1 To: Cc: From: Re: Subject: Ravindra Raut City of Alexandria, VA Bob Garbacz Katye North City of Alexandria, VA Larry Sefcik Grady Vaughan, EIT Wells + Associates, Inc. (31 Alfred Street) Supplemental Traffic Analysis Based on Comments Received at Meeting on November 16, 216 Date: January 6, 217 INTRODUCTION This memorandum provides responses to comments received from the City of Alexandria staff during a meeting on Tuesday, November 16, 216 regarding the Traffic Impact Analysis (TIA) revised through September 23, 216 in support of the renovation and expansion of the Alfred Street Baptist Church. The meeting was requested by City staff to gain further clarification on certain sections of the traffic study. It was agreed that the previous submitted TIA would not need to be amended. However, City staff requested supplemental analyses to be performed under separate cover to address concerns of City staff. The parameters of the supplemental analysis are listed below: The following signalized intersections from the TIA were included in the supplemental analysis (numbering based on the TIA):. Duke Street/Henry Street 9. Duke Street/Patrick Street 1. Duke Street/Alfred Street 15. Patrick Street/Gibbon Street The peak hour factors would be set to 1. and the peak 15-minute vehicular traffic counts would be multiplied by four (4) to forecast a hypothetical surge Sunday peak hour period. The 1 percent non-auto adjustment originally assumed in the TIA would be removed from the trip generation.

2 A further explanation of the parameters and the subsequent results of the analysis are discussed below. BACKGROUND The project is located in the City of Alexandria, Virginia and is bounded by Duke Street to the north, Wolfe Street to the south, South Patrick Street to the west and South Alfred Street to the east. The subject site is currently occupied by a 43,74 SF church with an observed typical attendance of approximately 1,2 parishioners per service. Additionally, 22 affordable townhouses are located on the southern portion of the site that are currently built and occupied. The applicant proposes to raze the townhomes and redevelop and expand the existing church with approximately 232,36 gross square feet of church space (from an observed 1,2 to proposed 2,163 seats) and a structured parking garage. The proposal includes a total of 129,13 SF of net floor area (3,31 SF existing + 91,99 SF proposed). The existing 1,2 seats is a recorded attendance of a typical Sunday service, with 92 seats provided within the existing sanctuary and chapel. The number of seats included in the proposed church space consists of the proposed main sanctuary and restored main chapel with their corresponding balconies. Of the 2,163 total seats, 1,96 seats would be located in the proposed main sanctuary while 257 seats would be located in the restored chapel. Parking would be provided via a proposed two level below-grade parking garage on site (216 spaces), a two level belowgrade parking garage across South Patrick Street from the site (194 spaces), and a surface lot across of South Patrick Street (4 spots) totaling 45 spaces. A total of 34 bicycle parking spaces will be provided at grade and/or within the below grade parking garage. The church currently has services at 7:3 AM, 9:3 AM, and 11:3 AM. It is a main goal of the renovation and expansion of the church to reduce the number of services from three (3) to two (2) on Sundays. The two (2) proposed services would be spread farther apart in the morning, likely allowing the earlier service to exit the study area prior to the later services arrival, reducing the effects of church traffic on the adjacent roadway network. In an effort to provide a conservative analysis, both inbound and outbound site traffic was added to the network for total future conditions with the development within the same peak study hour. Additionally, proposed conditions include both a full sanctuary and separated chapel (2,163 total seats), with the assumption that every seat would be occupied. It is noted that the existing observed attendance would not occupy all 2,163 during any one (1) service. SITE TRIP GENERATION METHODOLOGY The TIA assumed a 1 percent non-auto adjustment that included the synergy that would occur between the proposed development and adjacent mix of uses in Old Town, the shuttle service provided to Metro, local walkable residences, and bus routes adjacent to the church. The shuttle service records, on average, approximately 37 trips per month, and runs on a 2

3 continuous loop. It is noted that the majority of trips are requested during the peak service on Sundays. A covered bicycle parking area is proposed within the new parking structure to further encourage non-auto mode share. The trip generation without 1% non-auto mode split is included as Table 1. An internal survey was conducted by Alfred Street Church on June 4, 216. The survey included the following question: What primary means of transportation do you usually use to arrive at? Approximately 91 percent of the responses were drive. The remainder of the responses were divided among the remaining non-auto options: Ride with Someone, Bike, Public Transportation, Taxi, Uber, Lyft (similar service) Walk, Other Although both the initial traffic study scoping meeting with the City and the church survey show that a significant non-auto component exists, this supplemental analysis assumes no mode split. Therefore, the results of this study should be considered conservative. A copy of the survey question, the number of responses, and response ratio is shown as Attachment I. SITE TRAFFIC DISTRIBUTIONS AND TOTAL FUTURE TRAFFIC FORECASTS The trip assignment percentages used in the most recent TIA were derived based on input from City staff, private parishioner data, and knowledge of the local roadway network. With the 1 percent non-auto factor being eliminated from the analysis, the new trips were conservatively forecasted to arrive at the new on-site, underground parking garage. Further, resident information for Church members consistent with assumptions made in the TIA was requested by City staff and is included in Attachment II. In order to conservatively analyze the peak surge period of church operations on a Sunday, City staff requested that the analysis be completed by extrapolating the peak 15-minute observed vehicular traffic counts over a forecasted study hour. The surge peak hour observed traffic counts were used as the existing traffic volumes in traffic forecasts calculated consistent with future forecasts described in detail in the previously submitted TIA. The forecasts include volumes associated with regional growth, pipeline developments, new site trips, and peak hour rerouting. Additionally, site generated traffic was doubled based on the assumption that all trips entering and exiting the site arrive and leave within a 3-minute period. The doubled site trips provide capacity analyses that assume a surge period rather than results averaged over a typical peak hour. Peak hour traffic forecasts from the previously 3

4 submitted TIA and the updated analysis provided within this addendum are included in Attachment III. Traffic forecasts used in the updated analysis are shown on Figure 1. PEAK HOUR FACTORS (PHF) In order to analyze the peak 15-minute period at study intersections, peak hour factors between.5 and.92 were used in the previously submitted TIA based on existing peak hour traffic counts. Future conditions included peak hour factors of.92 for all movements as included in the signed scoping document. It is noted that a peak hour factor of.5 was used for the site driveways to model the spike in traffic before and after services as requested previously by City staff. The surge traffic forecasts included in the updated analysis represent the peak 15-minute period at each study location. Therefore, the peak hour factors were also set to 1. for the four (4) study intersections. CAPACITY ANALYSIS Future peak hour levels of service and 5 th and 95 th percentile queues with the proposed development are summarized in Tables 2 and 3. The results for the key study intersections and analysis parameters previously described indicate the following: The surge forecasting would increase average overall delays by approximately five (5) seconds or less at any of the four (4) key study intersections when compared to the previous TIA results. All signalized study intersections would continue to operate at acceptable overall LOS D or better during Sunday peak hours. The northbound left movement at the intersection of Duke Street/S. Patrick Street degrades from LOS D to LOS F with the surge forecasting, adjusted peak hour factors, and removal of the 1 percent non-auto reduction. Additionally, the northbound queue would increase by approximately 2 feet during the peak hour surge period. Peak hour operations along S. Patrick Street degrade during the surge period of the services beginning or ending. The average overall levels of service at the intersections would continue to be acceptable during the average Sunday peak hour. 4

5 CONCLUSIONS Based on the results of the conservative supplemental analysis outlined within this addendum including update site trip generation methodology, adjustment of peak hour factors, and updated total future traffic forecasts, the following conclusions are provided: Peak 15-minute surge operations of the four (4) key study intersections minimally increase delays and queues across the roadway network when compared to the results of the previously submitted TIA. All signalized intersections would continue to operate at acceptable overall levels of service during the total future with development conditions. If you have any questions or require additional information, do not hesitate to contact Larry Sefcik at or at or Grady Vaughan at (73) or at O:\PROJECTS\61-65\633 BAPTIST CHURCH\DOCUMENTS\REPORTS\ BAPTIST CHURCH TIA ADDENDUM (W+A SUBMISSION ).DOCX 5

6 Table 1 Site Trip Generation Analysis (1) ITE Land Use AM Peak Hour PM Peak Hour Weekday Sunday Peak Hour Sunday Land Use Code Size Units In Out Total In Out Total ADT (2) In Out Total ADT Existing (2) Church 56 43,74 SF ,2 seats ,235 Townhomes DU Existing Subtotal ,341 Proposed Development Church ,36 SF ,117 2,163 seats (3) ,32 4,2 Total Proposed Site Trips , ,32 4,2 NET NEW TRIPS (Proposed vs. Existing) , ,661 Notes: (1) Traffic estimates based on Institute of Transportation Engineers (ITE) Trip Generation, Ninth Edition. (2) Existing seat count was quantified using attendence recorded during a typical Sunday service. (3) Proposed seat number includes both seats in the main sanctuary (196 seats) and overflow seating in the chapel (257 seats). 6

7 Table 2 Total Future with Development Intersection Level of Service Summary (1) Intersection Intersection Approach/ Movement Control Alfred Street Baptist Church TIA Submitted September 23, 216 Sunday Peak Hour Revised Addendum Including Removal of Non Auto Mode Split and Peak Hour Factor Adjustments Sunday Peak Hour LOS Delay (sec.) LOS Delay (sec.). Henry Street/Duke Street Signalized EBT A 6.4 A 5.9 EBR A 5.2 A 5.4 WBL A 1.4 A 1.5 WBT A.2 A.2 Overall A 2. A Patrick Street/Duke Street Signalized EBL B 17.5 B 17. WBR B 15.7 B 15.1 NBL D 3.9 F 49. NBT C 3.4 D 35.4 NBR C 3.4 D 36.6 Overall C 27.7 C Alfred Street/Duke Street Signalized EBLTR B 12.9 B 13.4 WBLTR A 1.9 A 3.2 NBLTR B 1.4 B 17.5 SBLTR C 21.7 C 21.9 Overall B 1.1 B Patrick Street/Gibbon Street Signalized WBL C 29.7 C 31.2 *HCM 21 analysis is unavailable for the existing intersection geometry at this intersection. WBLTR C 2.3 C 2.5 NBLT B 16.6 B 19. SBTR B 12.2 B 13.7 Overall B 15. B 17. Notes: (1) Capacity analysis based on Highway Capacity Manual 21 methodology, using Synchro 9.1 unless otherwise noted. 7

8 Table 3 Total Future with Development Intersection Queue Summary (1) Intersection Intersection Approach/ Storage Movement Length Control (ft) TIA Submitted September 23, 216 Sunday Peak Hour Revised Addendum Including Removal of Non Auto Mode Split and Peak Hour Factor Adjustments Sunday Peak Hour 5th 95th 5th 95th. Henry Street/Duke Street Signalized EBT 175 # #229 EBR WBL 63 m67 74 m7 WBT 9 m m119 SBLTR* Patrick Street/Duke Street Signalized EBT 9 m WBTR 132 # #549 NBLTR ~363 # Alfred Street/Duke Street Signalized EBLTR m65 m WBLTR NBLTR SBLTR Patrick Street/Gibbon Street Signalized WBL WBT NBLT #56 SBTR 399 # #561 Notes: (1) Queue length is based on the 5th and 95th percentile queues in feet as reported by Synchro, Version 9. (2) "~" 5th percentile volume exceeds capacity, queue may be longer than shown. (3) "#" 95th percentile volume exceeds capacity, queue may be longer than shown. (4) "m" Volume for 95th percentile queue is metered by upstream signal.

9 PRINCE 9 1 SITE WOLFE WILKES 15 FRANKLIN O:\PROJECTS\61-65\633 BAPTIST CHURCH\GRAPHICS\633 - GRAPHICS.DWG JCP Figure 1 "Surge" Peak Hour Traffic Forecasts City of Alexandria, Virginia Transportation Consultants INNOVATION + SOLUTIONS NORTH EXISTING "SURGE" PEAK HOUR TRAFFIC VOLUMES SUNDAY "SURGE" PEAK HOUR SITE TRIPS 22 TOTAL FUTURE "SURGE" PEAK HOUR TRAFFIC FORECASTS

10

11 ATTACHMENT I

12 ATTACHMENT II ASBC Demographics 675 members total 7 don't live in District Maryland and Virginia ( DMV ) The average attendance over the entire weekend spread over four services live in the DMV area and 61% of the members that live in the DMV live in Virginia. 5% of the members that live in Virginia live in Alexandria. 25% of the members that live in the DMV live in Maryland 12% of the members that live in the DMV live in the District 13 watch services on line very week - not related to members or non-members

13 O:\PROJECTS\61-65\633 BAPTIST CHURCH\GRAPHICS\633 - GRAPHICS.DWG JCP SOUTH SOUTH FAYETTE SITE WOLFE FRANKLIN 17 SOUTH SOUTH WILKES SOUTH COLUMBUS PRINCE 5 NORTH KING CAMERON QUEEN PRINCESS GEORGE WASHINGTON MEMORIAL PARKWAY Transportation Consultants INNOVATION + SOLUTIONS Figure 6-2 Future Peak Hour Traffic Forecasts With Development (222) - Weekday City of Alexandria, Virginia AM PEAK HOUR PM PEAK HOUR / CAMERON /17 2/42 2 KING KING 35/ / /4 3 KING KING 5 KING KING GEORGE WASHINGTON MEMORIAL PARKWAY GEORGE WASHINGTON 36/57 215/9 MEMORIAL PARKWAY PRINCE PRINCE 7 PRINCE PRINCE 99/74 177/139 32/235 WOLFE GEORGE WASHINGTON MEMORIAL PARKWAY COLUMBUS GEORGE WASHINGTON 45/2 1992/764 2/2 MEMORIAL PARKWAY COLUMBUS 3/1 422/94 145/71 213/ /1544 1/19 FRANKLIN FRANKLIN COLUMBUS COLUMBUS 14/6 425/1 17/14 47/ /159 / DRIVEWAY SITE WOLFE WOLFE WOLFE 41/34 DRIVEWAY 1 /39 31/355 2/17 /6 467/12 5/11 11/19 431/167 1/2 136/ /156 SITE DRIVEWAY 2 25/7 14/242 19/26 9/2 154/32 13/19 WOLFE 43/3 7/25 5/96 16/1 416/46 4/ 51/12 326/25 2/25 32/24 291/333 1/9 13/1 157/131 19/53 44/45 14/21 1/29 1/16 6/443 3/ 24/75 43/23 2/11 13/12 394/43 6/45 2/3 33/224 13/3 17/5 343/34 13/9 CAMERON 6/12 262/626 1/24 12/59 17/14 /4 13/6 17/35 35/22 2/2 63/365 1/33 34/115 4/35 22/11 445/96 41/35 514/566 27/4 416/3 413/ /6 62/193 24/9 26/122 47/ /63 112/1647 2/1 143/ /251 11/55 KING 37/49 161/29 576/712 72/ /36 4/4 54/21 46/66 4/21 59/7 36/7 131/1392 /33 179/3523 /1 276/293 45/6 KING 212/25 43/96 9/139 17/33 16/39 /21 / 24/1 / 19/6 2/55 15/2 26/26 6/33 WOLFE 96/27 2/9 5/73 34/17 473/15 35/31 144/174 4/45 31/274 2/5 42/39 6/24 7/34 4/42 17/24 / 36/ /2 44/51 5/ ATTACHMENT III From TIA dated September 23, 216

14 O:\PROJECTS\61-65\633 BAPTIST CHURCH\GRAPHICS\633 - GRAPHICS.DWG JCP SOUTH SOUTH FAYETTE SITE WOLFE FRANKLIN 17 SOUTH SOUTH WILKES SOUTH COLUMBUS PRINCE 5 NORTH KING CAMERON QUEEN PRINCESS GEORGE WASHINGTON MEMORIAL PARKWAY Transportation Consultants INNOVATION + SOLUTIONS Figure 6-3 Future Peak Hour Traffic Forecasts With Development (222) - Sunday City of Alexandria, Virginia CAMERON KING KING KING KING 3 KING KING 5 KING KING GEORGE WASHINGTON MEMORIAL PARKWAY MEMORIAL PARKWAY PRINCE PRINCE 7 PRINCE PRINCE WOLFE WOLFE GEORGE WASHINGTON MEMORIAL PARKWAY COLUMBUS MEMORIAL PARKWAY COLUMBUS 133 FRANKLIN FRANKLIN COLUMBUS COLUMBUS DRIVEWAY SITE WOLFE WOLFE WOLFE 119 DRIVEWAY 1 WOLFE GEORGE WASHINGTON SITE DRIVEWAY CAMERON GEORGE WASHINGTON ATTACHMENT III From TIA dated September 23, 216

15 ATTACHMENT III Queues : Henry St & Duke St Total Future Sunday w/ Development 222 Lane Group EBT EBR WBL WBT SBT Lane Group Flow (vph) v/c Ratio Control Delay Queue Delay Total Delay Queue Length 5th (ft) Queue Length 95th (ft) # m7 m Internal Link Dist (ft) Turn Bay Length (ft) 125 Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Synchro 9 Report Wells + Associates Page 1

16 ATTACHMENT III HCM 21 Signalized Intersection Summary : Henry St & Duke St Total Future Sunday w/ Development 222 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Number Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Adj No. of Lanes Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(5%),veh/ln LnGrp Delay(d),s/veh LnGrp LOS A A A A Approach Vol, veh/h Approach Delay, s/veh Approach LOS A A Timer Assigned Phs 4 7 Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s * 5.3 * 5.3 * 5.3 Max Green Setting (Gmax), s * 32 *.4 * 1 Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 21 Ctrl Delay 2.6 HCM 21 LOS A Notes Synchro 9 Report Wells + Associates Page 3

17 ATTACHMENT III Queues 9: Patrick St & Duke St Total Future Sunday w/ Development 222 Lane Group EBT WBT NBT Lane Group Flow (vph) v/c Ratio Control Delay Queue Delay Total Delay Queue Length 5th (ft) ~363 Queue Length 95th (ft) 151 #549 #564 Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn 5 Storage Cap Reductn Reduced v/c Ratio Intersection Summary ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Synchro 9 Report Wells + Associates Page 5

18 ATTACHMENT III HCM 21 Signalized Intersection Summary 9: Patrick St & Duke St Total Future Sunday w/ Development 222 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Number Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Adj No. of Lanes Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(5%),veh/ln LnGrp Delay(d),s/veh LnGrp LOS B B F D D Approach Vol, veh/h Approach Delay, s/veh Approach LOS B B D Timer Assigned Phs 2 4 Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s 5. * 5.2 * 5.2 Max Green Setting (Gmax), s 36. * 34 * 34 Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 21 Ctrl Delay 32.9 HCM 21 LOS C Notes Synchro 9 Report Wells + Associates Page 7

19 ATTACHMENT III Queues 1: Alfred St & Duke St Total Future Sunday w/ Development 222 Lane Group EBT WBT NBT SBT Lane Group Flow (vph) v/c Ratio Control Delay Queue Delay Total Delay Queue Length 5th (ft) Queue Length 95th (ft) m Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn 2 52 Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary m Volume for 95th percentile queue is metered by upstream signal. Synchro 9 Report Wells + Associates Page 9

20 ATTACHMENT III HCM 21 Signalized Intersection Summary 1: Alfred St & Duke St Total Future Sunday w/ Development 222 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Number Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Adj No. of Lanes Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(5%),veh/ln LnGrp Delay(d),s/veh LnGrp LOS B A B C Approach Vol, veh/h Approach Delay, s/veh Approach LOS B A B C Timer Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 21 Ctrl Delay 1.2 HCM 21 LOS B Synchro 9 Report Wells + Associates Page 11

21 ATTACHMENT III Queues 15: Patrick St & Gibbon St Total Future Sunday w/ Development 222 Lane Group WBL WBT NBT SBT Lane Group Flow (vph) v/c Ratio..6dl.9.4 Control Delay Queue Delay Total Delay Queue Length 5th (ft) Queue Length 95th (ft) #56 #561 Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn 3 55 Spillback Cap Reductn 159 Storage Cap Reductn Reduced v/c Ratio Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. dl Defacto Left Lane. Recode with 1 though lane as a left lane. Synchro 9 Report Wells + Associates Page 12

22 ATTACHMENT III HCM Signalized Intersection Capacity Analysis 15: Patrick St & Gibbon St Total Future Sunday w/ Development 222 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width Grade (%) % 2% % % Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) 5 Lane Group Flow (vph) Confl. Peds. (#/hr) Confl. Bikes (#/hr) 2 Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 3% 3% 3% 3% 3% 3% Bus Blockages (#/hr) 2 Parking (#/hr) 1 Turn Type Split NA Perm NA NA Protected Phases 2 6 Permitted Phases 2 Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c v/s Ratio Perm c.52 v/c Ratio..6dl.9.4 Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service C C B B Approach Delay (s) Approach LOS A C B B Intersection Summary HCM 2 Control Delay 17. HCM 2 Level of Service B HCM 2 Volume to Capacity ratio.6 Actuated Cycle Length (s). Sum of lost time (s). Intersection Capacity Utilization 14.% ICU Level of Service G Synchro 9 Report Wells + Associates Page 13

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study Traffic Study To: From: James M. Moore, Director of Planning & Building Services, Town of Fairfax David Parisi, PE, TE, Parisi Transportation Consulting Date: October 14, 216 Subject: Victory Village Senior

More information

TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO

TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO APRIL 12, 218 REV. JULY 16, 218 Prepared for: Davis Development 43 Corporate Center Dr Suite 21 Stockbridge, GA 3281 Prepared by: 112

More information

MEMO DRAFT VIA . Mr. Terry Bailey Foremost Development Company. To: Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink.

MEMO DRAFT VIA  . Mr. Terry Bailey Foremost Development Company. To: Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink. MEMO DRAFT VIA EMAIL To: From: Mr. Terry Bailey Foremost Development Company Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink Date: August 29, 214 Re: Proposed Apartments City of Walled

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 11 Parsippany, NJ 754 862.27.59 PREPARED

More information

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama.

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama. Traffic Impact Study Crestline Piggly Wiggly Mountain Brook, Alabama Prepared for: Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama September 214 Revision 1 October 214 Crestline Piggly Wiggly Mountain

More information

George Street Transportation Impact Study. Paradigm Transportation Solutions Limited

George Street Transportation Impact Study. Paradigm Transportation Solutions Limited George Transportation Impact Study Paradigm Transportation Solutions Limited January 217 Project Summary Project Number 16191 January 217 Client Wastell Homes 5-1895 Blue Heron Drive London ON N6H 5L9

More information

February 13, Mr. Chuck Marshall Stewart's Shops Corp. PO Box 435 Saratoga Springs, NY 12866

February 13, Mr. Chuck Marshall Stewart's Shops Corp. PO Box 435 Saratoga Springs, NY 12866 February 13, 2017 Mr. Chuck Marshall Stewart's Shops Corp. PO Box 435 Saratoga Springs, NY 12866 Re: Modified Entrance Layout - Revised Traffic Assessment and Sight Distance Analysis Proposed Stewart's

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

Michigan Avenue Traffic Study

Michigan Avenue Traffic Study City of Sarnia Michigan Avenue Traffic Study Final Report November 29, 218 B17 SUBMITTED BY CIMA CANADA INC. 4 327 Harvester Road Burlington, ON L7N 3G7 T 289 288-287 F 289 288-285 cima.ca CONTACT Stephen

More information

CRYSTAL HOUSE III TRAFFIC IMPACT ANALYSIS ARLINGTON COUNTY, VA

CRYSTAL HOUSE III TRAFFIC IMPACT ANALYSIS ARLINGTON COUNTY, VA CRYSTAL HOUSE III TRAFFIC IMPACT ANALYSIS ARLINGTON COUNTY, VA Prepared for: Roseland, A Mack-Cali Company Prepared by: Wells + Associates, Inc. Michael R. Pinkoske, PTP Henry C. Clarke, EIT 70.97.660

More information

MEMORANDUM. Matt Folden, AICP, MNCPPC Rebecca Torma, MCDOT. Nancy Randall, AICP, PTP Barbara Mosier, P.E., PTOE Kevin Berger

MEMORANDUM. Matt Folden, AICP, MNCPPC Rebecca Torma, MCDOT. Nancy Randall, AICP, PTP Barbara Mosier, P.E., PTOE Kevin Berger To: From: Matt Folden, AICP, MNCPPC Rebecca Torma, MCDOT Nancy Randall, AICP, PTP Barbara Mosier, P.E., PTOE Kevin Berger 1110 Bonifant Street Suite 210, Silver Spring, MD 20910 301-448-1333 WellsandAssociates.com

More information

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012 Update for the May 31 st, 2012 Traffic Impact Study Prepared for Broccolini Construction 111-23596-00 September 20 th, 2012 2611 Queensview Drive, Suite 300, Ottawa, Ontario CANADA K2B 8K2 Telephone: 613-829-2800

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

Syracuse University University Place Road Closure

Syracuse University University Place Road Closure Transportation Impact Study for the proposed Syracuse University University Place Road Closure City of Syracuse, Onondaga County, NY March 216 Project No. 3613 Prepared For: Syracuse University Office

More information

Travel Demand Management Plan

Travel Demand Management Plan Travel Demand Management Plan Linden Corner at 43 rd Street & Upton Avenue South AUTHORIZED PROPERTY REPRESENTATIVE: By Dated: Mark Dwyer Linden Hills Redevelopment, LLC 4632 Washburn Avenue South Minneapolis,

More information

Student Housing Development

Student Housing Development Traffic Impact Study for the proposed Student Housing Development City of Oneonta Otsego County, New York Project No. 3259 December 212 Revised February 13, 212 Prepared For: Newman Development Group,

More information

STRATEGY 4 INC Mainway, City of Burlington. [ Month Year ] Project No.: TRAFFIC IMPACT AND PARKING STUDY APRIL 2018

STRATEGY 4 INC Mainway, City of Burlington. [ Month Year ] Project No.: TRAFFIC IMPACT AND PARKING STUDY APRIL 2018 STRATEGY 4 INC. TRAFFIC IMPACT AND PARKING STUDY 3257 Mainway, City of Burlington Project No.: 27-675 APRIL 28 [ Month Year ] April 7, 28 Reference No. 27-675 Mr. Jeff Kenny Strategy 4 Inc. 262 Bristol

More information

Technical Memo. Steve Gramm, SDDOT. RE: Phase 1, Task 100: Baseline Analysis. To: From: Steve Hoff, HDR Engineering, Inc.

Technical Memo. Steve Gramm, SDDOT. RE: Phase 1, Task 100: Baseline Analysis. To: From: Steve Hoff, HDR Engineering, Inc. Technical Memo To: Steve Gramm, SDDOT From: Steve Hoff, Engineering, Inc. Project: I-190/Silver Street Study CC: Date: 6//010 Job No: DOT Contract 41044, Order PD-0-09 RE: Phase 1, Task 100: Baseline Analysis

More information

4. Include the associated years anticipated for the short term and long term analysis in the

4. Include the associated years anticipated for the short term and long term analysis in the 2nd DE Review SM ROCHA, LLC responses to City comments are provided within. 8. Trip distribution is displayed in Figure 6. Distribution assumes SFA and commercial traffic combined for most conservative

More information

ENKA INTERMEDIATE SCHOOL

ENKA INTERMEDIATE SCHOOL TRANSPORTATION IMPACT ANALYSIS Prepared for Buncombe County Schools ENKA INTERMEDIATE SCHOOL Asheville, NC Project Number: 13-71 8/1/13 www.davenportworld.com DAVENlORT Transportation Impact Analysis Enka

More information

February 8, Ms. Jamie Jun, Esq. Fromhold Jaffe & Adams 789 East Lancaster Avenue, Suite 220 Villanova, PA 19085

February 8, Ms. Jamie Jun, Esq. Fromhold Jaffe & Adams 789 East Lancaster Avenue, Suite 220 Villanova, PA 19085 WWW.TRAFFICPD.COM February 8, 2016 Ms. Jamie Jun, Esq. Fromhold Jaffe & Adams 789 East Lancaster Avenue, Suite 220 Villanova, PA 19085 Re: Kohelet Yeshiva School Lower Merion Township, Montgomery County,

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748 City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License

More information

25 May 2018 OUR REF:

25 May 2018 OUR REF: 25 May 2018 OUR REF: 476088-01000 Roderick Lahey Architect Inc. 56 Beech Street Ottawa, ON K1S 3J6 Attention: Robert Verch Dear Rob: Re: 929 Richmond Road Transportation Impact Assessment Addendum #1 1.

More information

joint access drive. will be

joint access drive. will be Date: To: From: Subject: June 22, 2015 Bradley Reiner, PE Bowman Consulting David R. Kline, PE, PTOE, Incline Associates Thornton Self-Storage Traffic Analysis (DRAFT) - Thornton, Colorado INTRODUCTION

More information

FAIRFIELD - RYAN S CORNER TRAFFIC IMPACT ANALYSIS LOUDOUN COUNTY, VIRGINIA

FAIRFIELD - RYAN S CORNER TRAFFIC IMPACT ANALYSIS LOUDOUN COUNTY, VIRGINIA FAIRFIELD - RYAN S CORNER TRAFFIC IMPACT ANALYSIS LOUDOUN COUNTY, VIRGINIA Submitted on behalf of: Fairfield Residential Prepared by: Wells + Associates, Inc. 1420 Spring Hill Road, Suite 00 McLean, Virginia

More information

Prepared for Lutheran Services Carolinas. Project Number: /07/2017. Trinity Landing. New Hanover County, NC

Prepared for Lutheran Services Carolinas. Project Number: /07/2017. Trinity Landing. New Hanover County, NC Prepared for Lutheran Services Carolinas Project Number: 16273 4/7/217 Trinity Landing New Hanover County, NC Trinity Landing Transportation Impact nalysis Prepared for Lutheran Services Carolinas New

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Bank Street Retail/Hotel Development

Bank Street Retail/Hotel Development M a y 214 89-9 Bank Street Retail/Hotel Development Transportation Brief Google 214 Bing 214 Prepared for: Prepared by: Study 89-9 Type Bank Street May 214 Study Retail/Hotel Name Development February

More information

Kanata North Catholic Elementary School

Kanata North Catholic Elementary School December 216 Kanata North Catholic Elementary School Transportation Brief SITE Potential Future Development Trillium Woods Prepared for: Bryden Martel Architects Inc Prepared by: KANATA NORTH CATHOLIC

More information

February 24, 2017 Project #: 20076

February 24, 2017 Project #: 20076 February 24, 217 Project #: 276 Jinde Zhu Washington County Department of Land Use and Transportation 14 SW Walnut Street MS 17 Hillsboro, Oregon 97213 RE: Sunset Ridge Phase 2 Access Report and Zone Change

More information

S. Johnston (IBI Group)

S. Johnston (IBI Group) IBI GROUP 100 175 Galaxy Boulevard Toronto ON M9W 0C9 Canada tel 416 679 1930 fax 416 675 4620 ibigroup.com Memorandum To/Attention Project File Date October 15, 2013 From A. Ortlieb Project No 24RX12.0246.00

More information

December TRANSPORTATION BRIEF 1-19 Beechwood Avenue, Ottawa, ON TRANSPORTATION INFORMATION TE WATER

December TRANSPORTATION BRIEF 1-19 Beechwood Avenue, Ottawa, ON TRANSPORTATION INFORMATION TE WATER December 2012 TRANSPORTATION BRIEF 1-19 Beechwood Avenue, Ottawa, ON TRANSPORTATION INFORMATION TE WATER 1-19 Beechwood Avenue Mixed Use Development Transportation Brief prepared for: Minto Communities

More information

192 & 196 Bronson Avenue / 31 Cambridge Street

192 & 196 Bronson Avenue / 31 Cambridge Street Bronson Inc. July 213 192 & 196 Bronson Avenue / 31 Cambridge Street TRANSPORTATION BRIEF Prepared by: Study 192 Bronson Type Avenue July 213 Study Transportation Name Brief February 211 TB Check List

More information

Appendix G: Future Conditions Traffic Analysis Memorandum

Appendix G: Future Conditions Traffic Analysis Memorandum ppendix G: Future Conditions Traffic nalysis Memorandum Prepared by: Bolton & Menk, Inc. Riverfront Drive Corridor Study ǀ T42.867 ppendix MEMORNDUM Date: pril, 27 To: Paul Vogel From: Ross B. Tillman,

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

Re: Tanger Retail Outlets - Phase 2 Addendum #1 to Phase 1 CTS/TIS

Re: Tanger Retail Outlets - Phase 2 Addendum #1 to Phase 1 CTS/TIS 1223 Michael Street, Suite 100 Ottawa, Ontario K1J 7T2 (613) 738-4160 Fax: (613) 739-7105 www.parsons.com 8 December 2014 OUR REF: TO3186TOA RioCan Management Inc. Yonge Eglinton Centre 2300 Yonge Street

More information

Chapter Capacity and LOS Analysis of a Signalized I/S Overview Methodology Scope Limitation

Chapter Capacity and LOS Analysis of a Signalized I/S Overview Methodology Scope Limitation Chapter 37 Capacity and LOS Analysis of a Signalized I/S 37.1 Overview The Highway Capacity Manual defines the capacity as the maximum howdy rate at which persons or vehicle can be reasonably expected

More information

Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property

Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property Prepared for: Premier Gold Mines Limited Prepared by: Stantec Consulting Ltd. November 2014

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION PLANNING ORGANIZATIO BOSTON REGION MPO NMETROPOLITAN BOSTON REGION METROPOLITAN PLANNING ORGANIZATION Richard A. Davey, MassDOT Secretary and CEO and MPO Chairman Karl H. Quackenbush, Executive Direcr,

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

ATTACHMENT B: SYNCHRO HCM CAPACITY ANALYSIS OUTPUT

ATTACHMENT B: SYNCHRO HCM CAPACITY ANALYSIS OUTPUT ATTACHMENT B: SYNCHRO HCM CAPACITY ANALYSIS OUTPUT 1: T:ine Boulevard &Grann:i White Pike AM Existing Conditions.,J- +- -+ t of '- ~ t ~ \.!,.I Lane Configurations Sign Control Volume (vph) 58 43 87 121

More information

Multnomah County Courthouse Relocation. Transportation Alternatives Analysis Technical Memorandum: FINAL

Multnomah County Courthouse Relocation. Transportation Alternatives Analysis Technical Memorandum: FINAL Multnomah County Courthouse Relocation Portland, Oregon Transportation Alternatives Analysis Technical Memorandum: FIL Prepared for Multnomah County Facilities and Property Management Division 41 N Dixon

More information

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA April 217 T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA Submitted

More information

SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building

SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building State University of New York at Albany City of Albany,

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM To: Martha White, Natick Town Administrator February 17, 2011 Eric Nascimento, MassDOT

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

ATTACHMENT A EXISTING TRAFFIC ENVIRONMENT

ATTACHMENT A EXISTING TRAFFIC ENVIRONMENT ATTACHMENT A EXISTING TRAFFIC ENVIRONMENT a partnership of EXISTING CONDITIONS AND OPPORTUNITIES REPORT Public Review Draft December 217 Bascom Avenue Complete Streets Study Existing Data Review: Traffic

More information

Road Conversion Study Plumas Street

Road Conversion Study Plumas Street Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education

More information

Signal Warrant Studies

Signal Warrant Studies Signal Warrant Studies Seven Locations Piqua, Ohio December 12, 217 Signal Warrant Studies Seven Locations Piqua, Ohio TABLE OF CONTENTS Executive Summary... 3 Introduction... 5 Study Location... 5 Data

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

Appendices. Appendix J: Traffic Study

Appendices. Appendix J: Traffic Study Appendices Appendix J: Traffic Study The Platinum Triangle Subsequent EIR The Planning Center Appendices This page intentionally left blank. The Platinum Triangle Subsequent EIR The Planning Center TRAFFIC

More information

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT Prepared by: In Association with: November 2013 EXECUTIVE SUMMARY Patton Township, in partnership

More information

THE GEORGE WASHINGTON UNIVERSITY SITE 75A REVISED TRANSPORTATION IMPACT STUDY WASHINGTON, DC

THE GEORGE WASHINGTON UNIVERSITY SITE 75A REVISED TRANSPORTATION IMPACT STUDY WASHINGTON, DC THE GEORGE WASHINGTON UNIVERSITY SITE 75A REVISED TRANSPORTATION IMPACT STUDY WASHINGTON, DC Submitted on behalf of: The George Washington University Prepared by: Wells + Associates, Inc. September 2012

More information

LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY

LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY Prepared for: Liberty Tree Academy Prepared by: 161 Blake Street, Suite 2 Denver, Colorado 822 Contact: David Kline, PE, PTOE (33)-572-2 On Behalf of: Liberty

More information

THE GEORGE WASHINGTON UNIVERSITY SITE 75A TRANSPORTATION IMPACT STUDY WASHINGTON, DC

THE GEORGE WASHINGTON UNIVERSITY SITE 75A TRANSPORTATION IMPACT STUDY WASHINGTON, DC THE GEORGE WASHINGTON UNIVERSITY SITE 75A TRANSPORTATION IMPACT STUDY WASHINGTON, DC Submitted on behalf of: The George Washington University Prepared by: Wells + Associates, Inc. February 2012 TABLE OF

More information

DRAFT Step 3 Roundabout Evaluation

DRAFT Step 3 Roundabout Evaluation DRAFT Step 3 Roundabout Evaluation Geometric and Operational Analysis SR 655 (Recker Highway) at Thornhill Road Polk County, Florida Financial Management Number: 436560-1-22-01 Federal-Aid Project Number:

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

Oregon Country Fair Events

Oregon Country Fair Events Oregon Country Fair Events Traffic Impact Analysis Lane County, Oregon September, 5 Oregon Country Fair Events Traffic Impact Analysis. Introduction The purpose of this report is to provide a Traffic Impact

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff Arterial Traffic Analysis Some critical concepts Prepared by Philip J. Tarnoff Agenda Fundamentals Signal timing concepts Actuated signal controllers Developing timing plans Types of signal control First

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY 675 Millcreek Drive, Unit 1 Mississauga, Ontario L5N 5M4 T: 416.213.7121 F: 95.89.8499 www.transtech.co TRAFFIC IMPACT STUDY PROPOSED MOSQUE DEVELOPMENT 4269 REGIONAL ROAD 25 TOWN OF OAKVILLE PREPARED

More information

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM To: Thomas Cummings February 17, 2011 Holbrook Public Works Superintendent From: Re:

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE COMMITTEE ACTION ITEM

BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE COMMITTEE ACTION ITEM BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE COMMITTEE ACTION ITEM Date of Meeting: May 12, 2017 # 1 SUBJECT: ELECTION DISTRICT: Response to Board Member Initiative: Safety Concerns for Left Hand Turn

More information

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: 1649362 Ontario Inc. c/o Manor Park Management 231 Brittany Drive, Suite D Ottawa ON K1K 0R8 July

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

Conversation of at Grade Signalized Intersection in to Grade Separated Intersection

Conversation of at Grade Signalized Intersection in to Grade Separated Intersection IJIRST International Journal for Innovative Research in Science & Technology Volume 2 Issue 05 October 2015 ISSN (online): 2349-6010 Conversation of at Grade Signalized Intersection in to Grade Separated

More information

GW MOUNT VERNON CAMPUS TRANSPORTATION IMPACT STUDY WASHINGTON, D.C.

GW MOUNT VERNON CAMPUS TRANSPORTATION IMPACT STUDY WASHINGTON, D.C. GW MOUNT VERNON CAMPUS TRANSPORTATION IMPACT STUDY WASHINGTON, D.C. Submitted on behalf of: The George Washington University Prepared by: Wells + Associates, Inc. Jami L. Milanovich, P.E. Jorjean M. Stanton

More information

APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS

APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS MEMO : Peter Steacy, P.Eng. Date: December 3, 2014 : Ian Borsuk, P.Eng. Job No.: 3414015-000 Subject: City of Ottawa O-Train Extension Planning & EA Study

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc. Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

Fieldgate. Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton

Fieldgate. Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton Fieldgate Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton September 214 September 23 214 Ms Debbie Pacchiarotti Our

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

350 SPARKS STREET, OTTAWA HOTEL AND RESIDENTIAL DEVELOPMENT. Transportation Study. Prepared For: Morguard Real Estate Investment Trust.

350 SPARKS STREET, OTTAWA HOTEL AND RESIDENTIAL DEVELOPMENT. Transportation Study. Prepared For: Morguard Real Estate Investment Trust. SPARKS STREET, OTTAWA HOTEL AND RESIDENTIAL DEVELOPMENT Transportation Study Prepared For: Morguard Real Estate Investment Trust June, BA Consulting Group Ltd. St. Clair Avenue West, Suite Toronto, ON

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

Congestion Mitigation at IH 27 and U.S. Hwy 70 in Plainview, TX

Congestion Mitigation at IH 27 and U.S. Hwy 70 in Plainview, TX 2010 Congestion Mitigation at IH 27 and U.S. Hwy 70 in Plainview, TX Hongchao Liu, Hao Xu, and Rhett Dollins Multidisciplinary Research in Transportation Texas Tech University Mulidisciplinary Research

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

6060 North Central Expressway Mixed-Use Site Dallas, Texas

6060 North Central Expressway Mixed-Use Site Dallas, Texas Volume 1 Traffic Impact Analysis 6060 North Central Expressway Mixed-Use Site Dallas, Texas April 30, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #063238300 Registered Firm F-928 Traffic

More information

TRANSPORTATION IMPACT STUDY

TRANSPORTATION IMPACT STUDY Dundas MEP Developments Inc. City of Toronto 219 and 231 Dundas Street East, Proposed Mixed-Use Development TRANSPORTATION IMPACT STUDY 9782/2 April 216 LEA Consulting Ltd. Consulting Engineers & Planners

More information

2. Existing Conditions

2. Existing Conditions 2. Existing Conditions The existing traffic and parking conditions on the site and the surrounding area were reviewed based on the study methodology in Section 1.2. 2.1 Existing Land Use The portion of

More information

THE LANDMARK AT TALBOT PARK

THE LANDMARK AT TALBOT PARK TRAFFIC IMPACT STUDY FOR THE LANDMARK AT TALBOT PARK IN NORFOLK, VA INTERMODAL ENGINEERING, P.C. OCTOBER, 200 The Landmark at Talbot Park is a proposed redevelopment of the existing apartments along the

More information

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: Orleans Gardens Shopping Centre Inc. 2851 John Street, Suite 1 Markham, ON K3R 5R7

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited 2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief Paradigm Transportation Solutions Limited March 217 March 217 Project: 1627 Diana Vlasic, M.C.I.P., R.P.P Metropolitan Consulting 445 Paletta

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

DRAFT MEMORANDUM. 1. Introduction

DRAFT MEMORANDUM. 1. Introduction Dowling Associates, Inc. 180 Grand Ave., Suite 250, Oakland, CA 94612 (510) 839-1742 FAX: (510) 839-0871 428 J Street, Suite 500, Sacramento, CA 95814 (916) 266-2190 FAX: (916) 266-2195 MEMORANDUM To:

More information

Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) Final Report

Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) Final Report Consultant Services for Updating Intersections Operations to Accommodate Bi-Directional Cycle Tracks Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) January 30, 2014 Consultant

More information

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment March 11, 2015 Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA 01940 Re: Walnut Street Traffic Assessment Dear Board of Selectmen Members: As requested, BETA Group, Inc. (BETA)

More information

Self-Organizing Signals: A Better Framework for Transit Signal Priority

Self-Organizing Signals: A Better Framework for Transit Signal Priority Portland State University PDXScholar TREC Friday Seminar Series Transportation Research and Education Center (TREC) 3-13-2015 Self-Organizing Signals: A Better Framework for Transit Signal Priority Peter

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information

Methodology for analysing capacity and level of service for signalized intersections (HCM 2000)

Methodology for analysing capacity and level of service for signalized intersections (HCM 2000) Methodology for analysing capacity and level of service for signalized intersections (HCM 2000) Ivana Nedevska 1, Slobodan Ognjenović 2,* and Elena Gusakova 3 1 GEING Krebs und Kiefer-Skopje, Macedonia

More information