Traffic Analysis Report I-5 Interchanges 14 and 19 (Green Springs and North Ashland Interchanges) City of Ashland Jackson County

Size: px
Start display at page:

Download "Traffic Analysis Report I-5 Interchanges 14 and 19 (Green Springs and North Ashland Interchanges) City of Ashland Jackson County"

Transcription

1 Traffic Analysis Report I-5 Interchanges 14 and 19 (Green Springs and North Ashland Interchanges) City of Ashland Jackson County Prepared for Oregon Department of Transportation, Region NW Stewart Parkway Roseburg, Oregon Prepared by David Evans and Associates, Inc SW River Parkway Portland, Oregon August 22, 2006

2

3

4

5 TABLE OF CONTENTS Executive Summary... i 1. Introduction and Background Analysis Area Interchange 14 (Green Springs Interchange) Interchange 19 (North Ashland Interchange) Traffic Counts Developing 30 th Hour Volumes Traffic Operations Standards and Procedures Volume to Capacity Ratio Level of Service Analysis Procedures Existing Traffic Operations Green Springs Interchange 14 Northbound and Southbound Ramp Terminals North Ashland Interchange 19 Northbound and Southbound Ramp Terminals South Valley View Road at Rogue Valley Highway (OR 99) Merge/Diverge Analysis Safety Analysis Calculation of Crash Rates SPIS Data Intersection Crashes Segment Crashes Crash Analysis Conclusions Future Volume Development Future Traffic Operations Analysis No-Build Scenario Signal Warrant Analysis Ashland Street (OR 66) & I-5 Southbound Ramps Ashland Street (OR 66) & I-5 Northbound Ramps North Ashland Interchange Future Traffic Operations Analysis Build Options Green Springs Interchange Build Option Green Springs Interchange Build Option Green Springs Interchange Build Option Traffic Analysis Report August 22, 2006

6 11.4 Green Springs Interchange Build Option Analysis of AM Peak Hour at Interchange North Ashland Interchange Build Option North Ashland Interchange Build Option North Ashland Interchange Build Option Loop Ramp Design North Ashland Interchange Build Option North Ashland Interchange Build Option Improvements to South Valley View Road Access Management Standards List on Non-Conforming Accessses Changes to Access Management in Connection with Bridge Bundle Access Management Differences Between Build Options Bicycle and Pedestrian Facilities Conclusions Interchange 19 Overview Interchange 19 Conclusions Interchange 14 Overview Interchange 14 Conclusions TABLE OF TABLES Table 1 Analysis Area Roadway Inventory... 4 Table 2 Intersection Turning Movement Count Locations and Types... 6 Table 3 Seasonal Factors From Seasonal Trend Table Data... 7 Table 4 Existing (Year 2006) 30th Highest Hour Traffic Operations Analysis Results Table 5 Existing (Year 2006) 30th Highest Hour 95th Percentile Queues Table 6 Study Area Intersection Crash Rates Table 7 Freeway Crash Data Table 8 Existing and Future Year No Build Traffic Operations Analysis Results Table 9 Existing and Future Year No Build 95th Percentile Queues Table 10 Signal Warrant Analysis Summary Table 11 Build Options Analysis Summary Table 12 Build Options Queuing Summary Table 13 Build Options Queuing Summary; North Ashland Interchange Table 14 Summary of Build Option Adequacy, Potential Design and ROW Issues Traffic Analysis Report August 22, 2006

7 TABLE OF FIGURES Figure 1 Existing Lane Configurations and Traffic Control Devices... 3 Figure 2 Existing Conditions (2006) Balanced PM Peak Hour Volumes (30th Highest Hour Volumes) Traffic Operations Analysis Summary... 8 Figure 3 Year 2010 No Build Design Hour Volumes Traffic Operations Analysis Summary Figure 4 Year 2030 No Build Design Hour Volumes Traffic Operations Analysis Summary Figure 5 Green Springs Interchange Build Option Figure 6 Green Springs Interchange Build Option Figure 7 Green Springs Interchange Build Option Figure 8 Green Springs Interchange Build Option 14-4: SPUI Figure 9 North Ashland Interchange Build Option Figure 10 North Ashland Interchange Build Option Figure 11 North Ashland Interchange Build Option Figure 12 North Ashland Interchange Build Option Figure 13 North Ashland Interchange Build Option A. Traffic Counts B. Volume Adjustments C. Synchro and SimTraffic Analysis Output D. HCS Merge Analysis Output E. Signal Warrants APPENDICES Traffic Analysis Report August 22, 2006

8

9 Executive Summary This Traffic Analysis Report was undertaken to assess the bridge and roadway configuration needed in connection with OTIA III Bridge Bundle #314. The analysis focused on the year of construction (2010) and a twenty-year horizon (2030). No-build conditions were analyzed for traffic for analysis years 2006, 2010 and MUTCD traffic signal warrants and TPAU preliminary traffic signal warrants were analyzed. The principal focus, however, was to determine what lane configuration would be needed to meet mobility standards and to accommodate year 2030 traffic. At the North Ashland Interchange 19 (South Valley View Road), a three-lane bridge was determined to be adequate. Signalization of the ramp terminals is not necessary for at least several years based on the application of preliminary traffic signal warrants. Based on ODOT mobility standards, however, installation of traffic signals at the ramp terminals is likely to be necessary to accommodate year 2030 traffic volumes. As an alternative to signalization of the northbound ramp terminal, a loop ramp could be used at the northbound ramp terminal to accommodate the high volumes of traffic from northbound South Valley View Road to northbound I-5. A portion of both the northbound and southbound exit ramps will need two lanes as they approach the ramp terminals to allow separate left-turn and right-turn lanes. Eventually, the southbound exit ramp will likely require a dedicated, free-flow, right-turn lane onto southbound South Valley View Road to assure that the mobility standard specified in the Highway Design Manual is met. Widening of South Valley View Road to five lanes, a project specified in the County s Transportation System Plan, would allow this to be accommodated. At the Green Springs Interchange 14 (Ashland Street), a four-lane bridge was determined to be adequate to accommodate design hour volumes. Due to geometric constraints a four-lane bridge would likely require design exceptions for the westbound left-turn lane length and taper length between the westbound and eastbound left-turn lanes. A five-lane bridge appears to allow all ODOT design standards to be met on the bridge. High volumes of left turns from eastbound Ashland Street to northbound I-5 are sufficient to require dual left-turn lanes by Traffic signal warrants are currently met for the southbound ramp terminal and installation of traffic signals at the northbound ramp terminal will, in connection, with the dual turn lanes avoid long queues for the eastbound-to-northbound left turn and avoid operational problems. Two lanes will be required for a portion of the exit ramp to allow separate lanes for left and right turns at the ramp terminals. Right turns from the southbound exit ramp to westbound Ashland Street can be accommodated with a dedicated receiving lane on westbound Ashland Street. Traffic Analysis Report i August 22, 2006

10

11 1 Introduction and Background The OTIA III Bundle #314 bridge replacement, safety project will improve interstate interchange bridges crossing I-5 at the Green Springs Interchange (Exit 14) and the North Ashland Interchange (Exit 19), and will include ramp improvements. The OTIA III projects managed by the Oregon Bridge Delivery Partners (OBDP) are scheduled to be let in August 2008, with estimated completion by year Additionally, the Oregon Department of Transportation, Region 3, has identified the need to prepare Interchange Area Management Plans (IAMPs) for both interchanges, which will address public improvement investments via land use and transportation management planning. The work currently planned under the OTIA III Bridge Bundle #314 is intended to address immediate repair and safety improvements for the interchanges, allowing for future planned improvement projects identified in the regional, county and city Transportation System Plans (TSPs) to address long-term capacity improvements. Critical design elements of the Bridge Bundle #314 improvements at each interchange can be selected based in part on the results of the traffic analysis contained in this Traffic Analysis Report. This report focuses on the design of the bridges, ramp terminals, and roadway sections immediately adjacent to them and is intended to inform and support the scope of the OTIA III Bundle #314 bridge replacement, safety improvement project. The purpose of this Traffic Analysis Report is: 1) to provide ODOT and OBDP with adequate safety and operations analysis information to select appropriate bridge improvements for the Bundle #314 projects, and 2) for subsequent use in IAMP projects at the Green Springs and North Ashland Interchanges. This report provides an inventory of existing roadways, provides existing and future traffic operations analyses, safety analysis, and evaluates several build options at each interchange designed to address existing or projected transportation needs. 2 Analysis Area 2.1 Interchange 14 (Green Springs Interchange) This interchange consists of a standard diamond interchange in the southeastern area of Ashland. Ashland Street (OR 66, Green Springs Highway) is the cross street, which connects with OR 99 (Rogue Valley Highway) approximately one mile to the west. All four quadrants of the interchange area are developed. The existing bridge carries two lanes of OR 66 over I-5. The ramp terminals are unsignalized. Both the bridge and ramps are functionally obsolete to serve long-range transportation needs. The Green Springs Interchange analysis area stretches along OR 66 between its intersections with Tolman Creek Road and Oak Knoll Drive/East Main Street. The overall length of this roadway segment is just under one mile and is characterized by suburban commercial development with multiple closelyspaced private accesses. 2.2 Interchange 19 (North Ashland Interchange) This interchange has a standard diamond configuration. South Valley View Road, a Jackson County facility, is the interchange crossroad and provides access between the Rogue Valley Highway (OR 99) and I-5. The intersection angle of South Valley View Road and I-5 is slightly skewed but the existing ramp terminals intersect South Valley View Road at a 90-degree angle. While located outside of Traffic Analysis Report 1 August 22, 2006

12 Ashland s Urban Growth Boundary, this interchange is heavily used by commuters within the Rogue Valley MPO area. The segment of South Valley View Road between OR 99 and I-5 carries the highest traffic volumes of any Jackson County roadway. The North Ashland Interchange analysis area consists of all the major intersections along South Valley View Road from East Ashland Lane located directly north of the I-5 northbound ramp terminal intersection, to OR 99, which lies about 2500 feet south of the interchange. Figure 1 illustrates both analysis areas, showing existing lane configurations and traffic control at all analysis area intersections. Table 1 provides roadway names, jurisdictional authorities, functional classifications, posted speeds (if available), number of lanes and operational standards for analysis area roadways. This information was collected through a site visit and review of the 1999 Oregon Highway Plan, the Transportation System Plans for Jackson County and the City of Ashland, and the Ashland Municipal Code. Traffic Analysis Report 2 August 22, 2006

13 North Ashland Interchange 19 S. Valley View Rd. E. Ashland Ln. S. Valley View Rd. S. Valley View Rd. 1 I-5 NB Ramps 2 I-5 SB Ramps 3 Lowe Road S. Valley View Rd. S. Valley View Rd. NOT TO SCALE 4 Eagle Mill Road 5 OR Green Springs Interchange 14 Tolman Creek Rd. Washington St. I-5 SB Ramps 6 Ashland St. (OR 66) 7 Ashland St.(OR 66) 8 Ashland St. (OR 66) I-5 NB Ramps Clover Ln. Ashland St. (OR 66) East Main LEGEND 5 = Traffic Signal = Stop Sign = Allowable turning movement for desinated lane = Intersection number 9 Ashland St. (OR 66) 10 Ashland St. (OR 66) 11 Oak Knoll FIGURE 1 Existing Lane Configurations and Traffic Control Devices 5 I-5 Interchanges 14 & 19 P:\O\ODOT \0600INFO\TT\TT Figures\Volume Figures.xls 3 August 11, 2006

14 Table 1. Analysis Area Roadway Inventory Roadway/Highway Name Jurisdiction ODOT Functional Classification City/County Functional Classification Posted Speed Lanes OHP Mobility Standard 1,2 HDM Mobility Standard 1,3 City/ County Operational Standard 1 I-5 (Pacific Highway No. 1) ODOT Interstate Hwy, NHS 9, FR I-5 Ramp terminal Intersections ODOT Interstate Hwy, NHS 9, FR , Ashland Street (OR 66, Green Springs Highway) ODOT District Hwy Boulevard 35 2,3, Tolman Creek Road City of Ashland - Avenue Washington Street City of Ashland - Neighborhood Collector Clover Lane City of Ashland - Local Street Oak Knoll Drive City of Ashland - Avenue East Main Street City of Ashland - Avenue OR 99 (Rogue Valley Hwy) ODOT District Hwy Arterial 45, South Valley View Road Jackson County - Arterial Eagle Mill Road Jackson County - Minor Collector Lowe Road Jackson County - Local Street East Ashland Lane Jackson County - Local Street Notes: 1. Values shown are volume to capacity (v/c) ratios. 2. Source: 1999 Oregon Highway Plan (OHP), Table 6. Standards apply to planning projects through the planning horizon (2030). 3. Source: 2003 Highway Design Manual (HDM), Table Standards apply to project design through the planning horizon (2030). 4. Operational standard for interchange ramp terminals shall be the smaller of 0.85 or the value of the v/c for the crossroad. Within an MPO, v/c ratio may be as high as 0.90 if 95 th percentile queue does not extend into deceleration portion of the ramp (Source: 1999 OHP). 5. Five lanes west of I-5, 3 lanes between I-5 and Sutton Place, 2 lanes between Sutton Place and Oak Knoll Drive/East Main Street 6. Ashland Municipal Code requires that traffic operations on City facilities do not exceed capacity (v/c < 1.00) and defers to ODOT standards for intersections with State highways within the City. OHP District Highway mobility standard is shown mph south of I-5, 55 mph north of I Source: Jackson County Transportation System Plan. 9. NHS: National Highway System 10. FR: Freight Route Interchange 14 Interchange 19 Traffic Analysis Report 4 August 22, 2006

15 This page intentionally left blank Traffic Analysis Report 5 August 22, 2006

16 3 Traffic Counts Traffic counts were conducted on May 16, The counts consisted of 16-hour and 3-hour AM and PM peak period counts at analysis area intersections, and a 24-hour count on the I-5 mainline. The counts included full FHWA 13-class vehicle classifications. Raw traffic data at all count locations are provided in Appendix A. Table 2 below provides a list of all intersection count locations including the count type. Table 2. Intersection Turning Movement Count Locations and Types Location Type of Count North Ashland Interchange 19 Analysis Area I-5 mainline, both directions, South of North Ashland Interchange 24 hour South Valley View Road at East Ashland Lane 16-hour (6 AM 10 PM) North Ashland Interchange 19 : Northbound Ramps at South Valley View Road 16-hour (6 AM 10 PM) North Ashland Interchange 19: Southbound Ramps at South Valley View Road 16-hour (6 AM 10 PM) South Valley View Road at Lowe Road 3-hour AM and PM South Valley View Road at Eagle Mill Road 3-hour AM and PM South Valley View Drive at Rogue Valley Highway (OR 99) 16-hour (6 AM 10 PM) Green Springs Interchange 14 Analysis Area OR 66 (Ashland Street) at Tolman Creek Road 16-hour (6 AM 10 PM) Ashland Street at Washington Street 3-hour AM and PM Green Springs Interchange 14: Southbound Ramps at Ashland Street 16-hour (6 AM 10 PM) Green Springs Interchange 14: Northbound Ramps at Ashland Street 16-hour (6 AM 10 PM) Ashland Street at Clover Lane 3-hour AM and PM Ashland Street at Main Street / Oak Knoll Drive 3-hour AM and PM Note: All 16-hour and 3-hour counts conducted May 16, hour I-5 mainline count conducted from 22:00 May 15 to 22:00 May 16, Developing 30 th Hour Volumes The ODOT Transportation Planning Analysis Unit (TPAU) has developed procedures for calculating current year 30 th highest hour traffic volumes (30 th HV). These procedures are outlined in the TPAU Analysis Procedures Manual. 30 th hour traffic volumes usually occur during the peak month of the year and are calculated by applying a seasonal factor to the peak hour volumes. Typically the peak hour volumes occur during the PM peak hour. Occasionally the unique directional distribution and other factors associated with AM peak hour operations can result in the 30 th highest hour occurring during the AM peak hour at some intersections. Most intersections in the analysis area, and the system as a whole, experience higher traffic volumes during the PM peak hour than during the AM peak period. However, the southbound ramp terminal at Interchange 14 experiences roughly equivalent volumes during each of the AM and PM peak hours. Separate AM peak hour analyses were conducted at this interchange and are discussed in Section 11 of this report. After reviewing the TPAU methodologies for determination of seasonal factors, it was determined that use of the TPAU Seasonal Trend Table would be the most appropriate. The Seasonal Trend Table averages statewide seasonal trends according to highway type. Table 3 below provides selected data from the table for three seasonal trend types: Interstate, Summer and Commuter. The values provided in the May 15 column represent the inverse of the decimal percent of average daily traffic (ADT). For example, interstate volumes collected during mid-may are 98% (1/1.0200) of average. The values provided in the Peak SF column represent the inverse of the decimal percent of ADT during the peak month of the year. To determine a seasonal factor, the seasonal trend factor for the applicable time of year (May Traffic Analysis Report 6 August 22, 2006

17 15 column) is divided by the peak seasonal trend factor. The calculated seasonal factors resulting from the Interstate and Summer seasonal trends were 1.18 and 1.17, respectively; the seasonal factor resulting from the Commuter seasonal trend was Table 3. Seasonal Factors From Seasonal Trend Table Data Calculated Seasonal Trend May 15 Peak SF SF Interstate Summer Commuter Average of Summer, Commuter (50/50) Weighted Average of Summer, Commuter (25/75) Source: 2005 Seasonal Trend Table The Analysis Procedures Manual notes that it is appropriate to average Summer and Commuter trends in some mid-sized cities. A straight average of these two trends yields a seasonal factor of However, recognizing that the area is more strongly characterized by commuter travel patterns between Ashland and Medford, a weighted average of seasonal factors for the Summer and Commuter seasonal trends was also calculated. Applying a weighting of 25%/75% to Summer and Commuter seasonal trends, respectively, yields a seasonal factor of Based on a thorough evaluation of the best available data and consultation with TPAU staff three seasonal factors were derived and applied to the peak hour volumes, depending on the type of facility. A seasonal factor of 1.07 was applied to all non-ramp terminal intersections. A seasonal factor of 1.18 was applied to traffic volumes on the I-5 mainline. The seasonal factor for interchange ramp terminal intersections was determined by averaging the seasonal factors for non-freeway and freeway, or 1.07 and 1.18, respectively. The resulting seasonal factor was All traffic counts were conducted on the same day. Therefore, within a reasonable margin of error, and after accounting for the effects of driveways, the count volumes were essentially balanced between intersections. By applying different seasonal factors at different intersections the volumes were no longer balanced, and they needed to be manually balanced between intersections. Manual balancing consisted mostly of modifying intersection volumes upward so that entering volumes at each intersection roughly equaled exiting volumes at each adjacent intersection. This is a conservative method because after balancing, traffic volumes at many intersections were increased by more than the seasonal factors indicated on Table 3. Figure 2 illustrates 30 th highest hour volumes, balanced between intersections. Note that the volumes are not perfectly balanced however. This is due to the different seasonal factors applied to different intersections, and the effect of driveways. A table showing raw and adjusted traffic volumes for the common peak hour is provided in Appendix B. Traffic Analysis Report 7 August 22, 2006

18 North Ashland Interchange South Valley View Road CM = SBT V/C = 0.48 LOS = B South Valley View Road 1 I-5 NB Ramps/Ashland Lane I-5 SB Ramps 3 South Valley View Road CM = EBL/T/R V/C = 0.62 LOS = A South Valley View Road CM = EBL V/C = 0.07 LOS = D Lowe Road CM = WBL V/C = V/C = 0.23 LOS = C 2 LOS = D NOT TO SCALE Eagle Mill Road South Valley View Road OR Green Springs Interchange Tolman Creek Road Ashland Street (OR 66) 7 Ashland Street (OR 66) 8 I-5 NB Ramps V/C = 0.52 CM = NBL LOS = C V/C = 0.69 LOS = C Washington Street Ashland Street (OR 66) Ashland Street (OR 66) Ashland Street (OR 66) Oak Knoll 135 Ashland Street (OR 66) CM = NBL/T/R CM = NBL/R V/C = >1.00 V/C = 0.26 LOS = F LOS = A Clover Lane I-5 SB Ramps 15 5 CM = SBL/T/R V/C =.1.00 LOS = F East Main CM = SBL V/C = 0.24 LOS = B FIGURE 2 LEGEND 11 = Intersection number 123 = Turning movement volume = Allowable turning movement volume CM = Critical movement (TWSC) V/C = Intersection volume to capacity Critical volume to capacity (TWSC) LOS = Intersection Level of Service Critical Level of Service (TWSC) TWSC = Two-way stop-controlled Existing Conditions (2006) Balanced PM Peak Hour Volumes (30th Highest Hour Volumes) Traffic Operations Analysis Summary I-5 Interchanges 14 & 19 P:\O\ODOT \0600INFO\TT\TT Figures\Volume Figures.xls 8 August 11, 2006

19 5 Traffic Operations Standards and Procedures 5.1 Volume to Capacity Ratio Transportation engineers have established various standards for measuring traffic capacity and quality of service of roadways at intersections. A comparison of traffic volume demand to intersection capacity is one method of evaluating how well an intersection, roadway segment, or merge/diverge segment is operating. This comparison is presented as a volume-to-capacity (v/c) ratio. A v/c ratio of less than 1.0 indicates that the volume is less than capacity. When it is closer to 0.0, traffic conditions are generally good with little congestion and low delays for most intersection movements. As the v/c ratio approaches 1.0, traffic becomes more congested and unstable with longer delays. ODOT applies two sets of operational standards (mobility standards) to different types of projects. For planning and project analysis of existing conditions and no-build conditions the applicable mobility standards are found in Table 6 of the 1999 Oregon Highway Plan (OHP). For planning and project analysis of build alternatives, the applicable mobility standards are specified in Table 10-1 of the 2003 Highway Design Manual (HDM). Mobility standards are dependent on the roadway classification and area type and apply during peak operating conditions through the planning horizon year, which is year Both are presented in terms of v/c ratios, and they are shown in Table Level of Service Another standard for measuring traffic capacity and quality of service of roadways at intersections is level of service (LOS). At both stop-controlled and signalized intersections, LOS is a function of control delay, which includes initial deceleration delay, queue move-up time, stopped delay, and final acceleration delay. Six standards have been established ranging from LOS A where there is little or no delay, to LOS F, where there is delay of more than 50 seconds at unsignalized intersections, or more than 80 seconds at signalized intersections. It should be noted that, although delays can sometimes be long for some movements at a stop-controlled intersection, the v/c ratio may indicate that there is adequate capacity to process the demand for that movement. Similarly at signalized intersections, some movements, particularly side street approaches or left turns onto side streets, may experience longer delays because they receive only a small portion of the green time during a signal cycle but their v/c ratio may be relatively low. For these reasons it is important to examine both v/c ratio and LOS when evaluating overall intersection operations. Both are evaluated in the analyses that follow. It should be noted that all of the roadway jurisdictions use v/c, not LOS, as a measure of performance. 5.3 Traffic Operations Analysis Procedures All of the intersection operations were evaluated using the methodology outlined in the 2000 Highway Capacity Manual (HCM). Synchro analysis software was used to generate the HCM reports from which the v/c ratios were derived. This report presents 95 th percentile queuing and delay results that have been generated by SimTraffic simulation software. The SimTraffic results were derived from the average of five randomly seeded simulation model runs. LOS results were then calculated based on the delay from SimTraffic simulation. While Synchro provides HCM LOS results, SimTraffic simulation can more accurately represent the impact of nearby intersections to delay and queuing. Synchro (HCM) looks at each intersection in isolation. All Synchro and SimTraffic output sheets can be found in Appendix C. The Highway Capacity Software (HCS) tool was used to conduct freeway merge and diverge analyses. All HCM Merge analysis output sheets can be found in Appendix D. Traffic Analysis Report 9 August 22, 2006

20 CORSIM is another traffic simulation program that allows for user control of trip assignment through the ability to set vehicle-type specific turn percentages and set predefined vehicle routes. These abilities can be useful under certain circumstances, such as when a pronounced lane imbalance is present. However, it appears that traffic conditions that would warrant use of the CORSIM program are not present at any of the analysis area intersections. 6 Existing Traffic Operations This section summarizes the traffic operations analysis that was conducted for the study area intersections under existing (seasonally adjusted) traffic volume conditions. Table 4 summarizes the results for all analysis area intersections and also presents agency operational standards to enable comparison with intersection results. Table 5 summarizes queuing on critical approach legs at the same intersections. Critical movements at unsignalized intersections are typically the minor street left turns or, in the case of single-lane approaches, the minor street approaches. These movements are required to yield to all other movements at the intersection and thus are subject to the longest delays and have least capacity. Left turns from the major street are also subject to delays since motorists making these maneuvers must also yield to on-coming major street traffic. Bold numbers in the tables represent v/c ratios that exceed the mobility standards and approaches with long queues. Table 4. Existing (Year 2006) 30th Highest Hour Traffic Operations Analysis Results Intersection Critical Movement v/c Ratio LOS OHP Std. 1 HDM Std. 2 J.C. Std. 3 Green Springs Interchange 14 Analysis Area Ashland St (OR 66) & Tolman Creek Rd n/a C Ashland St (OR 66) & Washington St NBL 0.69 C Ashland St (OR 66) & I-5 SB Ramps SBL/T/R >1.00 F Ashland St (OR 66) & I-5 NB Ramps NBL/T/R >1.00 F Ashland St (OR 66) & Clover Ln NBL/R 0.26 A Ashland St (OR 66) & E. Main/Oak Knoll SBL B North Ashland Interchange 19 Analysis Area S. Valley View Rd & OR 99 n/a C S. Valley View Rd & Eagle Mill Rd WBL 0.23 D S. Valley View Rd & Lowe Rd EBL 0.07 D S. Valley View Rd & I-5 SB Ramps EBL/T/R 0.62 A S. Valley View Rd & I-5 NB Ramps WBL/T/R 0.48 C S. Valley View Rd & E. Ashland Lne WBL/R 0.05 C Notes: Oregon Highway Plan Mobility Standards (Table 6) ODOT Highway Design Manual Mobility Standards (Table 10-1) 3. Operational standards for Jackson County roadway facilities (Source: Jackson County Transportation System Plan) 4. Signalized intersection. LOS and v/c are for overall intersection. 5. Refers to left turn from Main Street to Ashland Street. Traffic Analysis Report 10 August 22, 2006

21 Table 5. Existing (Year 2006) 30th Highest Hour 95th Percentile Queues 95% Intersection Movement Queue Green Springs Interchange 14 Analysis Area Ashland St (OR 66) & Tolman Creek Rd EBL 125 WBL NBL SBL Ashland St (OR 66) & Washington St WBL 25 NBL 75 1 Ashland St (OR 66) & I-5 SB Ramps WBL/T 50 SBL/T/R 675 2,3 Ashland St (OR 66) & I-5 NB Ramps EBL/T NBL/T/R 375 Ashland St (OR 66) & Clover Ln WBL/T 50 NBL/R 75 Ashland St (OR 66) & E. Main/Oak Knoll NBL/T/R 50 SBL 75 1 North Ashland Interchange 19 Analysis Area S. Valley View Rd & OR 99 SBL/R EBL WBR S. Valley View Rd & Eagle Mill Rd WBL/R 175 SBL 75 S. Valley View Rd & Lowe Rd EBL/R 25 NBL/T 25 S. Valley View Rd & I-5 SB Ramps EBL/T/R 125 SBL/T 75 S. Valley View Rd & I-5 NB Ramps WBL/T/R 175 SBT S. Valley View Rd & E. Ashland Ln WBL/R 50 Notes: 1. Storage bay at or above capacity. 2. Queue extends beyond extent of SimTraffic model link. Therefore, queue may be longer than shown. 3. Queue extends into ramp deceleration area. 4. Queue extends into adjacent intersection(s). Most analysis area intersections currently operate with acceptable v/c ratios, queuing and levels of service. However, traffic operations at some key intersections do not meet mobility standards, and drivers experience long delays and substantial queuing. A discussion of these intersections follows. It should be noted that it is impossible to measure existing intersection operating conditions at a v/c of greater than 1.00, even though Table 4 appears to indicate otherwise. Volume to capacity ratios in excess of 1.00 cannot occur; they actually result from the application of seasonal adjustment factors and growth factors to existing volumes. The v/c ratios greater than 1.00 shown in Table 4 resulted from analysis based on seasonally adjusted volumes that were inflated to approximate 30 th highest hour traffic volumes. Traffic Analysis Report 11 August 22, 2006

22 6.1 Green Springs Interchange 14 Northbound and Southbound Ramp Terminals Under adjusted volume conditions that approximate the existing 30 th highest hour, analysis shows that critical v/c ratios at both ramp terminal intersections exceed mobility standards and also exceed available capacity. Queuing on both exit ramps, and especially the southbound ramp, is significant because of limited gaps on Ashland Street for left turning vehicles, combined with substantial right turning volumes (on the southbound exit ramp). The 95 th percentile queue on the southbound exit ramp is calculated to extend into the deceleration area of the ramp. Left turning vehicles from eastbound Ashland Street to the northbound I-5 entrance ramp are delayed because of conflicts with high westbound through volumes. These delays result in queuing over the bridge that is calculated to spill over into the southbound ramp terminal intersection. Compounding the operational problems at the ramp terminal intersections are the presence of many accesses to Ashland Street very close to the interchange ramp terminal intersections. These public streets (Clover Lane and Washington Street) and private driveways create potential vehicular conflicts and delay that may impact operations at the interchange. ODOT interchange area access spacing standards, as stated in OAR (Division 51), specify that no approaches should be located within 1320 feet of ramp terminal intersections along the cross street. While Division 51 standards are clearly not attainable in a developed area such as this, it is desirable to move in the direction of attaining the standards through access management techniques such as consolidation or elimination of accesses and implementation of turn prohibitions. Discussion of specific access management strategies is beyond the scope of this report and will be addressed in the future Interchange Area Management Plan (IAMP). A general discussion of access management as it pertains to the Green Springs Interchange area is contained in Section 12 of this report. 6.2 North Ashland Interchange 19 Northbound and Southbound Ramp Terminals Traffic operations analyses at the North Ashland Interchange revealed that both ramp terminals currently meet ODOT OHP mobility standards. However, under adjusted volume conditions that approximate existing 30 th highest hour volumes, queuing on the southbound exit ramp is calculated to extend into the deceleration portion of the ramp. Queue lengths are expected to lengthen as traffic volumes increase in the future. The northbound ramp terminal intersection has an unconventional configuration in which left turning vehicles from South Valley View Road to the I-5 northbound entrance ramp have a free movement. All other approaches, consisting of the I-5 northbound exit ramp and southbound South Valley View Road, must yield to the northbound through and left turning movements. This type of intersection control violates driver expectation and is generally not recommended for new construction. However, since the heaviest movement at this intersection is the left turn from northbound South Valley View Road to I-5 northbound, this configuration provides optimal capacity of any unsignalized configuration. As the safety analysis revealed, and as described in the following section, there is no evidence of an elevated crash rate at this intersection related to the unconventional intersection control. Similar to the Green Springs Interchange, there are many access points located within close proximity to the ramp terminals. Directly north of the northbound ramp terminal, East Ashland Lane, as well as several private residential driveways, intersect with South Valley View Road. East Ashland Lane provides access to a few homes and experiences very low volumes. Directly south of the southbound ramp terminal, Lowe Road, as well as several driveways (gas stations, a hotel and fast food restaurant) intersect South Valley View Road. Traffic volumes to the south of the interchange are significantly higher than those to the north of the interchange. As traffic volumes increase, the potential conflicts and delays associated with these accesses will have an increasingly significant impact on traffic operations at the interchange. Further discussion of access management as it pertains to the North Ashland Interchange area is contained in Section 12 of this report. Traffic Analysis Report 12 August 22, 2006

23 6.3 South Valley View Road at Rogue Valley Highway (OR 99) This intersection currently has a v/c ratio of 0.72 during 30 th highest hour traffic volume conditions. This meets the OHP mobility standard of 0.90 for District-level highways. However, queuing on the single-lane southbound approach is significant, at nearly 800 feet. Future traffic operations are expected to worsen with major queuing on the southbound approach leg. The Jackson County TSP recognizes the need for improvements to South Valley View Road between the North Ashland Interchange and OR 99, as this segment of arterial carries the highest traffic volume of any County roadway. Proposed improvements to this segment of South Valley View Road consist of an upgrade to a five-lane arterial. The TSP classifies the project as a Tier 1 financially constrained long-range ( ) roadway improvement project. 6.4 Merge/Diverge Analysis Analyses were conducted using HCM methodology for each of the merge and diverge segments for the entrance and exit ramps at each interchange under existing 30 th highest hour traffic volume conditions. The analyses showed that traffic operations at each of the ramp merge and diverge sections meet the OHP mobility standard for interstate freeways. Results of this analysis are provided in Appendix D. 7 Safety Analysis A safety analysis was conducted to determine if there were any significant documented safety issues within the analysis area and to recommend measures at specific locations or general strategies for improving overall safety. The safety analysis included a review of crash history data supplied by the ODOT Crash Analysis and Reporting Unit for the period between January 1, 2002 and December 31, 2004, which are the three most recent full years for which crash data is available. It should be noted that the crashes listed are only the crashes reported. The analysis also examined ODOT Safety Priority Index System (SPIS) data and compared calculated crash rates from analysis area roadways with statewide averages. The process for analyzing the safety data provided was to determine the location and frequency of crashes occurring in the study area. Crashes were totaled by segment and by intersection. After being summarized and placed into the appropriate segment, crash rates for each roadway segment and intersection influence area were calculated and compared to statewide averages. 7.1 Calculation of Crash Rates The crash rates were calculated from ODOT-provided crash data. For a crash to be considered associated with an intersection, it must occur within 0.05 mile (265 feet) of the intersection. Beyond this region, crash data is placed in the segment category. It should be noted that this analysis only accounts for those crashes that were reported. In Oregon, legally reportable crashes are those involving death, bodily injury or damage to any one person's property in excess of $1,000 (August 31, 1997 thru December 31, 2003) or $1,500 (after January 1, 2004). Intersection and segment crash rates were calculated using the following equations. rate ( Crashes 1,000, ) ( Years ADT ) = int and Rate int Rate segment rate segment = Crash rate per Million Entering Vehicles (MEV) ( Crashes 1,000, ) ( Years Length ADT ) = = Crash rate per Million Vehicle Miles Traveled (MVMT) Crashes = Number of crashes during the time segment, where Traffic Analysis Report 13 August 22, 2006

24 Years = Number of years being studied ADT = Average Daily Traffic volume Length = Length of roadway segment being studied (for segment rates). The number of crashes was determined from ODOT crash data. At intersections, the sum of all PM peak hour entering volumes from each leg were multiplied by ten to estimate an intersection ADT. For roadway segments the ADT was determined using the ODOT Volume Tables. Crash rates were then calculated for the entire threeyear study period. 7.2 SPIS Data The Safety Priority Index System (SPIS) is a method developed by ODOT for prioritizing locations where funding for safety improvements can be spent most efficiently and effectively. Based on crash data, the SPIS score is influenced by three components: crash frequency, crash rate, and crash severity. Three years of crash data are analyzed to determine a SPIS score for a specific location. SPIS locations meet one of two criteria during the previous three years: (1) three or more crashes at the same location, or (2) one or more fatal crashes at the same location. ODOT produces a list of the sites with the top 10% SPIS scores each year. For the year 2004, which includes crash data for 2001, 2002, and 2003, the SPIS scores at or above are in the top 10%. There is one Top 10% SPIS location in the analysis area of Interchanges 14 and 19, and it is located between milepost 1.27 and 1.37 on OR 66. This is the segment of Ashland Street between and including the northbound and southbound ramp terminals. 7.3 Intersection Crashes Documented crashes between the years 2002 and 2004 were summarized by location for each of the study intersections. For the purposes of this crash analysis, the study intersections consist only of the ramp terminals and intersections directly adjacent to them. After sorting crashes by location, intersection crash rates were calculated. Table 6 shows the ADT that was determined for each intersection and the calculated crash rates. Table 6. Study Area Intersection Crash Rates Intersection ADT 3 Year Crash Rate Green Springs Interchange 14: Southbound Ramps at Ashland Street 13, Green Springs Interchange 14: Northbound Ramps at Ashland Street 11, Ashland Street at Clover Lane 7, North Ashland Interchange 19: Northbound Ramps at S.Valley View Road/E. Ashland Lane 9, North Ashland Interchange 19: Southbound Ramps at S. Valley View Road 12, South Valley View Road at Lowe Road 8, The safety analysis showed that none of the intersections in the study area has a crash rate significantly greater than that of the surrounding area. As a rule of thumb, intersections with crash rates of 1.0 or above are potentially problematic and are candidates for further investigation. As Table 6 shows, all of the intersection crash rates are well below the threshold value of 1.0. There were no reported crashes during the three year study period at either of the ramp terminals of the North Ashland Interchange. However, there were four crashes resulting in three injuries at the intersection of South Valley View Road at Lowe Road, which is very close to the interchange, directly to the south of the southbound ramp terminal intersection. The primary type of crashes at this location are turning and rear end. While the intersection spacing is much closer than what is advised under current interchange design standards, there is no Traffic Analysis Report 14 August 22, 2006

25 evidence that the crashes were caused by the close spacing. However, future improvements to the interchange should include a relocation of the intersection to a point further south. 7.4 Segment Crashes Crashes were also examined along Interstate 5 in the vicinity of Interchanges 14 and 19. The crashes were examined on I-5 northbound from the Interchange 14 northbound exit ramp (MP 13.96) to the Interchange 19 northbound entrance ramp (MP 19.40), and on I-5 southbound from the Interchange 19 southbound exit ramp (MP 19.26) to the Interchange 14 southbound entrance ramp (MP 13.96). Table 7 below provides a summary of these crashes. Table 7. Freeway Crash Data Location Total Northbound Green Springs Interchange 14 Exit Ramp (MP 13.96) Green Springs Interchange 14 Entrance Ramp (MP 14.37) North Ashland Interchange 19 Exit Ramp (MP 18.96) North Ashland Interchange 19 Entrance Ramp (MP 19.40) Southbound North Ashland Interchange 19 Exit Ramp (MP 19.26) North Ashland Interchange 19 Entrance Ramp (MP 18.91) Green Springs Interchange 14 Exit Ramp (MP 14.37) Green Springs Interchange 14 Entrance Ramp (MP 13.96) As Table 7 shows, there were very few crashes during the three year study period along any of the freeway segments. The segment crash rates for both northbound and southbound I-5 is The comparable statewide average is As would be expected, neither northbound nor southbound directions have SPIS scores high enough to rank in the Top 10%. Segment crash rates were calculated and examined along all roadway segments in the analysis area and compared to statewide averages for comparable roadway segments. All segment crash rates excluding intersection areas were well below the statewide averages, which indicated that there are no significant safety issues along any of the roadway segments. A large majority of the documented crashes occurred in the vicinity of intersections. 7.5 Crash Analysis Conclusions Overall, there are no apparent crash patterns at any of the study area intersections, and no single intersection shows a significant safety problem. However, taken together, the crashes on Ashland Street between the I-5 northbound and southbound ramps warrant a SPIS score that ranks in the top 10% statewide. A total of eleven crashes were reported during the three-year study period on Ashland Street between Clover Lane and the I-5 southbound ramps. These crashes resulted in a total of six injuries. The primary types of crashes documented along this segment are turning and rear end. Rear end crashes are often caused by driver inattention in congested conditions, while the turning crashes may be a symptom of drivers accepting small gaps at unsignalized intersections. One change that would likely alter the crash statistics would be installing traffic signals at the ramp terminals. Traffic signals would create gaps in the traffic stream to allow vehicles to make turning maneuvers onto Ashland Street and the interchange ramps. Approval of new signals requires that certain traffic volume warrants are met. The Traffic Analysis Report will evaluate preliminary signal warrants at the ramp terminals to determine their appropriateness. Traffic Analysis Report 15 August 22, 2006

26 Another strategy that can enhance safety in the interchange vicinity would be the consolidation or elimination of access points. When driveways are spaced too closely the number of potential conflicts increase dramatically and capacity is diminished. Specific access management recommendations are beyond the scope of this report, but an access management plan will be a major component of the future IAMP. Finally, the geometric improvements associated with construction of a new interchange overcrossing of I-5 at Ashland Street is another improvement that could improve safety conditions by improving sight distance. The crash history at South Valley View Road and Lowe Road do not indicate a significant safety problem. However, to ensure long term safe and efficient operation of the North Ashland Interchange, it is recommended that future interchange improvements include a realignment of Lowe Road so that it intersects with South Valley View Road at a point further south. As previously noted, the future IAMP will contain more detail with respect to access management recommendations. 8 Future Volume Development In addition to current year conditions, traffic operations analysis were conducted under year 2010 and 2030 traffic volume scenarios to determine future needs and evaluate various build alternatives. Traffic volumes have been developed and are discussed below. Future traffic volumes were developed by applying an annual growth rate to existing 30 th hour volumes. An annual growth rate was determined from the Primary 2024 Future Volume Table, which is published each year by TPAU and uses traffic volumes from previous years to project future volumes. The table projects year 2024 Average Daily Traffic (ADT) at all count locations listed in the Transportation Volume Tables. Annual growth rates at locations within the analysis area were found to be between 2.0% and 2.3%, with an average of 2.1%. One location on OR 99 was found to have a growth rate of 1.3%. Therefore, a linear growth rate of 2.1% was applied to all 30 th hour volumes in the analysis area, with the exception of volumes on OR 99 for which a growth rate of 1.3% was applied. Use of this methodology was approved by TPAU. Another method for developing future volumes is a travel demand model. A Rogue Valley MPO travel demand model currently exists, but does not include the Ashland area. A new model that includes the Ashland area is currently under development, but will not be operational until late The schedule constraints of this project preclude use of the RVMPO model for future volume development. Figures 3 and 4 illustrate year 2010 and 2030 design hour volumes, respectively, balanced between intersections. The figures also show key operations analysis results that will be described in greater detail in the following section. A table showing future year design hour traffic volumes is provided in Appendix B. 9 Future Traffic Operations Analysis No-Build Scenario Operations analyses were conducted at all of the analysis area intersections under no-build conditions and two design hour scenarios: year 2010, which is the estimated year of build; and year 2030, which is the plan horizon year. Table 8 summarizes the v/c and LOS results from these analyses, plus year th highest hour analyses. Table 8 also presents agency operational standards to enable comparison with intersection results. Table 9 summarizes queuing on critical approach legs at the same intersections. Bold numbers in the tables represent v/c ratios that exceed the OHP mobility standards and approaches with long queues. Traffic Analysis Report 16 August 22, 2006

27 North Ashland Interchange South Valley View Road CM = SBT V/C = 0.54 LOS = C South Valley View Road 1 I-5 NB Ramps/Ashland Lane I-5 SB Ramps 3 South Valley View Road CM = EBL/T/R V/C = 0.71 LOS = B South Valley View Road CM = EBL V/C = 0.08 LOS = C Lowe Road CM = WBT V/C = V/C = 0.32 LOS = C 2 LOS = F NOT TO SCALE Eagle Mill Road South Valley View Road OR Green Springs Interchange Tolman Creek Road Ashland Street (OR 66) 7 Ashland Street (OR 66) 8 I-5 NB Ramps V/C = 0.59 CM = NBL LOS = C V/C = > LOS = D Washington Street Ashland Street (OR 66) Ashland Street (OR 66) Ashland Street (OR 66) Oak Knoll 145 Ashland Street (OR 66) CM = NBL/T/R CM = NBL/R V/C = >1.00 V/C = 0.30 LOS = F LOS = A Clover Lane I-5 SB Ramps 15 5 CM = SBL/T/R V/C = >1.00 LOS = F East Main CM = SBL V/C = 0.28 LOS = B FIGURE 3 LEGEND 11 = Intersection number 123 = Turning movement volume = Allowable turning movement volume CM = Critical movement (TWSC) V/C = Intersection volume to capacity Critical volume to capacity (TWSC) LOS = Intersection Level of Service Critical Level of Service (TWSC) TWSC = Two-way stop-controlled Year 2010 No-Build Design Hour Volumes Traffic Operations Analysis Summary I-5 Interchanges 14 & 19 P:\O\ODOT \0600INFO\TT\TT Figures\Volume Figures.xls 17 August 11, 2006

28 North Ashland Interchange South Valley View Road CM = SBT V/C = 0.95 LOS = D South Valley View Road 1 I-5 NB Ramps/Ashland Lane I-5 SB Ramps 3 South Valley View Road CM = EBL/T/R V/C = >1.00 LOS = F South Valley View Road CM = EBL V/C = 0.46 LOS = D Lowe Road CM = WBL V/C = > V/C = >1.00 LOS = F 5 LOS = F NOT TO SCALE Eagle Mill Road South Valley View Road OR Green Springs Interchange Tolman Creek Road Ashland Street (OR 66) 7 Ashland Street (OR 66) 8 I-5 NB Ramps V/C = 0.78 CM = NBL LOS = F V/C = > LOS = F Washington Street Ashland Street (OR 66) Ashland Street (OR 66) Ashland Street (OR 66) Oak Knoll 205 Ashland Street (OR 66) CM = NBL/T/R CM = NBL/R V/C = >1.00 V/C = 0.65 LOS = F LOS = B Clover Lane I-5 SB Ramps 25 CM = SBL/T/R V/C = >1.00 LOS = F East Main CM = SBL V/C = 0.68 LOS = B FIGURE 4 LEGEND 11 = Intersection number 123 = Turning movement volume = Allowable turning movement volume CM = Critical movement (TWSC) V/C = Intersection volume to capacity Critical volume to capacity (TWSC) LOS = Intersection Level of Service Critical Level of Service (TWSC) TWSC = Two-way stop-controlled Year 2030 No-Build Design Hour Volumes Traffic Operations Analysis Summary I-5 Interchanges 14 & 19 P:\O\ODOT \0600INFO\TT\TT Figures\Volume Figures.xls 18 August 11, 2006

29 Table 8. Existing and Future Year No Build Traffic Operations Analysis Results Critical 30 th HV Design Hour Design Hour Intersection Movement v/c LOS v/c LOS v/c LOS Green Springs Interchange 14 Analysis Area Ashland St (OR 66) & Tolman Creek Rd n/a C 0.59 C 0.78 F Ashland St (OR 66) & Washington St NBL 0.69 C >1.00 D >1.00 F Ashland St (OR 66) & I-5 SB Ramps SBL/T/R >1.00 F >1.00 F >1.00 F Ashland St (OR 66) & I-5 NB Ramps EBL/T 0.45 C 0.50 D 0.82 F NBL/T/R >1.00 F >1.00 F >1.00 F Ashland St (OR 66) & Clover Lane NBL/R 0.26 A 0.30 A 0.65 B Ashland St (OR 66) & E. Main/Oak Knoll SBL B 0.28 B 0.68 B North Ashland Interchange 19 Analysis Area S. Valley View Rd & OR 99 n/a C 0.79 C >1.00 F S. Valley View Rd & Eagle Mill Road WBL 0.23 D 0.32 F >1.00 F S. Valley View Rd & Lowe Road EBL 0.07 D 0.08 C 0.46 D S. Valley View Rd & I-5 SB Ramps EBL/T/R 0.62 A 0.71 B >1.00 F S. Valley View Rd & I-5 NB Ramps SBT 0.48 B 0.54 C 0.95 D S. Valley View Rd & E. Ashland Ln WBL/R 0.05 C 0.06 D 0.12 F Notes: Oregon Highway Plan Mobility Standard (Table 6) ODOT Highway Design Manual Mobility Standard (Table 10-1) 3. Operational standards for Jackson County roadway facilities (Source: Jackson County Transportation System Plan) 4. Signalized intersection. LOS and v/c are for overall intersection. 5. Refers to left turn from Main Street to Ashland Street. OHP Std. 1 HDM Std. 2 J.C. Std. 3 Traffic Analysis Report 19 August 22, 2006

30 Table 9. Existing and Future Year No Build 95th Percentile Queues 95 th Percentile Queue (ft) Intersection Movement Existing Green Springs Interchange 14 Analysis Area Ashland St (OR 66) & Tolman Creek Rd EBL WBL NBL ,2 SBL ,2 Ashland St (OR 66) & Washington St WBL NBL Ashland St (OR 66) & I-5 SB Ramps WBL/T SBL/T/R 675 2, , ,5 Ashland St (OR 66) & I-5 NB Ramps EBL/T NBL/T/R Ashland St (OR 66) & Clover Ln WBL/T NBL/R Ashland St (OR 66) & E. Main/Oak Knoll NBL/T/R SBL North Ashland Interchange 19 Analysis Area S. Valley View Rd & OR 99 SBL/R EBL WBR ,6 S. Valley View Rd & Eagle Mill Rd WBL/R SBL S. Valley View Rd & Lowe Rd EBL/R NBL/T S. Valley View Rd & I-5 SB Ramps EBL/TR SBL/T S. Valley View Rd & I-5 NB Ramps WBL/T/R SBT S. Valley View Rd & E. Ashland Ln WBL/R Notes: 1. Storage bay at or above capacity. 2. Queue extends beyond extent of SimTraffic model link. Therefore, queue may be longer than shown. 3. Because of standing queue on eastbound Ashland Street, right turning vehicles block access for left turning vehicles to northbound left turn bay. 4. Queue extends into adjacent intersection(s). 5. Queue extends into ramp deceleration area. 6. Queue spills over into adjacent lane creating a blocked condition. 7. Left turns are blocked due to queuing along South Valley View from OR 99 intersection. Results for future year no-build traffic operations analysis showed marked degradation at most key intersections. At the Green Springs Interchange 14, where existing 30 th highest hour critical v/c ratios at both ramps terminal intersections are greater than 1.00, future operations are expected to be characterized by more delay and queuing on intersection and ramp approaches. Without mitigation, queuing on the southbound exit ramp will frequently Traffic Analysis Report 20 August 22, 2006

31 extend into the deceleration area of the ramp, creating a potential safety problem. The increased demand for the eastbound left turn from Ashland Street to the I-5 northbound entrance ramp will generate queues that extend through and well beyond the adjacent southbound ramp terminal intersection. No-build traffic operations at both ramp terminals of the North Ashland Interchange 19 are expected to meet mobility standards under year 2010 conditions. However, under 2030 traffic volume conditions, the critical v/c is calculated to be 0.95, which exceeds the OHP mobility standard if no mitigation is implemented. The v/c at the southbound ramp terminal is calculated to be greater than 1.00 prior to the plan horizon year. Queuing on the exit ramp will be significant and will extend into the deceleration area of the ramp, creating a potential safety problem. The v/c ratio at the intersection of South Valley View Road and OR 99 under no-build conditions is expected to be greater than 1.00 prior to the planning horizon year. If South Valley View Road remains a two-lane road, queuing on the southbound approach will be substantial and is likely to impact operations as far north as the North Ashland Interchange. As noted in the discussion on existing conditions, an intersection cannot actually operate at a v/c of greater than Future v/c ratios greater than 1.00 indicate that anticipated demand will exceed capacity. 10 Signal Warrant Analysis The need for traffic signals at intersections is established by evaluating existing and projected traffic conditions against traffic signal warrants contained in the 2003 Manual on Uniform Traffic Control Devices (MUTCD). The MUTCD provides eight signal warrants that consider different conditions under which a new signal may be warranted. The most commonly applied signal warrants are based on traffic volumes, although the MUTCD contains signal warrants based on crash experience, coordinated signal systems, and warrants for signals at pedestrian and school crossings. MUTCD Warrant 1, Eight-Hour Vehicular Volume, was analyzed at each ramp terminal intersection for existing conditions (year 2006). Warrant 1 requires that certain volume thresholds are met for each of any eight (8) hours in an average day, and has two condition requirements. Condition A is met when a high volume of traffic is present on an intersecting roadway, and Condition B is met when mainline volumes are so high that traffic on the minor street experiences excessive delay. MUTCD Warrant 1 is met when either Condition A or Condition B are met. For years 2010 and 2030 conditions TPAU preliminary traffic signal warrants were evaluated. The TPAU preliminary warrants are based on MUTCD warrants, but require less data. TPAU developed these warrants for the purpose of projecting future traffic signal needs. OAR provides specific guidance on the application of signal warrants in Oregon. Meeting signal warrants does not guarantee that a signal shall be installed. For installation of signals, OAR (1) provides that traffic volumes sufficient to meet signal warrants must be met within three years of signal installation. Since the planning horizon used in this analysis is 2030, which greatly exceeds the three year specification in OAR , the preliminary traffic signal warrants rather than the MUTCD signal warrants are appropriate for this planning analysis. As specified in OAR (2), before a signal can be installed a comprehensive traffic engineering study must be undertaken at a future date when traffic volumes actually meet, or can be predicted to occur within three years that meet MUTCD warrants. A The traffic signal investigation must include an evaluation of traffic Traffic Analysis Report 21 August 22, 2006

32 conditions and physical characteristics of the proposed traffic signal location. OAR (4) requires additional analyses that includes evaluations of speeds, highway type, grades, sight distance, existing level of service and conflicting accesses. OAR requires progression analyses to be conducted to evaluate the impact of a new signal on the existing or future signal system. The State Traffic Engineer will make the final decision on the installation of a signal. Traffic signal warrants are assessed using average traffic volumes rather than the 30 th highest hour volumes used for roadway and intersection design. To calculate average traffic volumes, adjustment factors were applied to the existing 16-hour traffic counts taken in May The adjustment factors were equivalent to the values shown in the May 15 column of the Seasonal Trend Table, reproduced in Table 3 of this report ( for interchange ramp volumes and for cross street volumes). Signal warrant analysis results are summarized in Table 10. Complete signal warrant worksheets are contained in Appendix E. Table 10. Signal Warrant Analysis Summary Warrant 1, Eight-Hour Vehicular Volume TPAU Preliminary Traffic Signal Warrant Location Year Condition A Condition B Case A Case B Green Springs Interchange MET NOT MET Ashland St (OR 66) & I-5 SB Ramps 2010 NOT MET NOT MET 2030 MET MET 2006 NOT MET NOT MET Ashland St (OR 66) & I-5 NB Ramps 2010 NOT MET NOT MET 2030 NOT MET NOT MET North Ashland Interchange NOT MET NOT MET S. Valley View Road & I-5 SB Ramps 2010 NOT MET NOT MET 2030 NOT MET NOT MET 2006 NOT MET NOT MET S. Valley View Road & I-5 NB Ramps 2010 NOT MET NOT MET 2030 NOT MET NOT MET The signal warrant analyses showed that only the intersection of Ashland Street at the I-5 southbound ramp terminals meet MUTCD and TPAU preliminary signal warrants. However, most of the interchange build options evaluated in this report include signalized ramp terminals, and signalization is likely to be required at some time in the future to prevent failing intersection operations and excessive queuing on the exit ramps. At a minimum, junction boxes and conduit should be included in the design of the Bridge Bundle #314 improvements to accommodate future signals, regardless of whether the ramp terminals are signalized at this time. Traffic signal warrant analysis results for each intersection is discussed below Ashland Street (OR 66) & I-5 Southbound Ramps MUTCD Signal Warrant 1, Condition A, is met under existing traffic volume conditions, and TPAU Preliminary Warrant Condition B is met under future conditions. This intersection has significant left and right turning volumes on the southbound exit ramp and high cross street volumes on Ashland Street. The high cross street volumes limit the availability of gaps and result in failing v/c conditions with significant queuing that is calculated Traffic Analysis Report 22 August 22, 2006

33 to spill into the deceleration area of the southbound exit ramp. Because of the substantial volumes of left turning vehicles and their potential for interfering with right turning vehicles, 25% of the exit ramp right turning volume was included in the minor street approach volume when conducting the MUTCD warrant analysis. A right turn reduction was also applied for the TPAU preliminary signal warrant analysis consistent with the methodology presented in the Analysis Procedures Manual Ashland Street (OR 66) & I-5 Northbound Ramps MUTCD Warrant 1 is not met at this intersection under existing conditions, and the TPAU preliminary warrant is not met through the planning horizon. However, as noted in the previous section, this intersection currently experiences significant operational problems that are expected to worsen through the planning horizon. The high volumes on Ashland Street allow few gaps in the traffic stream for left turning vehicles on the northbound exit ramp. Furthermore, the high volumes of eastbound left turning vehicles and the lack of gaps afforded to them generate queues that extend through the southbound ramp terminal intersection. The queue spillover from the northbound ramp terminal exacerbates operational problems at the southbound ramp terminal. Although signal warrants based on traffic volumes are met only at the southbound ramp terminal, signalization of only the southbound ramp terminal without also signalizing the northbound ramp terminal would counteract the operational benefits of signalization at the southbound ramp terminals. Other warrants, particularly Warrant 8, Roadway Network, or Warrant 7, Crash Experience (location is a top 10% SPIS site), may provide justification for installation of a traffic signal, and installation of a signal may well be necessary to solve the operational problems including queuing and v/c problems related to the eastbound to northbound left turn. All build options for Interchange 14 include signalized intersections at the northbound and southbound ramp terminals North Ashland Interchange 19 MUTCD Warrant 1 is not met for existing conditions, nor are the TPAU preliminary signal warrants met for future conditions at either the northbound or southbound ramp terminals. Despite these results, signalization should remain an option at the interchange ramp terminals, and a future warrant analysis may prove that traffic signals are appropriate. A number of factors must be considered, and sound engineering judgment must be employed, when conducting a signal warrant investigation. Some items to consider for future signal warrant investigations are discussed below. For major streets with speeds of 40 mph or greater, or in isolated communities with populations of less than 10,000 residents, MUTCD methodology allows volume thresholds for meeting traffic signal warrants to be reduced to 70 percent of standard warrant values. This reduced volume threshold also applies to TPAU preliminary warrants. The posted speed of South Valley View Road through the interchange is 35 mph. Directly north of the northbound ramp terminal the posted speed changes to 45 mph. If the documented 85 th percentile speed is equal to or greater than 40 mph, then it could be suggested that the reduced warrant threshold would be appropriate. Application of the 70 percent values based on the isolated community standard may or may not be appropriate depending on the interpretation of what constitutes a rural or urban area. The Interchange 19 area has a rural character and is located outside of the Ashland Urban Growth Boundary. However, the interchange is located inside the Rogue Valley MPO boundary, and the traffic composition is largely regular commuter traffic within the region. Notwithstanding the above discussion, neither the northbound nor southbound ramp terminals appear to meet 70 percent of the standard TPAU preliminary signal warrants through the planning horizon. Traffic Analysis Report 23 August 22, 2006

34 At times it is appropriate to include some right turns in the volume calculation. However, at both Interchange 19 ramp terminals none of the right turns were counted in the volume calculations for preliminary signal warrant analyses. The TPAU Analysis Procedures Manual provides specific guidelines regarding application of right-turn reductions. These guidelines dictate when to apply reductions and, when applicable, the portion of right turns that should be included. The warrant analyses conducted for this Traffic Analysis Report adhered to the TPAU guidelines. By excluding all right turns, the major movement at the southbound ramp terminal (i.e., southbound I- 5 exit ramp to southbound South Valley View Road) is not reflected in the intersection volumes. This, in turn, reduces the likelihood of meeting signal warrants. The ability of motorists to turn right depends on provision of separate left turn and right turn lanes. Should queues of left-turning vehicles grow long enough that they inhibit the ability of right-turning vehicles to get to the intersection, some of the right-turning vehicles must be counted in the ramp approach volumes when assessing volume warrants. Failure to meet preliminary signal warrants at this time should not be viewed as a definitive disqualification for signalization as a possible future solution. The traffic operations analysis contained in Section 9 of this report shows both ramp terminals failing to meet operations standards within the planning horizon under their current, unsignalized conditions. Signalization may in fact be the appropriate solution as traffic volumes increase and interchange operations deteriorate. Should Region 3 decide to pursue signalization of one or both of the ramp terminals, the requisite traffic engineering investigation should consider the possibility of including some right turns in the intersection volumes, as well as evaluating whether using 70 percent of standard warrants are appropriate. If it is determined that either one of these modifications should be made, signal warrants may be found to be met at one or both ramp terminals. All Interchange 19 Build Options except 19-1 include signalization at the southbound ramp terminals. Build Option 19-3 includes a loop ramp at the northbound ramp terminal in lieu of a traffic signal. A loop ramp would remove the heaviest movement from the intersection and would eliminate the need for a signal at the northbound ramp terminals through the planning horizon. 11 Future Traffic Operations Analysis Build Options Each of the build options was analyzed to determine the intersection v/c, LOS and 95 th percentile queue. The traffic operations analysis results contained in this report, in combination with relevant cost and design data, should be employed to select an appropriate build option. Once a build option is selected, the designer should consider the traffic operations analysis results to determine appropriate design attributes for the selected build option, such as queue storage and ramp lengths. This report summarizes operations results and 95 th percentile queue lengths, but does not present specific recommendations for design features, as this is the purview of the designer. All analysis described in this section was performed using the Synchro and SimTraffic programs. As noted in Section 5.3, traffic conditions that would warrant the use of the CORSIM program (e.g., field observed lane imbalances) were not present. Four build options were developed for the Green Springs Interchange 14, and five build options were developed for the North Ashland Interchange 19. The objectives of the build options were to: 1) address existing and anticipated operational deficiencies; and 2) help ODOT and OBDP determine the extent of immediate improvements associated with the OTIA III Bridge Bundle #314 project. Traffic Analysis Report 24 August 22, 2006

35 All build options assumed that two lanes were provided on the exit ramp approaches to the ramp terminals to accommodate separate left and right turns. The required length of queue storage varies depending on the operational characteristics associated with each build option. Like the no-build analyses, the Synchro and SimTraffic software tools were used to evaluate traffic operations for each of the build options. When an alternative included signalization, signal timing was coordinated between the intersections and optimized to maximize capacity within the limits of usual operational parameters. An attempt was made to approximate realistic signal timing consistent with ODOT signal policy. A detailed discussion of each build option, including analysis results, is provided below. Figures 5-13 illustrate each option, and Tables list summary analysis results for the options Green Springs Interchange Build Option 14-1 Build Option 14-1 consists of a three lane bridge over I-5 with traffic signals at both northbound and southbound ramp terminals. The right turning movement from the I-5 southbound exit ramp is channelized with a dedicated receiving lane on westbound Ashland Street as shown on Figure 5. Operations analysis resulted in intersection v/c ratios of 0.83 for the southbound ramp terminal and 0.93 for the northbound ramp terminal under year 2030 conditions, neither of which meet the HDM mobility standard. A three-lane bridge does not appear to provide adequate length for back-to-back left-turn lanes at the southbound and northbound ramp terminals, plus the needed taper between them. Furthermore, queuing analysis indicates that the single eastbound left turn lane is not sufficient to accommodate the expected 95 th percentile queues. For these reasons, this build option does not appear to be adequate to accommodate design hour traffic volumes for year Figure 5. Green Springs Interchange Build Option 14-1 Note: Figure intended for illustration purposes only. Lane configurations are exaggerated for clarity. Traffic Analysis Report 25 August 22, 2006

36 11.2 Green Springs Interchange Build Option 14-2 Build Option 14-2 consists of a four-lane bridge and like Build Option 14.1, includes traffic signals at both ramp terminal intersections. Build Option 14-2 is shown in Figure 6. Four lanes accommodate dual eastbound left turn lanes for the high-volume eastbound Ashland Street to northbound I-5 movement; the left-hand eastbound leftturn lane is located back-to-back with the westbound left-turn lane. Note that dual left turn lanes require two receiving lanes on the northbound I-5 entrance ramp. The dual receiving lanes should be carried as far down the ramp as possible, but may merge into one lane prior to joining the I-5 mainline. The HCM does not provide a methodology to assess merging of two single-lane facilities or a lane drop from two lanes to one. However, the design hour volumes on the northbound entrance ramp are far below the capacity of the ramp, so it can accommodate a merge from two lanes to one lane prior to joining the mainline. The more critical factor is whether the I-5 mainline can absorb the design hour ramp volumes if they join the interstate in a single lane as opposed to dual lanes. The HCM provides a methodology for assessing merge movements on freeways. The analysis is applicable to either single or dual-ramps merging with multi-lane freeway sections. HCM merge analysis was conducted assuming design hour volumes and a single merge lane, and it showed that design year traffic volumes on the ramp could be accommodated by a single-lane ramp. Analysis details are contained in Appendix D. Build Option 14-2 also includes a channelized right turn lane with a dedicated receiving lane for southbound traffic exiting I-5 onto westbound Ashland Street. Analysis results show that v/c ratios at both ramp terminal intersections would meet HDM mobility standards. However, existing geometric constraints (i.e., the distance between ramp terminals) may result in a westbound left-turn lane and taper between the eastbound and westbound left-turn lanes that do not meet ODOT design standards. Preliminary measurements indicate that ODOT design standards require longer minimum left turn storage lane and taper lengths than what could be provided in Build Option A four-lane bridge option does not appear to simultaneously provide for: 1) sufficient storage for the 95th percentile queues for the design hour volume on the eastbound approach to the northbound I-5 ramp terminal; 2) a standard 100-foot storage bay for the westbound approach at the southbound ramp terminal; 3) a standard taper associated with a 40-mph design speed; and 4) a distance of approximately 535 feet between ramp terminals. It is important to note that this effects only the inside left turn lane of the dual lanes from eastbound Ashland Street to northbound I-5; the outside left turn lane queue storage is determined only by the distance between the ramp terminals. The fact that only one of the two turn lanes is limited by this configuration may be an important consideration when selecting the preferred design. Traffic Analysis Report 26 August 22, 2006

37 Figure 6. Green Springs Interchange Build Option 14-2 Note: Figure intended for illustration purposes only. Lane configurations are exaggerated for clarity Green Springs Interchange Build Option 14-3 Build Option 14-3 features a five-lane bridge. Build Option 14-3 contains all the attributes of Build Option 14-2, including signalization at the northbound and southbound ramp terminals, dual eastbound left-turn lanes, and a dedicated receiving lane on westbound Ashland Street for right-turning vehicles from the southbound exit ramp. This option adds an additional lane between the ramp terminals, resulting in a five-lane bridge. The lane configuration between the ramp terminals consists of single through lanes in both the eastbound and westbound directions, and dual eastbound left-turn lanes located side-by-side with a single westbound left-turn lane. Operationally, the ramp terminals associated with this option would function identically to those of Build Option The side-by-side left-turn lane configuration would simply allow all ODOT design standards to be met on the bridge since left-turn queue storage would be limited only by the distance between the ramp terminals and no tapers would be required. The implications of a five-lane bridge have not been assessed with regard to the impact on the sections of Ashland Street to the east and to the west of the ramp terminals. These issues are appropriately dealt with by the roadway designer. Traffic Analysis Report 27 August 22, 2006

38 Figure 7. Green Springs Interchange Build Option 14-3 Note: Figure intended for illustration purposes only. Lane configurations are exaggerated for clarity Green Springs Interchange Build Option 14-4 In response to Agency and OBDB requests, traffic operations were analyzed at the Green Springs Interchange for a single-point urban interchange, or SPUI. This interchange type brings all ramp terminals to a single intersection, and is shown in Figure 8. Like the other build options, traffic exiting from southbound I-5 would have a channelized right turn with a dedicated receiving lane on westbound Ashland Street. Traffic operations analysis results show that the SPUI would operate with a v/c of 0.71 under design year traffic volumes. Note that the traffic analysis was performed using a SPUI concept with the minimum number of lanes required to achieve acceptable ODOT mobility standards. Several of the approaches to the SPUI modeled for Interchange 14 include only a single approach lane. Typically SPUIs have multiple lanes for each approach. The fact that single lanes appear to provide a v/c ratio meeting mobility standards should not be taken as a recommendation that this is an appropriate design. Adding additional lanes for the approaches would improve the v/c ratio and may be necessary to meet other applicable design standards. Changes to the configuration may also alter the queue storage requirements reported in Table 12. Traffic Analysis Report 28 August 22, 2006

39 Figure 8. Green Springs Interchange Build Option 14-4: SPUI Note: Figure intended for illustration purposes only. Lane configurations are exaggerated for clarity Analysis of AM Peak Hour at Interchange 14 All analysis descriptions and summaries described above pertain to the PM peak hour. Total entering volumes at all but one of the analysis area ramp terminal intersections were higher during the PM peak hour than during the AM peak hour. However, traffic volumes at the Interchange 14 southbound ramp terminal were roughly equivalent during the AM and PM peak hours. As a check, traffic operations and queuing analysis was performed at Interchange 14 for Build Options 14-2 and 14-3 under projected year 2030 AM peak hour traffic volumes. The purpose of this analysis was to ensure that interchange design decisions based on design hour (PM peak hour) traffic operations were adequate to accommodate the volumes and directional distribution associated with the AM peak hour as well as the PM peak hour. The analysis showed that both Build Options 14-2 and 14-3 could adequately accommodate design year AM peak hour traffic volumes. Detailed analysis results are contained in Appendix C North Ashland Interchange Build Option 19-1 Build Option 19-1 improvements are limited to a three lane bridge over Interstate 5 and two lanes for portions of the northbound and southbound I-5 exit ramp approaches to South Valley View Road to provide separate left turn and right turn lanes. No traffic signals are included. The unconventional intersection control at the northbound ramp terminal is retained (free left turn from northbound South Valley View Road to the northbound I-5 entrance ramp). A portion of exit ramp approaches to ramp terminals are widened to two lanes to provide separate lanes for left turns and right turns. Build Option 19-1 is shown in Figure 9. Analysis results show that critical v/c ratios would not meet HDM mobility standards under year 2030 design hour traffic volume conditions. Build Option 19-1 provides minimal operational benefits over the current interchange configuration. Traffic Analysis Report 29 August 22, 2006

40 Conventional stop control was also examined as an alternative to the existing intersection control at the northbound ramp terminal. Conventional control would consist of free movements on the northbound and southbound South Valley View Road approaches and stop control on the northbound I-5 exit ramp approach. Analysis showed that conventional intersection control would result in worse operations than existing intersection control under design hour conditions. For conventional control, the v/c was calculated to be greater than 1.00 and with very long queues. Figure 9. North Ashland Interchange Build Option 19-1 Note:. Figure intended for illustration purposes only. Lane configurations are exaggerated for clarity North Ashland Interchange Build Option 19-2 This build option consists of a three-lane bridge and signalization at the northbound and southbound I-5 ramp terminals. Portions of the northbound and southbound exit ramps would be widened to two lanes to provide for separate left and right turns on the exit ramps at each signalized ramp terminal. Build Option 19-2 is shown in Figure 10. Analysis results show that under year 2030 traffic volume conditions, the northbound ramp terminal intersection would meet HDM mobility standards, but the southbound ramp terminal would not. The predicted sub-standard operational performance at the southbound ramp terminal is caused by limited capacity to accommodate the right-turn movement from the southbound I-5 exit ramp to southbound South Valley View Road south of the interchange ramp terminal, not the number of lanes on the bridge. A three-lane bridge section appears to simultaneously provide sufficient storage for the 95th percentile queues for both northbound and southbound left turns using year 2030 design hour volumes while meeting ODOT design standards for left turn lane storage and lane taper lengths. Traffic Analysis Report 30 August 22, 2006

41 Figure 10. North Ashland Interchange Build Option 19-2 Note: Figure intended for illustration purposes only. Lane configurations are exaggerated for clarity North Ashland Interchange Build Option 19-3 This option, shown in Figure 11, consists of a traffic signal at the southbound ramp terminal and a loop ramp in NE quadrant of interchange to accommodate the heavy left turn movement from northbound South Valley View Road to the northbound I-5 entrance ramp. Analysis results show that the northbound ramp terminal would meet HDM mobility standards, but the southbound ramp terminal would not. The southbound ramp terminal analysis results are nearly identical to those of Build Option Also, like in Build Option 19-2, the capacity limitation at the southbound ramp terminal is not associated with the number of lanes on the bridge nor the northbound loop ramp, but rather it is related to limited capacity for the right turn from the southbound I-5 exit ramp to southbound South Valley View Road. Option 19-4 provides a solution that allows the mobility standard to be met at the southbound ramp terminal that could be implemented in conjunction with a loop ramp at the northbound ramp terminal. All-way stop control would be necessary at the northbound ramp terminal intersection to meet HDM mobility standards. Analysis of the intersection based on free movements on South Valley View Road with stop-control on the exit ramp resulted in a v/c of 0.99 on the stop-controlled I-5 northbound exit ramp. Note that East Ashland Lane and Lowe Road are not shown intersecting South Valley View Road in their current locations near the interchange ramp terminals. Build Option 19-3 assumes that East Ashland Lane and Lowe Road would be realigned to intersect with South Valley View Road at points further from the ramp terminals, consistent with Division 51 access management standards for interchange areas. The designer may conclude that a relocation of East Ashland Lane would be necessary to accommodate a loop ramp. This may depend on the Traffic Analysis Report 31 August 22, 2006

42 design speed of the ramp and various other geometric and right-of-way considerations. Further discussion regarding access management issues at both interchanges is contained in Section 12 of this report. A loop ramp would likely require redesign of the existing northbound entrance ramp to allow adequate spacing between adjacent ramps or accommodating merging of the ramps prior to joining the northbound I-5 mainline. Operationally, either option (i.e., merging the ramps prior to joining I-5 or providing two separate merge points) would function adequately, as described below. HCM merge analysis was performed to assess year 2030 design hour traffic operations of a scenario consisting of two entrance ramps accessing northbound I-5 at Interchange 19. For the analysis, the two ramps were assumed to be 1000 feet apart, which is the minimum ODOT spacing. The analysis showed that the ramp influence areas would operate with acceptable v/c ratios. Analysis worksheets are contained in Appendix D. The conclusion that operations would be acceptable assuming the two ramps are spaced 1000 feet apart should not be taken as a recommendation that this distance be used. ODOT s recommended or desirable spacing may be more appropriate based on other factors such as cost or the availability of right of way. Another option would be to merge the ramps together prior to joining northbound I-5. As discussed in Section 11.2 of this report, the HCM does not provide a methodology to assess merging of two single-lane facilities or a lane drop from two lanes to one. However, the design hour volumes on the northbound entrance ramp are well below the capacity of a single ramp, so it could be expected accommodate a merge from two lanes to one lane prior to joining the mainline. The distance provided for merging of two single-lane ramps should be as long as possible. If a second northbound entrance ramp at Interchange 19 is added, or the existing ramp is relocated, an Access Modification Request would need to be prepared to address the requirements of the Federal Highway Administration. Traffic Analysis Report 32 August 22, 2006

43 Figure 11. North Ashland Interchange Build Option 19-3 Note: Figure intended for illustration purposes only. Lane configurations are exaggerated for clarity Loop Ramp Design As described in the previous section, Build Option 19-3 uses a loop ramp to accommodate the northbound traffic from South Valley View Road to northbound I-5. From a traffic operations standpoint, the loop ramp has certain advantages as well as certain disadvantages. The geometric design of the ramp is a function of the roadway designer and is typically undertaken during preliminary engineering. The following discussion may prove useful as the roadway designer considers various design options. ODOT s Highway Design Manual lists the Ramp Design Speed in Table 9-3. For a highway design speed of 50 mph, the desirable ramp design speed is 45 mph and the minimum design speed of the ramp is 25 mph. For a highway design speed of 55 mph, the desirable ramp design speed is 45 mph and the minimum design speed of the ramp is 30 mph. ODOT s Highway Design Manual lists Single Lane Ramp Capacity in Table 9-3. This table shows ramp design speed and level of service. This table, however, does not list either lane capacity or v/c ratios. The v/c ratio is the criterion upon which ODOT assesses compliance with the mobility standard. The Highway Capacity Manual does, however, provide information on capacity in Exhibit 25-3: Approximate Capacity of Roadway Ramps. This exhibit describes capacity of both single-lane and two-lane ramps according to the free-flow speed of ramps. The lowest ramp capacity listed is 1800 passenger cars per hour for a single lane ramp with a free-flow speed of less than 20 mph. At higher speeds, the ramp capacity increases. Since the projected year 2030 traffic volume on the optional loop ramp is approximately 550 vehicles during the peak hour, it is clear that ODOT s mobility standard is easily met even if one performs the calculation of the v/c ratio for the ramp based on a capacity of 1800 passenger vehicles per hour. Increasing the design speed and the free-flow speed of the ramp is not necessary to satisfy ODOT s mobility standard. The roadway designer need not be concerned about selecting a particular Traffic Analysis Report 33 August 22, 2006

44 ramp design speed to meet traffic operations standards. Any speed above the minimum ramp design speed specified in ODOT s Highway Design Manual will satisfy mobility standards for a potential entrance ramp at the North Ashland Interchange. Other factors such as the available right of way are more likely to be important when selecting design speed for a potential loop ramp. The roadway designer is also cautioned to consider that a lower speed on the ramp will also likely require a longer section for acceleration before the ramp joins the freeway main line. This factor may or may not be important in selecting the design speed for a potential loop ramp North Ashland Interchange Build Option 19-4 Build Option 19-4, shown in Figure 12, consists of all the features of Build Option 19-2 and adds a dedicated receiving lane on southbound South Valley View Road that accommodates a free right turn movement from a channelized right turn lane on the southbound I-5 exit ramp to southbound South Valley View Road. Ideally the additional southbound lane on South Valley View road should extend all the way to OR 99. Carrying two lanes southbound from the interchange to OR 99 avoids all issues related to merging. However, in lieu of the full length, the lane should be carried as far as possible. Analysis shows that this build option results in both ramp terminals meeting HDM mobility standards for the design year. Under year 2030 traffic volume conditions the southbound ramp terminal would operate with a v/c of 0.64 and the northbound ramp terminal would operate with a v/c of Traffic control and traffic operations at the northbound ramp terminal are identical to those from Build Option Traffic Analysis Report 34 August 22, 2006

45 Figure 12. North Ashland Interchange Build Option 19-4 Note: Figure intended for illustration purposes only. Lane configurations are exaggerated for clarity North Ashland Interchange Build Option 19-5 In response to Agency and OBDB requests, traffic operations were analyzed at the North Ashland Interchange for a four-lane bridge. Build Option 19-5, shown in Figure 13, consists of all the features of Build Option 19-4, but increases the width of the bridge to accommodate four lanes. The primary attribute of a four-lane bridge option is that it increases the amount of storage available for left turn movements at both ramp terminals and avoids any issues related to taper lengths that would be associated with back-to-back left turns at ramp terminals. The v/c at each ramp terminal was calculated to be identical to those of Build Option This indicates that a fourth lane provides no traffic operations benefit at the ramp terminals over a three-lane structure. A four lane bridge avoids any issue relating to tapers associated with left turn lanes by allowing side-by-side left turn lanes. Preliminary measurements indicate that the available left turn queue storage associated with a four-lane bridge section would be approximately 700 feet at both ramp terminals, which far exceeds the calculated 95 th percentile queue for the design year. Traffic Analysis Report 35 August 22, 2006

46 Figure 13. North Ashland Interchange Build Option 19-5 Note: Figure intended for illustration purposes only. Lane configurations are exaggerated for clarity Improvements to South Valley View Road Build Options 19-4 and 19-5 assume that South Valley View Road contains two southbound through lanes for an appropriate distance south of the ramp terminal such that it provides a dedicated receiving lane for right-turning vehicles coming from the southbound I-5 exit ramp. Analysis indicates that an additional southbound lane on South Valley View Road would be required to meet HDM mobility standards at the southbound ramp terminals in year Two southbound lanes would ideally extend south all the way to OR 99. This will be necessary within the planning horizon to prevent operational problems at the intersection of South Valley View Road at OR 99 from impacting the interchange. Since the HCM does not provide a methodology for assessing a lane drop from two lanes to one lane, a definitive assessment of the minimum distance for the two lanes cannot be specified. Lacking a method to specify a minimum distance, the recommendation is that the two lanes be carried as far as possible. Traffic Analysis Report 36 August 22, 2006

NO BUILD TRAFFIC OPERATIONS

NO BUILD TRAFFIC OPERATIONS 3. 23 NO BUILD TRAFFIC OPERATIONS This section addresses the operations of the transportation system and details how it would be expected to function under year 23 No Build conditions with the projected

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT Prepared by: In Association with: November 2013 EXECUTIVE SUMMARY Patton Township, in partnership

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon Traffic Analysis and Design Report NW Bethany Boulevard NW Bronson Road to NW West Union Road Washington County, Oregon May 2011 Table of Contents Table of Contents Section 1 Executive Summary... 2 Section

More information

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis MEMORANDUM Transportation Bill Troe, AICP Jason Carbee, AICP 12120 Shamrock Plaza Suite 300 Omaha, NE 68154 (402) 334-8181 (402) 334-1984 (Fax) To: Project File Date: Subject: Solberg Avenue / I-229 Grade

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM July 2014 FINAL (SR 43) Project Development and Environment Study From State Road 60 (Adamo Drive) to I-4 (SR 400) Hillsborough County, Florida Work Program Item

More information

Capital Region Council of Governments

Capital Region Council of Governments March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

FAIRFIELD - RYAN S CORNER TRAFFIC IMPACT ANALYSIS LOUDOUN COUNTY, VIRGINIA

FAIRFIELD - RYAN S CORNER TRAFFIC IMPACT ANALYSIS LOUDOUN COUNTY, VIRGINIA FAIRFIELD - RYAN S CORNER TRAFFIC IMPACT ANALYSIS LOUDOUN COUNTY, VIRGINIA Submitted on behalf of: Fairfield Residential Prepared by: Wells + Associates, Inc. 1420 Spring Hill Road, Suite 00 McLean, Virginia

More information

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY Prepared for: City of Thornton And Colorado Department of Transportation Prepared by: 11 Blake Street, Suite 2 Denver, Colorado 822 Contact: Brian Bern, PE, PTOE

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /

More information

Troutbeck Farm Development

Troutbeck Farm Development Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

I-95 Northbound at US 1 (Exit 126) Design and Study Final Report

I-95 Northbound at US 1 (Exit 126) Design and Study Final Report I-95 Northbound at US 1 (Exit 126) Design and Study Final Report July 2018 Prepared by: Prepared for: TABLE OF CONTENTS 1 Introduction... 1 Study Area Limits... 1 Purpose and Need of the Study... 1 Safety

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Introduction The Georgia Department of Transportation (GDOT) prepared a

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

Road Conversion Study Plumas Street

Road Conversion Study Plumas Street Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

Grant Avenue Streetscape

Grant Avenue Streetscape REPORT TYPE GOES HERE Grant Avenue Streetscape PREPARED FOR City of Manassas 9027 Center Street Manassas, VA 20110 PREPARED BY 8300 Boone Boulevard Suite 700 Vienna, Virginia 22182 571.389.8121 July 31,

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... IX 1 INTRODUCTION... 1 1.1 Project Overview... 1 1.2 Analysis Scenarios...

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:

More information

6060 North Central Expressway Mixed-Use Site Dallas, Texas

6060 North Central Expressway Mixed-Use Site Dallas, Texas Volume 1 Traffic Impact Analysis 6060 North Central Expressway Mixed-Use Site Dallas, Texas April 30, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #063238300 Registered Firm F-928 Traffic

More information

INTERSTATE 540 IMPROVEMENT STUDY

INTERSTATE 540 IMPROVEMENT STUDY INTERSTATE 540 IMPROVEMENT STUDY WASHINGTON COUNTY AND BENTON COUNTY APRIL, 2006 INTERSTATE 540 IMPROVEMENT STUDY WASHINGTON COUNTY AND BENTON COUNTY April, 2006 Prepared by Parsons Transportation Group

More information

Congestion Mitigation at IH 27 and U.S. Hwy 70 in Plainview, TX

Congestion Mitigation at IH 27 and U.S. Hwy 70 in Plainview, TX 2010 Congestion Mitigation at IH 27 and U.S. Hwy 70 in Plainview, TX Hongchao Liu, Hao Xu, and Rhett Dollins Multidisciplinary Research in Transportation Texas Tech University Mulidisciplinary Research

More information

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report Preparedby: ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS Final Report Prepared for Maricopa County Department of Transportation Prepared by TABLE OF CONTENTS Page EXECUTIVE SUMMARY ES-1

More information

3.9 - Transportation and Traffic

3.9 - Transportation and Traffic Transportation and Traffic 3.9 - Transportation and Traffic This section describes the potential transportation and traffic effects of project implementation on the project site and its surrounding area.

More information

Clay Street Realignment Project Traffic Study

Clay Street Realignment Project Traffic Study Final Clay Street Realignment Project Traffic Study November 24, 2009 Prepared for: City of Placerville RS07-2466 2990 Lava Ridge Court, Suite 200 Roseville, CA 95661 (916) 773-1900 Fax (916) 773-2015

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 Prepared by Planning and Research Division Arkansas State

More information

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION 7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION 7.1 INTRODUCTION & METHODOLOGY FEASIBILITY REPORT Congestion hot spot problem locations have been assessed using the

More information

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015 Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative

More information

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Figure 1: East West Connector Alignment Alternatives Concept Drawing Page 2 of 9 Figure 1: East West Connector Alignment Alternatives Concept Drawing The Montebello Drive extension will run north south and connect Wilsonville Road to the Boones Ferry Road to Brown Road

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

Traffic Academy: IJS & IMS FAQ/RULES OF THUMB

Traffic Academy: IJS & IMS FAQ/RULES OF THUMB FAQ/RULES OF THUMB HCS intersection analysis criteria See LDM Figure 401-14aE Cycle lengths between 60 to 120 seconds No impractical phases, i.e., 1 second green time Yellow + All Red must be no less than

More information

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

INTERSECTION SAFETY STUDY State Route 57 / Seville Road

INTERSECTION SAFETY STUDY State Route 57 / Seville Road INTERSECTION SAFETY STUDY State Route 57 / Seville Road City of Wadsworth, Medina County, Ohio Prepared For: City of Wadsworth Engineering Department 120 Maple Street Wadsworth, OH 44281 Prepared By: GPD

More information

5.3 TRAFFIC, CIRCULATION AND PARKING

5.3 TRAFFIC, CIRCULATION AND PARKING 5.3 TRAFFIC, CIRCULATION AND PARKING This section is based upon the Downtown Lancaster Specific Plan Traffic Impact Analysis (April 2, 2008) and the Downtown Lancaster Specific Plan Parking Analysis (May

More information

EXISTING (2006) CONDITIONS

EXISTING (2006) CONDITIONS Section 2 EXISTING (2006) CONDITIONS This section provides a description of the existing transportation system in the study area and a comprehensive analysis of existing traffic operations and crash history.

More information

5.0 Roadway System Plan

5.0 Roadway System Plan Southwest Boise Transportation Study Page 16 5.0 Roadway System Plan The Roadway System Plan outlines roadway improvements in the Initial Study Area. It forecasts future deficiencies on the arterial system,

More information

Appendix G: Future Conditions Traffic Analysis Memorandum

Appendix G: Future Conditions Traffic Analysis Memorandum ppendix G: Future Conditions Traffic nalysis Memorandum Prepared by: Bolton & Menk, Inc. Riverfront Drive Corridor Study ǀ T42.867 ppendix MEMORNDUM Date: pril, 27 To: Paul Vogel From: Ross B. Tillman,

More information

City of Homewood Transportation Plan

City of Homewood Transportation Plan City of Homewood Transportation Plan Prepared for: City of Homewood, Alabama Prepared by: Skipper Consulting, Inc. May 2007 TABLE OF CONTENTS INTRODUCTION... 1 BACKGROUND INFORMATION... 1 EXISTING TRANSPORTATION

More information

APPENDIX F SUPPLEMENTAL TRAFFIC DATA

APPENDIX F SUPPLEMENTAL TRAFFIC DATA APPENDIX F SUPPLEMENTAL TRAFFIC DATA Environmental and Planning Consultants 440 Park Avenue South 7th Floor New York, NY 10016 tel: 212 696-0670 fax: 212 213-3191 www.akrf.com Draft Memorandum To: Michael

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

Multnomah County Courthouse Relocation. Transportation Alternatives Analysis Technical Memorandum: FINAL

Multnomah County Courthouse Relocation. Transportation Alternatives Analysis Technical Memorandum: FINAL Multnomah County Courthouse Relocation Portland, Oregon Transportation Alternatives Analysis Technical Memorandum: FIL Prepared for Multnomah County Facilities and Property Management Division 41 N Dixon

More information

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT November 2016 TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT & Aspinwall Borough, Sharpsburg Borough & O Hara Township, Allegheny County, Pennsylvania Prepared for: Riverfront

More information

Operational Comparison of Transit Signal Priority Strategies

Operational Comparison of Transit Signal Priority Strategies Operational Comparison of Transit Signal Priority Strategies Revision Submitted on: November, 0 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 0 South Orange Avenue, Suite 00 Orlando,

More information

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study To: Ms. Susan C. Ryan Spaulding Youth Center 72 Spaulding Road Northfield, NH 03276 Date: September 7, 2017 Project #: 52455.00 From: Robin Bousa Director of Transportation Systems Re: Spaulding Youth

More information

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677 Transportation Impact Analysis Sierra College Boulevard Commercial Project City of Rocklin Prepared for: David Mohlenbrok City of Rocklin 081 Alvis Court Rocklin, CA 95677 Prepared by: 1875 Olympic Boulevard,

More information

TABLE TRAFFIC ANALYSIS SCENARIOS

TABLE TRAFFIC ANALYSIS SCENARIOS 4.11 TRANSPORTATION The potential traffic impacts of the proposed project are evaluated in the Buena Park Beach/Orangethorpe Mixed Use Project Traffic Analysis (Traffic Analysis) by Austin-Foust Associates

More information

Introduction Roundabouts are an increasingly popular alternative to traffic signals for intersection control in the United States. Roundabouts have a

Introduction Roundabouts are an increasingly popular alternative to traffic signals for intersection control in the United States. Roundabouts have a HIGH-CAPACITY ROUNDABOUT INTERSECTION ANALYSIS: GOING AROUND IN CIRCLES David Stanek, PE and Ronald T. Milam, AICP Abstract. Roundabouts have become increasingly popular in recent years as an innovative

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report Traffic Study of Fuller Street, Cady Street, West Street and West Avenue Final Report July 2005 Prepared for: Town of Ludlow Prepared by: Pioneer Valley Planning Commission 26 Central Street West Springfield,

More information

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748 City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License

More information

Access Location, Spacing, Turn Lanes, and Medians

Access Location, Spacing, Turn Lanes, and Medians Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-3 Access Location, Spacing, Turn Lanes, and Medians This section addresses access location, spacing, turn lane and median needs, including

More information

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine Draft Study STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine SUBMITTED TO: BANGOR AREA COMPREHENSIVE TRANSPORTATION SYSTEM SUBMITTED BY: I MAY 23, 2017 DRAFT STILLWATER AVENUE STUDY FINAL REPORT Table

More information

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007 Technical Memorandum May 2007 Syracuse Metropolitan Transportation Council Edwards and Kelcey with Wallace Roberts and Todd Alta Planning and Design CONTENTS SECTION ONE- INTRODUCTION...1 SECTION TWO-

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

A Traffic Operations Method for Assessing Automobile and Bicycle Shared Roadways

A Traffic Operations Method for Assessing Automobile and Bicycle Shared Roadways A Traffic Operations Method for Assessing Automobile and Bicycle Shared Roadways A Thesis Proposal By James A. Robertson Submitted to the Office of Graduate Studies Texas A&M University in partial fulfillment

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK TRAFFIC IMPACT STUDY FOR THE DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK MARCH 14, 2017 PREPARED FOR: 1950 Brighton Henrietta Town Line Rd Rochester, NY 14623 PREPARED

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners DRAFT Corridor study Honeysuckle Road October 2017 Prepared for the City of Dothan, AL Prepared by TABLE OF CONTENTS SECTION I... 1 STUDY SUMMARY... 1 INTRODUCTION... 1 CONCLUSIONS... 5 SECTION II... 7

More information

TRAFFIC OPERATIONS ANALYSIS REPORT. Pacheco Boulevard Alignment Study and Alternatives Analysis

TRAFFIC OPERATIONS ANALYSIS REPORT. Pacheco Boulevard Alignment Study and Alternatives Analysis TRAFFIC OPERATIONS ANALYSIS REPORT Pacheco Boulevard Alignment Study and Alternatives Analysis PREPARED FOR: CITY OF MARTINEZ AND CONTRA COSTA COUNTY OCTOBER 2016 FINAL REPORT Prepared By: under contract

More information

REVIEW OF LOCAL TRAFFIC FLOW / LONG RANGE PLANNING SOLUTIONS STUDY

REVIEW OF LOCAL TRAFFIC FLOW / LONG RANGE PLANNING SOLUTIONS STUDY ITEM Town of Atherton TRANSPORTATION COMMITTEE STAFF REPORT TO: FROM: MEMBERS OF THE COMMITTEE ROBERT OVADIA, PUBLIC WORKS DIRECTOR DATE: FEBRUARY 12, 2019 SUBJECT: REVIEW OF LOCAL TRAFFIC FLOW / LONG

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY TRAFFIC IMPACT STUDY for the GLEN ELLEN COUNTRY CLUB SENIOR RESIDENTIAL REDEVELOPMENT 84 Millis, Massachusetts Prepared by: McMahon Associates, Inc. Prepared for: Toll Brothers, Inc. August 216 DRAFT

More information

APPENDIXB. Traffic Operations Technical Memorandum

APPENDIXB. Traffic Operations Technical Memorandum APPENDIXB Traffic Operations Technical Memorandum Environmental Assessment - Lincoln County, SD 85 th Street: Sundowner Avenue to Louise Avenue November 2017 MEMORANDUM Transportation Jim Kollbaum, PE

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

Clackamas County Comprehensive Plan

Clackamas County Comprehensive Plan ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They

More information

Corridor Studies. LA 415 and LA 73

Corridor Studies. LA 415 and LA 73 Corridor Studies LA 415 and LA 73 Project Approach for Both Corridors 1. Data Collection 2. Data Summary 3. Traffic Analysis 4. Micro-Simulation modeling 5. Generation of alternatives 6. Modeling alternatives

More information

TRAFFIC SIGNAL WARRANT STUDY

TRAFFIC SIGNAL WARRANT STUDY TRAFFIC SIGNAL WARRANT STUDY 5 th STREET & ENCHANTED PINES DRIVE JANUARY 2013 TRAFFIC OPERATIONS ENGINEERING SERVICES/PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS INTERSECTION LOCATION MAP ii INTRODUCTION

More information

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas 133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS Overland Park, Kansas September 1, 2017 TABLE OF CONTENTS 1. INTRODUCTION... 1 2. LITERATURE REVIEW... 1 3. CONCEPT

More information

DRAFT Davidson Elementary School Expansion Transportation Impact Analysis

DRAFT Davidson Elementary School Expansion Transportation Impact Analysis DRAFT Davidson Elementary School Expansion Transportation Impact Analysis Prepared for: Town of Davidson 216 S. Main Street Davidson, NC 28036 Prepared by: Stantec Consulting Services Inc. 2127 Ayrsley

More information

US-6 Spanish Fork Fact Finding Study. December 2017

US-6 Spanish Fork Fact Finding Study. December 2017 US-6 Spanish Fork Fact Finding Study December 2017 US-6 Spanish Fork Fact Finding Study Avenue Consultants December 2017 US-6 Spanish Fork Fact Finding Study December 2017 Table of Contents 1 Introduction...

More information