1 Intersection Control Evaluation Trunk Highway 33 at Interstate 35 Ramps Cloquet, Carlton County, Minnesota S.P Minnesota Department of Transportation District June 27 SRF

2

3 Table of Contents Intersection Characteristics... 4 Existing Conditions... 4 Crash History... 4 Future Conditions... 7 Traffic Volumes... 8 nalysis of lternatives... Warrant nalysis... Operations nalysis... 2 Safety nalysis... 3 Planning-Level Cost nalysis... 5 lternatives ssessment... 6 Right-of-Way Considerations... 6 Transportation System Considerations... 6 Pedestrian Considerations... 6 Local cceptance... 6 Conclusions... 7 Recommendation... 8 ppendix... 9 H:\Projects\9\934\SD\ICE\Report\934_TH33 & I-35 Ramps_REVISED_7623.docx Intersection Control Evaluation ii SRF Consulting Group, Inc. TH 33 at I-35 Ramps June 27

4 Introduction This report comprises the intersection control evaluation (ICE) for the Trunk Highway 33 (TH 33) at Interstate 35 (I-35) Ramps intersection in Cloquet, Carlton County, Minnesota (see Figure ) and is part of the I-35 Mobility Study in Carlton County. The purpose of the I-35 Mobility Study in Carlton County is to identify existing geometric, safety, and operational/mobility issues, inventory infrastructure condition, develop improvement concepts, and generate a plan for MnDOT that will serve as a guide for planning and programming future projects along the I-35 corridor. The primary goal of the safety analysis for the I-35 Mobility Study in Carlton County is to identify locations where geometric and/or traffic control improvements can be implemented to improve the safety of the corridor and evaluate the safety impacts of various concept designs. The purpose of this evaluation was to analyze various traffic control alternatives for the TH 33 at I-35 Ramps intersection under existing and future conditions to identify a preferred alternative. It should be noted that the TH 33 at I-35 Ramps intersection was studied as part of the Highway 33 Corridor Study & ccess Management Plan (prepared by SEH in February 26). In this study, the following potential improvements at the TH 33 at I-35 Ramps intersection were identified: Install a Rural Intersection Conflict Warning System (RICWS) Close the Frontage Road ccess (west intersection leg) o Reroute the Frontage Road along TH 33 north to meet Gillette Road However, the potential Frontage Road rerouting is no longer considered feasible due to conflicts with a designated trout stream along the proposed Frontage Road alignment. dditional intersection alternatives were previously considered as part of the I-35 Mobility Study in Carlton County (see Concept Evaluation Matrix in the ppendix): Build Modified Side-Street Stop Control (Narrows median and removes existing two-stage crossing) Roundabout Control TH 33 rthbound Bridge Frontage Road Right-In/Right-Out The Build, TH 33 rthbound Bridge, and Frontage Road Right-In/Right-Out alternatives were subsequently eliminated from further consideration due to safety, cost, and access concerns (see Concept Evaluation Matrix in the ppendix). Consequently, this ICE has been requested and will consider the following remaining and additional traffic control alternatives: Modified Side-Street Stop Control (Narrows median and removes existing two-stage crossing) ll-way Stop Control Traffic Signal Control Roundabout Control Intersection Control Evaluation SRF Consulting Group, Inc. TH 33 at I-35 Ramps June 27

5 H:\Projects\9\934\SD\ICE\Figures\Fig_Study Intersection.cdr rth NORTH Cloquet 3 3 I N T E R S TT E 3 5 Study Intersection I N T E R S TT E June 27 Study Intersection Intersection Control Evaluation - TH 33 at I-35 Ramps Cloquet, Carlton County, Minnesota Figure

6 Detailed warrant, operations, crash, and planning-level cost analyses were performed to determine a preferred intersection control alternative that most effectively addresses the significant safety concern at the subject intersection. In addition to the analyses, other factors considered for this evaluation that were applicable to determining the long-term preferred intersection control included: Right-of-Way Considerations Transportation System Considerations Pedestrian Considerations Local cceptance Intersection Control Evaluation 3 SRF Consulting Group, Inc. TH 33 at I-35 Ramps June 27

7 Intersection Characteristics Existing Conditions The TH 33 at I-35 Ramps intersection is currently a four-leg intersection with side-street stop control. The TH 33 north leg is a four-lane divided roadway with a posted speed limit of 55 mph. It should be noted that the north/south intersection median is atypically wide and causes many side-street thru and left-turn maneuvers to be completed in two stages. The Frontage Road west leg is a two-lane undivided roadway with a posted speed limit of 45 mph. The I-35 South Ramps comprise the south leg while the I-35 rth Ramps comprise the east leg. Both TH 33 and I-35 are functionally classified as principal arterials. The area adjacent to the study intersection is comprised primarily of undeveloped wetlands/woodlands. Current intersection geometrics are listed in Table and shown in Figure 2. Existing peak hour traffic volumes, also shown in Figure 2, were collected by SRF Consulting Group in September 26. Table. Existing Conditions pproach Southbound TH 33 (rth Leg) Lane Configurations One left-turn lane, two thru lanes, and one right-turn lane I-35 rthbound Off-ramp (South Leg) One left-turn lane and one shared thru/right-turn lane I-35 Southbound Off-ramp (East Leg) One shared left-turn/thru lane and one channelized right-turn lane Eastbound Frontage Road (West Leg) One shared left-turn/thru/right-turn lane Crash History Crash data was obtained from the MnDOT Crash Mapping nalysis Tool (MnCMT) for a five year period from 2 through 25. pproximately 2 total crashes were reported during the analysis period at the TH 33 at I-35 Ramps intersection. This results in a crash rate of.73 crashes per Million Entering Vehicles (MEV). This is significantly greater than the statewide average crash rate of.25 crashes per MEV for a rural thru/stop intersection. It is also above the critical crash rate of.52 crashes per MEV. dditionally, there were two fatal and incapacitating injury crashes reported at this location. This leads to an observed rate of 7.27 fatal & serious injury crashes per MEV, which is above the critical rate of 5.37 crashes per MEV. The 2 intersection crashes are summarized as follows: Crash Severity: o Fatal (type K) crash o Incapacitating injury (type ) crash o n-incapacitating injury (type B) crash o 9 Possible injury (type C) crashes o 8 Property damage only crashes Intersection Control Evaluation 4 SRF Consulting Group, Inc. TH 33 at I-35 Ramps June 27

8 Crash Type: o 3 Right-angle crashes o Rear-end crash o Run-off-road crash o 5 Other crashes Due to the significant number of crashes at the intersection, ten years of crash data were analyzed further, for the period between Over this period, 37 total crashes were reported at the intersection, which results in a crash rate of.67 crashes per Million Entering Vehicles (MEV). This is above the critical crash rate of.46 crashes per MEV. There was also 7 fatal and incapacitating injury crashes observed at the location over the analysis period. This leads to an observed rate of 2.7 fatal & serious injury crashes per MEV, which is above the critical rate of 3.98 crashes per MEV. For details, see the ppendix. The crash severities are summarized as follows: 2 Fatal (type K) crash 5 Incapacitating injury (type ) crash 3 n-incapacitating injury (type B) crash 3 Possible injury (type C) crashes 4 Property damage only crashes For both observed sets of crash data (2-25 and 25-25), the observed crash rates were above the critical crash rates. This indicates that a statistically significant crash issue has been observed at this location and that there is a safety problem that needs to be corrected. dditionally, the observed fatal and serious injury crash rates were above the critical rates for both time periods, indicating that a notable problem with severe crash types has been observed. nalysis of the 2-25 data also indicated that the majority of crashes were right-angle crashes. Based on these factors, it is critical that the proposed traffic control alternative at this location addresses the safety issues, particularly with regards to severe and fatal crashes. Intersection Control Evaluation 5 SRF Consulting Group, Inc. TH 33 at I-35 Ramps June 27

9 H:\Projects\9\934\SD\ICE\Figures\Fig2_Existing Conditions.cdr rth NORTH 3 3 XX (XX) LEGEND -.M. Peak Hour Volumes - P.M. Peak Hour Volumes - Side-Street Stop Control Frontage Rd (52) 55 (7) 34 () 4 (8) 8 (475) 2 (2) I-35 South Ramps TH 33 () (356) 295 () 73 (248) 8 (33) () I-35 rth Ramps S T O P S T O P S T O P S T O P Frontage Rd I N T E R S TT E June 27 Existing Conditions Intersection Control Evaluation - TH 33 at I-35 Ramps Cloquet, Carlton County, Minnesota Figure 2

10 Future Conditions Opening Day Year 28 and Forecast Year 24 intersection lane configurations were used for the traffic operations and signal warrant analyses. The lane configurations analyzed were determined based on the needs of the intersection and represent the minimum number of lanes needed to construct each alternative. summary of the assumed lane configurations for the study intersection under Opening Day Year 28 conditions is shown in Table 2. Table 2. Opening Day Year 28 Conditions pproach Southbound TH 33 (rth Leg) I-35 rthbound Off-ramp (South Leg) I-35 Southbound Off-ramp (East Leg) Eastbound Frontage Road (West Leg) Side-Street Stop/ Traffic Signal Control One left-turn lane, two thru lanes, and one right-turn lane One left-turn lane and one shared thru/right-turn lane One shared left-turn/thru lane and one right-turn lane bypass One shared left-turn/thru/right-turn lane ll-way Stop/ Roundabout Control One left-turn lane and one shared thru/right-turn lane One shared left-turn/thru/right-turn lane One shared left-turn/thru lane and one right-turn lane bypass One shared left-turn/thru/right-turn lane The Forecast Year 24 intersection geometrics assumed the inclusion of an additional thru lane in the northbound direction. summary of the assumed lane configurations for the study intersection under Forecast Year 24 conditions is shown in Table 3. Table 3. Forecast Year 24 Conditions pproach Southbound TH 33 (rth Leg) I-35 rthbound Off-ramp (South Leg) I-35 Southbound Off-ramp (East Leg) Eastbound Frontage Road (West Leg) Side-Street Stop/ Traffic Signal Control One left-turn lane, two thru lanes, and one right-turn lane One left-turn lane, one thru lane, and one shared thru/right-turn lane One shared left-turn/thru lane and one right-turn lane One shared left-turn/thru/right-turn lane ll-way Stop/ Roundabout Control One left-turn lane and one shared thru/right-turn lane One shared left-turn/thru lane and one shared thru/right-turn lane One shared left-turn/thru lane and one right-turn lane One shared left-turn/thru/right-turn lane Intersection Control Evaluation 7 SRF Consulting Group, Inc. TH 33 at I-35 Ramps June 27

11 Traffic Volumes Existing peak hour intersection turning movement counts were collected at the TH 33 at I-35 Ramps intersection by SRF Consulting Group in September 26 and are shown in Figure 2. It should be noted that the TH 33 at I-35 Ramps intersection can experience significant recreational traffic peaks outside the typical weekday a.m. and p.m. peak hours. Therefore, intersection turning movement counts were also collected on the Friday and Monday of Labor Day Weekend 26. cursory review of the data collected indicates that traffic volumes during the recreational peaks can exceed those of the typical weekday a.m. and p.m. peak hours. However, due to the relatively infrequent occurrence of recreational peak traffic, the typical weekday a.m. and p.m. peak hours will be considered for the remainder of this ICE. To evaluate future conditions, forecast year 24 a.m. and p.m. peak hour traffic volumes were developed for the TH 33 at I-35 Ramps intersection. The forecasts were based on published MnDOT average annual daily traffic (DT) volumes and existing peak hour turning movement counts. In addition to existing data, the following plans were reviewed to better understand existing and future land use: Carlton County Community-Based Comprehensive Plan 2 City of Carlton, Minnesota Comprehensive Plan 25 City of Cloquet, Minnesota Comprehensive Plan 27 City of Scanlon, Minnesota Comprehensive Plan 25 review of the comprehensive plans identifies that Carlton County, the City of Cloquet, and the Town of Thomson are expected to see an increase in population over the next ten years. review of historical population data indicates that population within Carlton County has increased by approximately one percent annually between 99 and 2. Historical MnDOT DTs were used to complete a trend analysis. verage annual growth was first calculated and graphed using data from 994 to 24, and then projected out to the year 24. Once this data was graphed, it was apparent that growth within the study area has significantly slowed since 2. Therefore, average annual growth was also calculated and graphed using data from 2 to 24, and then projected out to the year 24. It is anticipated that improvements to the TH 33 at I-35 Ramps intersection would be completed in the year 28. Therefore, Opening Day Year 28 forecasts were developed using linear interpolation between existing traffic volumes and the Year 24 traffic forecasts. The resultant Opening Day Year 28 and Forecast Year 24 peak hour intersection turning movement volumes are shown in Figures 3 and 4, respectively. Intersection Control Evaluation 8 SRF Consulting Group, Inc. TH 33 at I-35 Ramps June 27

12 H:\Projects\9\934\SD\ICE\Figures\Fig3_Opening Day Year 28 Conditions.cdr rth NORTH 3 3 XX (XX) LEGEND -.M. Peak Hour Volumes - P.M. Peak Hour Volumes - Side-Street Stop Control - ll-way Stop Control - Traffic Signal Control - Roundabout Control Frontage Rd (55) 6 (2) 35 (5) 5 45 (25) 85 (49) 22 (22) I-35 South Ramps TH 33 or (5) 5 (37) 35 () 8 (255) (35) () I-35 rth Ramps Frontage Rd Frontage Rd (55) 6 (2) 35 (5) 5 45 (25) 85 (49) 22 (22) I-35 South Ramps TH 33 or (5) 5 (37) 35 () 8 (255) (35) () I-35 rth Ramps I N T E R S TT E June 27 Opening Day Year 28 Conditions Intersection Control Evaluation - TH 33 at I-35 Ramps Cloquet, Carlton County, Minnesota Figure 3

13 H:\Projects\9\934\SD\ICE\Figures\Fig4_Forecast Year 24 Conditions.cdr rth NORTH 3 3 XX (XX) LEGEND -.M. Peak Hour Volumes - P.M. Peak Hour Volumes - Side-Street Stop Control - ll-way Stop Control - Traffic Signal Control - Roundabout Control Frontage Rd (7) 75 (25) 45 (5) 5 55 (6) 245 (645) 29 (29) I-35 South Ramps TH 33 or (5) 5 (485) 45 () 235 (34) (45) () I-35 rth Ramps Frontage Rd Frontage Rd (7) 75 (25) 45 (5) 5 55 (6) 245 (645) 29 (29) I-35 South Ramps TH 33 or (5) 5 (485) 45 () 235 (34) (45) () I-35 rth Ramps I N T E R S TT E June 27 Forecast Year 24 Conditions Intersection Control Evaluation - TH 33 at I-35 Ramps Cloquet, Carlton County, Minnesota Figure 4

14 nalysis of lternatives The evaluation of intersection control alternatives included warrant, operations, crash, and planning-level cost analyses. Opening Day Year 28 and Forecast Year 24 volumes and lane configurations were used in the analysis. The following alternatives were considered: Side-Street Stop Control ll-way Stop Control Traffic Signal Control Roundabout Control Warrant nalysis warrant analysis was performed for the traffic signal control alternative as outlined in the February 25 Minnesota Manual on Uniform Traffic Control Devices (MnMUTCD). Signal warrants -3 were evaluated for the analysis. Signal warrants 4-9 were investigated and were determined to be not applicable for the study intersection. The warrant analysis was performed utilizing the Opening Day Year 28 and Forecast Year 24 volumes. The lane geometry and approach speeds assumed for the warrant analysis are shown in Table 4. Table 4. Warrant nalysis ssumptions pproach Geometry Speed Limit Southbound TH 33 (rth Leg) (Major) Two or more approach lanes 55 mph I-35 rthbound Off-ramp (South Leg) (Major) Two or more approach lanes 55 mph I-35 Southbound Off-ramp (East Leg) (Minor) One approach lane () 35 mph Eastbound Frontage Road (West Leg) (Minor) One approach lane 45 mph () Exclusive right-turn lane and associated traffic volumes not included in the warrant analysis. Right-turn volumes on the minor street approaches are typically excluded from a warrant analysis when there is an exclusive right-turn lane because these turns can be easily made and would not benefit from the addition of a signal. Therefore, the I-35 southbound off-ramp approach was considered to be a single lane approach due to the presence of an exclusive right-turn lane. It should also be noted that the 7 percent traffic volume factor was used for the warrant analysis, as proposed conditions meet the necessary criteria (major roadway speed limits are expected to remain greater than 4 mph). Since only forecasted a.m. and p.m. peak hour turning movement counts were available, the 8th highest traffic volume hour was estimated at 5 percent of the p.m. peak hour. Table 5 provides a warrant analysis summary, while the detailed volume-based analysis is shown in the ppendix. Intersection Control Evaluation SRF Consulting Group, Inc. TH 33 at I-35 Ramps June 27

15 Table 5. Signal Warrant nalysis Summary MnMUTCD Signal Warrant Hours Required Opening Day Year 28 Volumes Hours Met () Warrant Met? Forecast Year 24 Volumes Hours Met () Warrant Met? Warrant : Minimum Vehicular Volume 8 Warrant B: Interruption of Continuous Traffic Warrant C: Combination of Warrants 8 2 Warrant 2: Four Hour Volume Warrant 3B: Peak Hour Volume 2 Yes Warrants 4-9 t pplicable () Forecasted turning movement counts were available for the a.m. and p.m. peak hours. The 8th highest traffic volume hour was estimated at 5% of the p.m. peak hour. The results of the signal warrant analysis indicate that no signal warrants are expected to be met under Opening Day Year 28 volumes. However, peak hour volume warrant 3B is expected to be met under Forecast Year 24 volumes. Operations nalysis The operational analysis of the side-street stop, all-way stop, and traffic signal control alternatives was performed using Synchro/SimTraffic software, while the operational analysis of the roundabout control alternative was performed using Vistro software. The operational analysis identified a Level of Service (LOS) which indicates how well an intersection is operating based on the delay per vehicle measure of effectiveness. Delay is calculated based on procedures outlined in the Highway Capacity Manual (HCM). Intersections are given a ranking from LOS to LOS F. LOS indicates the best traffic operation and LOS F indicates an intersection where demand exceeds capacity. Table 6 provides a summary of the Opening Day Year 28 operational analysis. Results of the operational analysis indicate that the all-way stop control alternative is expected to perform at an overall LOS E during the p.m. peak hour under Opening Day Year 28 traffic volumes and proposed lane configurations. The side-street stop, traffic signal, and roundabout control alternatives are expected to perform at an overall LOS B or better during the a.m. and p.m. peak hours under Opening Day Year 28 traffic volumes and proposed lane configurations. The Opening Day Year 28 detailed operational analysis results are shown in the ppendix. Intersection Control Evaluation 2 SRF Consulting Group, Inc. TH 33 at I-35 Ramps June 27

16 Table 6. Opening Day Year 28 Operations nalysis Results lternative nalysis Tool LOS () M Peak Hour Delay (2) (sec/veh) LOS () PM Peak Hour Delay (2) (sec/veh) Side-Street Stop Control /D 5/26 /E 5/42 ll-way Stop Control Synchro/ SimTraffic C/C 6/8 E/E 39/49 Traffic Signal Control B/C 5/26 B/C 2/3 Roundabout Control Vistro / 4/8 / 5/8 () Overall intersection Level of Service (LOS) shown followed by the worst approach LOS. (2) Overall intersection delay shown followed by the worst approach delay. Table 7 provides a summary of the Forecast Year 24 operational analysis. Results of the operational analysis indicate that the all-way stop control alternative is expected to perform at an overall LOS D during the a.m. peak hour and overall LOS F during the p.m. peak hour under Forecast Year 24 traffic volumes and proposed lane configurations. The side-street stop, traffic signal, and roundabout control alternatives are expected to perform at an overall LOS B or better during the a.m. and p.m. peak hours under Forecast Year 24 traffic volumes and proposed lane configurations. However, significant side-street delays (LOS F) are anticipated under the side-street stop control alternative. The Forecast Year 24 detailed operational analysis results are shown in the ppendix. Table 7. Forecast Year 24 Operations nalysis Results lternative nalysis Tool LOS () M Peak Hour Delay (2) (sec/veh) LOS () PM Peak Hour Delay (2) (sec/veh) Side-Street Stop Control B/F 4/6 B/F 2/49 ll-way Stop Control Synchro/ SimTraffic D/E 26/38 F/F 4/88 Traffic Signal Control B/C 6/3 B/C 4/32 Roundabout Control Vistro / 6/7 /B 8/ () Overall intersection Level of Service (LOS) shown followed by the worst approach LOS. (2) Overall intersection delay shown followed by the worst approach delay. Safety nalysis safety analysis was performed to estimate the number of crashes per year for each traffic control alternative for the Opening Day Year 28 and Forecast Year 24 conditions for the study intersection. For the side-street stop control alternative, crash rates were expected to match the existing observed crash rate. To analyze the crash rates for the all-way stop, traffic signal, and roundabout alternatives, Crash Modification Factors (CMF) were taken from the CMF Clearinghouse. The CMF clearinghouse is a database sponsored by the Federal Highway dministration and contains CMFs determined through research studies. These CMFs can be used to estimate the impact that a Intersection Control Evaluation 3 SRF Consulting Group, Inc. TH 33 at I-35 Ramps June 27

17 road or intersection improvement will have on the expected crash rate for that location. summary of the projected crashes per intersection alternative is shown in Table 8. Table 8. Projected Crashes per Intersection lternative lternative Side-Street Stop Control Intersection DT Opening Day Year 28 Forecast Year 24 Crash Modification Factor verage Crash Rate () Projected Crashes/Year Opening Day Year 28 Forecast Year 24 N/.73 (2) ll-way Stop Control (3) , 2, Traffic Signal Control.56.4 (3) Roundabout Control.29.2 (3)..5 () Per million entering vehicles (2-25 data). (2) ssumed to match the observed crash rate. (3) Based on adjusting the observed crash rate with a crash modification factor. safety analysis was also performed to estimate the number of serious injury and fatal crashes per year for each traffic control alternative for the Opening Day Year 28 and Forecast Year 24 conditions for the study intersection. For the side-street stop control alternative, fatal and serious crash rates were expected to match the existing observed crash rate. The severe crash rates for the allway stop and traffic signal controls were determined using the same CMFs as were used for the overall crash rates. For the roundabout control alternative, a separate CMF for injury crashes was available and so was utilized in the analysis. summary of the projected crashes per intersection alternative is shown in Table 9. Table 9. Projected Fatal and Serious Injury Crashes per Intersection lternative lternative Side-Street Stop Control Intersection DT Opening Day Year 28 Forecast Year 24 Crash Modification Factor verage Crash Rate () Projected Crashes/Year Opening Day Year 28 Forecast Year 24 N/ 7.27 (2).4.5 ll-way Stop Control (3).2.3 5, 2, Traffic Signal Control (3).2.3 Roundabout Control.3.95 (3).. () Per million entering vehicles (2-25 data). (2) ssumed to match the observed crash rate. (3) Based on adjusting the observed crash rate with a crash modification factor. Based on the crash analysis, roundabouts are expected to best address the safety concern at this location, while all-way stop and traffic signal controls are expected to have fewer crashes than the side-street stop control alternative. Roundabouts typically have fewer conflict points than conventional intersections and the geometry of a roundabout induces lower speeds for vehicles approaching and traversing an intersection. With lower speeds, the severity of the crashes is decreased. Intersection Control Evaluation 4 SRF Consulting Group, Inc. TH 33 at I-35 Ramps June 27

18 roundabout should eliminate almost all right-angle and left-turn type crashes. Studies have shown the frequency of injury crashes is reduced more than property damage only crashes and that roundabout control significantly reduces the frequency of severe and fatal crashes. Conversely, because all-way stop and traffic signal controls do not impact roadway geometry, they provide limited benefits to specifically address severe crashes. Planning-Level Cost nalysis Capital Costs Because the study intersection currently exists as a side-street stop-controlled intersection, construction costs, excluding engineering and right-of-way costs, associated with the side-street stop, all-way stop, and traffic signal control alternatives would likely be less than the costs of a roundabout. Generally, roundabouts require more right-of-way than traditional intersections. However, the roadway cross section upstream from a roundabout in some cases can be narrower with the lack of turn lanes. Furthermore, the large footprint of the existing side-street stop controlled intersection may limit the need for additional right-of-way if considering the construction of a roundabout. Operation and Maintenance Cost Traffic signals typically have higher operation and maintenance costs because of the electricity required to operate the signal and routine maintenance required to keep the signal in operation. Operation and maintenance costs associated with a roundabout can vary depending on the amount of illumination required or landscaping alternatives used for the center island. Intersection Control Evaluation 5 SRF Consulting Group, Inc. TH 33 at I-35 Ramps June 27

19 lternatives ssessment Right-of-Way Considerations Due to the large footprint of the existing side-street stop-controlled intersection, no additional right-of-way should be necessary to implement a modified side-street stop, all-way stop, or traffic signal controlled intersection. Furthermore, the large intersection footprint may minimize the need for additional right-of-way to accommodate a 5 to 2 foot inscribed circle diameter for a multi-lane roundabout. Transportation System Considerations Currently, the number of signalized and other traditional intersections in Carlton County far outnumber roundabout controlled intersections. The side-street stop, all-way stop, and traffic signal control alternatives would, therefore, be an expected form of traffic control. Pedestrian Considerations There are no existing sidewalks, trails, or marked pedestrian crossings at the TH 33 at I-35 Ramps intersection. However, pedestrian/bicyclist accommodations could be included in any of the considered traffic control alternatives. The design of signalized intersections can create a safer environment for pedestrian crossings with the use of pedestrian signal phasing. This phasing allows pedestrians to safely cross an intersection while vehicular movements are served. The design of a roundabout allows pedestrians to cross one direction of traffic at a time on each leg of the roundabout. Their route is slightly longer since they are kept to the outside of the inscribed circle. lthough signalized intersections can provide indications showing pedestrian right-of-way, potential conflicts can come from red-light running thru vehicles and permissive turning traffic. Local cceptance Roundabouts are currently an uncommon form of traffic control in Carlton County. However, given the severe right-angle crash history at the existing side-street stop-controlled intersection, the safety benefits of a roundabout may be appealing to local drivers and will provide benefits to the driving public. Drivers are already familiar with traveling through side-street stop, all-way stop, and signalized intersections since the majority of nearby intersections are of these types of traffic control. Intersection Control Evaluation 6 SRF Consulting Group, Inc. TH 33 at I-35 Ramps June 27

20 Conclusions The following intersection control evaluation (ICE) conclusions and recommendations are provided for the TH 33 at I-35 Ramps intersection in Cloquet, Carlton County, Minnesota: Warrants nalysis The results of the signal warrant analysis indicate that no signal warrants are expected to be met under Opening Day Year 28 volumes. However, peak hour volume warrant 3B is expected to be met under Forecast Year 24 volumes. Operations nalysis Results of the operational analysis indicate that the all-way stop control alternative is expected to perform at an overall LOS E during the p.m. peak hour under Opening Day Year 28 traffic volumes and proposed lane configurations. The side-street stop, traffic signal, and roundabout control alternatives are expected to perform at an overall LOS B or better during the a.m. and p.m. peak hours under Opening Day Year 28 traffic volumes and proposed lane configurations. Results of the operational analysis indicate that the all-way stop control alternative is expected to perform at an overall LOS D during the a.m. peak hour and overall LOS F during the p.m. peak hour under Forecast Year 24 traffic volumes and proposed lane configurations. The side-street stop, traffic signal, and roundabout control alternatives are expected to perform at an overall LOS B or better during the a.m. and p.m. peak hours under Forecast Year 24 traffic volumes and proposed lane configurations. However, significant side-street delays (LOS F) are anticipated under the side-street stop control alternative. Safety nalysis Based on utilizing crash modification factors to evaluate the impact control alternatives will have on the existing observed crash rate, both all-way stop and traffic signal controls are expected to improve safety at the subject intersection. However, a roundabout is expected to provide the greatest benefit in terms of reducing crashes. Roundabout control would also be the best alternative to reduce the rate of fatal and serious injury crashes by reducing speeds and virtually eliminating right-angle crashes. Planning-Level Cost nalysis Both traffic signal and roundabout controls require large capital investments. Traffic signals typically have higher operation and maintenance costs because of the electricity required to operate the signal and routine maintenance required to keep the signal in operation. Operation and maintenance costs associated with a roundabout can vary depending on the amount of illumination required or landscaping alternatives used for the center island. Right-of-Way Considerations Due to the large footprint of the existing side-street stop-controlled intersection, no additional right-of-way should be necessary to implement a modified side-street stop, all-way stop, or traffic signal controlled intersection. Furthermore, the large intersection footprint may minimize the need Intersection Control Evaluation 7 SRF Consulting Group, Inc. TH 33 at I-35 Ramps June 27

21 for additional right-of-way to accommodate a 5 to 2 foot inscribed circle diameter for a multi-lane roundabout. Transportation System Considerations Currently, the number of signalized and other traditional intersections in Carlton County far outnumber roundabout controlled intersections. The side-street stop, all-way stop, and traffic signal control alternatives would, therefore, be an expected form of traffic control. Pedestrian Considerations There are no existing sidewalks, trails, or marked pedestrian crossings at the TH 33 at I-35 Ramps intersection. However, pedestrian/bicyclist accommodations could be included in any of the considered traffic control alternatives. Recommendation Both the traffic signal and roundabout control alternatives are expected to operate well in the long-term from a capacity standpoint, while both stop-controlled alternatives are expected to operate with failing levels of service under Forecast Year 24 volume conditions. traffic signal at this location would fail to be warranted under Opening Day 28 volume conditions. While a traffic signal is a more traditional form of traffic control in Carlton County, roundabout control is expected to produce significant safety benefits compared to traffic signal control. Due to the significant number of crashes observed at this intersection, it is imperative that the proposed traffic control alternative addresses safety issues. Based on the safety analysis roundabout control is expected to best improve safety at this location. In particular, roundabout control at the intersection is expected to significantly reduce or eliminate the high number of observed severe crashes at the intersection by lowering speeds and virtually eliminating opportunities for rightangle crashes. Thus, roundabout control is recommended as it will operate at acceptable levels of service and is expected to best address safety issues at the intersection. Intersection Control Evaluation 8 SRF Consulting Group, Inc. TH 33 at I-35 Ramps June 27

22 ppendix Concept Evaluation Matrix Crash Data Opening Day Year 28 Signal Warrant nalysis Forecast Year 24 Signal Warrant nalysis Opening Day Year 28 Detailed Operations nalysis Forecast Year 24 Detailed Operations nalysis Intersection Control Evaluation 9 SRF Consulting Group, Inc. TH 33 at I-35 Ramps June 27

23 Concept Evaluation Matrix

24 I-35 Planning Study Carlton County I-35 and Highway 33 Interchange Concept Evaluation Matrix - /8/27 Interchange lternative Year 24 Intersection Operations (verage Delay at Worst pproach) Safety Considerations Highway 33 Traffic Mobility Maintains ccess Heavy Truck Considerations Bridge Needs ROW Impact (cres) ROW Impact (Parcels) ROW Impact (Other) Environmental Impact Construction/ Traffic Impacts Construction Costs tes Build M Peak EB >3 Minutes PM Peak rthbound Recreational Peak EB >3 Minutes WB > 3 Minutes EB >3 Minutes WB > 3 Minutes Does not address current safety issue - Large Median -Two-stage crossing Maintains traffic flow on TH 33 Yes Change ne ne ne ne ne ne ne Dismissed since it does not address the safety issue Southbound Recreational Peak EB >3 Minutes WB > 3 Minutes Concept West Frontage Road M Peak PM Peak rthbound Recreational Peak SB - 6 Seconds SB - 3 Seconds SB - 4 Seconds Improves safety -Removes west leg -Removes westbound through movement -Reconfigures median Maintains traffic flow on TH 33 Yes West leg is moved 2,64 feet (.5 mile) north Change ne Billboards 3.7 acres of trees Trout stream impacts Minimal temporary traffic impacts during construction $.2 M Trout stream will be routed through culverts. Stream could be relocated/restored as an option. dditional infrastructure and maintenance, more traffic on the Frontage Road to the north (Gillette Road). Less efficient traffic operations at TH 33 and Gillette Road are expected. Southbound Recreational Peak SB - 2 Seconds Concept B Tight West Frontage Road M Peak PM Peak rthbound Recreational Peak SB - 6 Seconds SB - 3 Seconds SB - 4 Seconds Improves safety -Removes west leg -Removes westbound through movement -Reconfigures median Maintains traffic flow on TH 33 Yes West leg is moved 2,64 feet (.5 mile) north Change ne Billboards 2. acres of trees Trout stream impacts Minimal temporary traffic impacts during construction $.4 M Does not fully avoid trout stream. Will need to be relocated/restored which is not included in the construction cost. dditional infrastructure and maintenance, more traffic on the Frontage Road to the north (Gillette Road). Less efficient traffic operations at TH 33 and Gillette Road are expected. Southbound Recreational Peak SB - 2 Seconds Concept C Tight Intersection M Peak EB >3 Minutes PM Peak rthbound Recreational Peak EB >3 Minutes WB > 3 Minutes EB >3 Minutes WB > 3 Minutes Improves safety -Reconfigures median -Improves sight lines Maintains traffic flow on TH 33 Yes Substantial temporary Change ne ne ne ne 3.6 acres of wetlands impacts during $.5 M Significant amount of earthwork. Wetland will need to be relocated. construction Concept D Roundabout Southbound Recreational Peak M Peak EB >3 Minutes WB > 3 Minutes NB - Seconds PM Peak rthbound Recreational Peak NB - 2 Seconds NB - 75 Seconds * Improves safety -Reduction in rightangle and severe crashes Slows all traffic on Hwy 33 Yes Designed to accommodate a WB-62 ne ne ne ne ne Substantial temporary impacts during construction $. M May need to have two northbound through lanes to accommodate recreational traffic. Will increase construction costs. Concept E TH 33 NB Bridge Southbound Recreational Peak M Peak SB - 2 Seconds EB - 36 Seconds PM Peak rthbound Recreational Peak EB - 9 seconds EB - 6 seconds Improves safety -Removes conflict with northbound vehicles Maintains traffic flow on TH 33 Yes Change Bridge.2. Substantial temporary 7 Billboards ne impacts during $6.6 M construction Most expensive option. ll other options are within one million dollars. Still has the potential for right-angle crashes with Frontage Road traffic crossing southbound TH 33. Southbound Recreational Peak EB > 3 Minutes Concept F Frontage Road Right-In/Right-Out Was previously evaluated. Dismissed due to strong opposition from the local communities due to restricted access to/from frontage road. tes: * Expanding the northbound movement from a single lane to two lanes will reduce delay to seconds. H:\Projects\9\934\TS\TH 33 Concept Evaluation Matrix.xlsx /8/27 SRF Consulting Group

25 Crash Data

26

27

28

29 Opening Day Year 28 Signal Warrant nalysis

30 Background Information WRRNTS NLYSIS Year 28 TH I-35 Ramps I-35 Mobility Study in Carlton County Cloquet, MN Location : Cloquet, MN Speed (mph) Lanes Date: 2// or more Major pproach : nalysis Prepared By: Jordan Schwarze 55 2 or more Major pproach 3: Population Less than,: 45 Minor pproach 2: Seventy Percent Factor Used: Yes 35 Minor pproach 4: pproach Southbound TH 33 rthbound I-35 NB Off-ramp Eastbound Frontage Rd Westbound I-35 SB Off-ramp Warrants nalysis: Warrants, B and C Major Major Total Warrant Met Minor Minor Largest Warrant Met Met Same Hours Combination Hour pproach pproach pproach 2 pproach 4 Minor pp Condition Condition B B 7-8 M X X X X X X Estimated 8th Highest Hour X (5% of PM Peak Hour) 4-5 PM X X X X X Warrant and Description Warrant : Minimum Vehicular Volume Warrant B: Interruption of Continuous Traffic Warrant C: Combination of Warrants Warrant 2: Four-Hour Vehicular Volume Warrant 3B: Peak Hour *Based on estimating the 8th highest traffic volume hour Warrant Summary 2 2 Hours Met* Hours Required Met/t Met 8 t Met 2 8 t Met 8 t Met 2 4 t Met t Met

31 WRRNTS NLYSIS Year 28 TH I-35 Ramps I-35 Mobility Study in Carlton County Cloquet, MN WRRNT 2 - FOUR-HOUR VEHICULR VOLUME Warrants nalysis: Warrant 2 MINOR STREET HIGH VOLUME PPROCH -- VPH MJOR STREET -- TOTL OF BOTH PPROCHES -- VPH Number of Hours Satisfying Requirements: 2 tes:. 8 VPH PPLIES S THE LOWER THRESHOLD VOLUME FOR MINOR STREET PPROCH WITH TWO OR MORE LNES ND 6 VPH PPLIES S THE LOWER THRESHOLD VOLUME FOR MINOR STREET PPROCHING WITH ONE LNE. 2. INTERSECTION IS EITHER () WITHIN COMMUNITY LESS THN, POPULTION OR (2) HS SPEEDS BOVE 4 MPH ON MJOR STREET.

32 WRRNTS NLYSIS Year 28 TH I-35 Ramps I-35 Mobility Study in Carlton County Cloquet, MN WRRNT 3 - PEK HOUR Warrants nalysis: Warrant 3 MINOR STREET HIGH VOLUME PPROCH -- VPH MJOR STREET -- TOTL OF BOTH PPROCHES -- VPH Number of Hours Satisfying Requirements: tes:. VPH PPLIES S THE LOWER THRESHOLD VOLUME FOR MINOR STREET PPROCH WITH TWO OR MORE LNES ND 75 VPH PPLIES S THE LOWER THRESHOLD VOLUME FOR MINOR STREET PPROCHING WITH ONE LNE. 2. INTERSECTION IS EITHER () WITHIN COMMUNITY LESS THN, POPULTION OR (2) HS SPEEDS BOVE 4 MPH ON MJOR STREET.

33 Forecast Year 24 Signal Warrant nalysis

34 Background Information WRRNTS NLYSIS Year 24 TH I-35 Ramps I-35 Mobility Study in Carlton County Cloquet, MN Location : Cloquet, MN Speed (mph) Lanes Date: 2// or more Major pproach : nalysis Prepared By: Jordan Schwarze 55 2 or more Major pproach 3: Population Less than,: 45 Minor pproach 2: Seventy Percent Factor Used: Yes 35 Minor pproach 4: pproach Southbound TH 33 rthbound I-35 NB Off-ramp Eastbound Frontage Rd Westbound I-35 SB Off-ramp Warrants nalysis: Warrants, B and C Major Major Total Warrant Met Minor Minor Largest Warrant Met Met Same Hours Combination Hour pproach pproach pproach 2 pproach 4 Minor pp Condition Condition B B 7-8 M X X 2 2 X X X X X X Estimated 8th Highest Hour X X X (5% of PM Peak Hour) 4-5 PM X X X X X X Warrant and Description Warrant : Minimum Vehicular Volume Warrant B: Interruption of Continuous Traffic Warrant C: Combination of Warrants Warrant 2: Four-Hour Vehicular Volume Warrant 3B: Peak Hour *Based on estimating the 8th highest traffic volume hour Warrant Summary Hours Met* Hours Required Met/t Met 8 t Met 2 8 t Met 2 8 t Met 2 4 t Met 2 Met - Warrant 3B Satisfied

35 WRRNTS NLYSIS Year 24 TH I-35 Ramps I-35 Mobility Study in Carlton County Cloquet, MN WRRNT 2 - FOUR-HOUR VEHICULR VOLUME Warrants nalysis: Warrant 2 MINOR STREET HIGH VOLUME PPROCH -- VPH MJOR STREET -- TOTL OF BOTH PPROCHES -- VPH Number of Hours Satisfying Requirements: 2 tes:. 8 VPH PPLIES S THE LOWER THRESHOLD VOLUME FOR MINOR STREET PPROCH WITH TWO OR MORE LNES ND 6 VPH PPLIES S THE LOWER THRESHOLD VOLUME FOR MINOR STREET PPROCHING WITH ONE LNE. 2. INTERSECTION IS EITHER () WITHIN COMMUNITY LESS THN, POPULTION OR (2) HS SPEEDS BOVE 4 MPH ON MJOR STREET.

36 WRRNTS NLYSIS Year 24 TH I-35 Ramps I-35 Mobility Study in Carlton County Cloquet, MN WRRNT 3 - PEK HOUR Warrants nalysis: Warrant 3 MINOR STREET HIGH VOLUME PPROCH -- VPH MJOR STREET -- TOTL OF BOTH PPROCHES -- VPH Number of Hours Satisfying Requirements: 2 tes:. VPH PPLIES S THE LOWER THRESHOLD VOLUME FOR MINOR STREET PPROCH WITH TWO OR MORE LNES ND 75 VPH PPLIES S THE LOWER THRESHOLD VOLUME FOR MINOR STREET PPROCHING WITH ONE LNE. 2. INTERSECTION IS EITHER () WITHIN COMMUNITY LESS THN, POPULTION OR (2) HS SPEEDS BOVE 4 MPH ON MJOR STREET.

37 Opening Day Year 28 Detailed Operations nalysis

38 28 M Peak Period 2//27 Side-Street Stop 9: I-35 South Ramps/TH 33 & Frontage Road/I-35 rth Ramps Intersection Int Delay, s/veh 5.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - ne - - Free - - ne - - ne Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor2 Minor Major Major2 Conflicting Flow ll Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap- Maneuver Stage Stage Platoon blocked, % Mov Cap- Maneuver Mov Cap-2 Maneuver Stage Stage pproach EB WB NB SB HCM Control Delay, s HCM LOS D C Minor Lane/Major Mvmt NBL NBT NBR EBLnWBLnWBLn2 SBL SBT SBR Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS - - D C - - HCM 95th %tile Q(veh) H:\Projects\9\934\TS\Operations nalysis\synchro\28 lternatives\side-street Stop\28 Side-Street Stop M.syn Synchro 9 Report Page

39 28 PM Peak Period 2//27 Side-Street Stop 9: I-35 South Ramps/TH 33 & Frontage Road/I-35 rth Ramps Intersection Int Delay, s/veh 4.5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - ne - - Free - - ne - - ne Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor2 Minor Major Major2 Conflicting Flow ll Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap- Maneuver Stage Stage Platoon blocked, % Mov Cap- Maneuver Mov Cap-2 Maneuver Stage Stage pproach EB WB NB SB HCM Control Delay, s HCM LOS E D Minor Lane/Major Mvmt NBL NBT NBR EBLnWBLnWBLn2 SBL SBT SBR Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS - - E D - - HCM 95th %tile Q(veh) H:\Projects\9\934\TS\Operations nalysis\synchro\28 lternatives\side-street Stop\28 Side-Street Stop PM.syn Synchro 9 Report Page

40 28 M Peak Period 2//27 ll-way Stop 9: I-35 South Ramps/TH 33 & Frontage Road/I-35 rth Ramps Intersection Intersection Delay, s/veh 5.6 Intersection LOS C Movement EBU EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Peak Hour Factor Heavy Vehicles, % Mvmt Flow Number of Lanes pproach EB WB NB Opposing pproach WB EB SB Opposing Lanes 2 2 Conflicting pproach Left SB NB EB Conflicting Lanes Left 2 Conflicting pproach Right NB SB WB Conflicting Lanes Right 2 2 HCM Control Delay HCM LOS B B C Lane NBLn EBLn WBLn WBLn2 SBLn SBLn2 Vol Left, % % 62% % % 7% % Vol Thru, % % 38% % % 3% 69% Vol Right, % % % % % % 3% Sign Control Stop Stop Stop Stop Stop Stop Traffic Vol by Lane LT Vol Through Vol RT Vol 78 4 Lane Flow Rate Geometry Grp Degree of Util (X) Departure Headway (Hd) Convergence, Y/N Yes Yes Yes Yes Yes Yes Cap Service Time HCM Lane V/C Ratio HCM Control Delay HCM Lane LOS C B B C B HCM 95th-tile Q H:\Projects\9\934\TS\Operations nalysis\synchro\28 lternatives\ll-way Stop\28 ll-way Stop M.syn Synchro 9 Report Page

41 28 M Peak Period 2//27 ll-way Stop 9: I-35 South Ramps/TH 33 & Frontage Road/I-35 rth Ramps Intersection Intersection Delay, s/veh Intersection LOS Movement SBU SBL SBT SBR Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Peak Hour Factor Heavy Vehicles, % Mvmt Flow Number of Lanes 2 pproach SB Opposing pproach NB Opposing Lanes Conflicting pproach Left WB Conflicting Lanes Left 2 Conflicting pproach Right EB Conflicting Lanes Right HCM Control Delay 6. HCM LOS C H:\Projects\9\934\TS\Operations nalysis\synchro\28 lternatives\ll-way Stop\28 ll-way Stop M.syn Synchro 9 Report Page 2

42 28 PM Peak Period 2//27 ll-way Stop 9: I-35 South Ramps/TH 33 & Frontage Road/I-35 rth Ramps Intersection Intersection Delay, s/veh 38.5 Intersection LOS E Movement EBU EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Peak Hour Factor Heavy Vehicles, % Mvmt Flow Number of Lanes pproach EB WB NB Opposing pproach WB EB SB Opposing Lanes 2 2 Conflicting pproach Left SB NB EB Conflicting Lanes Left 2 Conflicting pproach Right NB SB WB Conflicting Lanes Right 2 2 HCM Control Delay HCM LOS B C D Lane NBLn EBLn WBLn WBLn2 SBLn SBLn2 Vol Left, % % 74% % % 47% % Vol Thru, % % 25% % % 53% 67% Vol Right, % % % % % % 33% Sign Control Stop Stop Stop Stop Stop Stop Traffic Vol by Lane LT Vol Through Vol RT Vol Lane Flow Rate Geometry Grp Degree of Util (X) Departure Headway (Hd) Convergence, Y/N Yes Yes Yes Yes Yes Yes Cap Service Time HCM Lane V/C Ratio HCM Control Delay HCM Lane LOS D B B C F D HCM 95th-tile Q H:\Projects\9\934\TS\Operations nalysis\synchro\28 lternatives\ll-way Stop\28 ll-way Stop PM.syn Synchro 9 Report Page

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

Syracuse University University Place Road Closure

Syracuse University University Place Road Closure Transportation Impact Study for the proposed Syracuse University University Place Road Closure City of Syracuse, Onondaga County, NY March 216 Project No. 3613 Prepared For: Syracuse University Office

More information

LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY

LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY Prepared for: Liberty Tree Academy Prepared by: 161 Blake Street, Suite 2 Denver, Colorado 822 Contact: David Kline, PE, PTOE (33)-572-2 On Behalf of: Liberty

More information

joint access drive. will be

joint access drive. will be Date: To: From: Subject: June 22, 2015 Bradley Reiner, PE Bowman Consulting David R. Kline, PE, PTOE, Incline Associates Thornton Self-Storage Traffic Analysis (DRAFT) - Thornton, Colorado INTRODUCTION

More information

February 24, 2017 Project #: 20076

February 24, 2017 Project #: 20076 February 24, 217 Project #: 276 Jinde Zhu Washington County Department of Land Use and Transportation 14 SW Walnut Street MS 17 Hillsboro, Oregon 97213 RE: Sunset Ridge Phase 2 Access Report and Zone Change

More information

February 8, Ms. Jamie Jun, Esq. Fromhold Jaffe & Adams 789 East Lancaster Avenue, Suite 220 Villanova, PA 19085

February 8, Ms. Jamie Jun, Esq. Fromhold Jaffe & Adams 789 East Lancaster Avenue, Suite 220 Villanova, PA 19085 WWW.TRAFFICPD.COM February 8, 2016 Ms. Jamie Jun, Esq. Fromhold Jaffe & Adams 789 East Lancaster Avenue, Suite 220 Villanova, PA 19085 Re: Kohelet Yeshiva School Lower Merion Township, Montgomery County,

More information

TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO

TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO APRIL 12, 218 REV. JULY 16, 218 Prepared for: Davis Development 43 Corporate Center Dr Suite 21 Stockbridge, GA 3281 Prepared by: 112

More information

Appendix G: Future Conditions Traffic Analysis Memorandum

Appendix G: Future Conditions Traffic Analysis Memorandum ppendix G: Future Conditions Traffic nalysis Memorandum Prepared by: Bolton & Menk, Inc. Riverfront Drive Corridor Study ǀ T42.867 ppendix MEMORNDUM Date: pril, 27 To: Paul Vogel From: Ross B. Tillman,

More information

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

Intersection Control Evaluation

Intersection Control Evaluation Intersection Control Evaluation Lor Ray Drive at Howard Drive in North Mankato, Nicollet County, Minnesota Mankato/North Mankato Area Planning Organization October 2016 SRF No. 016 09243 Table of Contents

More information

Roundabout Feasibility Memorandum

Roundabout Feasibility Memorandum Roundabout Feasibility Memorandum To From Gwen Pipkin Bill Howell Date June 18, 2013 Subject Roundabout Feasibility Study SR 29 PD&E Study From Oil Well Road to SR 82 Collier County, FL FPID 417540-1-22-01

More information

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study Traffic Study To: From: James M. Moore, Director of Planning & Building Services, Town of Fairfax David Parisi, PE, TE, Parisi Transportation Consulting Date: October 14, 216 Subject: Victory Village Senior

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

Intersection Control Evaluation

Intersection Control Evaluation Intersection Control Evaluation Stadium Road at Pohl Road in Mankato, Blue Earth County, Minnesota Mankato/North Mankato Area Planning Organization October 2016 SRF No. 016 09243 Table of Contents Introduction...

More information

Prepared for Lutheran Services Carolinas. Project Number: /07/2017. Trinity Landing. New Hanover County, NC

Prepared for Lutheran Services Carolinas. Project Number: /07/2017. Trinity Landing. New Hanover County, NC Prepared for Lutheran Services Carolinas Project Number: 16273 4/7/217 Trinity Landing New Hanover County, NC Trinity Landing Transportation Impact nalysis Prepared for Lutheran Services Carolinas New

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748 City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas 133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS Overland Park, Kansas September 1, 2017 TABLE OF CONTENTS 1. INTRODUCTION... 1 2. LITERATURE REVIEW... 1 3. CONCEPT

More information

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams. Technical Memorandum TRFFIC IMPCT STUDY RIDLEY ROD CONVENIENCE STORE Southampton County, V Prepared for: Mr. David Williams By: Charles Smith, P.E., PTOE EPR Charlottesville, V July 2014 1 TBLE OF CONTENTS

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

Student Housing Development

Student Housing Development Traffic Impact Study for the proposed Student Housing Development City of Oneonta Otsego County, New York Project No. 3259 December 212 Revised February 13, 212 Prepared For: Newman Development Group,

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

Road Conversion Study Plumas Street

Road Conversion Study Plumas Street Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

Technical Memo. Steve Gramm, SDDOT. RE: Phase 1, Task 100: Baseline Analysis. To: From: Steve Hoff, HDR Engineering, Inc.

Technical Memo. Steve Gramm, SDDOT. RE: Phase 1, Task 100: Baseline Analysis. To: From: Steve Hoff, HDR Engineering, Inc. Technical Memo To: Steve Gramm, SDDOT From: Steve Hoff, Engineering, Inc. Project: I-190/Silver Street Study CC: Date: 6//010 Job No: DOT Contract 41044, Order PD-0-09 RE: Phase 1, Task 100: Baseline Analysis

More information

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /

More information

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama.

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama. Traffic Impact Study Crestline Piggly Wiggly Mountain Brook, Alabama Prepared for: Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama September 214 Revision 1 October 214 Crestline Piggly Wiggly Mountain

More information

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM To: Thomas Cummings February 17, 2011 Holbrook Public Works Superintendent From: Re:

More information

MEMO DRAFT VIA . Mr. Terry Bailey Foremost Development Company. To: Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink.

MEMO DRAFT VIA  . Mr. Terry Bailey Foremost Development Company. To: Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink. MEMO DRAFT VIA EMAIL To: From: Mr. Terry Bailey Foremost Development Company Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink Date: August 29, 214 Re: Proposed Apartments City of Walled

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

Intersection Traffic Control Feasibility Study

Intersection Traffic Control Feasibility Study Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property

Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property Prepared for: Premier Gold Mines Limited Prepared by: Stantec Consulting Ltd. November 2014

More information

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT Prepared by: In Association with: November 2013 EXECUTIVE SUMMARY Patton Township, in partnership

More information

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 Prepared by Planning and Research Division Arkansas State

More information

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny

More information

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny

More information

Signal Warrant Studies

Signal Warrant Studies Signal Warrant Studies Seven Locations Piqua, Ohio December 12, 217 Signal Warrant Studies Seven Locations Piqua, Ohio TABLE OF CONTENTS Executive Summary... 3 Introduction... 5 Study Location... 5 Data

More information

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012 Update for the May 31 st, 2012 Traffic Impact Study Prepared for Broccolini Construction 111-23596-00 September 20 th, 2012 2611 Queensview Drive, Suite 300, Ottawa, Ontario CANADA K2B 8K2 Telephone: 613-829-2800

More information

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

Gene Dillon Elementary School Traffic Study Division Street Site

Gene Dillon Elementary School Traffic Study Division Street Site To: From: Dr. James Hess, Superintendent Jordan Schwarze, PE, Senior Engineer Matt Pacyna, PE, Senior Associate Date: March 30, 2016 Subject: Gene Dillon Elementary School Traffic Study reet Site Memorandum

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE COMMITTEE ACTION ITEM

BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE COMMITTEE ACTION ITEM BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE COMMITTEE ACTION ITEM Date of Meeting: May 12, 2017 # 1 SUBJECT: ELECTION DISTRICT: Response to Board Member Initiative: Safety Concerns for Left Hand Turn

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

Figure 1 in the attachments shows the location of the study intersections and the general area of study.

Figure 1 in the attachments shows the location of the study intersections and the general area of study. Technical Memorandum To: Jenny Max, City of Nisswa From: Bryant Ficek, PE, PTOE Max Moreland, PE Date: July 16, 218 Re: CSH 77/Nokomis venue rea Traffic Study Existing Conditions Grand View Lodge on Gull

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM To: Martha White, Natick Town Administrator February 17, 2011 Eric Nascimento, MassDOT

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis MEMORANDUM Transportation Bill Troe, AICP Jason Carbee, AICP 12120 Shamrock Plaza Suite 300 Omaha, NE 68154 (402) 334-8181 (402) 334-1984 (Fax) To: Project File Date: Subject: Solberg Avenue / I-229 Grade

More information

Traffic Impact Study Flathead County Rail Park Kalispell, Montana DRAFT. Prepared for Flathead County Economic Development Association

Traffic Impact Study Flathead County Rail Park Kalispell, Montana DRAFT. Prepared for Flathead County Economic Development Association Flathead County Rail Park Kalispell, Montana DRFT Prepared for Flathead County Economic Development ssociation Prepared by KLJ May 2013 KLJ Project # 15413003 CERTIFICTION I hereby certify that this traffic

More information

Multnomah County Courthouse Relocation. Transportation Alternatives Analysis Technical Memorandum: FINAL

Multnomah County Courthouse Relocation. Transportation Alternatives Analysis Technical Memorandum: FINAL Multnomah County Courthouse Relocation Portland, Oregon Transportation Alternatives Analysis Technical Memorandum: FIL Prepared for Multnomah County Facilities and Property Management Division 41 N Dixon

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY 675 Millcreek Drive, Unit 1 Mississauga, Ontario L5N 5M4 T: 416.213.7121 F: 95.89.8499 www.transtech.co TRAFFIC IMPACT STUDY PROPOSED MOSQUE DEVELOPMENT 4269 REGIONAL ROAD 25 TOWN OF OAKVILLE PREPARED

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

Date: April 7, 2015 To: Chris Hartzell, PE Dakota County, MN From: Jacob Bongard, PE Bolton & Menk, Inc. Subject: Traffic Considerations Memorandum

Date: April 7, 2015 To: Chris Hartzell, PE Dakota County, MN From: Jacob Bongard, PE Bolton & Menk, Inc. Subject: Traffic Considerations Memorandum M E M O R A N D U M Date: April 7, 2015 To: Chris Hartzell, PE Dakota County, MN From: Jacob Bongard, PE Bolton & Menk, Inc. Subject: Traffic Considerations Memorandum I. Introduction The objective of

More information

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS STAFF REPORT OF: January 6, 2019 SUPERVISORIAL DISTRICT: 5 SUBJECT: LOCATION: INVESTIGATOR: O Neill Drive at Roanoke Drive; Ladera Ranch; TB 922-E6 Clever

More information

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff Arterial Traffic Analysis Some critical concepts Prepared by Philip J. Tarnoff Agenda Fundamentals Signal timing concepts Actuated signal controllers Developing timing plans Types of signal control First

More information

Appendices. Appendix J: Traffic Study

Appendices. Appendix J: Traffic Study Appendices Appendix J: Traffic Study The Platinum Triangle Subsequent EIR The Planning Center Appendices This page intentionally left blank. The Platinum Triangle Subsequent EIR The Planning Center TRAFFIC

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY TRAFFIC IMPACT STUDY for the GLEN ELLEN COUNTRY CLUB SENIOR RESIDENTIAL REDEVELOPMENT 84 Millis, Massachusetts Prepared by: McMahon Associates, Inc. Prepared for: Toll Brothers, Inc. August 216 DRAFT

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

FINAL Albertville Business Park AUAR Update Traffic Study

FINAL Albertville Business Park AUAR Update Traffic Study FINAL Albertville Business Park AUAR Update Traffic Study Prepared for City of Albertville, MN July 20, 2017 SRF No. 10060.00 Table of Contents Introduction... 1 Existing Conditions... 1 Data Collection...

More information

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015 Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative

More information

George Street Transportation Impact Study. Paradigm Transportation Solutions Limited

George Street Transportation Impact Study. Paradigm Transportation Solutions Limited George Transportation Impact Study Paradigm Transportation Solutions Limited January 217 Project Summary Project Number 16191 January 217 Client Wastell Homes 5-1895 Blue Heron Drive London ON N6H 5L9

More information

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: 1649362 Ontario Inc. c/o Manor Park Management 231 Brittany Drive, Suite D Ottawa ON K1K 0R8 July

More information

Route 29 Corridor Assessment Update. Development of Possible Solutions

Route 29 Corridor Assessment Update. Development of Possible Solutions Route 29 Corridor Assessment Update Development of Possible Solutions Public Workshop #3 October 27, 2016 Purpose of Developing Possible Solutions Recap of where we ve been and timeline for moving forward

More information

Capital Region Council of Governments

Capital Region Council of Governments March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry

More information

Intersection Improvement Study Nixon, Green, and Dhu Varren Roads

Intersection Improvement Study Nixon, Green, and Dhu Varren Roads City of Ann Arbor Intersection Improvement Study Nixon, Green, and Dhu Varren Roads ` i Contents 1 Introduction...1 1.1 Study Location... 1 1.2 Purpose of Study and Scope... 3 1.3 Background Information...

More information

Travel Demand Management Plan

Travel Demand Management Plan Travel Demand Management Plan Linden Corner at 43 rd Street & Upton Avenue South AUTHORIZED PROPERTY REPRESENTATIVE: By Dated: Mark Dwyer Linden Hills Redevelopment, LLC 4632 Washburn Avenue South Minneapolis,

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 11 Parsippany, NJ 754 862.27.59 PREPARED

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building

SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building State University of New York at Albany City of Albany,

More information

US-6 Spanish Fork Fact Finding Study. December 2017

US-6 Spanish Fork Fact Finding Study. December 2017 US-6 Spanish Fork Fact Finding Study December 2017 US-6 Spanish Fork Fact Finding Study Avenue Consultants December 2017 US-6 Spanish Fork Fact Finding Study December 2017 Table of Contents 1 Introduction...

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

FAIRFIELD - RYAN S CORNER TRAFFIC IMPACT ANALYSIS LOUDOUN COUNTY, VIRGINIA

FAIRFIELD - RYAN S CORNER TRAFFIC IMPACT ANALYSIS LOUDOUN COUNTY, VIRGINIA FAIRFIELD - RYAN S CORNER TRAFFIC IMPACT ANALYSIS LOUDOUN COUNTY, VIRGINIA Submitted on behalf of: Fairfield Residential Prepared by: Wells + Associates, Inc. 1420 Spring Hill Road, Suite 00 McLean, Virginia

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Michigan Avenue Traffic Study

Michigan Avenue Traffic Study City of Sarnia Michigan Avenue Traffic Study Final Report November 29, 218 B17 SUBMITTED BY CIMA CANADA INC. 4 327 Harvester Road Burlington, ON L7N 3G7 T 289 288-287 F 289 288-285 cima.ca CONTACT Stephen

More information

TRAFFIC SIGNAL WARRANT STUDY

TRAFFIC SIGNAL WARRANT STUDY TRAFFIC SIGNAL WARRANT STUDY 5 th STREET & ENCHANTED PINES DRIVE JANUARY 2013 TRAFFIC OPERATIONS ENGINEERING SERVICES/PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS INTERSECTION LOCATION MAP ii INTRODUCTION

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

ENKA INTERMEDIATE SCHOOL

ENKA INTERMEDIATE SCHOOL TRANSPORTATION IMPACT ANALYSIS Prepared for Buncombe County Schools ENKA INTERMEDIATE SCHOOL Asheville, NC Project Number: 13-71 8/1/13 www.davenportworld.com DAVENlORT Transportation Impact Analysis Enka

More information