CITY OF WARRENVILLE MEMO
|
|
- Solomon Barrett
- 5 years ago
- Views:
Transcription
1 CITY OF WARRENVILLE MEMO TO: Mayor, City Council, and City Administrator Coakley FROM: Senior Civil Engineer Hocking SUBJECT: PREFERRED ALTERNATIVE FOR MACK ROAD BIKE PATH PROJECT DATE: May 3, 2017 The purpose of this memorandum is to i. provide a brief description of this project; ii. summarize the alternatives analysis and cost estimates, iii. recommend the preferred alternative, and iv. Outline next steps. Mack Road Bike Path Phase I Engineering Study In December 2015, The City was awarded Surface Transportation Program (STP) funding for 75% of construction and phase III / construction engineering costs to install a new asphalt path along Mack Road between Route 59 and McKee Marsh. Preliminary project costs were estimated at $751,531 ($683,210 construction and $68,321 construction engineering). The local cost share for construction and construction engineering was $187,883 ($170,803 construction and $17,080 construction engineering). The City has executed an Intergovernmental Agreement with the Forest Preserve District of DuPage County (FPD) that has defined the City s ability to install a path on Forest Preserve District property, local costsharing responsibilities (70% City, 30% FPD) and longterm ownership and maintenance responsibilities for the proposed infrastructure. The proposed improvements include pedestrian signal modifications at the intersection of Route 59 and Mack Road, a 10 asphalt path, a pedestrian bridge over the West Branch of the DuPage River, and a connection to the existing West Branch Regional Trail. This project will benefit residents by making it safer and easier to cross Illinois Route 59 and access the regional trails to which this project will connect. The City hired Engineering Resource Associates (ERA) to prepare the preliminary engineering design, environmental studies, preliminary plans and public coordination. To date, there has been a kickoff meeting with City, FPD, and Township staff and consultants as well as a meeting to discuss the Alternatives Analysis ERA prepared for the project. Alternatives Analysis ERA s Alternatives Analysis report (Exhibit A) evaluated the feasibility, costs, and benefits of the following three alternative trail configurations:
2 Preferred Alternative for Mack Road Bike Path Project May 3, 2017 Page 2 of 2 Alternative 1 OnStreet Bike Lanes Alternative 2 South Side Trail with Prefabricated Bridge Alternative 3 North Side Trail with WideninKind Bridge Alternative 1 includes onstreet 5foot wide bike lanes along each side of Mack Road including a midblock crossing to the McKee Marsh parking lot. Road widening, ComEd pole relocation and easements are included as part of the scope. No bridge modifications are necessary. The cost estimate is $576,800 and is within the original grant budget. Alternative 2 includes a 10foot wide asphalt bike path along the south side of Mack Road. Impacts to Class IV Forest Preserve property, dog park/canoe launch modifications, gas utility line conflicts a new prefabricated trail bridge and a midblock crossing are included as part of the scope. Mack Road would not need to be widened to accommodate the new trail. The cost estimate for this alternative is between $1,193,400 to $1,343,400 and will require a STP grant resubmittal. Estimated local costs for construction and construction engineering will approximately double to between $328,185 and $369,435. Alternative 3 includes a 10foot wide asphalt bike path along the north side of Mack Road. ComEd pole relocation, easements, and a widening of the existing Mack Road bridge are included as part of the scope. Mack Road would not need to be widened and a midblock crossing is not necessary. The cost estimate is $947,146 and will require a STP grant resubmittal. Estimated local costs for construction and construction engineering will increase to $260,465. The City s share will increase $50,808 to approximately $182,326 (70%). Also, the estimated Phase II Final Engineering consultant costs will most likely increase due to the increased construction costs. The FY18 budget includes sufficient funding to cover the City s projected share of increased Phase II costs. Recommended Alternative and Next Steps The Forest Preserve District (Exhibit B) and Winfield Township (Exhibit C) provided position memos identifying Alternative 3 as their preferred alternative. At the April 12 Bicycle and Pedestrian Advisory Commission (BPAC) meeting, the Commission unanimously recommended Alternative 3. The project will require a resubmittal of the STP grant application in early August due to the increase in construction cost. Also, since this alternative affects residential properties along the north side of Mack Road, staff recommends the City hold a public information and input meeting on the proposed project prior to the grant resubmittal. Staff Recommendation Staff recommends the City Council approve the Alternative 3 as the City s Preferred Alternative and direct staff to: i.) Hold a public information and input meeting on the project; and ii.) Reapply for STP grant funding for the project in early August.
3 MACK ROAD ALTERNATIVE TRAIL ALIGNMENT NARRATIVE ALTERNATIVE 1 ONSTREET BIKE LANES Trail Alignment Improvements include two separate 5foot wide, bike lanes along Mack Road, extending approximately 1590 feet from IL Route 59 to the Blackwell McKee Marsh Parking Lot. The bike lanes will begin at the IL Route 59/Mack Road intersection where existing bike detection is provided at the signalization intersection. The current bike detection will direct users from the west side of IL Route 59 onto Mack Road to the proposed bike lanes. From the intersection, the bike lanes will continue along Mack Road until it enters the property owned by the FPDDC known as the Blackwell McKee Marsh, at which point the trail will become a twoway asphalt trail that crosses the drive aisle (between the roundabout and the parking lot), and then connects to the existing gravel trail just north of the Blackwell McKee March Parking Lot. Cross sections AA, BB, CC and DD have been provided to show the typical profile at several critical sections along the corridor. Roadway Modifications Proposed widening will take place beginning at 29W700 Mack Road (PIN No ) and terminating near the entrance to the FPDDC Dog Park (PIN No ). The existing roadway, featuring two 11foot lanes and 1foot gravel shoulders, will be modified to two 12foot lanes with two 5foot bike lanes one on the north and one on the south side of Mack Road. The new cross section will be restriped to delineate the bike lanes. Bridge Modifications Proposed improvements include restriping the vehicular lanes to accommodate the onstreet bike lanes over the bridge. A 5 foot wide bike lane will be provided on both the north and south side of the bridge, and the vehicular lanes will remain as 12 feet wide. The proposed improvements include a new concrete wearing surface and new steel railings on either side to account for the required railing height of 4 6. Cross section CC has been provided to show a typical section at the bridge. Impacts to Adjacent Properties Privately Owned Parcels Along the north side of Mack Road, several decorative pillars, landscape boxes and fences placed within the rightofway may need to be removed or relocated to accommodate the proposed roadway widening and trail. The affected properties include the following: 29W700 MACK ROAD (Pin No ) one address marker 29W660 MACK ROAD (Pin No ) one decorative landscape box 29W630 MACK ROAD (Pin No ) two decorative pillars and wooden fencing 29W606 MACK ROAD (Pin No ) two decorative pillars and wooden fencing 29W530 MACK ROAD (Pin No ) two decorative pillars Additionally, a temporary easement and a permanent rightofway easement will need to be acquired from the property owner at 29W530 Mack Road (Pin No ) for construction of the proposed trail.
4 Mack Road Bike Trail ERA Project No February 15, 2017 Revised 4/7/17 Potential Utility Conflicts Existing 3phase overheard wires and poles owned by ComEd extend throughout the project limits along the northern line approximately 20 feet north of the existing centerline of Mack Road on the west side of the West Branch, and approximately 25 feet north of the existing centerline of Mack Road to the east of the West Branch. Pole relocation and coordination with ComEd may be necessary in order to accommodate the proposed roadway widening and bike lanes. Pedestrian Crossing & Signalization at the IL Route 59/Mack Rd. Intersection The proposed bike lanes will cross IL Route 59 using previously installed bike detection for the west and east legs of the intersection. As a result, pedestrian signals are not proposed as part of this alternative. Traffic signal improvements at the intersection would be limited to new pavement markings and new loop detection to accommodate the bike lanes. Coordination with District 1 traffic section will be required for traffic signal modification and work within the rightofway along IL Route 59. Alternative #1 Cost Opinion $576,800
5 Mack Road Bike Trail ERA Project No February 15, 2017 Revised 4/7/17 ALTERNATIVE 2 SOUTH SIDE TRAIL WITH PREFABRICATED BRIDGE Trail Alignment A 10foot wide asphalt bike trail, approximately 2470 linear feet, is proposed to run along the south side of Mack Road from IL Route 59 to the Blackwell McKee March Parking Lot. The trail will begin at the IL Route 59/Mack Road intersection where pedestrian signalization is proposed at the southwest corner to safely direct users from the existing sidewalks along Mack Road to the proposed trail. From the intersection, the trail will continue along the south side of Mack Road. The trail will be located as close to the Mack Road rightofway as possible in order to meet ADA slope requirements and the buffer requirements adjacent to a public roadway. Encroachments onto the FPDDC property and the need to remove trees will be minimized. The trail will cross the West Branch of the DuPage River and run parallel to the FPDDC Dog park parking lot. At this point, striping and passive signage will be provided to alert vehicles to the pedestrian crossing.as it enters property on the north side of Mack Road owned by the FPDDC known as the Blackwell McKee Marsh, at which point it will meander around the existing roundabout and then connect to the existing gravel trail just north of the Blackwell McKee Marsh Parking Lot. Alternative options are considered for the improvements adjacent to the existing dog park/canoe launch area. Cross sections AA, BB, CC and DD have been provided to show the typical profile at several critical sections along the corridor. Roadway Modifications With the exception of pavement markings for the crossing, there are no anticipated roadway modifications. Pedestrian Bridge To accommodate a 10foot path the clear width on the pedestrian bridge shall be 14feet unless a design variance is pursued. It is anticipated that the prefabricated pedestrian bridge will be constructed approximately 5 feet south from the existing Mack Road bridge structure and span approximately 150feet long. The span was set to ensure that when the existing bridge (SN ) is replaced there will be no conflict with the pedestrian bridge. The superstructure height is anticipated to be approximately 3 6, but is subject to refinement during the design phase. Additionally, the bottom chord will not be lower than the low beam on the bridge. Cross section CC has been prepared to show the existing versus proposed typical section at the bridge. Impacts to Adjacent Properties Class IV Parcel (FPDDC property PIN No ) The proposed trail will meander through both the rightofway and the northern part of the FPDDC property on the south side of Mack Road. As a result, several trees will need to be removed to clear a path for the proposed trail. It is understood that this property is a Class IV woodland area with rigid restrictions on the removal of vegetation, and a result, all efforts will be made to remove only those trees within the footprint of the trail and immediate surroundings areas in order to preserve as many trees as possible. Dog Park/Canoe Launch Modifications (FPDDC property PIN No ) OPTION A Modifications include shifting the existing gravel boat launch and gravel roundabout approximately 20 feet to the south to provide adequate space for the proposed trail alignment just east of the West Branch. The existing entrance, driving aisle and parking stalls servicing the dog park will remain unaltered.
6 Mack Road Bike Trail ERA Project No February 15, 2017 Revised 4/7/17 OPTION B Proposed modifications include a realignment of the several dog park facilities including the driving aisle, parking stalls, boat launch and the roundabout. The proposed alignment of the new driving aisle and parking configuration would be oriented parallel to Mack Road, and the boat launch and roundabout would be shifted south approximately 30 feet to provide additional space for the proposed trail. As a result, the fenced in "play area" adjacent to the existing parking lot would also be reconfigured to accommodate the proposed parking lot improvements. Potential Utility Conflicts An existing 8" gas line is located with the rightofway along the south side of Mack Road along the length of the project. Conflicts are not anticipated, however, coordination with Nicor Gas may be required. Pedestrian Crossing & Signalization at the IL Route 59/Mack Rd. Intersection The proposed trail will cross IL Route 59 at the southeast corner of the intersection where it will connect to an existing sidewalk on the south side of Mack Road (west of the intersection). Pedestrian signals will be installed at the southeast and southwest corners of the intersection to accommodate trail users, and the traffic signals will be modified to provide adequate time for crossing IL Route 59. Coordination with IDOT traffic section will be required for traffic signal modification and work within the rightofway along IL Route 59. Alternative #2 Cost Opinion Option 1 w/ Boat Launch Modification $1,193,400 Option 2 w/dog Park Modification $1,343,400
7 Mack Road Bike Trail ERA Project No February 15, 2017 Revised 4/7/17 ALTERNATIVE 3 NORTH SIDE TRAIL WITH WIDENINKIND BRIDGE Trail Alignment A 10foot wide asphalt bike trail, approximately 2290 linear feet, is proposed to run along the north side of Mack Road from IL Route 59 to the Blackwell McKee March Parking Lot. The trail will begin at the IL Route 59/Mack Road intersection where pedestrian signalization is proposed at the southeast, southwest and northwest corner to safely direct users from the existing sidewalks along Mack Road to the proposed trail. From the intersection, the trail will continue along the north side of Mack Road crossing over the West Branch of the DuPage River and continuing along the north side of Mack Road before entering into the Blackwell McKee Marsh. The asphalt trail will extend east around the existing roundabout until it connects into the existing trail just north of the Blackwell McKee Marsh Parking Lot. Cross sections AA, BB, CC and DD have been provided to show the typical profile at several critical sections along the corridor. Roadway Modifications With the exception of pavement markings for the crossing, there are no anticipated roadway modifications. Bridge Modifications Wideninkind the Existing Bridge (SN ) The existing bridge will be widened approximately 9 feet to accommodate the proposed trail alignment on the north side of Mack Road. This bridge widening alternative reduces the roadway clearance from 34 0 to 30 0, but adds a concrete parapet for vehicle and pedestrian protection. The widening is accomplished by the addition of two new deck beams with a 6 inch concrete wearing surface, and new railings. Cross section CC has been prepared to show the existing versus proposed typical section at the bridge. Impacts to Adjacent Properties Privately Owned Parcels Along the north side of Mack Road, several decorative pillars, landscape boxes and fences placed within the rightofway may need to be removed or relocated to accommodate the proposed trail. The affected properties include the following: 29W700 MACK ROAD (Pin No ) one address marker 29W660 MACK ROAD (Pin No ) one decorative landscape box 29W630 MACK ROAD (Pin No ) two decorative pillars and wooden fencing 29W606 MACK ROAD (Pin No ) two decorative pillars and wooden fencing 29W530 MACK ROAD (Pin No ) two decorative pillars Additionally, a temporary easement and a permanent rightofway easement will need to be acquired from the property owner at 29W530 Mack Road (Pin No ) for construction of the proposed trail. Potential Utility Conflicts Existing 3phase overheard wires and poles owner by ComEd extend throughout the project limits along the northern rightofway of Mack Road. Pole relocation by ComEd may be necessary in order to accommodate the proposed trail if the trail cannot be constructed north of the proposed pole west of the river. Pedestrian Crossing & Signalization at the IL Route 59/Mack Rd. Intersection The proposed trail will cross IL Route 59 at the northeast corner of the intersection where it will connect to an existing sidewalk on the north side of Mack Road (west of the intersection). A crosswalk will be provided from the northwest corner of the intersection to the southwest corner where there is an existing sidewalk. Pedestrian signals will be installed at the northwest, southwest and southeast corners of the intersection to accommodate trail users, and the traffic signals will be modified to
8 Mack Road Bike Trail ERA Project No February 15, 2017 Revised 4/7/17 provide adequate time for crossing IL Route 59 and Mack Road. Coordination with IDOT traffic section will be required for traffic signal modification and work within the rightofway along IL Route 59. Alternative #3 Cost Opinion $947,146
9 West DuPage W eb Mapping Application DuPage County, Illinois DuPage County Ph# 1(630) This map is for assessment purposes only. Information Technology Department / GIS Division gis@dupageco.org 421 N County Farm Rd. Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., DuPage GEBCO, Maps Portal: DuPage Maps Portal: ± Wheaton, IL USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, Copyright DuPage 2016 METI, Esri China (Hong Kong), swisstopo, MapmyIndia, OpenStreetMap contributors, and the GIS User Community
10 East DuPage W eb Mapping Application DuPage County, Illinois DuPage County Ph# 1(630) This map is for assessment purposes only. Information Technology Department / GIS Division gis@dupageco.org 421 N County Farm Rd. Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., DuPage GEBCO, Maps Portal: DuPage Maps Portal: ± Wheaton, IL USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, Copyright DuPage 2016 METI, Esri China (Hong Kong), swisstopo, MapmyIndia, OpenStreetMap contributors, and the GIS User Community
11 West DuPage W eb Mapping Application DuPage County, Illinois DuPage County Ph# 1(630) This map is for assessment purposes only. Information Technology Department / GIS Division gis@dupageco.org 421 N County Farm Rd. Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., DuPage GEBCO, Maps Portal: DuPage Maps Portal: ± Wheaton, IL USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, Copyright DuPage 2016 METI, Esri China (Hong Kong), swisstopo, MapmyIndia, OpenStreetMap contributors, and the GIS User Community
12 East DuPage W eb Mapping Application DuPage County, Illinois DuPage County Ph# 1(630) This map is for assessment purposes only. Information Technology Department / GIS Division gis@dupageco.org 421 N County Farm Rd. Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., DuPage GEBCO, Maps Portal: DuPage Maps Portal: ± Wheaton, IL USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, Copyright DuPage 2016 METI, Esri China (Hong Kong), swisstopo, MapmyIndia, OpenStreetMap contributors, and the GIS User Community
13 West DuPage W eb Mapping Application DuPage County, Illinois DuPage County Ph# 1(630) This map is for assessment purposes only. Information Technology Department / GIS Division gis@dupageco.org 421 N County Farm Rd. Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., DuPage GEBCO, Maps Portal: DuPage Maps Portal: ± Wheaton, IL USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, Copyright DuPage 2016 METI, Esri China (Hong Kong), swisstopo, MapmyIndia, OpenStreetMap contributors, and the GIS User Community
14 East DuPage W eb Mapping Application DuPage County, Illinois DuPage County Ph# 1(630) This map is for assessment purposes only. Information Technology Department / GIS Division gis@dupageco.org 421 N County Farm Rd. Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., DuPage GEBCO, Maps Portal: DuPage Maps Portal: ± Wheaton, IL USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, Copyright DuPage 2016 METI, Esri China (Hong Kong), swisstopo, MapmyIndia, OpenStreetMap contributors, and the GIS User Community
15 ~ Mack Road 30'0" 30'0" ROW South of CL ROW North of CL 2'0" 11'0" 11'0" 2'0" Existing Roadway Existing Groundline EXISTING SECTION AA ~ Mack Road 30'0" ROW South of CL 30'0" ROW North of CL 2'0" 2'0" 2'0" 5'0" 12'0" 12'0" 5'0" 2'0" 2'0" 2'0" Bikeway Bikeway Existing Roadway Existing Groundline 3:1 3:1 3:1 3:1 $USER$ $DATE$ $TIME$ $FILE$ ENGINEERING RESOURCE ASSOCIATES 3S701 WEST AVENUE, SUITE 150 WARRENVILLE, ILLINOIS PHONE (630) FAX (630) Existing 8" Gas DRAWN DESIGNED CHECKED DATE M. LANGE FEBRUARY 2017 ALTERNATE #1 SHARED ROADWAY SECTION AA EXHIBIT A1
16 ~ Mack Road 30'0" ROW South of CL 30'0" ROW North of CL 10'0" 2'0" 6'0" 2'0" 2'0" 2'0" 11'0" 11'0" 2'0" Bike Path Existing Roadway Existing 8" Gas ALTERNATE #2 PEDESTRIAN BRIDGE SOUTH OF EXISTING ROADWAY SECTION AA ~ Mack Road 30'0" ROW South of CL 30'0" ROW North of CL 11'0" 11'0" 10'6" 10'0" 2'0" Bike Path Existing Roadway $USER$ $DATE$ $TIME$ $FILE$ ENGINEERING RESOURCE ASSOCIATES 3S701 WEST AVENUE, SUITE 150 WARRENVILLE, ILLINOIS PHONE (630) FAX (630) Existing 8" Gas DRAWN DESIGNED CHECKED DATE M. LANGE FEBRUARY 2017 ALTERNATE #3 WIDENINKIND EXISTING BRIDGE SECTION AA EXHIBIT A2
17 ~ Mack Road 30'0" 30'0" 2'0" 11'0" 11'0" 2'0" EXISTING SECTION BB ~ Mack Road 30'0" ROW South of CL 30'0" ROW North of CL 2'0" 5'0" 12'0" 12'0" 5'0" 2'0" Bikeway Bikeway $USER$ $DATE$ $TIME$ $FILE$ ENGINEERING RESOURCE ASSOCIATES 3S701 WEST AVENUE, SUITE 150 WARRENVILLE, ILLINOIS PHONE (630) FAX (630) DRAWN DESIGNED CHECKED DATE M. LANGE FEBRUARY 2017 ALTERNATE #1 SHARED ROADWAY SECTION BB EXHIBIT B1
18 2:1(max) (h:v) ~ Mack Road ~ Trail and 30'0" 30'0" 3'0" 10'0" 2'0" 6'0" 2'0" 2'0" 2'0" 11'0" 11'0" Front Face of Wall Shareduse path 4'6" Railing Finished Grade, F.F. 1'6" typ. Existing groundline ALTERNATE #2 PEDESTRIAN BRIDGE SOUTH OF EXISTING ROADWAY SECTION BB ~ Mack Road 30'0" 30'0" 2'0" 11'0" 11'0" 10'6" 10'0" 2'0" Shareduse path ALTERNATE #3 WIDENINKIND EXISTING BRIDGE $USER$ $DATE$ $TIME$ $FILE$ ENGINEERING RESOURCE ASSOCIATES 3S701 WEST AVENUE, SUITE 150 WARRENVILLE, ILLINOIS PHONE (630) FAX (630) DRAWN DESIGNED CHECKED DATE M. LANGE FEBRUARY 2017 SECTION BB EXHIBIT B2
19 ~ Mack Road 30'0" Varies 30'0" to 50'0" 1'0" ~ Bridge 36'0" Out to Out of Deck 34'0" Face to Face of Curb 4'0" 12'0" 12'0" 6'0" Shoulder Shoulder Existing HMA Overlay (12) 17" PPC Deck 3'0" cts. = 33'0" EXISTING TYPICAL SECTION CC ~ Mack Road and Bridge 30'0" Varies 30'0" to 50'0" 1'0" Steel Railing, Type TP1 (Modified) 36'0" Out to Out of Deck 4'6" Railing 1'0" 5'0" bikeway 12'0" 34'0" Face to Face of Curb 12'0" 5'0" Bikeway Grout & Seal Joints New 4" Concrete Wearing Surface (12) 17" PPC Deck 3'0" cts. = 33'0" ALTERNATE #1 SHARED ROADWAY SECTION CC $USER$ $DATE$ $TIME$ $FILE$ ENGINEERING RESOURCE ASSOCIATES 3S701 WEST AVENUE, SUITE 150 WARRENVILLE, ILLINOIS PHONE (630) FAX (630) DRAWN DESIGNED CHECKED DATE M. LANGE FEBRUARY 2017 EXHIBIT C1
20 ~ Mack Road Existing 30'0" Varies 30'0" to 50'0" ROW 1'0" ~ Bridge ** 9'6" Subject to refinement during design phase ~ Trail and PGL 14'0" Out to Out Clear SteelFormed Deck with Concrete ** 3'6" Stringer Beams Floor Beam 5'9" 4'0" Shoulder 12'0" 36'0" Out to Out of Deck 34'0" Face to Face of Curb 12'0" Existing HMA Overlay 6'0" Shoulder (12) 17" PPC Deck 3'0" cts. = 33'0" Bottom of truss to match Low Beam on the bridge ALTERNATE #2 PEDESTRIAN BRIDGE SOUTH OF EXISTING BRIDGE SECTION CC ** Subject to refinement during design phase 44'9" Out to Out of Bridge ~ Mack Road 27'9" Varies 30'0" to 50'0" 1'0" 30'0" Face to Face of Curb 1'0" 12'4" 4" Curb Bike Path 4'0" 12'0" 12'0" Parapet Railing 2'0" 1'8" Pedestrian Railing Shoulder Existing Bituminous Wearing Surface 2'4" 4'6" (12) 17" PPC Deck 3'0" cts. = 33'0" (2) 17" PPC Deck 4'0" cts ALTERNATE #3 WIDENINKIND EXISTING BRIDGE $USER$ $DATE$ $TIME$ $FILE$ ENGINEERING RESOURCE ASSOCIATES 3S701 WEST AVENUE, SUITE 150 WARRENVILLE, ILLINOIS PHONE (630) FAX (630) DRAWN DESIGNED CHECKED DATE M. LANGE FEBRUARY 2017 SECTION CC EXHIBIT C2
21 ~ Mack Road 30'0" ROW South of CL 50'0" ROW North of CL 2'0" 12'0" 12'0" 2'0" Existing Roadway EXISTING SECTION DD ~ Mack Road 30'0" ROW South of CL 50'0" ROW North of CL 2'0" 5'0" 12'0" 12'0" 5'0" 2'0" Bikeway Bikeway Existing Roadway 3:1 50:1 50:1 3:1 Existing $USER$ $DATE$ $TIME$ $FILE$ ENGINEERING RESOURCE ASSOCIATES 8" Gas 3S701 WEST AVENUE, SUITE 150 WARRENVILLE, ILLINOIS PHONE (630) FAX (630) DRAWN DESIGNED CHECKED DATE M. LANGE FEBRUARY 2017 ALTERNATE #1 SHARED ROADWAY SECTION DD EXHIBIT D1
22 ~ Mack Road 30'0" ROW South of CL 50'0" ROW North of CL 2'0" 10'0" 8'0" 2'0" 2'0" 2'0" 11'0" 11'0" 2'0" Bike Path Existing Roadway 3:1 ALTERNATE #2 PEDESTRIAN BRIDGE SOUTH OF ROADWAY Existing 8" Gas SECTION DD ~ Mack Road 30'0" ROW South of CL 50'0" ROW North of CL 11'0" 11'0" 10'6" 10'0" 2'0" Bike Path Existing Roadway $USER$ $DATE$ $TIME$ $FILE$ ENGINEERING RESOURCE ASSOCIATES Existing 8" Gas 3S701 WEST AVENUE, SUITE 150 WARRENVILLE, ILLINOIS PHONE (630) FAX (630) DRAWN DESIGNED CHECKED DATE M. LANGE FEBRUARY 2017 ALTERNATE #3 WIDENINKIND EXISTING BRIDGE SECTION DD EXHIBIT D2
23 3s701 West Avenue, Suite 150 phone Warrenville, IL fax PROJECT: Mack Road Bike Path BY: KLK LOCATION: Warrenville DATE: REVISED: ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST ALTERNATIVE 1 SITE PREPARATION, EARTHWORK, & EROSION CONTROL* QUANTITY UNIT UNIT COST TOTAL COST Earth Excavation/Removal of Unsuitable Soil 1,230 C.Y. $30.00 $36, Silt Fence Allowance 3,630 L.F. $3.00 $10, Ditch Grading 3,180 L.F. $8.00 $25, Tree Protection Fencing 1 L SUM $5, $5, Clearing 1 L SUM $ 16, $16, Tree Removal 5 EACH $ $2, Remove & Relocate Fence 370 L.F. $15.00 $5, Remove & Relocate Mailbox 4 EACH $50.00 $ Remove & Relocate Decorative Pillar 7 EACH $3, $25, Remove & Relocate Post 1 EACH $ $ Restoration 1 L SUM $10, $10, SUBTOTAL = $137, PAVEMENT QUANTITY UNIT UNIT COST TOTAL COST Street Widening & Bike Lane Allowance 1,840 S.Y. $50.00 $92, Porous Granular Embankment 613 C.Y. $30.00 $18, Paint Pavement Marking Letters and Symbols 1 L SUM $7, $7, Detectable Warning Strip 60 S.F. $35.00 $2, Crosswalk Striping 1 L SUM $1, $1, SUBTOTAL = $120, STORMWATER QUANTITY UNIT UNIT COST TOTAL COST Compensatory Floodplain Storage 768 C.Y. $50.00 $38, SUBTOTAL = $38, MISCELLANEOUS QUANTITY UNIT UNIT COST TOTAL COST Traffic/Pedestrian Signal Modification Allowance 1 L SUM $10, $10, Trail Signage 1 L SUM $3, $3, Bridge Modifications 1 L SUM $142, $142, Traffic Control & Protection 1 L SUM $10, $10, SUBTOTAL = $165, CONSTRUCTION QUANTITY UNIT UNIT COST TOTAL COST Mobilization 1 L SUM $30, $30, Construction Layout & AsBuilt Survey 1 L SUM $8, $8, SUBTOTAL = $38, TOTAL = $501, % CONTINGENCY = $75, GRAND TOTAL = $576,748.00
24 3s701 West Avenue, Suite 150 phone Warrenville, IL fax PROJECT: Mack Road Bike Path BY: KLK/JFM LOCATION: Warrenville DATE: REVISED: ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST ALTERNATIVE 2 SITE PREPARATION, EARTHWORK, & EROSION CONTROL* QUANTITY UNIT UNIT COST TOTAL COST Earth Excavation/Removal of Unsuitable Soil 1,380 C.Y. $30.00 $41, Silt Fence Allowance 2,120 L.F. $3.00 $6, Tree Protection Fencing 1 L SUM $5, $5, Clearing 1 L SUM $11, $11, Tree Removal 8 EACH $ $4, Remove & Relocate Mailbox 4 EACH $50.00 $ Remove & Relocate Sign 4 EACH $1, $4, Remove & Relocate Address Post 1 EACH $ $ Restoration 1 L SUM $13, $13, SUBTOTAL = $85, PAVEMENT QUANTITY UNIT UNIT COST TOTAL COST Asphalt Trail Pavement Allowance 2,470 S.Y. $40.00 $98, Porous Granular Embankment 860 C.Y. $30.00 $25, Detectable Warning Strip 40 S.F. $35.00 $1, Crosswalk Striping 1 L SUM $2, $2, SUBTOTAL = $128, STORMWATER QUANTITY UNIT UNIT COST TOTAL COST Compensatory Floodplain Storage 1,160 C.Y. $50.00 $58, SUBTOTAL = $58, MISCELLANEOUS QUANTITY UNIT UNIT COST TOTAL COST Traffic/Pedestrian Signal Modification Allowance 1 L SUM $50, $50, Trail Signage 1 L SUM $3, $3, Prefabricated Pedestrian Bridge 1 L SUM $569, $569, Retaining Walls 1 L SUM $30, $30, Dog Park Modification Allowance A 1 L SUM $25, $25, Wetland Restoration 1 L SUM $20, $20, Traffic Control & Protection 1 L SUM $7, $7, SUBTOTAL = $705, CONSTRUCTION QUANTITY UNIT UNIT COST TOTAL COST Mobilization 1 L SUM $50, $50, Construction Layout & AsBuilt Survey 1 L SUM $10, $10, SUBTOTAL = $60, OPTIONAL (Not Included) QUANTITY UNIT UNIT COST TOTAL COST Dog Park Modification Allowance B 1 L SUM $150, $150, SUBTOTAL = $150, TOTAL = $1,037, % CONTINGENCY = $155, GRAND TOTAL = $1,193,366.50
25 3s701 West Avenue, Suite 150 phone Warrenville, IL fax PROJECT: Mack Road Bike Path BY: KLK/JFM LOCATION: Warrenville DATE: REVISED: ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST ALTERNATIVE 3 SITE PREPARATION, EARTHWORK, & EROSION CONTROL* QUANTITY UNIT UNIT COST TOTAL COST Earth Excavation/Removal of Unsuitable Soil 1,290 C.Y. $30.00 $38, Silt Fence Allowance 2,010 L.F. $3.00 $6, Tree Protection Fencing 1 L SUM $5, $5, Clearing 1 L SUM $27, $27, Tree Removal 25 EACH $ $12, Remove & Relocate Fence 370 L.F. $10.00 $3, Remove & Relocate Decorative Pillar 7 EACH $3, $25, Remove & Relocate Sign 1 EACH $2, $2, Remove & Relocate Address Post 1 EACH $ $ Restoration 1 L SUM $10, $10, SUBTOTAL = $130, PAVEMENT QUANTITY UNIT UNIT COST TOTAL COST Asphalt Trail Pavement Allowance 2,290 S.Y. $40.00 $91, Porous Granular Embankment 575 C.Y. $30.00 $17, Detectable Warning Strip 40 S.F. $35.00 $1, Depressed Curb 30 L.F. $35.00 $1, " PCC Sidewalk 30 S.F. $7.50 $ Crosswalk Striping 1 L SUM $1, $1, SUBTOTAL = $113, STORMWATER QUANTITY UNIT UNIT COST TOTAL COST 18" RCP Class IV 230 L.F. $50.00 $11, Structures 4 EACH $1, $6, Culvert 14 L.F. $50.00 $ Compensatory Floodplain Storage 1,331 C.Y. $50.00 $66, SUBTOTAL = $84, MISCELLANEOUS QUANTITY UNIT UNIT COST TOTAL COST Traffic/Pedestrian Signal Modification Allowance 1 L SUM $50, $50, Split Rail Fence 1,480 L.F. $10.00 $14, Trail Signage 1 L SUM $3, $3, Bridge Widening 1 L SUM $260, $260, Approach Slab Widening 1 L SUM $61, $61, Retaining Walls 1 L SUM $30, $30, Wetland Restoration 1 L SUM $20, $20, Traffic Control & Protection 1 L SUM $7, $7, SUBTOTAL = $447, CONSTRUCTION QUANTITY UNIT UNIT COST TOTAL COST Mobilization 1 L SUM $40, $40, Construction Layout & AsBuilt Survey 1 L SUM $8, $8, SUBTOTAL = $48, TOTAL = $823, % CONTINGENCY = $123, GRAND TOTAL = $947,145.75
26
27
28
29 From: To: Cc: Subject: Date: Road District Hocking, Kristine Road District RE: Winfield Township Position Letter for Mack Road Bike Path Thursday, March 16, :03:08 PM After careful consideration of the preliminary design layout locations for the proposed bike path on Mack Road, the township is in favor of the bike path located entirely on the North side of the pavement edge. This route is preferable for safety, design and maintenance concerns. Please advise our office if another alternative is being considered as the primary solution. We appreciate your willingness to include us in your project in the planning phase. John S. Dusza Highway Commissioner Winfield Township Road District 30W575 Roosevelt Road P.O. Box 617 West Chicago, IL (p) (f) From: Hocking, Kristine Sent: Thursday, March 16, :12 AM To: Road District Subject: Winfield Township Position Letter for Mack Road Bike Path John, I was wondering if we could get a position letter regarding which Mack Road Bike Path Alternative that the Township favors. Thanks, Kristine
30 Kristine Hocking, P.E, CFM Senior Civil Engineer City of Warrenville (phone) (fax)
Streetscape Report Streetscape Report FALL 2017
Streetscape Report Streetscape Report FALL 2017 EXECUTIVE SUMMARY The Streetscape Report's Plan Report is an effort to address community desires and recommendations related to the Tacoma Link Expansion
More informationDesign Criteria. Design Criteria
F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road
More informationChapter 3 DESIGN SPECIFICATIONS
Brampton PathWays Planning and Design Guidelines 27 Chapter 3 DESIGN SPECIFICATIONS 3.1 CLASS 1 MULTI-USE PATH Off-road multi-use trails are the backbone of the Brampton PathWays Network. They are typically
More informationChapter 4: Funding and Implementation
Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,
More informationItem No. 14 Town of Atherton
Item No. 14 Town of Atherton CITY COUNCIL STAFF REPORT CONSENT AGENDA TO: THROUGH: FROM: HONORABLE MAYOR AND CITY COUNCIL GEORGE RODERICKS, CITY MANAGER MICHAEL KASHIWAGI, COMMUNITY SERVICES DIRECTOR MARTY
More informationMAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report
Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction
More informationOverview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?
Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy
More informationCITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL
ve ha 8t G B A Mantorville Ave N 240th Ave 16th St NE 11th Ave NE K-M HIGH SCHOOL SUNRISE TRAIL TO MANTORVILLE MNTH 57 SUNSET TRAIL TO MANTORVILLE NE PARK 16TH ST NE TRAIL K-M ELEMENTARY SCHOOL K-M MIDDLE
More informationR A M P U P! - City of Tacoma's Curb Ramp Installation Matrix
R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix DESCRIPTION OF WORK NEW CONSTR. ALTERATION MAINT. COMMENTS STREET PAVING New street paving or overlay through an intersection (Figures 1 &
More informationHospital Link Project Project Update September 2017
Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important
More informationsection 4 Existing Conditions, Issues, and Options
section 4 Existing Conditions, Issues, and Options 4.0 Existing Conditions, Issues, and Options This section analyzes each segment of the corridor on a street to street basis. Each segment is discussed
More informationIMPLEMENTATION WORKBOOK
Lawrence Township Bicycle and Pedestrian Planning Assistance Study IMPLEMENTATION WORKBOOK Final Action Plan - Part 2 April 2009 Prepared For: The Township of Lawrence and the New Jersey Department of
More informationRoute 47 (North Main Street) Reconstruction
TOWN OF SUNDERLAND Route 47 (North Main Street) Reconstruction Presented by Lou Rabito, P.E. Presented to Town of Sunderland June 11, 2018 Project Overview MassDOT Project No. 607245 Resurfacing and Related
More informationAppendix D: Planning Level Cost Calculator
Appendix D: Planning Level Cost Calculator Network Costs by Facility Type Facility Type Total Miles of Facility Total Number of Intersections Cost per feature or per mile Total Cost Bicycle Boulevard 52.14
More informationAmericans with Disabilities Act Transition Plan for Public Right-of-Way Improvements
Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Prepared by: Public Works Department Engineering Division October 2015 Table of Contents Section I Introduction.. 3
More informationCity of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE
Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway
More informationPaul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)
To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,
More informationPennsylvania Avenue (CR 484) Design Alternatives Study
MEMORANDUM Pennsylvania Avenue (CR 484) Design Alternatives Study Prepared for: APRIL 2016 Prepared By TABLE OF CONTENTS Project Background... 2 Previous Concept... 2 Existing Conditions... 4 New Alternatives...
More informationADA PRESENTATION (CURB RAMPS)
ADA PRESENTATION (CURB RAMPS) ACECNJ/NJDOT/FHWA DESIGN SUMMIT Warren Howard New Jersey Department of Transportation May 21, 2013 ADA Curb Ramps NJDOT wants curb ramps to be designed & constructed properly
More informationCity of Memphis. To: John E. Cameron, PE City Engineer. From: Kyle Wagenschutz. Cc: Manny Belen, Randall Tatum. Date: November 5, 2015
City of Memphis Tennessee A C Wharton, Jr. Mayor Jack Sammons Chief Administrative Officer Division of Engineering John E. Cameron, P.E. City Engineer Memo To: John E. Cameron, PE City Engineer From: Kyle
More informationCity of Scotts Valley CITY COUNCIL STAFF REPORT
DATE: April 19, 2017 City of Scotts Valley CITY COUNCIL STAFF REPORT AGENDA ITEM 2 DATE: 4-19-2017 TO: FROM: APPROVED: SUBJECT: Honorable Mayor and City Council Scott Hamby, Public Works Director Jenny
More informationBrooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017
Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn
More informationCity of Margate, Florida. Neighborhood Traffic Management Manual
City of Margate, Florida Neighborhood Traffic Management Manual Table of Contents Page No. I. INTRODUCTION... 1 II. TRAFFIC CALMING REQUEST AND PROCESSING PROCEDURES... 2 1. COMPLETE AND SUBMIT PROJECT
More informationDriveway Design Criteria
Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved
More informationBicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)
Appendix B Neighborhood Connections Summaries This Appendix is a supplement to the information presented in Chapter 3 Connect People. The Appendix includes a summary or profile for each of the proposed
More information4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project
City of RE 4APNOIPF Vh, X` W\ YII PTC ING, CITY COUNCIL AGENDA REPORT Council Meeting Date: September 26, 2016 To: From: Agenda Item: Honorable Mayor and City Council Members Ron Rosenthal, Engineering
More informationStreet Paving and Sidewalk Policy
City Commission Policy 600 Street Paving and Sidewalk Policy DEPARTMENT: Public Works DATE ADOPTED: June 7, 1995 DATE OF LAST REVISION: December 10, 2014 Policy No. 600.01 AUTHORITY: PASS City of Tallahassee-Leon
More informationMemorandum. Sunday, July 13, Saturday, July 19, 2014
Memorandum To: David Lowin, Brooklyn Bridge Park Corporation From: Daniel Schack, AICP, PTP Date: Re: Brooklyn Bridge Park Pier 5/6 Loop Road Traffic Study Project No: 14-01-2407 At the request of Brooklyn
More informationCity of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate
City of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate Project ID Project Category Project Name Qty/Len(Mi) Cost Estimate BB 1 Bike boulevard Jefferson Street or
More informationWalkabout Summary Report
Walkabout Summary Report Introduction On September 3, 2014, stakeholders at Bessie Weller Elementary School (Bessie Weller ES) in Staunton, Virginia met to examine the walking and bicycling network around
More informationAPPENDIX L: COST ESTIMATING TOOLS
APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders
More informationCity of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS
SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable
More informationCONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach
CONNECTIVITY PLAN Adopted December 5, 2017 City of Virginia Beach CONTENTS 1.0 Background & Purpose... 2 2.0 Existing Inventory & Analysis... 3 ViBe District Existing Walking Conditions... 4 3.0 ViBe District
More informationImproving Cyclist Safety at the Dundas Street West and Sterling Road Intersection
STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee
More informationAPPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016
APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of
More information5. RUNNINGWAY GUIDELINES
5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved
More informationComplete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER
Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER Complete Streets City Commission adopted a Complete Streets policy in 2012 Complete Streets are road networks that are designed for all users:
More information6.4 RECOMMENDED IMPROVEMENTS
6.4 RECOMMENDED IMPROVEMENTS 6.4.1 Williston Road Recommendations While all alternatives would be an improvement over existing conditions, Alternative 3B is recommended over the others because it provides
More informationSt. Francis Drive through the City of Santa Fe Corridor Study
VII. ENGINEERING AND ENVIRONMENTAL EVALUATION TRAIL CONNECTIVITY In the southern portion of the Corridor there is a lack of a sidewalk, trail or bicycle facility within the right-ofway. However, the City
More informationOcean Park Boulevard Green Street Project Alternatives & Trade Offs
Planning Commission March 4, 2009 Ocean Park Boulevard Green Street Project Alternatives & Trade Offs Purpose of Tonight s Meeting Review concept plans and options Provide input on alternatives and trade-offs
More informationAtwood Avenue Fair Oaks Avenue Cottage Grove Road
Atwood Avenue Fair Oaks Avenue Cottage Grove Road Agenda Purpose Review project scope & goals Present design alternatives Gather feedback Answer Questions Format Open House Presentation Q&A Open House
More informationBPP / SUB
Development Services Department Project/File: Lead Agency: Site address: Millwell Place Subdivision/ BPP15-0031/ SUB15-0064 This is a preliminary plat application to allow for the development of 68 building
More informationFY 2006 TRANSPORTATION CAPITAL PROGRAM
Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported
More informationHospital Link Project Project Update November 2017
Hospital Link Project Project Update November 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important
More informationPROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT
PROJECT NO. 093 MA 199 H 5807 01C FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENI HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT (INTERSECTION IMPROVEMENT) US 93/US 60 FINAL PROJECT ASSESSMENT April
More informationBoard of Supervisors February 27, 2017
: Traffic Analysis Results & Draft Conceptual Plan Board of Supervisors February 27, 2017 Transportation Solutions Building Better Communities Presentation Overview Background Summary of Traffic Analysis
More informationPoor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns
Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement
More informationMid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)
Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364) Sponsor St Peters Project No. RB19-000022 Project Type Other TOTAL FUNDING Total County Sponsor Federal $1,177,251.00 $238,179.00 $59,546.00 $879,526.00
More informationMay 4, Dear Mr. Thomas and Mr. Snyder,
Daniel Thomas, Principal Planner Christopher Snyder, County Engineer DuPage County Division of Transportation 421 N County Farm Road Wheaton, IL 60187 May 4, 2016 Dear Mr. Thomas and Mr. Snyder, On behalf
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.
More informationADA TRANSITION PLAN 2013
ADA TRANSITION PLAN 2013 TABLE OF CONTENTS Contents Introduction 1 Purpose 2 Identified Obstacles to the Public Right of Way 3 Criteria for Determining Impediments at Village Facilities 4 Removing Barriers
More informationWHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.
CEDAR-ISLES-DEAN NEIGHBORHOOD ASSOCIATION ( CIDNA ) RESOLUTION OPPOSING A DRUG STORE DRIVE THRU, AND COMMENDING DORAN COMPANIES FOR PROPOSING MITIGATING AMENITIES INCLUDING NEW LANDSCAPING AND A DEDICATED
More informationHouma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION
APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP
More informationCITY OF LANCASTER PROPOSED NEW PROJECTS
CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4
More informationTypical Cross Section: DOWNTOWN (Observer Highway - 8th Street)
Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street) DRAFT SEPTEMBER 23, 14 1 Washington Street Typical Block Downtown Typical Block: DOWNTOWN (Observer Highway - 8th Street) New crosswalks
More informationMake Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.
Lincoln Highway Streetscape Plan Stakeholder Workshop #2 Handout Contents Introduction and Project Vision Planning Principles Specific Recommendations including a Proposed Typical Roadway Section Renderings
More informationPROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia
PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia PRELIMINARY ENGINEERING REPORT Prepared for: Prepared by: July 2017 Table of Contents 1
More informationWarsaw, Missouri Van Buren Street Preliminary Engineering Report
Warsaw, Missouri Van Buren Street Preliminary Engineering Report Prepared for: The City of Warsaw 181 Harrison Street Warsaw, MO 65355 (660) 438-5522 Prepared by Charles LePage, P.E. CFS Engineers 119
More informationTransportation Planning Division
Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving
More informationTraffic Circulation & Pedestrian Safety Study
Lyons Township High School North Campus La Grange, Illinois Parking Lot Vaughan Building N Main Building Prepared for: Prepared by: July 23, 2015 Contents List of Figures, iii 1. Introduction...1 2. Existing
More informationSECTION 3 STREET DESIGN
3.01 GENERAL SECTION 3 STREET DESIGN For purposes of geometric and structural design, streets shall be classified according to the following table. The City Engineer will determine the class of all proposed
More informationEast Burke Transportation, Safety and Capacity Improvements
East Burke Transportation, Safety and Capacity Improvements The purpose of this project is to increase mobility and improve safety for pedestrians, cyclists, and motor vehicles along VT Route 114 in the
More informationCHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS
CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...
More informationMunicipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018
Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Background Agenda Traffic Study Update Class EA Alternatives Bridge
More informationLincoln Highway Streetscape Plan Concept Plan
Lincoln Highway Streetscape Plan Concept Plan November 14, 2014 Introduction This report provides a summary of conceptual transportation, land use, and design recommendations in the Lincoln Highway Streetscape
More informationFEDERAL HIGHWAY ADMINISTRATION APPLICATION
FEDERAL HIGHWAY ADMINISTRATION APPLICATION REQUEST FOR PERMISSION TO EXPERIMENT WITH A BICYCLE BOX INTERSECTION TREATMENT Submitted by: City of Columbus Department of Public Service Date: June 26, 2009
More informationList of Display Boards
List of Display Boards Welcome Introduction Municipal Class Environmental Assessment (EA) Process Need and Justification for an Interchange Alternatives for Evaluation Vertical and Horizontal Alignments
More informationOcean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs
City Council Study Session January 27, 2009 Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs Scope of Work Purpose of Tonight s Meeting Review work to date and direct staff
More informationActive Transportation Facility Glossary
Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike
More informationMontgomery County Life Sciences Center. LOOP TRAIL GSSC Implementation Advisory Committee Meeting #2 March 26, 2015
Montgomery County Life Sciences Center LOOP TRAIL GSSC Implementation Advisory Committee Meeting #2 March 26, 2015 Trail Alternatives GENERAL ASSUMPTIONS Where separated bicycle and pedestrian facilities
More informationPaoli Road Improvement Feasibility Study
Paoli Road Improvement Feasibility Study & Public Participation Project March 24, 2015 Prepared for: Tredyffrin Township Prepared by: McMahon Associates, Inc. with Town Planning Partnership, LLC Glackin
More informationCTH M HIGHWAY PROJECT CTH Q to STH 113
CTH M HIGHWAY PROJECT CTH Q to STH 113 PUBLIC INFORMATIONAL MEETING #3 Wednesday, May 25, 2005 Town of Westport Administration Building 5387 Mary Lake Road 6:00 p.m. to 8:00 p.m. PUBLIC INFORMATIONAL MEETING
More informationInformation for File #MVP MVM
Information for File #MVP-2018-00168-MVM Applicant: City of Lino Lakes Corps Contact: Marissa Merriman Address: 180 Fifth Street East, Suite 700, St. Paul, Minnesota 55101-1678 E-Mail: Marissa.V.Merriman@usace.army.mil
More informationNJDOT Complete Streets Checklist
Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip
More informationTrans-Canada Highway 1 RW Bruhn Bridge Replacement
Trans-Canada Highway 1 RW Bruhn Bridge Replacement May 2016 RW Bruhn Bridge Project Objectives Improve safety, traffic flow and movement of goods Improve safety for pedestrians and cyclists Replace the
More informationROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS
RT 81 Corridor Study CLINTON ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS View north on High Street, with potential improvements to the streetscape Draft Recommendations November 8 th, 2018 TOWN OF CLINTON
More informationMiles PROJECT LOCATION EOP, MP STATION BOP, MP 379 STATION
K avik River Barrow Prudhoe Bay Kotzebue Nome Fairbanks Eagle Tok McGrath Glennallen Bethel Valdez Kenai Dillingham Homer Seward Kodiak Cold Bay Unalaska PROJECT LOCATION Haines Juneau Sitka Ketchikan
More information5 CIRCULATION AND STREET DESIGN
5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing
More informationRZC Appendix 8A Marymoor Subarea Street Requirements
RZC Appendix 8A Marymoor Subarea Street Requirements For additional design details for Marymoor Subarea infrastructure, refer to the 2017 Marymoor Subarea Infrastructure Planning Report. STREET REQUIREMENTS
More informationConstruction Specifications Manual
Isle of Wight County Pedestrian and Bicycle Master Plan Construction Specifications Manual Adopted August 20, 2009 Introduction The Isle of Wight County Pedestrian and Bicycle Facilities Master Plan was
More informationAPPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD
APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR
More informationEast Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study
East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study Houston, TX Technical Memorandum April 15 th, 2009 Prepare by: 2950 North Loop West, Ste. 900 Houston, TX 77092
More informationInspector MUST Sign and Date Each Inspection
Work Area: Applicant: Mercer County Department of Transportation - Highways Division Application and Permit for Road Work in Mercer County, New Jersey NO. East Windsor Ewing Hamilton Hopewell Lawrence
More informationPublic Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018
Public Information Meeting Orange Camp Road Dr. Martin Luther King Jr. Beltway to I-4 Presented by: Volusia County August 2, 2018 1 Project Goals To improve the operations and safety for Orange Camp Road
More informationAGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive
AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell
More informationSaskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening
Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening We are here today to present the draft plan for the Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening project
More informationMONTGOMERY COUNTY PLANNING DEPARTMENT
MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No Date: 6-07-2018 MD355 Over Little Bennett Creek Bridge Replacement (SHA Project No. MO4275180),
More informationENGINEERING AND PUBLIC WORKS. Transportation Improvements: Santa s Village Road (MR15) Public Meeting
ENGINEERING AND PUBLIC WORKS Transportation Improvements: Santa s Village Road (MR15) Public Meeting March 22, 2018 Agenda Welcome and Introductions Fred Jahn: Commissioner of Engineering and Public Works
More informationPublic Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017
Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017 Purpose of Meeting Why are we here? Project Recap/Updates Project Limits/Segments Road Diet Concept Lessons Learned
More informationAbout the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability
About the study Key goals of this study are to: North Milwaukee Avenue is a local and regional street for multiple modes of transportation. It is officially zoned and functions as a pedestrian street southeast
More informationPreliminary Design of Wayzata Boulevard Improvements(CSAH 112)
Project Area Map 6 COUNTY 112 COUNTY Preliminary Design of Wayzata Boulevard Improvements(CSAH 112) Public Open House Open House To Do List: Sign in Visit with Hennepin County staff and design team Learn
More informationAppendix A-2: Screen 1 Alternatives Report
Appendix A-2: Screen 1 Alternatives Report SCREEN 1 ALTERNATIVES REPORT Western & Ashland Corridors Bus Rapid Transit (BRT) Project Prepared for Chicago Transit Authority 567 West Lake Street Chicago,
More informationAccess requests to County streets and roadways are processed through one of the following methods:
13.1 GENERAL APPLICATION PROCESS Access requests to County streets and roadways are processed through one of the following methods: A. Planned Developments may set general locations for access points.
More informationRebuilding Highway 7 Town Centre Boulevard to Sciberras Road
Rebuilding Highway 7 Town Centre Boulevard to Sciberras Road Project Status Update Presentation to City of Markham Development Services Committee October 22, 2013 Presentation Outline Background Status
More information4. TRAIL DESIGN GUIDELINES
Trail Design Guidelines 4. TRAIL DESIGN GUIDELINES This chapter provides specific design guidelines for the Humboldt Bay Trail that are consistent with the guidelines currently observed in California and
More informationBeacon Lakes NW 122nd Ave
¹ Site Location Document Path: M:\Projects\2015 Projects\2015-0062-001 Beacon Lakes CDDNW 122nd Avenue\4_figures and drawings\gis\figure 1 - Location Map.mxd Site Location Approximate Site Boundary (±11.00
More information01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS
01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS Existing Bus Stop Existing US101 On-ramp Existing POC Old Redwood Highway Rich Street City ROW Environmental Study Limit Industrial Way NO DESIGNATED
More informationThis Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.
4.1 GENERAL This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans. These Roadway Standards are for new construction and modification
More informationFEASIBILITY STUDY MACARTHUR BOULEVARD
FEASIBILITY STUDY MACARTHUR BOULEVARD Wabash Avenue to South Grand Avenue Springfield, IL SANGAMON COUNTY TABLE OF CONTENTS 1.0 DESCRIPTION & PURPOSE AND NEED OF STUDY... 1 2.0 EXISTING CONDITIONS... 2
More informationFinal Sidewalk Feasibility Study
Garfield Drive From Anastasia Drive to Elizabeth Place City of South Daytona July 23, 2009 Final Sidewalk Feasibility Study Prepared for: Prepared by: Final Sidewalk Feasibility Study Garfield Drive 2
More information