Evaluation Criteria. Record of Decision (ROD) 7/04-8/05 8/05-9/05 TBD TBD TBD. Final EIS (FEIS) Community Outreach

Size: px
Start display at page:

Download "Evaluation Criteria. Record of Decision (ROD) 7/04-8/05 8/05-9/05 TBD TBD TBD. Final EIS (FEIS) Community Outreach"

Transcription

1 EIS Process We are here Scoping Purpose and Need Evaluation Criteria Alternative Development Alternative 7/03-12/03 12/03-2/04 12/03-2/04 1/04-5/04 3/04-8/ Draft EIS (DEIS) Evaluation Formal Public Comment on DEIS Final EIS (FEIS) Formal Public Comment on FEIS Record of Decision (ROD) 7/04-8/05 8/05-9/05 TBD TBD TBD Community Outreach A cooperative effort between FHWA, FTA, CDOT, RTD, and Denver

2 Draft Pre- and Comparative Analysis Results Pre- Comparative Detailed DEIS Full Evaluation Interstate Alignment Section 1 I-25 to Brighton Boulevard IA1 Existing I-70 vertical alignment IA2 Existing I-70 horizontal alignment IA3 Lower I-70 below existing ground IA4 Add a level to the viaduct IA5 Enclose I-70 IA6 Put I-70 at-grade IA7 Triple level section of I-70 (below ground) IA8 I-70 tunnel IA9 I-70 above and below with at ground level Section 2 Brighton Boulevard to Colorado Boulevard IA10 Existing I-70 vertical alignment IA11 Existing I-70 horizontal alignment IA12 Lower I-70 below existing ground IA13 Add a level to the viaduct IA14 Enclose I-70 IA15 Put I-70 at-grade IA16 Triple level section of I-70 (below ground) IA17 I-70 tunnel IA18 I-70 above and below with at ground level Section 3 Colorado Boulevard to I-270 IA19 Existing I-70 vertical alignment IA20 Existing I-70 horizontal alignment Section 4 I-270 to I-225 IA21 Existing I-70 vertical alignment IA22 Existing I-70 horizontal alignment Section 5 I-225 to Peña Boulevard IA23 Existing I-70 vertical alignment IA24 Existing I-70 horizontal alignment Other IA25 Improve I-270 and reclassify I-70 IA26 Realign the I-70 westbound lanes north IA27 Realign the I-70 eastbound lanes to Smith Road IA28 Move I-70 north of Elyria/Swansea (along rail alignment) IA29 Move I-70 north of Elyria/Swansea (along 52nd Avenue) IA30 Move I-70 north of Elyria/Swansea (along I-270/rail alignment) Alternative will be carried forward to detailed screening Alternative will not be not carried forward Not considered a stand alone alternative, may be combined with other alternatives as necessary to improve overall system operations. Will not be evaluated as a stand alone alternative in the remaining screening levels. Interstate Alignment

3 Draft Pre- and Comparative Analysis Results Pre- Comparative Detailed DEIS Full Evaluation Interchanges I1 I-25 I2 Washington Street I3 Brighton Boulevard I4 York Street I5 Steele Street/Vasquez Boulevard I6 Colorado Boulevard I7 Dahlia Street I8 Holly Street I9 Monaco Street I10 Quebec Street I11 I-270 I12 Havana Street I13 Peoria Street I14 I-225 I15 Chambers Boulevard I16 Peña Boulevard I17 Airport Boulevard I18 Tower Road 1 I19 Picadilly Road I20 Central Park Boulevard I21 Additional access to Globeville area I22 I-270/Quebec Street improvements I23 Eliminate accesses I24 Combine accesses 1 1. Does not address purpose and need. Alternative will be carried forward to detailed screening Alternative will not be not carried forward Not considered a stand alone alternative, may be combined with other alternatives as necessary to improve overall system operations. Will not be evaluated as a stand alone alternative in the remaining screening levels. Interchanges

4 Draft Pre- and Comparative Analysis Results Pre- Comparative Detailed DEIS Full Evaluation Interstate Lane Types IL1 Dedicated lane for commuters IL2 Dedicated lane for DIA travelers IL3 Reversible expressway lane IL4 High Occupancy Vehicle (HOV) lane IL5 Toll lane IL6 General purpose lane IL7 Dedicated bus lane IL8 Dedicated truck lane IL9 Collector distributor (C-D) roads IL10 Emergency lane IL11 Frontage roads IL12 Auxiliary lanes IL13 Truck only ramps at Steele Street/Vasquez Boulevard IL14 Braided ramps IL15 Dual divided highway IL16 High Occupancy Toll (HOT) lanes Alternative will be carried forward to detailed screening Alternative will not be not carried forward Not considered a stand alone alternative, may be combined with other alternatives as necessary to improve overall system operations. Will not be evaluated as a stand alone alternative in the remaining screening levels. Interstate Lane Types

5 Draft Pre- and Comparative Analysis Results Pre- Comparative Detailed DEIS Full Evaluation Transit Alignment On-street Downtown Transit Alignments TA19 Brighton Boulevard TA4 Broadway Street TA5 Washington Street TA29 California Street TA30 Welton Street/Downing Street Off-street East-West Transit Alignments TA1 Along I-70 (in the ROW) TA2 Existing Union Pacific tracks/smith Road TA31 BNSF Denver Market Lead On-street East-West Transit Alignments TA3 35th Avenue TA6 Martin Luther King Boulevard TA9 Bruce Randolph/35th Avenue TA10 38th Avenue 1 TA11 Montview Boulevard TA7 Colfax Avenue TA13 Havana Street TA14 56th Avenue/North of 56th Avenue TA15 64th Avenue median Off-street Airport Transit Alignments TA8 Tower Road TA12 Peña Boulevard 1 TA16 Run Further East of DIA TA17 Picadilly Road TA18 E-470 Other Transit Alignments 2 TA20 Connection to North Front Range Area TA21 30th Avenue/Downing Street to 40th Ave/40th Street TA22 Downtown Brighton to National Western Complex TA23 US 36/ I-70 connection before Denver Union Station TA24 From Montbello to downtown Denver to DIA TA25 Connection to 40th/40th should be provided TA26 Connection between I-225 and I-70 transit alternatives TA27 Depressed alignment TA28 Elevated alignment Does not address purpose and need. 2. Providing a connection to the North Front Range Area is currently being evaluated in the North I-25 EIS. Alternative will be carried forward to detailed screening Alternative will not be not carried forward Not considered a stand alone alternative, may be combined with other alternatives as necessary to improve overall system operations. Will not be evaluated as a stand alone alternative in the remaining screening levels. Transit Alignment

6 Draft Pre- and Comparative Analysis Results Pre- Comparative Detailed DEIS Full Evaluation Station Locations S1 Denver Union Station S2 Five Points Area S3 Blake Street S4 33rd and Downing S5 31st Street S6 Cole Area S7 40th Avenue/40th Street S8 National Western Complex (47th/Brighton Boulevard) S9 Globeville Area S10 Brighton Boulevard S11 Swansea/Globeville Area S12 47th /Brighton Boulevard S13 Swansea Area S14 York Street S15 Steele Street S16 Clayton Area S17 Northeast Denver S18 40th Avenue/Colorado Boulevard S19 Colorado Boulevard S20 Dahlia Street S21 Northeast Park Hill S22 Holly Street S23 Quebec Street S24 Former Stapleton S25 Within Stapleton Development S26 Havana Street S27 Smith Road and Peoria Street 3 S28 Fitzsimons S29 Gateway S30 Peña Boulevard/Tower Road S31 40th Avenue/Peña Boulevard S32 Airport Boulevard/Smith Road S33 68th/Tower Road S34 56th/Tower Road S35 48th/Tower Road S36 45th/Tower Road S37 Smith Road/Tower Road S38 Denver International Airport (DIA) S39 One to two miles apart with Park-n-Rides S40 Ballpark Area S41 Monaco Parkway 3 3. A station location near Fitzsimons will be evaluated in the RTD Corridor Scoping Study on I-225 and is not a part of this study. Alternative will be carried forward to detailed screening Alternative will not be not carried forward Not considered a stand alone alternative, may be combined with other alternatives as necessary to improve overall system operations. Will not be evaluated as a stand alone alternative in the remaining screening levels. Stations

7 Draft Pre- and Comparative Analysis Results Pre- Comparative Detailed DEIS Full Evaluation Transit Technology TT1 Bus Rapid Transit (BRT) TT2 Commuter rail TT3 Heavy rail TT4 High speed rail (Bullet train) TT5 Light rail TT6 Magnetic levitation (MagLev) TT7 Monorail TT8 Personal Rapid Transit (PRT) TT9 Sky tram TT10 Street car/trolley TT11 Alternative fueled transit vehicles TT12 Bus feeder system TT13 Call-n-Ride service TT14 Diesel Multiple Unit (DMU) TT15 Double decker buses TT16 Electric trains TT17 Express buses TT18 Local and express trains Alternative will be carried forward to detailed screening Alternative will not be not carried forward Not considered a stand alone alternative, may be combined with other alternatives as necessary to improve overall system operations. Will not be evaluated as a stand alone alternative in the remaining screening levels. Transit Technology

8 Draft Pre- and Comparative Analysis Results Pre- Comparative Detailed DEIS Full Evaluation Transportation Demand Management/ Transportation System Management (TDM/TSM) DS1 Improved pedestrian facilities DS2 Improved bicycle facilities DS3 Enhanced bus service DS4 Ride sharing DS5 Vary business work schedules (Flex time) DS6 Intelligent Transportation Systems (ITS) DS7 Freight transport management DS8 Road pricing/congestion pricing Pre- Comparative Detailed DEIS Full Evaluation Local System Improvements LS1 Connect I-76 to DIA LS2 Improve 56th Avenue LS3 Improve Smith Road 1 LS4 Improve 6th Avenue LS5 Improve intersections where the railroad crosses 4 LS6 Extend Smith Road LS7 Connect tolling options to E-470 LS8 Remove through trucks from I-70 LS9 At-grade crossings LS10 Outer Loop LS11 Improve I Does not address purpose and need. 4. Extending Smith Road is included in local plans. 1 4 Note: Removal of local system improvements from the screening process does not eliminate the merit of improvements to the system to address local needs. These improvement alternatives do not meet the purpose and need of the I-70 East Corridor EIS. Alternative will be carried forward to detailed screening Alternative will not be not carried forward Not considered a stand alone alternative, may be combined with other alternatives as necessary to improve overall system operations. Will not be evaluated as a stand alone alternative in the remaining screening levels. Transportation Demand Management Transportation System Management Local System Improvements

9 IA3 Westbound Existing Ground Eastbound Westbound I-70 Eastbound I-70 Lower I-70 Below Existing Ground

10 IA4 I-70 Lanes I-70 Lanes I-70 Lanes Westbound Eastbound Existing Ground Add a Level to the Viaduct

11 IA5 Cover (roof) over I-70 Westbound I-70 Eastbound I-70 Eastbound Eastbound Existing Ground Enclose I-70

12 Existing Ground Westbound I-70 Eastbound I-70 Put I-70 At-Grade IA6

13 IA7 Westbound Eastbound Existing Ground Westbound I-70 Eastbound I-70 Triple Level Section of I-70 (Below Ground)

14 IA8 Westbound Eastbound Existing Ground Westbound I-70 Eastbound I-70 I-70 Tunnel

15 IA9 Eastbound I-70 Westbound Eastbound Existing Ground Westbound I-70 I-70 Above and Below with 46th Avenue at Ground

16 Cover (roof) over I-70 Westbound I-70 Eastbound I-70 Westbound Eastbound Existing Ground Enclose I-70 IA14

17 Westbound Eastbound Existing Ground Westbound I-70 Eastbound I-70 Triple Level Section of I-70 (Below Ground) IA16

18 IA18 Eastbound I-70 Westbound Eastbound Existing Ground Westbound I-70 I-70 Above and Below with at Ground Level

19 High Speed Rail TT4

20 Magnetic Levitation TT6

21 Personal Rapid Transit TT8

22 Heavy Rail TT3

23 Monorail TT7

CHAPTER 4: TRANSPORTATION IMPACTS AND MITIGATION MEASURES

CHAPTER 4: TRANSPORTATION IMPACTS AND MITIGATION MEASURES CHAPTER 4: TRANSPORTATION IMPACTS AND MITIGATION MEASURES This chapter examines the effects of the alternatives evaluated on transportation facilities within the transportation impacts study area. This

More information

CORRIDOR-WIDE MEETING SUMMARY

CORRIDOR-WIDE MEETING SUMMARY CORRIDOR-WIDE MEETING SUMMARY Date/Time: (5:00 P.M.) Location: Bruce Randolph Middle School (Denver) Project Team: Michelle Tyler Manolo Gonzalez-Estay Karen Allen Billye Clinton Peter Kozinski Kim Gambrill

More information

STATION #3 INITIAL ALTERNATIVES

STATION #3 INITIAL ALTERNATIVES www.dot.il.gov www.eisenhowerexpressway.com STATIO #3 IHB RR Heavy Rail Transit (HRT) High capacity transit mode serving urban areas:» Steel wheeled, high performance electric powered rail vehicles» Right-of-way

More information

Proposed Project I 35 from Denton to Cooke County Line

Proposed Project I 35 from Denton to Cooke County Line Proposed Project I 35 from Denton to Cooke County Line The existing I 35 facility is four lanes from I 35E/I 35W to Farm to Market Road (FM) 3002. The purpose of the proposed project is to increase capacity

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

East Corridor Final Environmental Impact Statement

East Corridor Final Environmental Impact Statement Transportation Systems Central Park Station RTD would provide pedestrian connections at key locations near the station, including: Smith Road between the west end of the station area and the bus access

More information

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments! MetroDenverMTDGovernanceCommittee October23,2013 9:00AMto10:00AM DenverRegionalCouncilofGovernments MeetingRecord MetroDenverMTDGovernanceCommittee October23,2013 9:00AM Agenda: 9:00AM Welcome&Introductions

More information

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,

More information

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011 Corridor Advisory Group and Task Force Meeting #10 July 27, 2011 1 Agenda Recap CAG/TF #9 Public Meeting #2 Summary Single Mode Alternatives Evaluation Results Next Steps 2 3 CAG/TF #9 Recap CAG /TF #9

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

Foothill Expressway Improvements Between El Monte and San Antonio

Foothill Expressway Improvements Between El Monte and San Antonio Foothill Expressway Improvements Between El Monte and San Antonio June 29, 2017 - Los Altos Community Meeting Introduction Project Background Agenda Visit Stations: Provide Input and Ask Questions Reconvene:

More information

I-290 Phase 1 Study Alternatives Tool Box.

I-290 Phase 1 Study Alternatives Tool Box. I-290 Phase 1 Study Alternatives Tool Box www.dot.il.gov www.eisenhowerexpressway.com I-290 Phase 1 Study Alternatives Tool Box www.dot.il.gov www.eisenhowerexpressway.com Page 1 Table of Contents: Page

More information

Comprehensive Collection of Stakeholder Alternatives by Mode

Comprehensive Collection of Stakeholder Alternatives by Mode 2011 Illinois Department of Transportation Comprehensive Collection of Stakeholder Alternatives by Mode October 2009 January 2011 www.dot.il.gov www.eisenhowerexpressway.com FILEY RD FILEY RD IHB RR 2

More information

Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS

Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS Overview Highway Functions and Classifications Highway Design Components Design Control

More information

Technical Working Group November 15, 2017

Technical Working Group November 15, 2017 Technical Working Group November 15, 2017 Welcome and Introductions Project Partners Regional Transportation District (RTD) Colorado Department of Transportation (CDOT) Denver Regional Council of Governments

More information

CHAPTER 3.0: TRANSPORTATION IMPACTS

CHAPTER 3.0: TRANSPORTATION IMPACTS CHAPTER 3.0: TRANSPORTATION IMPACTS Chapter 4.0 of the Final Environmental Impact Statement (FEIS) provided information about transportation impacts of the Light Trail Transit (LRT) alternative, including:

More information

Chapter 6 Transportation Plan

Chapter 6 Transportation Plan Chapter 6 Transportation Plan Transportation Plan Introduction Chapter 6 Transportation Plan Transportation Plan Introduction This chapter describes the components of Arvada s transportation system, comprised

More information

Freeway System Considerations

Freeway System Considerations Session 11 Jack Broz, PE, HR Green May 5-7, 2010 Freeway System Considerations Mainline Transit: Shoulder Operations, BRT, Stations HOV, HOT, UPA Interchanges Exit Ramps Entrance Ramps Bridges Local Crossings

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

the New Transit Systems in the Tappan Zee Bridge/I287 Corridor

the New Transit Systems in the Tappan Zee Bridge/I287 Corridor the New Transit Systems in the Tappan Zee Bridge/I287 Corridor Russell Robbins Transportation Planning Manager NYSDOT-Tappan Zee Bridge/I-287 Corridor Project Tarrytown, N.Y. New Transit Systems in the

More information

South King County High-Capacity Transit Corridor Study

South King County High-Capacity Transit Corridor Study HIGH-CAPACITY TRANSIT CORRIDOR STUDY South King County Corridor South King County High-Capacity Transit Corridor Study Corridor Report August 2014 South King County High Capacity Transit Corridor Report

More information

Bus Rapid Transit Plans

Bus Rapid Transit Plans Twin Cities Region Bus Rapid Transit Plans ULI Minnesota Workshop Connecting Bus Rapid Transit to the Community December 15, 2009 John Levin Director of Service Development Metro Transit Metropolitan Area

More information

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719) LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsccs.com May 15, 2009 Mr. Davis Farrar Western Slope Consulting, LLC

More information

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP DRAFT NOT FINAL (Note: document was not finalized due to an eastbound stopping site distance design issue that requires more detailed bridge and roadway design considerations. This discussion starts on

More information

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives Contents EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW... 1-1 1.1 Study Scope... 1-1 1.2 Study Area... 1-1 1.3 Study Objectives... 1-3 2 EXISTING CONDITIONS... 2-1 2.1 Existing Freeway Conditions... 2-4 2.1.1

More information

Preliminary Review of the T-REX Southeast Corridor Highway and Light Rail Transit Project

Preliminary Review of the T-REX Southeast Corridor Highway and Light Rail Transit Project Preliminary Review of the T-REX Southeast Corridor Highway and Light Rail Transit Project DRCOG Congestion Mitigation Program White Paper 07-1 (February 16, 2007) On time and under budget! Festivities

More information

Community Task Force November 15, 2017

Community Task Force November 15, 2017 Community Task Force November 15, 2017 Welcome and Introductions Project Partners Regional Transportation District (RTD) Colorado Department of Transportation (CDOT) Denver Regional Council of Governments

More information

DRAFT. Memo. Range of the Alternatives Considered in the EIS

DRAFT. Memo. Range of the Alternatives Considered in the EIS Memo Date: Friday, December 09, 2016 Project: To: From: Subject: State Route 30 EIS UDOT Vince Izzo This memorandum summarizes the draft State Route (S.R.) 30 Level 1 screening results. A more detailed

More information

County of Fairfax, Virginia. Department of Transportation

County of Fairfax, Virginia. Department of Transportation Fairfax County Parkway History 2 Planning began 50 years ago 1960s Washington s Regional Transportation Plan Recommends improved north/south travel Construct Capital Beltway and outer beltway Outer beltway

More information

Bus Rapid Transit ALTERNATIVES ANALYSIS. Open House

Bus Rapid Transit ALTERNATIVES ANALYSIS. Open House Bus Rapid Transit ALTERNATIVES ANALYSIS Open House June 23, 2015 Open House Meeting Agenda Agenda Introductions What is BRT? Project Goals Study Tasks Next steps Discussion PVTA Bus Rapid Transit Study

More information

I-80 Corridor Overhaul

I-80 Corridor Overhaul I-80 Corridor Overhaul MTC Horizon Transformative Projects 15 November, 2018 Megan Gee Arup Vision A rightsized freeway network future-proofs the region for population growth, new mobility innovations,

More information

2017 General Obligation Bond

2017 General Obligation Bond 2017 General Obligation Bond Agency Presentation to Transportation & Mobility Stakeholder Committee April 6, 2017 Presentation Highlights Overview Vision and Need Projects Critical System Mobility Networks

More information

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04 TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04 SUBJECT: FINANCE COMMITTEE RECOMMENDATION TO ADOPT TRANSPORTATION STRATEGIC

More information

C C C

C C C C-012-001 Thank you for your support for the creation of new public space and nonmotorized access between downtown and the waterfront through the Overlook Walk, the East-West Connections, and the Promenade.

More information

RTA 2013 Leadership Briefing and Tour Report

RTA 2013 Leadership Briefing and Tour Report RTA 2013 Leadership Briefing and Tour Report Suburban MD, Northern VA, Baltimore, Washington, DC Mike Fendrick, PE, Parsons Brinckerhoff Bill Jenkins, PE, AECOM Mike Surasky, PE, A. Morton Thomas & Associates,

More information

3.0 PROJECT DESCRIPTION

3.0 PROJECT DESCRIPTION The following section of the Draft EIR contains a description of the proposed Elk Grove Boulevard/SR 99 Interchange Modification project, consistent with the requirements of CEQA Guidelines Section 15124.

More information

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative EXHIBIT B-1 PROJECT DESCRIPTION Phase 1 of the Preferred Alternative The Transform 66 Public-Private Partnership (P3) Project (the Project ) means the Phase 1 of the Preferred Alternative components of

More information

Washington DC Section of ITE Project Briefing

Washington DC Section of ITE Project Briefing Washington DC Section of ITE Project Briefing November 5, 2015 Renée Hamilton, VDOT, Deputy District Administrator I-66 Outside the Beltway Improvement Area Project Location Virginia 2 Purpose and Need

More information

Initial Alternatives Identification and Evaluation Report. November 2011 APPENDIX B. Summary of Stakeholder Single Mode Suggestions

Initial Alternatives Identification and Evaluation Report. November 2011 APPENDIX B. Summary of Stakeholder Single Mode Suggestions Initial Alternatives Identification and Evaluation Report ovember 2011 APPEDIX B Summary of Stakeholder Single Mode Suggestions 2011 Illinois Department of Transportation Summary of Stakeholder Alternatives

More information

Executive Summary BEYOND THE B-LINE: RAPID TRANSIT LINE PHASE II - COMMERCIAL DRIVE WEST. Final Draft December 13, Appendix B BROADWAY/LOUGHEED

Executive Summary BEYOND THE B-LINE: RAPID TRANSIT LINE PHASE II - COMMERCIAL DRIVE WEST. Final Draft December 13, Appendix B BROADWAY/LOUGHEED BEYOND THE B-LINE: BROADWAY/LOUGHEED RAPID TRANSIT LINE PHASE II - COMMERCIAL DRIVE WEST Appendix B Executive Summary Final Draft December 13, 1999 UMA Lloyd Lindley Davidson Yuen Simpson Architects BROADWAY/LOUGHEED

More information

Interstate 66 Tier 1 Environmental Impact Statement (EIS)

Interstate 66 Tier 1 Environmental Impact Statement (EIS) WELCOME Welcome to the second Citizen Information Meeting for the Tier 1 Environmental Impact Statement (EIS). As an integral part in the environmental study process, the study team is seeking your comments

More information

Dumbarton Transportation Corridor Study. San Francisco Bay ITE November 2016

Dumbarton Transportation Corridor Study. San Francisco Bay ITE November 2016 Dumbarton Transportation Corridor Study San Francisco Bay ITE November 2016 Dumbarton Corridor Source: Wikipedia 2 Dumbarton Corridor 3 Growth Imbalance Jobs-housing imbalance Major employers driving growth

More information

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation APRIL 2016 A collaborative study between: For Additional Information or to Comment If you would like additional

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the

More information

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, 2015 Susan Shaw, P.E., VDOT, Megaprojects Director I-66 Corridor Conditions Steady population growth Employment growth in activity centers Congestion

More information

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE

More information

Van Ness Avenue BRT Overview and Scoping Process. Geary BRT CAC January 8, 2009

Van Ness Avenue BRT Overview and Scoping Process. Geary BRT CAC January 8, 2009 Van Ness Avenue BRT Overview and Scoping Process Geary BRT CAC January 8, 2009 VAN NESS AVENUE S ROLE Identified in Prop K for BRT treatment Muni 47 and 49; 19 operates on Polk 20,000 daily riders on Van

More information

FM #: ETDM #: 11241

FM #: ETDM #: 11241 SR 826/Palmetto Expressway PD&E Study From SR 93/I 75 to the Golden Glades Interchange FM #: 418423 1 22 01 ETDM #: 11241 Agency/ Kick Off Meeting October 27, 2011 2 Location Map From SR 93/I 75 to Golden

More information

BRT for Berkeley A Proposal for Consideration

BRT for Berkeley A Proposal for Consideration BRT for Berkeley A Proposal for Consideration CITY OF BERKELEY STAFF PROPOSAL FOR A LOCALLY PREFERRED ALTERNATIVE OF THE EAST BAY BUS RAPID TRANSIT PROJECT SEPTEMBER 8, 2009 Table of Contents Executive

More information

Chapter 3 BUS IMPROVEMENT CONCEPTS

Chapter 3 BUS IMPROVEMENT CONCEPTS Chapter 3 BUS IMPROVEMENT CONCEPTS The purpose of this chapter is to describe potential bus improvement strategies and potential impacts or implications associated with BRT implementation within the existing

More information

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway TRANSPORTATION PLAN INTENT Transportation is the key to the economic and social development of Prince William County and especially to the I 66/Route 29 Sector Plan area. This includes transportation for

More information

The following notes describe comments received that were written/drawn on maps by workshop participants.

The following notes describe comments received that were written/drawn on maps by workshop participants. Stakeholder Workshop Additional Feedback Received Maps and Comment Forms October 5, 2016 The following notes describe comments received that were written/drawn on maps by workshop participants. MAP 1 MAP

More information

Project Data Sheets. Friday, February 18, 2011

Project Data Sheets. Friday, February 18, 2011 Project Data Sheets Friday, February 18, 2011 KEY1 Relocate the proposed 38th Street pedestrian bridge over the railroad to 36th Street Eagle P3 Mid Term RTD/ The EIS proposed pedestrian bridge accommodates

More information

Creating the Future Bruce B Downs Blvd

Creating the Future Bruce B Downs Blvd Creating the Future Bruce B Downs Blvd How things look today May not be how things look in the future. Bruce B Downs PD&E Study 2003 Construction programmed 2009, Palm Springs to Pebble Creek Tampa Rail

More information

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016 Managed Lanes Steve Schilke, P.E. Major Projects Unit Head District 1 Illinois Traffic Engineering and Safety Conference October 2016 Agenda Managed Lanes Projects I-55 (Stevenson Expressway) Express Toll

More information

Project Mobility - Route 3 South Express Toll Lanes. Industry Day Overview

Project Mobility - Route 3 South Express Toll Lanes. Industry Day Overview Project Mobility - Route 3 South Express Toll Lanes Industry Day Overview October 15, 2014 Today s Agenda Project Mobility Overview Design Alternatives and Construction Estimates Existing Traffic Congestion/Project

More information

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7

More information

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan #70421 Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan Public Information Meetings and Hearings May June 2002 1 Reason for Freeway System Study 270-mile

More information

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO TRAFFIC ACTION PLAN North Central Neighborhood CITY OF SAN MATEO Draft February 2017 Table of Contents Introduction... 1 The Traffic Forum Process... 4 Neighborhood Traffic Issues... 6 Neighborhood Recommendations

More information

Long List of Level 1 Alternatives

Long List of Level 1 Alternatives New York State Thruway Authority MTA Metro-North Railroad Long List of Level 1 Alternatives Tappan Zee Bridge/I-287 Environmental Review June 8, 2003 Long List of Alternatives Alternative No. Title Description

More information

Topics To Be Covered. Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps

Topics To Be Covered. Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps Topics To Be Covered Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps Tier 2 Council Direction Dismiss Bus Rapid Transit along the Union Pacific Railroad Dismiss Bus Rapid

More information

IH 20 RANGER HILL PUBLIC MEETING

IH 20 RANGER HILL PUBLIC MEETING IH 20 RANGER HILL PUBLIC MEETING AUGUST 25, 2015 IH 20, Eastland County, TX CSJ 0007-06-084 IH 20 from 3.5 mi. East of LP 254 to SH 16 (Ranger Hill) August 25, 2015 Agenda Introductions Purpose of the

More information

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Northern Virginia

More information

Chapter 7 ACCESS MANAGEMENT RELATED ACCOMPLISHMENTS

Chapter 7 ACCESS MANAGEMENT RELATED ACCOMPLISHMENTS Chapter 7 ACCESS MANAGEMENT RELATED ACCOMPLISHMENTS Introduction The US-41/M-28 Access Management Plan was the first of its kind in the Upper Peninsula. Since 2004, when the Corridor Advisory Group first

More information

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 20, 2012 Garrett Moore VDOT District Administrator, Northern Virginia Paving Program 2012 This season's paving program will

More information

Broadway Complete Streets Project

Broadway Complete Streets Project Broadway Complete Streets Project Megan Johnson, P.E. Associate Civil Engineer James Pangburn, P.E. Consultant Project Manager After the construction of the highway system, Broadway was cut off

More information

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

Recommended Roadway Plan Section 2 - Land Development and Roadway Access Recommended Roadway Plan Section 2 - Land Development and Roadway Access SECTION 2 Land Development and Roadway Access 2.1 Land Use and Access Management The Federal Highway Administration (FHWA) defines

More information

I-395 Express Lanes Northern Extension Project Public Hearings

I-395 Express Lanes Northern Extension Project Public Hearings I-395 Express Lanes Northern Extension Project Public Hearings Susan Shaw, PE, Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Manager Virginia Department of

More information

Using Simulation to Evaluate Traffic Signal Preemption at Railway-Highway Grade Crossings

Using Simulation to Evaluate Traffic Signal Preemption at Railway-Highway Grade Crossings Using Simulation to Evaluate Traffic Signal Preemption at Railway-Highway Grade Crossings Reuben B. Goldblatt, P.E. Mayer Horn, P.E., Member, AREMA Abstract This paper describes the development of highway

More information

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007 Technical Memorandum May 2007 Syracuse Metropolitan Transportation Council Edwards and Kelcey with Wallace Roberts and Todd Alta Planning and Design CONTENTS SECTION ONE- INTRODUCTION...1 SECTION TWO-

More information

Charlotte Region Fast Lanes Study Phase III

Charlotte Region Fast Lanes Study Phase III Charlotte Region Fast Lanes Study Phase III Stakeholder Workshop #3 December 13, 2012 Fast Lanes Study, Phases I and II Performed between 2007 and 2009 Evaluated all types of managed lanes (HOV, HOT, truck-only

More information

Fitting Light Rail through Well-established Communities

Fitting Light Rail through Well-established Communities Fitting Light Rail through Well-established Communities San Francisco 2008 Michael D. Madden Chief, Project Development, Maryland Transit Administration Project Setting Located inside the Capital Beltway

More information

Welcome to the Sellwood Bridge Project Open House!

Welcome to the Sellwood Bridge Project Open House! Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred

More information

US287 Asset Inventory Loveland. Figure 6-1 Loveland Bridges and Traffic Signals

US287 Asset Inventory Loveland. Figure 6-1 Loveland Bridges and Traffic Signals Chapter 6: City of Loveland US287 extends for approximately 13.1 miles through the City of Loveland. Between the northern City boundary and 29 th Street, the road is labeled Garfield Avenue, before transitioning

More information

Staunton. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Staunton. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation 2020 Transportation Plan Developed for the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration

More information

Preliminary Transportation Analysis

Preliminary Transportation Analysis Preliminary Transportation Analysis Goals of a Robust, Multimodal Transportation Network Safe Accessible/Connected Efficient Comfortable Context-Sensitive Motor Vehicle: Continue to analyze the data to

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT DRAFT NEED AND PURPOSE

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT DRAFT NEED AND PURPOSE NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT DRAFT NEED AND PURPOSE APPROVED BY FHWA: JULY 2010 UPDATED: OCTOBER 2011 Section 1 Need for and Purpose of Proposed Action Per Council on Environmental Quality

More information

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016 I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016 Susan Shaw, PE, Megaprojects Director, Virginia Department of Transportation Amanda Baxter, Special Projects

More information

Financial Project ID No(s).: and ETDM No(s).: and 14181

Financial Project ID No(s).: and ETDM No(s).: and 14181 Palm Beach Metropolitan Planning Organization (MPO) Presentation I-95 at Boynton Beach Boulevard Interchange and I-95 at Gateway Boulevard Interchange Project Development and Environment Study Palm Beach

More information

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)? 1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)? The Los Angeles County Metropolitan Transportation Authority (Metro) is evaluating the development of a grade separation

More information

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016 I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016 Mike Snare, PE, Project Manager Virginia Department of Transportation GEC Michelle Holland, Megaprojects

More information

Cherry Creek Transportation and Land Use Forum September 25, 2013 Meeting Summary

Cherry Creek Transportation and Land Use Forum September 25, 2013 Meeting Summary Cherry Creek Transportation and Land Use Forum September 25, 2013 Meeting Summary I. LEAD-IN TO SMALL GROUP DISCUSSION, POLLING AND STEERING COMMITTEE/TECHNICAL TASK FORCE DISCUSSION The meeting began

More information

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary WELCOME! Thank you for attending our open house. There will be no formal presentation today so please take the time to read the boards. If you have any questions, please do not hesitate to approach one

More information

TRAFFIC CONDITIONS REPORT FOR INTERSTATE HIGHWAY 225 (I-225) PLANNING AND ENVIRONMENTAL LINKAGES (PEL) STUDY

TRAFFIC CONDITIONS REPORT FOR INTERSTATE HIGHWAY 225 (I-225) PLANNING AND ENVIRONMENTAL LINKAGES (PEL) STUDY TRAFFIC CONDITIONS REPORT FOR INTERSTATE HIGHWAY 225 (I-225) PLANNING AND ENVIRONMENTAL LINKAGES (PEL) STUDY CDOT Project No. STA 2254 85 (19187) Prepared for: Colorado Department of Transportation Region

More information

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION 5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION Having held a public hearing, that Council approve the preliminary designs

More information

STH 57 & STH 100 Intersection Village of Brown Deer Milwaukee County November 2015

STH 57 & STH 100 Intersection Village of Brown Deer Milwaukee County November 2015 STH 57 & STH 100 Intersection Village of Brown Deer Milwaukee County November 2015 Introduction How we got to here WIS 57 Bridge over WIS 100 in need of replacement Local support favors At-Grade Intersection

More information

A District Council of the Urban Land Institute

A District Council of the Urban Land Institute A District Council of the Urban Land Institute Thank you to our sponsors! A District Council of the Urban Land Institute Thank you to our Community Partners! A District Council of the Urban Land Institute

More information

3.0 ACCESS CONTROL PLAN - HARMONY ROAD (SH68)

3.0 ACCESS CONTROL PLAN - HARMONY ROAD (SH68) 3.0 ACCESS CONTROL PLAN - HARMONY ROAD (SH68) 3.1 Existing Conditions Roadway Physical Characteristics Typical Section The existing typical cross-section for SH68 is shown on Figure 3-1 and is comprised

More information

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations. The Last Mile Planning for Pedestrians Planning around stations will put pedestrians first. Making walking to stations safe and easy is important; walking will be a part of every rapid transit Accessible

More information

4.0 TRANSPORTATION SYSTEMS

4.0 TRANSPORTATION SYSTEMS Transportation Systems 4.0 TRANSPORTATION SYSTEMS This chapter examines the impacts of the Central Corridor Extension on existing roadways and traffic operations and discusses the transit service, operations,

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018 Tunnel Reconstruction Brooklyn CB 1 August 14, 2018 Reconstructing the Tunnel 2 Service During Tunnel Reconstruction April 2019 through July 2020 3 Projected Cross River Travel Paths of Customers The Service

More information

STUDY PROCESS & SCHEDULE

STUDY PROCESS & SCHEDULE STUDY PROCESS & SCHEDULE Route Centennial Bridge Study KDOT Project No. -52 KA-3229-01 STUDY OVERVIEW STUDY SCHEDULE The Kansas Department of Transportation (KDOT) has identified a future need to replace

More information

Project Fact Sheet. August 1,

Project Fact Sheet. August 1, Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation

More information

Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI)

Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI) Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI) City of Fort Lauderdale ~ Commission Conference July 10, 2012 Page 1 of 15 A Multi-Agency

More information

Alternatives Considered 2.0 ALTERNATIVES CONSIDERED

Alternatives Considered 2.0 ALTERNATIVES CONSIDERED Alternatives Considered 2.0 ALTERNATIVES CONSIDERED PROPOSED ACTION The Proposed Action calls for six continuous lanes (three in each direction) from I-25 to Powers Boulevard and four continuous lanes

More information

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Tunnel Reconstruction South 5 th Street Association October 16, 2018 Tunnel Reconstruction South 5 th Street Association October 16, 2018 Reconstructing the Tunnel 2 Service During Tunnel Reconstruction April 2019 through July 2020 3 Projected Cross River Travel Paths of

More information

Interim Transit Ridership Forecast Results Technical Memorandum

Interim Transit Ridership Forecast Results Technical Memorandum Interim Transit Ridership 401 South Jackson Street Seattle, WA 98104-2826 September 2012 Table of Contents 1 INTRODUCTION... 1-1 1.1 Project Background... 1-1 2 RIDERSHIP FORECASTS... 2-1 2.1 System Ridership

More information

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) US 20 Feasibility Study Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) Village Board Meeting Bartlett Village Hall February 16, 2016 1 Background 1991 IDOT Study Recommendations

More information