February 13, Mr. Chuck Marshall Stewart's Shops Corp. PO Box 435 Saratoga Springs, NY 12866

Size: px
Start display at page:

Download "February 13, Mr. Chuck Marshall Stewart's Shops Corp. PO Box 435 Saratoga Springs, NY 12866"

Transcription

1 February 13, 2017 Mr. Chuck Marshall Stewart's Shops Corp. PO Box 435 Saratoga Springs, NY Re: Modified Entrance Layout - Revised Traffic Assessment and Sight Distance Analysis Proposed Stewart's Shop, 112 Maple Avenue, Voorheesville, NY CHA File: Dear Mr. Marshall: Subsequent to submission of the Traffic Impact Study dated November 2016 to the Village, the site access plan was revised to address comments from the Village and their engineer. As such, the concept plan has been revised from two full ingress/egress accesses to an entrance only driveway (west site driveway) and a full ingress/egress access (east site access). See Site Plan in Attachment A. This letter addresses the Village engineer's request for the revised level of service analysis and a sight distance evaluation. The revised traffic analysis also includes the traffic from the three residential subdivision projects in approval/ under construction in the Town of New Scotland that was previously addressed in the December 21, 2016 letter. Therefore, the revised analyses contained in this Traffic Assessment includes assessment of the study area intersections for the weekday AM and PM peak hours for the following conditions: 2017 No-Build (peak hour of adjacent street) 2017 Build (peak hour of adjacent street) 2017 No-Build (peak hour of school traffic) 2017 Build (peak hour of school traffic) A. UPDATED TRAFFIC ANALYSIS The updated 2017 No-Build condition was developed by applying the site generated traffic from the Kensington Woods (169 units located on Hilton Road), Le Vie Farms (18 units approved on Maple Avenue near the Colonie Country Club) and Country Club Estates (40 units near the Country Club) developments to the 2017 No-Build conditions contained in the November 29, 2016 TIS. The site generated traffic from these 3 developments that was incorporated into the updated 2017 No-Build condition was copied from the December 21, 2016 letter and is shown in Table 1 below. This is a conservative estimate of the specific project background site trips since it assumes full build out of Kensington Woods, as opposed to using Phase I only, and 100% of the traffic associated with specific movements at the SR 85A/ Hilton Road and SR 155 / CR 306 intersections. "Satisfying Our Clients with Dedicated People Committed to Total Quality" Ill Winners Circle, P.O. Box 5269, Albany, NY T e F o

2 Mr. Chuck Marshall Page 2 February 13, 2017 Table 1 Other Developments (Kensington, Le Vie, Country Club Estates) Site Generated Traffic Intersection Kensington Woods M ovemen t - Kensington Woods TIS Movement - Ste^vart's Study Area - NYS Route 85A AM Peak Hour PM Peak Hour Eastbound Westbound Eastbound Westbound SR 155/ CR 306 EB Through EB Through 1 5 WB Through WB Through 5 SR 85A /Hilton Rd EB Left EB Through 3 10 SB Right WB Through 9 Subtotal EB Through 4 15 WB Through 14 Subtotal (2-way) LeVie & Country Club Estates 6 a 6 a TOTAL a AM peak hour = 2 EB and 4 WB; PM peak hour = 4 EB and 2 WB Exhibits 1 and 2 show the updated 2017 No-Build weekday AM and PM peak hour volumes for the adjacent street peak hour and the school peak hour conditions, respectively. Exhibit 1 No-Build AM [PM] Adjacent Street Peak Hour Traffic Volumes t N ^o 0 c 0 [83] [220] [315] F 284 [560] F 284 [560] V y V 159 [247] Maple Avenue V 0 [2] V 0 [6] [70] 55-3 [203] 257 J [422] FS T [420] i r T [1] 0 i 0 0 [2] 0 i 0 0 [2] [0] [1] [2] 112 Maple Avenue - Existing Resaurant Legend: AM fpmf

3 Mr. Chuck Marshall Page 3 February 13, 2017 Exhibit 2 No-Build AM [PM] School Peak Hour Volumes t N -a m cc o Em [89] [207] t< y [238] F LG 95 [208] Maple Avenue il 237 [446] 0 [0] [446] V 0 [2] [56] 61 -) [392] l 71 [392] [186] 203 y [1] 0 Si 0 0 [1] Oy [0] [1] Legend: AM [PM] 112 Maple Avenue - Existing Restaurant The site generated traffic volumes and overall distribution patterns remain the same as shown in the November 29, 2016 TIS. However, since the westerly site access is proposed as an entrance only site driveway, as opposed to the previously proposed full ingress/egress access, the volumes shown exiting the west site access were relocated to the east site access. Exhibit 3 below summarizes the combined site generated trips for the primary, pass-by and revised site accesses. Exhibit 3 Stew arts Combined Site Generated Traffic: Primary, Pass-By and Consolidated Exit only N c 0 a [10] 8 F 8 [10] F 15 [19] 7 [9] Maple Avenue tl 3 [4] -3 [-21] II F -12 [-33] V 23 [47] IC 71 [9] 7 'Si [40] 47 y 0 [3] 2 Si t_ [56] [37] ^Q u v StewantS ShopS umi Legend: AM [PM]

4 Mr. Chuck Marshall Page 4 February 13, 2017 The site generated traffic (Exhibit 3) was added to the updated 2017 weekday AM and PM peak hour No-Build volumes to represent the estimated future volume Build conditions for the site. Exhibit 4 shows the Build conditions for the peak of adjacent street and Exhibit 5 shows the Build conditions for the School peak. Although this is an existing site that currently generates some vehicular traffic, given its size and use, the volume is negligible in comparison to the adjacent street peak volumes, school peak volumes and the volumes generated by the project. As such, the Build site driveway volumes include the existing site driveway volumes and represents a conservative analysis. The 2017 weekday AM and PM School peak hour Build volumes are conservative in that the site generated traffic volumes that were added to the school peaks period condition are higher than would be expected during school peak hours. Exhibit 4 Build AM [PM] Adjacent Street Peak Hour Traffic Volumes t N m CC C E rcd Q [83] [230] F 133 [325] F 299 [580] F 272 [527] V N V 166 [256] Maple Avenue V 3 [6] V 23 [53] [70] 55 -^ [401] 545 -! ^? [212] 264 N [41] 47 N [396] [5] 2 N T [59] [39] Stewants Shops Legend: AM [PM]

5 Mr. Chuck Marshall Page 5 February 13, 2017 Exhibit 5 Build AM [PM] School Peak Hour Traffic Volumes g n N v CC EM a [89] [217] F 150 [248] F 252 [465] [413] tl y V 102 [217] Maple Avenue ll 3 [4] V 23 [49] 1 0 [4] 2 N [56] 61-3 [371] 458 > [367] [195] 210 f [41] 47 T [56] [39] l Stewant8 Shops Legend: AM [PM Capacity analyses were performed for the above noted conditions for each of the study area intersections. Summaries of these analyses are provided in Error! Reference source not found.6 and Exhibit 7 for the weekday AM and PM peak hour of adjacent street traffic, respectively, and on Exhibit 8 and Exhibit 9 for the weekday AM and PM peak hour of school traffic, respectively. The capacity analysis reports are provided in Attachment B. Exhibit 6 Level of Service Summary se AM Adjacent Street Peak Hour NOVEMBER 2016 TIS FEBRUARY 2017 ANALYSIS a Intersection Street Approach Lane Group/ Movement 2017 No- Build 2017 Build 2017 No- Build 2017 Build 1 LOS Delay 2 LOS Delay Z LOS Delay Z LOS Delay z Maple Avenue EB LT B 12.4 B 12.9 B 12.7 B 13.3 TH A 9.7 B 10.1 A 10.0 B 10.4 Maple Avenue &Altamont Road Maple Avenue WB RT A 1.3 A 1.2 A 1.3 A 1.2 Maple Avenue & WestAccess Altamont Rd SB LT B 15.7 B 16.0 B 15.8 B 15.9 RT B 11.6 B 11.7 B 11.6 B 11.7 Maple Avenue WB LT NA A 0.1 NA A 0.1 West Site Access NB LT/RT A 0.0 B 14.7 A 0.0 NA Maple Avenue WB LT NA A 1.0 NA A 0.9 Maple Avenue & East Access East Site Access NB LT/RT A 0.0 C 15.8 A 0.0 C 16.6 ' LT- Left-turn, TH= Through, RT=Right-turn; LT/TH = shared Left and through, LT/RT = shared left and right-turn, TH/RT = shared through and right-turn ' Delay is in second/vehicle Includes 3 residential developments in No-Build/Build conditions and revision to site accesses; west access as entrance only and east access as full ingress/egress access

6 Mr. Chuck Marshall Page 6 February 13, 2017 Exhibit 7 Level of Service Summary - PM Adjacent Street Peak Hour NOVEMBER 2016 TIS FEBRUARY 2017 ANALYSIS a Intersection Street Approach Lane Group/ Movement 2017 No- Build 2017 Build 2017 No- Build 2017 Build ' LOS Delay a LOS Delay 2 LOS Delay 2 LOS Delay Z Maple Avenue EB LT B 10.4 B 10.6 B 10.6 B 10.8 TH A 9.4 A 9.6 A 9.6 A 9.8 Maple Avenue WB Maple Avenue & Altamont Road RT A 3.3 A 3.3 A 3.2 A 3.2 Maple Avenue & West Access Maple Avenue & East Access Altamont Rd SB LT B 15.1 B 15.5 B 15.5 B 15.9 RT B 13.8 B 13.9 B 13.9 B 14.0 Maple Avenue WB LT A 0.1 A 0.2 A 0.1 A 0.2 West Site Access NB LT/RT C 19.3 C 17.4 C 20.1 NA Maple Avenue WB LT A 0.2 A 1.3 A 0.2 A 1.3 East Site Access NB LT/RT B 13.7 C 20.8 B 14.0 C 24.0 LT - Left-turn, TH=Through, RT=Right-turn; LT/TH = shared Left and through, LT/AT=shared left and right-turn, TH/RT= shared through and right-turn Z Delay is in second/vehicle Includes 3 residential developments in No-Build/Build conditions and revision to site accesses; west access as entrance only and east access as full ingress/egress access Exhibit 8 Level of Service Summary - AM School Peak Hour NOVEMBER 2016 TIS FEBRUARY 2017 ANALYSIS Intersection Street Approach Lane Group/ Movement 2017 No- Build 2017 Build 2017 Noguild 2017 Build LOS Delay z LOS Delay Z LOS Delay 2 LOS Delay 2 Maple Avenue EB LT B 11.6 B 11.9 B 11.8 B 12.0 TH A 9.6 A 9.8 A 9.7 A 9.9 Maple Avenue WB Maple Avenue & Altamont Road RT A 2.6 A 2.6 A 2.6 A 2.5 Maple Avenue & West Access Maple Avenue & East Access Altamont Rd 5B LT B 17.0 B 17.4 B 17.2 B 17.4 RT B 13.0 B 13.1 B 13.1 B 13.1 Maple Avenue WB LT NA A 0.1 NA A 0.1 West Site Access NB LT/RT A 0.0 B 13.1 A 0.0 NA Maple Avenue WB LT NA A 1.0 NA A 1.0 East Site Access NB LT/RT A 0.0 B 13.9 A 0.0 B 14.4 LT - Left-turn, TH= Through, RT=Right-turn; LT/TH = shared Left and through, LT/RT =shared left and right-turn, TH/RT =shared through and right-turn z Delay is in second/vehicle Includes 3 residential developments in No-Build/Build conditions and revision to site accesses; west access as entrance only and east access as full ingress/egress access

7 Mr. Chuck Marshall Page 7 February 13, 2017 Exhibit 9 Level of Service Summary - PM School Peak Hour NOVEMBER 2016 TIS FEBRUARY 2017 ANALYSIS } Intersection Street Approach Lane Group/ Movement 2017 No- Build 2017 Build 2017 No- Build 2017 Build t LOS Delay 2 LOS Delay 2 LOS Delay 2 LOS Delay 2 Maple Avenue EB LT B 10.4 B 10.7 B 10.7 B 10.9 TH A 9.4 A 9.7 A 9.6 A 9.8 Maple Avenue WB Maple Avenue & Altamont Road RT A 3.1 A 3.1 A 3.1 A 3.0 Maple Avenue & West Access Altamont Rd SB LT B 15.2 B 15.6 B 15.6 B 15.8 RT B 13.9 B 14.0 B 14.0 B 14.0 Maple Avenue WB LT NA A 0.1 NA A 0.1 West Site Access NB LT/RT B 10.5 B 14.6 B 10.6 NA Maple Avenue WB LT A 0.1 A 1.3 A 0.1 A 1.3 Maple Avenue & East Access East Site Access NB LT/RT C 17.3 B 10.7 C 18.9 ' LT - Left-turn, TH= Through, RT=Right-turn; LT/TH =shared Left and through, LT/RT =shared left and right-turn, TH/RT = shared through and right-turn 2 Delay is in second/vehicle 3 Includes 3 residential developments in No-Build/Build conditions and revision to site accesses; west access as entrance only and east access as full ingress/egress access The capacity analyses show that the LOS for all of the movements at the signalized intersection are estimated to remain the same LOS in the Build Condition as the LOS for the No-Build Condition for both the AM and PM peak hours of adjacent street peak and School peak hour traffic. Comparison of the Build analysis shows that there will be no degradation in LOS at the site driveways during the AM and PM peak periods for both the adjacent street peak and School peak hour traffic by consolidating the exiting movements to the easterly site access. The LOS for the two existing / proposed site driveways will continue to operate at LOS C or better during the AM and PM peak periods for both the adjacent street peak and School peak hour traffic. The project will not have a significant effect on traffic operations and no improvements are necessary or recommended. B. SIGHT DISTANCE ANALYSIS Sight distance was assessed for the proposed Stewart's driveways that are located in essentially the same location as the two existing full ingress/egress site accesses for the Smith's Tavern. As shown on the site plan, dated 2/6/2017, the proposed site accesses have been modified to an entrance only driveway (west site driveway) and a full ingress/egress access (east site access) on NYS Route 85A (Maple Avenue). The available sight distances were estimated from the following perspectives: Driver exiting the site onto Maple Avenue from the full access driveway looking left and right. Driver entering the site from Maple Avenue (left-turn) looking ahead toward opposing traffic from both entrance only access (west access) and full site access (east access). Stopping sight distance along NYS Route 85A. Maple Avenue is a two-lane roadway with a posted speed limit of 30 mph in front of the site accesses and has a posted school speed limit of 20 mph west of Altamont Road. The existing sight distances measured at the location of the proposed site access driveways were adjusted to account for limiting sight distance associated with vegetation, trees and their canopy. The adjusted existing sight distances were compared to the guidelines in the Association of State Highways and Transportation C 11

8 Mr. Chuck Marshall Page 8 February 13, 2017 Officials (AASHTO), A Policy on Geomet ric Design of Highways and Streets, 2011, for a design speed of 35 mph for Maple Avenue. This evaluation is summarized in Exhibit 10. Exhibit 10: Sight Distance Summary Intersection Sight Distance (in feet) i Left-turn from Site Driveway Stopping Sight Distance (SSD)(in feet) 2 Left-turn Right-turn from Location from Site Looking Looking Major Driveway From From Left Right Road (DO (Di) (DR) (Ds) West East West Access Available NA NA NA (entrance only) Recommended East Access (full Available access) Recommended Intersection sight distance is measured at 14.5 feet back from the travel way at an eye height of 3.5 feet and object height of 3.5 ft. 2 SSD - Stopping sight distance measured for a 2-foot object located in the path of westbound and eastbound vehicles. 3 Sight distance with assumed vegetation and tree canopy. This analysis indicates that the available sight distances for the proposed site accesses exceed the recommended minimum distances and no measures or improvements are necessary to accommodate sight distance. As shown in the above updated traffic analysis and the sight distance analysis, it is concluded that the Stewart's project will not have a significant effect on traffic operations at the Maple Avenue and Altamont Road intersection, at the site driveways or the adjacent street network. Therefore, no improvements are necessary or recommended. Please contact me at (518) or clilholt@chacompanies.com if you have any questions. Christine L. olt, P.E., PTOE Traffic Engineer CJL/ Attachment A - Concept Site Plan Attachment B - Capacity Analyses \':\ProjectsWNY\K4\31753\Reports\Revised Traffic Assessment - February 2017\3 1753_L03_Marshall.docx

9 Attachment A Concept Site Plan CI V Stewart's Shops, Voorheesville, NY

10 I SiteStatistics: Current Zoning: Business District - Retail Businesses Parel Area: 63,035 s.f.,1.45 Acres Building Size: 3,675 s.f. Class I Minimum Lot Size wl off-site sewer and water: (required) 15,000 s.f., (provided) 63,035s,f, REFER TO SHEET C-608 FOR CURB LAYOUT AND DETAILS 18" VIDE STOP BAR DETECBBLE WARNING STRIP Lot Width: (required) 100 ft., (provided) ft. Front Yard Setback: (required) 25 ft., (provided) 25 ft. Side Yard Setback: (required) 20 ft., (provided) 20 ft. Rear Yard Setback: (required) 30 ft., (provided) 30 ft. Maximum Building Height: (required) 35 ft., (provided) 35 ft. O Off-Street Parking: 1 for each 200 s.f floor area (required 3, = spaces (provided) 19 spaces water - connection to existing public water along Route 85A sanitary sewer - proposed gravity system connecting to existing manhole along Route 85A stormwater - on-site stormwater management 100 Year Floodplain Elevation: (Based on Federal Emergency Management Agency, Albany County, NY, Flood Profiles, Vly Creek, 130P, the floodplain elevation range within this site is to 331.0) Building Finish Floor Elevation: = 2.5' above 100 yr floodplan elev. RETAINING WALL 4 Will ORNAMENTAL FENCE GAS VENT IN CANOPY COLUMN FUEL DISPENSER FUEL DISPENSER (3+1 DISPENSER WITH LOW FLOW DIESEL NOZZLE) BOLLARDS AT FUEL DISPENSER oe loedpmrn ^^Cleo. - CANOPY 26' x 80' RESESSED-l.ED.CAN^P}' LIGHTS - Ordinary High Water was based on a combination of field observations and hydraulic modeling performed by CHA STEWART'S 112 MAPLE AVENUE VOORHEESVILLE, N.Y. ::_:_::- ^ HEAVY DUTY -- IFHEEt STOPS TTMBER GMT RAIL C-604 PtE csa / DELINEATED BY CHA ^ _30>_REAR SETBACK,; _J ORDINARY HIGH MY CREEK SNOW REMOVAL NOTE: _GEC100RN \ SNOW WILL BE REMOVED FROM SITE AFTER PLOWING. NO ON-SITE SNOW STORAGE IS PROPOSED. F,. ) / 0 \\ 2l Scle in feet I0

11 Attachment B Capacity Analyses Stewart's Shops, Voorheesville, NY

12 HCM Signalized Intersection Capacity Analysis 1: Maple Ave/ Maple Ave & Altamont Rd f No-Build AM (Consolidated Drwys) 2/6/2017 Movement EBL EBT WBT WBR SBL SBR Lane Configurations ' Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) 4% 4% 4% 7% 3% 8% Turn Type Perm NA NA pm+ov Prot Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c0.23 v/s Ratio Perm c v/c Ratio Uniform Delay, dl Progression Factor Incremental Delay, d Delay (s) Level of Service B A A B B Approach Delay (s) Approach LOS B A B HCM 2000 Control Delay 11.7 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.61 Actuated Cycle Length (s) 53.6 Sum of lost time (s) 13.0 Intersection Capacity Utilization 61.0% ICU Level of Service B c Critical Lane Group 31753: Stewarts, Voorheesville Synchro 8 Report CHA Page 1

13 HCM Unsignalized Intersection Capacity Analysis No-Build AM (Consolidated Drwys) 6: West Access & Maple Ave/Maple Ave 2/6/2017 Direction, Lane # EB 1 WB 1 NB 1 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS A Approach Delay (s) Approach LOS A 4 EBT EBR WBL WBT NBL NBR 4 V Free Free Stop 0% 0% 0% Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) px, platoon unblocked vc, conflicting volume vcl, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Average Delay 0.0 Intersection Capacity Utilization 33.7% ICU Level of Service A 31753: Stewarts, Voorheesville Synchro 8 Report CHA Page 2

14 HCM Unsignalized Intersection Capacity Analysis 8: East Access & Maple Ave 4 t Movement EBT EBR WBL WBT NBL NBR Lane Configurations 4 V Volume (veh/h) Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) 380 px, platoon unblocked vc, conflicting volume vcl, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 NB 1 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS A Approach Delay (s) Approach LOS A Average Delay 0.0 Intersection Capacity Utilization 33.7% ICU Level of Service A 0 No-Build AM (Consolidated Drwys) 2/6/ : Stewarts, Voorheesville Synchro 8 Report CHA Page 3

15 HCM Signalized Intersection Capacity Analysis 1: Maple Ave & Altamont Rd No-Build PM (Consolidated Drwys) 2/8/2017 Movement EBL EBT WBT WBR SBL SBR Lane Configurations + Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Fit Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) 13% 3% 3% 2% 2% 3% Turn Type Perm NA NA pm+ov Prot Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c0.13 v/s Ratio Perm c v/c Ratio Uniform Delay, dl Progression Factor Incremental Delay, d Delay (s) Level of Service B A A B B Approach Delay (s) Approach LOS B A B HCM 2000 Control Delay 9.5 HCM 2000 Level of Service A HCM 2000 Volume to Capacity ratio 0.44 Actuated Cycle Length (s) 46.5 Sum of lost time (s) 13.0 Intersection Capacity Utilization 53.9% ICU Level of Service A c Critical Lane Group 31753: Stewarts, Voorheesville Synchro 8 Report CHA Page 1

16 HCM Unsignalized Intersection Capacity Analysis No-Build PM (Consolidated Drwys) 6: West Access & Maple Ave 2/8/2017 Movement EBT EBR WBL WBT NBL NBR Lane Configurations 4 V Volume (veh/h) Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) 290 px, platoon unblocked vc, conflicting volume vc1,stage 1 conf vol vc2,stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 NB 1 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS A C Approach Delay (s) Approach LOS C Average Delay 0.1 Intersection Capacity Utilization 41.1% ICU Level of Service A 31753: Stewarts, Voorheesville CHA Synchro 8 Report Page 2

17 HCM Unsignalized Intersection Capacity Analysis No-Build PM (Consolidated Drwys) 8: East Acces & Maple Ave 2/8/ C 4 4 Movement EBT EBR WBL WBT NBL NBR Lane Configurations 4 Volume (veh/h) Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) px, platoon unblocked vc, conflicting volume vcl, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) 380 Direction, Lane # EB 1 WB 1 NB 1 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS A B Approach Delay (s) Approach LOS B Average Delay 0.1 Intersection Capacity Utilization 44.3% ICU Level of Service A 31753: Stewarts, Voorheesville CHA Synchro 8 Report Page 3

18 HCM Signalized Intersection Capacity Analysis 1: Maple Ave & Altamont Rd Build AM (Consolidated Drwys) 2/6/2017 Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Fit Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) 4% 4% 4% 7% 3% 8% Turn Type Perm NA NA pm+ov Prot Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c0.23 v/s Ratio Perm c v/c Ratio Uniform Delay, dl Progression Factor Incremental Delay, d Delay (s) Level of Service B B A B B Approach Delay (s) Approach LOS B A B HCM 2000 Control Delay 12.0 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.62 Actuated Cycle Length (s) 55.4 Sum of lost time (s) 13.0 Intersection Capacity Utilization 61.8% ICU Level of Service B c Critical Lane Group 4/ 31753: Stewarts, Voorheesville Synchro 8 Report CHA Page 1

19 HCM Unsignalized Intersection Capacity Analysis Build AM (Consolidated Drwys) 6: West Access & Maple Ave 2/6/2017 Movement EBT EBR WBL WBT NBL NBR Lane Configurations 1 4 Volume 45 (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) px, platoon unblocked vc, conflicting volume vcl, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Free 0% Free 0% 325 Stop 0% Direction, Lane # EB 1 WB 1 Volume Total Volume Left 0 3 Volume Right 51 0 csh Volume to Capacity Queue Length 95th (ft) 0 0 Control Delay (s) Lane LOS A Approach Delay (s) Approach LOS Average Delay 0.0 Intersection Capacity Utilization 34.9% ICU Level of Service A 31753: Stewarts, Voorheesville CHA Synchro 8 Report Page 2

20 HCM Unsignalized Intersection Capacity Analysis Build AM (Consolidated Drwys) 8: East Access & Maple Ave 2/6/2017 Movement EBT EBR WBL WBT NBL NBR Lane Configurations 4 V Volume (veh/h) Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) 380 px, platoon unblocked vc, conflicting volume vcl, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 NB 1 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS A C Approach Delay (s) Approach LOS C Average Delay 1.7 Intersection Capacity Utilization 44.4% ICU Level of Service A 31753: Stewarts, Voorheesville Synchro 8 Report CHA Page 3

21 HCM Signalized Intersection Capacity Analysis Build PM (Consolidated Drwys) 1: Maple Ave & Altamont Rd 2/6/2017 Movement EBL EBT WBT WBR SBL SBR Lane Configurations + ' Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Fit Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) 13% 3% 3% 2% 2% 3% Turn Type Perm NA NA pm+ov Prot Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c0.14 v/s Ratio Perm c v/c Ratio Uniform Delay, dl Progression Factor Incremental Delay, d Delay (s) Level of Service B A A B B Approach Delay (s) Approach LOS B A B Intersection Summa HCM 2000 Control Delay 9.7 HCM 2000 Level of Service A HCM 2000 Volume to Capacity ratio 0.45 Actuated Cycle Length (s) 47.6 Sum of lost time (s) 13.0 Intersection Capacity Utilization 55.4% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group 31753: Stewarts, Voorheesville Synchro 8 Report CHA Page 1

22 HCM Unsignalized Intersection Capacity Analysis Build PM (Consolidated Drwys) 6: West Access & Maple Ave 2/6/2017 Movement EBT EBR WBL WBT NBL NBR Lane Configurations 4 Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) px, platoon unblocked vc, conflicting volume vcl, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Free 0% Free 0% 630 Stop 0% Direction, Lane # EB 1 WB 1 Volume Total Volume Left 0 7 Volume Right 45 0 csh Volume to Capacity Queue Length 95th (ft) 0 0 Control Delay (s) Lane LOS A Approach Delay (s) Approach LOS Average Delay 0.1 Intersection Capacity Utilization 38.6% ICU Level of Service A 31753: Stewarts, Voorheesville CHA Synchro 8 Report Page 2

23 HCM Unsignalized Intersection Capacity Analysis 8: East Access & Maple Ave Build PM (Consolidated Drwys) 2/6/2017 Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (Ws) Percent Blockage Right turn flare (veh) Median type -II. Median storage veh) Upstream signal (ft) 380 px, platoon unblocked vc, conflicting volume vcl, stage 1 conf vol vc2, stage 2 conf vol Sr- 4\ EBT EBR WBL WBT NBL 4 V Free Free Stop 0% 0% 0% p NBR vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 NB 1 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS A C Approach Delay (s) Approach LOS C Average Delay 2.9 Intersection Capacity Utilization 67.5% ICU Level of Service C : Stewarts, Voorheesville Synchro 8 Report CHA Page 3

24 HCM Signalized Intersection Capacity Analysis No-Build AM - School Pk (consolidated drwys) 1: Maple Ave & Altamont Rd 2/6/2017 Movement EBL EBT WBT WBR SBL SBR Lane Configurations a' + 1 pt Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) 2 Heavy Vehicles (%) 0% 3% 12% 4% 3% 18% Turn Type Perm NA NA pm+ov Prot Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot co.18 v/s Ratio Perm co v/c Ratio Uniform Delay, dl Progression Factor Incremental Delay, d Delay (s) Level of Service B A A B B Approach Delay (s) Approach LOS B A B HCM 2000 Control Delay 11.9 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.49 Actuated Cycle Length (s) 50.5 Sum of lost time (s) 13.0 Intersection Capacity Utilization 45.8% ICU Level of Service A c Critical Lane Group 31753: Stewarts, Voorheesville Synchro 8 Report CHA Page 1

25 HCM Unsignalized Intersection Capacity Analysis No-Build AM - School Pk (consolidated drwys) 6: West Access & Maple Ave 2/6/2017 Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) px, platoon unblocked vc, conflicting volume vcl, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) 4 4 EBT EBR WBL WBT NBL NBR 4 'f 490 Free 0% Free 0% Stop 0% Direction, Lane # EB 1 WB 1 NB 1 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS A Approach Delay (s) Approach LOS A Average Delay 0.0 Intersection Capacity Utilization 29.1% ICU Level of Service A 31753: Stewarts, Voorheesville CHA Synchro 8 Report Page 2

26 HCM Unsignalized Intersection Capacity Analysis No-Build AM - School Pk (consolidated drwys) 8: East Access & Maple Ave 2/6/ Movement EBT EBR WBL WBT NBL NBR Lane Configurations 4 V Volume (veh/h) Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (Ws) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) 380 px, platoon unblocked vc, conflicting volume vcl, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 NB 1 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS A Approach Delay (s) Approach LOS A Average Delay 0.0 Intersection Capacity Utilization 29.1% ICU Level of Service A 31753: Stewarts, Voorheesville Synchro 8 Report CHA Page 3

27 HCM Signalized Intersection Capacity Analysis No-Build PM - School Peak (Consolidated Drwys) 1: Maple Ave & Altamont Rd 2/6/ Lane Configurations ' + Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Fit Protected Satd. Flow (prot) Fit Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) 11% 8% 5% Turn Type Perm NA NA Protected Phases 1 5 Permitted Phases 1 Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot 0.13 v/s Ratio Perm c0.18 v/c Ratio Uniform Delay, dl Progression Factor Incremental Delay, d Delay (s) Level of Service B A Approach Delay (s) Approach LOS B A % 2% 5% pm+ov Prot Perm c A B B 15.1 B HCM 2000 Control Delay 10.0 HCM 2000 Level of Service A HCM 2000 Volume to Capacity ratio 0.44 Actuated Cycle Length (s) 46.8 Sum of lost time (s) 13.0 Intersection Capacity Utilization 51.0% ICU Level of Service A Analysis Period (min) 15 c Critical Lane Group 31753: Stewarts, Voorheesville Synchro 8 Report CHA Page 1

28 HCM Unsignalized Intersection Capacity Analysis No-Build PM - School Peak (Consolidated Drwys) 6: West Access & Maple Ave 2/6/2017 Direction, Lane # EB 1 WB 1 NB 1 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS B Approach Delay (s) Approach LOS B t EBT EBR WBL WBT NBL NBR 4 ' Free Free Stop 0% 0% 0% Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) 290 px, platoon unblocked vc, conflicting volume vcl, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Average Delay 0.0 Intersection Capacity Utilization 33.5% ICU Level of Service A 31753: Stewarts, Voorheesville Synchro 8 Report CHA Page 2

29 HCM Unsignalized Intersection Capacity Analysis No-Build PM - School Peak (Consolidated Drwys) 8: East Access & Maple Ave 2/6/ \ /0' Movement EBT EBR WBL WBT NBL NBR Lane Configurations '* 4 V Volume (veh/h) Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) 380 px, platoon unblocked vc, conflicting volume vcl, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 NB 1 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS A B Approach Delay (s) Approach LOS B Average Delay 0.0 Intersection Capacity Utilization 35.1% ICU Level of Service A 31753: Stewarts, Voorheesville CHA Synchro 8 Report Page 3

30 HCM Signalized Intersection Capacity Analysis Build AM - School Pk (Consolidated Drwys) 1: Maple Ave/ Maple Ave & Altamont Rd 2/6/2017 Movement EBL EBT WBT WBR Lane Configurations ' + Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Fit Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) 0% 3% 12% 4% Turn Type Perm NA NA pm+ov Protected Phases Permitted Phases 1 5 Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm c v/c Ratio Uniform Delay, dl Progression Factor Incremental Delay, d Delay (s) Level of Service B A A Approach Delay (s) Approach LOS B A SBL SBR % 18% Prot Perm c B B 16.9 B HCM 2000 Control Delay 12.0 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.50 Actuated Cycle Length (s) 51.1 Sum of lost time (s) 13.0 Intersection Capacity Utilization 46.6% ICU Level of Service A Analysis Period (min) 15 c Critical Lane Group 31753: Stewarts, Voorheesville Synchro 8 Report CHA Page 1

31 HCM Unsignalized Intersection Capacity Analysis Build AM - School Pk (Consolidated Drwys) 6: West Access & Maple Ave/Maple Ave 2/6/ r0 Movement EBT EBR WBL WBT NBL NBR Lane Configurations '+ 4 Volume (veh/h) Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) 290 px, platoon unblocked vc, conflicting volume vcl, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 Volume Total Volume Left 0 3 Volume Right 51 0 csh Volume to Capacity Queue Length 95th (ft) 0 0 Control Delay (s) Lane LOS A Approach Delay (s) Approach LOS Average Delay 0.0 Intersection Capacity Utilization 30.3% ICU Level of Service A 31753: Stewarts, Voorheesville CHA Synchro 8 Report Page 2

32 HCM Unsignalized Intersection Capacity Analysis Build AM - School Pk (Consolidated Drwys) 8: East Access & Maple Ave 2/6/2017 c 4-4 p Movement EBT EBR WBL WBT NBL NBR Lane Configurations 't 4 Volume (veh/h) Sign Control Free Free Grade 0% 0% Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) 380 px, platoon unblocked vc, conflicting volume vcl, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 WB 1 NB 1 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS A B Approach Delay (s) Approach LOS B Stop 0% Average Delay 1.7 Intersection Capacity Utilization 42.1% ICU Level of Service A 31753: Stewarts, Voorheesville CHA Synchro 8 Report Page 3

33 HCM Signalized Intersection Capacity Analysis Build PM - School Peak (Consolidated Drwys) 1: Maple Ave & Altamont Rd 2/6/2017 f _, i_ k \if. 4/ Movement EBL EBT WBT WBR SBL SBR Lane Configurations ' + Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) 11% 8% 5% 3% 2% 5% Turn Type Perm NA NA pm+ov Prot Perm Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) vls Ratio Prot c0.14 v/s Ratio Perm c v/c Ratio Uniform Delay, dl Progression Factor Incremental Delay, d Delay (s) Level of Service B A A B B Approach Delay (s) Approach LOS B A B HCM 2000 Control Delay 10.1 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.46 Actuated Cycle Length (s) 47.5 Sum of lost time (s) 13.0 Intersection Capacity Utilization 52.0% ICU Level of Service A Analysis Period (min) 15 c Critical Lane Group 31753: Stewarts, Voorheesville Synchro 8 Report CHA Page 1

34 HCM Unsignalized Intersection Capacity Analysis Build PM - School Peak (Consolidated Drwys) 6: West Access & Maple Ave 2/6/2017 Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) px, platoon unblocked vc, conflicting volume vcl, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) ' 4 EBT EBR WBL WBT NBL NBR ') Free Free Stop 0% 0% 0% Direction, Lane # EB 1 WB 1 Volume Total Volume Left 0 4 Volume Right 45 0 csh Volume to Capacity Queue Length 95th (ft) 0 0 Control Delay (s) Lane LOS A Approach Delay (s) Approach LOS Average Delay 0.1 Intersection Capacity Utilization 31.0% ICU Level of Service A 31753: Stewarts, Voorheesville CHA Synchro 8 Report Page 2

35 HCM Unsignalized Intersection Capacity Analysis Build PM - School Peak (Consolidated Drwys) 8: East Access & Maple Ave 2/6/ t Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) px, platoon unblocked vc, conflicting volume vcl, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) EBT EBR WBL WBT NBL NBR 4 I Free Free Stop 0% 0% 0% Direction, Lane # EB 1 WB 1 NB 1 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS A C Approach Delay (s) Approach LOS C Average Delay 2.6 Intersection Capacity Utilization 59.5% ICU Level of Service B 31753: Stewarts, Voorheesville CHA Synchro 8 Report Page 3

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study Traffic Study To: From: James M. Moore, Director of Planning & Building Services, Town of Fairfax David Parisi, PE, TE, Parisi Transportation Consulting Date: October 14, 216 Subject: Victory Village Senior

More information

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

MEMO DRAFT VIA . Mr. Terry Bailey Foremost Development Company. To: Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink.

MEMO DRAFT VIA  . Mr. Terry Bailey Foremost Development Company. To: Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink. MEMO DRAFT VIA EMAIL To: From: Mr. Terry Bailey Foremost Development Company Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink Date: August 29, 214 Re: Proposed Apartments City of Walled

More information

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama.

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama. Traffic Impact Study Crestline Piggly Wiggly Mountain Brook, Alabama Prepared for: Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama September 214 Revision 1 October 214 Crestline Piggly Wiggly Mountain

More information

Michigan Avenue Traffic Study

Michigan Avenue Traffic Study City of Sarnia Michigan Avenue Traffic Study Final Report November 29, 218 B17 SUBMITTED BY CIMA CANADA INC. 4 327 Harvester Road Burlington, ON L7N 3G7 T 289 288-287 F 289 288-285 cima.ca CONTACT Stephen

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 11 Parsippany, NJ 754 862.27.59 PREPARED

More information

Travel Demand Management Plan

Travel Demand Management Plan Travel Demand Management Plan Linden Corner at 43 rd Street & Upton Avenue South AUTHORIZED PROPERTY REPRESENTATIVE: By Dated: Mark Dwyer Linden Hills Redevelopment, LLC 4632 Washburn Avenue South Minneapolis,

More information

George Street Transportation Impact Study. Paradigm Transportation Solutions Limited

George Street Transportation Impact Study. Paradigm Transportation Solutions Limited George Transportation Impact Study Paradigm Transportation Solutions Limited January 217 Project Summary Project Number 16191 January 217 Client Wastell Homes 5-1895 Blue Heron Drive London ON N6H 5L9

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012 Update for the May 31 st, 2012 Traffic Impact Study Prepared for Broccolini Construction 111-23596-00 September 20 th, 2012 2611 Queensview Drive, Suite 300, Ottawa, Ontario CANADA K2B 8K2 Telephone: 613-829-2800

More information

STRATEGY 4 INC Mainway, City of Burlington. [ Month Year ] Project No.: TRAFFIC IMPACT AND PARKING STUDY APRIL 2018

STRATEGY 4 INC Mainway, City of Burlington. [ Month Year ] Project No.: TRAFFIC IMPACT AND PARKING STUDY APRIL 2018 STRATEGY 4 INC. TRAFFIC IMPACT AND PARKING STUDY 3257 Mainway, City of Burlington Project No.: 27-675 APRIL 28 [ Month Year ] April 7, 28 Reference No. 27-675 Mr. Jeff Kenny Strategy 4 Inc. 262 Bristol

More information

Student Housing Development

Student Housing Development Traffic Impact Study for the proposed Student Housing Development City of Oneonta Otsego County, New York Project No. 3259 December 212 Revised February 13, 212 Prepared For: Newman Development Group,

More information

Syracuse University University Place Road Closure

Syracuse University University Place Road Closure Transportation Impact Study for the proposed Syracuse University University Place Road Closure City of Syracuse, Onondaga County, NY March 216 Project No. 3613 Prepared For: Syracuse University Office

More information

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748 City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License

More information

Technical Memo. Steve Gramm, SDDOT. RE: Phase 1, Task 100: Baseline Analysis. To: From: Steve Hoff, HDR Engineering, Inc.

Technical Memo. Steve Gramm, SDDOT. RE: Phase 1, Task 100: Baseline Analysis. To: From: Steve Hoff, HDR Engineering, Inc. Technical Memo To: Steve Gramm, SDDOT From: Steve Hoff, Engineering, Inc. Project: I-190/Silver Street Study CC: Date: 6//010 Job No: DOT Contract 41044, Order PD-0-09 RE: Phase 1, Task 100: Baseline Analysis

More information

ENKA INTERMEDIATE SCHOOL

ENKA INTERMEDIATE SCHOOL TRANSPORTATION IMPACT ANALYSIS Prepared for Buncombe County Schools ENKA INTERMEDIATE SCHOOL Asheville, NC Project Number: 13-71 8/1/13 www.davenportworld.com DAVENlORT Transportation Impact Analysis Enka

More information

February 24, 2017 Project #: 20076

February 24, 2017 Project #: 20076 February 24, 217 Project #: 276 Jinde Zhu Washington County Department of Land Use and Transportation 14 SW Walnut Street MS 17 Hillsboro, Oregon 97213 RE: Sunset Ridge Phase 2 Access Report and Zone Change

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building

SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building State University of New York at Albany City of Albany,

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property

Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property Prepared for: Premier Gold Mines Limited Prepared by: Stantec Consulting Ltd. November 2014

More information

TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO

TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO APRIL 12, 218 REV. JULY 16, 218 Prepared for: Davis Development 43 Corporate Center Dr Suite 21 Stockbridge, GA 3281 Prepared by: 112

More information

February 8, Ms. Jamie Jun, Esq. Fromhold Jaffe & Adams 789 East Lancaster Avenue, Suite 220 Villanova, PA 19085

February 8, Ms. Jamie Jun, Esq. Fromhold Jaffe & Adams 789 East Lancaster Avenue, Suite 220 Villanova, PA 19085 WWW.TRAFFICPD.COM February 8, 2016 Ms. Jamie Jun, Esq. Fromhold Jaffe & Adams 789 East Lancaster Avenue, Suite 220 Villanova, PA 19085 Re: Kohelet Yeshiva School Lower Merion Township, Montgomery County,

More information

Alfred Street Baptist Church (301 Alfred Street) Supplemental Traffic Analysis Based on Comments Received at Meeting on November 16, 2016

Alfred Street Baptist Church (301 Alfred Street) Supplemental Traffic Analysis Based on Comments Received at Meeting on November 16, 2016 To: Cc: From: Re: Subject: Ravindra Raut City of Alexandria, VA Bob Garbacz Katye North City of Alexandria, VA Larry Sefcik Grady Vaughan, EIT Wells + Associates, Inc. (31 Alfred Street) Supplemental Traffic

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

Oregon Country Fair Events

Oregon Country Fair Events Oregon Country Fair Events Traffic Impact Analysis Lane County, Oregon September, 5 Oregon Country Fair Events Traffic Impact Analysis. Introduction The purpose of this report is to provide a Traffic Impact

More information

Bank Street Retail/Hotel Development

Bank Street Retail/Hotel Development M a y 214 89-9 Bank Street Retail/Hotel Development Transportation Brief Google 214 Bing 214 Prepared for: Prepared by: Study 89-9 Type Bank Street May 214 Study Retail/Hotel Name Development February

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

ATTACHMENT B: SYNCHRO HCM CAPACITY ANALYSIS OUTPUT

ATTACHMENT B: SYNCHRO HCM CAPACITY ANALYSIS OUTPUT ATTACHMENT B: SYNCHRO HCM CAPACITY ANALYSIS OUTPUT 1: T:ine Boulevard &Grann:i White Pike AM Existing Conditions.,J- +- -+ t of '- ~ t ~ \.!,.I Lane Configurations Sign Control Volume (vph) 58 43 87 121

More information

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM To: Thomas Cummings February 17, 2011 Holbrook Public Works Superintendent From: Re:

More information

Prepared for Lutheran Services Carolinas. Project Number: /07/2017. Trinity Landing. New Hanover County, NC

Prepared for Lutheran Services Carolinas. Project Number: /07/2017. Trinity Landing. New Hanover County, NC Prepared for Lutheran Services Carolinas Project Number: 16273 4/7/217 Trinity Landing New Hanover County, NC Trinity Landing Transportation Impact nalysis Prepared for Lutheran Services Carolinas New

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

4. Include the associated years anticipated for the short term and long term analysis in the

4. Include the associated years anticipated for the short term and long term analysis in the 2nd DE Review SM ROCHA, LLC responses to City comments are provided within. 8. Trip distribution is displayed in Figure 6. Distribution assumes SFA and commercial traffic combined for most conservative

More information

joint access drive. will be

joint access drive. will be Date: To: From: Subject: June 22, 2015 Bradley Reiner, PE Bowman Consulting David R. Kline, PE, PTOE, Incline Associates Thornton Self-Storage Traffic Analysis (DRAFT) - Thornton, Colorado INTRODUCTION

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY

LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY Prepared for: Liberty Tree Academy Prepared by: 161 Blake Street, Suite 2 Denver, Colorado 822 Contact: David Kline, PE, PTOE (33)-572-2 On Behalf of: Liberty

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff Arterial Traffic Analysis Some critical concepts Prepared by Philip J. Tarnoff Agenda Fundamentals Signal timing concepts Actuated signal controllers Developing timing plans Types of signal control First

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

DRAFT Step 3 Roundabout Evaluation

DRAFT Step 3 Roundabout Evaluation DRAFT Step 3 Roundabout Evaluation Geometric and Operational Analysis SR 655 (Recker Highway) at Thornhill Road Polk County, Florida Financial Management Number: 436560-1-22-01 Federal-Aid Project Number:

More information

Signal Warrant Studies

Signal Warrant Studies Signal Warrant Studies Seven Locations Piqua, Ohio December 12, 217 Signal Warrant Studies Seven Locations Piqua, Ohio TABLE OF CONTENTS Executive Summary... 3 Introduction... 5 Study Location... 5 Data

More information

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: 1649362 Ontario Inc. c/o Manor Park Management 231 Brittany Drive, Suite D Ottawa ON K1K 0R8 July

More information

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny

More information

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny

More information

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM To: Martha White, Natick Town Administrator February 17, 2011 Eric Nascimento, MassDOT

More information

25 May 2018 OUR REF:

25 May 2018 OUR REF: 25 May 2018 OUR REF: 476088-01000 Roderick Lahey Architect Inc. 56 Beech Street Ottawa, ON K1S 3J6 Attention: Robert Verch Dear Rob: Re: 929 Richmond Road Transportation Impact Assessment Addendum #1 1.

More information

Multnomah County Courthouse Relocation. Transportation Alternatives Analysis Technical Memorandum: FINAL

Multnomah County Courthouse Relocation. Transportation Alternatives Analysis Technical Memorandum: FINAL Multnomah County Courthouse Relocation Portland, Oregon Transportation Alternatives Analysis Technical Memorandum: FIL Prepared for Multnomah County Facilities and Property Management Division 41 N Dixon

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY 675 Millcreek Drive, Unit 1 Mississauga, Ontario L5N 5M4 T: 416.213.7121 F: 95.89.8499 www.transtech.co TRAFFIC IMPACT STUDY PROPOSED MOSQUE DEVELOPMENT 4269 REGIONAL ROAD 25 TOWN OF OAKVILLE PREPARED

More information

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment March 11, 2015 Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA 01940 Re: Walnut Street Traffic Assessment Dear Board of Selectmen Members: As requested, BETA Group, Inc. (BETA)

More information

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION PLANNING ORGANIZATIO BOSTON REGION MPO NMETROPOLITAN BOSTON REGION METROPOLITAN PLANNING ORGANIZATION Richard A. Davey, MassDOT Secretary and CEO and MPO Chairman Karl H. Quackenbush, Executive Direcr,

More information

S. Johnston (IBI Group)

S. Johnston (IBI Group) IBI GROUP 100 175 Galaxy Boulevard Toronto ON M9W 0C9 Canada tel 416 679 1930 fax 416 675 4620 ibigroup.com Memorandum To/Attention Project File Date October 15, 2013 From A. Ortlieb Project No 24RX12.0246.00

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: Orleans Gardens Shopping Centre Inc. 2851 John Street, Suite 1 Markham, ON K3R 5R7

More information

ATTACHMENT A EXISTING TRAFFIC ENVIRONMENT

ATTACHMENT A EXISTING TRAFFIC ENVIRONMENT ATTACHMENT A EXISTING TRAFFIC ENVIRONMENT a partnership of EXISTING CONDITIONS AND OPPORTUNITIES REPORT Public Review Draft December 217 Bascom Avenue Complete Streets Study Existing Data Review: Traffic

More information

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for oad & Traffic Management Road & Traffic Management R Atlantic Traffic Engineering Specialists Draft Report Traffic Impact Study Superstore, Wal-Mart, and Kent Development Yarmouth, Nova Scotia Prepared

More information

Road Conversion Study Plumas Street

Road Conversion Study Plumas Street Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

Chapter Capacity and LOS Analysis of a Signalized I/S Overview Methodology Scope Limitation

Chapter Capacity and LOS Analysis of a Signalized I/S Overview Methodology Scope Limitation Chapter 37 Capacity and LOS Analysis of a Signalized I/S 37.1 Overview The Highway Capacity Manual defines the capacity as the maximum howdy rate at which persons or vehicle can be reasonably expected

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

192 & 196 Bronson Avenue / 31 Cambridge Street

192 & 196 Bronson Avenue / 31 Cambridge Street Bronson Inc. July 213 192 & 196 Bronson Avenue / 31 Cambridge Street TRANSPORTATION BRIEF Prepared by: Study 192 Bronson Type Avenue July 213 Study Transportation Name Brief February 211 TB Check List

More information

Kanata North Catholic Elementary School

Kanata North Catholic Elementary School December 216 Kanata North Catholic Elementary School Transportation Brief SITE Potential Future Development Trillium Woods Prepared for: Bryden Martel Architects Inc Prepared by: KANATA NORTH CATHOLIC

More information

Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) Final Report

Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) Final Report Consultant Services for Updating Intersections Operations to Accommodate Bi-Directional Cycle Tracks Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) January 30, 2014 Consultant

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

Intersection of Massachusetts Avenue and Maple Street in Lexington Signalized Intersection and Roundabout Comparison

Intersection of Massachusetts Avenue and Maple Street in Lexington Signalized Intersection and Roundabout Comparison Intersection of Massachusetts Avenue and Maple Street in Lexington Signalized Intersection and Roundabout Comparison Michael Wallwork, Roundabout Expert, Orange Park, Florida Tom Bertulis (MS, PE, PTOE),

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Traffic Impact and Access Study PROPOSED DURKEE FARM ESTATES. Foster Street Littleton, Massachusetts. Prepared for: Grimes Road, LLC.

Traffic Impact and Access Study PROPOSED DURKEE FARM ESTATES. Foster Street Littleton, Massachusetts. Prepared for: Grimes Road, LLC. Traffic Impact and Access Study PROPOSED DURKEE FARM ESTATES Foster Street Littleton, Massachusetts Prepared for: Grimes Road, LLC. Westford, MA Prepared by: MDM Transportation Consultants, Inc. 28 Lord

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY Prepared for: City of Thornton And Colorado Department of Transportation Prepared by: 11 Blake Street, Suite 2 Denver, Colorado 822 Contact: Brian Bern, PE, PTOE

More information

6060 North Central Expressway Mixed-Use Site Dallas, Texas

6060 North Central Expressway Mixed-Use Site Dallas, Texas Volume 1 Traffic Impact Analysis 6060 North Central Expressway Mixed-Use Site Dallas, Texas April 30, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #063238300 Registered Firm F-928 Traffic

More information

Analysis of Signalized Intersections

Analysis of Signalized Intersections Analysis of Signalized Intersections What is Intersection analysis Inverse application of the signal timing design In signal timing design, green times are estimated to provide necessary capacity In intersection

More information

Appendices. Appendix J: Traffic Study

Appendices. Appendix J: Traffic Study Appendices Appendix J: Traffic Study The Platinum Triangle Subsequent EIR The Planning Center Appendices This page intentionally left blank. The Platinum Triangle Subsequent EIR The Planning Center TRAFFIC

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

FORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION

FORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION FORM 901.3.A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION The following information is required from all applicants directly or indirectly accessing any collector or arterial road or as otherwise

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

THE LANDMARK AT TALBOT PARK

THE LANDMARK AT TALBOT PARK TRAFFIC IMPACT STUDY FOR THE LANDMARK AT TALBOT PARK IN NORFOLK, VA INTERMODAL ENGINEERING, P.C. OCTOBER, 200 The Landmark at Talbot Park is a proposed redevelopment of the existing apartments along the

More information

APPENDIX D. Traffic Impact Study Creighton Manning Engineering, LLP

APPENDIX D. Traffic Impact Study Creighton Manning Engineering, LLP APPENDIX D Traffic Impact Study Creighton Manning Engineering, LLP Traffic Impact Study Catskill Access Evaluation NYS Thruway Exit 21 Town of Catskill, New York CM Project No. 114-232 Prepared For: Greene

More information

Transportation and General Civil Engineering Projects

Transportation and General Civil Engineering Projects Continuing Engineering Services for Transportation and General Civil Engineering Projects Broward County, Florida Why Atkins 2 Existing and Past Clients 3 25+ years Experienced in Civil Engineering PM

More information

Access Location, Spacing, Turn Lanes, and Medians

Access Location, Spacing, Turn Lanes, and Medians Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-3 Access Location, Spacing, Turn Lanes, and Medians This section addresses access location, spacing, turn lane and median needs, including

More information

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for: TRAFFIC IMPACT STUDY For Creekside Thornton, Colorado August 215 November 215 Revised: August 216 Prepared for: Jansen Strawn Consulting Engineers 45 West 2 nd Avenue Denver, Colorado 8223 Prepared by:

More information

Date: 09/22/2016 Subject: To: From: PennDOT Engineering District 5-0. Dear Applicant,

Date: 09/22/2016 Subject: To: From: PennDOT Engineering District 5-0. Dear Applicant, Date: 09/22/2016 Subject: Highway Occupancy Permit Application No. 112807 Returned For Revisions To: Wal-Mart Real Estate Business Trust 2001 SE 10th Street Bentonville, AR 72716 From: PennDOT Engineering

More information

Congestion Mitigation at IH 27 and U.S. Hwy 70 in Plainview, TX

Congestion Mitigation at IH 27 and U.S. Hwy 70 in Plainview, TX 2010 Congestion Mitigation at IH 27 and U.S. Hwy 70 in Plainview, TX Hongchao Liu, Hao Xu, and Rhett Dollins Multidisciplinary Research in Transportation Texas Tech University Mulidisciplinary Research

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

Troutbeck Farm Development

Troutbeck Farm Development Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com

More information

December TRANSPORTATION BRIEF 1-19 Beechwood Avenue, Ottawa, ON TRANSPORTATION INFORMATION TE WATER

December TRANSPORTATION BRIEF 1-19 Beechwood Avenue, Ottawa, ON TRANSPORTATION INFORMATION TE WATER December 2012 TRANSPORTATION BRIEF 1-19 Beechwood Avenue, Ottawa, ON TRANSPORTATION INFORMATION TE WATER 1-19 Beechwood Avenue Mixed Use Development Transportation Brief prepared for: Minto Communities

More information

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc

More information

Tight Diamond Interchange versus Single Point Urban Interchange: Pedestrians Prospective

Tight Diamond Interchange versus Single Point Urban Interchange: Pedestrians Prospective Tight Diamond Interchange versus Single Point Urban Interchange: Pedestrians Prospective Ahmed Amer, M.S. Ph.D. Candidate Graduate Research/Teaching Assistant Department of Civil & Environmental Engineering

More information

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT November 2016 TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT & Aspinwall Borough, Sharpsburg Borough & O Hara Township, Allegheny County, Pennsylvania Prepared for: Riverfront

More information

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 151714A Table of Contents Table of Contents I. INTRODUCTION... 2 II. EXISTING CONDITIONS... 5 III. 215 EXISTING TRAFFIC CONDITIONS... 6

More information

APPENDIX C Additional Traffic Data

APPENDIX C Additional Traffic Data APPENDIX C Additional Traffic Data Raleigh and Heiden Properties FEIS F- ATTACHMENT Response.8- Traffic Count WEEKENDPEAK5MINUTECOUNTSPROJECTRaleighandHeidenPropertiesLOCATIONCR6,andCR9DATEFridayAugust6,TIME:PMto6:PM5MinuteTraficCR6SBCR9EBCR6NBSTARTENDleftthrurightTotalleftthrurightTotalleftthrurightTotalleftthrurightTotalGRANDTIMETIME56TAL-------------------:PM:5PM56:5PM:PM666566:PM:5PM685886:5PM:PM555585:PM:5PM5856889:5PM:PM8656:PM:5PM955656885:5PM:PM65986858:PM:5PM66855:5PM:PM69898:PM:5PM895858959:5PM:PM8589:PM:5PM85569:5PM:PM586985:PM:5PM55859565:5PM5:PM886559655:PM5:5PM56699595:5PM5:PM668955:PM5:5PM666856555:5PM6:PM95885-------------------TAL85896959688668

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE COMMITTEE ACTION ITEM

BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE COMMITTEE ACTION ITEM BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE COMMITTEE ACTION ITEM Date of Meeting: May 12, 2017 # 1 SUBJECT: ELECTION DISTRICT: Response to Board Member Initiative: Safety Concerns for Left Hand Turn

More information