at Lot at Site Usman Road Neighbourhood Park Adjacent to Centre Total 7:45 AM 5 5 8: AM 5 5 8:15 AM 9 9 8:3 AM 1 1 8:45 AM :3 PM :45 PM : PM :15 PM :3 PM :45 PM : PM :15 PM :45 PM : PM :15 PM :3 PM :45 PM 7 1 8

116 APPENDIX G Transportation Demand Management Plan Documents

117

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: 1649362 Ontario Inc. c/o Manor Park Management 231 Brittany Drive, Suite D Ottawa ON K1K 0R8 July

More information

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY DECEMBER 2012 READ, VOORHEES & ASSOCIATES TORONTO, ONTARIO Read, Voorhees & Associates

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study. Trillium Housing Oak Non-Profit Corp.

William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study. Trillium Housing Oak Non-Profit Corp. William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study Trillium Housing Oak Non-Profit Corp. R.J. Burnside & Associates Limited 1465 Pickering Parkway Suite 2 Pickering ON L1V 7G7

More information

BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited.

BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited. BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: 2534189 Ontario Limited April 6, 2018 117-668 TIA Report_2.doc D. J. Halpenny & Associates

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

Traffic Study North Shore School District 112

Traffic Study North Shore School District 112 Traffic Study North Shore School District 112 Proposed Expansion of Northwood Junior High School Prepared By: May 1, 2015 1. Introduction Kenig, Lindgren, O Hara, Aboona, Inc. (KLOA, Inc.) has been retained

More information

AMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning

AMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning AMEC Earth and Environmental Bovaird Drive Environmental Assessment Traffic Study Final Report August Excellence in Transportation Planning AMEC Earth and Environmental Bovaird Drive Class EA Traffic

More information

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: Orleans Gardens Shopping Centre Inc. 2851 John Street, Suite 1 Markham, ON K3R 5R7

More information

Corporation of the Town of Oakville. December 16, 2013

Corporation of the Town of Oakville. December 16, 2013 Corporation of the Town of Oakville Transportation Impact Analysis and Parking Study for Proposed Secondary School, Oakville Draft Final Report Submitted by: HDR Corporation 100 York Boulevard, Suite 300

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Fieldgate. Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton

Fieldgate. Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton Fieldgate Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton September 214 September 23 214 Ms Debbie Pacchiarotti Our

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

TRANSPORTATION IMPACT STUDY

TRANSPORTATION IMPACT STUDY Dundas MEP Developments Inc. City of Toronto 219 and 231 Dundas Street East, Proposed Mixed-Use Development TRANSPORTATION IMPACT STUDY 9782/2 April 216 LEA Consulting Ltd. Consulting Engineers & Planners

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Ajax. Ajax Downs. Proposed Ajax Downs Expansion Transportation Assessment Town of Ajax

Ajax. Ajax Downs. Proposed Ajax Downs Expansion Transportation Assessment Town of Ajax Ajax Ajax Downs Proposed Ajax Downs Expansion Transportation Assessment Town of Ajax 2821628 (13281) March 2015 March 19, 2015 Mr Andrew Picov Ajax Downs 50 Alexander s Crossing Ajax ON L1Z 2E6 Dear Mr

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

Gene Dillon Elementary School Traffic Study Division Street Site

Gene Dillon Elementary School Traffic Study Division Street Site To: From: Dr. James Hess, Superintendent Jordan Schwarze, PE, Senior Engineer Matt Pacyna, PE, Senior Associate Date: March 30, 2016 Subject: Gene Dillon Elementary School Traffic Study reet Site Memorandum

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited 2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief Paradigm Transportation Solutions Limited March 217 March 217 Project: 1627 Diana Vlasic, M.C.I.P., R.P.P Metropolitan Consulting 445 Paletta

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

May 5, 2009 File:

May 5, 2009 File: MMM Group Limited Suite 600 1455 West Georgia Street Vancouver, BC V6G 2T3 t: 604-685-9381 f: 604-683-8655 www.mmm.ca May 5, 2009 File: 50-09001-007 1420 1055 West Hastings Street Vancouver, BC V6E 2E9

More information

3.2.2 Proposed Road Network within Phase 1B Lands

3.2.2 Proposed Road Network within Phase 1B Lands 3.2.2 Proposed Road Network within Phase 1B Lands Figure 3.1 also shows the proposed road network within the Premier Gateway Phase 1B Employment Area lands, which features two collector roads providing

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

TRAFFIC MANAGEMENT PLAN

TRAFFIC MANAGEMENT PLAN April 19, 018 PK# 415-17.387 TRAFFIC MANAGEMENT PLAN Project: In Dallas, Texas Prepared for: City of Dallas On behalf of: Dallas Independent School District Prepared by: Hunter W. Lemley, P.E. 7557 Rambler

More information

CPC Parking Lot Riverside Drive. Transportation Brief

CPC Parking Lot Riverside Drive. Transportation Brief CPC Parking Lot 2785 Riverside Drive Transportation Brief Prepared By: NOVATECH Suite 2, 24 Michael Cowpland Drive Ottawa, Ontario K2M P6 7 / 5 / 25 Novatech File: 49 Ref: R-25-22 July 5 th, 25 City of

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

Road Conversion Study Plumas Street

Road Conversion Study Plumas Street Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education

More information

List of Exhibits...ii

List of Exhibits...ii One Brickell Traffic Study TABLE OF CONTENTS List of Exhibits...ii EXECUTIVE SUMMARY...1 1. INTRODUCTION...2 1.1 Study Area...2 1.2 Study Objective...5 2. EXISTING TRAFFIC CONDITIONS...6 2.1 Data Collection...6

More information

Troutbeck Farm Development

Troutbeck Farm Development Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com

More information

Marina Loft (DRC 51-R-12)

Marina Loft (DRC 51-R-12) Marina Loft (DRC 51-R-12) traffic study prepared for: Cymbal Development OCtober 2012 Traf Tech October 1, 2012 Mr. Asi Cymbal - President Cymbal Development 3470 North Miami Avenue Upper Suite Miami,

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

Glebe Parking Garage 170 Second Avenue, Ottawa, Ontario Transportation Impact Study

Glebe Parking Garage 170 Second Avenue, Ottawa, Ontario Transportation Impact Study Glebe Parking Garage 17 Second Avenue, Ottawa, Ontario Transportation Impact Study C i t y o f O t t a w a S e p t e m b e r 2 13 www.genivar.com GENIVAR 2611 Queensview Drive, Suite 3 Ottawa, Ontario

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY 675 Millcreek Drive, Unit 1 Mississauga, Ontario L5N 5M4 T: 416.213.7121 F: 95.89.8499 www.transtech.co TRAFFIC IMPACT STUDY PROPOSED MOSQUE DEVELOPMENT 4269 REGIONAL ROAD 25 TOWN OF OAKVILLE PREPARED

More information

Joe Rocca P.Eng., Traffic and Asset Management Supervisor. Review for Proposed Kingsway Sports and Entertainment Complex, City of Greater Sudbury

Joe Rocca P.Eng., Traffic and Asset Management Supervisor. Review for Proposed Kingsway Sports and Entertainment Complex, City of Greater Sudbury LETTER REPORT TO: Joe Rocca P.Eng., Traffic and Asset Management Supervisor FROM: Brett Sears and Ubaid Ali, WSP SUBJECT: Review for Proposed Kingsway Sports and Entertainment Complex, City of Greater

More information

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for oad & Traffic Management Road & Traffic Management R Atlantic Traffic Engineering Specialists Draft Report Traffic Impact Study Superstore, Wal-Mart, and Kent Development Yarmouth, Nova Scotia Prepared

More information

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina Prepared for Longbranch Development Prepared by January 13, 219 ii Table of Contents Subject Page Signature Page... i Table of Contents...

More information

84-88 Columbia Street West Waterloo, Ontario Transportation Impact Study. Paradigm Transportation Solutions Limited

84-88 Columbia Street West Waterloo, Ontario Transportation Impact Study. Paradigm Transportation Solutions Limited 84-88 Columbia Street West Waterloo, Ontario Transportation Impact Study Paradigm Transportation Solutions Limited June 217 Project Summary Project Number 15255 June 217 Client Masri O Inc. Architects

More information

Onni Group of Companies TRANSPORTATION STUDY FOR THE PROPOSED DEVELOPMENT AT 13 TH STREET/LONSDALE, CITY OF NORTH VANCOUVER, BC FINAL REPORT

Onni Group of Companies TRANSPORTATION STUDY FOR THE PROPOSED DEVELOPMENT AT 13 TH STREET/LONSDALE, CITY OF NORTH VANCOUVER, BC FINAL REPORT Onni Group of Companies TRANSPORTATION STUDY FOR THE PROPOSED DEVELOENT AT 13 TH STREET/LONSDALE, CITY OF NORTH VANCOUVER, BC FINAL REPORT OCTOBER 10, 2012 Onni Group of Companies DOCUMENT CONTROL Client:

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc. Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6

More information

Traffic Control Signals Review 4325 McCowan Road

Traffic Control Signals Review 4325 McCowan Road REPORT FOR ACTION Traffic Control Signals Review 4325 McCowan Road Date: March 15, 2018 To: Scarborough Community Council From: Director, Transportation Services, Scarborough District Wards: Ward 41 Scarborough

More information

2. Existing Conditions

2. Existing Conditions 2. Existing Conditions The existing traffic and parking conditions on the site and the surrounding area were reviewed based on the study methodology in Section 1.2. 2.1 Existing Land Use The portion of

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Lake Whitney Elementary School

Lake Whitney Elementary School Lake Whitney Elementary School SCHOOL ROUTE PLAN For LAKE WHITNEY ELEMENTARY SCHOOL LOCATION 18 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

TRAFFIC MANAGEMENT PLAN

TRAFFIC MANAGEMENT PLAN May 4, 018 PK# 415-17.387 Z 178-150 TRAFFIC MANAGEMENT PLAN Project: In Dallas, Texas Prepared for: City of Dallas On behalf of: Dallas Independent School District Prepared by: Hunter W. Lemley, P.E. 7557

More information

Chapter 16: Traffic and Parking A. INTRODUCTION

Chapter 16: Traffic and Parking A. INTRODUCTION Chapter 6: Traffic and Parking A. ITRODUCTIO This chapter examines the potential traffic and parking impacts of the proposed Fresh Kills Park roads. The analysis of transit and pedestrians is presented

More information

Operational Comparison of Transit Signal Priority Strategies

Operational Comparison of Transit Signal Priority Strategies Operational Comparison of Transit Signal Priority Strategies Revision Submitted on: November, 0 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 0 South Orange Avenue, Suite 00 Orlando,

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

Atlanta Braves Stadium and Mixed- Use Development

Atlanta Braves Stadium and Mixed- Use Development Transportation Analysis Atlanta Braves Stadium and Mixed- Use Development DRI #2381 Cobb County, Georgia Prepared for: BRED Co., LLC Prepared by: Kimley-Horn and Associates, Inc. 817 West Peachtree Street

More information

3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION

3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION Report No. 8 of the Transportation Services Committee Regional Council Meeting of October 20, 2011 3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION The Transportation Services Committee recommends:

More information

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012 Update for the May 31 st, 2012 Traffic Impact Study Prepared for Broccolini Construction 111-23596-00 September 20 th, 2012 2611 Queensview Drive, Suite 300, Ottawa, Ontario CANADA K2B 8K2 Telephone: 613-829-2800

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. 1.0 EXECUTIVE SUMMARY King Soopers #116, a grocery marketplace anchored commercial development, is proposed

More information

PROPOSED RESIDENTIAL DEVELOPMENT. Transportation Impact Study Update Highway 2 CLARINGTON, ONTARIO. May, 2017 Project No: NT

PROPOSED RESIDENTIAL DEVELOPMENT. Transportation Impact Study Update Highway 2 CLARINGTON, ONTARIO. May, 2017 Project No: NT Consulting Engineers A Division of NextEng Consulting Group Inc. Transportation Planning Traffic Impact Assessment Parking Assessment Site Access Design & Review Site Servicing and Grading Stormwater Management

More information

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 ACCESSIBILITY Under the Accessibility Standards 2015 for Customer

More information

Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) Final Report

Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) Final Report Consultant Services for Updating Intersections Operations to Accommodate Bi-Directional Cycle Tracks Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) January 30, 2014 Consultant

More information

Enclosure 1. Crimson Drive Traffic Safety and Calming Review Report

Enclosure 1. Crimson Drive Traffic Safety and Calming Review Report Enclosure 1 Crimson Drive Traffic Safety and Calming Review Report Prepared by: Tahir Hameed, P.Eng. Traffic Safety Engineer Planning Engineering and Safety Transportation Planning and Engineering Date:

More information

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748 City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License

More information

December TRANSPORTATION BRIEF 1-19 Beechwood Avenue, Ottawa, ON TRANSPORTATION INFORMATION TE WATER

December TRANSPORTATION BRIEF 1-19 Beechwood Avenue, Ottawa, ON TRANSPORTATION INFORMATION TE WATER December 2012 TRANSPORTATION BRIEF 1-19 Beechwood Avenue, Ottawa, ON TRANSPORTATION INFORMATION TE WATER 1-19 Beechwood Avenue Mixed Use Development Transportation Brief prepared for: Minto Communities

More information

3.9 - Transportation and Traffic

3.9 - Transportation and Traffic Transportation and Traffic 3.9 - Transportation and Traffic This section describes the potential transportation and traffic effects of project implementation on the project site and its surrounding area.

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

South Street Campus Lands Development. City of London TRANSPORTATION IMPACT ASSESSMENT

South Street Campus Lands Development. City of London TRANSPORTATION IMPACT ASSESSMENT South Street Campus Lands Development City of London TRANSPORTATION IMPACT ASSESSMENT TW1387 South Street Campus Lands Development City of London TRANSPORTATION IMPACT ASSESSMENT May 2013 South Street

More information

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine Draft Study STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine SUBMITTED TO: BANGOR AREA COMPREHENSIVE TRANSPORTATION SYSTEM SUBMITTED BY: I MAY 23, 2017 DRAFT STILLWATER AVENUE STUDY FINAL REPORT Table

More information

Mission Street Medical Office Development

Mission Street Medical Office Development reet Medical Office Development Traffic Impact Analysis Prepared for: Palo Alto Medical Foundation February 23, 2012 Hexagon Office: 7888 Wren Avenue, Suite B121 Gilroy, CA 95020 Hexagon Job Number: 11RD11

More information

TRAFFIC MANAGEMENT PLAN

TRAFFIC MANAGEMENT PLAN 292 84 140440 TRAFFIC MANAGEMENT PLAN The purpose of the Traffic Management Plan (TMP) is to have established procedures for traffic flow and circulation around the elementary school related to student

More information

350 SPARKS STREET, OTTAWA HOTEL AND RESIDENTIAL DEVELOPMENT. Transportation Study. Prepared For: Morguard Real Estate Investment Trust.

350 SPARKS STREET, OTTAWA HOTEL AND RESIDENTIAL DEVELOPMENT. Transportation Study. Prepared For: Morguard Real Estate Investment Trust. SPARKS STREET, OTTAWA HOTEL AND RESIDENTIAL DEVELOPMENT Transportation Study Prepared For: Morguard Real Estate Investment Trust June, BA Consulting Group Ltd. St. Clair Avenue West, Suite Toronto, ON

More information

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT

TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT Prepared by Orth-Rodgers & Associates, Inc. December 14, 2009 Updated November 9, 2010 230 South Broad Street Philadelphia

More information

10.0 CURB EXTENSIONS GUIDELINE

10.0 CURB EXTENSIONS GUIDELINE 10.0 CURB EXTENSIONS GUIDELINE Road Engineering Design Guidelines Version 1.0 March 2017 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services

More information

December 4, Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA Attn: Kathy Marshall. Dear Board Members:

December 4, Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA Attn: Kathy Marshall. Dear Board Members: December 4, 28 Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA 86 Attn: Kathy Marshall RE: RAMSHEAD MERRIMAC, MA Dear Board Members: Bayside Engineering, Inc. has received the MDM Transportation

More information

Low Level Road Improvements Traffic Analysis. Report

Low Level Road Improvements Traffic Analysis. Report Low Level Road Improvements Traffic Analysis Report June, 22 Table of Contents. INTRODUCTION.... LOW LEVEL ROAD PROJECT....2 STUDY AREA....2. West-End Corridor Improvements... 2.2.2 East-End Corridor Improvements...

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information