1 Expanding the Strategic Road Improvement Programme 2015 Consultation Document Please respond by Friday 29 September 2006 to: Network Development Branch Roads Service Headquarters Clarence Court Adelaide Street Belfast BT2 8GB

2 Expanding the Strategic Road Improvement Programme Background 1.1 Strategic Road Improvements (SRIs) are large capital schemes (> 1m) to develop and improve Northern Ireland s motorway and trunk road network. The purpose of this document is to consult key stakeholders on the make-up of an expanded SRI programme, made possible by the Investment Strategy for Northern Ireland (ISNI) which was developed by the Strategic Investment Board and announced in December [ 1.2 ISNI envisages an investment of 1,400m in SRIs in the period up to This is around 400m more than the current SRI programme which emanated from the Regional Strategic Transport Network Transport Plan (RSTN TP) published in March ISNI envisages the additional funding to be available towards the end of the 2015 period. 1.3 The Strategic Road Network is Northern Ireland s motorway and trunk road network, comprising the 5 Key Transport s (KTCs), 4 Link s, the Belfast Metropolitan Transport s and the remainder of the trunk road network (see Annex E). The RSTN TP identified schemes to develop this network up to the end of Consultation on the RSTN TP revealed strong support for SRIs. In a largely rural region, the strategic road network is seen as essential to facilitate the transport of people, goods and services and to support economic development across Northern Ireland. 1.5 While ISNI gives a very good basis for medium-term planning, it is important to note that once the expanded SRI programme is finalised, each scheme will be progressed on a measure-by-measure basis subject to: detailed economic appraisal; clearing the relevant statutory procedures such as environmental assessment, planning and land acquisition (each of which may require public inquiries); and the availability of funds through the normal budgetary processes. 1.6 The costs of all schemes in this document are estimated at 2005 prices, to match the price base used by ISNI. 2. Current SRI Programme 2.1 The current SRI programme comprises schemes on the motorway and trunk road network that are either at construction, preparation or forward planning stage. Construction Programme - Schemes already under construction. Preparation Pool - High priority schemes that Roads Service is progressing through the statutory procedures of Environmental Appraisal, Direction Order

3 Expanding the Strategic Road Improvement Programme 2015 (equivalent to planning approval) and Land Vesting. Preparation Pool schemes are expected to be implemented within the next 5 years or so (subject to clearing the statutory procedures, having a satisfactory economic appraisal and the availability of funds at the time). Forward Planning Schedule - Schemes that perform well when assessed at feasibility stage using the 5 national criteria and which are expected to be implemented within the next 10 years or so (subject to clearing the statutory procedures, having a satisfactory economic appraisal and the availability of funds at the time). 2.2 A list of all schemes in the current SRI programme is given in Annex A. 3. Expanded SRI Programme 3.1 ISNI envisages an additional investment in SRIs of around 400m, becoming available towards the end of the 2015 period. 3.2 However, SRIs have long lead times at least 6 years from the time they are included in a programme until the work starts on site. This is because extensive feasibility studies are needed to select the preferred route, there is a requirement to undertake environmental assessments, ground surveys and economic appraisals as well as to progress the schemes through the statutory procedures of environmental statement, planning approval, land acquisition and procurement. So it is important to start planning early. 3.3 Roads Service has developed a proposed list of additional SRIs to make up the Expanded SRI Programme and this is given in Annex B. The description of any particular scheme should not be taken to represent the line of the scheme on the ground this will be developed later once the scheme enters the Preparation Pool. 3.4 The proposed Expanded SRI programme, like the RSTN TP, is based on the guidance set out in the Regional Development Strategy (RDS) and the Regional Transportation Strategy (RTS). The selection is based on the Government s five key criteria of environment, safety, economy, accessibility and integration. It builds on the extensive work undertaken for the RSTN Transport Plan and aims to address bottlenecks on the Strategic Network, giving priority to the KTCs, next the link corridors and then the trunk roads. 3.5 In developing the list, it was essential to work within the funding envisaged by ISNI. This meant the list had to be constrained, and other possible SRI schemes which performed less well in the assessment, but which are not affordable within the ISNI funding envisaged to 2015, are given in Annex C. These are given for information, but are not proposed for the expanded programme at this time. 4. Distribution 4.1 The proposed list is reasonably well balanced across Northern Ireland, with good coverage in the West (which has 48% by value of the additional schemes) and the North-West (39%); this is on top of the 250m Derry to

4 Expanding the Strategic Road Improvement Programme 2015 Dungiven scheme added to the existing programme last December. For example, the proposed additional SRIs include a significant new route from Londonderry Strabane Sion Mills, bypasses of Enniskillen, Ballykelly and Fivemiletown and improvements to the A32 route from Enniskillen to Omagh. 4.2 But there are also schemes necessary to deal with bottlenecks and safety concerns on very highly trafficked routes in the east. These include a 50m scheme to provide a flyover junction carrying Westlink over York Street, as well as dualling on the A26 from Coleraine to Ballymoney and the A3 from Portadown to Richill. On the key A1 route from Belfast to Dublin, there would be a new 45m link between the M1 and Hillsborough to take through traffic past Sprucefield, and 4 additional flyover junctions on the existing dual carriageway between Hillsborough and Loughbrickland which, in addition to the 4 already programmed, will turn it into an expressway with no movements across the central reserve and a continuous central safety barrier. 5 Section 75 of the Northern Ireland Act In consideration of its obligations under Section 75 of the Northern Ireland Act 1998, the Department determined that a full Equality Impact Assessment (EQIA) should be carried out for the Regional Strategic Transport Network Transport Plan. The EQIA was published in June In addition to this the Department also considered New Targeting Social Needs(TSN), Rural Proofing and Health Impact Assessments. Copies of the EQIA document are available on the DRD website [ 5.2 A Section 75 Screening Analysis has been completed for the Expanded SRI Programme. In developing the proposed additions to the SRI programme and completing the screening process, Roads Service has taken into account the equality work already carried out for the RDS, RTS and RSTN TP. It has concluded that a further full EQIA is not required as the proposed programme does not affect the previous assessments. A copy of the Section 75 Screening Analysis Form can be obtained by contacting Roads Service at the address or given in section 7.3 or alternatively from the DRD and Road Service websites which are also given in section Strategic Environmental Assessment 6.1 The Department has developed a draft Environmental Report for consultation alongside the consultation of the Expanded SRI Programme. A copy of this draft report can be obtained by contacting Roads Service at the address given in section 7.3 or alternatively from the DRD and Road Service websites which are also given in section 7.3.

5 Expanding the Strategic Road Improvement Programme Consultation 7.1 We are interested in your views on the proposed list of additional SRIs given in Annex B. In particular, we welcome responses to the following questions: 1. Are you generally in favour of the additional SRIs proposed in Annex B, and are there any particular schemes in it that you strongly support? 2. Are there any of additional SRIs proposed in Annex B that you definitely do not support, and if so what are your reasons? 3. Are there any schemes not listed in Annex B that you would like to see included in an expanded SRI programme? Given that we have to work within the funding envisaged by ISNI, which scheme or schemes would you remove from the list in order to make room for your additional proposals. 4. Do you agree with the Section 75 Screening conclusion? If not please give details. 7.2 In responding, please note two very important points: This element of ISNI and this particular consultation is in relation to major improvement schemes (i.e. > 1m) on the motorway and trunk network. In this consultation we will not be able to take account of suggestions for schemes on other roads, nor comments in relation to other types of work. The overall funding for this type of work is envisaged in ISNI which was the subject of consultation in In this consultation we will not be able to take account of suggestions that would vary the amount of funds envisaged by ISNI for SRIs. There will be an opportunity to consider that aspect again when ISNI is reviewed by the SIB in the next year or so. 7.3 The consultation period begins on the 31 July and responses must be returned by Friday 29 September Responses should be addressed to; Network Development Branch Roads Service Headquarters Clarence Court Adelaide Street Belfast BT2 8GB Copies of this Consultation Document and the Draft Environmental Report are also available on the Roads Service and DRD Websites Should you require this document in an accessible format such as Braille, audio-tape, large print, minority ethnic language etc please contact the above address.

6 Expanding the Strategic Road Improvement Programme 2015 Annex List Annex A All Schemes in Current SRI Programme Annex B Proposed additional SRI Schemes to be added to the programme subject to consultation Annex C List of schemes that performed well in the assessment but are not affordable with the ISNI funding envisaged to Annex D Map showing locations of schemes in Annexes A, B and C Annex E Map showing the Regional Strategic Transport Network

7 Annex A ALL SCHEMES IN CURRENT SRI PROGRAMME Scheme Description Status Cost m Eastern Seaboard M2 Widening (Sandyknowes to Greencastle) M1 / Westlink Upgrade A1 Junction Improvements A1 L brickland to Beech Hill A1 Beech Hill to Cloghogue A1 Newry to Dundalk Link Road (NI section) Widen 5.4km of motorway to 3 lanes from Sandyknowes to Greencastle, replace 3 overbridges, and provide 3 lanes northbound over Greencastle interchange. Widen 2.6km of motorway and 1.4km of dual carriageway to 3+3 lanes between Blacks Road and Divis Street, including 2 underpass junctions. PP 20m CP 104m Provide flyovers at 4 key junctions on A1. PP 16m Upgrade 9.0km of single carriageway to standard dual carriageway, including hard shoulders. 12.1km of high standard dual carriageway with no central reserve crossings, including hard shoulders and 5 grade separated junctions. 4.3km of high standard dual carriageway with no central reserve crossings, including hard shoulders and 1 grade separated junction (+10km in ROI). CP 25m PP 109m CP 33m North Western A2 Widening - Widening from Pennyburn roundabout to Skeoge Link Buncrana Rd section & from Skeoge Link to Border section. FPS 18m Skeoge Link, Londonderry New 1.9km dual carriageway link road. PP 5m A514 Crescent Widen 1.9km of single carriageway to standard dual Link carriageway (completes dualling of Crescent Link). PP 5m A6 Derry to 30km of dual carriageway from outskirts of Derry to Dungiven Southeast of Dungiven (inc. Dungiven ). FPS 250m A6 Dualling: 14.0km of high standard dual carriageway with no Randalstown - gaps in the central reserve and flyover-type junctions. Castledawson PP 70m M2 Crosskennan slip roads at Antrim Hospital Northern A2 Broadbridge Dualling A26 Glarryford - A44 Dualling A26 / M2 Ballee Road East Provision of two on-slips onto M2 CP 3m 6.75km of existing route to standard dual carriageway. PP 25m 7km of standard dual carriageway. FPS 33m 1.5km of dual carriageway passing under the Larne Road Roundabout, with 2 slip roads and 0.5km of side road. PP 7m

8 Annex A Scheme Description Status Cost m Western A5/N14 Strabane - Lifford Link A5 Omagh Throughpass Stage 3 South Western A4 Dungannon to Ballygawley A4 / A5 Improvements A4 Henry Street/Sligo Road Link between N14/ N15 in Lifford and A5 in Strabane (NI section). 2.4km single carriageway extension to Omagh Throughpass. 20.5km of high standard dual carriageway from Dungannon to Ballygawley Roundabout with no central reserve crossings and 6 flyover-type junctions. A4 Annaghilla: 3.8km of single carriageway realignment with eastbound 2+1 lane. A5 Tullyvar: 3.1km of single carriageway realignment with climbing lanes each way. Provision of additional traffic lane on approach to junction Belfast Metropolitan Transport s A55 Widening at Knock Road, Belfast Widen 0.6km of existing two lane single carriageway to four lane carriageway between Clarawood and Kings Road FPS 3m CP 10m PP 102m PP 16m PP 2m PP 4m A2 Sydenham Widen 2.5km of dual to 3 lanes FPS 29m A2 Widening, Widen 2.4km of single carriageway to four lane Greenisland carriageway between Jordanstown and Seapark. PP 39m Link s and Trunk Roads A20 New 2.0km link road from Blair Mayne Rd South to Newtownards Comber Rd to Portaferry Rd in conjunction with Southern Castlebawn Development Distributor PP 3m A20 Newtownards Frederick Street Link A24 Ballynahinch A28 Armagh East A29 Carland Bridge Improvement A29 Cookstown Eastern Distributor A31 Magherafelt New 0.3km single carriageway link road PP 2m 4.1km single carriageway bypass with climbing lanes FPS 12m 1.5 km single carriageway link road from Portadown Rd. to Newry Rd FPS 6m 1.3km of single carriageway realignment PP 4m 2.8 km single carriageway distributor road between Dungannon Rd. roundabout and Old Coagh Rd 3.0km single carriageway bypass linking Moneymore Rd. and Castledawson Rd FPS 13m FPS 13m

9 Annex A Scheme Description Status Cost m A32 Cherrymount New 1.1km single carriageway link road PP 4m Link A3 Armagh North and West link New 3.8km single carriageway link road to Portadown PP 28m Notes: 1: CP Construction Programme PP Preparation Pool (within 5 years) FPS Forward Planning Schedule (5 to 10 years)

10 Annex B PROPOSED ADDITIONAL SRI SCHEMES TO BE ADDED TO PROGRAMME SUBJECT TO CONSULTATION Scheme Description Cost m Eastern Seaboard M2 / A8(M) Sandyknowes Junction Westlink / York St flyover M1 Slip Roads at Blacks Road M1 / A1 Sprucefield A1 Junctions Improvement to link the A8 Larne to the M2 motorway without being delayed at the Sandyknowes roundabout. Provide grade separated junction at the last remaining part of Westlink which has a traffic signalled junction. 2 west facing on/off slips at the M1 Blacks Road junction, to relieve local roads carrying traffic to and from the M1 (west). Approx 4km of high standard dual carriageway from M1 motorway to A1 at Hillsborough, bypassing Sprucefield Retail Centre and including flyover at Hillsborough roundabout. 4 additional flyover junctions and central safety fence to upgrade the A1 between Sprucefield & Loughbrickland to a higher standard dual with no at-grade crossings. Northern A2 Ballykelly 6km of 2+1 single carriageway to bypass Ballykelly. A26-7km of standard dual carriageway between Ballymoney to Ballymoney (Portrush Road roundabout) and Coleraine Coleraine (Windyhall) A26 Nutt's Corner to M1 Moira Western A5 Londonderry to Victoria Bridge. South Western A4 Enniskillen Southern Provision of 2+1 carriageway widening schemes. 30km of new route to 2 +1 standard, including bypasses of New Buildings, Maghermason, Strabane and Sion Mills. 3.2km of 2+1 single carriageway to bypass Enniskillen. 10m 50m 5m 45m 22m 30m 35m 15m 130m 18m A4 Fivemiletown 3.4km of 2+1 single carriageway to bypass Fivemiletown. 12m Link s and Trunk Roads A3 Portadown Richill Dualling 6.5km of standard dual carriageway. 33m A32 Dromore - Irvinestown - Enniskillen Programme of single carriageway improvement and realignment schemes including 2+1 sections. 10m 415m

11 Annex C LIST OF SCHEMES THAT PERFORMED WELL IN THE ASSESSMENT BUT NOT AFFORDABLE WITHIN ISNI FUNDING ENVISAGED TO 2015 Scheme Description Location Cost m Eastern Seaboard M1 Widening Sprucefield to Black's road North Western Queens Quay, Londonderry. Northern Greysteel Western A5 Omagh South Western A4 Improvements Provision of additional lane in both directions, possibly using hard shoulder running. 0.5 km of 4 Lane urban road to widen the last remaining 2 lane section between Craigavon Bridge and Culmore Roundabout. 5.5km single carriageway bypass of Greysteel, linking to the proposed Ballykelly. Outer bypass of Omagh for strategic through traffic, to single carriageway 2+1 standard. Series of widening schemes Link s and Trunk Roads Newry Southern Relief Road A3 Killylea Road to Monaghan Road Armagh A3 Northway Junction Strategic link from Warrenpoint to the A1, avoiding Newry City Centre. Proposed measures to be developed and costed in feasibility study. 2+1 single carriageway extension of the Armagh North and West link scheme, currently in the Preparation Pool. Improvement of key junction for Portadown local traffic and through traffic to Armagh. Eastern Seaboard North Western Northern Western South Western Trunk road Link Link 18m 10m 27m 22m 10m Not yet known 6m 8m

12 A E X D L en d A e x A SCHEMES IN CUR R ENT SRI PRO GRAMM E A e x B PRO POS ED ADDI TI NA L SRI SCHEMES TO BE ADDED TO PRO GRAMM E SUB J ECT TO CONSUL TATI N A e x C SCHEMES TH T PER ORM ED WELL IN THE ASS ES M ENT BUT NOT AFF ORDABL E ITH N ISNI FUN DIN G ENVIS AG ED TO 2015 B lycastl e L g h F e C erain e A26 Ballymone y - Colerain e 5. m A2 Wid enin g Bun cran a Rd Qu en s Quay ke g e Link 5. m A2 Bro adbridg e 5. m A514 Cre scen t Link 5. m ON ON ERR Y A2 Bally ke ly Byp as s A2 Gre ystee l Byp as s L avad y B lymone y A26 Gla rryfor d - A44 N A6 Der r y to Dun give 50 0 m D r y to Vic tori a Bridg e (in cludin g byp as s of New Bui ldings, Mag hermason, Str aban e & Sion Mil ls ) 0.0 m 5/ 1 4 Str aban e - Lif for d Link S aban e M herafel t A31 Mag herafel t Byp as s B lymen a A6 M22 - Cas tledawso n 6/ 2 Balle e Rd East m 0 M2 Cross ke na n Slip s A ri m L n e C rickfergu s A2 Gre enislan d wid enin g go r B E ter n Div isio n M A8(M ) Sandy kn we s jun ctio n M A12/M 3 York St - Wes tlin k g d e sep arate d jun ctio n 50 m 0 M1 Bla c ks Rd slip roa d s 5. m M A 1 Spr ucefield i ludin g gra d e sep arate d L bur n Rd/ Hillsboroug h Rd jun ctio n 5 m A5 Oma g h Byp as s Om g h A5 Oma g h Thr oughpas s A29 Coo ks ow n Eas ter n Dis tributo r C kstow n A29 Car lan d Bridg e D ganno n L g h N g h FAS B T M1 Wes tlin k upg rad e 4.0 m L bur n M2 Wid enin g A26 Nut t s Cor ne r - M1 Moir a 5. m A ydenha m Byp as s townard s N A55 Kno c k Rd wid enin g A Newtownard s Sou ther n Dis tributo r be r C C ryduf f M1 Spr ucefield - Bla c ks Rd Wid enin g A Newtownard s Fre deric k Str ee t Link S angfor d L g h L e r Lou g h Erne A4 Hen r y St/ Slig o Rd A32 Dro mor e - Irv inestow n - Enn is ki le n A32 Che rrymoun t Link E iskille n En is ki le n Sou ther n Byp as s A4 Imp rovement s A4 Fiv emiletow n Byp as s ga n L A4 Dun ganno n - Ballygawle y 2.0 m A A 5 Annaghilla/ Tu lyva r A3 Nor thwa y Jun ctio n 6. m igavo n C tadow P n A3 Por tadow n - Ric hil l A3 Arm ag h Nor t h & West Link bridg B e ag h A A3 Killyle a Rd to A28 Arm ag h East M agha n Rd 6. m 6. m D mor e A1 Jun ctio n Imp rovement s 6. m A1 Loughbric kl n d - Bee c h Hill 5. m B lynahinc h A1 Jun ction s exp ande d SRI.0 S ntfiel d A24 Ballynahinc h Byp as s D npatric k U e r L g h Er e N castl e A1 Bee c h Hill - Clo ghogu e 9.0 m K ilometer s A1 New r y - bor de r N y N r y Sou ther n Relie f Road TB.0 m W renpoin t M ile s R roduce d by per missio n of the Ord anc e Sur ve y of Nor ther n Ire lan d on beh alf of the C trolle r of Her Majesty' s Sta tioner y Off ic Cro w n cop yrigh t Per mit No l r

13 Expanding the Strategic Road Improvement Programme 2015 Annex E : The Regional Strategic Transport Network Cross Border Routes Figure 1.1 The Regional Strategic Transport Network International /European Ports Ballycastle Portrush A44 Ports Coleraine A37 Ballymoney Belfast International Airport Limavady A26 A2 LONDONDERRY A26 Airports N13 A29 Letterkenny Dungiven Larne A6 M2 Ballymena Strabane A36 A6 A26 N15 Magherafelt M22 A57 A5 A8 A31 A6 Carrickfergus Newtownstewart A29 Antrim Newtownabbey M2 A505 A57 Bangor Cookstown Lough A21 BELFAST A20 Neagh Newtownards Omagh A26 M3 A29 Comber M1 Strangford Lough Lisburn A5 Lower Dungannon M1 Lough Lurgan A46 Erne A32 A5 Craigavon A7 A29 Portadown Ballynahinch A4 Aughnacloy A3 A24 Banbridge Armagh Downpatrick Enniskillen A27 To Sligo A4 A3 A28 Upper A2 Lough Erne Key Transport s Monaghan Newcastle Link s A509 Newry Trunk Roads N2 A2 Railways A509 Warrenpoint A1 A1 Railway Services Discontinued N1 N3 To Athlone To Dublin To Dublin Shaded area represents BMA Reproduced by permission of the Ordinance Survey of NI on behalf of the controller of Her Majesty s Stationery Office Crown Copyright 2003.

1-19 STONE ROW & STABLE LANE

1-19 STONE ROW & STABLE LANE MIXED USE INVESTMENT WITH SIGNIFICANT ASSET MANAGEMENT OPPORTUNITIES 1-19 STONE ROW & 20-22 STABLE LANE COLERAINE Excellent Opportunity to Acquire a Prominent Town Centre Mixed Use Investment with Substantial

More information

3-5. Church Street. Coleraine RETAIL INVESTMENT OPPORTUNITY

3-5. Church Street. Coleraine RETAIL INVESTMENT OPPORTUNITY 3-5 Church Street Coleraine RETAIL INVESTMENT OPPORTUNITY Excellent Opportunity to Acquire Two Prominent Ground Floor Retail Units INVESTMENT SUMMARY: The properties are located in Coleraine, County Londonderry,

More information

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017 A127/A130 Fairglen Interchange Improvement Schemes Information Leaflet February 2017 1 2 Foreword By Councillor Kevin Bentley Essex is continuing to grow as a vibrant economic hub and as a fantastic place

More information

Library Events July and August 2018

Library Events July and August 2018 Big Summer Read 2018 Sea to Shore Library Events July and August 2018 Big Summer Read 2018 Sea to Shore Ahoy there Welcome to the Big Summer Read 2018 Libraries NI is delighted to present the Big Summer

More information

1.0 Introduction. 2.0 Regional Policy Context

1.0 Introduction. 2.0 Regional Policy Context Local Development Plan Transportation October 2018 1.0 Introduction 1.1 This background paper has been prepared to draw together the evidence base that has been used to inform the preparation of the Fermanagh

More information

CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION

CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION Title: Prepared by: A9 Dualling Project: Dalraddy to Slochd Murray Ferguson, Director of Planning and Rural Development and Gavin Miles, Head of Planning

More information

LET US KNOW WHAT YOU THINK

LET US KNOW WHAT YOU THINK A164 and Jock s Lodge Junction Improvement Scheme Funding Bid PUBLIC CONSULTATION November 2017 Public Exhibition to be held at Beverley Racecourse on Wednesday 8 th November 2017 between 9.30 am and 6.45

More information

Cork to Limerick Route Pre-Feasibility Study Update

Cork to Limerick Route Pre-Feasibility Study Update Cork to Limerick Route Pre-Feasibility Study Update November 2008 Document Title: Cork to Limerick Route Pre-Feasibility Study Update Document Ref(s). : Date Rev Status Originator Checked Approved 01/12/08

More information

Police Recorded Injury Road Traffic Collisions and Casualties Northern Ireland. Detailed Trends Report 2015

Police Recorded Injury Road Traffic Collisions and Casualties Northern Ireland. Detailed Trends Report 2015 Police Service of Northern Ireland Police Recorded Injury Road Traffic Collisions and Casualties Northern Ireland Detailed Trends Report 2015 Annual Bulletin Published 30 th June 2016 Contact: Traffic

More information

14 EFFECTS ON ALL TRAVELLERS

14 EFFECTS ON ALL TRAVELLERS 14 EFFECTS ON ALL TRAVELLERS 14.1 Executive summary 14.1.1 The aim of the assessment was to determine the potential impacts of the Proposed Scheme on the users of long distance routes and local roads.

More information

NRA New Divided Road Types: Type 2 and Type 3 Dual-carriageways

NRA New Divided Road Types: Type 2 and Type 3 Dual-carriageways NRA New Divided Road Types: Type 2 and Type 3 Dual-carriageways BENEFITS of the TYPE 2 and TYPE 3 DUAL CARRIAGEWAY ROAD TYPE There are significant safety and economic benefits associated with the Type

More information

Economic development the challenge of the new normal

Economic development the challenge of the new normal Economic development the challenge of the new normal Neil Gibson, Director of Regional Services 24th November 2010 Overview The new normal globally The new normal in Northern Ireland Inequalities and imbalances

More information

EuroRAP 2008: Ireland Results Risk and Star rating of Ireland s major roads

EuroRAP 2008: Ireland Results Risk and Star rating of Ireland s major roads www.aaireland.ie EuroRAP 2008: Ireland Results Risk and Star rating of Ireland s major roads 2 Foreword (Motoring Clubs) The AA, Roads Service Northern Ireland and the National Roads Authority have been

More information

NRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways

NRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways NRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways DN-GEO-03059 December 2007 DN Design Technical TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland

More information

Improving the A1 in Northumberland Public consultation. November December North of Ellingham

Improving the A1 in Northumberland Public consultation. November December North of Ellingham A1 Improving the A1 in Northumberland Public consultation November December 2016 North of Ellingham Improving the A1 in Northumberland In autumn 2014, the government announced the first Road Investment

More information

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design Cycle traffic and the Strategic Road Network Sandra Brown, Team Leader, Safer Roads- Design Highways England A Government owned Strategic Highways Company Department for Transport Road Investment Strategy

More information

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria, 1.0 Introduction 1.1 The Transport Assessment has been prepared on behalf of Eon and Roger Bullivant Ltd in respect of the proposed mixed use sustainable urban extension of Drakelow Park. 1.2 The methodology

More information

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016 Context. Author: Parish Clerk 2 The Draft Integrated Transport Policy (DITS) sets out a vision and objectives, and identifies a detailed programme of interventions to support the Maidstone Borough Local

More information

Broom Hill/Blackberry Hill Walking and Cycling Improvements

Broom Hill/Blackberry Hill Walking and Cycling Improvements Broom Hill/Blackberry Hill Walking and Cycling Improvements Introduction Bristol has been awarded additional funding from the UK government to upgrade and extend walking and cycling routes across the city.

More information

A465 Heads of the Valleys Dualling Sections 5 and 6 Dowlais Top to Hirwaun SUMMARY PROOF OF EVIDENCE. Highways Engineering Document WG 1.3.

A465 Heads of the Valleys Dualling Sections 5 and 6 Dowlais Top to Hirwaun SUMMARY PROOF OF EVIDENCE. Highways Engineering Document WG 1.3. A465 Heads of the Valleys Dualling Sections 5 and 6 Dowlais Top to Hirwaun SUMMARY PROOF OF EVIDENCE Highways Engineering Document WG 1.3.2 by Jonathan Thirkettle MARCH 2018 1. Introduction 1.1 I am Jonathan

More information

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013 Douglas Land Use and Transportation Strategy (DLUTS) Summary August 2013 Background Douglas is a large and popular residential suburb of approximately 30,000 persons on the periphery of Cork City along

More information

SCHEME DESIGN AND ENGINEERING

SCHEME DESIGN AND ENGINEERING THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK CLASSIFIED ROAD) SIDE ROADS ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK) COMPULSORY PURCHASE ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL

More information

CONTROL AND COMMUNICATIONS PROVISION PART 1 TD 46/05 MOTORWAY SIGNALLING SUMMARY

CONTROL AND COMMUNICATIONS PROVISION PART 1 TD 46/05 MOTORWAY SIGNALLING SUMMARY DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 9 SECTION 1 NETWORK - TRAFFIC CONTROL AND COMMUNICATIONS STANDARDS OF PROVISION PART 1 TD 46/05 MOTORWAY SIGNALLING SUMMARY This issue of TD 46 incorporates Interim

More information

Place Exhibit Prize Title Christian Name Surname Town County Mr K Hawkes Omagh Co Tyrone M/s A & T Irwin Omagh Co Tyrone

Place Exhibit Prize Title Christian Name Surname Town County Mr K Hawkes Omagh Co Tyrone M/s A & T Irwin Omagh Co Tyrone Results for Cattle CATTLE Place Exhibit Prize Title Christian Name Surname Town County 12 BEST PAIR OF DAIRY COWS 1 46 23.75 Mr K Hawkes Omagh Co Tyrone 2 50 19.00 M/s A & T Irwin Omagh Co Tyrone 3 45

More information

Proposed: Temporary Traffic Management Design Guidance

Proposed: Temporary Traffic Management Design Guidance Current Temporary Traffic Management Guidance Structure: Chapter 8 Traffic Signs Manual First published in 1996, updated 2007 Addendum in 2010 Guidance for the Control and Management of Traffic at Road

More information

Community engagement guide May 2018

Community engagement guide May 2018 Community engagement guide May 2018 Greater Wellington Regional Council (GWRC), Hutt City Council (HCC) and the New Zealand Transport Agency (NZTA) are working together to achieve some big improvements

More information

Roads and public rights of way

Roads and public rights of way Roads and public rights of way This factsheet outlines how the effects of the Proposed Scheme on roads and public rights of way (PRoW) along the line of route would be managed. Version 1.0 Last updated:

More information

Police Recorded Injury Road Traffic Collisions and Casualties Northern Ireland

Police Recorded Injury Road Traffic Collisions and Casualties Northern Ireland Police Service of Northern Ireland Police Recorded Injury Road Traffic Collisions and Casualties Northern Ireland Monthly Report Covering the reporting period 1 st January 2018 31 st August 2018 Published

More information

2. Context. Existing framework. The context. The challenge. Transport Strategy

2. Context. Existing framework. The context. The challenge. Transport Strategy Transport Strategy Providing quality connections Contents 1. Introduction 2. Context 3. Long-term direction 4. Three-year priorities 5. Strategy tree Wellington City Council July 2006 1. Introduction Wellington

More information

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008 Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008 The following amendments to the wording of the maintenance strategy apply following the revised maintenance

More information

Guildford Borough (Draft)

Guildford Borough (Draft) ITEM Annex Page 7 Guildford Borough (Draft) Forward Programme Part A This is a work in progress and its completion is subject to the adoption of the Local Plan and Infrastructure Delivery Schedule November

More information

Helen Hughes Senior Project Manager

Helen Hughes Senior Project Manager Helen Hughes Senior Project Manager hhughes@nra.ie What is a 2+1 Road? A road with two lanes in one direction and one in in the other The two lane section is provided alternately for each direction of

More information

DOE Climate Change Proposals

DOE Climate Change Proposals DOE Climate Change Proposals Sustrans response to Proposals for Taking Forward NI Climate Change Legislation January 2016 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable.

More information

IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING

IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING BBAG BRIEFING NOTE EMAIL: BERMUDABRIDGEAGP@BTINTERNET.COM WWW.FACEBOOK.COM/GROUPS/BERMUDABRIDGEAG TWITTER @BERMUDABRIDGEAG CYCLING BBAG BRIEFING NOTE

More information

Technical note. 1. Introduction

Technical note. 1. Introduction Project: A428 study - Phase 2 To: Adrian Shepherd Subject: Park & Ride site locations From: Atkins Date: Jun 3, 2016 cc: Ashley Heller 1. Introduction 1.1. Purpose of Technical Note The purpose of this

More information

PUBLIC INQUIRY QUESTION

PUBLIC INQUIRY QUESTION M4 Corridor around Newport PUBLIC INQUIRY QUESTION REFERENCE NO. : PIQ/156 RAISED BY: The Inspector DATE: 31/01/18 RESPONDED BY: Matthew Jones DATE: 02/03/18 SUBJECT: The Welsh Government s response to

More information

CUERDEN TRANSPORT PROPOSALS

CUERDEN TRANSPORT PROPOSALS 1 CUERDEN TRANSPORT PROPOSALS The transport assessment, submitted with the Cuerden development planning application, looks at access to the site and the impact on the local road network in detail. This

More information

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

More information

Bus and Transit Lane Review Update

Bus and Transit Lane Review Update Board Meeting / 25 February 2013 Agenda Item no.8(i) Bus and Transit Lane Review Update Glossary Auckland Transport New Zealand Transport Agency Transit Two Transit Three (AT) (NZTA) (T2) (T3) Executive

More information

BELFAST ON THE MOVE Transport Masterplan for Belfast City Centre

BELFAST ON THE MOVE Transport Masterplan for Belfast City Centre BELFAST ON THE MOVE Transport Masterplan for Belfast City Centre CIHT Technical Evening 23 February 2015 Ciarán de Búrca, Director Transport Projects Division Civic Spine Background Belfast Metropolitan

More information

Published 24th June 2016 Published 31 st August Police Service of Northern Ireland Police Service of Northern Ireland

Published 24th June 2016 Published 31 st August Police Service of Northern Ireland Police Service of Northern Ireland Police Service of Northern Ireland Police Service of Northern Ireland Police Recorded Injury Road Traffic Police Recorded Injury Road Traffic Collisions and Casualties Collisions and Casualties Northern

More information

2018 Irish Short Circuit Championships

2018 Irish Short Circuit Championships 2018 Irish Short Circuit Championships Positions at 26th July Irish. Sidecar Class. 8 Rounds 1 55 Peter O'Neill / Alvin Griffin. LCR Kawasaki 188 3 Race Wins Dundrod 2 1 Dylan Lynch / Mark Gash. LCR Suzuki

More information

Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016

Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016 Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016 1. Introduction The concept of the Sustainable Movement Corridor (hereafter the SMC ) was first developed

More information

Welsh Government Trunk Road Maintenance Manual

Welsh Government Trunk Road Maintenance Manual Welsh Government Trunk Road Maintenance Manual into Value for Money of Motorway and Trunk Road Investment. the Welsh Government's specification 'Trunk Road Maintenance Manual' (TRMM). This. 11 Materials,

More information

NORTH TURNAROUND. Recommended Design: Expand the existing transit terminal

NORTH TURNAROUND. Recommended Design: Expand the existing transit terminal NORTH TURNAROUND Recommended Design: Expand the existing transit terminal Feedback from stakeholders and the public: Make it easy to transfer between local and Rapid Transit service Why is this design

More information

National Planning Framework National Development Plan ( )

National Planning Framework National Development Plan ( ) Project Ireland 2040 National Planning Framework National Development Plan (2018-2027) Tara Spain Head of Land Use Planning TII Geraldine Fitzpatrick Head of Roads Capital Programme TII. September 2018

More information

M6 Junction 10 Public Consultation

M6 Junction 10 Public Consultation M6 Junction 10 Public Consultation December 2015 Introduction Walsall Council and Highways England are developing plans to provide a long term improvement to M6 junction 10. We are holding this non-statutory

More information

A future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network

A future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network Need for a strategy 1. The government s aim is to double cycling levels nationally by 2025 [note 1]. This would bring significant health, environmental, economic and traffic benefits [note 2]. It is widely

More information

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development BELFAST RAPID TRANSIT Ciarán de Búrca Director, Transport Projects Division Department for Regional Development Objectives of Belfast Rapid Transit To provide a modern, safe, efficient and high quality

More information

Progress with the Road Investment Strategy

Progress with the Road Investment Strategy Report by the Comptroller and Auditor General Department for Transport and Highways England Progress with the Road Investment Strategy HC 1056 SESSION 2016-17 22 MARCH 2017 4 Key facts Progress with the

More information

Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age.

Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age. Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age 30 th March 2015 1 Presentation Overview Roles and responsibilities Snapshot of Key Challenges

More information

Wellington Public Transport Spine Study

Wellington Public Transport Spine Study Wellington Public Transport Spine Study Study purpose Feasibility study Options for a high quality, high frequency PT system Key action from Ngauranga to Airport Corridor Plan (2008) Long-term outlook

More information

Donegal National Roads Design Office. Phase 1: Scheme Feasibility Report. TEN-T Priority Route Improvement Project, Donegal

Donegal National Roads Design Office. Phase 1: Scheme Feasibility Report. TEN-T Priority Route Improvement Project, Donegal Donegal National Roads Design Office Phase 1: Document Control Sheet Client: Project Title: Document Title: Document No: TT_MGT0337-RPS-00-ZZ-RP-Z-RP1002 Text Pages: 37 Appendices: 1 Rev. Status Date Author(s)

More information

A30 Chiverton to Carland Cross Moving forward: The application

A30 Chiverton to Carland Cross Moving forward: The application A30 Chiverton to Carland Cross Moving forward: The application Foreword We are pleased to share the final plans for the A30 Chiverton to Carland Cross scheme with you following the submission of our application

More information

A52 Nottingham Junctions Nottingham Knight and Wheatcroft Public information exhibition

A52 Nottingham Junctions Nottingham Knight and Wheatcroft Public information exhibition Nottingham Junctions Nottingham Knight and Wheatcroft Public information exhibition Aerial view of Wheatcroft roundabout Introduction Investing in our roads At Highways England we believe in a connected

More information

Welcome. Knutsford to Bowdon Improvement. Start of works exhibition November An executive agency of the Department for Transport

Welcome. Knutsford to Bowdon Improvement. Start of works exhibition November An executive agency of the Department for Transport Start of works exhibition November 2014 Welcome Scheme plan A56 Bowdon A56 M56 Booth Bank Junction 8 M56 Millington Lane Cherry Tree Lane Junction 7 Millington Hall Lane Rostherne Mere Rostherne Lane N140519

More information

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,

More information

TRASBURG RANSPORTATION

TRASBURG RANSPORTATION TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION

More information

CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT PHASE 2 PUBLIC CONSULTATION MADINGLEY MULCH ROUNDABOUT TO CAMBOURNE

CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT PHASE 2 PUBLIC CONSULTATION MADINGLEY MULCH ROUNDABOUT TO CAMBOURNE CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT PHASE 2 PUBLIC CONSULTATION MADINGLEY MULCH ROUNDABOUT TO CAMBOURNE Have your say on proposals for a new public transport link and Park & Ride facility

More information

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR SAY Consultation open from 24 September to 5 November 2018 Contents Introduction 3 Background 4 Springwood Drive Roundabout

More information

Road to the future What road users want from Highways England s Route Strategies Summary report November 2016

Road to the future What road users want from Highways England s Route Strategies Summary report November 2016 Road to the future What road users want from Highways England s 2020-25 Route Strategies Summary report November 2016 Road to the future Summary report Foreword Guy Dangerfield Transport Focus aims to

More information

Updated A before and after study of 3M Driver Feedback Signs

Updated A before and after study of 3M Driver Feedback Signs Updated 2006 A before and after study of 3M Driver Feedback Signs 3 Site 1 Cleves Cross, Ferryhill, County Durham Site Description Cleves Cross is on the eastern side of Ferryhill. The site is approximately

More information

Race Manual. Under Cycling Ireland Technical Rules and Regulations

Race Manual. Under Cycling Ireland Technical Rules and Regulations Race Manual Under Cycling Ireland Technical Rules and Regulations 1 Table of Contents Race Schedule... 4 Race Officials... 5 Stage 1... 6 Stage 1 Route Notes... 6 Stage 1 Map... 8 Stage 1 Route Profile...

More information

Upgrade to smart motorway Junctions 3 to 12

Upgrade to smart motorway Junctions 3 to 12 Upgrade to smart motorway Junctions 3 to 12 Information exhibitions July 2018 About smart motorways Smart motorways are a technology All lane running driven approach to the use of our motorways, increasing

More information

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN 8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN The Transportation Services Committee recommends the adoption of the recommendation contained in the following report

More information

New Directions in Street Auditing: Lessons from the PERS Audits. David Allen, Transport Research Laboratory. Spencer Clark, Transport for London

New Directions in Street Auditing: Lessons from the PERS Audits. David Allen, Transport Research Laboratory. Spencer Clark, Transport for London New Directions in Street Auditing: Lessons from the PERS Audits David Allen, Transport Research Laboratory Spencer Clark, Transport for London TRL (Transport Research Laboratory) and TfL, Transport for

More information

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport LONDON BOROUGH OF RICHMOND UPON THAMES Cabinet Member Decision DATE: January 2012 REPORT OF: LEAD OFFICER: SUBJECT: WARDS: The Cabinet Member for Highways & Streetscene Aurang Zeb - Head of Highways &

More information

2017 Ulster Short Circuit Championships.

2017 Ulster Short Circuit Championships. 2017 Ulster Short Circuit Championships. Positions after St Angelo 7th October Young Guns Class. 17 Rounds 1 Cameron Dawson 125cc Aprilia 2 321 5 Race Wins Dungannon 2 Brendan Glover 125cc Aprilia 67 279

More information

Douglas Land Use and Transportation Study

Douglas Land Use and Transportation Study Douglas Land Use and Transportation Study Summary: Key: Yellow Box = key project information Green Box = project recommendations Grey Box = anticipated project outcomes Background: It is an objective of

More information

APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION)

APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION) APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION) West Midlands Interchange Transport Assessment DCO Submission WEST MIDLANDS INTERCHANGE SUBJECT: Technical Note 22 Review of Vicarage Road Junction

More information

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails Chapter 7 Transportation Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails 7.1 TRANSPORTATION BACKGROUND The District of Maple Ridge faces a number of unique

More information

CAMBRIDGE SOUTH WEST PARK & RIDE

CAMBRIDGE SOUTH WEST PARK & RIDE CAMBRIDGE SOUTH WEST PARK & RIDE Have your say on: Extra Park & Ride spaces to the south west of Cambridge Bus priority measures into the city centre CREATING MORE PARK & RIDE SPACES The existing Park

More information

PROPOSED RESIDENTIAL SUBDIVISION

PROPOSED RESIDENTIAL SUBDIVISION PROPOSED RESIDENTIAL SUBDIVISION PART OF TARNEIT ROAD & 1121 DOHERTYS ROAD, TARNEIT Prepared For: TCG (RM) Developments Pty Ltd MARCH 2014 OUR REF: 16740R#1 PROPOSED RESIDENTIAL SUBDIVISION PART OF TARNEIT

More information

GOLFING UNION OF IRELAND (ULSTER BRANCH)

GOLFING UNION OF IRELAND (ULSTER BRANCH) GLFING UNIN F IRELAND (ULSTER BRANCH) AIG JIMMY BRUEN SHIELD 2018 (ULSTER QUALIFYING SECTIN) T BE PLAYED N SUNDAY 6 MAY 2018 Blackwood 08:30 Blackwood, 08:30, Greenacres, Whitehead 09:15,, Kirkistown Castle

More information

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation Frascati Road and Temple Hill Route Improvements Outline Design Report to Accompany Public consultation September 2013 Background: Dún Laoghaire-Rathdown is committed to providing high quality pedestrian

More information

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING NOVEMBER 216 MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING Cambridgeshire County Council Type of document (version)

More information

Cycle Lanes Dixon Street (Worksop Road to Crayne Street)

Cycle Lanes Dixon Street (Worksop Road to Crayne Street) Cycle Lanes Dixon Street (Worksop Road to Crayne Street) Purpose of the Report To seek a decision to continue the on-road cycle lanes from Worksop Road to Crayne Street along Dixon Street in conjunction

More information

WELCOME TO OPEN HOUSE # 1 June 14, 2017

WELCOME TO OPEN HOUSE # 1 June 14, 2017 Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE # 1 June 14, 2017 Please sign in and join our mailing list Purpose of Open House #1 & Study Area York

More information

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY The Caledon Transportation Needs Study has been undertaken as a joint project by the Town of Caledon and the Region of Peel to determine the existing

More information

DRAFT BICYCLE STRATEGY for Northern Ireland

DRAFT BICYCLE STRATEGY for Northern Ireland Ms. Anne Burke Cycling Unit Department for Regional Development Clarence Court 10-18 Adelaide Street Belfast BT2 8GB The Tailor's Hall, Back Lane, Dublin 8. E: Damien.otuama@antaisce.org T: 01-7077064

More information

Cycle Routes. Traffic Advisory Leaflet 3/95 March Introduction. Implementation. Project aims. Design

Cycle Routes. Traffic Advisory Leaflet 3/95 March Introduction. Implementation. Project aims. Design Traffic Advisory Leaflet 3/95 March 1995 Cycle Routes Introduction The leaflet summarises the findings of the Cycle Routes Programme. This research was undertaken for the Department of Transport by the

More information

Alberta Highway 881. Corridor Management Plan. Session Forum 1 - Highways. Tri-Party Transportation Conference Moving Alberta Into the Future

Alberta Highway 881. Corridor Management Plan. Session Forum 1 - Highways. Tri-Party Transportation Conference Moving Alberta Into the Future Tri-Party Transportation Conference Moving Alberta Into the Future Alberta Highway 881 Corridor Management Plan Lac La Biche to Anzac Session Forum 1 - Highways March 2017 INTRODUCTION + 241 km long, 2

More information

Principles. 4biii. Good Urban Design

Principles. 4biii. Good Urban Design Principles Good Urban Design The Sherford approach to the hierarchy of travel modes is fostered and encouraged by a combination of influences. These are as follows, described in further detail below: Town

More information

5. WOODROFFE AVENUE BUS-ONLY LANES BASELINE STATION TO FALLOWFIELD PARK & RIDE CONSULTANT APPOINTMENTS CONTRACTS NOS. ETL , 6001 AND 6002

5. WOODROFFE AVENUE BUS-ONLY LANES BASELINE STATION TO FALLOWFIELD PARK & RIDE CONSULTANT APPOINTMENTS CONTRACTS NOS. ETL , 6001 AND 6002 5. WOODROFFE AVENUE BUS-ONLY LANES BASELINE STATION TO FALLOWFIELD PARK & RIDE CONSULTANT APPOINTMENTS CONTRACTS NOS. ETL 99-6000, 6001 AND 6002 COMMITTEE RECOMMENDATIONS That Council approve: 1. The award

More information

Dundalk Western Transportation Infrastructure. Supplementary Development Contribution Scheme

Dundalk Western Transportation Infrastructure. Supplementary Development Contribution Scheme Comhairle Baile Dhún Dealgan Dundalk Town Council Comhairle Chondae Lú Louth County Council Dundalk Western Transportation Infrastructure Supplementary Development Contribution Scheme Adopted by Louth

More information

SH3 Waitara to Bell Block

SH3 Waitara to Bell Block SH3 Waitara to Bell Block NZ Transport Agency August 2017 Community feedback report Copyright information This publication is copyright NZ Transport Agency. Material in it may be reproduced for personal

More information

Club Name Club County Club Province Delegates

Club Name Club County Club Province Delegates Aldergrove Cycling Club Antrim Ulster 2 Ballycastle CC Antrim Ulster 3 Ballymena Road Club Antrim Ulster 4 Ballymoney Causeway Coast Rouleurs Antrim Ulster 3 Ballymoney CC Antrim Ulster 4 Bann Wheelers

More information

BRIEFING NOTES FOR THE SEASON 2018/2019

BRIEFING NOTES FOR THE SEASON 2018/2019 BRIEFING NOTES FOR THE SEASON 2018/2019 FOA: Club Youth Officers Introduction If you are continuing in office with your club, thank you for your service to your club and Ulster Hockey. If you are taking

More information

INTERIM ADVICE NOTE 188/16

INTERIM ADVICE NOTE 188/16 INTERIM ADVICE NOTE 188/16 Guidance on Omission of Warning Lights (Road Danger Lamps) for Relaxation Works on Dual Carriageways Summary Guidance for omission of warning lights (road danger lamps) in temporary

More information

North of Ireland Family History Society. MeMbers Interests Names being Researched

North of Ireland Family History Society. MeMbers Interests Names being Researched MeMbers Interests Names being Researched Acheson Drumadillar, Devenish, Fermanagh Pre 1820 + B1804 Adams Newry 1800s B1716 Agnew Ballyclare, Antrim 1750-1850 B2300 Aicken Bangor, Co Down 1700-1920 A3501

More information

Feedback form. Let s get started. Waihi to Tauranga Corridor. You can

Feedback form. Let s get started. Waihi to Tauranga Corridor. You can Waihi to Tauranga Corridor Feedback form We appreciate you taking the time to provide feedback on the short list of options under consideration for State Highway 2 between Waihi and Tauranga. The different

More information

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY HAMILTON BIKING PLAN 2015-2045 OUR VISION: A BIKE FRIENDLY CITY INTRODUCTION Biking as a travel option is experiencing a resurgence internationally and in New Zealand, growing as a familyfriendly and healthy

More information

The Ten-T Regulation, the Core Network and Protected Roads

The Ten-T Regulation, the Core Network and Protected Roads The Ten-T Regulation, the Core Network and Protected Roads Michelle Doyle 29 September 2016 Ten-T An EU Regulation therefore binding in its entirety Member States shall take appropriate measures to complete

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

The Dance United Northern Ireland Collection

The Dance United Northern Ireland Collection The Dance United Northern Ireland Collection N33 The National Dance Archive of Ireland University of Limerick The National Dance Archive of Ireland University of Limerick The Dance United Northern Ireland

More information

Initial ideas for bus and cycle links

Initial ideas for bus and cycle links Initial ideas for bus and cycle links HAVE YOUR SAY The Greater Cambridge City Deal working in partnership: Please complete the survey inside this leaflet or online at: www.gccitydeal.co.uk/a1307 by 1

More information

Maynooth Cycling Submission on North South Corridor

Maynooth Cycling Submission on North South Corridor Maynooth Cycling Submission on North South Corridor Maynooth Cycling welcomes the intention to improve facilities and quality of service for pedestrians and cyclists in Maynooth. In particular, we strongly

More information

Transportation Committee Project Priority List

Transportation Committee Project Priority List Transportation Committee Project Priority List Funded Priorities PRIORITY 1 - Interstate 81, Exit 310 Improvements Description: Construct improvements to Exit 310 interchange. Capital Cost: $54,200,000

More information

Aiming for Zero Road Worker Safety. Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012

Aiming for Zero Road Worker Safety. Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012 Aiming for Zero Road Worker Safety Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012 1. Road Worker Safety Strategy. RWS Strategic Target No. 1: achieve a substantial

More information

Transportation Master Plan Advisory Task Force

Transportation Master Plan Advisory Task Force Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved

More information