William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study. Trillium Housing Oak Non-Profit Corp.

Size: px
Start display at page:

Download "William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study. Trillium Housing Oak Non-Profit Corp."

Transcription

1 William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study Trillium Housing Oak Non-Profit Corp. R.J. Burnside & Associates Limited 1465 Pickering Parkway Suite 2 Pickering ON L1V 7G7 CANADA June

2 Trillium Housing Oak Non-Profit Corp. i William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June 218 R.J. Burnside & Associates Limited Report Prepared By: Report Reviewed By: Benedict Wong, EIT Transportation Planner BW:cv David Angelakis, C.E.T. Senior Project Manager Transportation R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

3 Trillium Housing Oak Non-Profit Corp. ii William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June 218 Executive Summary Trillium Housing and VanMar Constructors are co-developers of a new residential community in Pickering located in the developing Duffin Heights neighbourhood. The new community is planned to complement adjacent residential uses and natural areas through low-rise medium-density development. In order to facilitate this development, the development corporation, Trillium Housing Oak Non-Profit Corporation, is requesting an Official Plan and Zoning By-Law Amendment from the City of Pickering (the City). R.J. Burnside & Associates Limited (Burnside) was retained by Trillium Housing Oak Non-Profit Corp. (the Client) to undertake a Transportation Study for the proposed development to be located at the intersection of William Jackson Drive and Earl Grey Avenue. The development will consist of 264 units in thirteen 3-storey stacked back-to-back townhouse blocks planned around a publicly-accessible private street and pedestrian walkways. In order to promote walkability and reduce impacts on the natural environment, the majority of parking is located underground (45 spaces) with an additional 16 surface parking spaces located above ground. A central driveway provides access to the underground parking garage at the centre of the site and provides fire department access to all units. The development proposes approximately.17 hectares of parks and open space consisting of two outdoor amenity areas located centrally and along the eastern edge of the site and an approximately 9 square metre park to be dedicated to the City at the southern reaches of the site. Additional outdoor amenity space is provided to residents through front yards and rooftop areas. Access is proposed along William Jackson Drive via a driveway across from Rex Heath Drive and a second driveway on the south side of the site. Existing and Future Road Network Operations Under existing, background and total conditions, during the morning and afternoon peak hours, all study intersections are operating and will continue to operate with excess capacity and a level of service D or better. Delivery / Refuse Pickup Vehicle Access An AutoTurn analysis confirms that refuse/delivery trucks can access the proposed loading area via the proposed driveways. TDM The site is well designed to provide access by pedestrians and cyclists to area sidewalks, bike routes and transit, thus encouraging choices in modes of travel. Bike R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

4 Trillium Housing Oak Non-Profit Corp. iii William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June 218 spaces will be provided for visitors and residents based on City requirements. Durham Region Transit (DRT) operates two bus routes that are accessible within a 4-minute walk of the site. DRT is also planning for future bus rapid transit along Brock Road. In addition, Metrolinx is planning a GO station along a new Havelock Line at Brock Road that would be an approximate 7-minute walk from the site. There is also an existing multi-use path on the east side of William Jackson along the frontage of the site. Parking/Loading Review The proposed supply of vehicular parking, bicycle parking and loading space will comply with City requirements and meet future demand. R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

5 Trillium Housing Oak Non-Profit Corp. iv William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June 218 Table of Contents 1. Introduction Scope of Work Intersection Analysis Methodology Existing Conditions Site Context Existing Road Network Transit Services Existing Traffic Volumes Future Background Conditions Background Traffic Growth Background Developments Future Background Traffic Volumes Proposed Development Trip Generation Trip Distribution and Assignment Total Traffic Conditions Total Traffic Volumes Traffic Operations Analysis Existing Traffic Operations Future Traffic Operations Queuing Review Delivery / Refuse Vehicle Access Review Transportation Demand Management Pedestrian Accommodation Cyclist Accommodation Transit Parking and Loading Spaces Vehicle Parking Requirements Residents Visitors Accessible Bicycle Parking Requirements Loading/Refuse Space Requirements Conclusions R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

6 Trillium Housing Oak Non-Profit Corp. v William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June 218 Tables Table 1: Site Trips Table 2: Trip Distribution Table 3: Existing Brock Rd. & Zents Dr. / Rex Heath Dr. Intersection Operations Table 4: Existing William Jackson Dr. & Rex Heath Dr. Intersection Operations Table 5: Existing and Future Brock Road & Zents Drive / Rex Heath Drive Intersection Operations Table 6: Existing and Future Unsignalized Intersection Operations Figures Figure 1: Site Location... 1 Figure 2: Existing Road Network... 5 Figure 3: Durham Region Transit Routes... 6 Figure 4: Existing Traffic Volumes... 7 Figure 5: 224 Background Traffic Volumes... 9 Figure 6: Proposed Site Plan... 1 Figure 7: Site Traffic Volumes Figure 8: 224 Total Traffic Volumes Appendices Appendix A Existing Traffic Counts and Signal Timing Plan Appendix B Background Development Site Traffic Volumes Appendix C Existing Traffic Operations Appendix D 224 Background Traffic Operations Appendix E 224 Total Traffic Operations Appendix F Queue Analysis Appendix G Autoturn Analysis Appendix H Zoning By-Law Excerpts Appendix I Traffic & Parking By-Law Excerpts R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

7 Trillium Housing Oak Non-Profit Corp. vi William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June 218 Disclaimer Other than by the addressee, copying or distribution of this document, in whole or in part, is not permitted without the express written consent of R.J. Burnside & Associates Limited. In the preparation of the various instruments of service contained herein, R.J. Burnside & Associates Limited was required to use and rely upon various sources of information (including but not limited to: reports, data, drawings, observations) produced by parties other than R.J. Burnside & Associates Limited. For its part R.J. Burnside & Associates Limited has proceeded based on the belief that the third party/parties in question produced this documentation using accepted industry standards and best practices and that all information was therefore accurate, correct and free of errors at the time of consultation. As such, the comments, recommendations and materials presented in this instrument of service reflect our best judgment in light of the information available at the time of preparation. R.J. Burnside & Associates Limited, its employees, affiliates and subcontractors accept no liability for inaccuracies or errors in the instruments of service provided to the client, arising from deficiencies in the aforementioned third-party materials and documents. R.J. Burnside & Associates Limited makes no warranties, either express or implied, of merchantability and fitness of the documents and other instruments of service for any purpose other than that specified by the contract. R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

8 Trillium Housing Oak Non-Profit Corp. 1 William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June Introduction R.J. Burnside & Associates Limited (Burnside) was retained by Trillium Housing Oak Non-Profit Corp. (the Client) to undertake a Transportation Study for a proposed stacked townhouse development located in the southeast quadrant of William Jackson Drive and Earl Grey Avenue in the City of Pickering (City). Currently, the subject site is vacant. Official Plan and Zoning By-Law Amendment Applications are required and this report forms part of those applications. The location of the proposed development is shown in Figure 1. Figure 1: Site Location Based upon the concept plan by Kirkor Architects and Planners, dated June 4, 218, the proposed development will consist of 264 stacked townhomes. Access is proposed via two full movement driveways on William Jackson Drive. The north proposed driveway will be aligned with Rex Heath Drive. Parking for the proposed development will be provided by an underground parking garage with 45 parking spaces and a surface lot R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

9 Trillium Housing Oak Non-Profit Corp. 2 William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June 218 with 16 spaces. A total of 421 parking spaces will be supplied with 66 spaces for visitors and 355 spaces for residents. 2. Scope of Work The study scope of work summarized below was discussed and confirmed with Region of Durham (the Region) and City of Pickering (City) staff prior to conducting the study. Analysis Scenarios Existing traffic conditions 224 background traffic conditions 224 total traffic conditions (224 background traffic plus site traffic) Analysis Time Periods Weekday AM peak hour (7: 9: AM) Weekday PM peak hour (4: 6: PM) Analysis Intersections Brock Road / Zents Drive / Rex Heath Drive William Jackson Drive / Rex Heath Drive / Proposed North Driveway William Jackson Drive / Proposed South Driveway Parking Review Compliance with the City Zoning By-law for vehicular, accessible and bicycle parking requirements Transportation Demand Management (TDM) Provide recommendations on feasible TDM strategies to discourage single-occupancy vehicles 2.1 Intersection Analysis Methodology Intersection operations were assessed for intersections in the study area using the software program Synchro 9, which employs methodology from the Highway Capacity Manual (HCM2 and HCM 21), published by the Transportation Research Board National Research Council. Synchro 9 can analyze both signalized and unsignalized intersections in a road corridor or network taking into account the spacing, interaction, queues and operations between intersections. The analysis has utilized the HCM2 methodology. The signalized intersection analysis considers two separate measures of performance: The capacity of all intersection movements, which is based on a volume to capacity ratio that measure of the degree of capacity utilized. The level of service (LOS) for all intersection movements, which is based on the average control delay per vehicle for the various movements through the intersection and overall. Delay is an indicator of how long a vehicle must wait to complete a R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

10 Trillium Housing Oak Non-Profit Corp. 3 William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June 218 movement and is represented by a letter between A and F, with F being the longest delay. The link between LOS and delay (in seconds) for signalized intersections is summarized below. Level of Service Control Delay per Vehicle(s) A 1 B > 1 2 C > 2 35 D > E > 55 8 F > 8 The two-way unsignalized intersection analysis considers two separate measures of performance: The capacity of the intersection s critical movements, which is based on a volume to capacity ratio. The level of service for the critical movements, which is based on the average control delay per vehicle for the various critical movements within the intersection. The link between LOS and delay (in seconds) for unsignalized intersections is summarized below. 3. Existing Conditions 3.1 Site Context Level of Service Control Delay per Vehicle(s) A 1 B > 1 15 C > D > E > 35 5 F > 5 Currently, the subject site is vacant. To the north of the site is low to medium density residential homes, to the east is the Pickering Golf Club and to the south is a neighbourhood park. To the west of the site are proposed residentials developments currently under construction (see Section 4.2 for more details). The site is within the Duffin Heights Neighbourhood. R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

11 Trillium Housing Oak Non-Profit Corp. 4 William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June Existing Road Network The existing road network is described below and illustrated in Figure 2, including existing traffic control. Brock Road (Region Road #1) Brock Road is a north-south Type A arterial road under the jurisdiction of the Region. The roadway consists of a 4-lane urban cross section and has a posted speed limit of 7 km/h. Multi-use paths are provided on both sides of the road. William Jackson Drive William Jackson Drive is a north-south collector road within the study area. North and south of the study area, the roadway transitions into an east-west collector road. The road is under the jurisdiction of the City. The roadway has a 2-lane urban cross section and a posted speed limit of 4 km/h. A multi-use path is provided on the east side of the road with a sidewalk on the west side of the road. Zents Drive / Rex Heath Drive Zents Drive / Rex Heath Drive is an east-west collector road under the jurisdiction of the City. West of Brock Road, the roadway is called Zents Drive and continues east of Brock Road as Rex Heath Drive. The roadway consists of a 2-lane urban cross section and has a posted speed limit of 4 km/h. On Zents Drive, a sidewalk is provided on the south side of the road and a multi-use path is provided on the north side. On Rex Heath Drive, sidewalks are on the south side of the road. R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

12 Trillium Housing Oak Non-Profit Corp. 5 William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June 218 Figure 2: Existing Road Network 3.3 Transit Services Durham Region Transit (DRT) operates two bus routes within the vicinity of the area. Bus route #112 (Brock Road) operates 7 days a week from Pickering GO Station to Zents Drive / Rex Heath Drive / William Jackson. During the weekday morning and afternoon peak period, the bus provides 13 to 15-minute frequency service. The closest bus stop is located on the south side of Zents Drive, west of Brock Road, which is approximately 35 meters away (a 4-minute walk) from the site. Bus route #63 (Pickering to Uxbridge) operates Monday to Friday from Pickering GO Station to Uxbridge. These bus routes are shown in Figure 3. R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

13 Trillium Housing Oak Non-Profit Corp. 6 William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June 218 Figure 3: Durham Region Transit Routes DRT is planning for future bus rapid transit along Brock Road and Metrolinx is planning a GO station along a new Havelock Line at Brock Road that would be an approximate 7- minute walk from the site. 3.4 Existing Traffic Volumes Turning movement traffic counts were conducted by Accu-Traffic Inc. at study intersections, on behalf of Burnside, for the weekday morning (7: - 9: AM) and afternoon (4: - 6: PM) peak periods on Tuesday, May 1, 218. The weekday AM and PM peak hours were selected as these are the typical peak traffic periods for a residential development. Traffic operations were observed during both peak periods to note any problems or potential concerns, however no notable occurrences were observed. R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

14 Trillium Housing Oak Non-Profit Corp. 7 William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June 218 The existing traffic volumes are illustrated in Figure 4 and the traffic counts are provided in Appendix A. Figure 4: Existing Traffic Volumes 4. Future Background Conditions Future background traffic consists of existing traffic, background traffic growth and traffic from other developments. Background traffic growth and traffic from other developments are discussed below. The horizon year of 224 was selected for future projections. 4.1 Background Traffic Growth As recommended by Region staff, a growth rate of 2% compounded annually for all north-south through movements was applied on Brock Road. No growth was applied to any other movements as growth in the area is being driven primarily by other local development as noted below. 4.2 Background Developments Following consultation with City staff, five background developments were identified to be within the vicinity of the site and are anticipated to be built within the study horizon years as follows: R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

15 Trillium Housing Oak Non-Profit Corp. 8 William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June 218 Averton Located west of the subject site on William Jackson Drive. 176 condo-apartments and 235 townhouses. Total of 27 trips during the AM peak hour and 335 trips during the PM peak hour. The peak hour trips were based on the Duffin Heights Residential Subdivision Traffic Impact Study, by BA Group, dated June 213. Avonmore Ventures Located northwest of the subject site on William Jackson Drive. 178 townhouses. Total of 82 trips during the AM peak hour and 99 trips during the PM peak hour. The peak hour trips were based on the William Jackson Drive Traffic Impact Study, by TMIG, dated November 217. Brock Dersan Located southwest of Brock Road / Dersan Street. 176 condo-apartments and 235 townhouses. Total of 181 trips during the AM peak hour and 214 trips during the PM peak hour. The peak hour trips were based on the Brock Road and Dersan Street Residential Development Traffic Impact Study, by GHD, dated November 217. Madison Brock Located southwest of Brock Road / Dersan Street. 194 townhouses. Total of 6 trips during the AM peak hour and 7 trips during the PM peak hour. The peak hour trips were based on the Madison Brock Traffic Impact Study, by DevTrans Engineering Inc, dated June 217. Stonepay Lands Located southwest of Brock Road / Dersan Street. 759 townhouses. Total of 175 trips during the AM peak hour and 213 trips during the PM peak hour. The peak hour trips were based on the Stonepay Lands Duffin Heights Traffic Impact Study, by Candevcon Limited, dated March 217 The related background development site traffic figures are provided in Appendix B. R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

16 Trillium Housing Oak Non-Profit Corp. 9 William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June Future Background Traffic Volumes Background traffic volumes consist of the application of the growth per annum (up to the horizon year 224) to existing volumes as shown in Figure 4, along with the traffic from background developments. The resulting traffic volumes are illustrated in Figure 5. Figure 5: 224 Background Traffic Volumes 5. Proposed Development The proposed development will consist of 264 stacked townhomes. Site access is proposed along William Jackson Drive via a driveway across from Rex Heath Drive and a driveway on the south side of the site. Sixteen parking spaces will be provided on the surface and 45 parking spaces will be provided in an underground parking garage for a total of 421 parking spaces. There will be 355 parking spaces for residents and 66 parking spaces will be for visitors. The proposed site plan is shown in Figure 6. R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

17 Trillium Housing Oak Non-Profit Corp. 1 William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June 218 Figure 6: Proposed Site Plan R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

18 Trillium Housing Oak Non-Profit Corp. 11 William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June Trip Generation Trip generation for the proposed development was based upon information contained in the Trip Generation Manual, 9 th Edition, published by the Institute of Transportation Engineers. The Land Use Code (LUC) for Residential Condominium / Townhouses (23) was used in the generation of new trips, which are summarized in Table 1. A modal split of 1% was applied to account for active transportation and transit use as recommended by the Region. Table 1: Site Trips Weekday AM Trips Peak Hour Weekday PM Peak Hour In Out Total In Out Total Trip Rates Site Trips % Modal Split Total Trips The site was previously approved to be occupied by an elementary school. A typical elementary school has 6 students. Based on ITE LUC 52, a school would have generated 27 trips in the weekday AM peak hour and 9 trips in the PM peak hour. The current proposal is 169 trips less in the AM and only 3 trips more in the PM peak hours. 5.2 Trip Distribution and Assignment Trip distribution and assignment of site trips were based on existing travel patterns, the available road network and a review of the 216 Transportation Tomorrow Survey for the area. The estimated distribution of site trips is summarized in Table 2. Table 2: Trip Distribution To/From Via Distribution North Brock Road 4% North William Jackson Drive 5% South Brock Road 55% Total 1% The resulting site traffic assignment is shown in Figure 7. R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

19 Trillium Housing Oak Non-Profit Corp. 12 William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June 218 Figure 7: Site Traffic Volumes 6. Total Traffic Conditions 6.1 Total Traffic Volumes Total traffic volumes consist of the 224 background volumes shown in Figure 5 plus the site trips shown in Figure 7. The resulting traffic volumes are shown in Figure 8. R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

20 Trillium Housing Oak Non-Profit Corp. 13 William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June 218 Figure 8: 224 Total Traffic Volumes 7. Traffic Operations Analysis Traffic operations analyses were conducted for existing and future traffic volumes for the weekday AM and PM peak hours at all study intersections. 7.1 Existing Traffic Operations Existing traffic operations were assessed based on the existing road network as shown in Figure 2 and existing traffic volumes shown in Figure 4. Existing traffic operations, utilizing existing signal timings (as provided by the Region and contained in Appendix A), are shown in Table 3 for the signalized intersection of Brock Road and Zents Drive / Rex Heath Drive and Table 4 for the unsignalized intersection of William Jackson Drive and Rex Heath Drive. Detailed Synchro reports are provided in Appendix C. R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

21 Trillium Housing Oak Non-Profit Corp. 14 William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June 218 Table 3: Existing Brock Road & Zents Drive / Rex Heath Drive Intersection Operations Note: Movement Weekday AM Peak Hour Weekday PM Peak Hour v/c LOS v/c LOS Overall.38 A.38 A Eastbound Left.48 D.22 D Eastbound Through.2 D.1 D Eastbound Right.2 D.1 D Westbound Left.4 D.6 D Westbound Through-Right.3 D.6 D Northbound Left.3 A.2 A Northbound Through.26 A.38 A Northbound Right.1 A.1 A Southbound Left.2 A.5 A Southbound Through.37 A.26 A Southbound Right.2 A.2 A v/c volume to capacity, LOS level of service Under existing conditions, all movements at Brock Road and Zents Drive / Rex Heath Drive are operating with excess capacity and level of service D or better. Table 4: Existing William Jackson Dr. & Rex Heath Dr. Intersection Operations Movement Weekday AM Peak Hour Weekday PM Peak Hour v/c LOS v/c LOS Eastbound Left-Right.1 A.4 A Northbound Left-Through.2 A. A Under existing conditions, all movements at William Jackson Drive and Rex Heath Drive are operating with excess capacity and level of service A. 7.2 Future Traffic Operations Based on 224 background and total traffic volumes found in Figure 5 and Figure 8 respectively, signalized intersection operations were assessed and summarized in Table 5 and in Table 6 for unsignalized intersections. Detailed Synchro reports are provided in Appendix D for 224 background conditions and in Appendix E for 224 total conditions. Under existing conditions, there was a high percentage of trucks (heavy vehicles) at study intersections due to the many construction sites in the area. However, it is R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

22 Trillium Housing Oak Non-Profit Corp. 15 William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June 218 expected that truck volumes will decrease once development around the study area is completed. Regardless, for a more conservative analysis, the heavy vehicle percentages were not adjusted for future conditions. Under future conditions, all movements at Brock Road and Zents Drive / Rex Heath Drive will operate with excess capacity and level of service D or better. Under future conditions, all movements at unsignalized intersections will operate with excess capacity and level of service B or better. R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

23 Trillium Housing Oak Non-Profit Corp. 15 William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June 218 Table 5: Existing and Future Brock Road & Zents Drive / Rex Heath Drive Intersection Operations Note: Movement Weekday AM Peak Hour Weekday PM Peak Hour Existing Background Total Existing Background Total v/c LOS v/c LOS v/c LOS v/c LOS v/c LOS v/c LOS Overall.38 A.49 A.51 B.38 A.5 A.51 A Eastbound Left.48 D.25 C.22 C.22 D.11 C.1 C Eastbound Through.2 D.1 C.1 C.1 D.1 C. C Eastbound Right.2 D.2 C.2 C.1 D.1 C.1 C Westbound Left.4 D.55 D.61 D.6 D.5 D.56 D Westbound Through-Right.3 D.5 C.7 C.6 D.4 C.5 C Northbound Left.3 A.4 A.4 A.2 A.3 A.3 A Northbound Through.26 A.4 A.41 A.38 A.5 A.51 A Northbound Right.1 A.3 A.3 A.1 A.7 A.9 A Southbound Left.2 A.6 A.8 A.5 A.24 A.38 A Southbound Through.37 A.48 A.49 A.26 A.4 A.4 A Southbound Right.2 A.2 A.2 A.2 A.2 A.2 A 1. v/c - volume to capacity, LOS - level of service R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

24 Trillium Housing Oak Non-Profit Corp. 16 William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June 218 Table 6: Existing and Future Unsignalized Intersection Operations Intersection & Movement Weekday AM Peak Hour Weekday PM Peak Hour Existing Background Total Existing Background Total v/c LOS v/c LOS v/c LOS v/c LOS v/c LOS v/c LOS William Jackson Drive / Rex Heath Drive / Propose North Driveway Eastbound Left-Through-Right 2.1 A.3 A.6 B.4 A.8 A.18 B Westbound Left-Through-Right B B Northbound Left-Through-Right 3.2 A.2 A.2 A. A. A. A Southbound Left-Through-Right A A William Jackson Drive / Proposed South Driveway Westbound Left-Right A A Notes: 1. v/c - volume to capacity, LOS - level of service 2. Eastbound movement is Left-Right under existing conditions and will be Left-Through-Right under future conditions. 3. Northbound movement is Left-Through under existing conditions and will be Left-Through-Right under future conditions. 4. Southbound movement is Through-Right under existing conditions and will be Left-Through-Right under future conditions R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

25 Trillium Housing Oak Non-Profit Corp. 17 William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June Queuing Review There were no identified queuing concerns at any study intersections. Detailed queueing results are provided in Appendix F. 9. Delivery / Refuse Vehicle Access Review An analysis of access to the proposed loading/refuse pickup area was conducted for a Region of Durham refuse truck utilizing AutoTurn. The Region of Durham truck is larger than a typical delivery truck so represents the largest vehicle that would access the site. The analysis is provided in Appendix G and confirms that the proposed driveway geometrics to the loading/refuse areas will accommodate the expected design vehicle. 1. Transportation Demand Management 1.1 Pedestrian Accommodation The site is well designed to accommodate pedestrian access. Continuous pedestrian connections will be provided to the existing sidewalk on William Jackson Drive. 1.2 Cyclist Accommodation Bicycle storage will be provided in the garage. Cyclists can access the site via the two driveways to William Jackson Drive and which provides a multi-use path. 1.3 Transit As summarized in Section 2.3, there are currently two bus routes that serve the site. The nearest bus stops are located along Zents Drive near Brock Road, which is an approximate 3-4 minute walk. DRT is also planning for future bus rapid transit along Brock Road and Metrolinx is planning a GO station along a new Havelock Line at Brock Road that would be an approximate 7-minute walk from the site. 11. Parking and Loading Spaces Zoning By-Law 337, which applies to the Duffin Heights Neighbourhood, is a dated By-law for rural uses and does not provide vehicle parking, loading, or bicycle parking requirements for the proposed use. Therefore, other City Zoning By-laws in other areas of the City, which reflect contemporary standards for medium density housing types, were reviewed for this type of use, for these requirements. R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

26 Trillium Housing Oak Non-Profit Corp. 18 William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June Vehicle Parking Requirements Residents Pickering Town Centre Zoning By-Law 7553/17 and Seaton Zoning By-Law 7364/14 both require 1.25 resident spaces per unit for stacked townhouses. Excerpts from these by-laws are contained in Appendix H. Given that the Seaton area is comparable to the Duffin Heights area in relation to access to transit, it is our opinion that the same rates should apply. Applying this rate results in a required resident parking supply of 33 spaces. The proposed supply is 355 spaces, which would result in a surplus of 25 spaces Visitors Pickering Town Centre Zoning By-Law 7553/17 requires.15 visitor spaces per unit and Seaton Zoning By-Law 7364/14 requires.25 visitor spaces per unit for stacked townhouses. Excerpts from these by-laws are contained in Appendix H. As not above, given that the Seaton area is comparable to the Duffin Heights area in relation to access to transit, it is our opinion that the same rates should apply. In addition, City staff requested that the visitor parking supply be a minimum of.25 spaces per unit. Applying this rate results in a required visitor parking supply of 66 spaces. The proposed supply is 66 spaces Accessible City By-law 664/5 (the Traffic and Parking By-law) requires 1 Type A and 2 Type B accessible spaces for a visitor parking supply of spaces. Excerpts from the by-law are contained in Appendix I. According to the By-law, the required minimum number of accessible parking spaces for multi-unit residential developments is applied only to the visitor parking supply. Four Type A spaces are proposed. The minimum width of a Type A space is 3.4 m and the space must be signed as van accessible. Type B spaces have a minimum width of 2.4 m. Both accessible spaces must have a minimum length of 5.4 m. R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

27 Trillium Housing Oak Non-Profit Corp. 19 William Jackson Drive & Earl Grey Avenue, Pickering, ON Transportation Study June Bicycle Parking Requirements Pickering City Centre Zoning By-law 7553/17 was the only by-law found in the City to contain bicycle parking requirements for townhouses, which requires a minimum 1 space per dwelling unit. The By-law does not provide a split between resident and visitor spaces. It is our opinion that this By-law applies to a downtown area that is not comparable to the subject site s area, which is suburban. It is recommended that the rates used in the City of Toronto for suburban areas of the City, apply to this site. City of Toronto Zoning By-law requires.68 bicycle spaces for residents and.7 spaces for visitors for that area of the City north of Lawrence Avenue. This results in a requirement of 18 spaces for residents and 18 spaces for visitors for a total of 198 spaces. The proposed bicycle parking supply is 246 spaces for residents and 18 spaces for visitors for a total of 264 spaces Loading/Refuse Space Requirements There does not appear to be loading or refuse space minimums in any City Zoning Bylaws. However, it is our opinion that the one proposed combined loading/refuse space will adequately serve the development. However, Seaton Zoning By-law 7553/17 has a loading space minimum required width of 3.5 m, minimum length of 9. m, and minimum vertical clearance of 4.2 m. It is our opinion that these dimensions would be appropriate for this development. The site plan complies with these dimensions. 12. Conclusions Under existing, background and total conditions, during the morning and afternoon peak hours, all study intersections are operating and will operate with excess capacity and a level of service D or better. An Auto Turn analysis confirms that refuse and delivery trucks can access the proposed loading/refuse space via the proposed driveways. The proposed vehicular and bicycle parking supply and loading space will meet future demand and the operational requirements of the site, respectively. The site is well designed to provide access by pedestrians and cyclists to area sidewalks, a multi-use path on William Jackson, bike routes and transit, thus encouraging choices in modes of travel. R.J. Burnside & Associates Limited _Report_265 William Jackson Transportation Study.docx

28 Appendix A Appendix A Existing Traffic Counts and Signal Timing Plan

29 Accu-Traffic Inc. Morning Peak Diagram Specified Period From: 7:: To: 9:: One Hour Peak From: 7:3: To: 8:3: Municipality: Site #: Intersection: TFR File #: Count date: Pickering Brock Rd & Zents Dr 1 1-May-18 Weather conditions: Person counted: Person prepared: Person checked: ** Signalized Intersection ** Major Road: Brock Rd runs N/S North Leg Total: 1673 Heavys Heavys 6 East Leg Total: 6 North Entering: 962 Trucks Trucks 21 East Entering: 41 North Peds: Cars Cars 63 East Peds: Peds Cross: Totals Totals 711 Peds Cross: Heavys Trucks Cars Totals Zents Dr Heavys Trucks Cars Totals Brock Rd N W E S Brock Rd Cars Trucks Heavys Totals Rex Heath Dr Cars Trucks Heavys Totals Peds Cross: Cars 869 Cars Peds Cross: West Peds: Trucks 21 Trucks South Peds: 1 West Entering: 65 Heavys 69 Heavys South Entering: 651 West Leg Total: 95 Totals 959 Totals South Leg Total: 161 Comments

30 Accu-Traffic Inc. Afternoon Peak Diagram Specified Period From: 16:: To: 18:: One Hour Peak From: 16:3: To: 17:3: Municipality: Site #: Intersection: TFR File #: Count date: Pickering Brock Rd & Zents Dr 1 1-May-18 Weather conditions: Person counted: Person prepared: Person checked: ** Signalized Intersection ** Major Road: Brock Rd runs N/S North Leg Total: 1745 Heavys Heavys 33 East Leg Total: 48 North Entering: 727 Trucks Trucks 11 East Entering: 2 North Peds: Cars Cars 974 East Peds: Peds Cross: Totals Totals 118 Peds Cross: Heavys Trucks Cars Totals Zents Dr Heavys Trucks Cars Totals Brock Rd N W E S Brock Rd Cars Trucks Heavys Totals Rex Heath Dr Cars Trucks Heavys Totals Peds Cross: Cars 643 Cars Peds Cross: West Peds: Trucks 15 Trucks South Peds: 1 West Entering: 25 Heavys 27 Heavys South Entering: 111 West Leg Total: 77 Totals 685 Totals South Leg Total: 1696 Comments

31 Total Count Diagram Accu-Traffic Inc. Municipality: Site #: Intersection: TFR File #: Count date: Pickering Brock Rd & Zents Dr 1 1-May-18 Weather conditions: Person counted: Person prepared: Person checked: ** Signalized Intersection ** Major Road: Brock Rd runs N/S North Leg Total: 6436 Heavys Heavys 26 East Leg Total: 21 North Entering: 3162 Trucks Trucks 6 East Entering: 12 North Peds: Cars Cars 38 East Peds: 1 Peds Cross: Totals Totals 3274 Peds Cross: Heavys Trucks Cars Totals Zents Dr Heavys Trucks Cars Totals Brock Rd N W E S Brock Rd Cars Trucks Heavys Totals Rex Heath Dr Cars Trucks Heavys Totals Peds Cross: Cars 2779 Cars Peds Cross: West Peds: 1 Trucks 67 Trucks South Peds: 3 West Entering: 174 Heavys 195 Heavys South Entering: 3157 West Leg Total: 346 Totals 341 Totals South Leg Total: 6198 Comments

32 Accu-Traffic Inc. Traffic Count Summary Intersection: Count Date: Municipality: Brock Rd & Zents Dr 1-May-18 Pickering North Approach Totals South Approach Totals North/South Hour Includes Cars, Trucks, & Heavys Total Hour Includes Cars, Trucks, & Heavys Total Ending Peds Approaches Ending Grand Total Left Thru Right Left Thru Right 7:: 7:: 8:: :: :: :: :: 16:: 17:: :: :: :: Grand Total Total Peds Totals: Hour Ending S Totals: East Approach Totals West Approach Totals East/West Includes Cars, Trucks, & Heavys Total Hour Includes Cars, Trucks, & Heavys Total Total Peds Approaches Ending Peds Grand Total Left Thru Right Left Thru Right 7:: 7:: 8:: :: :: :: :: 16:: 17:: :: :: :: Grand Total Totals: W Totals: Calculated Values for Traffic Crossing Major Street Hours Ending: Crossing Values: 7: 8: 49 9: 41 16: 17: 37 18: 18 : :

33 Count Date: 1-May-18 Site #: Interval Time Accu-Traffic Inc. Passenger Cars - North Approach Trucks - North Approach Heavys - North Approach Pedestrians Left Thru Right Left Thru Right Left Thru Right North Cross Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr 7:: 7:15: :3: :45: :: :15: :3: :45: :: :15: :: :15: :3: :45: :: :15: :3: :45: :: :15: :15:

34 Count Date: 1-May-18 Site #: Interval Time Accu-Traffic Inc. Passenger Cars - East Approach Trucks - East Approach Heavys - East Approach Pedestrians Left Thru Right Left Thru Right Left Thru Right East Cross Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr 7:: 7:15: :3: :45: :: :15: :3: :45: :: :15: :: :15: :3: :45: :: :15: :3: :45: :: :15: :15:

35 Count Date: 1-May-18 Site #: Interval Time Accu-Traffic Inc. Passenger Cars - South Approach Trucks - South Approach Heavys - South Approach Pedestrians Left Thru Right Left Thru Right Left Thru Right South Cross Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr 7:: 7:15: :3: :45: :: :15: :3: :45: :: :15: :: :15: :3: :45: :: :15: :3: :45: :: :15: :15:

36 Count Date: 1-May-18 Site #: Interval Time Accu-Traffic Inc. Passenger Cars - West Approach Trucks - West Approach Heavys - West Approach Pedestrians Left Thru Right Left Thru Right Left Thru Right West Cross Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr 7:: 7:15: :3: :45: :: :15: :3: :45: :: :15: :: :15: :3: :45: :: :15: :3: :45: :: :15: :15:

37 Accu-Traffic Inc. Morning Peak Diagram Specified Period From: 7:: To: 9:: One Hour Peak From: 7:3: To: 8:3: Municipality: Site #: Intersection: TFR File #: Count date: Pickering William Jackson Dr & Rex Heath Dr 1 1-May-18 Weather conditions: Person counted: Person prepared: Person checked: ** Non-Signalized Intersection ** Major Road: William Jackson Dr runs N/S North Leg Total: 126 Heavys 8 8 Heavys 5 North Entering: 94 Trucks Trucks North Peds: Cars Cars 27 Peds Cross: Totals Totals 32 Heavys Trucks Cars Totals William Jackson Dr N Rex Heath Dr W E Heavys Trucks Cars Totals S William Jackson Dr Peds Cross: Cars 73 Cars Peds Cross: West Peds: Trucks 1 Trucks 1 1 South Peds: West Entering: 12 Heavys 8 Heavys South Entering: 53 West Leg Total: 57 Totals 82 Totals South Leg Total: 135 Comments

38 Accu-Traffic Inc. Afternoon Peak Diagram Specified Period From: 16:: To: 18:: One Hour Peak From: 16:45: To: 17:45: Municipality: Site #: Intersection: TFR File #: Count date: Pickering William Jackson Dr & Rex Heath Dr 1 1-May-18 Weather conditions: Person counted: Person prepared: Person checked: ** Non-Signalized Intersection ** Major Road: William Jackson Dr runs N/S North Leg Total: 123 Heavys Heavys North Entering: 43 Trucks Trucks 1 North Peds: 1 Cars Cars 79 Peds Cross: Totals 7 36 Totals 8 Heavys Trucks Cars Totals William Jackson Dr N Rex Heath Dr W E Heavys Trucks Cars Totals S William Jackson Dr Peds Cross: Cars 47 Cars Peds Cross: West Peds: Trucks Trucks 1 1 South Peds: West Entering: 3 Heavys Heavys South Entering: 67 West Leg Total: 43 Totals 47 Totals 6 61 South Leg Total: 114 Comments

39 Total Count Diagram Accu-Traffic Inc. Municipality: Site #: Intersection: TFR File #: Count date: Pickering William Jackson Dr & Rex Heath Dr 1 1-May-18 Weather conditions: Person counted: Person prepared: Person checked: ** Non-Signalized Intersection ** Major Road: William Jackson Dr runs N/S North Leg Total: 432 Heavys 9 9 Heavys 8 North Entering: 218 Trucks Trucks 1 North Peds: 1 Cars Cars 25 Peds Cross: Totals Totals 214 Heavys Trucks Cars Totals William Jackson Dr N Rex Heath Dr W E Heavys Trucks Cars Totals S William Jackson Dr Peds Cross: Cars 22 Cars Peds Cross: West Peds: Trucks 2 Trucks South Peds: West Entering: 77 Heavys 11 Heavys South Entering: 224 West Leg Total: 167 Totals 215 Totals South Leg Total: 439 Comments

40 Accu-Traffic Inc. Traffic Count Summary Intersection: Count Date: Municipality: William Jackson Dr & Rex Heath 1-May-18 Pickering North Approach Totals South Approach Totals North/South Hour Includes Cars, Trucks, & Heavys Total Hour Includes Cars, Trucks, & Heavys Total Ending Peds Approaches Ending Grand Total Left Thru Right Left Thru Right 7:: 7:: 8:: :: :: :: :: 16:: 17:: :: :: :: Grand Total Total Peds Totals: Hour Ending S Totals: East Approach Totals West Approach Totals East/West Includes Cars, Trucks, & Heavys Total Hour Includes Cars, Trucks, & Heavys Total Total Peds Approaches Ending Peds Grand Total Left Thru Right Left Thru Right 7:: 7:: 8:: 16 8:: :: 14 9:: :: 16:: 17:: 18 17:: :: 29 18:: Grand Total Totals: 77 W Totals: Calculated Values for Traffic Crossing Major Street Hours Ending: Crossing Values: 7: 8: 1 9: 5 16: 17: 12 18: 2 : :

41 Count Date: 1-May-18 Site #: Interval Time Accu-Traffic Inc. Passenger Cars - North Approach Trucks - North Approach Heavys - North Approach Pedestrians Left Thru Right Left Thru Right Left Thru Right North Cross Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr 7:: 7:15: :3: :45: :: :15: :3: :45: :: :15: :: :15: :3: :45: :: :15: :3: :45: :: :15: :15:

42 Count Date: 1-May-18 Site #: Interval Time Accu-Traffic Inc. Passenger Cars - East Approach Trucks - East Approach Heavys - East Approach Pedestrians Left Thru Right Left Thru Right Left Thru Right East Cross Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr 7:: 7:15: 7:3: 7:45: 8:: 8:15: 8:3: 8:45: 9:: 9:15: 16:: 16:15: 16:3: 16:45: 17:: 17:15: 17:3: 17:45: 18:: 18:15: 18:15:15

43 Count Date: 1-May-18 Site #: Interval Time Accu-Traffic Inc. Passenger Cars - South Approach Trucks - South Approach Heavys - South Approach Pedestrians Left Thru Right Left Thru Right Left Thru Right South Cross Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr 7:: 7:15: :3: :45: :: :15: :3: :45: :: :15: :: :15: :3: :45: :: :15: :3: :45: :: :15: :15:

44 Count Date: 1-May-18 Site #: Interval Time Accu-Traffic Inc. Passenger Cars - West Approach Trucks - West Approach Heavys - West Approach Pedestrians Left Thru Right Left Thru Right Left Thru Right West Cross Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr Cum Incr 7:: 7:15: 6 6 7:3: 9 3 7:45: :: :15: :3: :45: :: :15: :: :15: :3: :45: :: :15: :3: :45: :: :15: :15:

45

46

47 Appendix B Appendix B Background Development Site Traffic Volumes

48 1 1(25} Site Traffic Figure, from Averton TIS, by BA Group, dated June 213 > \ (5)1 HO)2 {1)1 J (2J1 A m Taunlon Road (15) n Drw 815; Future Collector Road ---I ---E-- - ZC Y ITS- Drlufi I {4 U Sm: 7w DH bt" ZOHSJ L, k JARS- 3"- 1mm 1(3) L Jackso William In ('1 '_'1 u") II U K 1.1 fl.a v 1 I " "'2 d": h DRAWN: ILE "'I_' 9 NKUE _ P 6 P E).5 L 3.CLr-Jw m. 9'. T _ E) _. J O O J" F" (:1-u 'rv ~._._ rfl._'. Vfi'E I m SITE TRAFFIC VOLUMES -_L_. Jure ". I 4,2}- L -. _r h [.- r:r5:1-r'.'f_37'rx :f _..'..-'- J I. _.-.r. '! J-P " F"I _ }.'. r.- I LITH "i:lel,.'\,-.'fn."{ FIUUHQ 8

49 TRANSPORTATION IMACT STUDY WILLIAM JACKSON DRIVE FINAL NOVEMBER 217 AVONMORE VENTURES INC. Site Traffic Figure, from Avonmore TIS, by TMIG, dated November 217 Figure 5-1 Estimated Site Trips PAGE 1 TMIG PROJECT NUMBER WILLIAM JACKSON FINAL TIS.DOCX

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY DECEMBER 2012 READ, VOORHEES & ASSOCIATES TORONTO, ONTARIO Read, Voorhees & Associates

More information

Proposed Addition to Pickering Islamic Centre

Proposed Addition to Pickering Islamic Centre TRAFFIC IMPACT STUDY, PARKING STUDY, SITE CIRCULATION REVIEW & TDM PLAN Proposed Addition to Pickering Islamic Centre 265 Brock Road City of Pickering, Ontario Prepared for: Pickering Islamic Centre Masjid

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

84-88 Columbia Street West Waterloo, Ontario Transportation Impact Study. Paradigm Transportation Solutions Limited

84-88 Columbia Street West Waterloo, Ontario Transportation Impact Study. Paradigm Transportation Solutions Limited 84-88 Columbia Street West Waterloo, Ontario Transportation Impact Study Paradigm Transportation Solutions Limited June 217 Project Summary Project Number 15255 June 217 Client Masri O Inc. Architects

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited 2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief Paradigm Transportation Solutions Limited March 217 March 217 Project: 1627 Diana Vlasic, M.C.I.P., R.P.P Metropolitan Consulting 445 Paletta

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9.

Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9. Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9 Prepared By: URS Canada Inc. 4 th Floor, 30 Leek Crescent Richmond Hill, Ontario L4B

More information

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc. Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: 1649362 Ontario Inc. c/o Manor Park Management 231 Brittany Drive, Suite D Ottawa ON K1K 0R8 July

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

Sixth Line Development - Transit Facilities Plan

Sixth Line Development - Transit Facilities Plan Memorandum Date: November 13, 2012 To: From: c.c. Subject: Rob Freeman (Freeman Planning) Kevin Phillips Sixth Line Development - Transit Facilities Plan 33016631 This memo was prepared to review the transit

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

Corporation of the Town of Oakville. December 16, 2013

Corporation of the Town of Oakville. December 16, 2013 Corporation of the Town of Oakville Transportation Impact Analysis and Parking Study for Proposed Secondary School, Oakville Draft Final Report Submitted by: HDR Corporation 100 York Boulevard, Suite 300

More information

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Prepared for: The Town of Caledon August 9 Transportation Solutions Ltd. 43 Forest Road Cambridge, ON N1S 3B4

More information

TRANSPORTATION IMPACT STUDY

TRANSPORTATION IMPACT STUDY Dundas MEP Developments Inc. City of Toronto 219 and 231 Dundas Street East, Proposed Mixed-Use Development TRANSPORTATION IMPACT STUDY 9782/2 April 216 LEA Consulting Ltd. Consulting Engineers & Planners

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748 City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

PROPOSED RESIDENTIAL DEVELOPMENT. Transportation Impact Study Update Highway 2 CLARINGTON, ONTARIO. May, 2017 Project No: NT

PROPOSED RESIDENTIAL DEVELOPMENT. Transportation Impact Study Update Highway 2 CLARINGTON, ONTARIO. May, 2017 Project No: NT Consulting Engineers A Division of NextEng Consulting Group Inc. Transportation Planning Traffic Impact Assessment Parking Assessment Site Access Design & Review Site Servicing and Grading Stormwater Management

More information

BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited.

BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited. BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: 2534189 Ontario Limited April 6, 2018 117-668 TIA Report_2.doc D. J. Halpenny & Associates

More information

Classification Criteria

Classification Criteria SCHEDULE D TO RECOMMENDED OFFICIAL PLAN AMENDMENT NO. 40 SCHEDULE C-4 Road Criteria Criteria Traffic Service Objective Land Service/Access Typical Daily Traffic Volume Flow characteristics Travel Speed

More information

CastleGlenn Consultants Inc.

CastleGlenn Consultants Inc. February 1 st, 2010 CastleGlenn Consultants Inc. Engineers, Project Managers & Planners Mr. Kevin Yemm Planning and Land Development Richraft Ltd. 2280 St. Laurent Boulevard Suite 201 Ottawa, Ontario (Tel:

More information

List of Exhibits...ii

List of Exhibits...ii One Brickell Traffic Study TABLE OF CONTENTS List of Exhibits...ii EXECUTIVE SUMMARY...1 1. INTRODUCTION...2 1.1 Study Area...2 1.2 Study Objective...5 2. EXISTING TRAFFIC CONDITIONS...6 2.1 Data Collection...6

More information

Parking Lot P6C Transportation Impact Assessment

Parking Lot P6C Transportation Impact Assessment Transportation Carleton University Parking Lot P6C Transportation Impact Assessment Prepared by: AECOM 302 1150 Morrison Drive 613 820 8282 tel Ottawa, ON, Canada K2H 8S9 613 820 8338 fax www.aecom.com

More information

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for: TRAFFIC IMPACT STUDY For Creekside Thornton, Colorado August 215 November 215 Revised: August 216 Prepared for: Jansen Strawn Consulting Engineers 45 West 2 nd Avenue Denver, Colorado 8223 Prepared by:

More information

AMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning

AMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning AMEC Earth and Environmental Bovaird Drive Environmental Assessment Traffic Study Final Report August Excellence in Transportation Planning AMEC Earth and Environmental Bovaird Drive Class EA Traffic

More information

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012 Update for the May 31 st, 2012 Traffic Impact Study Prepared for Broccolini Construction 111-23596-00 September 20 th, 2012 2611 Queensview Drive, Suite 300, Ottawa, Ontario CANADA K2B 8K2 Telephone: 613-829-2800

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

Fieldgate. Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton

Fieldgate. Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton Fieldgate Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton September 214 September 23 214 Ms Debbie Pacchiarotti Our

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams. Technical Memorandum TRFFIC IMPCT STUDY RIDLEY ROD CONVENIENCE STORE Southampton County, V Prepared for: Mr. David Williams By: Charles Smith, P.E., PTOE EPR Charlottesville, V July 2014 1 TBLE OF CONTENTS

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... IX 1 INTRODUCTION... 1 1.1 Project Overview... 1 1.2 Analysis Scenarios...

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY TRAFFIC IMPACT STUDY for the GLEN ELLEN COUNTRY CLUB SENIOR RESIDENTIAL REDEVELOPMENT 84 Millis, Massachusetts Prepared by: McMahon Associates, Inc. Prepared for: Toll Brothers, Inc. August 216 DRAFT

More information

Glebe Parking Garage 170 Second Avenue, Ottawa, Ontario Transportation Impact Study

Glebe Parking Garage 170 Second Avenue, Ottawa, Ontario Transportation Impact Study Glebe Parking Garage 17 Second Avenue, Ottawa, Ontario Transportation Impact Study C i t y o f O t t a w a S e p t e m b e r 2 13 www.genivar.com GENIVAR 2611 Queensview Drive, Suite 3 Ottawa, Ontario

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

SECTION 1 - TRAFFIC PLANNING

SECTION 1 - TRAFFIC PLANNING SECTION 1 - TRAFFIC PLANNING 1.1 TRAFFIC OPERATIONS 1.1.1 Roadway Functional Classification The Multnomah County Comprehensive Framework Plan s Policy 34: Trafficways and the Functional Classification

More information

350 SPARKS STREET, OTTAWA HOTEL AND RESIDENTIAL DEVELOPMENT. Transportation Study. Prepared For: Morguard Real Estate Investment Trust.

350 SPARKS STREET, OTTAWA HOTEL AND RESIDENTIAL DEVELOPMENT. Transportation Study. Prepared For: Morguard Real Estate Investment Trust. SPARKS STREET, OTTAWA HOTEL AND RESIDENTIAL DEVELOPMENT Transportation Study Prepared For: Morguard Real Estate Investment Trust June, BA Consulting Group Ltd. St. Clair Avenue West, Suite Toronto, ON

More information

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc

More information

2.0 LANE WIDTHS GUIDELINE

2.0 LANE WIDTHS GUIDELINE 2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated

More information

APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS

APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS MEMO : Peter Steacy, P.Eng. Date: December 3, 2014 : Ian Borsuk, P.Eng. Job No.: 3414015-000 Subject: City of Ottawa O-Train Extension Planning & EA Study

More information

Joe Rocca P.Eng., Traffic and Asset Management Supervisor. Review for Proposed Kingsway Sports and Entertainment Complex, City of Greater Sudbury

Joe Rocca P.Eng., Traffic and Asset Management Supervisor. Review for Proposed Kingsway Sports and Entertainment Complex, City of Greater Sudbury LETTER REPORT TO: Joe Rocca P.Eng., Traffic and Asset Management Supervisor FROM: Brett Sears and Ubaid Ali, WSP SUBJECT: Review for Proposed Kingsway Sports and Entertainment Complex, City of Greater

More information

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 151714A Table of Contents Table of Contents I. INTRODUCTION... 2 II. EXISTING CONDITIONS... 5 III. 215 EXISTING TRAFFIC CONDITIONS... 6

More information

South Street Campus Lands Development. City of London TRANSPORTATION IMPACT ASSESSMENT

South Street Campus Lands Development. City of London TRANSPORTATION IMPACT ASSESSMENT South Street Campus Lands Development City of London TRANSPORTATION IMPACT ASSESSMENT TW1387 South Street Campus Lands Development City of London TRANSPORTATION IMPACT ASSESSMENT May 2013 South Street

More information

Ajax. Ajax Downs. Proposed Ajax Downs Expansion Transportation Assessment Town of Ajax

Ajax. Ajax Downs. Proposed Ajax Downs Expansion Transportation Assessment Town of Ajax Ajax Ajax Downs Proposed Ajax Downs Expansion Transportation Assessment Town of Ajax 2821628 (13281) March 2015 March 19, 2015 Mr Andrew Picov Ajax Downs 50 Alexander s Crossing Ajax ON L1Z 2E6 Dear Mr

More information

December 4, Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA Attn: Kathy Marshall. Dear Board Members:

December 4, Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA Attn: Kathy Marshall. Dear Board Members: December 4, 28 Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA 86 Attn: Kathy Marshall RE: RAMSHEAD MERRIMAC, MA Dear Board Members: Bayside Engineering, Inc. has received the MDM Transportation

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

Premier Gateway Phase 1B Employment Area Secondary Plan Transportation Study. Paradigm Transportation Solutions Limited

Premier Gateway Phase 1B Employment Area Secondary Plan Transportation Study. Paradigm Transportation Solutions Limited Premier Gateway Phase 1B Employment Area Secondary Plan Transportation Study Paradigm Transportation Solutions Limited July 217 Project Summary Project Number 177 July 217 Client Town of Halton Hills

More information

Mr. Randy Kowalchuk, President

Mr. Randy Kowalchuk, President October 20, 2017 #201, 8506-200th Street, Langley, BC V2Y 0M1 T: 604.371.0091 F: 604.371.0098 Our Reference: 31931 Naramata Benchland Properties 176 Fraser Court, Penticton, BC V2A 8B4 Attention: Mr. Randy

More information

Troutbeck Farm Development

Troutbeck Farm Development Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

December 15, City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor Ottawa, ON K1P 1J1

December 15, City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor Ottawa, ON K1P 1J1 December 15, 2017 City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor Ottawa, ON K1P 1J1 Attention: Mr. Wally Dubyk, C.E.T. Project Manager, Infrastructure Approvals Dear

More information

CPC Parking Lot Riverside Drive. Transportation Rationale

CPC Parking Lot Riverside Drive. Transportation Rationale CPC Parking Lot Transportation Rationale Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September 2015 Novatech File: 114093 Ref: R-2015-153 Table of Contents 1.0 INTRODUCTION...

More information

3.2.2 Proposed Road Network within Phase 1B Lands

3.2.2 Proposed Road Network within Phase 1B Lands 3.2.2 Proposed Road Network within Phase 1B Lands Figure 3.1 also shows the proposed road network within the Premier Gateway Phase 1B Employment Area lands, which features two collector roads providing

More information

D.13 Transportation and Traffic

D.13 Transportation and Traffic This section addresses transportation and traffic issues and impacts related to the Proposed Project. Section D.13.1 provides a description of the affected environment for the Proposed Project. Applicable

More information

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY The Caledon Transportation Needs Study has been undertaken as a joint project by the Town of Caledon and the Region of Peel to determine the existing

More information

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study To: Ms. Susan C. Ryan Spaulding Youth Center 72 Spaulding Road Northfield, NH 03276 Date: September 7, 2017 Project #: 52455.00 From: Robin Bousa Director of Transportation Systems Re: Spaulding Youth

More information

CPC Parking Lot Riverside Drive. Transportation Brief

CPC Parking Lot Riverside Drive. Transportation Brief CPC Parking Lot 2785 Riverside Drive Transportation Brief Prepared By: NOVATECH Suite 2, 24 Michael Cowpland Drive Ottawa, Ontario K2M P6 7 / 5 / 25 Novatech File: 49 Ref: R-25-22 July 5 th, 25 City of

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

DRAFT Davidson Elementary School Expansion Transportation Impact Analysis

DRAFT Davidson Elementary School Expansion Transportation Impact Analysis DRAFT Davidson Elementary School Expansion Transportation Impact Analysis Prepared for: Town of Davidson 216 S. Main Street Davidson, NC 28036 Prepared by: Stantec Consulting Services Inc. 2127 Ayrsley

More information

Bridge Street Corridor Study Report

Bridge Street Corridor Study Report Bridge Street Corridor Study Report Prepared for: Prepared by: BRIDGE STREET CORRIDOR STUDY REPORT PREPARED FOR: CITY OF ARROYO GRANDE COMMUNITY DEVELOPMENT DEPARTMENT 300 EAST BRANCH STREET ARROYO GRANDE,

More information

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for oad & Traffic Management Road & Traffic Management R Atlantic Traffic Engineering Specialists Draft Report Traffic Impact Study Superstore, Wal-Mart, and Kent Development Yarmouth, Nova Scotia Prepared

More information

Traffic Impact Study for Rolling Ridge Redevelopment

Traffic Impact Study for Rolling Ridge Redevelopment Traffic Impact Study for Rolling Ridge Redevelopment Webster Groves, Missouri October 19, 2018 Prepared For: Gershman Commercial Real Estate 150 North Meramec Avenue Suite 500 St. Louis, Missouri 63105

More information

Onni Group of Companies TRANSPORTATION STUDY FOR THE PROPOSED DEVELOPMENT AT 13 TH STREET/LONSDALE, CITY OF NORTH VANCOUVER, BC FINAL REPORT

Onni Group of Companies TRANSPORTATION STUDY FOR THE PROPOSED DEVELOPMENT AT 13 TH STREET/LONSDALE, CITY OF NORTH VANCOUVER, BC FINAL REPORT Onni Group of Companies TRANSPORTATION STUDY FOR THE PROPOSED DEVELOENT AT 13 TH STREET/LONSDALE, CITY OF NORTH VANCOUVER, BC FINAL REPORT OCTOBER 10, 2012 Onni Group of Companies DOCUMENT CONTROL Client:

More information

St. Stefan Serbian Orthodox Church 1989 and 1993 Prince of Wales Drive, Ottawa REVISED TRANSPORTATION BRIEF

St. Stefan Serbian Orthodox Church 1989 and 1993 Prince of Wales Drive, Ottawa REVISED TRANSPORTATION BRIEF St. Stefan Serbian Orthodox Church 1989 and 1993 Prince of Wales Drive, Ottawa REVISED TRANSPORTATION BRIEF Prepared By: NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa,

More information

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Balancing Operation & Safety for Motorized and Non-Motorized Traffic Balancing Operation & Safety for Motorized and Non-Motorized Traffic Brian Willham, PE, PTOE Iowa Director - MOVITE June 30, 2014 Learning Objectives: When & Why should we measure the performance of complete

More information

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Figure 1: East West Connector Alignment Alternatives Concept Drawing Page 2 of 9 Figure 1: East West Connector Alignment Alternatives Concept Drawing The Montebello Drive extension will run north south and connect Wilsonville Road to the Boones Ferry Road to Brown Road

More information

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon Traffic Analysis and Design Report NW Bethany Boulevard NW Bronson Road to NW West Union Road Washington County, Oregon May 2011 Table of Contents Table of Contents Section 1 Executive Summary... 2 Section

More information

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006 Corporate NO: C012 Report COUNCIL DATE: June 26, 2006 COUNCIL-IN-COMMITTEE TO: Mayor & Council DATE: June 22, 2006 FROM: General Manager, Engineering FILE: 0410-20(MoT/Gate) SUBJECT: Surrey Response on

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

NO BUILD TRAFFIC OPERATIONS

NO BUILD TRAFFIC OPERATIONS 3. 23 NO BUILD TRAFFIC OPERATIONS This section addresses the operations of the transportation system and details how it would be expected to function under year 23 No Build conditions with the projected

More information

455 Via Verona Avenue

455 Via Verona Avenue TRANSPORTATION Transportation Brief 455 Via Verona Avenue Submitted to Multifaith Housing Initiative by IBI Group March 2015 Table of Contents 1.0 INTRODUCTION... 1 2.0 PROPOSED DEVELOPMENT... 1 2.1 Site

More information

CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California

CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California TUSTIN 17782 17th Street Suite 200 Tustin, CA 92780-1947 714.665.4500 Fax: 714.665.4501 LOS ANGELES 145 S. Spring Street Suite 120

More information