1 FAIRFIELD - RYAN S CORNER TRAFFIC IMPACT ANALYSIS LOUDOUN COUNTY, VIRGINIA Submitted on behalf of: Fairfield Residential Prepared by: Wells + Associates, Inc Spring Hill Road, Suite 00 McLean, Virginia /91-20 Michael J. Workosky, PTP (Mjworkosky@mjwells.com) Michael J. Buelow, E.I.T. (mjbuelow@mjwells.com) April 0, 2008 (Updated November, 2008)

2 Fairfield Ryan s Corner Traffic Impact Analysis Loudoun County, Virginia TABLE OF CONTENTS PAGE EXECUTIVE SUMMARY 1 Section 1 INTRODUCTION 2 STUDY SCOPE... 2 PURPOSE... 2 TEN PERCENT RULE... 2 STUDY OBJECTIVES/METHODOLOGY... 2 PREVIOUS TRAFFIC STUDY... STUDY AREA... FIGURE 1-1: LIMITS OF STUDY AREA... 4 Section 2 BACKGROUND INFORMATION 5 DESCRIPTION OF PROPOSED DEVELOPMENT... 5 SITE LOCATION... 5 LOCATION WITHIN THE JURISDICTION AND REGION... 5 DESCRIPTION OF PARCEL... 5 GENERAL TERRAIN FEATURES... 5 COMPREHENSIVE PLAN RECOMMENDATIONS FOR PARCEL... 5 FIGURE 2-1: PROPOSED PLAN REDUCTION... FIGURE 2-2: COMPREHENSIVE PLAN RECOMMENDATIONS (LAND USE)... ZONING... 8 ROADWAY NETWORK... 8 HAZARDOUS LOCATIONS... 8 EXISTING ROADWAY CONDITIONS... 8 FIGURE 2-: EXISTING LANE USE AND TRAFFIC CONTROL... 9 PROGRAMMED IMPROVEMENTS PROFFERED IMPROVEMENTS PROFFERED IMPROVEMENTS BY OTHERS PUBLIC TRANSIT SERVICE SURROUNDING LAND USE PIPELINE DEVELOPMENTS FIGURE 2-4: PROGRAMMED IMPROVEMENTS FIGURE 2-5: MAP OF SURROUNDING USES... 1 FIGURE 2-: LOCATION OF PIPELINE DEVELOPMENTS Section ANALYSIS OF EXISTING CONDITIONS 15 TRAFFIC VOLUMES FIGURE -1: EXISTING PEAK HOUR TRAFFIC VOLUMES... 1 CAPACITY ANALYSIS... 1 TABLE -1: EXISTING LEVELS OF SERVICE Figure -2: EXISTING LEVELS OF SERVICE i

3 Fairfield Ryan s Corner Traffic Impact Analysis Loudoun County, Virginia Section 4 ANALYSIS OF FUTURE CONDITIONS WITHOUT DEVELOPMENT 20 TRAFFIC VOLUMES METHODOLOGY/ASSUMPTIONS PIPELINE DEVELOPMENTS REGIONAL GROWTH FUTURE TRAFFIC VOLUMES WITHOUT DEVELOPMENT FIGURE 4-1: PLANNED FUTURE LANE USE AND TRAFFIC CONTROL WITHOUT DEVELOPMENT TABLE 4-1: 2015 PIPELINE TRIP GENERATION FIGURE 4-2: 2015 TRIPS GENERATED BY ALL PIPELINE DEVELOPMENTS... 2 FIGURE 4-: 2015 REGIONAL GROWTH FOR BUILD OUT FIGURE 4-4: 2015 PEAK HOUR TRAFFIC FORECASTS WITHOUT DEVELOPMENT CAPACITY ANALYSIS... 2 TABLE 4-2: 2015 LEVELS OF SERVICE WITHOUT DEVELOPMENT... 2 Figure 4-5: 2015 LEVELS OF SERVICE WITHOUT DEVELOPMENT Section 5 TRIP GENERATION, DISTRIBUTION AND ASSIGNMENT 29 TRIP GENERATION SITE TRIP DISTRIBUTION AND ASSIGNMENT TABLE 5-1: TRIP GENERATION... 0 Figure 5-1: SITE TRIP DISTRIBUTION AND ASSIGNMENT... 1 Section ANALYSIS OF FUTURE CONDITIONS WITH DEVELOPMENT 2 TRAFFIC VOLUMES... 2 TURN LANE ASSESSMENT... 2 CAPACITY ANALYSIS... 2 Figure -1: 2015 FUTURE PEAK HOUR TRAFFIC FORECASTS WITH DEVELOPMENT... 4 Figure -2: 2015 RECOMMENDED LANE USE AND TRAFFIC CONTROL WITH DEVELOPMENT... 5 TABLE -1: 2015 LEVELS OF SERVICE WITH DEVELOPMENT... Figure -: 2015 LEVELS OF SERVICE WITH DEVELOPMENT... Section RECOMMENDED IMPROVEMENTS 8 LIST OF IMPROVEMENTS... 8 PROPOSED PROFFERS LOUDOUN COUNTY MODEL ANALYSIS... 9 Figure -1: 200 LOUDOUN COUNTY TRAFFIC MODEL FORECASTS Section 8 CONCLUSIONS AND RECOMMENDATIONS 41 ii

4 Fairfield Ryan s Corner Traffic Impact Analysis Loudoun County, Virginia LIST OF FIGURES FIGURE TITLE 1-1 LIMITS OF STUDY AREA PROPOSED PLAN REDUCTION COMPREHENSIVE PLAN RECOMMENDATIONS (LAND USE) EXISTING LANE USE AND TRAFFIC CONTROL PROGRAMMED IMPROVEMENTS MAP OF SURROUNDING USES LOCATION OF PIPELINE DEVELOPMENTS EXISTING PEAK HOUR TRAFFIC VOLUMES EXISTING LEVELS OF SERVICE PLANNED FUTURE LANE USE AND TRAFFIC CONTROL WITHOUT DEVELOPMENT TRIPS GENERATED BY ALL PIPELINE DEVELOPMENTS REGIONAL GROWTH FOR BUILD OUT PEAK HOUR TRAFFIC FORECASTS WITHOUT DEVELOPMENT LEVELS OF SERVICE WITHOUT DEVELOPMENT SITE TRIP DISTRIBUTION AND ASSIGNMENT FUTURE PEAK HOUR TRAFFIC FORECASTS WITH DEVELOPMENT RECOMMENDED LANE USE AND TRAFFIC CONTROL WITH DEVELOPMENT LEVELS OF SERVICE WITH DEVELOPMENT RECOMMENDED IMPROVEMENTS LANE USE AND TRAFFIC CONTROL LIST OF TABLES TABLE TITLE -1 EXISTING LEVELS OF SERVICE PIPELINE TRIP GENERATION LEVELS OF SERVICE WITHOUT DEVELOPMENT TRIP GENERATION LEVELS OF SERVICE WITH DEVELOPMENT... iii

5 Fairfield Ryan s Corner Traffic Impact Analysis Loudoun County, Virginia LIST OF APPENDICES APPENDIX A B C D E F G H I J K L TITLE Summary of Comments and Responses Scoping Agreement 10 Percent Rule Pulte Ryan s Corner TIS Approved Proffers Existing Traffic Counts Existing Levels of Service Other Development Trip Assignments 2015 Background Levels of Service 2015 Future Turn Lane Assessments 2015 Total Future Queue Analysis 2015 Total Future levels of Service iv

6 Fairfield Ryan s Corner Traffic Impact Analysis Loudoun County, Virginia EXECUTIVE SUMMARY Fairfield Ryan s Corner residential development consists of two adjacent properties located in the Dulles North region of Loudoun County, Virginia, just south of and east of Shellhorn Road. The combination of these two properties constitutes the proposed site which is approximately 22. acres. According to the Loudoun County Comprehensive Plan the subject site is currently zoned R-1. The proffers of the two adjacent properties, state that approximately 19 townhouses have been approved for development. approved by VDOT, and provide regional transportation, pedestrian, and transit proffers that exceed those approved under the current density. The proposed proffer commitments for this project meet the requirements to effectively mitigate sitegenerated trips. Fairfield Residential is filing a ZMAP and SPEX to increase the residential density from R-1 to R-24. The R-1 permits the development of 19 townhouses. The Fairfield Ryan s Corner application proposes to develop approximately 540 multi-family rental apartments that would be built and occupied by This change in use and density would generate 28 AM peak hour trips, 15 PM peak hour trips, and,9 daily (24-hour) trips. This represents 19 more AM peak hour trips, 210 more PM peak hour trips, and 1,82 more daily trips than the currently approved density. Access to the proposed site would be provided via a driveway on opposite Ashburn Road and on Shellhorn Road opposite Ryan Park Terrace. The traffic analyses indicate that the recently signalized intersections currently operate at acceptable levels of service during the peak commuter periods. Some side-street turning movements exceed capacity at stop controlled intersections. Each of the major intersections in the study area would require signalization in order to accommodate anticipated traffic volumes by 2015, assuming the construction of the currently approved 19 townhouse units. The Fairfield Ryan s Corner project proposes construct separate turn lanes at the site driveway on Shellhorn Road, widen existing to a four-lane undivided roadway between Ashburn Road and Shellhorn Road, install a new traffic signal at the Ashburn Road/Site Entrance, if warranted and 1

7 Fairfield Ryan s Corner Traffic Impact Analysis Loudoun County, Virginia SECTION 1 INTRODUCTION intersection volume must be included in the traffic study. A graphical representation of this analysis is contained in Appendix C. STUDY SCOPE This report presents the results of a traffic impact study for Fairfield - Ryan s Corner as part of a Zoning Map Amendment Plan (ZMAP) and Special Exception (SPEX) to permit two properties currently zoned R-1 that allows 19 residential units to be modified to R-24 and allow the development of 540 multi-family apartments. This traffic presents an update to the previously prepared report, dated April 0, 2008 based on comments provided by the Virginia Department of Transportation (VDOT) and the Loudoun County office of Transportation Services (OTS). These comments have been incorporated into this document. Detailed responses to agency comments are contained in Appendix A. PURPOSE The purpose of this traffic study is to evaluate the adequacy of the existing transportation network in conjunction with the proposed ZPCA application, and to identify potential mitigation measures to offset its traffic impacts. This study was conducted in accordance with Fairfax County s Recommended Guidelines for Traffic Impact Studies and the recently adopted 52 Traffic Impact Study Guidelines published by VDOT. The study area was determined with VDOT and County staff based on a traffic scoping meeting. The approved VDOT scoping form is included as Appendix B. The traffic impacts were evaluated at project buildout (2015). Per the scoping agreement, a buildout plus 10-year scenario was not required. TEN PERCENT RULE In accordance with Loudoun County Facility Standards Manual (FSM), all intersections within the vicinity of the subject site in which site-generated trips account for 10 percent or more of the total STUDY OBJECTIVES/METHODOLOGY Tasks undertaken in this study included the following: 1. Review the proposed development plans, other traffic impact studies conducted in the immediate site vicinity, the Countywide Transportation Plan (CTP), and other background data. 2. A field reconnaissance of existing roadway and intersection geometrics, traffic controls, traffic signal phasings/timings, and speed limits.. Agreement with Loudoun County Office of Transportation Services (OTS) and Virginia Department of Transportation (VDOT) staff regarding the traffic study scope. 4. Counts of existing traffic at seven key intersections. 5. Analysis of existing levels of service at these intersections.. Preparation of background future traffic forecasts for a project buildout year of Calculation of background levels of service at key intersections based on background traffic forecasts, existing traffic controls, and existing/planned intersection geometrics. 8. Estimation of the number of weekday AM and PM peak hour, and daily trips that would be generated by the proposed project based on Institute of Transportation Engineers (ITE) trip generation rates and estimates of transit and internal trips. 9. Preparation of total future traffic forecasts to reflect 2015 conditions. 2

8 Fairfield Ryan s Corner Traffic Impact Analysis Loudoun County, Virginia 10. Calculation of total future levels of service at key intersections based on total future traffic forecasts, existing traffic controls, and existing/planned intersection geometrics. 11. Identification of the roadway improvements required to adequately accommodate the future traffic impacts of the project. 12. Comparison of the currently approved and proposed transportation proffers for the project. 1. Identification of the 200 future traffic forecasts as provided by the Loudoun County Office of Transportation Services staff. 1. Shellhorn Road (Route 4)/Ryan Road (Ashburn Village Boulevard). 2. Dulles Greenway WB ramps/ryan Road (Ashburn Village Boulevard).. (Route 25)/Ashburn Road. 4. (Route 25)/Ryan s Corner Place (Old Ryan Road). 5. Shellhorn Road (Route 4)/ (Route 25).. (Route 25)/Faulkner Parkway (Route 40).. (Route 25)/Ryan Park Terrace. Figure 1-1 shows the limits of the study area. This analysis was undertaken in accordance with Loudoun County s Facilities Standards Manual (FSM) and the Virginia Department of Transportation s Traffic Impact Regulations (52 Report). Sources of data for this analysis included the Institute of Transportation Engineers (ITE), Loudoun County, the Virginia Department of Transportation (VDOT), Fairfield Residential, Bowman Consulting Group, and previous studies prepared by Wells + Associates. This traffic study was conducted in accordance with Loudoun County s Facilities Standards Manual (FSM) and VDOT s 52 study guidelines. PREVIOUS TRAFFIC STUDY The eastern portion of the property was rezoned to R-1 and approved for 14 townhouses in 2004 and was the subject of a traffic study. The Ryan s Corner Traffic Analysis, dated March 10, 2004 prepared by Wells + Associates was used as the basis for the approved access, proffers, and traffic assignment. It is noted that the study assumed 12 dwelling units. A copy of this traffic report is contained in Appendix D. The approved proffers are contained in Appendix E. STUDY AREA Wells + Associates studied the following area intersections in accordance with Loudoun County and VDOT guidelines:

9 WAXPOOL RD ASHBURN ROAD OLD SHELLHORN ROAD 4 5 FAULKNER PKWY WAXPOOL RD SITE DRIVEWAY SITE SITE DRIVEWAY RYAN PARK TERRACE DULLES GREENWAY ASHBURN 2 VILLAGE BOULEVARD 1 SHELLHORN ROAD Wells + Associates, INC

10 Fairfield Ryan s Corner Traffic Impact Analysis Loudoun County, Virginia SECTION 2 BACKGROUND INFORMATION GENERAL TERRAIN FEATURES The area generally consists of level terrain. DESCRIPTION OF PROPOSED DEVELOPMENT The site is currently vacant and approved for a total of 19 residential townhouses within two sections. Fairfield Residential has filed a ZMAP and SPEX to allow the development of 540 multi-family apartments. COMPREHENSIVE PLAN RECOMMENDATIONS FOR PARCEL The Loudoun County Comprehensive Plan indicates that site is planned for high density residential, as summarized on Figure 2-2. SITE LOCATION The Fairfield Ryan s Corner site is located at the northwest quadrant of Route 4 (Shellhorn Road) and Ashburn Village Boulevard (Route 22), between the Dulles Greenway (Route 2) and Waxpool Road (Route 25), in Loudoun County, Virginia. LOCATION WITHIN THE JURISDICTION AND REGION The Fairfield Ryan s Corner property is located in the Dulles North planning area of Loudoun County. It is bordered by the Dulles Greenway on the south and west and Shellhorn Road on the east. DESCRIPTION OF PARCEL The Fairfield Ryan s Corner application area is located on approximately 22. acres and identified as Tax Map parcels 9-19, 9-20, 9-20A, 9-20B, 9-20C, 9-21, 9-22, 9-2, and 9-24 MCPI # , , , , , , , , , and The proposed generalized development plan is shown on Figure

11 Wells + Associates, INC

12 SITE PLANNED LAND USE: HIGH DENSITY RESIDENTIAL 2 0 Wells + Associates, INC

13 Fairfield Ryan s Corner Traffic Impact Analysis Loudoun County, Virginia ZONING The overall site is comprised of two properties that were the subject of a rezoning case. The western portion of the site (Huntmoore at Waxpool) was approved for a total of townhouses and currently zoned R-1. The eastern portion (ZMAP ) was approved in 2004 for 10 townhouses and is currently zoned R-1. Fairfield Residential has filed a ZMAP and SPEX to increase the residential density of the permitted use to R-24 in order to develop approximately 540 multi-family rental apartments on 22. acres of the combined properties. ROADWAY NETWORK Existing Network. Regional access to Fairfield Ryan s Corner is provided by the Dulles Greenway, Ryan Road/Ashburn Village Boulevard, and Waxpool Road (Route 25). Local access is provided by Shellhorn Road. The Dulles Greenway (Route 2) is a six-lane, median divided principal arterial roadway with a speed limit of 5 MPH in the site vicinity. The Greenway operates as a limited access rural toll facility with existing grade separated interchanges at Loudoun County Parkway and Ashburn Village Boulevard. Loudoun County Parkway (Route 0) is currently a six-lane median divided minor arterial roadway with a posted speed limit of 45 MPH north of Shellhorn Road. South of the Dulles Greenway (Route 2), Loudoun County Parkway is constructed as a four-lane divided roadway. The Dulles Greenway on- and off-ramp terminals on Loudoun County Parkway currently operate under stop sign control. Ashburn Village Boulevard (Route 2 Relocated) is constructed as a median divided, four-lane major collector between the Greenway and Route 25. The posted speed limit is 5 MPH. (Route 25) is a two-lane roadway adjacent to the site. It widens to four-lanes west of Ashburn Road, and has as posted speed limit of 5 MPH. Shellhorn Road (Route 4) is constructed as a four-lane median divided roadway within the segment between Loudoun County Parkway and Ashburn Village Boulevard, with a posted speed limit of 5 MPH. Ryan s Corner Place (Old Ryan Road) (Route 2) currently exists on the south side of Waxpool Road (Route 25) as a two-lane local road with a cul-de-sac. The north leg of this local roadway is a two-lane section named Old Shellhorn Road. Both Ryan s Corner Place and Old Shellhorn Road intersect with (Route 25) at a skew. Hazardous Locations Based on a field reconnaissance in the vicinity of Fairfield Ryan s Corner, it was noted that the skewed intersection of Ryan s Corner Place/Old Shellhorn Road and results in the limitation of sight distance for approaching northbound and southbound vehicles creating a need for the current all-way stop control. No other hazardous locations or constraints were identified. Existing Roadway Conditions. The following study intersections currently operate under signal control: 1. Shellhorn Road (Route 4)/Ryan Road (Ashburn Village Boulevard). 2. Dulles Greenway WB ramps/ryan Road (Ashburn Village Boulevard). The following study intersections currently operate under stop sign control: 1. (Route 25)/Ashburn Road. 2. (Route 25)/Ryan s Corner Place (Old Ryan Road).. Shellhorn Road (Route 4)/ (Route 25). 4. (Route 25)/Faulkner Parkway (Route 40). 5. Shellhorn Road (Route 4)/Ryan Park Terrace. The existing lane use and traffic control are shown on Figure 2-. 8

14 1 2 Old Shellhorn Road 4 Ashburn Road 41 Faulkner Parkway Dulles Greenway Mooreview Parkway Old Ryan Road 2 Ryan's Corner Place 4 5 SITE Site Entrance Ashburn Village Ryan Park Terrace Shellhorn Road 1 4 Boulevard Wells + Associates, INC

15 Fairfield Ryan s Corner Traffic Impact Analysis Loudoun County, Virginia Programmed Improvements. The following describes planned improvements to the roadway network as part of the Countywide Transportation Plan (CTP) and other projects within the site vicinity. A copy of the CTP for this area is shown on Figure 2-4. The Dulles Greenway (Route 2) is designated in the CTP as a six-lane principal arterial roadway. Thus, additional travel lanes are not anticipated to be constructed in the site vicinity on the Greenway. Ryan Road/Loudoun County Parkway (Route 0) is designated as a six-lane minor arterial throughout the study area. Additional through lanes are ultimately anticipated south of Shellhorn Road. is designated as a U4 local access undivided rural collector in the vicinity of the site. This designation specifies a four-lane undivided roadway with turn lanes required at major intersections. Ashburn Village Boulevard (Route 2) will ultimately provide a six-lane median divided major collector roadway between Farmwell Road and Loudoun County Parkway. Additional through lanes are envisioned throughout the study area. Shellhorn Road (Route 4) is designated as a four-lane divided major collector. Additional through lanes are not anticipated in the site vicinity. There is currently no project funding available in the VDOT Six-Year Plan to complete any of the CTP recommended improvements. Ryan s Corner Place (Old Ryan Road - South Leg) is planned to remain as a cul-de-sac and serve the proposed project and other adjacent residential uses (the Parkside at Ashburn property). The north leg (Old Shellhorn Road) is planned to be terminated north of (cul-de-sac has recently been installed) and east of Ashburn Road and was assumed for 2015 conditions. Proffered Improvements. The following roadway improvements are proffered by others in the study area. Approved Ryan s Corner Program Proffers (with development of 10 townhouses). 1. Construct or bond for construction a right turn lane on Shellhorn Road at the site entrance. 2. Bond and/or construct a four lane section of, between Old Ryan Road and Shellhorn Road.. A regional transportation proffer of $,500 per residential unit. Approved Huntmoore Program Proffers (with development of townhouses). 1. Construct or bond for construction one half (Eastbound) of the planned improvements to along the subject property frontage (from Ashburn Road to Ryan s corner Place); separate turn lanes are not warranted and are not proffered. 2. A regional transportation proffer of $,000 per residential unit.. A transit service contribution proffer of $500 per residential unit. 4. A sum of +/-$10,000 proffered to be paid to Loudoun County for the contribution to the installation or study of a traffic signal within a one (1) mile radius of the subject site, or for regional road improvements as defined by the revised general plan. The transportation proffers are included as Appendix E. Proffers by Others. Ryan s Park Center (ZMAP /ZPCA ) proffered a new traffic signal at the Shellhorn Road (Route 4)/ (Route 25) intersection. This improvement was assumed to be in place by

16 Fairfield Ryan s Corner Traffic Impact Analysis Loudoun County, Virginia A second southbound right turn lane on Shellhorn Road at Ashburn Village Boulevard is proffered by others (ZMAP ), but has not been considered as part of this study. Public Transit Service. Public transit service is not currently provided in the vicinity of the site. estimating background traffic volumes in the study area. They do not constitute an independent economic forecast. Individual projects may develop at a faster or slower pace than forecasted here. The background traffic forecasts contained in this report will still pertain to the overall development levels and general distribution assumptions as described within the analyses. SURROUNDING LAND USE The land parcels both east and west of the subject site is occupied by residential uses. Ryan Park Terrace is located on the east side of Shellhorn Road and Parkside at Ashburn is located directly adjacent to the east. Farmwell Hunt is located north of the site on, as shown on Figure 2-5. Pipeline Developments. Pipeline project development projections were prepared for project buildout (2015) based on previously prepared and on-going traffic studies in the site vicinity. These developments were revised and updated based on VDOT comments. The approximate location of each pipeline development is shown on Figure 2-. The following projects were considered in this traffic study (refer to Table 2): 1. Pulte Ryan s Corner (current approval). 2. Huntmoore at Waxpool (current approval).. Ryan Park Center. 4. Loudoun Station. 5. Greenway Corporate Park.. Loudoun Exchange.. Ashburn Center. 8. Ashburn Technology Park. 9. WorldCom/Verizon Campus. 10. Dulles Parkway Center (west). 11. Morefield Station. 12. Broadlands South. Table 2 indicates that approximately 2,22 residential dwelling units, 1.5 million S.F. of commercial space, and nearly 259 hotel rooms are anticipated to be built and occupied in the study area by These project-by-project development forecasts were prepared for the sole purpose of reasonably 11

17 Wells + Asso ciates, INC

18 PDH4 SITE R-1 R-1 PDSA PDOP KEY R-1 - RESIDENTIAL PDH4 - RESIDENTIAL PDOP- OFFICE PDSA - SPECIAL ACTIVITY Wells + Associates, INC

19 1-PULTE-RYAN'S CORNER 2-HUNTMOORE AT WAXPOOL 8-Ashburn Tech park 12-Broadlands South SITE -Ashburn Center -Ryan Park Center 9-WorldCom/ Verizon Campus 4-Loudoun Station 5-Greenway Corp. Park -Loudoun Exchange 11-Moorefield Station 10-Dulles Parkway Center Wells + Associates, INC

20 Fairfield Ryan s Corner Traffic Impact Analysis Loudoun County, Virginia SECTION ANALYSIS OF EXISTING CONDITIONS TRAFFIC VOLUMES Existing AM and PM peak period traffic counts were conducted on Thursday, March 2, 2008 by Wells + Associates at the following intersections: 1. Shellhorn Road (Route 4)/Ryan Road (Ashburn Village Boulevard). 2. Dulles Greenway WB ramps/ryan Road (Ashburn Village Boulevard).. (Route 25)/Ashburn Road. 4. (Route 25)/Ryan s Corner Place (Old Ryan Road). 5. Shellhorn Road (Route 4)/ (Route 25).. (Route 25)/Faulkner Parkway (Route 40).. (Route 25)/Ryan Park Terrace The 2008 weekday vehicular traffic volumes are shown on Figure -1. Traffic count worksheets are contained in Appendix F. The results of the existing counts indicate that the weekday peak hour generally occurred from 8:00 AM to 9:00 AM in the morning and from 5:0 PM to :0 PM in the evening. Figure 4 indicates that Shellhorn Road, adjacent to the site, presently carries 59 AM peak hour trips and 455 PM peak hour trips. The existing count data indicates that the majority of traffic travels to the Greenway during both the AM and PM peak hours on Shellhorn Road. Average daily traffic volumes on key links in the study area were estimated using the 10 percent k factor consistent with Loudoun County OTS practice, as shown on Figure

21 1 2 Old Shellhorn Road 4 Ashburn Road 41 Faulkner Parkway 40 2, ,980 Dulles Greenway Mooreview Parkway 2, Old Ryan Road 2 8,00 Ryan's Corner Place 9, SITE Site Entrance,40,50 Ashburn Village,580 Ryan Park Terrace Shellhorn Road 1 4 5,10,10 Boulevard 9,020 Wells + Associates, INC

22 Fairfield Ryan s Corner Traffic Impact Analysis Loudoun County, Virginia CAPACITY ANALYSIS Existing peak hour levels of service were estimated at the seven key existing intersections in the study area based on the existing lane usage and traffic control, the existing traffic volumes, and the Highway Capacity Manual methodology (Synchro version ). The results are presented in Appendix G and summarized in Table -1 and Figure -2, and indicate the following: Parkway operates near capacity (at LOS E ) during the PM peak hour.. All of the turning movements at the Shellhorn Road/Ryan Park Terrace driveway currently operate at acceptable levels of service during both the AM and PM peak hours. 1. The recently signalized Shellhorn Road/Ryan Road (Ashburn Village Boulevard) currently operates at acceptable levels of service during the AM and PM peak hours for both movements and approaches. 2. The signalized Dulles Greenway westbound ramps/ryan Road (Ashburn Village Boulevard) intersection currently operates at acceptable levels of service during the AM and PM peak hours.. All of the turning movements at the /Ashburn Road intersection currently operate at acceptable levels of service during both the AM and PM peak hours under stop sign control. 4. All of the turning movements at the /Old Shellhorn Road/Ryan s Corner Place (Old Ryan Road) currently operate at acceptable levels of service, with the exception of the westbound approach on which operates at level of service (LOS) F during the PM peak hour. 5. The unsignalized Shellhorn Road/Waxpool Road intersection operates at acceptable levels of service during the AM peak hour. The northbound left turn from Shellhorn Road to westbound currently operates at LOS F during the evening peak hour.. The /Faulkner Parkway intersection operates at an acceptable level of service during the AM peak hour, however the northbound left turning movement from to Faulkner 1

23 Table -1 Fairfield at Ryan's Corner Existing Intersection Levels of Service 2008 Intersection Critical Existing Intersection Control Movement AM PM 1. Shellhorn Road (Route 4)/ Signal EBL B (18.9) B (1.5) Ashburn Village Blvd (Route 2) EBT C (2.0) C (24.5) Four-way Stop controled intersection (Existing) EBR B (18.) B (15.8) WBL B (1.1) B (1.9) WBT C (24.4) C (25.1) WBR C (21.1) C (21.4) NBL C (2.4) C (25.2) NBT B (14.8) B (15.) NBR A (9.) B (10.) SBL C (.0) C (0.0) SBT C (20.5) C (22.0) SBR B (11.2) B (11.0) Overall B (20.0) B (19.) 2. Ashburn Village Blvd (Route 2)/ Signal EBL D (49.) D (4.2) Dulles Greenway Westbound on/off Ramps EBT A (2.) A (5.) WBTR A (4.) A (9.1) NBLT D (8.0) D (9.8) NBR A (0.0) A (0.4) Overall A (.9) B (11.8). (Route 25)/ Stop Sign EBL A [8.0] A [9.0] Ashburn Road SBL C [21.4] C [22.4] SBR B [10.1] B [14.4] Proffered Background Improvement: Signal EBLT Add EB Thru-Lane WBT Non Proffered Background Improvement: WBR Add WB Thru-Lane and Separate Right Turn Lane SBL SBR Overall Site Improvement: Add NB Driveway Stop Sign EBLTR Add EB Thru-lanes and WB Left Turn Lane WBL NBLTR SBLT SBR Site Improvement: Install Signal Signal EBLTR WBL WBT WBR NBLTR SBLT SBR Overall 4. (Route 25)/ Stop Sign EBLTR D [2.] B [12.4] Old Shellhorn Road/Ryans Corner Place WBLTR B [1.] F [50.1] Four-way Stop controled intersection (Existing) NBLTR B [10.4] A [9.] SBLTR B [15.0] B [11.8] Proffered Background Improvement: Stop Sign EBTR SB Old Shellhorn Road becomes cul-de-sac. WBLT Add EB and WB Thru-Lanes NBLR Site Improvement: Intersection Removed 5. Shellhorn Road (Route 4)/ Stop Sign WBL A [9.5] A [8.] (Route 25) NBL C [15.5] F [5.] NBR B [10.] A [9.8] Proffered Background Improvement: Signal EBT Install Signal EBR WBL WBT NBL NBR Overall Site Improvement: expanded Signal EBT to 4-Lanes with separtate turn lanes EBR WBL WBT NBL NBR Overall. (Route 25)/ Stop Sign WBL A [.] A [8.5] Faulkner Parkway NBL B [11.] E [.8] NBR B [10.9] A [9.9]. Shellhorn Road (Route 4)/Ryan Park Terrace/ Stop Sign EBLTR Fairfield at Ryan's Corner Driveway WBLTR B [10.9] B [12.1] NBL A [0.0] A [0.0] SBLTR A [0.0] A [0.4] Notes: Numbers in parentheses () represent delay at signalized intersections in seconds per vehicle. Numbers in square brackets [] represent delay at unsignalized intersections in seconds per vehicle. 18 Wells + Associates, Inc McLean, Virginia

24 1 2 Old Shellhorn Road 4 Ashburn Road 41 Faulkner Parkway Dulles Greenway Mooreview Parkway Old Ryan Road 2 Ryan's Corner Place 4 5 SITE Site Entrance Ashburn Village Ryan Park Terrace Shellhorn Road 1 4 Boulevard Wells + Associates, INC

25 Fairfield Ryan s Corner Traffic Impact Analysis Loudoun County, Virginia SECTION 4 ANALYSIS OF FUTURE CONDITIONS WITHOUT DEVELOPMENT TRAFFIC VOLUMES For the purposes of this analysis, it was assumed that the proposed development would be complete and occupied by Background traffic forecasts without the development of the subject property were derived through a composite of existing traffic, traffic associated with pipeline developments, and increases in traffic associated with regional growth were developed. As specified in the scoping agreement, a buildout plus 10-year condition was not required. Methodology/Assumptions. The planned lane use and traffic control is shown on Figure 4-1 to include programmed/proffered improvements by others. Pipeline Developments. Traffic generated by 12 other developments mentioned previously was included in this study. The number of trips expected to be generated by the adjacent development projects was calculated using the standard rates and equations published in the Institute of Transportation Engineers Trip Generation, Seventh Edition. Development densities for each of the projects listed were derived from previous studies in the area obtained or prepared by Wells + Associates. Table 4-1 indicates that a total of,9 weekday AM peak hour trips,,11 weekday PM peak hour trips, and,22 daily trips would be added to the existing roadway network in Traffic generated by the pipeline developments were applied to the roadway network based on previous studies, where applicable. A composite of pipeline development trips are shown on Figure 4-2. Individual traffic assignments are contained in Appendix H. Since Old Shellhorn Road was open to traffic when the existing traffic data was collected, the existing traffic using this section of roadway was re-assigned to Ashburn Road and Faulkner Parkway. These adjustments to existing traffic are shown in Appendix H. Regional Growth. Consistent with previously prepared traffic studies, an annual growth rate of 1.0 percent per year from 2008 to 2015 was applied to existing volumes. Regional traffic growth volumes are shown on Figure 4- for the year Future Traffic Volumes Without Development. Background future forecasts for 2015 were developed by adding the existing traffic volumes (Figure -1) to traffic generated by pipeline developments (Figures 4-2) and regional growth rates (Figures 4-). The resultant forecasts are summarized on Figure 4-4. A summary of the background trip generation information is shown in Table 4-1 for 2015 buildout conditions. 20

26 1 2 * * Old Shellhorn Road 4 Ashburn Road Dulles Greenway Ryan's Corner Place SITE Site Entrance 8 Ashburn Village Ryan Park Terrace Shellhorn Road 1 4 Boulevard Mooreview Parkway Old Ryan Road * Faulkner Parkway Wells + Associates, INC

27 Table 4-1 Fairfield - Ryan's Corner Pipeline Project Trip Generation Analysis for Year 2015 (1) ITE Average Land Use Year 2015 Program AM Peak Hour PM Peak Hour Daily Development Code Amount Units In Out Total In Out Total Traffic 1. Pulte - Ryan's Corner Townhouse DU ,92 2. Huntmore at Waxpool Townhouse 20 DU Ryan Park Center Hotel Rooms Loudoun Station Residential DU ,50 Office ,19 SF ,9 Retail ,000 SF , Restaurant 81 25,000 SF ,940 Total ,21 5. Greenway Corporate Park Office 10 50,000 SF Loudoun Exchange/Metro Park Office 50,000 SF Ashburn Center Research Center (R&D) 0 5,000 S.F H-T Restaurant 92 8,000 S.F ,01 Total , Ashburn Tech Park Research Center (R&D) 0 0,000 S.F WorldCom/Verizon Campus Office Park ,000 SF , Dulles Parkway Center (West) Office ,000 S.F ,4 Hotel Rooms Total , Moorefield Station Single Family DU Townhouse DU ,218 Multi-Family 220 1,500 DU ,15 Office ,000 S.F ,25 Total , ,402 14, Broadlands South Office ,000 S.F ,82 TOTAL BACKGROUND DEVELOPMENT TRIPS FOR ,04 1,8,9 1,504 2,20,11,22 Notes: 1. Trip rates based on Trip Generation, 1. Trip rates based on Trip Generation, th Edition, The Institute of Transportation Engineers (ITE) unless otherwise noted. 22 Wells + Associates, Inc. McLean, Virginia

28 1 2 Old Shellhorn Road 4 Ashburn Road Faulkner Parkway Dulles Greenway Mooreview Parkway 0,40 Old Ryan Road Ryan's Corner Place 9,840 SITE Site Entrance Ashburn Village 0 Ryan Park Terrace Shellhorn Road 1 4 0,200 Boulevard 190 Wells + Associates, INC

29 1 2 Old Shellhorn Road 4 Ashburn Road 41 Faulkner Parkway Dulles Greenway 2 Ryan's Corner Place 4 5 SITE Site Entrance 8 Ashburn Village Ryan Park Terrace Shellhorn Road 1 4 Boulevard Mooreview Parkway Old Ryan Road Wells + Associates, INC

30 1 2 Old Shellhorn Road 4 Ashburn Road Dulles Greenway Mooreview Parkway 10,80,0 4,240 9, Faulkner Parkway 9,080 Ryan's Corner Place 22, SITE 11,0 Site Entrance 8 Ashburn Village,0 Ryan Park Terrace Shellhorn Road 1 4,420 5,190 5,000 15,50 Boulevard 11,190 Old Ryan Road ADT Wells + Associates, INC

31 Fairfield Ryan s Corner Traffic Impact Analysis Loudoun County, Virginia CAPACITY ANALYSIS Future peak hour levels of service, without the proposed Fairfield Ryan s Corner residential development, were calculated at all intersections in the study area for The analyses are based on the future lane use and traffic control shown on Figure 4-1, the Synchro software, in accordance with the FSM. The results are presented in Appendix I and are summarized in Table 4-2 and on Figure 4-5 and discussed below: 1. The signalized Shellhorn Road and Dulles Greenway westbound ramps intersections on Ryan Road (Ashburn Village Boulevard) would continue to operate at acceptable levels of service in When analyzed under stop sign control and assuming known proffered improvements to be in place by 2015, the southbound left turning movement from Ashburn Road to operates at LOS E during both the AM peak hour. The Waxpool Road/Ashburn Road intersection would require a new traffic signal (if warranted and approved by VDOT) in order to maintain acceptable levels of service during both the AM and PM peak hours in The installation of a new traffic signal is not a currently proffered improvement. 5. All of the turning movements at the /Faulkner Parkway intersection are forecasted to operate at acceptable levels of service during both the AM and PM peak hours under stop sign control.. All of the turning movements at the unsignalized Shellhorn Road/Ryan Park Terrace driveway would continue to operate at acceptable levels of service during both the AM and PM peak hours.. The access drive serving the approved Ryan s Corner property (assuming development of the 10 townhouses) is expected to operate at acceptable levels of service during the AM and PM peak hours. 8. The access drive on which serves the approved Huntmoore property (assuming development of the townhouses) is expected to operate at acceptable levels of service during the AM and PM peak hours.. Assuming Old Shellhorn Road (north leg) is terminated north of, all of the remaining turning movements at /Ryan s Corner Place (Old Ryan Road) would continue to operate at acceptable levels of service during both the morning and evening peak hours under stop sign control. 4. Under stop sign control, the northbound left turn at the Shellhorn Road/Waxpool Road intersection would operate at LOS F during the evening peak hour in A new traffic signal (if warranted and approved by VDOT) would be necessary to restore all movements to acceptable levels of service. This improvement is currently proffered by others (Ryan Park Center). 2

32 Table 4-2 Fairfield at Ryan's Corner Future Intersection Levels of Service without Development Intersection Critical Existing Background Intersection Control Movement AM PM AM PM 1. Shellhorn Road (Route 4)/ Signal EBL B (18.9) B (1.5) B (19.) C (20.) Ashburn Village Blvd (Route 2) EBT C (2.0) C (24.5) C (1.4) C (0.1) Four-way Stop controled intersection (Existing) EBR B (18.) B (15.8) B (19.5) B (15.2) WBL B (1.1) B (1.9) B (18.) B (19.5) WBT C (24.4) C (25.1) C (22.) C (2.) WBR C (21.1) C (21.4) B (1.0) C (2.) NBL C (2.4) C (25.2) D (.) C (4.2) NBT B (14.8) B (15.) C (2.1) C (21.4) NBR A (9.) B (10.) B (1.1) B (14.0) SBL C (.0) C (0.0) D (41.1) D (41.) SBT C (20.5) C (22.0) C (.2) C (4.) SBR B (11.2) B (11.0) C (22.1) B (19.9) Overall B (20.0) B (19.) C (25.9) C (2.1) 2. Ashburn Village Blvd (Route 2)/ Signal EBL D (49.) D (4.2) D (44.1) D (44.5) Dulles Greenway Westbound on/off Ramps EBT A (2.) A (5.) A (.) A (.4) WBTR A (4.) A (9.1) A (9.4) B (19.0) NBLT D (8.0) D (9.8) D (44.) D (45.9) NBR A (0.0) A (0.4) A (0.1) A (0.5) Overall A (.9) B (11.8) A (8.) B (1.5). (Route 25)/ Stop Sign EBL A [8.0] A [9.0] A [8.1] A [9.2] Ashburn Road SBL C [21.4] C [22.4] E [.9] D [2.0] SBR B [10.1] B [14.4] B [10.4] C [15.] Proffered Background Improvement: Signal EBLT A (5.) A (5.5) Add EB Thru-Lane WBT A (4.4) A (5.4) Non Proffered Background Improvement: WBR A (4.0) A (4.4) Add WB Thru-Lane and Separate Right Turn Lane SBL A (9.0) A (.1) SBR A (8.5) A (.1) Overall A (5.9) A (5.) Site Improvement: Add NB Driveway Stop Sign EBLTR Add EB Thru-lanes and WB Left Turn Lane WBL NBLTR SBLT SBR Site Improvement: Install Signal Signal EBLTR WBL WBT WBR NBLTR SBLT SBR Overall 4. (Route 25)/ Stop Sign EBLTR D [2.] B [12.4] Old Shellhorn Road/Ryans Corner Place WBLTR B [1.] F [50.1] Four-way Stop controled intersection (Existing) NBLTR B [10.4] A [9.] SBLTR B [15.0] B [11.8] Proffered Background Improvement: Stop Sign EBTR A [0.0] A [0.0] SB Old Shellhorn Road becomes cul-de-sac. WBLT A [0.1] A [0.2] Add EB and WB Thru-Lanes NBLR B [1.4] B [12.0] Site Improvement: Intersection Removed 5. Shellhorn Road (Route 4)/ Stop Sign WBL A [9.5] A [8.] B [10.2] A [8.] (Route 25) NBL C [15.5] F [5.] C [18.0] F [4.0] NBR B [10.] A [9.8] B [11.] B [10.] Proffered Background Improvement: Signal EBT A (5.) A (8.2) Install Signal EBR A (5.0) A (.9) WBL A (4.) A (.9) WBT A (4.4) A (8.5) NBL B (10.4) A (8.) NBR A (9.) A (.5) Overall A (5.8) A (8.0) Site Improvement: expanded Signal EBT to 4-Lanes with separtate turn lanes EBR WBL WBT NBL NBR Overall. (Route 25)/ Stop Sign WBL A [.] A [8.5] A [8.0] A [8.4] Faulkner Parkway NBL B [11.] E [.8] B [12.] D [29.1] NBR B [10.9] A [9.9] B [14.9] B [10.9]. Shellhorn Road (Route 4)/Ryan Park Terrace/ Stop Sign EBLTR Fairfield at Ryan's Corner Driveway WBLTR B [10.9] B [12.1] B [11.5] B [1.] NBL A [0.0] A [0.0] A [0.0] A [0.] SBLTR A [0.0] A [0.4] A [0.0] A [0.0] 8. North Site Entrance/ Stop Sign EBLR B [12.1] A [9.9] Shellhorn Road NBTL A [1.5] A [2.] SBTR A [0.0] A [0.0] 9. Huntmoore Driveway/ Stop Sign EBTR A [0.0] A [0.0] WBTL A [0.1] A [0.] NBLR B [12.4] B [11.5] Notes: Numbers in parentheses () represent delay at signalized intersections in seconds per vehicle. Numbers in square brackets [] represent delay at unsignalized intersections in seconds per vehicle. 2 Wells + Associates, Inc McLean, Virginia

33 1 2 Old Shellhorn Road 4 Ashburn Road Faulkner Parkway Dulles Greenway Ryan's Corner Place SITE Site Entrance 8 Ashburn Village Ryan Park Terrace Shellhorn Road 1 4 Boulevard Mooreview Parkway Old Ryan Road Wells + Associates, INC

34 Fairfield Ryan s Corner Traffic Impact Analysis Loudoun County, Virginia SECTION 5 TRIP GENERATION, DISTRIBUTION AND ASSIGNMENT The resulting traffic assignments and directional distributions are shown on Figure 5-1. TRIP GENERATION The volume of trips generated by the proposed Fairfield Ryan s Corner was calculated using the standard rates and equations published in the Institute of Transportation Engineers Trip Generation, Seventh Edition. The results are summarized on Table 5-1, and indicate that the currently approved 19 townhouses would generate 89 trips (15 in and 4 out) during the AM peak hour, 105 trips (0 in and 5 out) during the PM peak hour, and 1,14 daily (24-hour) trips. The proposed 540 multi-family apartments would generate 28 trips (54 in and 214 out) during the AM peak hour, 15 trips (205 in and 110 out) during the PM peak hour, and,9 daily (24-hour) trips. Thus, the proposed project would generate 19 more AM peak hour trips, 210 more PM peak hour trips, and 1,82 more daily trips than the currently approved density. SITE TRIP DISTIBUTION AND ASSIGNMENT The distribution of peak hour trips generated by Fairfield Ryan s Corner and other approved projects was determined based on existing travel patterns and previous traffic studies in the area. The Ryan s Corner residential development applied the following distributions of site-generated traffic: 45 percent from the east via Dulles Greenway 10 percent from the west via Dulles Greenway 15 percent from the north/west via and Ashburn Road 25 percent from the north/east via Loudoun County Pkwy and Ashburn Village Blvd. 5 percent from the south via Loudoun County Parkway 29

35 Table 5-1 Fairfield - Ryan's Corner Site Trip Generation (1) ITE Average Land Use AM Peak Hour PM Peak Hour Daily Land Use Code Size Units In Out Total In Out Total Trips (2) Approved Development () Residential Townhouse DU ,14 Proposed Development Residential Multi - Family (Rental Apartments) DU ,9 Additional Trips (Approved vs. Proposed) 4 DU ,82 Notes: (1) Traffic estimates based on Institute of Transportation Engineers (ITE) Trip Generation. (2) ADT rate of 8. per D.U. is required by VDOT for townhomes () Includes Pulte-Ryans Corner (10 Units) and Huntmore at Waxpool ( Units) 0 Wells + Associates, Inc. McLean, Virginia

36 1 2 Old Shellhorn Road 4 Ashburn Road 41 Faulkner Parkway INTERSECTION REMOVED 10% Dulles Greenway Place Ryan's Corner 4 5 SITE Site Entrance 90 Ryan Park Terrace 1, Mooreview Parkway Old Ryan Road Ashburn Village % Shellhorn Road 1 4 Boulevard XXX Wells + Associates, INC

37 Fairfield Ryan s Corner Traffic Impact Analysis Loudoun County, Virginia SECTION ANALYSIS OF FUTURE CONDITIONS WITH DEVELOPMENT TRAFFIC VOLUMES Total future forecasts for were developed by adding the existing traffic volumes, traffic generated by adjacent developments, and the traffic generated by the proposed project, and are summarized on Figure -1. Turn Lane Assessment Consistent with the currently approved study, the need for separate left and right turn lanes was analyzed for the proposed site entrance on Shellhorn Road opposite Ryan s Corner Terrace, in accordance with VDOT standards. As shown on the nomograph in Appendix J, the left and right turn volume during the AM and PM peak hours would warrant the construction of separate northbound left turn lane and a southbound right turn taper. It is noted that these results differ from the currently approved study. However, according to the Countywide Transportation Plan, left and right turn lanes are required at all intersections on Shellhorn Road. A separate northbound left turn lane exists on Shellhorn Road at the site entrance that will be utilized by Fairfield Ryan s Corner traffic. This existing lane provides approximately 100 feet of storage area (or approximately four to five vehicles) and is proposed to be lengthened by approximately 25 to 50 feet to provide the maximum amount of storage without impacting the southbound left turns on Shellhorn Road at Ashburn Village Boulevard. The queue for the northbound left was calculated based on HCM methodology and indicates that the maximum queue (95 th percentile) would occur during the evening peak hour and is expected to be one to two vehicles. The need for separate turn lanes was also evaluated at the secondary entrance located on opposite Ashburn Road and is shown in Appendix J. The results indicate that a westbound left turn lane is warranted on based on the 2015 future AM and PM peak hour volumes. The recommended storage length is 5 feet. A westbound right turn lane taper is warranted at the secondary entrance on at Ashburn Road and is proffered by others. A separate left turn lane is warranted on eastbound for both peak hours based on the 2015 future forecasts. However, due to right-of-way constraints and proximity of the Parkside at Ashburn driveway approximately 250 feet west of the intersection, a separate eastbound left is not proposed to be constructed. The future lane use is shown on Figure -2. CAPACITY ANALYSIS Future peak hour levels of service with Fairfield Ryan s Corner were estimated at the key intersections in the study area based on the total future traffic forecasts are shown on Figure -1, the future lane usage and traffic controls shown on Figure -2, and the Synchro software, in accordance with the FSM. The results are presented in Appendix K and summarized in Table -1 and Figure - and discussed below. 1. The signalized intersections of Shellhorn Road and the Dulles Greenway westbound ramps on Ryan Road (Ashburn Village Boulevard) would continue to operate at acceptable levels of service in 2015 without further improvements. 2. Similar to 2015 background conditions, the intersections of /Ashburn Road/Site Entrance and Waxpool Road/Shellhorn Road would require the installation of traffic signals in order to maintain acceptable levels of service. It is noted that the traffic signal at the Waxpool Road/Shellhorn Road intersection is currently proffered by others.. All of the turning movements at the proposed site driveway on Shellhorn Road opposite Ryan s Park Terrace would operate at acceptable levels of service with 2

38 Fairfield Ryan s Corner Traffic Impact Analysis Loudoun County, Virginia full development of the site. 4. The unsignalized (Route 25)/Faulkner Parkway would continue to operate at acceptable levels of service in 2015 with the site buildout. 5. The Ashburn Road/Site Entrance/Waxpool Road intersection is forecasted to operate at acceptable levels of service during both the AM and PM peak hours, assuming a new traffic signal is installed and widening of to a four-lane undivided road as identified under background conditions is constructed.

39 1 2 Old Shellhorn Road 4 Ashburn Road 41 Faulkner Parkway 40 5, INTERSECTION REMOVED ,050 Dulles Greenway Mooreview Parkway,800 4,40 Old Ryan Road 2 12,040 Ryan's Corner Place 2, SITE Site Entrance Ashburn Village 8,0 Ryan Park Terrace Shellhorn Road 1 4,920,90 15,50 Boulevard 11,90 ADT Wells + Associates, INC

40 Old Shellhorn Road 4 Ashburn Road * + + Faulkner Parkway Dulles Greenway Mooreview Parkway Old Ryan Road 2 Place Ryan's Corner 4 5 SITE Site Entrance Ashburn Village Ryan Park Terrace Shellhorn Road 1 4 Boulevard Wells + Associates, INC

41 Table -1 Fairfield at Ryan's Corner Total Future Intersection Levels of Service with Development Intersection Critical Existing Background Total Future Intersection Control Movement AM PM AM PM AM PM 1. Shellhorn Road (Route 4)/ Signal EBL B (18.9) B (1.5) B (19.) C (20.) C (21.) B (19.9) Ashburn Village Blvd (Route 2) EBT C (2.0) C (24.5) C (1.4) C (0.1) C (4.1) C (29.1) Four-way Stop controled intersection (Existing) EBR B (18.) B (15.8) B (19.5) B (15.2) C (21.5) B (14.) WBL B (1.1) B (1.9) B (18.) B (19.5) C (21.5) C (21.) WBT C (24.4) C (25.1) C (22.) C (2.) C (25.1) D (5.) WBR C (21.1) C (21.4) B (1.0) C (2.) C (20.2) C (25.5) NBL C (2.4) C (25.2) D (.) C (4.2) D (40.0) D (.4) NBT B (14.8) B (15.) C (2.1) C (21.4) C (22.8) C (2.5) NBR A (9.) B (10.) B (1.1) B (14.0) B (14.) B (15.9) SBL C (.0) C (0.0) D (41.1) D (41.) D (4.1) D (44.8) SBT C (20.5) C (22.0) C (.2) C (4.) C (2.1) D (.) SBR B (11.2) B (11.0) C (22.1) B (19.9) C (22.4) C (20.2) Overall B (20.0) B (19.) C (25.9) C (2.1) C (2.0) C (2.) 2. Ashburn Village Blvd (Route 2)/ Signal EBL D (49.) D (4.2) D (44.1) D (44.5) D (44.1) D (44.5) Dulles Greenway Westbound on/off Ramps EBT A (2.) A (5.) A (.) A (.4) A (.) A (.4) WBTR A (4.) A (9.1) A (9.4) B (19.0) A (9.) B (19.) NBLT D (8.0) D (9.8) D (44.) D (45.9) D (44.) D (45.9) NBR A (0.0) A (0.4) A (0.1) A (0.5) A (0.1) A (0.) Overall A (.9) B (11.8) A (8.) B (1.5) A (8.) B (1.). (Route 25)/ Stop Sign EBL A [8.0] A [9.0] A [8.1] A [9.2] Ashburn Road SBL C [21.4] C [22.4] E [.9] D [2.0] SBR B [10.1] B [14.4] B [10.4] C [15.] Proffered Background Improvement: Signal EBLT A (5.) A (5.5) Add EB Thru-Lane WBT A (4.4) A (5.4) Non Proffered Background Improvement: WBR A (4.0) A (4.4) Add WB Thru-Lane and Separate Right Turn Lane SBL A (9.0) A (.1) SBR A (8.5) A (.1) Overall A (5.9) A (5.) Site Improvement: Add NB Driveway Stop Sign EBLTR A [.9] A [4.9] Add EB Thru-lanes and WB Left Turn Lane WBL A [8.5] A [8.0] NBLTR C [2.8] D [25.0] SBLT F [2.0] F [58.4] SBR A [9.] B [11.] Site Improvement: Install Signal Signal EBLTR B (15.0) B (11.5) WBL B (11.0) A (9.) WBT B (11.5) B (11.0) WBR B (10.) A (9.1) NBLTR C (28.) B (1.2) SBLT C (21.0) B (14.9) SBR B (19.8) B (14.4) Overall B (1.9) B (11.9) 4. (Route 25)/ Stop Sign EBLTR D [2.] B [12.4] Old Shellhorn Road/Ryans Corner Place WBLTR B [1.] F [50.1] Four-way Stop controled intersection (Existing) NBLTR B [10.4] A [9.] SBLTR B [15.0] B [11.8] Proffered Background Improvement: Stop Sign EBTR A [0.0] A [0.0] SB Old Shellhorn Road becomes cul-de-sac. WBLT A [0.1] A [0.2] Add EB and WB Thru-Lanes NBLR B [1.4] B [12.0] Site Improvement: Intersection Removed Intersection No Longer Exists 5. Shellhorn Road (Route 4)/ Stop Sign WBL A [9.5] A [8.] B [10.2] A [8.] (Route 25) NBL C [15.5] F [5.] C [18.0] F [4.0] NBR B [10.] A [9.8] B [11.] B [10.] Proffered Background Improvement: Signal EBT A (5.) A (8.2) Install Signal EBR A (5.0) A (.9) WBL A (4.) A (.9) WBT A (4.4) A (8.5) NBL B (10.4) A (8.) NBR A (9.) A (.5) Overall A (5.8) A (8.0) Site Improvement: expanded Signal EBT A (5.0) A (.1) to 4-Lanes with separtate turn lanes EBR A (5.2) A (.8) WBL A (4.) A (.0) WBT A (4.) A (8.) NBL A (8.) A (9.1) NBR A (.9) A (.8) Overall A (5.4) A (8.0). (Route 25)/ Stop Sign WBL A [.] A [8.5] A [8.0] A [8.4] A [8.0] A [8.5] Faulkner Parkway NBL B [11.] E [.8] B [12.] D [29.1] B [1.0] D [.] NBR B [10.9] A [9.9] B [14.9] B [10.9] C [15.9] B [11.]. Shellhorn Road (Route 4)/Ryan Park Terrace/ Stop Sign EBLTR B [1.2] B [12.1] Fairfield at Ryan's Corner Driveway WBLTR B [10.9] B [12.1] B [11.5] B [1.] C [15.0] C [18.] NBL A [0.0] A [0.0] A [0.0] A [0.] A [8.] A [8.2] SBLTR A [0.0] A [0.4] A [0.0] A [0.0] A [0.0] A [0.5] 8. North Site Entrance/ Stop Sign EBLR B [12.1] A [9.9] Shellhorn Road NBTL A [1.5] A [2.] SBTR A [0.0] A [0.0] 9. Huntmoore Driveway/ Stop Sign EBTR A [0.0] A [0.0] WBTL A [0.1] A [0.] NBLR B [12.4] B [11.5] Notes: Numbers in parentheses () represent delay at signalized intersections in seconds per vehicle. Numbers in square brackets [] represent delay at unsignalized intersections in seconds per vehicle. Wells + Associates, Inc McLean, Virginia

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

CRYSTAL HOUSE III TRAFFIC IMPACT ANALYSIS ARLINGTON COUNTY, VA

CRYSTAL HOUSE III TRAFFIC IMPACT ANALYSIS ARLINGTON COUNTY, VA CRYSTAL HOUSE III TRAFFIC IMPACT ANALYSIS ARLINGTON COUNTY, VA Prepared for: Roseland, A Mack-Cali Company Prepared by: Wells + Associates, Inc. Michael R. Pinkoske, PTP Henry C. Clarke, EIT 70.97.660

More information

BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE COMMITTEE ACTION ITEM

BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE COMMITTEE ACTION ITEM BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE COMMITTEE ACTION ITEM Date of Meeting: May 12, 2017 # 1 SUBJECT: ELECTION DISTRICT: Response to Board Member Initiative: Safety Concerns for Left Hand Turn

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748 City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License

More information

MEMORANDUM. Matt Folden, AICP, MNCPPC Rebecca Torma, MCDOT. Nancy Randall, AICP, PTP Barbara Mosier, P.E., PTOE Kevin Berger

MEMORANDUM. Matt Folden, AICP, MNCPPC Rebecca Torma, MCDOT. Nancy Randall, AICP, PTP Barbara Mosier, P.E., PTOE Kevin Berger To: From: Matt Folden, AICP, MNCPPC Rebecca Torma, MCDOT Nancy Randall, AICP, PTP Barbara Mosier, P.E., PTOE Kevin Berger 1110 Bonifant Street Suite 210, Silver Spring, MD 20910 301-448-1333 WellsandAssociates.com

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

Appendix G: Future Conditions Traffic Analysis Memorandum

Appendix G: Future Conditions Traffic Analysis Memorandum ppendix G: Future Conditions Traffic nalysis Memorandum Prepared by: Bolton & Menk, Inc. Riverfront Drive Corridor Study ǀ T42.867 ppendix MEMORNDUM Date: pril, 27 To: Paul Vogel From: Ross B. Tillman,

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study Traffic Study To: From: James M. Moore, Director of Planning & Building Services, Town of Fairfax David Parisi, PE, TE, Parisi Transportation Consulting Date: October 14, 216 Subject: Victory Village Senior

More information

Student Housing Development

Student Housing Development Traffic Impact Study for the proposed Student Housing Development City of Oneonta Otsego County, New York Project No. 3259 December 212 Revised February 13, 212 Prepared For: Newman Development Group,

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

Erickson Living at Limestone Valley

Erickson Living at Limestone Valley Erickson Living at Limestone Valley Howard County, Maryland July 28, 27 Adequate Road Facilities Test Evaluation and Traffic Study Prepared for: Erickson Living Steven Montgomery Vice President of Development

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

Appendices. Appendix J: Traffic Study

Appendices. Appendix J: Traffic Study Appendices Appendix J: Traffic Study The Platinum Triangle Subsequent EIR The Planning Center Appendices This page intentionally left blank. The Platinum Triangle Subsequent EIR The Planning Center TRAFFIC

More information

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama.

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama. Traffic Impact Study Crestline Piggly Wiggly Mountain Brook, Alabama Prepared for: Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama September 214 Revision 1 October 214 Crestline Piggly Wiggly Mountain

More information

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for: TRAFFIC IMPACT STUDY For Creekside Thornton, Colorado August 215 November 215 Revised: August 216 Prepared for: Jansen Strawn Consulting Engineers 45 West 2 nd Avenue Denver, Colorado 8223 Prepared by:

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

THE GEORGE WASHINGTON UNIVERSITY SITE 75A REVISED TRANSPORTATION IMPACT STUDY WASHINGTON, DC

THE GEORGE WASHINGTON UNIVERSITY SITE 75A REVISED TRANSPORTATION IMPACT STUDY WASHINGTON, DC THE GEORGE WASHINGTON UNIVERSITY SITE 75A REVISED TRANSPORTATION IMPACT STUDY WASHINGTON, DC Submitted on behalf of: The George Washington University Prepared by: Wells + Associates, Inc. September 2012

More information

Traffic Analysis Report I-5 Interchanges 14 and 19 (Green Springs and North Ashland Interchanges) City of Ashland Jackson County

Traffic Analysis Report I-5 Interchanges 14 and 19 (Green Springs and North Ashland Interchanges) City of Ashland Jackson County Traffic Analysis Report I-5 Interchanges 14 and 19 (Green Springs and North Ashland Interchanges) City of Ashland Jackson County Prepared for Oregon Department of Transportation, Region 3 3500 NW Stewart

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

6060 North Central Expressway Mixed-Use Site Dallas, Texas

6060 North Central Expressway Mixed-Use Site Dallas, Texas Volume 1 Traffic Impact Analysis 6060 North Central Expressway Mixed-Use Site Dallas, Texas April 30, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #063238300 Registered Firm F-928 Traffic

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams. Technical Memorandum TRFFIC IMPCT STUDY RIDLEY ROD CONVENIENCE STORE Southampton County, V Prepared for: Mr. David Williams By: Charles Smith, P.E., PTOE EPR Charlottesville, V July 2014 1 TBLE OF CONTENTS

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012 Update for the May 31 st, 2012 Traffic Impact Study Prepared for Broccolini Construction 111-23596-00 September 20 th, 2012 2611 Queensview Drive, Suite 300, Ottawa, Ontario CANADA K2B 8K2 Telephone: 613-829-2800

More information

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY Prepared for: City of Thornton And Colorado Department of Transportation Prepared by: 11 Blake Street, Suite 2 Denver, Colorado 822 Contact: Brian Bern, PE, PTOE

More information

Traffic Impact Statement

Traffic Impact Statement Traffic Impact Statement Mixed Use Development, US 41 and Old Trail Drive aka Tide-Starbucks 4900 9 th Street North General Development Site Plan (GDSP) Collier County, FL 10/6/2015 Prepared for: Prepared

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

Paul VI Redevelopment. Traffic Impact Study

Paul VI Redevelopment. Traffic Impact Study ATTACHMENT 5 Paul VI Redevelopment Traffic Impact Study April 18, 2017 PAUL VI REDEVELOPMENT TRAFFIC IMPACT STUDY CITY OF FAIRFAX, VIRGINIA Prepared for: IDI GROUP COMPANIES Prepared by: Wells + Associates,

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

4. Include the associated years anticipated for the short term and long term analysis in the

4. Include the associated years anticipated for the short term and long term analysis in the 2nd DE Review SM ROCHA, LLC responses to City comments are provided within. 8. Trip distribution is displayed in Figure 6. Distribution assumes SFA and commercial traffic combined for most conservative

More information

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT November 2016 TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT & Aspinwall Borough, Sharpsburg Borough & O Hara Township, Allegheny County, Pennsylvania Prepared for: Riverfront

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

THE GEORGE WASHINGTON UNIVERSITY SITE 75A TRANSPORTATION IMPACT STUDY WASHINGTON, DC

THE GEORGE WASHINGTON UNIVERSITY SITE 75A TRANSPORTATION IMPACT STUDY WASHINGTON, DC THE GEORGE WASHINGTON UNIVERSITY SITE 75A TRANSPORTATION IMPACT STUDY WASHINGTON, DC Submitted on behalf of: The George Washington University Prepared by: Wells + Associates, Inc. February 2012 TABLE OF

More information

4.0 TRAFFIC IMPACT STUDIES

4.0 TRAFFIC IMPACT STUDIES SECTION 4 4.0 TRAFFIC IMPACT STUDIES 4.1 TRAFFIC IMPACT STUDY REQUIREMENTS The City has established Traffic Impact Study (TIS) requirements for the purpose of ensuring that both the quantitative and qualitative

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO

TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO APRIL 12, 218 REV. JULY 16, 218 Prepared for: Davis Development 43 Corporate Center Dr Suite 21 Stockbridge, GA 3281 Prepared by: 112

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

Blackthorne Inn & Restaurant Traffic Impact Analysis

Blackthorne Inn & Restaurant Traffic Impact Analysis Blackthorne Inn & Restaurant Traffic Impact Analysis 10087 John Mosby Highway (US Rte. 50) Fauquier County, VA Prepared For: Easton Porter Group, LLC 5022 Plank Road North Garden, VA 22959 Submitted By:

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

T$- RIB Endineering, ac

T$- RIB Endineering, ac T$- RIB Endineering, ac..' Transportation Endineerimg Solutions Transportation Impact Study Vineyard-Goldelm Fort Collins, Colorado February 2016 Vineyard-Goldelm Transportation Impact Study Fort Collins,

More information

County of Loudoun. Department of Planning and Zoning MEMORANDUM

County of Loudoun. Department of Planning and Zoning MEMORANDUM County of Loudoun Department of Planning and Zoning MEMORANDUM DATE: March 16, 2015 TO: FROM: Kate McConnell, AICP, Project Manager Land Use Review Joseph Carter, AICP, CZA, GISP, Senior Planner Community

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT Prepared by: In Association with: November 2013 EXECUTIVE SUMMARY Patton Township, in partnership

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

February 24, 2017 Project #: 20076

February 24, 2017 Project #: 20076 February 24, 217 Project #: 276 Jinde Zhu Washington County Department of Land Use and Transportation 14 SW Walnut Street MS 17 Hillsboro, Oregon 97213 RE: Sunset Ridge Phase 2 Access Report and Zone Change

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

TABLE TRAFFIC ANALYSIS SCENARIOS

TABLE TRAFFIC ANALYSIS SCENARIOS 4.11 TRANSPORTATION The potential traffic impacts of the proposed project are evaluated in the Buena Park Beach/Orangethorpe Mixed Use Project Traffic Analysis (Traffic Analysis) by Austin-Foust Associates

More information

GW MOUNT VERNON CAMPUS TRANSPORTATION IMPACT STUDY WASHINGTON, D.C.

GW MOUNT VERNON CAMPUS TRANSPORTATION IMPACT STUDY WASHINGTON, D.C. GW MOUNT VERNON CAMPUS TRANSPORTATION IMPACT STUDY WASHINGTON, D.C. Submitted on behalf of: The George Washington University Prepared by: Wells + Associates, Inc. Jami L. Milanovich, P.E. Jorjean M. Stanton

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

Congestion Mitigation at IH 27 and U.S. Hwy 70 in Plainview, TX

Congestion Mitigation at IH 27 and U.S. Hwy 70 in Plainview, TX 2010 Congestion Mitigation at IH 27 and U.S. Hwy 70 in Plainview, TX Hongchao Liu, Hao Xu, and Rhett Dollins Multidisciplinary Research in Transportation Texas Tech University Mulidisciplinary Research

More information

joint access drive. will be

joint access drive. will be Date: To: From: Subject: June 22, 2015 Bradley Reiner, PE Bowman Consulting David R. Kline, PE, PTOE, Incline Associates Thornton Self-Storage Traffic Analysis (DRAFT) - Thornton, Colorado INTRODUCTION

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677 Transportation Impact Analysis Sierra College Boulevard Commercial Project City of Rocklin Prepared for: David Mohlenbrok City of Rocklin 081 Alvis Court Rocklin, CA 95677 Prepared by: 1875 Olympic Boulevard,

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

Fieldgate. Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton

Fieldgate. Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton Fieldgate Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton September 214 September 23 214 Ms Debbie Pacchiarotti Our

More information

Marina Loft (DRC 51-R-12)

Marina Loft (DRC 51-R-12) Marina Loft (DRC 51-R-12) traffic study prepared for: Cymbal Development OCtober 2012 Traf Tech October 1, 2012 Mr. Asi Cymbal - President Cymbal Development 3470 North Miami Avenue Upper Suite Miami,

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

Prepared for Lutheran Services Carolinas. Project Number: /07/2017. Trinity Landing. New Hanover County, NC

Prepared for Lutheran Services Carolinas. Project Number: /07/2017. Trinity Landing. New Hanover County, NC Prepared for Lutheran Services Carolinas Project Number: 16273 4/7/217 Trinity Landing New Hanover County, NC Trinity Landing Transportation Impact nalysis Prepared for Lutheran Services Carolinas New

More information

South Street Campus Lands Development. City of London TRANSPORTATION IMPACT ASSESSMENT

South Street Campus Lands Development. City of London TRANSPORTATION IMPACT ASSESSMENT South Street Campus Lands Development City of London TRANSPORTATION IMPACT ASSESSMENT TW1387 South Street Campus Lands Development City of London TRANSPORTATION IMPACT ASSESSMENT May 2013 South Street

More information

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA April 217 T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA Submitted

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

Troutbeck Farm Development

Troutbeck Farm Development Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com

More information

Patuxent Green Golf Course

Patuxent Green Golf Course Patuxent Green Golf Course Laurel, Maryland February 23, 2018 Traffic Impact Analysis Prepared for: ADC Builders Alan Cohen 2701 Tower Oaks Boulevard, Suite 200 Rockville, Maryland 20852 TABLE OF CONTENTS

More information

TRAFFIC OPERATIONS ANALYSIS REPORT. Pacheco Boulevard Alignment Study and Alternatives Analysis

TRAFFIC OPERATIONS ANALYSIS REPORT. Pacheco Boulevard Alignment Study and Alternatives Analysis TRAFFIC OPERATIONS ANALYSIS REPORT Pacheco Boulevard Alignment Study and Alternatives Analysis PREPARED FOR: CITY OF MARTINEZ AND CONTRA COSTA COUNTY OCTOBER 2016 FINAL REPORT Prepared By: under contract

More information

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina Prepared for Longbranch Development Prepared by January 13, 219 ii Table of Contents Subject Page Signature Page... i Table of Contents...

More information

Arterial Management Plan for US Route 250 and State Route 623

Arterial Management Plan for US Route 250 and State Route 623 Arterial Management Plan for US Route 250 and State Route 623 June 25, 2014 Brad Shelton, AICP Access Management and Traffic Impact Analysis Programs Manager Transportation and Mobility Planning Division

More information

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc

More information

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study To: Ms. Susan C. Ryan Spaulding Youth Center 72 Spaulding Road Northfield, NH 03276 Date: September 7, 2017 Project #: 52455.00 From: Robin Bousa Director of Transportation Systems Re: Spaulding Youth

More information

List of Exhibits...ii

List of Exhibits...ii One Brickell Traffic Study TABLE OF CONTENTS List of Exhibits...ii EXECUTIVE SUMMARY...1 1. INTRODUCTION...2 1.1 Study Area...2 1.2 Study Objective...5 2. EXISTING TRAFFIC CONDITIONS...6 2.1 Data Collection...6

More information

Technical Memo. Steve Gramm, SDDOT. RE: Phase 1, Task 100: Baseline Analysis. To: From: Steve Hoff, HDR Engineering, Inc.

Technical Memo. Steve Gramm, SDDOT. RE: Phase 1, Task 100: Baseline Analysis. To: From: Steve Hoff, HDR Engineering, Inc. Technical Memo To: Steve Gramm, SDDOT From: Steve Hoff, Engineering, Inc. Project: I-190/Silver Street Study CC: Date: 6//010 Job No: DOT Contract 41044, Order PD-0-09 RE: Phase 1, Task 100: Baseline Analysis

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY TRAFFIC IMPACT STUDY for the GLEN ELLEN COUNTRY CLUB SENIOR RESIDENTIAL REDEVELOPMENT 84 Millis, Massachusetts Prepared by: McMahon Associates, Inc. Prepared for: Toll Brothers, Inc. August 216 DRAFT

More information

Volume 1 Traffic Impact Analysis. Texas Odyssey TIA Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. May 23, 2018

Volume 1 Traffic Impact Analysis. Texas Odyssey TIA Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. May 23, 2018 Volume 1 Traffic Impact Analysis Texas Odyssey TIA Dallas, Texas May 23, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064529800 Registered Firm F-928 Traffic Impact Analysis Texas Odyssey

More information

Grant Avenue Streetscape

Grant Avenue Streetscape REPORT TYPE GOES HERE Grant Avenue Streetscape PREPARED FOR City of Manassas 9027 Center Street Manassas, VA 20110 PREPARED BY 8300 Boone Boulevard Suite 700 Vienna, Virginia 22182 571.389.8121 July 31,

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property

Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property Prepared for: Premier Gold Mines Limited Prepared by: Stantec Consulting Ltd. November 2014

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis MEMORANDUM Transportation Bill Troe, AICP Jason Carbee, AICP 12120 Shamrock Plaza Suite 300 Omaha, NE 68154 (402) 334-8181 (402) 334-1984 (Fax) To: Project File Date: Subject: Solberg Avenue / I-229 Grade

More information

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners DRAFT Corridor study Honeysuckle Road October 2017 Prepared for the City of Dothan, AL Prepared by TABLE OF CONTENTS SECTION I... 1 STUDY SUMMARY... 1 INTRODUCTION... 1 CONCLUSIONS... 5 SECTION II... 7

More information

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited 2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief Paradigm Transportation Solutions Limited March 217 March 217 Project: 1627 Diana Vlasic, M.C.I.P., R.P.P Metropolitan Consulting 445 Paletta

More information

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment March 11, 2015 Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA 01940 Re: Walnut Street Traffic Assessment Dear Board of Selectmen Members: As requested, BETA Group, Inc. (BETA)

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny

More information