APPENDIX 1 CAPITAL PRGRAM PROJECT LISTS

Size: px
Start display at page:

Download "APPENDIX 1 CAPITAL PRGRAM PROJECT LISTS"

Transcription

1 APPENDIX 1 CAPITAL PRGRAM PROJECT LISTS Background This Appendix contains additional information about the projects included in the RTP, TIP and in the travel demand model used in the air quality conformity determination. Table 1 describes all of the projects included in the Transportation Capital Program from 2009 to 2030, irrespective of funding source or whether or not they are considered to be Regionally Significant. Table 2 contains detailed funding information for the Regional Strategic Investments included in the Regional Transportation Plan, as set out on pages of the RTP Table 3 identifies the projects that are included in the regional travel demand forecast model network that was used in the air quality conformity analysis for the RTP. APPENDIX 1 to the REGIONAL TRANSPORTATION PLAN

2 APPENDIX 1, TABLE 1 TRANSPORTATION CAPITAL PROGRAM, This table lists all of the projects included in the Transportation Capital Program from 2009 to 2030, irrespective of funding source or whether or not they are considered to be Regionally Significant. The projects are listed in alphabetical order of street name or project title. The data shown includes the limits of the project, the project description, the sponsoring agency, and the year when the project is expected to be complete. The final column indicates whether the project is considered to be Regionally Significant and how the project is treated in the travel demand modeling and air quality conformity analysis. The classifications shown in this final column are described below: ModelClass Description RS Regionally Significant Project RS-T Regionally significant transit project included in mode split model NRS-M Non-regionally significant project included in travel demand forecast model NRS-T Non-regionally significant transit project included in mode split model TCM Transportation Control Measure identified in the State Implementation Plans (SIP) TCM-T. TCM-A Transit or alternate Mode Transportation Control Measure identified in the SIP OCM Other control measure for which emissions credit could be calculated (#) OCM-T, OCM-A, OCM-I. OCM-O Transit, alternate mode or ITS project or operational improvement for which emissions credit could be calculated (#) EX Exempt Project or project exempt from regional emissions analysis EX-T, EX-A, EX-I, EX-O Exempt transit, alternate mode or ITS project or operational improvement EX-IR Exempt ITS project on a regionally significant facility EX-P Planning, Preliminary Engineering or Right-of-Way safeguarding only. ONX Other non-exempt project - not modeled ONX-T Other non-exempt transit project - not modeled XTDM Project outside the travel demand forecast model area XNAA Project outside the Ozone non-attainment area (#) Projects designated OCM are considered to have potential air quality benefits, but these have not been calculated as part of the current conformity determination. Projects in the classifications shown above in bold face are included in the RTP list of Regional Strategic Investments, irrespective of funding source. That list also includes all other projects that are federally funded or involve federal action. The travel demand forecast modeling used in the air quality conformity analysis includes all projects classified as RS or NRS-M. Table 3 lists these projects and also shows the Horizon Year in which each project is expected to be complete. APPENDIX 1 to the REGIONAL TRANSPORTATION PLAN

3 Regional Transportation Commission of Southern Nevada Appendix 1, Table 1: List of Projects in the Transportation Capital Program Project # Location / Title From To Description Sponsor Entity Year Complete Model Class 4116 A Road (North of Moccasin) B St. US 95 Construct 6 lanes Las Vegas 2014 NRS-M 733 Alexander Rd. Rancho Dr. Decatur Blvd. Widen to4lanes Las Vegas 2016 NRS-M 788 Alexander Rd. Simmons St. Martin Luther King Blvd. Widen from 2 to 4 lanes North Las Vegas 2010 NRS-M 816 Alexander Rd. Martin Luther King Blvd. Losee Rd. Widen from 2 to 4 lanes North Las Vegas 2010 NRS-M 4078 Aliante Pkwy. CC-215 Northern Beltway Grand Teton Dr. Widen from 4 to 6 lanes North Las Vegas 2010 NRS-M 790 Allen Ln. Lone Mountain Rd. Centennial Pkwy. Widen from 2 to 4 lanes North Las Vegas 2019 NRS-M 1554 Alternative Mode Off-Street Development & Construction of Off-Street Projects: Alternative Mode Facilities in Various Locations 2009 OCM-A 1555 Alternative Mode Off-Street Development & Construction of Off-Street Projects: Alternative Mode Facilities in Various Locations 2010 OCM-A 1556 Alternative Mode Off-Street Development & Construction of Off-Street Projects: Alternative Mode Facilities in Various Locations 2020 OCM-A 1557 Alternative Mode Off-Street Development & Construction of Off-Street Projects: Alternative Mode Facilities in Various Locations 2025 OCM-A 1558 Alternative Mode Off-Street Development & Construction of Off-Street Projects: Alternative Mode Facilities in Various Locations 2030 OCM-A 640 American Pacific Dr. Stephanie St. Gibson Rd. Reconstruct existing roadway - mill/overlay Henderson 2016 EX 4208 American Pacific Dr. Gibson Arroya Grande Resconstruct existing roadway -mill/overlay Henderson 2016 EX 711 Amigo St. SR.146 St.Rose Pkwy Sunridge Heights Construct 4-lane roadway Henderson 2019 NRS-M 564 Ann Rd. Durango Dr. US 95 Construct to 6 lanes Las Vegas 2012 NRS-M 796 Ann Rd. Camino Al Norte Bruce St Widen from 2 to 6 lanes North Las Vegas 2020 NRS-M 862 Ann Rd. Linn Ln. Hollywood Blvd. Widen from 2 to 4 lanes North Las Vegas 2015 NRS-M 834 Ann Rd. / Tropical Pkwy. Bruce St. Statz St. Construct 6-lane roadway North Las Vegas 2010 NRS-M Connector 149 Arterial Incident & Event Institution of multi-modal traveler information Management System system and integration into the Freeway Management System North Las Vegas 2005 EX-I Regional Transportation Plan : Draft for Consultation September 2008 Appendix 1, Table1: Page 1 of 24

4 Appendix 1, Table 1: List of Projects in the Transportation Capital Program Project # Location / Title From To Description Sponsor Entity Year Complete Model Class 737 Arterial reconstruction & Reconstruction of various roads Las Vegas overlay program 2025 EX 4117 Arville St. Sahara Avenue Charleston Blvd. Widen to 4 lanes Las Vegas 2013 NRS-M 646 Athens Ave. Racetrack Rd. Foothills Dr. Construct 4-lane roadway Henderson 2030 NRS-M 4054 Aviary Way Dorrell Ln. Grand Teton Dr. Widen from 2 to 4 lanes North Las Vegas 2010 NRS-M 4114 B Road (North of Moccasin) US 95 F St. Construct 6 lanes Las Vegas 2014 NRS-M 647 Barrett St. Warm Springs Rd. Boulder Hwy. Construct 4-lane roadway Henderson 2025 NRS-M 932 Bearden Dr. Shadow Ln. Martin Luther King Blvd. Extend to Martin Luther King widen to 4 lanes Las Vegas 2010 NRS-M 516 Bermuda Rd. SR 146 St.Rose Pkwy Silverado Ranch Blvd. Widen to 4 Lanes Clark County 2014 NRS-M 649 Bermuda Rd. SR.146 St.Rose Pkwy I-15 Construct to 4 Lanes Henderson 2013 NRS-M 839 Bermuda Rd. Starr Rd. SR.146 St.Rose Pkwy Construct 4-lane roadway Henderson 2015 NRS-M 740 Bonneville Ave. / Clark Ave. Main St. Charleston Blvd. Convert to one-way couplet, 3 lanes in each Las Vegas 2010 NRS-M Couplet direction 1583 Bonneville Ave. / Clark Ave. Casino Center Dr Las Vegas Blvd Landscaping Las Vegas 2009 EX-E Couplet 2722 Boulder City - various Roadway improvements Boulder City locations 2010 XTDM 2020 Boulder Hwy: Bus Rapid College Dr Downtown Las Vegas Roadway reconstruction and intersection 2012 RS-T Transit improvements to accommodate Rapid Transit operations in the Boulder Hwy corridor 2022 Boulder Hwy: Bus Rapid College Dr Downtown Las Vegas Construct shelters and ancillary equipment for 2012 RS-T Transit Rapid Transit operations in the Boulder Hwy corridor 1508 BPE On-Street Bike Installation of Bicycle Lanes & Routes in Various Projects: Locations 2009 TCM-A 1509 BPE On-Street Bike Installation of Bicycle Lanes & Routes in Various Projects: Locations 2010 TCM-A 869 Bruce St. Maryland Pkwy Washington Ave. Widen to 6 lanes Las Vegas 2023 NRS-M 4077 Bruce St. Lone Mountain Rd. Centennial Pkwy. Widen from 2 to 4 lanes North Las Vegas 2015 NRS-M 929 Bruner Ave. Gilespie St. Executive Airport Dr. Construct 6-lane roadway Henderson 2015 NRS Regional Transportation Plan : Draft for Consultation September 2008 Appendix 1, Table1: Page 2 of 24

5 Appendix 1, Table 1: List of Projects in the Transportation Capital Program Project # Location / Title From To Description Sponsor Entity Year Complete Model Class 2993 Bruner Ave. Gilespie St. Executive Airport Construct to 6 lanes Henderson 2016 NRS-M 517 Buffalo Dr. SR 160 Blue Diamond Rd. CC-215 Southern Construct 4-lane roadway Clark County Beltway 2017 NRS-M 518 Buffalo Dr. CC-215 Southern Beltway Hacienda Ave. Construct 6 Lanes, 100' R.O.W. Clark County 2016 NRS-M 2725 Bunkerville - various Roadway improvements Mesquite locations 2030 XNAA 654 Burkholder Blvd. SR.146 Lake Mead Dr. Racetrack Rd. Widen to 4 lanes Henderson 2009 NRS-M 657 Burkholder Blvd. Warm Springs Rd. Lake Mead Dr. Construct 4-lane roadway Henderson 2020 NRS-M 658 Burkholder Blvd. Warm Springs Rd. Russell Rd. Widen to 6 Lanes Henderson 2020 NRS-M 2048 Bus fleet replacement Acquire 78 buses for the fixed-route bus program replacement program 2012 EX-T 2049 Bus fleet replacement Acquire 46 buses for the fixed-route bus program replacement program 2015 EX-T 2050 Bus fleet replacement Acquire buses for the fixed-route bus replacement program program 2030 EX-T 2006 Bus Rapid Transit - fleet Acquire 50 vehicles for the expansion of the Ace expansion Rapid Transit fleet 2010 RS-T 2042 Bus Rapid Transit fleet Acquire vehicles for the Ace Rapid Transit fleet replacement program replacement program 2030 EX-T 866 Bus Turnouts - various Construct turnouts for buses along approved routes North Las Vegas locations 2009 EX-T 871 Bus Turnouts - various Turnouts for busses to improve traffic flow along locations bus routes Las Vegas 2010 EX-T 4111 C Road (North of Moccasin) A St. Sheep Mountain Pkwy. Construct 4 lanes Las Vegas 2014 NRS-M 659 Cactus Ave. Maryland Pkwy. Spencer St. Widen to 6 Lanes (Partially Clark County Funded) Henderson 2010 NRS-M 898 Cactus Ave. Fort Apache Rd. Rainbow Blvd. Construct to 6 lanes with a grade seperation at Clark County 2015 NRS-M UPPR 4240 Cactus Ave. Rainbow Blvd. Dean Martin Dr. Construct 6-lane roadway Clark County 2018 NRS-M 4255 Cactus Ave. Las Vegas Blvd. Maryland Pkwy. Clark County 2015 NRS-M 108 Cactus Ave. at I-15 Dean Martin Dr Las Vegas Blvd. Construct an interchange Clark County 2013 RS Regional Transportation Plan : Draft for Consultation September 2008 Appendix 1, Table1: Page 3 of 24

6 Appendix 1, Table 1: List of Projects in the Transportation Capital Program Project # Location / Title From To Description Sponsor Entity Year Complete Model Class 2714 Carey Ave. Rancho Dr. Commerce St. ITS and signal interconnect improvements North Las Vegas 2009 OCM-I 1563 Casino Center Blvd. / 3rd St. Coolidge Ave. Charleston Bl. Re-align Casino Center Blvd to connect with 3rd Las Vegas 2009 NRS-M Realignment St. at Charleston Blvd. (4 lanes + BRT) 4158 CC 215 Interchanges I-215 from the Airport I-15 North PE for the construction of four regional beltway NDOT 2010 EX-P Connector interchanges 506 CC-215 Northern Beltway Tenaya Way Decatur Blvd. Upgrade to 6-lane freeway with interchanges at Clark County 2010 RS Jones Blvd. and Decatur Blvd. and an overpass at Bradley Rd 507 CC-215 Northern Beltway Decatur Blvd. North Fifth St. Upgrade to 6-lane freeway with interchanges at Clark County 2011 RS Revere St and North 5th St. 508 CC-215 Northern Beltway North Fifth St. Range Rd. Upgrade to 6-lane freeway with interchanges at Clark County 2011 RS Losee Rd., Pecos Rd., Lamb Blvd., and Range Rd. 509 CC-215 Northern I-15 Upgrade to system-to-system interchange and Clark County 2013 RS widen to 6 lanes 926 CC-215 Northern Hualapai Way Tenaya Way Upgrade to system-to-stsem interchange and Clark County 2013 RS US.95 widen to 6 lanes 504 CC-215 Western Beltway Alta Dr north of Summerlin Construct interchanges at Far Hills Ave and Pkwy Summerlin Pkwy and widen to 6 lanes from Charleston Blvd to Summerlin Pkwy. Clark County 2010 RS 510 CC-215 Western Beltway Craig Rd. Hualapai Way (North) Upgrade to 6-lane freeway with interchanges at Clark County 2012 RS Lone Mountain Rd and Ann Rd and an overpass at Centennial Pkwy. 792 Centennial Pkwy. Revere St. Losee Rd. Widen from 2 to 6 lanes. North Las Vegas 2017 NRS-M 798 Centennial Pkwy. Range Rd. Elkhorn Rd. Widen from 2 to 4 lanes North Las Vegas 2020 NRS-M 805 Centennial Pkwy. Lamb Blvd. Range Rd. Widen from 2 to 4 lanes w/grade seperation at North Las Vegas 2020 NRS-M UPRR tracks 815 Centennial Pkwy. Losee Rd. Lamb Blvd. Widen from 2 to 6 lanes North Las Vegas 2014 NRS-M 859 Centennial Pkwy. Sloan Ln. Hollywood Blvd. Construct to 4 lanes (east of I -15) North Las Vegas 2015 NRS-M 4071 Centennial Pkwy. Decatur Blvd. Aliante Pkwy. Widen from 2 to 6 lanes North Las Vegas 2012 NRS-M 4084 Centennial Grand Montecito Pkwy. Grand Montecito Construct intersection improvements Las Vegas 2009 NRS-M 4109 Centennial Pkwy. Sheep Mountain Pkwy. Hualapai Way Widen to 4 lanes Las Vegas 2011 NRS-M 4101 Center Burkholder Lake Mead Parkway Reconstruct existing roadway - mill/overlay Henderson 2014 NRS Regional Transportation Plan : Draft for Consultation September 2008 Appendix 1, Table1: Page 4 of 24

7 Appendix 1, Table 1: List of Projects in the Transportation Capital Program Project # Location / Title From To Description Sponsor Entity Year Complete Model Class 2010 Central City Intermodal Development of a new intermodal transportation Transportation Terminal center to serve downtown Las Vegas 2010 RS-T 935 Charleston Blvd. Maryland Pkwy. Pecos Rd. Widen to 6 lanes Las Vegas 2016 NRS-M 2716 Charleston Lamb Blvd. Intersection improvements Las Vegas 2010 OCM-O 2718 Cheyenne M.L.King Blvd. Intersection improvements North Las Vegas 2010 OCM-O 2736 Cheyenne Ave. CC-215 Western Beltway Decatur Blvd ITS and signal infrastructure improvements Las Vegas 2010 EX-I 4145 Cheyenne Ave. US 95 Nellis Blvd. Restripe to 6 lanes, where possible North Las Vegas 2010 RS 523 Christy Ln. Charleston Blvd. Lake Mead Blvd. Construct to 4 Lanes Clark County 2025 NRS-M 524 Cimarron Rd. Peace Way Desert Inn Rd. Construct 4-lane roadway Clark County 2020 NRS-M 1561 City of Las Vegas Union Park Main St Construct pedestrian overbridge across UPRR Las Vegas 2009 EX-A 2719 City of Las Vegas - various ITS communications and signal timing locations infrastructure Las Vegas 2009 EX-I 140 City of North Las Vegas - various locations Modify traffic signals and lane configuration to construct dual lefts at Las Vegas Blvd./Civic Center Dr., Las Vegas Blvd./Carey Ave. & Civic Center Dr./Carey Ave. North Las Vegas 2009 EX-O 2720 City of North Las Vegas - ITS communications and signal timing various locations infrastructure North Las Vegas 2009 EX-I 936 City Pkwy. F St. D St. Construct 4-lane connector road Las Vegas 2010 NRS-M 2809 Clark and Nye Counties Operating and administrative support for transit operations between Pahrump and Las Vegas NDOT 2012 EX-T 2807 Clark County Development and operation of a same day paratransit service 2012 EX-T 2808 Clark County Operating and administrative support for transit operations in Mesquite and Laughlin NDOT 2012 EX-T 4055 Clayton St. Centennial Pkwy. Grand Teton Dr. Widen from 2 to 4 lanes North Las Vegas 2025 NRS-M 4085 Cliff Shadows Pkwy Buckskin Lone Mountain Widen to 4 lanes Las Vegas 2009 NRS-M 789 Commerce St. Cheyenne Ave. Alexander Rd. Widen from 2 to 4 lanes North Las Vegas 2013 NRS-M 959 Commerce St. Alexander Rd. Ann Rd. Widen from 2 to 4 lanes North Las Vegas 2010 NRS-M 4015 Commerce St. Ann Rd. Deer Springs Way Widen from 2 to 6 lanes North Las Vegas 2009 NRS-M Regional Transportation Plan : Draft for Consultation September 2008 Appendix 1, Table1: Page 5 of 24

8 Appendix 1, Table 1: List of Projects in the Transportation Capital Program Project # Location / Title From To Description Sponsor Entity Year Complete Model Class 4100 Commerce St. Craig Road Lone Mountain Widen to 4 lanes North Las Vegas 2017 NRS 1582 Craig Rd Revere St North 5th St Median landscaping North Las Vegas 2009 EX-E 2747 Craig Rd Tenaya Way Decatur Blvd ITS and signal infrastructure improvements Las Vegas 2010 EX-IR 4112 D Road (North of Moccasin) B St. Sheep Mountain Pkwy. Construct 6 lanes Las Vegas 2014 NRS-M 306 Dean Martin Dr. Blue Diamond Rd. Warm Springs Rd. Construct to 4 Lanes Clark County 2013 NRS-M 526 Decatur Blvd. CC-215 Southern Beltway Tropicana Blvd. Widen to 6 Lanes Clark County 2015 NRS-M 527 Decatur Blvd. Blue Diamond Rd. Warm Springs Rd. Construct to 6 Lanes Clark County 2010 NRS-M 528 Decatur Blvd. Cactus Ave. Blue Diamond Rd. Widen from 4 to 6 Lanes, 100' R.O.W. Clark County 2013 NRS-M 529 Decatur Blvd. Warm Springs Rd. CC-215 Southern Construct 6 Lanes with 2 railroad overpasses Clark County Beltway 2010 NRS-M 833 Decatur Blvd. CC-215 Northern Beltway Mocassin Rd. Widen from 2 to 6 lanes North Las Vegas 2011 NRS-M 4086 Decatur Blvd. Meadows ln. Sahara Av. Widen to 8 lanes with bus turnouts Las Vegas 2010 NRS-M 4105 Decatur Blvd. Iron Mountain Rd. Sheep Mountain Pkwy. Widen to 6 lanes Las Vegas 2018 NRS-M 806 Decatur Blvd. (East 1/2) Ann Rd. CC-215 Northern Widen to 6 lanes w/ median (east half only) North Las Vegas Beltway 2010 NRS-M 746 Decatur Blvd. (West 1/2) CC-215 Northern Beltway Moccasin Rd. Construct to 3 lanes w/median (West half only) Las Vegas 2025 NRS-M 821 Deer Springs Way Commerce St. Losee Rd. Widen from 2 to 4 lanes North Las Vegas 2012 NRS-M 4074 Deer Springs Way Losee Rd. Walnut Rd. Widen from 2 to 6 lanes North Las Vegas 2010 NRS-M 4079 Deer Springs Way Aviary Way Revere St. Construct 4-lane roadway North Las Vegas 2012 NRS-M 720 Democracy Dr. Anthem Boundary Grand Cayman Blvd. Construct 4-lane roadway Henderson 2020 NRS-M 530 Desert Inn Rd. Boulder Hwy. Nellis Blvd. Construct 6-lane roadway Clark County 2025 NRS-M 957 Dorrell Ln. Clayton St. North Fifth St. Widen from 2 to 4 lanes North Las Vegas 2012 NRS-M 4013 Dorrell Ln. North Fifth St. Bruce St. Construct 4-lane roadway North Las Vegas 2011 NRS-M 532 Durango Dr. SR 160 Blue Diamond Rd. Windmill Ln. Construct 6 Lanes, 100' R.O.W. Clark County 2013 NRS-M 533 Durango Dr. Windmill Ln. Hacienda Ave. Construct to 6 Lanes Clark County 2013 NRS-M 754 Durango Dr. Grand Teton Dr. Log Cabin Way Construct to 6 Lanes Las Vegas 2025 NRS-M Regional Transportation Plan : Draft for Consultation September 2008 Appendix 1, Table1: Page 6 of 24

9 Appendix 1, Table 1: List of Projects in the Transportation Capital Program Project # Location / Title From To Description Sponsor Entity Year Complete Model Class 2703 Durango Westcillf Dr. Develop a park-and-ride lot, including transit 2010 ONX-T passenger facilities, to serve the Summerlin Pkwy corridor 2709 Durango Dr. CC-215 Southern Beltway Desert Inn Rd. Signal interconnects and timing infrastructure Clark County 2011 OCM-I 4113 E Road (North of Moccasin) US 95 F St. Construct 6 lanes Las Vegas 2014 NRS-M 2711 Eastern Ave. Anthem Dr. SR 146 St.Rose Pkwy. ITS communications and signal timing Henderson 2009 OCM-I infrastructure 4218 Eastern Ave. St Rose Pkwy. Reunion Rehabiltate roadway Henderson 2009 EX 4232 Eastern Ave. Serene Sunridge Signal and intersection improvements Henderson 2009 EX-IR 2746 Eastern Avve Serene Ave Flamingo Rd ITS and signal infrastructure improvements Clark County 2010 EX-IR 4104 Eastgate Rd. Warm Springs Sunset Reconstruct existing roadway - mill and overlay - Henderson 2021 NRS-M Widen to 4 lanes where required 665 Eastgate Rd. (Reserve Blvd.) Autoshow Dr. Lake Mead Dr. Construct to 4 lanes Henderson 2009 NRS-M 4122 Egan Crest Dr. Irom Mountain Dr. Grand Teton Dr. Construct 4 lanes Las Vegas 2010 NRS-M 848 El Campo Grande Ave. Range Rd. Hollywood Blvd. Construct 4-lane roadway North Las Vegas 2025 NRS-M 4053 Elkhorn Rd Decatur Blvd Aviary Way Widen from 2 to 4 lanes North Las Vegas 2010 NRS-M 537 Elkhorn Rd. Tenaya Way Jones Blvd. Construct 6 Lanes, 100' R.O.W. Clark County 2025 NRS-M 756 Elkhorn Rd. Grand Canyon Dr. Durango Dr./El Capitan Widen to 6 Lanes Las Vegas Way 2014 NRS-M 4062 Elkhorn Rd. Clayton St. Losee Rd. Construct 6-lane roadway North Las Vegas 2015 NRS-M 4063 Elkhorn Rd. Aviary Way Clayton St. Construct 6-lane roadway North Las Vegas 2010 NRS-M 4242 Elkhorn Rd. at US 95 Construct HOV direct connect ramps Las Vegas 2017 RS 666 Equestrian Dr. Appaloosa Dr. Foothills Dr. Construct to 4 Lanes Henderson 2020 NRS-M 4115 F Road (North of Moccasin) Sheep Mountain Pkwy. B St. Construct 6 lanes Las Vegas 2014 NRS-M 854 Farm Rd. Hollywood Blvd. Grand Teton Dr. Construct 4-lane roadway North Las Vegas 2025 NRS-M 855 Farm Rd. Losee Rd. Lamb Blvd. Construct 4-lane roadway North Las Vegas 2030 NRS-M 4052 Farm Rd. Decatur Blvd Aliante Pkwy Widen from 2 to 4 lanes North Las Vegas 2010 NRS-M Regional Transportation Plan : Draft for Consultation September 2008 Appendix 1, Table1: Page 7 of 24

10 Appendix 1, Table 1: List of Projects in the Transportation Capital Program Project # Location / Title From To Description Sponsor Entity Year Complete Model Class 163 FAST Freeway Management Institution and operation of a Freeway & Arterial System Management System of Transportation (FAST) (PE, RW, Const.) NDOT 2012 EX-I 672 Foothills Dr. Warm Springs Rd. Equestrian Dr. Construct to 4 Lanes Henderson 2023 NRS-M 673 Foothills Dr. Warm Springs Rd. Lake Mead Dr. Construct to 4 Lanes Henderson 2030 NRS-M 543 Fort Apache Rd. Warm Springs Rd. Tropicana Ave. Construct 6 travel lanes Clark County 2011 NRS-M 544 Fort Apache Rd. Blue Diamond Rd. Warm Springs Rd. Construct 4 travel lanes Clark County 2020 NRS-M 590 Fort Apache Rd. Brent Ln. Log Cabin Way Widen to 6 lanes Las Vegas 2012 NRS-M 759 Fort Apache Rd. CC-215 Northern Beltway Grand Teton Dr. Widen to 4 Lanes Las Vegas 2025 NRS-M 4107 Fort Apache Rd. Log Cabin Way Sheep Mountain Pkwy. Construct 6 lane roadway Las Vegas 2013 NRS-M 4260 Fort Apache Rd. Centennial Pkwy. Deer Springs Rd Construct 4-lane roadway and overpass across Clark County 2010 NRS-M CC Freeway Service Patrol Operation of a motorist assistance program on I- 15 from the Jean Interchange to the Apex Interchange and on US 95/I-515 from Railroad Pass to SR.157 NDOT 2030 EX-O 643 Galleria Dr. Boulder Hwy. Sunset Rd. Construct to 4 Lanes Henderson 2010 NRS-M 722 Galleria Dr. Sunset Rd. Lake Las Vegas Pkwy. Construct 4-lane roadway Henderson 2013 NRS-M 2713 Galleria Dr. Stephanie St. SR 582 Boulder Hwy. ITS communications and signal timing Henderson 2010 OCM-I infrastructure 4204 Galleria Dr. Boulder Highway Pabco Construct 2 lane roadway Henderson 2009 NRS-M 675 Gibson Rd. Cape Horn Dr. I -215 Construct to 6 Lanes Henderson 2009 NRS-M 2712 Gibson Rd. I-215 Southern Beltway Cape Horn Dr. ITS communications and signal timing Henderson 2010 OCM-I infrastructure 676 Gilespie St. SR.146 St.Rose Pkwy Grand Cayman Blvd. Construct to 6 Lanes Henderson 2015 NRS-M 807 Gowan Rd. Commerce St. Losee Rd. Widen from 2 to 4 lanes North Las Vegas 2014 NRS-M 677 Grand Cayman Blvd. SR.146 St.Rose Pkwy I-15 Construct to 4 Lanes Henderson 2010 NRS-M 902 Grand Teton Dr. Decatur Blvd Aliante Pkwy. Widen from 2 to 6 lanes North Las Vegas 2011 NRS-M 903 Grand Teton Dr. Aliante Pkwy. Clayton St. Widen from 2 to 6 lanes North Las Vegas 2013 NRS-M Regional Transportation Plan : Draft for Consultation September 2008 Appendix 1, Table1: Page 8 of 24

11 Appendix 1, Table 1: List of Projects in the Transportation Capital Program Project # Location / Title From To Description Sponsor Entity Year Complete Model Class 4056 Grand Teton Dr. Clayton St. Losee Rd. Widen from 2 to 4 lanes North Las Vegas 2015 NRS-M 4096 Grand Teton Dr. Decatur Blvd. Maverick Widening from 2 to 4 lanes Las Vegas 2009 NRS-M 4108 Grand Teton Dr. Sheep Mountain Pkwy. Grand Canyon Dr. Widen to 6 lanes Las Vegas 2010 NRS-M 130 Grand Teton US-95 Fort Apache Rd. El Capitan Way Construct 6-lane overpass Las Vegas 2013 NRS-M 147 Green Valley Pkwy. Sunset Rd. Horizon Ridge Pkwy. Construct 20 bus turnouts Henderson 2010 NRS-M 680 Green Valley Pkwy. Horizon Ridge Pkwy. UPRR Reconstruct existing roadway - mill and overlay Henderson 2015 EX 553 Harmon Ave. Polaris East of Las Vegas Blvd. Widen from 4 to 6 Lanes Clark County 2011 NRS-M 4261 Harmon Ave. Swenson East of Las Vegas Widen from 4 to 6 lanes Clark County Blvd.St NRS-M 928 Haven St. South City Limits SR 146 St.Rose Pkwy Construct 4-lane roadway Henderson 2020 NRS 559 Hollywood Blvd. SR 604 Las Vegas Blvd. North Speedway Blvd. Construct 6 Lanes, 100' R.O.W. Clark County 2014 NRS-M 853 Hollywood Blvd. Elkhorn Rd. Farm Rd. Construct 4-lane roadway North Las Vegas 2020 NRS-M 1050 Hollywood Blvd. Charleston Blvd. Lake Mead Blvd. Widen from 2 to 4 lanes Clark County 2010 NRS-M 684 Horizon Ridge Pkwy. Gibson Rd. Mission Dr. Reconstruct roadway -mill and overlay and restripe Henderson 2015 NRS-M to 6 lanes 4040 Horizon Ridge Pkwy. Mission Volunteer Construct bus turnouts Henderson 2025 EX-T 4264 Horizon Ridge Pkwy. at I-515 Operational Improvements Henderson 2009 EX-O 4090 Horse Dr Rainbow Blvd. Decatur Blvd. Widen to 4 lanes Las Vegas 2020 NRS-M 129 Horse US-95 Grand Canyon Dr. Fort Apache Rd. Construct 6-lane overpass with an interchange at Las Vegas 2011 RS US Horse Dr./Hualapi Way Grand Teton Dr. US 95 Construct 6 lanes Las Vegas 2010 NRS-M 563 Hualapai Way CC-215 Northern Beltway US 95 Construct 6 lanes, 100' R.O.W. Clark County 2015 NRS-M 4124 Hualapai Way Grand Teton Dr. Kyle Canyon Construct 6 lanes Las Vegas Interchange 2010 NRS-M 110 I-15 at Starr Ave. Construct new interchange Henderson 2020 RS 115 I-15 at Bermuda Rd. Construct new interchange Henderson 2030 RS Regional Transportation Plan : Draft for Consultation September 2008 Appendix 1, Table1: Page 9 of 24

12 Appendix 1, Table 1: List of Projects in the Transportation Capital Program Project # Location / Title From To Description Sponsor Entity Year Complete Model Class 166 I-15 I-515/US 95 Interchange SR.573 Craig Rd. Widen from 6 to 10 lanes from US 95/I-515 to (Spaghetti Bowl) Lake Mead Blvd.; Widen from 4 to 8 Lanes from Lake Mead Blvd. to SR 573 Craig Road. NDOT 2011 RS 177 Alta Dr. Project Neon: PE and Right-of-Way for the NDOT 2012 EX-P construction of SB on- and NB off-ramps 243 I-15 CA State Line Sloan Rd. Widen from 6 to 8 lanes (PE, RW, Const.) NDOT 2027 RS 244 I-15 Sloan Rd. SR.160 Blue Diamond I-15 South Phase 2: Widen from 6 to 8 lanes and Rd. add additional auxiliary lanes NDOT 2020 RS 245 I-15 Sloan Rd. SR.160 Blue Diamond I-15 South Phase 4: Widen to 10 lanes and add Rd. additional auxiliary lanes NDOT 2030 RS 246 I-15 SR 160 Blue Diamond Rd. Tropicana Ave. I-15 South Phase 1: Widen from 6 to 8 lanes, to NDOT 2012 RS include HOV lanes and auxiliary lanes 247 I-15 SR 160 Blue Diamond Rd. Tropicana Ave. I-15 South Phase 3: Widen to 10 lanes to include NDOT 2030 RS HOV lanes and additional auxiliary lanes and operational improvements 758 Sloan Rd. Construct an interchange (PE, ROW, Construction) Henderson 2025 RS 961 Mile Post 108 PE and RoW for the construction of an Mesquite 2010 XNAA interchange to serve Mesquite Airport 968 MP.120 Mesquite Blvd Reconstruct interchange Mesquite 2013 XNAA 971 Mile Post 118 Pioneer Construct new interchange Mesquite Blvd. Extension 1011 I-15 Sahara Ave. I-515 / US-95 Project Neon: Conduct NEPA process NDOT Interchange (Spaghetti Bowl) XNAA-RS EX-P 4017 I-15 I-215 Southern Beltway I-15 / US-95 Conduct NEPA process and preliminary Interchange (Spaghetti engineering Bowl) NDOT 2010 EX-P 4023 I-15 Las Vegas Valley PE and Right-of-Way for various widening and NDOT 2012 EX-P interchange improvements 4025 Starr Ave PE and RW for new Interchange Henderson 2010 EX-P 4138 I-15 Sahara Av. I-515/US 95 PE and Right-of-Way for widening to 10 lanes, to Interchange (Spaghetti include HOV lanes, plus auxiliary lanes and Bowl) collector/distributer roads NDOT 2010 EX-P Regional Transportation Plan : Draft for Consultation September 2008 Appendix 1, Table1: Page 10 of 24

13 Appendix 1, Table 1: List of Projects in the Transportation Capital Program Project # Location / Title From To Description Sponsor Entity Year Complete Model Class 4140 Mile Post 118 Pioneer PE for the construction of a new interchange Mesquite Blvd. Extension 2010 XNAA 4142 I-15 Russell Rd. Sahara Ave. Widen from 8 to 10 lanes including 2 express NDOT 2010 RS lanes each way and 3 general purpose lanes each way 4144 I-15 I-215 I-515 / US-95 Widen from 10 to 14 lanes to include HOV lanes NDOT Interchange (Spaghetti Bowl) 2030 RS 4153 I-215 Southern Beltway System to sytem direct connector HOV ramps NDOT 2030 RS 4159 I-15 at US 93 (North) PE for construction of an interchange NDOT 2010 EX-P 4202 MP 3 Construct new southern airport access interchange DoA 2011 RS on I I-15 / US 95 I-15 south of Oakey Blvd US 95 east of Rancho Dr Project Neon Phase 1: Construct a 4 lane systemto-system direct connect HOV ramps, including add/drop lanes at Oakey/Wyoming. Widen 1-15 to accommodate HOV ramps NDOT 2018 RS 4151 I-15 / US 95 I-15 south of Oakey Blvd US 95 east of Rancho Project Neon Phase 1: PE for the construction of Dr system-to-system direct connect HOV ramps, including add/drop lanes at Oakey/Wyoming NDOT 2010 EX-P 4237 I-15 /LV Wash Trail Regional trail grade seperation over I-15 North Las Vegas 2009 EX-A 4157 I-15 Corridor Study CA stateline Mesquite Corridor Study, NV NDOT 2010 EX-P 4162 I-15 Northbound Sahara Ave. I-515/US 95 Interchange (Spaghetti Bowl) Project Neon Phase 4: Construct SB collector distributor roads with new bridges over Sahara Av., Oakey/Wyoming, Charleston and northbound off ramps to Alta Dr. NDOT 2030 RS 4161 I-15 Southbound I-515/US 95 Interchange Sahara Av. Project Neon Phase 3: Construct SB collector NDOT (Spaghetti Bowl) distributor roads with new bridges over Alta, Charleston, and Oakey/Wyoming (PE, RW, Const.) 2030 RS 221 I-215 Southern Airport Connector Upgrade Interchange, expand mainline from I-15 Clark County 2012 RS to Windmill Ln. 228 I-215 Southern Beltway Eastern Ave. Windmill Ln. Widen from 6 to 8 lanes Clark County 2013 RS 1584 I-215 Southern Beltway at Eastern Ave Interchange landscaping Clark County 2009 EX-E 4253 I-215/ SR 564 I-515 at Green Valley Blvd Boulder Hwy Develop and integrate ITS infrastructure NDOT 2010 OCM-I Regional Transportation Plan : Draft for Consultation September 2008 Appendix 1, Table1: Page 11 of 24

14 Appendix 1, Table 1: List of Projects in the Transportation Capital Program Project # Location / Title From To Description Sponsor Entity Year Complete Model Class 134 Galleria Dr. Construct interchange and construct Galleria Dr. 4 Henderson 2011 RS lanes between Stephanie and Boulder Hwy. 203 I-515 Foothills Grade Separation I-15 / US 95 Conduct NEPA process and preliminary Interchange (Spaghetti engineering Bowl) NDOT 2009 EX-P 249 I-515 Foothills Grade Separation Charleston Blvd. Widen to 10 lanes; to include HOV lanes and add NDOT 2030 RS new interchange at Sahara Ave. (PE, RW, Const.) 250 I-515 Charleston Blvd. I-15 / US-95 Widen to 10 lanes; to include HOV lanes and add Interchange (Spaghetti new interchanges at Pecos Rd, F St. (PE, RW, Bowl) Const.) NDOT 2030 RS 4155 I-515 I-215 SR 159 Charleston Blvd. FAST package B1: ITS infrastructure NDOT 2011 OCM-I 4156 I-515 I-215 SR 159 Charleston Blvd. FAST package B2: ITS infrastructure NDOT 2012 OCM-I 2728 Indian Springs - various Roadway improvements Clark County locations 2030 XNAA 764 Industrial Rd. Sahara Ave. Wyoming Ave. Widen to 6 Lanes Las Vegas 2010 NRS-M 2904 Inter-city passenger rail Los Angeles Las Vegas Acquisition of conventional passenger rail NDOT 2012 EX-T equipment 765 Iron Mountain Rd. Grand Canyon Dr. Decatur Blvd. Widen to 4 Lanes Las Vegas 2025 NRS-M 4123 Iron Mountain Rd. Sheep Mountain Pkwy. Horse Dr. Construct 6 lanes Las Vegas 2010 NRS-M 4126 Iron Mountain Rd. Fort Apache Rd. Tee Pee Ln. Construct 4 lanes Las Vegas 2010 NRS-M 4201 Ivanpah Expwy Proposed Ivanpah Valley I-15 near MP 22 Construct 4-lane expressway with a superarterial DoA 2017 RS Airport design concept from Ivanpah Airport to I-15 south of Sloan Rd, including interchange with I Ivanpah Expwy Proposed Ivanpah Valley I-15 near MP 22 PE and RoW for new expressway from Ivanpah DoA 2012 EX-P Airport Airport to I-15 south of Sloan Rd, including interchange with I Jones Blvd. SR.160 Blue Diamond Rd. Windmill Ln. Construct to 4 Lanes, 100' ROW Clark County 2012 NRS-M 570 Jones Blvd. Cactus Ave. Blue Diamond Rd. Construct 6 Lanes, 100' R.O.W. Clark County 2020 NRS-M 768 Jones Blvd. Elkhorn Rd. Horse Dr. Widen to 6 Lanes Las Vegas 2009 NRS-M 622 Kyle Canyon Rd. Rufus Rd. Sheep Mountain Pkwy. Re-align and widen to 6 lanes Las Vegas 2030 NRS-M 4087 Kyle Canyon Rd. at US.95 Construct 4 lane interchange/overpass at Kyle Las Vegas 2020 RS Canyon Rd and US95 Regional Transportation Plan : Draft for Consultation September 2008 Appendix 1, Table1: Page 12 of 24

15 Appendix 1, Table 1: List of Projects in the Transportation Capital Program Project # Location / Title From To Description Sponsor Entity Year Complete Model Class 4244 Kyle Canyon Rd. Replace Bridge NDOT 2010 EX 4267 Kyle Canyon Rd. at US.95 PE and RoW for interchange at Kyle Canyon Rd Las Vegas 2012 EX-P and US Lake Mead Blvd Civic Center Dr Pecos Rd ITS and signal infrastructure improvements North Las Vegas 2010 EX-I 4146 Lake Mead Blvd. Losee Rd. Las Vegas Blvd. Realign roadway and widen to 8 lanes, including dedicated right- and left-turn lanes, auxiliary lanes, and modification of freeway ramps associated with the I-15 interchange. (PE, ROW, Construction) North Las Vegas 2020 NRS-M 4246 Lake Mead NRA; PRA LAME 1 (10) Northshore Rd. Rehabiltate NDOT 4245 Lake Mead NRA; PRA Northshore and Eco Bay Rehabiltate NDOT LAME 1 (9) & 11 (1) Access Rds EX EX 145 Lamb Blvd. CC-215 Northern Beltway I-15 Construct 8-lane roadway (120' ROW), with North Las Vegas 2009 NRS-M railroad grade separation at UPRR 850 Lamb Blvd. CC-215 Northern Beltway Sheep Construct 6-lane limited acess roadway with transit Mountian/Mountain lanes/ pedestrian crossing and an interchange at Edge Pkwy Mountain Edge Pkwy North Las Vegas 2030 NRS-M 230 Lamb Blvd. / Donovan Way Donovan Ann Rd. Novak Dovovan Construct 4-lane roadway North Las Vegas Connector Way 2743 Las Vegas Area Regional Transit System Development 2744 Las Vegas Area Regional Intersection Traffic Flow Improvements 2745 Las Vegas Area Regional Pedestrian Realm Enhancments 2748 Las Vegas Area Electric Bike Pilot Project in downtown Las Vegas NRS-M EX-T OCM-O OCM-A OCM-A 2801 Las Vegas Area Projects to be selected under the Coordinated Public Transit - Human Services Transportation Plan 2012 EX-T 2802 Las Vegas Area Projects to be selected under the Coordinated Public Transit - Human Services Transportation Plan 2012 EX-T 2805 Las Vegas Area Institute regular paratransit service for disabled workers 2012 EX-T 2806 Las Vegas Area Development and operation of a centralized information and referral service for human services transportation clients EX-T Regional Transportation Plan : Draft for Consultation September 2008 Appendix 1, Table1: Page 13 of 24

16 Appendix 1, Table 1: List of Projects in the Transportation Capital Program Project # Location / Title From To Description Sponsor Entity Year Complete Model Class 2100 Las Vegas Blvd SR.146 St. Rose Pkwy Sunset Rd Construct shelters and ancillary equipment for 2016 RS-T Rapid Transit operations in the South Strip corridor 2603 Las Vegas Blvd Sunset Rd Downtown Las Vegas Upgrade transit shelters, TVMs and security 2010 EX-T systems at selected transit stops on the Las Vegas Strip 2731 Las Vegas Blvd Silverado Ranch Blvd Russell Rd ITS and signal infrastructure improvements Clark County 2010 EX-I 4203 Las Vegas Blvd South Proposed Ivanpah Valley Jean Construct Las Vegas Blvd. South as 2-lane arterial Airport roadway from Ivanpah Airport to Jean DoA 2010 RS 572 Las Vegas Bellagio/ Paris Construct Above-Grade Pedestrian Crossing Clark County 2016 EX-A 573 Las Vegas Harmon Ave. Construct Above-Grade Pedestrian Crossing Clark County 2010 EX-A 574 Las Vegas Riviera Blvd. Construct Above-Grade Pedestrian Crossing Clark County 2016 EX-A 575 Las Vegas Sahara Ave. Construct Above-Grade Pedestrian Crossing Clark County 2016 EX-A 890 Las Vegas Blvd. Bonanza Rd. Owens Ave. Widen to 6 lanes Las Vegas 2030 NRS-M 4200 Las Vegas Monorail McCarren International Airport MGM Hotel Monorail Station Design/permit/construct dual quideway monorail from the existing Las Vegas Monorail Station at the MGM Grand Hotel to McCarren Internationl Airport LVMC 2012 RS-T 2903 Laughlin Development and construction of building for Southern Nevada Transit Coalition public transit operations 2009 ONX-T 3001 Laughlin Needles Hwy. Bullhead City, AZ Planning and NEPA process for new Colorado 2010 XTDM River crossing 3002 Laughlin Needles Hwy. Bullhead City, AZ Construct new Colorado River bridge and related Clark County 2013 XTDM road works 4125 Log Cabin Way Fort Apache Rd. Tee Pee Ln. Construct 4 lanes Las Vegas 2010 NRS-M 582 Lone Mountain Rd. CC-215 Western Beltway Durango Dr. Construct 4-lane roadway Clark County 2015 NRS-M 770 Lone Mountain Rd. Rancho Dr. Torrey Pines Widen to 4 Lanes Las Vegas 2015 NRS-M 810 Lone Mountain Rd. Decatur Blvd. Clayton St. Widen from 2 to 4 lanes North Las Vegas 2011 NRS-M 819 Lone Mountain Rd. Clayton St. Camino Al Norte Widen from 2 to 4 lanes North Las Vegas 2020 NRS-M 958 Lone Mountain Rd. Losee Rd. Pecos Rd. Widen from 2 to 4 lanes North Las Vegas 2012 NRS-M 4014 Lone Mountain Rd. Commerce St. Losee Rd. Widen from 2 to 4 lanes North Las Vegas 2012 NRS-M Regional Transportation Plan : Draft for Consultation September 2008 Appendix 1, Table1: Page 14 of 24

17 Appendix 1, Table 1: List of Projects in the Transportation Capital Program Project # Location / Title From To Description Sponsor Entity Year Complete Model Class 320 Losee Rd. Alexander Rd. CC-215 Northern Widen from 4 to 6 Lanes North Las Vegas Beltway 2015 NRS-M 4061 Losee Rd. Losee Rd. Grand Teton Dr. Construct 6-lane roadway North Las Vegas 2015 NRS-M 694 Magic Way Newport Rd. Warm Springs Rd. Construct to 2 Lanes Henderson 2021 NRS-M 847 Major Ave. Van Wagenen St. Warm Springs Rd. Reconstruct existing roadway Henderson 2009 EX 849 Marion Dr. Centennial Pkwy. Deer Springs Way Construct 4-lane roadway North Las Vegas 2025 NRS-M 184 Martin Luther King Blvd. / Industrial Rd. south of M.L.King Blvd. at Project Neon Phase 2: Construct a 6-lane Industrial Rd. Connector Wyoming Ave Palomino Ln. overpass across I-15 with grade separation at Oakey/Wyoming NDOT 2011 RS 4147 Martin Luther King Blvd. / Industrial Rd. south of M.L.King Blvd. at Preliminary Engineering and Right-of-Way for a 6- Industrial Rd. Connector Wyoming Ave Palomino Ln. lane overpass across I-15 with grade separation at Neon Phase 2 Oakey/Wyoming NDOT 2030 EX-P 312 Maryland Pkwy. SR 146 St.Rose Pkwy Volunteer Blvd. Construct 4-lane roadway Henderson 2020 NRS-M 4235 Maryland Pkwy. Pebble St. Rose Pkwy. Widen to 6 lanes Clark County 2011 NRS-M 2723 Mesquite - various locations Roadway improvements Mesquite 2730 Moapa Town - various Roadway improvements Clark County locations 2729 Moapa Valley - various Roadway improvements Clark County locations 2727 Mount Charleston - various Roadway improvements Clark County locations XNAA XNAA XNAA XNAA 860 Mount Hood St. Ann Rd. Centennial Way Widen from 2 to 4 lanes North Las Vegas 2030 NRS-M 702 Newport Rd. Racetrack Rd. Pueblo Construct to 4 Lanes and construct a bridge at C-1 Henderson 2025 NRS-M channel 969 North 5th St. Cheyenne Ave. Craig Rd. Widen from 2 to 8 lanes including 2 transit lanes, North Las Vegas 2018 RS grade-separated pedestrian crossings, landscaping, and multi-use trails 2110 North 5th St. Downtown Las Vegas CC.215 Northern Construct shelters and ancillary equipment for Beltway Rapid Transit operations in the North 5th St. corridor 2020 RS-T 4001 North 5th St. Craig Rd. CC-215 Northern Widen from 2 to 8 lanes including 2 transit lanes, Beltway grade-separated pedestrian crossings, landscaping, and multi-use trails North Las Vegas 2021 RS Regional Transportation Plan : Draft for Consultation September 2008 Appendix 1, Table1: Page 15 of 24

18 Appendix 1, Table 1: List of Projects in the Transportation Capital Program Project # Location / Title From To Description Sponsor Entity Year Complete Model Class 4035 North 5th St. Owens Ave. Cheyenne Ave. Construct 8-lane roadway with overpass at I-15 and new interchange at Cheyenne Ave, including transit lanes, grade-separated pedestrian crossings and multi-use trails; Reconfigure Main St./Owens Ave./Las Vegas Blvd. intersections. North Las Vegas 2012 RS 4060 North 5th St. CC-215 Northern Beltway Grand Teton Dr. Construct to 8 lanes including 2 dedicated transit North Las Vegas 2015 NRS-M lanes, multi-use trails, and landscaping 4070 North 5th Ann Rd. Construct urban interchange with ramps and North Las Vegas 2022 NRS-M dedicated transit lanes 4076 North 5th Craig Rd. Construct urban interchange with ramps and North Las Vegas 2018 RS dedicated transit lanes 4269 North 5th St. Cheyenne Ave. Craig Rd. PE for widening to 8 lanes North Las Vegas 2010 EX-P 812 North Las Vegas Arterial Reconstruction North Las Vegas - various roadways Various locations Reconstruct portions of various arterial roadways North Las Vegas 4243 Northshore Rd. (Lake Mead Northshore Road and Various Rehabilitate Mile (Construction Engineering) NDOT NRA) Routes NRS EX 4249 Oakey/Wyoming I-15 Main St. Construct a grade seperation at Oakey/Wyoming Las Vegas 2019 RS (PE, RW, Const.) 2707 Off-road diesel engine Off-road diesel engine retrofits DAQEM retrofit program 2020 OCM 965 Old Highway Riverside Rd. New Airport Airport Access Road: Rebuild Riverside to new Mesquite 2014 XNAA Airport along Old Highway 1573 Ozone Non-Attainment Various measures to reduce Ozone emissions, to Area - Clark County be determined in the Ozone SIP Clark County 2013 TCM 671 Paradise Hills Rd. Greenway Rd. College Dr. Widen existing roadway to 4 lanes Henderson 2021 NRS 114 Paradise Rd. Tropicana Ave. Desert Inn Rd. Widen to 6 Lanes Clark County 2013 NRS-M 2033 Paratransit fleet expansion Acquire 22 vehicles for the expansion of paratransit operations ONX-T 2035 Paratransit fleet expansion Acquire vehicles for the expansion of paratransit operations ONX-T 2055 Paratransit fleet expansion Acquire 60 vehicles for the expansion of paratransit operations ONX-T Regional Transportation Plan : Draft for Consultation September 2008 Appendix 1, Table1: Page 16 of 24

19 Appendix 1, Table 1: List of Projects in the Transportation Capital Program Project # Location / Title From To Description Sponsor Entity Year Complete Model Class 2034 Paratransit fleet replacement Acquire vehicles for the paratransit fleet replacement program 2030 EX-T 2052 Paratransit fleet replacement Acquire 257 vehicles for the expansion of paratransit operations EX-T 2053 Paratransit fleet replacement Acquire 220 vehicles for the expansion of paratransit operations EX-T 2706 Park-and-Ride lots - various Development of park-and-ride lots locations 708 Paseo Verde Pkwy. Gibson Rd. east to existing Construct to 4 Lanes Henderson development ONX-T NRS-M 827 Pecos Rd. Washburn Rd. Centennial Pkwy. Widen from 2 to 6 lanes North Las Vegas 2010 NRS-M 956 Pecos Rd. Centennial Pkwy. CC-215 Widen from 2 to 6 lanes North Las Vegas 2017 NRS-M 4012 Pecos Rd. CC-215 Northern Beltway Grand Teton Dr. Construct 6-lane roadway North Las Vegas 2020 NRS-M 4041 Pecos Eastern Ave Complete south half of the roadway Henderson 2013 NRS-M 927 Plymouth Rock Bermuda Rd. Democracy Dr. Construct to 4 lanes Henderson 2020 NRS-M 313 Pueblo Rd. Boulder Hwy. Warm Springs Rd. Widen to 4 lanes / new roadway near Boulder Henderson 2015 NRS-M Hwy. W/ full offsites - Along C-1 Channel 118 Rainbow Blvd. Cactus Ave. SR 160 Blue Diamond Construct 6 Lanes, 100' R.O.W. Clark County Rd NRS-M 551 Rainbow Blvd. CC-215 Southern Beltway Tropicana Ave. Widen from 4 to 6 lanes Clark County 2011 RS 1578 Rainbow Blvd. Desert Inn Rd. US.95 Intersection improvements at Desert Inn Rd, Las Vegas 2010 OCM-O Oakey Blvd, Charleston Blvd and Alta Dr Rainbow Blvd. at Sahara Ave Intersection improvements Las Vegas 2010 OCM-O 1580 Rainbow Blvd. Desert Inn Rd. US.95 Construct bus turnouts Las Vegas 2012 EX-T 747 Rainbow Blvd./Desert Inn Rd. Rainbow Blvd. Desert Inn Rd. Feasibility Study and PE for road improvements Las Vegas 2015 EX-P 941 Rancho Dr. Bonanza Rd. Ann Rd. Feasibility study to look at 6 grade separations and Las Vegas 2020 EX add 4 lanes 2708 Rancho Dr. Sahara Ave. Rainbow Blvd. Signal interconnects and timing infrastructure Las Vegas 2010 EX-I 832 Range Rd. Tropical Pkwy. Centennial Pkwy. Widen from 2 to 4 lanes North Las Vegas 2021 NRS-M Regional Transportation Plan : Draft for Consultation September 2008 Appendix 1, Table1: Page 17 of 24

20 Appendix 1, Table 1: List of Projects in the Transportation Capital Program Project # Location / Title From To Description Sponsor Entity Year Complete Model Class 2051 Regional express transit various locations Operating support for freeway express transit system development routes 2017 OCM-T 2046 Regional transit bus stop Enhancements to transit shelters including TVMs, and shelter program signage, passenger amenities, landscaping and related sidewalk improvements 2012 EX-T 2600 Regional transit system various locations Transit system enhancement projects enhancements 2030 EX-T 2602 Regional transit system various locations Upgrade and replacement of security systems at facilities facilities 2010 EX-T 2601 Regional transit system various locations Security systems for the regional transit system security systems 2030 EX-T 794 Revere St. Ann Rd. Deer Springs Way Widen from 2 to 6 lanes North Las Vegas 2010 NRS-M 828 Revere St. Deer Springs Way Grand Teton Dr. Construct to 6 lanes North Las Vegas 2015 NRS-M 318 Robindale Rd. Las Vegas Blvd. Tamarus St. Construct to 4 Lanes Clark County 2014 NRS-M 595 Robindale Rd. Jones Blvd. Valley View Blvd. Construct 4-lane roadway Clark County 2025 NRS-M 597 Robindale Rd. Valley View Blvd. Las Vegas Blvd. Construct 4-lane roadway, including overpass at I- Clark County 2025 NRS-M Russell Rd Decatur Blvd Las Vegas Blvd ITS and signal infrastructure improvements Clark County 2010 EX-I 599 Russell Rd. CC-215 Southern Beltway Rainbow Blvd. Construct 6-lane roadway Clark County 2009 NRS-M 713 Russell Rd. Pabco Burkholder Blvd. Construct 4-lane roadway Henderson 2015 NRS-M 128 Sahara Rainbow Blvd. Feasibility Study, Intersection improvement Las Vegas 2010 EX-P 601 Sands Ave/ Twain Ave. Paradise Rd. Maryland Pkwy. Widen from 4 to 6 lanes Clark County 2020 NRS-M 2724 Searchlight - various Roadway improvements Clark County locations 2013 XNAA 714 Senate Ave. Las Vegas Blvd. Executive Airport Dr. Construct 4-lane roadway Henderson 2014 NRS-M 716 Serene Ave. Pecos Rd. Eastern Ave. Widening existing roadway to 4 lanes Henderson 2009 NRS-M 942 Shadow Ln. Charleston Blvd. Alta Dr. Widen to 4 lanes Las Vegas 2011 NRS-M 4121 Shaumber Dr. Iron Mountain Dr. Grand Teton Dr. Construct 4 lanes Las Vegas 2010 NRS-M 889 Sheep Mountain US-95 & CC-215 Western Construct interchanges Las Vegas Beltway 2028 RS Regional Transportation Plan : Draft for Consultation September 2008 Appendix 1, Table1: Page 18 of 24

21 Appendix 1, Table 1: List of Projects in the Transportation Capital Program Project # Location / Title From To Description Sponsor Entity Year Complete Model Class 938 Sheep Mountain Pkwy. CC-215 Western Beltway US-95 Construct expressway Las Vegas 2027 RS 4263 Sheep Mountain US-95 & CC-215 Western PE and right-of-way for the construction of Beltway interchanges Las Vegas 2010 EX-P 4027 Sheep Mountian Pkwy. CC-215 Western Beltway I-15 PE and NEPA process/environmental assessment Las Vegas 2009 EX-P for new roadway and ROW 548 Silverado Ranch Blvd. Jones Blvd. Dean Martin Construct 6-lane roadway Clark County 2013 NRS-M 2702 Silverado Ranch Dean Martin Dr Develop a park-and-ride lot and related facilities to Clark County 2009 ONX-T serve the I-15 South corridor 791 Simmons St. Lone Mountain Rd. Centennial Pkwy. Widen from 2 to 6 lanes North Las Vegas 2011 NRS-M 830 Simmons St. Carey Ave. Lone Mountain Rd. Widen from 2 to 6 lanes North Las Vegas 2015 NRS-M 4265 Southern Nevada FAST ITS and signal timing coordination on regional System freeway and arterial roadways 2030 OCM-I 611 Spencer St. Wigwam Ave. Warm Springs Rd. Construct 4-lane roadway Clark County 2014 NRS-M 612 Spencer St. SR 146 St. Rose Pkwy. Wigwam Ave. Widen to 4 lanes Clark County 2014 NRS-M 193 SR 146 St. Rose Pkwy. Gillespie St./ Coronado Center Spencer St./Seven Hills Phase 2B: Widen from 6 to 8 lanes (from Gillespie Dr./I-215 St. to Seven Hills/Spencer St. & from Coronado Center Dr. to I-215) NDOT 2009 RS 263 SR 160 Blue Diamond Rd. Decatur Blvd. Rainbow Blvd. Phase 2B: Construct a new 8-lane road; Construct a new grade separation over the UPRR at the existing at-grade crossing; Realign Jones Bl. South of SR. 160 to intersect SR.160 on the section line. NDOT 2009 RS 4028 SR 160 Blue Diamond Rd. Durango Dr. SR.159 Red Rock Widen from 2 to 4 lanes with a raised median Canyon Road island NDOT 2012 RS 4167 SR 160 Blue Diamond I-15 Construct a directional ramp from EB SR 160 to NDOT 2030 RS NB I SR 160 Blue Diamond Rd. Rainbow Blvd. Durango Dr. Widen from 2 to 4 lanes NDOT 2011 RS 4018 SR 160 Pahrump Valley Rd. SR.159 Red Rock Canyon Mountain Springs Widen from 2 to 4 Lanes NDOT Road 843 SR 564 Lake Mead Pkwy. Boulder Highway Lake Mead National Widen to 6 lanes Henderson Recreation Area XTDM RS 913 SR 564 Lake Mead Pkwy: Boulder Highway Lake Mead National Corridor and Trail Beautification Phase 1 (PE, Corridor Trail Recration Area Construction) Henderson 2009 EX-E Regional Transportation Plan : Draft for Consultation September 2008 Appendix 1, Table1: Page 19 of 24

Amendment to the Summary of Regional Strategic Investments included in the Regional Transportation Plan

Amendment to the Summary of Regional Strategic Investments included in the Regional Transportation Plan Attachment A Amendment to the Summary of Regional Strategic Investments included in the Regional Transportation Plan Street and Highway improvements Project costs include all funded phases including planning,

More information

APPENDIX G: 20 Year Transportation Improvement Project Cost Lists

APPENDIX G: 20 Year Transportation Improvement Project Cost Lists APPENDIX G: 20 Year Transportation Improvement Project Cost Lists Fiscal Year 2018 2022 Projects KEY BIKE LANE QUANTITY FOR KPI LENGTH ESTIMATED CLV OTHER ENTITY Buffered Non Buffered but New Basic WARD

More information

State Route 160 (Blue Diamond Highway)

State Route 160 (Blue Diamond Highway) State Route 160 (Blue Diamond Highway) ~ Multi-Year Expansion Program ~ Highway Improvement Projects in Clark and Nye Counties EXHIBIT G Treasures Document consists of 16 slides. Entire exhibit provided.

More information

Nevada s Transportation Infrastructure and Future Transportation Needs

Nevada s Transportation Infrastructure and Future Transportation Needs Nevada s Transportation Infrastructure and Future Transportation Needs Susan Martinovich, P.E. Director Interim Legislative Committee on Transportation Nov. 13, 2007 State Transportation Board of Directors

More information

REGIONAL BICYCLE NETWORK GAP ANALYSIS

REGIONAL BICYCLE NETWORK GAP ANALYSIS REGIONAL BICYCLE NETWORK GAP ANALYSIS UPWP Task: 3650-13 RTC Contract No: 13-081 Prepared for: 600 S. Grand Central Parkway Suite 350 Las Vegas, Nevada 89106-4512 Prepared by: 6671 Las Vegas Boulevard

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

APPENDIX B: Planned and Programmed Improvements Technical Memorandum

APPENDIX B: Planned and Programmed Improvements Technical Memorandum APPENDIX B: Planned and Programmed Improvements Technical Memorandum MOBILITY MASTER PLAN Planned and Programmed Improvements Technical Memorandum Prepared for April 2015 Contents Acronyms and Abbreviations...

More information

PATRICK COMMERCE CENTER

PATRICK COMMERCE CENTER S PECOS ROAD PATRICK COMMERCE CENTER KYLE CANYON GATEWAY SPRING MOUNTAIN SILVERSTONE IRON MOUNTAIN PARK HIGHLANDS PROVIDENCE ELKHORN SPRINGS ALIANTE EL DORADO LAS VEGA MOTOR SPEE PAINTED DESERT LOS PRADOS

More information

AVAILABLE: Park West Business Center

AVAILABLE: Park West Business Center VALLEY VIEW BLVD. INTERSTATE 15 PECOS AVAILABLE: Park West Business Center 6365 Montessouri Street Las Vegas, Nevada 89113 ±46,020 SF Free-Standing Industrial Building Property Features ±46,020 SF Available;

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

Chapter 6 Transportation Plan

Chapter 6 Transportation Plan Chapter 6 Transportation Plan Transportation Plan Introduction Chapter 6 Transportation Plan Transportation Plan Introduction This chapter describes the components of Arvada s transportation system, comprised

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7

More information

Relevant Studies and Industry Practices Summary

Relevant Studies and Industry Practices Summary April 1, 2016 Draft Prepared For: Prepared By: Background There are a number of residential areas in unincorporated Clark County (County) that have an Overlay District and Planned Land use designation

More information

CMAQ DETAILED PROJECT LISTING REPORT ( FY 2001 )

CMAQ DETAILED PROJECT LISTING REPORT ( FY 2001 ) Fiscal Year = 'By Fiscal Year' and Status Selection Criteria = 'All' and State = '' $943,000 Traffic Flow Improvements Downtown Traffic Management System (phase 2) Systems - Other 7 68 $800,000 Traffic

More information

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ % Fee Program Project List - 2004 General Plan Cost Estimate 2004 Alternative Route Study West Valley Condition 27 Alternative connection between, Feasibility study. Included in /White Rock Connector. south

More information

TRANSPORTATION TRAINING TOPICS. April 6, 2010

TRANSPORTATION TRAINING TOPICS. April 6, 2010 TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA

More information

ANNUAL VEHICLE MILES OF TRAVEL

ANNUAL VEHICLE MILES OF TRAVEL NEVADA DEPARTMENT OF TRANSPORTATION AVMT AVMT AVMT AVMT AVMT AVMT AVMT ANNUAL VEHICLE MILES OF TRAVEL In Cooperation with U.S. Department of Transportation Federal Highway Administration, Nevada Division

More information

STUDY ADVISORY COMMITTEE. October 8, 2015

STUDY ADVISORY COMMITTEE. October 8, 2015 STUDY ADVISORY COMMITTEE October 8, 2015 Study Purpose evaluate the long-term transportation strategies and investments needed to sustain the county s economic health and quality of life in the coming

More information

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9. CHAPTER NINE: TRANSPORTATION AND CIRCULATION 9.1 INTRODUCTION 9.1 9.2 ASSUMPTIONS 9.1 9.3 TRANSPORTATION FACILITIES 9.1 9.4 TRANSPORTATION IMPROVEMENTS PHASING 9.3 LIST OF FIGURES LIST OF TABLES Figure

More information

THE FINGERS AT LAKE LAS VEGAS

THE FINGERS AT LAKE LAS VEGAS THE FINGERS AT FOR SALE TENTATIVE MAPPED WATER FRONT SINGLE FAMILY LOTS Henderson, Nevada STRIP HILTON SOUTHSHORE GOLF COURSE THE WESTIN RESORT & SPA SUBJECT PROPERTY For More Information: TEL + 02 6 9

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

Basalt Creek Transportation Refinement Plan Recommendations

Basalt Creek Transportation Refinement Plan Recommendations Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for

More information

Project Description Form 8EE

Project Description Form 8EE Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000

More information

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners Transportation Investment Act Gwinnett County Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners April 25, 2012 Transportation Investment Act Gwinnett County Gwinnett County Transportation

More information

3.0 PROJECT DESCRIPTION

3.0 PROJECT DESCRIPTION The following section of the Draft EIR contains a description of the proposed Elk Grove Boulevard/SR 99 Interchange Modification project, consistent with the requirements of CEQA Guidelines Section 15124.

More information

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015 City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015 McPhail Transportation Planning Services Ltd. AGENDA 6:00 7:00 pm Viewing Boards / Q & A with the Team 7:00 7:50

More information

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,

More information

Welcome to the Quebec Alternatives Analysis Public Meeting

Welcome to the Quebec Alternatives Analysis Public Meeting Welcome to the Public Meeting Please sign in. Public Comment Please fill out a comment card and tell us what you think. Check back or comment any time at: www.quebecalternatives.com Project Area Technical

More information

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL

More information

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2. Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW

More information

TRASBURG RANSPORTATION

TRASBURG RANSPORTATION TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION

More information

A METHODOLOGY TO IDENTIFY HIGH PEDESTRIAN CRASH LOCATIONS: AN ILLUSTRATION USING THE LAS VEGAS METRO AREA

A METHODOLOGY TO IDENTIFY HIGH PEDESTRIAN CRASH LOCATIONS: AN ILLUSTRATION USING THE LAS VEGAS METRO AREA A METHODOLOGY TO IDENTIFY HIGH PEDESTRIAN CRASH LOCATIONS: AN ILLUSTRATION USING THE LAS VEGAS METRO AREA Srinivas S. Pulugurtha Transportation Research Center University of Nevada, Las Vegas 4505 Maryland

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives Contents EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW... 1-1 1.1 Study Scope... 1-1 1.2 Study Area... 1-1 1.3 Study Objectives... 1-3 2 EXISTING CONDITIONS... 2-1 2.1 Existing Freeway Conditions... 2-4 2.1.1

More information

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

Proposed Project I 35 from Denton to Cooke County Line

Proposed Project I 35 from Denton to Cooke County Line Proposed Project I 35 from Denton to Cooke County Line The existing I 35 facility is four lanes from I 35E/I 35W to Farm to Market Road (FM) 3002. The purpose of the proposed project is to increase capacity

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

Regional Transportation Needs Within Southeastern Wisconsin

Regional Transportation Needs Within Southeastern Wisconsin Regional Transportation Needs Within Southeastern Wisconsin #118274 May 24, 2006 1 Introduction The Southeastern Wisconsin Regional Planning Commission (SEWRPC) is the official areawide planning agency

More information

A: PLANNED P ROJECTS PROJECTS

A: PLANNED P ROJECTS PROJECTS Appendix A: PLANNED PROJECTS Programming Study Sound Barrier along south side of for approx. 2100 feet. Construction Complete $850,000 5 8613.00 Y Y Y Sound Barrier along south side of for 500' west of

More information

Chapter 3 BUS IMPROVEMENT CONCEPTS

Chapter 3 BUS IMPROVEMENT CONCEPTS Chapter 3 BUS IMPROVEMENT CONCEPTS The purpose of this chapter is to describe potential bus improvement strategies and potential impacts or implications associated with BRT implementation within the existing

More information

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

TRANSPORTATION & MOBILITY

TRANSPORTATION & MOBILITY TRANSPORTATION & MOBILITY ROADWAY SYSTEM There are approximately 40 miles of roadways in Manitou Springs. For planning purposes, roadways are typically assigned a functional classification which defines

More information

STREET AND HIGHWAY PLAN

STREET AND HIGHWAY PLAN STREET AND HIGHWAY PLAN Introduction The street and highway system in the Winston-Salem Urban Area consists of thousands of miles of traffic carrying facilities, ranging from short local residential streets

More information

Stakeholder Focus Group Meeting #3 January 9, 2013 Cattlemens, 2000 Taylor Road, Roseville

Stakeholder Focus Group Meeting #3 January 9, 2013 Cattlemens, 2000 Taylor Road, Roseville PRESENT Stakeholder Focus Group Meeting #3 January 9, 2013 Cattlemens, 2000 Taylor Road, Roseville PROJECT TEAM REPRESENTATIVES Name Organization Celia McAdam Luke McNeel Caird Leo Heuston Judy Matsui

More information

% of Sales Tax (net of Admin) First Year Amount. Metro State of Good Repair 2% $ 17 $ 350 $ 910 $ 1,140 $ 2,400

% of Sales Tax (net of Admin) First Year Amount. Metro State of Good Repair 2% $ 17 $ 350 $ 910 $ 1,140 $ 2,400 Attachment A Proposed One-Half Cent Sales Tax for Transportation Outline of Expenditure Categories 40-s: Fiscal (FY ) 2018-2057, Escalated Dollars (millions) DRAFT Program % of Sales Tax (net of Admin)

More information

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report Appendix I Traffic Impact Study Street 0 80-1947 500.4501 RITA ld Court 0 91355-1096 400.7401 LA n Avenue 0 590-3745 300-9301

More information

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments! MetroDenverMTDGovernanceCommittee October23,2013 9:00AMto10:00AM DenverRegionalCouncilofGovernments MeetingRecord MetroDenverMTDGovernanceCommittee October23,2013 9:00AM Agenda: 9:00AM Welcome&Introductions

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY Multi Modal Transit Access Plan KIPDA ID # 239 Project Type: STUDY Description: In conjunction with the results from Project Gobility and the Transit LOS Analysis, TARC seeks to examine the possibilities

More information

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative EXHIBIT B-1 PROJECT DESCRIPTION Phase 1 of the Preferred Alternative The Transform 66 Public-Private Partnership (P3) Project (the Project ) means the Phase 1 of the Preferred Alternative components of

More information

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 What s Happening The City plans to mill and resurface Dr. M.L.

More information

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion RapidRide Roosevelt Seattle Bicycle Advisory Board 1 Our mission, vision, and core values Mission: deliver a high-quality transportation system for Seattle Vision: connected people, places, and products

More information

Keep Placer Moving. Placer is Growing. POPULATION (From 2014 to 2045) 70,000 new homes and well over 180,000 more residents

Keep Placer Moving. Placer is Growing. POPULATION (From 2014 to 2045) 70,000 new homes and well over 180,000 more residents Keep Placer Moving Placer is Growing Keep Placer Moving POPULATION (From 2014 to 2045) 70,000 new homes and well over 180,000 more residents 30% of the total housing market growth in the Sacramento region.

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

North County Metro. Community Summaries, Maps and Matrices

North County Metro. Community Summaries, Maps and Matrices North County Metro Interstate 15 Mountain Meadow Road / Mirar De Valle Road Deer Springs Road Overview Sponsor Group Preferences The North County Metro sub-region includes two represented communities:

More information

Scottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012

Scottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012 Scottsdale Road/Rural Road Alternatives Analysis (AA) Study Arizona ITE/IMSA Spring Conference March 7, 2012 Study Location and Duration Primary Study Corridor (major focus of effort) Rural Road and Scottsdale

More information

DEKALB COUNTY. 22. Priority Projects for DeKalb County

DEKALB COUNTY. 22. Priority Projects for DeKalb County DEKALB COUNTY 2 0 1 4 T R A N S P O R T A T I O N P L A N 22. Priority s for DeKalb County Following the completion of the project prioritization metrics, each project was able to be compared to other

More information

PRESS RELEASE San Joaquin Council of Governments

PRESS RELEASE San Joaquin Council of Governments PRESS RELEASE San Joaquin Council of Governments For Immediate Release February 23, 2018 Contact: Nicole Gorham, 235-0582 gorham@sjcog.org SJCOG Board Awards $19.63 Million in Measure K Bicycle, Pedestrian,

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

Freeway System Considerations

Freeway System Considerations Session 11 Jack Broz, PE, HR Green May 5-7, 2010 Freeway System Considerations Mainline Transit: Shoulder Operations, BRT, Stations HOV, HOT, UPA Interchanges Exit Ramps Entrance Ramps Bridges Local Crossings

More information

ALTERNATIVES ANALYSIS EXECUTIVE SUMMARY

ALTERNATIVES ANALYSIS EXECUTIVE SUMMARY West Valley Connector Corridor ALTERNATIVES ANALYSIS EXECUTIVE SUMMARY FINAL September 2014 Ontario International Airport Ontario Mills Rancho Cucamonga Metrolink Station Kaiser Permanente PARSONS EXECUTIVE

More information

REGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012

REGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012 WEST CENTRAL FLORIDA MPO CHAIRS COORDINATING COMMITTEE REGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012 TRANSPORTATION REGIONAL INCENTIVE PROGRAM (TRIP)

More information

2. TRANSPORTATION ELEMENT.

2. TRANSPORTATION ELEMENT. 2. TRANSPORTATION ELEMENT. The purpose of this element is to assist in establishing an adequate transportation system within the City and to plan for future motorized and non-motorized traffic circulation

More information

F.1 ENHANCED FISCALLY CONSTRAINED CAPITAL IMPROVEMENT PLAN

F.1 ENHANCED FISCALLY CONSTRAINED CAPITAL IMPROVEMENT PLAN APPENDIX F F.0 APPENDIX F F.1 ENHANCED FISCALLY CONSTRAINED CAPITAL IMPROVEMENT PLAN Recognizing the limitations of the fiscally constrained CIP discussed in Section 7.5, an enhanced fiscally constrained

More information

NOTICE OF PREPARATION. Environmental Programs 3331 North First Street, Building B-2 San Jose, CA

NOTICE OF PREPARATION. Environmental Programs 3331 North First Street, Building B-2 San Jose, CA NOTICE OF PREPARATION May 29, 2018 To: Reviewing Agencies and Organizations From: Santa Clara Valley Transportation Authority Environmental Programs 3331 North First Street, Building B-2 San Jose, CA 95134-1927

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

Project Fact Sheet. August 1,

Project Fact Sheet. August 1, Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation

More information

Evaluation Criteria. Record of Decision (ROD) 7/04-8/05 8/05-9/05 TBD TBD TBD. Final EIS (FEIS) Community Outreach

Evaluation Criteria. Record of Decision (ROD) 7/04-8/05 8/05-9/05 TBD TBD TBD. Final EIS (FEIS) Community Outreach EIS Process We are here 1 2 3 4 5 Scoping Purpose and Need Evaluation Criteria Alternative Development Alternative 7/03-12/03 12/03-2/04 12/03-2/04 1/04-5/04 3/04-8/04 6 7 8 9 10 Draft EIS (DEIS) Evaluation

More information

PROGRAMMED PHASE FISCAL YEAR, FDOT FM NO. SIS FUNDS 2014 PRIORITY 2015 PRIORITY PROJECT NAME ULTIMATE IMPLEMENTATION DESCRIPTION PROPOSED PHASE

PROGRAMMED PHASE FISCAL YEAR, FDOT FM NO. SIS FUNDS 2014 PRIORITY 2015 PRIORITY PROJECT NAME ULTIMATE IMPLEMENTATION DESCRIPTION PROPOSED PHASE Red denotes new funding in FDOT WP since last year. SPACE COAST TRANSPORTATION PLANNING ORGANIZATION (SCTPO) DRAFT 2016 TRANSPORTATION PROJECT PRIORITIES FY 2017-FY 2021 A(1). STRATEGIC INTERMODAL SYSTEM

More information

San Tomas Expressway

San Tomas Expressway Implementation Plan San Tomas Expressway Roads and Airports Department August 19, 2003 Implementation Plan San Tomas Expressway County of Santa Clara Roads and Airports Department 101 Skyport Drive San

More information

Bluffdale South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle

Bluffdale South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle Bluffdale 14600 South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle From Pony Express to UPRR Bridge over SR-140 $ 669,700 $ 624,361 To build bicycle/shoulder lanes on SR-140. SR-140 is an official

More information

APPENDIX L: COST ESTIMATING TOOLS

APPENDIX L: COST ESTIMATING TOOLS APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders

More information

Projects to Be Evaluated for the STP and CMAQ Funds and the 2021 TAP Programs

Projects to Be Evaluated for the STP and CMAQ Funds and the 2021 TAP Programs Multi Utah Transit Authority Bus Stop Improvements NA NA Transit Capital The project will upgrade approximately 50 of the highest ridership bus stop locations in need of improvement throughout the Valley

More information

NEED FOR ADDITIONAL FUNDING

NEED FOR ADDITIONAL FUNDING Measure B BACKGROUND 2013: Vision for a supplement to Measure A that prioritizes local roads & regional capital projects Plan developed by Professional Advisory Group Consensus recently built on RT O&M

More information

EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP

EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP EXISTING PRIORITIES FUNDED FOR CONSTRUCTION Limits Description Status 1 415489 3 H1865 US HWY 301 FROM SR 674 TO BALM RD Widen 2 lanes to 6 lanes divided County / Construction Programmed 2016 2 405492

More information

Clackamas County Comprehensive Plan

Clackamas County Comprehensive Plan ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They

More information

Short and Long Term Needs

Short and Long Term Needs Short and Long Term Needs The short- and long-term programs of proposed projects listed below have been designed to address the mobility issues in South Montgomery County. These improvements to the transportation

More information

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose

More information

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017 ` SR 976 BIRD ROAD/SW 40TH STREET FROM SR 821/HEFT TO SR 5/US-1 Miami-Dade County, Florida FPID No.: 434845-4-22-01 Planning Study Project Advisory Team Meeting May 24, 2017 1 Agenda Introductions Project

More information

Proposed White Flint Separated Bike Lane Network September 2015

Proposed White Flint Separated Bike Lane Network September 2015 Proposed White Flint Separated Bike Lane Network September 2015 Abstract This report includes a proposed separated bike lane network for the White Flint Sector Plan area. Separated bike lanes create a

More information

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Introduction The Georgia Department of Transportation (GDOT) prepared a

More information

2040 RTP. Chapter 6: Investments in our Transportation Future

2040 RTP. Chapter 6: Investments in our Transportation Future 2040 RTP Chapter 6: Investments in our Transportation Future This chapter describes the transportation investments proposed for the San Benito region that support the goals and objectives of the Regional

More information

Terwillegar Drive Expressway Draft Concept Plan

Terwillegar Drive Expressway Draft Concept Plan Terwillegar Drive Expressway Draft Concept Plan Anthony Henday Drive to Whitemud Drive November 28 5:00-8:00 p.m. December 1 10:00 a.m. - 3:00 p.m. Let s Talk Today you can: Learn about the new direction

More information

Bay to Bay Boulevard Complete Streets Project

Bay to Bay Boulevard Complete Streets Project Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information

More information

NOTICE OF AVAILABILITY/NOTICE OF COMMENT PERIOD OF A DRAFT EIR/EIS/EIS FOR PUBLIC REVIEW AND HEARINGS

NOTICE OF AVAILABILITY/NOTICE OF COMMENT PERIOD OF A DRAFT EIR/EIS/EIS FOR PUBLIC REVIEW AND HEARINGS Tahoe Transportation District 128 Market Street, Suite 3F Stateline, NV 89449 Phone: (775) 589-5500 www.tahoetransportation.org Federal Highway Administration 650 Capitol Mall, Suite 4-100 Sacramento,

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four

More information

Maryland Parkway Corridor Complete Streets Analysis and Considerations Technical Report

Maryland Parkway Corridor Complete Streets Analysis and Considerations Technical Report Maryland Parkway Corridor Complete Streets Analysis and Considerations Technical Report DRAFT (v2.2) vember 3, 2017 Prepared for: Regional Transportation Commission of Southern Nevada (RTC) Prepared by:

More information

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements Scott King, Senior Aviation Planner Jason Gately, Senior Aviation Planner Preston Beck, Associate Planner

More information

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING February 13, 2012 This regional transportation plan will: 1. Review existing plans for the cities and counties,

More information

BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT FOR EXISTING AND PLANNED SECTIONS OF US 19

BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT FOR EXISTING AND PLANNED SECTIONS OF US 19 BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT FOR EXISTING AND PLANNED SECTIONS OF US 19 Project Advisory Committee Meeting January 27, 2016 A JOINT EFFORT OF THE PINELLAS METROPOLITAN PLANNING

More information

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) US 20 Feasibility Study Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) Village Board Meeting Bartlett Village Hall February 16, 2016 1 Background 1991 IDOT Study Recommendations

More information

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017 MCA Member Meeting: Tysons Update Fairfax County Department of Transportation November 13, 2017 Presentation Overview Balancing Land Use and Transportation How Are We Doing? Studies and Projects Neighborhood

More information

Bus Rapid Transit Plans

Bus Rapid Transit Plans Twin Cities Region Bus Rapid Transit Plans ULI Minnesota Workshop Connecting Bus Rapid Transit to the Community December 15, 2009 John Levin Director of Service Development Metro Transit Metropolitan Area

More information

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,

More information

INTERMODAL TRANSPORTATION PLAN

INTERMODAL TRANSPORTATION PLAN INTRODUCTION INTERMODAL TRANSPORTATION PLAN Effective intermodal transportation implies a public policy for actively decreasing the demand for automobile trips and consequently reducing automobile related

More information