1 T h e V il l a g e V o ic e AN INITIAL UPDATE FROM THE VILLAGE SHORELINE PROTECTION COMMMITTEE; The beaches of Bald Head Island are critical to the stakeholders of the island from an environmental, aesthetic and an economic standpoint. Without healthy and sustainable beaches, the vitality of the Bald Head experience and investment is compromised. The purpose of this brief communication is to: - Update BHI stakeholders on the current state of the beaches; Present ent issues which impact success in protecting our shoreline; Detail efforts made to-date date and still on on-going to confront the erosion challenge; Consider what s ahead. WHERE WE STAND: Despite years of work and effort by the Village Council, Village S Staff, taff, and Committee volunteers, the state of our beaches remains fragile. So far, our best efforts have yet to yield the optimal outcomes in many instances due to a variety of reasons. Man-made made erosion due to the creation of the Cape Fear River Channel bby y the U.S.Army Corps of Engineers (USACE) to access the Port of Wilmington remains the key focus. Based on research and studies by scientists, coastal engineers, and other experts, the Channel adversely impacts the beaches closest to it, specifically South Sou Beach, The Point, and West Beach. Moreover, it has interrupted the natural littoral flow of sand from sources west of BHI. Thus, the vitality of those beaches is directly linked to the development and maintenance of the USACE navigation Channel. Moree detailed information is presented in the Mayor s response to Monitoring Report No. 7 on the Village website: The Cape Fear River inlet is naturally a shallow water inlet that has be been en substantially altered by the USACE. The current authorized depth of 44 feet is three times deeper than the natural river channel and the Channel width, 650 feet in some areas, is much wider than the natural river Channel. The Corps expansion of the navigation vigation Channel to deep water levels has added significant instability to the river inletinlet including the neighboring BHI beaches. USACE dredging has stabilized the location of the Channel in one location but has resulted in significant changes and instab instability ility in the movement of sand within the inlet as nature attempts to rere establish equilibrium. That may be impossible considering the current and projected dimensions of the navigation Channel within the narrow opening between BHI and Ft. Caswell. Accelerated man-made made erosion directly attributable to the dredging of the Channel puts our beaches at great risk. The USACE maintains the Channel to specific width and depth dimensions to accommodate ships going and coming from Wilmington and Sunny Point. This dredging, at times only yards from our shoreline, cuts into the toe of the island, greatly increasing the pace and severity of the consequential erosion. As a remedy, the Village, and three other communities, negotiated the Sand Management Plan in BHI also resolved litigation it brought against the USACE with a Settlement Agreement in March, 2005, regarding certain sand placement, ongoing studies, and communication. Under the Sand Management Plan, the USACE agreed to dredge the channel on a six-year year cycle with three dredging events, each two years apart. The Sand Management Plan specified BHI would get sand from the first two successive bi-annual bi dredging events and Caswell Beach and Oak Island would get sand from the third dredging. This arrangement ar was to be reviewed if a problem occurred or upon completion of the cycle. However, lack of federal funds for dredging in 2004 and 2010 have delayed the cycle and it is only now being reviewed at the ten year mark. Also, because of

2 insufficient federal funds in the 2007 dredging event, the Village and State were called upon to partially underwrite the costs. Furthermore, in 2009 a serious problem, which had been anticipated, was encountered. Based on the six-year cycle, BHI received sand in 2005 and 2007 (see table below). Year Volume Location /- Mcy Cape Fear Trail to Sea Holly Trail /- Mcy Cape Fear Trail to Coquina /- Mcy Cape Fear Trail to Muscadyne /- Mcy South Beach (Sta to ) /- Mcy South Beach (Sta to ) ,800 cy West Beach (Sta to 34+00) /- Mcy South Beach (Sta to ) Caswell Beach/ Oak Island received sand in Although BHI was due to receive sand again in 2011, by early 2009, our beaches required nourishment. In fact, we now believe, absent any intervening factor such as a structure or Channel relocation our beaches require nourishment at a minimum every two years. Having anticipated we could not go four years without sand nourishment, our Village Council, successfully executed an engineered beach strategy, whereby taxpayers purchased 1.5 million cubic years of sand, financed through General Obligation Bonds. The sand source was nearby Jay Bird Shoals, rather than the Channel itself. This sand countered the severe erosion related to the Corps 2009 dredging effort. But the damage from the 09 dredging was severe, tragically losing some landmark dunes, private property, and public infrastructure. Beyond the much needed protection the engineered beach sand provided our threatened beaches, BHI was to receive its normal two year cycle of sand under the SMP during the early months of However, the USACE did not receive funds under the Federal Budget to pay for this contractual obligation and the available dredging funds went to Channel locations perceived by the Corps, Pilots, and State Port Authority as a greater threat to navigation. Disappointingly, the efforts of our US Senate and Congressional Representatives did not succeed in getting deserved funding through the appropriation processes. This means we are at risk until nourishment reoccurs. ISSUES IMPACTING THE OUTCOME: Sand Supply: A barrier island is, by nature, an unstable body. Every healthy barrier island requires viable and sustainable sand sources for its nourishment and maintenance. The natural littoral flow of sand from Caswell Beach to Bald Head was permanently interrupted and halted by the USACE navigation Channel. Without a sand supply from a natural source of sand, BHI is vulnerable to the ravages of nature and man alike. There are some potential sand sources within feasible distance of our beaches, including Jay Bird Shoals, Bald Head Island Shoals, Smith Island Shoals and even Frying Pan Shoals. These built-up, sand laden shoals serve as natural protectors of BHI, absorbing the energy of wind, tide, currents, and waves. Under normal circumstance, Bald Head Island Shoals would naturally nourish South and West Beaches, but as sediment movement from west to east is interrupted, because of the deepened Channel, the protecting shoals are diminished, resetting the critical dynamics of erosion including the volume and the depth of water, the tidal flow intensity, the water velocity, and the water current. These changing dynamics help explain the carving of sand off of our beaches.

3 T h e V il l a g e V o ic e Groins Geotextile, Timber, and otherwise: BHI does have man-made made structures near The Point and north of the Harbor entrance designed to reduce and retard erosion and to stabilize the beaches. Currently, we have sixteen non-permanent permanent geotextile groins, recently reconstructed as part of the engin engineered eered beach project and four timber groins, soon to be repaired. Additionally, there are a significant number of temporary sandbags buried alongside South Bald Head Wynd to protect Village infrastructure. It is presently unclear whether or not an engin engineered eered permanent structural solution could protect our beaches while making the Channel more navigable by reducing the rate of sand loss. Although this type of hardened terminal groin or jetty is not, as a general rule, allowed in North Carolina by existi existing ng statute, Bald Head Island may have such a structure for navigation Channel purposes. Also, channel jetties exist, and appear to function well, at several North Carolina locations. It is hoped that studies underway will provide the data and modeling with which to examine this option. Section 216 Study: Section 216 of the Water Resources Development Act (WRDA) authorizes the Corps to review existing projects and make reports to Congress when found advisable due to significantly changed physical or economic omic conditions, or for improving the quality of the environment in the overall public interest. The USACE has given us the good news their Initial Appraisal of the Channel has led to the positive finding that a Reconnaissance Study should be conducte conducted. d. That may lead to a Full Feasibility Study of implementing solutions to problems at Channel segments near BHI. This has the potential to offer both the Corps and Bald Head Island solutions to problems related to the Channel. The Reconnaissance Study Study report is expected to issue in December That report will merely determine whether or not there is sufficient federal interest to proceed to a Feasibility Study. Sand Management Plan Modifications: The current Sand Management Plan is being reviewed revi at present by the USACE, with its report to issue in late April 2011, as part of Monitoring Report 8. This is a potentially positive milestone for BHI, if it is determined that changes in sand management should be made to benefit BHI beaches. Sufficient nt data should be available to more precisely inform the judgment of what the Channel s proportional impact is between communities and what adjustments are needed. Other beach communities are stakeholders in this process and will provide input, along with BHI. (Bald Head Island, Oak Island, Caswell Beach, and Holden Beach). Competing Priorities: As we are seeing from this year s absence of federal dredging funding, dredging and management of the Channel near BHI depends on adequate funding. This must be obtained on an on-going on basis through the Federal budget or through the appropriations process. Due to funding scarcity, it is subject to project prioritizing by the Corps. This means the NC Ports Authority and the Corps may judge the need for Channel dredging as less pressing than other projects for which they seek funding, putting them in possible opposition to our Island s interests. Additionally, the amount of sand in the Channel at the time of funding is sought can make a difference, as the Corp does not dredge the Channel in order to give BHI sand; it does so to remove sand that could be a hindrance to navigation. Village Affordability: The financing of the recent engineered beach project demonstrates clearly how expensive it is for our Villagee to underwrite the costs of beach nourishment. It is both expensive and unaffordable on a regular basis. Placing this financial burden on the Government is appropriate, since it is their Channel operated and maintained for national and State interest interestss related to both defense and commerce. The remedy for collateral damage inflicted on our island by such operation and maintenance should be the responsibility of the Corps.

4 Future Expansion of Navigation: If the Channel is deepened and widened in order to accommodate future Federal navigational requirements, it is likely that inlet instability, Channel shoaling, and beach erosion will worsen, if not remedied. Relocation of the Channel further away from BHI or a precisely-engineered marine structure could lessen the impact but these approaches may have other consequences not understood at this point. Computer modeling efforts might provide insight to these solution options. Environmental Impact: The area surrounding the navigation channel is a pristine environmental treasure: thousands of acres between the developed portion of BHI and the Ft. Fisher Recreation Area are protected areas controlled by preservation orders. The Wilmington Harbor Project, including the expansion and re-alignment of the Channel in 2000, had known adverse environmental impact to BHI beaches that, ten years later, is still being mitigated by the Corps. The implication of the Channel relative to the environment is an important concern. ACTIONS TAKEN BY THE VILLAGE TO PROTECT THE ISLAND: In the face of a daunting and complex situation, one with dozens of elements to understand and manage, the Village has taken an aggressive approach to protect our shoreline, including the following measures: Shoreline Protection Manager Position: Chris McCall, Assistant Village Manager, was appointed Shoreline Protection Manager earlier this year. He acts as a liaison with the USACE, works with our coastal engineering consultant, as well as with our attorneys and lobbyists. Additionally, Chris oversees all beach-related projects, stays in effective contact with the many State agencies with jurisdictional authority, and works to keep the Village Council and the Village Shoreline Protection Committee informed on all matters related to the beach and its protection. Village Shoreline Protection Committee: The Village Shoreline Protection Committee (VSPC) is a standing committee charged by the Village Council to lead the efforts to protect our beaches. Comprised of seven volunteer members, Mayor Sayre and Councilman Douglas as liaison members, and Shoreline Protection Manager, Chris McCall, the committee meets twice monthly and on an as needed basis. The VSPC consults with and advises the Village on issues affecting the beach and has aggressively explored a wide variety of approaches to our erosion problem. Pursuit of Funding / Influencing Opinion: The Village engaged the services of two separate lobbying organizations for both State and Federal issues. Working with these consultants and with the Village legal team, we aggressively pursued FY2011 funding for dredging and other shoreline protection related purposes. Funds for operation and maintenance dredging, although included in the USACE budget request, was not part of the Presidential budget created by the Office of Budget and Management. Similarly, efforts by our elected Congressional and Senate representatives did not produce appropriations that would fund the government contractual obligations to maintain the Channel. On a more positive note, through the efforts of Senator Hagan, $600,000 is currently ear-marked for funding important Channel studies. As the final budget has not yet been approved, this appropriation is not a certainty. In addition to these efforts to be included in the budget and in that absence, in an appropriation, the Committee is working with the Village Finance Committee to find alternative funding through State and county sources. Going forward, stakeholders should expect to be urged to contact those individuals and organizations who might support our island s interests. Such grass roots lobbying can be an effective tool. Negotiations with USACE: Continuing discussions with the Army Corp of Engineers have produced mixed results. Ongoing and cooperative efforts include the study of concerns about the Channel through Section 216 and potential modifications to the Sand Management Plan. However, there are significant conflicting views on causation, contractual obligations, and solutions. If meaningful success is not achieved through continuing negotiations, more forceful legal remedies will be considered on a timely basis.

5 T h e V il l a g e V o ic e Timber Groin Repairs: The Village, in partnership with BHI Ltd and the Harbor Association, has started the process of repairing the wooden groins oins placed on west beach, north of the entrance to the harbor. These protective devices have deteriorated markedly and the permit is being secured and the repair logistics arranged to restore their effectiveness. Dredging Bald Head Creek: As there is no funding for the Corps maintenance dredging of the Channel this cycle, depriving BHI of beach nourishment, the Village is in the final phase of securing the necessary permits to dredge no more than 100,000 cubic yards of sand from the mouth of Bald Head C Creek. reek. This amount of sand is only a fraction of what we otherwise would expect from cyclical SMP nourishment. However, it could be helpful in an emergency situation to limit the damage from storm storm-related related erosion threatening homes or infrastructure. Opposition to the NCIT: Following a thorough review of the likely impact upon BHI of the North Carolina International Terminal (NCIT), a mega--port port at Southport, including consultation with all key BHI groups, the Village joined several other area beach comm communities unities in opposition to the proposed NCIT. Communications: The Village has appointed a standing Communications Committee to facilitate better and more effective communications with all stakeholders. Efforts are underway to develop an e listing for each BHI property owner that will become the key link for electronic communications. Improving this direct link between the Village and its stakeholders will help maximize our chance for success in protecting our shoreline. WHAT S AHEAD? Winter 2011: First, without the sand we expected from the cyclical nourishment this winter, we face a difficult period, forcing us to rely on good fortune to keep damaging storms away or to a minimum. While we have had mild winters in the past, reality suggests we ccould ould have some damage to both private property and public infrastructure. The severe erosion of winter 09 was caused not by seasonal storms as much as by the dredging of the Channel mere yards from our shore, with sand placement at Oak Island/ Caswell Beach Be under the terms of the SMP. It is some consolation, but not much, that no such dredging into the toe of our island will happen this winter. Bald Head Creek: As mentioned in this article, the Village expects to have a permit to dredge the entrance to Bald ald Head Creek, harvesting no more that 100,000 cubic yards. This is roughly 1/15th of the sand we would otherwise expect to receive from our normal cyclical nourishment and will be of limited remedy to address hot spots as they appear. Shoaling: The Corp of Engineers mission fixes their attentions on maintaining the Channel for commercial and defense shipping, not on placing sand on depleted beaches flanking the Channel. Our review of the publicly available data suggests the Channel is reaching its ssaturation aturation point for sand density, beyond which it hinders navigation and poses a threat to shipping. If that point is reached prior to the next normally scheduled dredging, the Corp would have to respond quickly in an expedient emergency manner, by by-passing ing normal process and funding sources. Conceptually, such a status could bend to our favor with our beaches being a preferred destination of sand removed by hopper dredge on an urgent basis. But such a sequence of events cannot be relied upon.

6 Section 216 of WRDA: The USACE has given us the good news their Initial Appraisal of the Channel has led to a positive finding that further study is needed. Accordingly, the next step in the process is to move forward with a Reconnaissance Study which may lead to a Feasibility Study. This Section 216 process offers legitimate hope for a meaningful middle-to-long term solution. The Corps has advised the Village that it has the funds necessary to complete the Reconnaissance Study. Additionally, money identified in a $600,000 appropriation, secured through the efforts of Senator Hagan, may fund other important studies related to our shoreline protection. While the time frame from start to finish may be five years or more, implementing a solution to the beach erosion problem makes this a positive development. SMP 10 Year Review: The ten year review and related modifications to the SMP are other potentially positive developments in this effort. We expect to be given some glimpse into the Corps thinking early in Of course, improving the terms of a contract that can be easily avoided by failure to fund the dredging obligation still leaves us vulnerable without a permanent remedy such as a structured solution or moving the Channel. Recognizing the importance of securing O&M funding annually, the Village has intensified its lobbying efforts with sharper and better strategies informed by our experience. We are working on timely basis to be funded under the President s budget put together by the Office of Management and Budget, considering such inclusion a preferred result to competing for appropriation or ear-marked money. In either case, economic realities and trends suggest no easy access to money going forward. Alternative Funding: Another summary point to mention is the effort to seek alternative funding from the State of North Carolina and from Brunswick County. Considering the essential economic contributions made by the beach communities, in general, and Bald Head Island, in particular, supporting these economics engines is a matter of self-interest to the State and county. Suffice it to say, there is a tremendous inequity between funding rendered to Brunswick County by Bald Head Island and what is returned. A strategy to present our case effectively is being considered. Legal Action: The final point to share relates to any legal action undertaken by the Village to protect its interests. As is publicly known, the Village, through its attorneys, has provided appropriate notice to certain parties of the potential to file suit and this remains an option. However, it is not appropriate to share details of such tactical thinking in this particular news piece. All of the individuals drawn together in this effort remain committed to do all they can to protect the shoreline of Bald Head Island and to preserve and enhance the quality of the Bald Head Island experience for its stakeholders. Your input and support throughout this process is very important, and you are encouraged to keep abreast of the issue and activity through the Village website, By going to the section for the Village Shoreline Protection Committee, you can read the minutes of the Committee meetings, all of which are open to the public, and other documents. You can express your views easily by to any of the Committee members directly or by village@villagebhi.org.

MOREHEAD CITY HARBOR, NC. Dredged Material Management Plan (DMMP)

MOREHEAD CITY HARBOR, NC. Dredged Material Management Plan (DMMP) MOREHEAD CITY HARBOR, NC Dredged Material Management Plan (DMMP) Public Meeting/Info Session 15 January 2014 US Army Corps of Engineers Morehead City Harbor DMMP Presentation Topics Morehead City Harbor

More information

CORPS ON THE COAST. North Carolina Coastal Conference Coastal Infrastructure Raleigh, NC April 14, Jim Medlock Chief, Programs Management Branch

CORPS ON THE COAST. North Carolina Coastal Conference Coastal Infrastructure Raleigh, NC April 14, Jim Medlock Chief, Programs Management Branch CORPS ON THE COAST North Carolina Coastal Conference Coastal Infrastructure Raleigh, NC April 14, 2015 Jim Medlock Chief, Programs Management Branch US Army Corps of Engineers OVERVIEW What Are The Corps

More information

Regular Workshop October 20, 2014 Agenda Item: Dr. Albert E. Browder, PE; Olsen Associates, Inc.

Regular Workshop October 20, 2014 Agenda Item: Dr. Albert E. Browder, PE; Olsen Associates, Inc. Regular Workshop October 20, 2014 Agenda Item 8 Agenda Item: Presenter: Summary: Beach Update Town Manager; Dr. Albert E. Browder, PE; Olsen Associates, Inc. At the January 21, 2014 Regular Workshop Meeting,

More information

FINAL ENVIRONMENTAL IMPACT STATEMENT ON BROWARD COUNTY SHORE PROTECTION PROJECT SEGMENTS II AND III BROWARD COUNTY, FLORIDA

FINAL ENVIRONMENTAL IMPACT STATEMENT ON BROWARD COUNTY SHORE PROTECTION PROJECT SEGMENTS II AND III BROWARD COUNTY, FLORIDA FINAL ENVIRONMENTAL IMPACT STATEMENT ON BROWARD COUNTY SHORE PROTECTION PROJECT SEGMENTS II AND III BROWARD COUNTY, FLORIDA 1. PROJECT PURPOSE AND NEED 1.1. PROJECT AUTHORITY. 1.1.1. INITIAL AUTHORIZATION.

More information

ATLANTIC COUNTY 2006 to 2008

ATLANTIC COUNTY 2006 to 2008 ATLANTIC COUNTY 2006 to 2008 The Atlantic County oceanfront shoreline consists of three barrier islands where the northern one, Little Beach Island and a third of the second, Brigantine Island, are undeveloped

More information

Delaware Chapter Surfrider Foundation - Indian River Inlet Monitoring

Delaware Chapter Surfrider Foundation - Indian River Inlet Monitoring Delaware Chapter Surfrider Foundation - Indian River Inlet Monitoring In 2012, the Delaware Surfrider Foundation Chapter formed the Surf Quality and Access Committee to focus on issues such as surf spot

More information

CRC Inlet Management Study. Matt Slagel Shoreline Management Specialist

CRC Inlet Management Study. Matt Slagel Shoreline Management Specialist CRC Inlet Management Study Matt Slagel Shoreline Management Specialist Study Origin CRC shall study feasibility of creating new AEC for lands adjacent to mouth of Cape Fear River (HB 819) Collaborate with

More information

Inlet Management Study for Pass-A-Grille and Bunces Pass, Pinellas County, Florida

Inlet Management Study for Pass-A-Grille and Bunces Pass, Pinellas County, Florida Inlet Management Study for Pass-A-Grille and Bunces Pass, Pinellas County, Florida Final Report Submitted By Ping Wang, Ph.D., Jun Cheng Ph.D., Zachary Westfall, and Mathieu Vallee Coastal Research Laboratory

More information

Long Term Success and Future Approach of the Captiva and Sanibel Islands Beach Renourishment Program

Long Term Success and Future Approach of the Captiva and Sanibel Islands Beach Renourishment Program 2017 National Conference on Beach Preservation Technology February 8-10, 2017; Stuart, Florida Long Term Success and Future Approach of the Captiva and Sanibel Islands Beach Renourishment Program Thomas

More information

Mouth of the Columbia River Jetties Three-Phase Construction Plan

Mouth of the Columbia River Jetties Three-Phase Construction Plan Mouth of the Columbia River Jetties Three-Phase Construction Plan Project Overview October 9, 2012 US Army Corps of Engineers MCR Jetties Major Rehabilitation Sand Island pile dikes 1930-1935 Columbia

More information

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD ST. LOUIS SECTION PROJECT OF THE YEAR AWARD Originality and Innovation The St. Louis Harbor Project is located in the Upper Mississippi River between the entrance to the Chain of Rocks Canal at River

More information

Building Coastal Resiliency at Plymouth Long Beach

Building Coastal Resiliency at Plymouth Long Beach Building Coastal Resiliency at Plymouth Long Beach Department of Marine and Environmental Affairs March 30, 2017 Introducing Green Infrastructure for Coastal Resiliency Plymouth Long Beach & Warren s Cove

More information

KEYNOTE PRESENTATION FSBPA olsen

KEYNOTE PRESENTATION FSBPA olsen AMELIA ISAND, FLORIDA BEACH MANAGEMENT PARTNERING AND PERSERVERENCE Erik Olsen, PE associates, inc. KEYNOTE PRESENTATION FSBPA 2009 IN ORDER TO ADDRESS SHORE PROTECTION TODAY LOCAL INTERESTS PARTNER WITH:

More information

Estimated on-the-ground start and end dates: 1 June October 2018

Estimated on-the-ground start and end dates: 1 June October 2018 A. Applicant Information Name of Organization: U.S. Army Corps of Engineers, Carlyle Lake 801 Lake Road, Carlyle, IL 62231 Contact Information: Robert Wilkins, Operations Manager, (618) 594-2484, Robert.Wilkins@usace.army.mil

More information

Figure79. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 155

Figure79. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 155 154 Figure79. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 155 ATLANTIC COUNTY SPRING 2009 to FALL 2010 The Atlantic County coastline consists of three barrier islands. Between Little

More information

Volume and Shoreline Changes along Pinellas County Beaches during Tropical Storm Debby

Volume and Shoreline Changes along Pinellas County Beaches during Tropical Storm Debby Volume and Shoreline Changes along Pinellas County Beaches during Tropical Storm Debby Ping Wang and Tiffany M. Roberts Coastal Research Laboratory University of South Florida July 24, 2012 Introduction

More information

BALD HEAD ISLAND, NC SAND SHARING SYSTEM OVERVIEW AND ASSESSMENT. Erik J. Olsen, P.E. olsen associates, inc.

BALD HEAD ISLAND, NC SAND SHARING SYSTEM OVERVIEW AND ASSESSMENT. Erik J. Olsen, P.E. olsen associates, inc. BALD HEAD ISLAND, NC SAND SHARING SYSTEM OVERVIEW AND ASSESSMENT Erik J. Olsen, P.E. Olsen Associates, Inc. BACKGROUND Both the Village of Bald Head Island (VBHI) and the Bald Head Island Limited, LLC.

More information

Town of Duck, North Carolina

Town of Duck, North Carolina Tracking No. 00.00.2010 Erosion Mitigation And Shoreline Management Feasibility Study Town of Duck, North Carolina Coastal Planning & Engineering of North Carolina August 15, 2012 Tom Jarrett Robert Neal

More information

SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT

SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT Department of the Army New England District, Corps of Engineers 696 Virginia Road

More information

North Shore of Long Island, Feasibility Study

North Shore of Long Island, Feasibility Study North Shore of Long Island, Asharoken New York Asharoken, Feasibility Study Asharoken, NY Public Meeting June 30, 2015 US Army Corps of Engineers US Army Corps of Engineers New York BUILDING STRONG BUILDING

More information

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE 8-FOOT CHANNEL OF THE FEDERAL NAVIGATION PROJECT IN KENNEBUNK RIVER KENNEBUNK & KENNEBUNKPORT, ME

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE 8-FOOT CHANNEL OF THE FEDERAL NAVIGATION PROJECT IN KENNEBUNK RIVER KENNEBUNK & KENNEBUNKPORT, ME fr.iiif.i ~ US Anny Corps of Engineers New England District 696 Virginia Road Concord, MA 01742-2751 Public Notice In Reply Refer to: Mr. Jack Karalius nae-pn-nav@usace.army.mil Programs/Project Management

More information

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M) Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M) Shallow draft coastal harbors include a subsistence harbor at Silver Lake CONGRESSIONAL DISTRICT: NC 3 and 7 DATE: 23 February 2015 1.

More information

New Jersey Beach Profile Network Atlantic County Profile Site Locations

New Jersey Beach Profile Network Atlantic County Profile Site Locations 215 RICHARD STOCKTON COLLEGE OF NEW JERSEY New Jersey Beach Profile Network Atlantic County Profile Site Locations COASTAL RESEARCH CENTER Figure 128 There are nine NJBPN survey sites on the Atlantic County

More information

APPENDIX M DREDGED MATERIAL MANAGEMENT PLAN (DMMP) FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT

APPENDIX M DREDGED MATERIAL MANAGEMENT PLAN (DMMP) FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT APPENDIX M DREDGED MATERIAL MANAGEMENT PLAN (DMMP) Brazos Island Harbor, Texas Channel Improvement Study FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT This page is intentionally left

More information

COUPLED MANAGEMENT STRATEGY LAKE CATHIE ESTUARY & COAST

COUPLED MANAGEMENT STRATEGY LAKE CATHIE ESTUARY & COAST Lake Cathie Progress Association Inc. ABN 28 251 433 854 P.O. Box 247 Lake Cathie NSW 2445 PHONE/FAX: 02 6584 8211 EMAIL: r3packag@bigpond.com 20 th October 2009 Port Macquarie Hastings Council PO Box

More information

Q1. What are the primary causes/contributors to coastal erosion at Westshore and the concept of longshore / littoral drift.

Q1. What are the primary causes/contributors to coastal erosion at Westshore and the concept of longshore / littoral drift. Q1. What are the primary causes/contributors to coastal erosion at Westshore and the concept of longshore / littoral drift. In order of (timing related) contribution to present problem 1. Beach is too

More information

23- Year Sand Volume Changes at Site 132, 15th Street, Brigantine

23- Year Sand Volume Changes at Site 132, 15th Street, Brigantine 149 Figure75. Location map for the 9 NJBPN profile sites in Atlantic County, NJ ATLANTIC COUNTY SPRING 2008 to FALL 2009 150 The Atlantic County oceanfront shoreline consists of three barrier islands.

More information

Building Beaches with Navigation Sand, Just Don t Forget the Dunes!!

Building Beaches with Navigation Sand, Just Don t Forget the Dunes!! Building Beaches with Navigation Sand, Just Don t Forget the Dunes!! Ken Willson Kenneth.Willson@CBI.com Introduction Decrease in Federal Funding (Shallow Draft Navigation Maintenance and Shore Protection)

More information

SPECIAL SPRING 2018 STORM REPORT ON THE CONDITION OF THE MUNICIPAL BEACHES FOR THE BOROUGH OF STONE HARBOR, CAPE MAY COUNTY, NEW JERSEY

SPECIAL SPRING 2018 STORM REPORT ON THE CONDITION OF THE MUNICIPAL BEACHES FOR THE BOROUGH OF STONE HARBOR, CAPE MAY COUNTY, NEW JERSEY SPECIAL SPRING 2018 STORM REPORT ON THE CONDITION OF THE MUNICIPAL BEACHES FOR THE BOROUGH OF STONE HARBOR, CAPE MAY COUNTY, NEW JERSEY Aerial photograph taken April 21, 2018 showing the view up the beach

More information

4/20/17. #32 - Coastal Erosion Case Histories - Lake Michigan

4/20/17. #32 - Coastal Erosion Case Histories - Lake Michigan Writing Assignment Due Monday by 11:59 pm #32 - Coastal Erosion Case Histories - Lake Michigan See main class web pages for detailed instructions Submit papers Illinois Compass No copying: Compass will

More information

DUNE STABILIZATION AND BEACH EROSION

DUNE STABILIZATION AND BEACH EROSION DUNE STABILIZATION AND BEACH EROSION CAPE HATTERAS NATIONAL SEASHORE NORTH CAROLINA ROBERT DOLAN PAUL GODFREY U. S. DEPARTMENT OF INTERIOR NATIONAL PARK SERVICE OFFICE OF NATURAL SCIENCE WASHINGTON, D.

More information

INDEPENDENT EVALUATION GROUP - IFC APPROACH PAPER

INDEPENDENT EVALUATION GROUP - IFC APPROACH PAPER 82211 INDEPENDENT EVALUATION GROUP - IFC Evaluation of IFC s Private Enterprise Partnership Technical Assistance Program in the Former Soviet Union (PEP study). APPROACH PAPER A. Introduction 1. This evaluation

More information

ST. JOSEPH PENINSULA, GULF COUNTY, FLORIDA Beach Re-Nourishment and Environmental Enhancement Project RECOMMENDATIONS

ST. JOSEPH PENINSULA, GULF COUNTY, FLORIDA Beach Re-Nourishment and Environmental Enhancement Project RECOMMENDATIONS ST. JOSEPH PENINSULA, GULF COUNTY, FLORIDA Beach Re-Nourishment and Environmental Enhancement Project RECOMMENDATIONS January 23, 2018 543 Harbor Boulevard, Suite 204 Destin, Florida 32541 850.654.1555

More information

Coastal Hazards and Management in North Carolina. Braxton Davis April 14, 2015

Coastal Hazards and Management in North Carolina. Braxton Davis April 14, 2015 Coastal Hazards and Management in North Carolina Braxton Davis April 14, 2015 Coastal Facts and Figures 320 miles of ocean beaches 12,000+ miles of estuarine shoreline 2 million + acres of sounds, creeks,

More information

The 2017 Panama City Beaches Beach Interim Renourishment Project. Answers to Common Questions

The 2017 Panama City Beaches Beach Interim Renourishment Project. Answers to Common Questions The 2017 Panama City Beaches Beach Interim Renourishment Project The fourth renourishment of the Panama City Beaches will be under construction during March and April 2017, with a planned completion by

More information

Broad Beach Sand & Dune Habitat Restoration Project. Revetment Owners Meeting July 12, 2017

Broad Beach Sand & Dune Habitat Restoration Project. Revetment Owners Meeting July 12, 2017 Broad Beach Sand & Dune Habitat Restoration Project Revetment Owners Meeting July 12, 2017 Status of Project Entitlement Coastal Commission CDP approved 10/15 (consolidated with City of Malibu), PTI conditions

More information

Channel Turns. Cape Fear River

Channel Turns. Cape Fear River A Look at the Channel Turns in the Cape Fear River Revised November 5, 2011 Prepared for Save the Cape, Inc. Southport, North Carolina Contents The Channel in the Cape Fear River...2 Experience...7 Corps

More information

La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle

La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas Mark Coyle Corpus Christi Navigation Channel PCCA La Quinta Expansion Project History Corpus Christi Ship Channel Improvement Projects

More information

US Beach Nourishment Experience:

US Beach Nourishment Experience: Beach Nourishment: Introduction of new sand to the beach by truck or dredge Large beach >1 million cubic yards (100,000 dump truck loads) Funding is a combination of federal, state, local & private Also

More information

CLAM PASS ANNUAL RESTORATION & MANAGEMENT PLAN TIDAL ANALYSIS ELEMENT REPORT NO. 13

CLAM PASS ANNUAL RESTORATION & MANAGEMENT PLAN TIDAL ANALYSIS ELEMENT REPORT NO. 13 CLAM PASS ANNUAL RESTORATION & MANAGEMENT PLAN TIDAL ANALYSIS ELEMENT REPORT NO. 13 Submitted to: Pelican Bay Services Division Prepared by: Humiston & Moore Engineers H&M File No. 13-078 November 2012

More information

PHYSICAL MONITORING WILMINGTON HARBOR NAVIGATION PROJECT REPORT 1: August 2000 June 2003

PHYSICAL MONITORING WILMINGTON HARBOR NAVIGATION PROJECT REPORT 1: August 2000 June 2003 PHYSICAL MONITORING WILMINGTON HARBOR NAVIGATION PROJECT REPORT 1: August 2000 June 2003 AUGUST 2004 For questions or comment, contact Project Manager, Ms. Sharon Haggett, 910-251-4441 EXECUTIVE SUMMARY

More information

Impacts of breakwaters and training walls

Impacts of breakwaters and training walls Across the eastern seaboard of Australia, breakwaters and training walls have instigated fundamental perturbations to coastal and estuary processes. This has induced long-term changes to foreshore alignments,

More information

Beach Nourishment Impact on Beach Safety and Surfing in the North Reach of Brevard County, Florida

Beach Nourishment Impact on Beach Safety and Surfing in the North Reach of Brevard County, Florida Beach Nourishment Impact on Beach Safety and Surfing in the North Reach of Brevard County, Florida Prepared by John Hearin, Ph.D. Coastal Engineering Vice Chairman Cocoa Beach Chapter Port Canaveral Patrick

More information

Climate Change Impacts to KSC Launch Complex

Climate Change Impacts to KSC Launch Complex Climate Change Impacts to KSC Launch Complex Presented to: 2010 International Workshop on Environment and Energy By: John Shaffer NASA Environmental Management Branch Kennedy Space Center Hurricane Season

More information

OECS Regional Engineering Workshop September 29 October 3, 2014

OECS Regional Engineering Workshop September 29 October 3, 2014 B E A C H E S. M A R I N A S. D E S I G N. C O N S T R U C T I O N. OECS Regional Engineering Workshop September 29 October 3, 2014 Coastal Erosion and Sea Defense: Introduction to Coastal/Marine Structures

More information

USE OF SEGMENTED OFFSHORE BREAKWATERS FOR BEACH EROSION CONTROL

USE OF SEGMENTED OFFSHORE BREAKWATERS FOR BEACH EROSION CONTROL .. CETN-III-22 4/84 PURPOSE: USE OF SEGMENTED OFFSHORE BREAKWATERS FOR BEACH EROSION CONTROL To provide information on the functional application of and general design considerations for using offshore

More information

DRAFT. October 17, 2014 File No Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA.

DRAFT. October 17, 2014 File No Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA. GZA GeoEnvironmental, Inc. Engineers and Scientists October 17, 2014 File No. 18.0171857.00 Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA. 01929 DRAFT Re: Essex River

More information

County of Santa Barbara Permit Option Analysis Goleta Beach JULY 13, 2017

County of Santa Barbara Permit Option Analysis Goleta Beach JULY 13, 2017 County of Santa Barbara Permit Option Analysis Goleta Beach JULY 13, 2017 Introduction 2 Goleta Beach Park welcomes 1.5 million visitors annually Amenities include: Picnic Areas and Group Areas w/bbqs

More information

UPPER BEACH REPLENISHMENT PROJECT RELATED

UPPER BEACH REPLENISHMENT PROJECT RELATED ASSESSMENT OF SAND VOLUME LOSS at the TOWNSHIP of UPPER BEACH REPLENISHMENT PROJECT RELATED to the LANDFALL OF HURRICANE SANDY - PURSUANT TO NJ-DR 4086 This assessment is in response to Hurricane Sandy

More information

LAB: WHERE S THE BEACH

LAB: WHERE S THE BEACH Name: LAB: WHERE S THE BEACH Introduction When you build a sandcastle on the beach, you don't expect it to last forever. You spread out your towel to sunbathe, but you know you can't stay in the same spot

More information

A REVIEW OF THE CONDITION OF THE MUNICIPAL BEACHES AS A RESULT OF HURRICANE SANDY IN THE BOROUGH OF STONE HARBOR, CAPE MAY COUNTY, NEW JERSEY

A REVIEW OF THE CONDITION OF THE MUNICIPAL BEACHES AS A RESULT OF HURRICANE SANDY IN THE BOROUGH OF STONE HARBOR, CAPE MAY COUNTY, NEW JERSEY A REVIEW OF THE CONDITION OF THE MUNICIPAL BEACHES AS A RESULT OF HURRICANE SANDY IN THE BOROUGH OF STONE HARBOR, CAPE MAY COUNTY, NEW JERSEY View along the dune scarp from 103 rd Street on October 31,

More information

Nearshore Dredged Material Placement Pilot Study at Noyo Harbor, CA

Nearshore Dredged Material Placement Pilot Study at Noyo Harbor, CA 1 Nearshore Dredged Material Placement Pilot Study at Noyo Harbor, CA Noyo Cove N 2011 National Conference on Beach Preservation Technology 9-11, February 2011 Lihwa Lin, Honghai Li, Mitchell Brown US

More information

FINDING OF NO SIGNIFICANT IMPACT

FINDING OF NO SIGNIFICANT IMPACT DEPARTMENT OF THE ARMY CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A HAGOOD AVENUE CHARLESTON, SOUTH CAROLINA 29403-5107 FINDING OF NO SIGNIFICANT IMPACT EDISTO BEACH COASTAL STORM DAMAGE REDUCTION GENERAL

More information

TITLE: North Carolina s Changing Shorelines. KEYWORDS: erosion - shorelines - mapping - sustainability

TITLE: North Carolina s Changing Shorelines. KEYWORDS: erosion - shorelines - mapping - sustainability UNC Coastal Studies Institute Teacher Resources 1 TITLE: North Carolina s Changing Shorelines KEYWORDS: erosion - shorelines - mapping - sustainability Changing shorelines impact coastal infrastructure.

More information

EVALUATION OF BEACH EROSION UP-DRIFT OF TIDAL INLETS IN SOUTHWEST AND CENTRAL FLORIDA, USA. Mohamed A. Dabees 1 and Brett D.

EVALUATION OF BEACH EROSION UP-DRIFT OF TIDAL INLETS IN SOUTHWEST AND CENTRAL FLORIDA, USA. Mohamed A. Dabees 1 and Brett D. EVALUATION OF BEACH EROSION UP-DRIFT OF TIDAL INLETS IN SOUTHWEST AND CENTRAL FLORIDA, USA Mohamed A. Dabees 1 and Brett D. Moore 1 The paper discusses the analysis of up-drift beach erosion near selected

More information

WATERWAYS AND HARBORS DIVISION Proceedings of the American Society of Civil Engineers. EQUILIBRIUM FLOW AREAS OF INLETS ON SANDY COASTS a

WATERWAYS AND HARBORS DIVISION Proceedings of the American Society of Civil Engineers. EQUILIBRIUM FLOW AREAS OF INLETS ON SANDY COASTS a 6405 February, 1969 WWl J oumal of the WATERWAYS AND HARBORS DIVISION Proceedings of the American Society of Civil Engineers EQUILIBRIUM FLOW AREAS OF INLETS ON SANDY COASTS a By Morrough P. O'Brien,!

More information

Saco River Maintenance Dredge PROJECT PLAN AND TIMELINE JUNE 15, 2017

Saco River Maintenance Dredge PROJECT PLAN AND TIMELINE JUNE 15, 2017 Saco River Maintenance Dredge 2017-2018 PROJECT PLAN AND TIMELINE JUNE 15, 2017 Overview Last dredged in 1994 Removing ~150,000 cy of sand and silt from the upper and lower reaches Disposal sites: In-River

More information

Impact of Hurricane Matthew on the Atlantic Coast of Florida

Impact of Hurricane Matthew on the Atlantic Coast of Florida Impact of Hurricane Matthew on the Atlantic Coast of Florida A coastal engineer was driving across country and his jeep broke down in front of a monastery. It was late in the day and the monks invited

More information

RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416]

RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416] October 25, 2016 Iris Hill Town Administrator Town of Edisto Beach 2414 Murray St Edisto Beach SC 29438 RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416] Dear Iris, Hurricane

More information

Louisiana CPRA SJB Group, Baton Rouge Coastal Engineering Consultants U.S. Army Corps of Engineers Federal and State PDT Members

Louisiana CPRA SJB Group, Baton Rouge Coastal Engineering Consultants U.S. Army Corps of Engineers Federal and State PDT Members Louisiana CPRA SJB Group, Baton Rouge Coastal Engineering Consultants U.S. Army Corps of Engineers Federal and State PDT Members Project Setting and Background Island Restoration Plans Pre-Screening Analysis

More information

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS Page 1 of 9 EXECUTIVE SUMMARY Alberta Transportation ( AT ) is preparing to construct the final sections of the Calgary Ring Road. This includes the South West Ring Road ( SWRR ) (from Lott Creek Blvd

More information

The purpose and needs of the Figure Eight Island Inlet and Shoreline Management Project are as follows:

The purpose and needs of the Figure Eight Island Inlet and Shoreline Management Project are as follows: Chapter 2 PURPOSE AND NEEDS 1. What are the purpose and needs of this project? The main concern of residents and owners at Figure Eight Island are economic losses resulting from damages to structures and

More information

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M) Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M) Shallow draft coastal harbors include a subsistence harbor at Silver Lake CONGRESSIONAL DISTRICT: NC 3 and 7 DATE: 23 February 2015 1.

More information

Assateague Island National Seashore North End Restoration Project Timeline

Assateague Island National Seashore North End Restoration Project Timeline Assateague Island National Seashore North End Restoration Project Timeline Date Event Some information provided in the Project Introduction document. Detailed events are available in a timeline compiled

More information

Tanya M. Beck. Kelly Legault. Research Physical Scientist Coastal & Hydraulics Lab, ERDC Vicksburg, MS

Tanya M. Beck. Kelly Legault. Research Physical Scientist Coastal & Hydraulics Lab, ERDC Vicksburg, MS Inlet And Adjacent Shoreline Processes at Cascading Time Scales Using the Coastal Modeling System and GenCade Tanya M. Beck Research Physical Scientist Coastal & Hydraulics Lab, ERDC Vicksburg, MS Kelly

More information

DRAFT FOR DISCUSSION Water Forum Terms of reference: September 2016

DRAFT FOR DISCUSSION Water Forum Terms of reference: September 2016 Severn Trent Water Forum DRAFT FOR DISCUSSION Water Forum Terms of reference: September 2016 The Water Forum is a multi-stakeholder panel created in 2012 to challenge Severn Trent as it developed its business

More information

Evaluation of Placement Alternatives for Matagorda Ship Channel Bottleneck Removal

Evaluation of Placement Alternatives for Matagorda Ship Channel Bottleneck Removal Evaluation of Placement Alternatives for Matagorda Ship Channel Bottleneck Removal James Rosati III Ashley E. Frey CPT Grays Harbor, WA Wood Wood chips Flour Other CMS Shark River Inlet, NJ US Army Corps

More information

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M) Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M) Shallow draft coastal harbors include a subsistence harbor at Silver Lake CONGRESSIONAL DISTRICT: NC 3, 7 DATE: 23 April 2018 1. AUTHORIZATION:

More information

PUBLIC EXHIBITION OF COASTAL ZONE MANAGEMENT PLAN FOR COLLAROY-NARRABEEN BEACH AND FISHERMANS BEACH

PUBLIC EXHIBITION OF COASTAL ZONE MANAGEMENT PLAN FOR COLLAROY-NARRABEEN BEACH AND FISHERMANS BEACH ITEM 8.3 REPORTING MANAGER TRIM FILE REF 2014/110936 ATTACHMENTS PUBLIC EXHIBITION OF COASTAL ZONE MANAGEMENT PLAN FOR COLLAROY-NARRABEEN BEACH AND FISHERMANS BEACH GROUP MANAGER NATURAL ENVIRONMENT 1

More information

ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY. Contract #2 Construction Scope. April 18th-19th 2018

ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY. Contract #2 Construction Scope. April 18th-19th 2018 ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY Contract #2 Construction Scope April 18th-19th 2018 New York District PLAN COMPONENTS Length of Beachfill 35,000

More information

New Jersey Coastal Zone Overview. The New Jersey Beach Profile Network (NJBPN) 3 Dimensional Assessments. Quantifying Shoreline Migration

New Jersey Coastal Zone Overview. The New Jersey Beach Profile Network (NJBPN) 3 Dimensional Assessments. Quantifying Shoreline Migration New Jersey Coastal Zone Overview The New Jersey Beach Profile Network (NJBPN) Objectives Profile Locations Data Collection Analyzing NJBPN Data Examples 3 Dimensional Assessments Methodology Examples Quantifying

More information

Town of Duck, North Carolina

Town of Duck, North Carolina Tracking No. 00.00.2010 Erosion Mitigation And Shoreline Management Feasibility Study Town of Duck, North Carolina Coastal Planning & Engineering of North Carolina February 28, 2013 Ken Willson 1 Tracking

More information

Fact Sheet Ordinance Regulating Erosion Threatened Structures

Fact Sheet Ordinance Regulating Erosion Threatened Structures Fact Sheet Ordinance Regulating Erosion Threatened Structures Town of Duck, North Carolina August 15, 2011 What is being considered? The Town of Duck Council is considering an ordinance to limit the encroachment

More information

V. HARBOR DEPTHS, CHANNEL DESIGN AND PROPOSED CONSTRUCTION AND DREDGING

V. HARBOR DEPTHS, CHANNEL DESIGN AND PROPOSED CONSTRUCTION AND DREDGING V. HARBOR DEPTHS, CHANNEL DESIGN AND PROPOSED CONSTRUCTION AND DREDGING A. DISCUSSION: For the most part, projects that involve dredging and construction require a comprehensive design and review process

More information

Habitat Development: Habitat Boulders Lawson Pier Foreshore Enhancement

Habitat Development: Habitat Boulders Lawson Pier Foreshore Enhancement Habitat Development: Habitat Boulders Improve the existing habitat by stabilising beach sediments. Increase biodiversity by creating new habitats and colonisation opportunities. Loose cobble is unstable;

More information

Fishery Improvement Projects

Fishery Improvement Projects Fishery Improvement Projects What is a Fishery Improvement Project? A FIP is an alliance of stakeholders retailers, processors, producers and catchers that comes together to resolve problems within a specific

More information

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY I. VISION, GOALS & PRINCIPLES VISION To improve the streets of Portland making them safer and more accessible for all users including pedestrians,

More information

2026 Olympic and Paralympic Winter Games Bid Book Overview

2026 Olympic and Paralympic Winter Games Bid Book Overview 2026 Olympic and Paralympic Winter Games Assessment OPC2018-0738 Committee 2017 June 12 Page 1 of 5 EXECUTIVE SUMMARY This report provides an overview of the Bid Book that is being prepared by The City

More information

PEASE DEVELOPMENT AUTHORITY DIVISION OF PORTS & HARBORS ANNUAL DREDGE REPORT

PEASE DEVELOPMENT AUTHORITY DIVISION OF PORTS & HARBORS ANNUAL DREDGE REPORT PEASE DEVELOPMENT AUTHORITY DIVISION OF PORTS & HARBORS ANNUAL DREDGE REPORT 2018 555 Market Street Portsmouth, New Hampshire 03801 Phone #603 436 8500 Fax #603 436 2780 TABLE OF CONTENTS Cover Page Table

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic modifications on Twin Peaks Boulevard between Christmas

More information

HARBOR INFRASTRUCTURE INVENTORIES Oak Orchard Harbor, New York

HARBOR INFRASTRUCTURE INVENTORIES Oak Orchard Harbor, New York HARBOR INFRASTRUCTURE INVENTORIES Oak Orchard Harbor, New York Harbor Location: Oak Orchard Harbor is located on the southern shore of Lake Ontario at the mouth of Oak Orchard Creek in the village of Point

More information

Dear Mr. Howard Ruben,

Dear Mr. Howard Ruben, Mr. Howard Ruben ( Howard.Ruben@usace.army.mil) The U.S. Army Corps of Engineers New York District Planning Division-Environmental Branch 26 Federal Plaza New York, New York 10278-0090 Dear Mr. Howard

More information

Feasibility Report and Environmental Impact Statement. Coastal Storm Damage Reduction SURF CITY AND NORTH TOPSAIL BEACH, NORTH CAROLINA.

Feasibility Report and Environmental Impact Statement. Coastal Storm Damage Reduction SURF CITY AND NORTH TOPSAIL BEACH, NORTH CAROLINA. Feasibility Report and Environmental Impact Statement on Coastal Storm Damage Reduction SURF CITY AND NORTH TOPSAIL BEACH, NORTH CAROLINA Appendix H Correspondence Appendix H Correspondence This appendix

More information

The Sand Beaches of New Hampshire and Maine

The Sand Beaches of New Hampshire and Maine The Sand Beaches of New Hampshire and Maine Beach Preservation and Erosion Control Photographs provided by Joe Kelly and Steve Adams Cover photo: Reid State Park, ME Introduction The sand beaches of New

More information

An Example of a Unique Partnership for Contaminated Sediment Management The Port Hueneme Experience

An Example of a Unique Partnership for Contaminated Sediment Management The Port Hueneme Experience An Example of a Unique Partnership for Contaminated Sediment Management The Port Hueneme Experience AAPA/USACE Quality Partnership Initiative 4 th Annual Project Managers Workshop Port of Ponce, Puerto

More information

Pennsylvania Avenue (CR 484) Design Alternatives Study

Pennsylvania Avenue (CR 484) Design Alternatives Study MEMORANDUM Pennsylvania Avenue (CR 484) Design Alternatives Study Prepared for: APRIL 2016 Prepared By TABLE OF CONTENTS Project Background... 2 Previous Concept... 2 Existing Conditions... 4 New Alternatives...

More information

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012 NOME HARBOR 1-32 NOME HARBOR, ALASKA (CWIS NOS. 72742, 87755, 12270, & 10422) Condition of Improvement 30 September 2012 AUTHORIZATION: (1) Rivers and Harbors Act, 8 August 1917 (House Doc. 1932, 64th

More information

2018 Beach Preservation Project Information

2018 Beach Preservation Project Information QUICK FACTS Beach Renourishment to begin late April 2018 o U.S. Army Corps of Engineers project o Project Area: 8 th St. E. to end of E. Ashley Ave. o Project Length: 2 miles o Cost: $10,900,000 o Funding:

More information

BICYCLE PROGRAM IMPLEMENTATION UPDATE. Transportation and Trinity River Project Council Committee June 13, 2016

BICYCLE PROGRAM IMPLEMENTATION UPDATE. Transportation and Trinity River Project Council Committee June 13, 2016 BICYCLE PROGRAM IMPLEMENTATION UPDATE Transportation and Trinity River Project Council Committee Purpose 01 Provide background and a status update on onstreet bicycle facility planning and implementation

More information

Shoalwater Bay Shorline Erosion Dredging

Shoalwater Bay Shorline Erosion Dredging Shoalwater Bay Shorline Erosion Dredging ROSS ISLAND SAND & GRAVEL CO. Saving the Tokeland Penninsula Willapa Bay & Tokeland Penninsula Southwestern Washington Coast Shoalwater Bay Historic View Settlements

More information

Absecon Island Shore Protection The planning behind the project

Absecon Island Shore Protection The planning behind the project Absecon Island Shore Protection The planning behind the project Most residents of Atlantic City, Ventnor, Margate and Longport are now aware of upcoming plans to protect their common coastline with a beachfill

More information

This report provides an overview of all the feedback received, key themes which emerged and the actions Grenadier will take in response.

This report provides an overview of all the feedback received, key themes which emerged and the actions Grenadier will take in response. Executive Summary During October 2017, Grenadier held three well attended public consultation events at Ocean in Exmouth. In addition, a bespoke consultation website was created to allow for online feedback,

More information

Implications of proposed Whanganui Port and lower Whanganui River dredging

Implications of proposed Whanganui Port and lower Whanganui River dredging PO Box 637 Wanganui 4540 Attention: Rowan McGregor Dear Rowan 1 Summary We understand that it has been proposed to bring large vessels into the Port at Whanganui requiring the excavation of a channel up

More information

The approach of CanoeKayak BC Whitewater (CKBC-WW) to River Access issues is driven by the organizational Mission Statement:

The approach of CanoeKayak BC Whitewater (CKBC-WW) to River Access issues is driven by the organizational Mission Statement: CanoeKayak BC - Whitewater DRAFT RIVER ACCESS POLICY For Comment The approach of CanoeKayak BC Whitewater (CKBC-WW) to River Access issues is driven by the organizational Mission Statement: Provide structure

More information

Tennis Victoria Club Guide Coach Relationship

Tennis Victoria Club Guide Coach Relationship Tennis Victoria Club Guide Coach Relationship Background Tennis is in a unique position as the sport has a large workforce of qualified & skilled development officers at its disposal the professional tennis

More information

DELAWARE S VULNERABLE COASTAL AREAS. DELAWARE INLAND BAYS and DELAWARE BAY RECONNAISSANCE STUDY

DELAWARE S VULNERABLE COASTAL AREAS. DELAWARE INLAND BAYS and DELAWARE BAY RECONNAISSANCE STUDY DELAWARE S VULNERABLE COASTAL AREAS and the DELAWARE INLAND BAYS and DELAWARE BAY RECONNAISSANCE STUDY Kimberly K. McKenna, PG Delaware Dept. of Natural Resources & Environmental Control Division of Watershed

More information

PORT MASTER PLANNING LUIS AJAMIL

PORT MASTER PLANNING LUIS AJAMIL PORT MASTER PLANNING LUIS AJAMIL 10.24.17 B&A Ports experience Master Planning Practical WHAT WILL THIS PLACE BE LIKE IN 30 YEARS? WHAT WILL THE PORT BE LIKE THEN? WHAT WILL BE IMPORTANT? 2017 2020 2025

More information

Cat Island Chain Restoration

Cat Island Chain Restoration Cat Island Chain Restoration 1820s Fox River Military Road Map to Fort Howard 1845 Chart of Green Bay & Fox River Cat Island Chain - 1938 Cat Island Brown County Aerial Photography, 1938 Historic Western

More information

QLDC Council 29 October Report for Agenda Item: 3

QLDC Council 29 October Report for Agenda Item: 3 QLDC Council 29 October 2015 Department: Infrastructure Beach Street Pedestrianisation Purpose Report for Agenda Item: 3 1 The purpose of this report is to obtain Council approval to consult over options

More information

CORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG

CORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG CORPS FACTS Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG Disaster Response Sedimentation in the channel is caused by the normal cycle of silt movement, erosion from high water or heavy

More information